Development Plan for Wynyard Quarter
HISTORY OF WYNYARD QUARTER
1930– The Western Reclamation, now known as Wynyard Quarter was progressively constructed by Ports of Auckland’s predecessor,
the Auckland Harbour Board with the last component of the reclamation being completed in 1930.
2004- Early plans intended to name the new area 'Kahurangi', Māori for 'blue/precious jewel'. This has now been replaced with
'Wynyard Quarter', though it is still generally referred to as Tank Farm, including when talking about the whole Western Reclamation.
Others have suggested the label 'Tech-Farm', referencing a 2004 call to showcase on the waterfront New Zealand's best sustainable
design and technology, as well as anticipating the government's and council's 2012 initiative to establish an 'innovation precinct' within
the Wynyard Quarter.
Political and design processes were underway in the mid and late 2000s to define the future shape of the area, a change process that will
take up to 20 years. One of the main public inputs at that time was a wish for increased waterfront access, as well as the desire for more
parkland on the point. However, some of these wishes were muted from political sources, as the redevelopment of the area is to be paid
by the development of residential areas, with the available land for this use shrinking with an increase of the proposed park space.
Already mostly agreed on was a bridge connecting the new quarter to the Viaduct Basin.
2006- Ports of Auckland still owned 18ha of the 35ha site in 2006 when it was decided that the land would be transferred to its
parent company, Auckland Regional Holdings, owned by the Auckland Regional Council. Also in 2006 after 10-16 storey buildings
proposed met strong opposition, the revised July 2007 design contained only a small number of 14-storey towers, with the main
apartment strips along the eastern side of Wynyard Wharf being no higher than seven storeys at the road, stepping down to three storeys
at the water’s edge. In addition, the plan stated the new Western Reclamation zone was to be dominated by public transport, with the
targeted transport mix being 70% public transport / walking / cycling and 30% motor vehicle, a reversal of the rest of Auckland City.
Ferries are also mooted as possible connections.
HISTORY OF WYNYARD QUARTER CONTINUED
2007– In June 2007, more detailed concept plans were published after a year of negotiation between stakeholders. In the first stage of
the redevelopment, the eastern section of the Western Reclamation, along Jellicoe Street, was to be turned into an entertainment strip, to
complement similar areas on the eastern side of the Viaduct Basin, and to be completed in time for the 2011 Rugby World Cup. This area
was to be linked to the Auckland CBD via a new 'Te Wero' bridge, to be constructed as a lift- or swing bridge after an international design
competition, and expected to cost around NZ$35 million.
SeaLink runs a car and passenger ferry service to Great Barrier Island from a terminal at the base of Wynyard Wharf. The company was
seeking clarification of its future facilities in the area in 2007, as their lease was running out in 2010, and it was unlikely to invest a planned
NZ$19 million in a new terminal or start using a new, faster ferry vessel before legal concerns were sorted out. An ARC planning committee
noted that it supported the further provision of the ferry service in the area, though there had previously been concerns about the island
freight shipping not fitting into the redevelopment vision of the area. The Waterfront Plan completed 2012 does include the island ferry
terminal, to be in the same general area as before.
Late 2000’s - As of the late 2000s, the area was still used by the bulk liquid industry which provides NZ$1.2 billion of yearly
turnover, and 4000 jobs in the Auckland economy. There are also more than 100 marine companies around the area, with a NZ$400 million
yearly turnover, exporting items worth NZ$120 million per year.
2011- The August 2011 opening of the Wynyard Quarter to the general public, with the main features being the new Jellicoe Street and
North Wharf areas, as well as the open spaces around 'Silo Park' (designed by Taylor Cullity Lethlean and Wraight and Associates) and the
Viaduct Events Centre, were met with great public interest, and critical acclaim for the synthesis between open space and formerly
industrial use.
1. Wynyard Crossing (Te
Wero Bridge) –
pedestrian/cycle bridge
2. Viaduct Events Centre
(2011) - exhibition,
meeting and hospitality
space
3. Karanga Plaza – Public
Open Space: Features art,
steps down to the water’s
edge and is the perfect
spot to relax and watch
the world go by on the
large wooden recliners.
Also features Karanga
Kiosk – hub for info on
Wynyard Quarter
4. North Wharf (1910-15) -
redeveloped to strengthen
pedestrian and cycle
connectivity along the
waterfront axis. The
waterfront edge features
retail & hospitality
businesses and remains a
working wharf, accessible
to ferries and fishing
industries and the public
5. Jellicoe Street – runs
parallel to North Wharf
and connects Karanga
Plaza to marine related
activity in the West
