Scorecard A3
Plant Layout
Plant Flow Layout Improvement
Plant had 3 Significant problems with the shop floor organization.
1. The plant bottleneck was washing. This was due to a mismatch in the
capacity of the washers and the volumes required. A value stream
analysis was done to determine the bottleneck, the cause and the
solution.
2. The two stroke engine housings were made in a one man one
machine method that left much free time for the operator. A standard
work project was done to demonstrate that one man could run two
machines.
3. Four stroke engine housings and assemblies were also done on a one
man per machine basis. It was found through value stream analysis
of the assembly that the honing, assembly, OP 30 and wash could be
put together in one work cell.
Plant layout before improvement
Plant layout after improvement

More Related Content

Viewers also liked (6)

Shop Floor Layout
Shop Floor LayoutShop Floor Layout
Shop Floor Layout
 
Process Plant Layout
Process Plant LayoutProcess Plant Layout
Process Plant Layout
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for services
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plant layout
Plant layoutPlant layout
Plant layout
 

Similar to Plant layout a3

Can Crusher Project
Can Crusher ProjectCan Crusher Project
Can Crusher Project
Ali Taheri
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernization
Amitoj Kaur
 
Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decision
Rohit Raina
 

Similar to Plant layout a3 (20)

Puro water plant
Puro water plantPuro water plant
Puro water plant
 
Can Crusher Project
Can Crusher ProjectCan Crusher Project
Can Crusher Project
 
Textile plant layout.pptx
Textile plant layout.pptxTextile plant layout.pptx
Textile plant layout.pptx
 
O0123190100
O0123190100O0123190100
O0123190100
 
Workstation redesign
Workstation redesignWorkstation redesign
Workstation redesign
 
Reducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingReducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream Mapping
 
K034050900107
K034050900107K034050900107
K034050900107
 
S0330980102
S0330980102S0330980102
S0330980102
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernization
 
Design lean sysm
Design lean sysmDesign lean sysm
Design lean sysm
 
Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decision
 
6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT
 
INTERNSHIP REPORT AT DRONA AUTOMATIONS
INTERNSHIP REPORT AT DRONA AUTOMATIONSINTERNSHIP REPORT AT DRONA AUTOMATIONS
INTERNSHIP REPORT AT DRONA AUTOMATIONS
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 
EGR 590 Final GM
EGR 590 Final GM EGR 590 Final GM
EGR 590 Final GM
 
Wastewater Applications & Innovations
Wastewater Applications & InnovationsWastewater Applications & Innovations
Wastewater Applications & Innovations
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
The Performance Analysis of a Fettling Shop Using Simulation
The Performance Analysis of a Fettling Shop Using SimulationThe Performance Analysis of a Fettling Shop Using Simulation
The Performance Analysis of a Fettling Shop Using Simulation
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 

More from Edward Jones (9)

Resilient systems design
Resilient systems designResilient systems design
Resilient systems design
 
Resilient systems design
Resilient systems designResilient systems design
Resilient systems design
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Mahle scorecard a3
Mahle scorecard a3Mahle scorecard a3
Mahle scorecard a3
 
Syed salman abbas green belt nov15
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15
 
Yun Shen Green Belt
Yun Shen Green Belt Yun Shen Green Belt
Yun Shen Green Belt
 

Recently uploaded

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Recently uploaded (15)

Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 

Plant layout a3

  • 2. Plant Flow Layout Improvement Plant had 3 Significant problems with the shop floor organization. 1. The plant bottleneck was washing. This was due to a mismatch in the capacity of the washers and the volumes required. A value stream analysis was done to determine the bottleneck, the cause and the solution. 2. The two stroke engine housings were made in a one man one machine method that left much free time for the operator. A standard work project was done to demonstrate that one man could run two machines. 3. Four stroke engine housings and assemblies were also done on a one man per machine basis. It was found through value stream analysis of the assembly that the honing, assembly, OP 30 and wash could be put together in one work cell.
  • 3. Plant layout before improvement
  • 4. Plant layout after improvement