including Silo Marina.
Primary destination for
entertainment, retail
commercial activity.
Includes up-market
shopping, dining,
bars/clubs and fishing
activity such as the fish
market.
6. Silo Park – The park
comprises of a combination
of grass areas, concrete
areas, low impact swales
(to manage water runoff
and filter pollutants) and
walkways. The combination
of these elements within
the park provides a setting
to host outdoor events
including Silo markets, an
open-air movie theatre,
exhibitions and other
events.
7. North Wharf Extension -
an extension to North Wharf
will facilitate its use for
recreational activities as well
as the potential for ferry and
water taxi services that will
compliment and support
the adjacent land based
activities.
1.Wynyard Wharf
2.Point Park
3.Beaumont Plaza
4.Public Open Space/Water Feature
5.Jellicoe Plaza
6.North Wharf
7.Wynyard Plaza
8.Madden Plaza/Viaduct Harbour Edge
9.Daldy Street Linear Park
10.Central Park
11.Gateway Plaza
A.Te Wero Bridge
B.North Wharf extension
C.Fanshawe Street intersections
D.Pedestrian Bridge
Purpose of
Development
 Mission: As most exciting and diverse places in
Auckland, the creation of marine park joining the
neighbourhood and new marine parks will open for
visitors and local’s to enjoy, offer a more exciting
and new Wynyard Quarter.
 Vision: Offer combination of residential, retail and
commercial development to support development of
stable, diverse, lively residential and business
community while keeping the existing industries.
Potential Market
Segments
• Families
• Schools/Educational Institutions
• Property Investors
• Upscale shoppers
AUCKQUATIC
Marine Park
Dolphin Pool
Dolphin and Seal Shows
Stingray Pool
Penguin Pool
Aquarium
Souvenir Shop
Indoor Garden
Coffee Shop
Car Park
Full Facilities For Those With
Disabilities
OTHER AuckQUATIC MARINE PARK DETAILS
Opening Times
5th April – 26th September (2020)
Monday – Thursday: 9:00am – 6:00pm
Saturday – Sunday: 10:00am – 5:00pm
27th September – 4th April (2020-21)
Monday – Thursday: 9:00am – 8:00pm
Saturday – Sunday: 9:00am – 7:00pm
Admission Costs
Adults - $40.00
Children (2-15 yrs) - $20.00
Under 2 Years – FREE!
Family Pass A (2 Adults, 1 Child) - $75.00
Family Pass B (2 Adults, 2 Children) - $100.00
Family Pass Additional Child - $15.00
• Added bonus – pre purchase your tickets
online and show your ticket to public transport
in order to receive free return travel on tram,
red link bus, or 010 bus.
Location
Located between ANZ Events Centre and Wynyard Wharf
ESTIMATED INITIAL INVESTMENT COST TO BUILD MARINE
PARK : $200 Million = 4 Years for return of initial investment
costs based on an average of 500,000 visitors a year at an
average spending rate of $100.00 per guest.
Residential
Accommodation
Three different styles of residences:
Pavilions - The pavilions are distinct, free-standing
buildings which overlook Daldy Street Park. The individual
pavilions are on a modest scale and provide for only one,
two or three apartments on each level. On the ground
floor of Daldy Street you will find boutique retailers and
cafés, while the pavilion apartments are accessed from a
lane off Pakenham Street.
Townhouses – A row of eight townhouses is accessed via
private patios and individual garages that open to the lane.
They are developed over three levels.
Apartments - The larger apartment building is situated
behind the row of townhouses and is accessed from a
Pakenham Street laneway. The apartments come with one,
two or three bedrooms. The intimacy of the lane makes
the ground floor of the apartments a perfect location for
cafés and boutique retail.
The residences are priced from $1,095,000 for a two
bedroom apartment with car park, and $1,460,000 for a
three bedroom apartment with car park.
Penthouses built on 132 Hasley are expected to go for in
excess of $5 million!
Commercial
Accommodation
Park Hyatt Hotel
Hawkins Group Ltd & China Construction NZ Ltd signed
the contract with Fu Wah International Group to deliver
the Park Hyatt Auckland hotel in the Wynyard Quarter
through a joint venture.
Hawkins built the ANZ Viaduct Events Centre and is
building the ASB Theatre, working on streetscaping
throughout the Wynyard Quarter and on the Precinct
Properties NZ Ltd Innovation Precinct project in Madden
St.
The 7-storey hotel on the former Team NZ site fronting
the Viaduct Basin will have a total floor area of
29,000m², 195 rooms, food & beverage outlets, event
spaces, a spa and a fitness centre that includes a 25m
pool.
Work is due to start this month for completion in late
2018.
Accessibility
WALKING/CYCLING
From Britomart Transport Centre, Wynyard Quarter
is a short five-minute walk down Quay Street,
on to Te Wero Island and across the new
Wynyard Crossing bridge.
Also plans to build a new pedestrian bridge to
establish a link to Victoria Park and adjacent areas.
DRIVING
From Fanshawe Street take either Halsey or
Beaumont Street onto Jellicoe Street.
RED INNER CITY LINK BUS
Wynyard Quarter – Britomart-
Queen Street – K-Road (return)
Monday to Saturday every 7 to 8
minutes from 6:25am to 11:25pm
Sundays and Public Holidays every
10 minutes for 7am to 11.20pm
010 BUS
Onehunga to Wynyard Quarter via Ponsonby, Williamson Ave,
Great North Road, Carrington Road and Mt Albert Road.
Monday to Friday every 30 minutes from 6:30am to 9am
then every hour until 3pm. Then every half hour until 6pm
PUBLIC TRANSPORT
PUBLIC TRANSPORT CONTINUED
TRAM
The 15 minute tramway circuit loops
around Halsey, Gaunt, Daldy and Jellicoe
Streets between the Auckland Viaduct
Basin and Westhaven Marina.
The tram however is currently closed
while the final stages of the road
developments in Wynyard Quarter takes place
and is expected to reopen in late 2016 and
will have a new 1.8km extension added which
connects the Wynyard Quarter loop to
Britomart (shown in green in photo).
Initially admission prices were $2.00 for
adults, $1.00 for children and $5.00 for a
family pass, however this was some time
ago and public transport prices have continued
to gradually rise so admission prices will
be revised prior to reopening of the tram
service.
Public Parking
CAR PARKS
If you're coming from Downtown Auckland,
Viaduct Harbour or Te Wero Island, the Downtown
car park is the most convenient located at
31 Customs Street West.
Disability car parking is available in the Jellicoe Street
Car Park at the end closest to the Playspace. There
is also disability car parking available behind the Viaduct
Events Centre.
There is a Wynyard Quarter carpark with the entrance
off Beaumont Street and Madden Street. First hour free—
$2 hour following that.
Other street side parking availability is indicated
on map.
LEGISLATION
RESOURCE MANAGEMENT ACT 1991
- The RMA promotes the sustainable management of
natural and physical resources such as land, air and
water.
(1) The purpose of this Act is to promote the
sustainable management of natural and physical
resources.
(2) In this Act, sustainable management means
managing the use, development, and protection of
natural and physical resources in a way, or at a rate,
which enables people and communities to provide for
their social, economic, and cultural wellbeing and for
their health and safety while—
(a) Sustaining the potential of natural and physical
resources (excluding minerals) to meet the reasonably
foreseeable needs of future generations; and
(b) Safeguarding the life-supporting capacity of air,
water, soil, and ecosystems; and
(c) Avoiding, remedying, or mitigating any adverse
effects of activities on the environment.
BUILDING ACT 2004 –
Building work in New Zealand is controlled by the
Building Act 2004 and the various Building Regulations
which includes the building code.
The purpose of the Act is to ensure that buildings:
• Are safe, sanitary and have suitable means of escape
from fire; and
• Contribute to the physical independence and well
being of people who use them
• Are designed, constructed and able to be used in ways
that promote sustainable development.
The regulations prescribe the Building Code with which
all building work must comply. Performance standards
that must be met include building:
• Durability
• Fire safety
• Sanitation (services and facilities)
• Moisture control
• Energy efficiency
• Access
POTENTIAL ENVIRONMENTAL IMPACTs
POSITIVE NEGATIVE
• Increased conservation of local area
including land, sea and air.
• Improvement of natural environment,
especially soil and water.
• Improvement of infrastructure
• Increased environmental awareness
• Conservation programmes of marine
life (education through Marine Park).
• Water, air, soil, noise pollution.
• Visual Pollution?
• Water and waste disposal problems
• Ecological disruption
• Environmental hazards
• Land use problems?
ENVIRONMENTAL IMPACT RISK ASSESSMENT
AIR QUALITY
VIADUCT WATER
QUALITY
SURFACE WATER
QUALITY
GROUND WATER
QUALITY
SOIL QUALITY
NOISE LEVELS
TYPE OF
IMPACT
EVALUATION OF IMPACT
NO IMPACT MINOR IMPACT MODERATE IMPACT SERIOUS IMPACT COMMENTS
WASTE DISPOSAL
VISUAL AMENITY
MANAGING ENVIRONMENTAL IMPACTs
NEGATIVE IMPACT EXAMPLES OF CONTROL MEASURES
Water pollution • Sewage treatment
• Industrial waste water treatment
• Erosion and sediment control for
construction sites
• Control of urban run off
Visual pollution; Land use problems • Application of land zoning regulations
• Architectural design standards
• Strategic/appropriate location placement
of visual construct
Water and waste disposal problems • Installation of water supply and sewage
disposal systems
• Use of proper solid waste disposal
techniques
• Recycling of water where applicable
Environmental hazards • Construction of adequate drainage to
prevent flooding
• Adequate setback of buildings from
shoreline
Ecological disruption • Management of visitor flow/use control
• Control on collection of plants, species
POTENTIAL SOCIO-ECONOMIC IMPACTs
POSITIVE NEGATIVE
• Economic benefits i.e. increased
revenue generation and contribution
to local economy
• Creates opportunities for employment
• Infrastructure/development
investment
• Increased carrying capacity
• Increase in local tourism numbers
• Loss of economic benefit through
leakages and uneven distribution of
benefits
• Infrastructure costs
• Overcrowding and loss of amenities
for residents
• Increase in prices e.g. local
commodities, land and real estate
SOCIO-ECONOMIc IMPACT RISK ASSESSMENT
LEAKAGES
INFRASTUCTURE
COSTS
OVERCROWDING
INCREASE IN
PRICES
TYPE OF
IMPACT
EVALUATION OF IMPACT
NO IMPACT MINOR IMPACT MODERATE IMPACT SERIOUS IMPACT COMMENTS
MANAGING SOCIO-ECONOMIC IMPACTs
NEGATIVE IMPACT EXAMPLES OF CONTROL MEASURES
Loss of economic benefit through leakages • Provide financial incentives and trainings for local
ownership
• Use local products and services
• Use domestic investors with development where
possible
Increase in prices • Create collective agreements/consortiums
between similar neighbouring regions/businesses
• Adopt local strategies to combat inflation
• Offer cheaper alternatives to public sector
Infrastructure costs • Use more than one investor
• Take into consideration both private AND public
stakeholders in development
• Keep infrastructure construction/development
relevant
• Use a mix of both private and public investment
Overcrowding • Establish control measures to prevent
overcrowding
• Promote/encourage and provide use of public
transport to prevent traffic congestion
• Further develop area to increase carrying
capacity
QUALMARK
Those businesses wanting to be specifically recognised
for their sustainable tourism practices may be further
evaluated through the Qualmark Enviro Award.
Businesses are awarded for meeting strict environmental
and social standards, with achievement levels of Gold,
Silver and Bronze.
All businesses that display a Qualmark star grading or
endorsed logo are evaluated on their environmental
performance and have met minimum requirements
including:
• Having facilities in place for recycling and initiatives to
reduce waste, energy or water consumption
• Completing and using an environmental checklist to
review the environmental impacts of the business
• The ability to verify all environmental claims
INVESTMENT AND KEY STAKEHOLDERS
• Private investment of $2 billion is needed towards
development of Wynyard Quarter.
• The Auckland City Council has contributed $285 million
towards development of the area.
• $750 million will be invested towards a block of 120
apartments which will be on the corner of Daldy and
Madden Street. Willis Bond Capital Partners have invested
$228 million towards this project.
• Expected cost of $504 million to develop area of which 5-
10% are expected to be spent on clean up of soil
contamination.
• $349 million going towards public infrastructure with $112
million from Auckland Regional Holdings (Auckland Regional
Council) and $43 million from Auckland City Council.
• $2.5 million was spent on constructing the ‘Te Wero’ Bridge.
• $200 million invested by Fu Wah International Group
towards the Park Hyatt Hotel with $2.5 million committed
to the development of a new public space and art display in
the area around the hotel in Wynyard Quarter.
KEY STAKEHOLDERS
• Auckland City Council
• Auckland Regional Holdings
• Willis Bond Capital Partners
• Athfield Architects
• Fu Wah International Group
• Architectus
• LT McGuinness
• Auckland Transport
• Merlin Entertainments??
KEY OWNERS
• Waterfront Auckland
• Viaduct Harbour Holdings Ltd
• ASB, Auckland Theatre Company Fonterra,
Marine Industries, Sanford’s, Viaduct
Event’s Centre, Percy Vos Charitable Trust,
Hyatt Corporation.
POTENTIAL RETURN AND COMPLETION
The redevelopment is projected to
extend over
30 years, directly supporting 20,000
new full-
time jobs in Auckland and contributing
towards
an additional 20,000 jobs across the
region.
By 2040 the
waterfront redevelopment is forecast
to
contribute $4.29 billion to Auckland’s
economy.
INNOVATION PRECINCT
Population: 3,000 workers
Site area: 14,000m² - 16,000²
Proposed GFA: up to 48,000²
Project timing: 2013 - 2018
End value: $190m - $230m
RESIDENTIAL DEVELOPMENT
Population: 1,100 - 1500 (600-1000 dwellings)
Site area: 20,000² - 22,000²
Proposed GFA: 65,000² - 100,000 ²
Project timing: 2014 - 2030
End value: $470m - $700m
HYATT HOTEL
Number of rooms: 200 - 240
Site area: 5,500²
Proposed GFA: 17,000²
Project timing: 2014 – 2018
End value: $70m - $90m
2015
2020Proposed
Development
Sites after
2020
Thank you for watching
our presentation!
REFERENCES
http://www.wynyard-quarter.co.nz/history (Slides 2-3)
https://en.wikipedia.org/wiki/Wynyard_Quarter (Slides 2-3)
http://www.aucklandcity.govt.nz/council/documents/central/pdfs/annexure14c.pdf (Slide 4)
http://www.aucklandcity.govt.nz/council/documents/central/pdfs/annexure14c.pdf (Slide 5)
http://www.wynyard-quarter.co.nz/living-in-wynyard (Slide 20)
https://www.panuku.co.nz/wynyard-quarter (Slide 20)
http://www.wynyard-quarter.co.nz/news/park-hyatt-consent-approved (Slide 21)
http://www.wynyard-quarter.co.nz/getting-here (Slide 23)
https://at.govt.nz/projects-roadworks/wynyard-quarter/ (Slide 22&25)
http://www.mfe.govt.nz/rma (Slide 26)
https://www.consumer.org.nz/articles/the-building-act (Slide 26)
http://www.tourismnewzealand.com/tools-for-your-business/qualmark/getting-your-qualmark/ (Slide 33)
https://www.panuku.co.nz/www/uploads/moduleresourceitems/the-waterfront-plan-2012-
9e08935901.pdf (Slide 34)
https://www.panuku.co.nz/www/uploads/moduleresourceitems/sustainable-development-framework-
2013- 198fab5712.pdf (Slide 35)
https://www.youtube.com/watch?v=fAQoz_n3FYo (Slides 36 & 37)

More Related Content

What's hot

30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lresMichelle Dudson
 
Anaha at 1108 Auhai St., Honolulu, HI 96814
Anaha at 1108 Auhai St., Honolulu, HI 96814Anaha at 1108 Auhai St., Honolulu, HI 96814
Anaha at 1108 Auhai St., Honolulu, HI 96814Mark G. Howard, abr
 
Vintners\' Hall on the Estuary
Vintners\' Hall on the EstuaryVintners\' Hall on the Estuary
Vintners\' Hall on the EstuarySteve Worthington
 
swan-yard-brochure-low-res
swan-yard-brochure-low-resswan-yard-brochure-low-res
swan-yard-brochure-low-resNicholas Silver
 
City Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyCity Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyDesigningHongKong
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentationbridgetingle
 
The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210Lisa van den Heuvel
 
ROYAL EXPOSITION BUILDING,AUSTRALIA
ROYAL EXPOSITION BUILDING,AUSTRALIAROYAL EXPOSITION BUILDING,AUSTRALIA
ROYAL EXPOSITION BUILDING,AUSTRALIAARCHITECTURE SCHOOL
 
Abandoned Attractions Doc
Abandoned Attractions DocAbandoned Attractions Doc
Abandoned Attractions DocNyasa Jackson
 
Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020RamaChilamkurthy
 
Save middle head public meeting 17 july 2014
Save middle head public meeting 17 july 2014Save middle head public meeting 17 july 2014
Save middle head public meeting 17 july 2014savemiddlehead
 
Royal Phuket Marina
Royal Phuket MarinaRoyal Phuket Marina
Royal Phuket MarinaJohnFalcon
 

What's hot (19)

30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lres
 
Anaha at 1108 Auhai St., Honolulu, HI 96814
Anaha at 1108 Auhai St., Honolulu, HI 96814Anaha at 1108 Auhai St., Honolulu, HI 96814
Anaha at 1108 Auhai St., Honolulu, HI 96814
 
Vintners\' Hall on the Estuary
Vintners\' Hall on the EstuaryVintners\' Hall on the Estuary
Vintners\' Hall on the Estuary
 
swan-yard-brochure-low-res
swan-yard-brochure-low-resswan-yard-brochure-low-res
swan-yard-brochure-low-res
 
City Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyCity Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for Vibrancy
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentation
 
Vridian writing sample
Vridian writing sampleVridian writing sample
Vridian writing sample
 
The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Case Study - RMA
Case Study - RMACase Study - RMA
Case Study - RMA
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
Vision Report: The Bay Way (2004)
Vision Report:  The Bay Way (2004)Vision Report:  The Bay Way (2004)
Vision Report: The Bay Way (2004)
 
ROYAL EXPOSITION BUILDING,AUSTRALIA
ROYAL EXPOSITION BUILDING,AUSTRALIAROYAL EXPOSITION BUILDING,AUSTRALIA
ROYAL EXPOSITION BUILDING,AUSTRALIA
 
Kaec
KaecKaec
Kaec
 
Abandoned Attractions Doc
Abandoned Attractions DocAbandoned Attractions Doc
Abandoned Attractions Doc
 
Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020Stead park community meeting presentation june 18, 2020
Stead park community meeting presentation june 18, 2020
 
Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013
 
Save middle head public meeting 17 july 2014
Save middle head public meeting 17 july 2014Save middle head public meeting 17 july 2014
Save middle head public meeting 17 july 2014
 
Royal Phuket Marina
Royal Phuket MarinaRoyal Phuket Marina
Royal Phuket Marina
 

Similar to Planning and Development Assessment 2 - Presentation

Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects guest387c76
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalEdison Mugoya
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergWaterfront for All
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136StefanPodgrabinski
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)jonathan st-pierre
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)jonathan st-pierre
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)jonathan st-pierre
 
Points With A Crew - Waiheke
Points With A Crew - WaihekePoints With A Crew - Waiheke
Points With A Crew - WaihekeBurke20Post
 
Kapalama Canal workshop #2 powered by Crowdbrite
Kapalama Canal workshop #2 powered by CrowdbriteKapalama Canal workshop #2 powered by Crowdbrite
Kapalama Canal workshop #2 powered by CrowdbriteDarin Dinsmore
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)jonathan st-pierre
 
Bridge The Gap Final Compilation FINAL
Bridge The Gap Final Compilation FINALBridge The Gap Final Compilation FINAL
Bridge The Gap Final Compilation FINALRachel Safren
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelR Ray Saikus
 
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...AAICHA1
 
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...AAICHA1
 

Similar to Planning and Development Assessment 2 - Presentation (20)

Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects
 
AndersonBomarFeb15
AndersonBomarFeb15AndersonBomarFeb15
AndersonBomarFeb15
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
CANADA
CANADACANADA
CANADA
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken Greenberg
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
Points With A Crew - Waiheke
Points With A Crew - WaihekePoints With A Crew - Waiheke
Points With A Crew - Waiheke
 
Kapalama Canal workshop #2 powered by Crowdbrite
Kapalama Canal workshop #2 powered by CrowdbriteKapalama Canal workshop #2 powered by Crowdbrite
Kapalama Canal workshop #2 powered by Crowdbrite
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
Bridge The Gap Final Compilation FINAL
Bridge The Gap Final Compilation FINALBridge The Gap Final Compilation FINAL
Bridge The Gap Final Compilation FINAL
 
AP Tour packet
AP Tour packetAP Tour packet
AP Tour packet
 
mf_xsmall
mf_xsmallmf_xsmall
mf_xsmall
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
Final Boards
Final BoardsFinal Boards
Final Boards
 
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
 
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
quebec-city_quebec-city-in-four-days-easy-going-itinerary_2022_02_11_05_11_26...
 

More from Paul Senior

Tourism Planning and Development - Assessment 1
Tourism Planning and Development - Assessment 1Tourism Planning and Development - Assessment 1
Tourism Planning and Development - Assessment 1Paul Senior
 
Customer Service and Selling Essay
Customer Service and Selling EssayCustomer Service and Selling Essay
Customer Service and Selling EssayPaul Senior
 
Assessment 2 - Individual Report
Assessment 2 - Individual ReportAssessment 2 - Individual Report
Assessment 2 - Individual ReportPaul Senior
 
Facilities Design - Report 2
Facilities Design - Report 2Facilities Design - Report 2
Facilities Design - Report 2Paul Senior
 
Visitor Attractions and Activities Essay
Visitor Attractions and Activities EssayVisitor Attractions and Activities Essay
Visitor Attractions and Activities EssayPaul Senior
 
Global Tourism - Assessment 2 - Vienna
Global Tourism - Assessment 2 - ViennaGlobal Tourism - Assessment 2 - Vienna
Global Tourism - Assessment 2 - ViennaPaul Senior
 
Global Tourism Assessment 1 - Vienna
Global Tourism Assessment 1 - ViennaGlobal Tourism Assessment 1 - Vienna
Global Tourism Assessment 1 - ViennaPaul Senior
 

More from Paul Senior (8)

Tourism Planning and Development - Assessment 1
Tourism Planning and Development - Assessment 1Tourism Planning and Development - Assessment 1
Tourism Planning and Development - Assessment 1
 
Customer Service and Selling Essay
Customer Service and Selling EssayCustomer Service and Selling Essay
Customer Service and Selling Essay
 
Assessment 2 - Individual Report
Assessment 2 - Individual ReportAssessment 2 - Individual Report
Assessment 2 - Individual Report
 
Facilities Design - Report 2
Facilities Design - Report 2Facilities Design - Report 2
Facilities Design - Report 2
 
Visitor Attractions and Activities Essay
Visitor Attractions and Activities EssayVisitor Attractions and Activities Essay
Visitor Attractions and Activities Essay
 
Global Tourism - Assessment 2 - Vienna
Global Tourism - Assessment 2 - ViennaGlobal Tourism - Assessment 2 - Vienna
Global Tourism - Assessment 2 - Vienna
 
Global Tourism Assessment 1 - Vienna
Global Tourism Assessment 1 - ViennaGlobal Tourism Assessment 1 - Vienna
Global Tourism Assessment 1 - Vienna
 
Tour Brochure
Tour BrochureTour Brochure
Tour Brochure
 

Planning and Development Assessment 2 - Presentation

  • 1. Development Plan for Wynyard Quarter
  • 2. HISTORY OF WYNYARD QUARTER 1930– The Western Reclamation, now known as Wynyard Quarter was progressively constructed by Ports of Auckland’s predecessor, the Auckland Harbour Board with the last component of the reclamation being completed in 1930. 2004- Early plans intended to name the new area 'Kahurangi', Māori for 'blue/precious jewel'. This has now been replaced with 'Wynyard Quarter', though it is still generally referred to as Tank Farm, including when talking about the whole Western Reclamation. Others have suggested the label 'Tech-Farm', referencing a 2004 call to showcase on the waterfront New Zealand's best sustainable design and technology, as well as anticipating the government's and council's 2012 initiative to establish an 'innovation precinct' within the Wynyard Quarter. Political and design processes were underway in the mid and late 2000s to define the future shape of the area, a change process that will take up to 20 years. One of the main public inputs at that time was a wish for increased waterfront access, as well as the desire for more parkland on the point. However, some of these wishes were muted from political sources, as the redevelopment of the area is to be paid by the development of residential areas, with the available land for this use shrinking with an increase of the proposed park space. Already mostly agreed on was a bridge connecting the new quarter to the Viaduct Basin. 2006- Ports of Auckland still owned 18ha of the 35ha site in 2006 when it was decided that the land would be transferred to its parent company, Auckland Regional Holdings, owned by the Auckland Regional Council. Also in 2006 after 10-16 storey buildings proposed met strong opposition, the revised July 2007 design contained only a small number of 14-storey towers, with the main apartment strips along the eastern side of Wynyard Wharf being no higher than seven storeys at the road, stepping down to three storeys at the water’s edge. In addition, the plan stated the new Western Reclamation zone was to be dominated by public transport, with the targeted transport mix being 70% public transport / walking / cycling and 30% motor vehicle, a reversal of the rest of Auckland City. Ferries are also mooted as possible connections.
  • 3. HISTORY OF WYNYARD QUARTER CONTINUED 2007– In June 2007, more detailed concept plans were published after a year of negotiation between stakeholders. In the first stage of the redevelopment, the eastern section of the Western Reclamation, along Jellicoe Street, was to be turned into an entertainment strip, to complement similar areas on the eastern side of the Viaduct Basin, and to be completed in time for the 2011 Rugby World Cup. This area was to be linked to the Auckland CBD via a new 'Te Wero' bridge, to be constructed as a lift- or swing bridge after an international design competition, and expected to cost around NZ$35 million. SeaLink runs a car and passenger ferry service to Great Barrier Island from a terminal at the base of Wynyard Wharf. The company was seeking clarification of its future facilities in the area in 2007, as their lease was running out in 2010, and it was unlikely to invest a planned NZ$19 million in a new terminal or start using a new, faster ferry vessel before legal concerns were sorted out. An ARC planning committee noted that it supported the further provision of the ferry service in the area, though there had previously been concerns about the island freight shipping not fitting into the redevelopment vision of the area. The Waterfront Plan completed 2012 does include the island ferry terminal, to be in the same general area as before. Late 2000’s - As of the late 2000s, the area was still used by the bulk liquid industry which provides NZ$1.2 billion of yearly turnover, and 4000 jobs in the Auckland economy. There are also more than 100 marine companies around the area, with a NZ$400 million yearly turnover, exporting items worth NZ$120 million per year. 2011- The August 2011 opening of the Wynyard Quarter to the general public, with the main features being the new Jellicoe Street and North Wharf areas, as well as the open spaces around 'Silo Park' (designed by Taylor Cullity Lethlean and Wraight and Associates) and the Viaduct Events Centre, were met with great public interest, and critical acclaim for the synthesis between open space and formerly industrial use.
  • 4. 1. Wynyard Crossing (Te Wero Bridge) – pedestrian/cycle bridge 2. Viaduct Events Centre (2011) - exhibition, meeting and hospitality space 3. Karanga Plaza – Public Open Space: Features art, steps down to the water’s edge and is the perfect spot to relax and watch the world go by on the large wooden recliners. Also features Karanga Kiosk – hub for info on Wynyard Quarter 4. North Wharf (1910-15) - redeveloped to strengthen pedestrian and cycle connectivity along the waterfront axis. The waterfront edge features retail & hospitality businesses and remains a working wharf, accessible to ferries and fishing industries and the public 5. Jellicoe Street – runs parallel to North Wharf and connects Karanga Plaza to marine related activity in the West including Silo Marina. Primary destination for entertainment, retail commercial activity. Includes up-market shopping, dining, bars/clubs and fishing activity such as the fish market. 6. Silo Park – The park comprises of a combination of grass areas, concrete areas, low impact swales (to manage water runoff and filter pollutants) and walkways. The combination of these elements within the park provides a setting to host outdoor events including Silo markets, an open-air movie theatre, exhibitions and other events. 7. North Wharf Extension - an extension to North Wharf will facilitate its use for recreational activities as well as the potential for ferry and water taxi services that will compliment and support the adjacent land based activities.
  • 5. 1.Wynyard Wharf 2.Point Park 3.Beaumont Plaza 4.Public Open Space/Water Feature 5.Jellicoe Plaza 6.North Wharf 7.Wynyard Plaza 8.Madden Plaza/Viaduct Harbour Edge 9.Daldy Street Linear Park 10.Central Park 11.Gateway Plaza A.Te Wero Bridge B.North Wharf extension C.Fanshawe Street intersections D.Pedestrian Bridge
  • 6. Purpose of Development  Mission: As most exciting and diverse places in Auckland, the creation of marine park joining the neighbourhood and new marine parks will open for visitors and local’s to enjoy, offer a more exciting and new Wynyard Quarter.  Vision: Offer combination of residential, retail and commercial development to support development of stable, diverse, lively residential and business community while keeping the existing industries.
  • 7. Potential Market Segments • Families • Schools/Educational Institutions • Property Investors • Upscale shoppers
  • 9.
  • 19. Full Facilities For Those With Disabilities
  • 20. OTHER AuckQUATIC MARINE PARK DETAILS Opening Times 5th April – 26th September (2020) Monday – Thursday: 9:00am – 6:00pm Saturday – Sunday: 10:00am – 5:00pm 27th September – 4th April (2020-21) Monday – Thursday: 9:00am – 8:00pm Saturday – Sunday: 9:00am – 7:00pm Admission Costs Adults - $40.00 Children (2-15 yrs) - $20.00 Under 2 Years – FREE! Family Pass A (2 Adults, 1 Child) - $75.00 Family Pass B (2 Adults, 2 Children) - $100.00 Family Pass Additional Child - $15.00 • Added bonus – pre purchase your tickets online and show your ticket to public transport in order to receive free return travel on tram, red link bus, or 010 bus. Location Located between ANZ Events Centre and Wynyard Wharf ESTIMATED INITIAL INVESTMENT COST TO BUILD MARINE PARK : $200 Million = 4 Years for return of initial investment costs based on an average of 500,000 visitors a year at an average spending rate of $100.00 per guest.
  • 21. Residential Accommodation Three different styles of residences: Pavilions - The pavilions are distinct, free-standing buildings which overlook Daldy Street Park. The individual pavilions are on a modest scale and provide for only one, two or three apartments on each level. On the ground floor of Daldy Street you will find boutique retailers and cafés, while the pavilion apartments are accessed from a lane off Pakenham Street. Townhouses – A row of eight townhouses is accessed via private patios and individual garages that open to the lane. They are developed over three levels. Apartments - The larger apartment building is situated behind the row of townhouses and is accessed from a Pakenham Street laneway. The apartments come with one, two or three bedrooms. The intimacy of the lane makes the ground floor of the apartments a perfect location for cafés and boutique retail. The residences are priced from $1,095,000 for a two bedroom apartment with car park, and $1,460,000 for a three bedroom apartment with car park. Penthouses built on 132 Hasley are expected to go for in excess of $5 million!
  • 22. Commercial Accommodation Park Hyatt Hotel Hawkins Group Ltd & China Construction NZ Ltd signed the contract with Fu Wah International Group to deliver the Park Hyatt Auckland hotel in the Wynyard Quarter through a joint venture. Hawkins built the ANZ Viaduct Events Centre and is building the ASB Theatre, working on streetscaping throughout the Wynyard Quarter and on the Precinct Properties NZ Ltd Innovation Precinct project in Madden St. The 7-storey hotel on the former Team NZ site fronting the Viaduct Basin will have a total floor area of 29,000m², 195 rooms, food & beverage outlets, event spaces, a spa and a fitness centre that includes a 25m pool. Work is due to start this month for completion in late 2018.
  • 23. Accessibility WALKING/CYCLING From Britomart Transport Centre, Wynyard Quarter is a short five-minute walk down Quay Street, on to Te Wero Island and across the new Wynyard Crossing bridge. Also plans to build a new pedestrian bridge to establish a link to Victoria Park and adjacent areas. DRIVING From Fanshawe Street take either Halsey or Beaumont Street onto Jellicoe Street.
  • 24. RED INNER CITY LINK BUS Wynyard Quarter – Britomart- Queen Street – K-Road (return) Monday to Saturday every 7 to 8 minutes from 6:25am to 11:25pm Sundays and Public Holidays every 10 minutes for 7am to 11.20pm 010 BUS Onehunga to Wynyard Quarter via Ponsonby, Williamson Ave, Great North Road, Carrington Road and Mt Albert Road. Monday to Friday every 30 minutes from 6:30am to 9am then every hour until 3pm. Then every half hour until 6pm PUBLIC TRANSPORT
  • 25. PUBLIC TRANSPORT CONTINUED TRAM The 15 minute tramway circuit loops around Halsey, Gaunt, Daldy and Jellicoe Streets between the Auckland Viaduct Basin and Westhaven Marina. The tram however is currently closed while the final stages of the road developments in Wynyard Quarter takes place and is expected to reopen in late 2016 and will have a new 1.8km extension added which connects the Wynyard Quarter loop to Britomart (shown in green in photo). Initially admission prices were $2.00 for adults, $1.00 for children and $5.00 for a family pass, however this was some time ago and public transport prices have continued to gradually rise so admission prices will be revised prior to reopening of the tram service.
  • 26. Public Parking CAR PARKS If you're coming from Downtown Auckland, Viaduct Harbour or Te Wero Island, the Downtown car park is the most convenient located at 31 Customs Street West. Disability car parking is available in the Jellicoe Street Car Park at the end closest to the Playspace. There is also disability car parking available behind the Viaduct Events Centre. There is a Wynyard Quarter carpark with the entrance off Beaumont Street and Madden Street. First hour free— $2 hour following that. Other street side parking availability is indicated on map.
  • 27. LEGISLATION RESOURCE MANAGEMENT ACT 1991 - The RMA promotes the sustainable management of natural and physical resources such as land, air and water. (1) The purpose of this Act is to promote the sustainable management of natural and physical resources. (2) In this Act, sustainable management means managing the use, development, and protection of natural and physical resources in a way, or at a rate, which enables people and communities to provide for their social, economic, and cultural wellbeing and for their health and safety while— (a) Sustaining the potential of natural and physical resources (excluding minerals) to meet the reasonably foreseeable needs of future generations; and (b) Safeguarding the life-supporting capacity of air, water, soil, and ecosystems; and (c) Avoiding, remedying, or mitigating any adverse effects of activities on the environment. BUILDING ACT 2004 – Building work in New Zealand is controlled by the Building Act 2004 and the various Building Regulations which includes the building code. The purpose of the Act is to ensure that buildings: • Are safe, sanitary and have suitable means of escape from fire; and • Contribute to the physical independence and well being of people who use them • Are designed, constructed and able to be used in ways that promote sustainable development. The regulations prescribe the Building Code with which all building work must comply. Performance standards that must be met include building: • Durability • Fire safety • Sanitation (services and facilities) • Moisture control • Energy efficiency • Access
  • 28. POTENTIAL ENVIRONMENTAL IMPACTs POSITIVE NEGATIVE • Increased conservation of local area including land, sea and air. • Improvement of natural environment, especially soil and water. • Improvement of infrastructure • Increased environmental awareness • Conservation programmes of marine life (education through Marine Park). • Water, air, soil, noise pollution. • Visual Pollution? • Water and waste disposal problems • Ecological disruption • Environmental hazards • Land use problems?
  • 29. ENVIRONMENTAL IMPACT RISK ASSESSMENT AIR QUALITY VIADUCT WATER QUALITY SURFACE WATER QUALITY GROUND WATER QUALITY SOIL QUALITY NOISE LEVELS TYPE OF IMPACT EVALUATION OF IMPACT NO IMPACT MINOR IMPACT MODERATE IMPACT SERIOUS IMPACT COMMENTS WASTE DISPOSAL VISUAL AMENITY
  • 30. MANAGING ENVIRONMENTAL IMPACTs NEGATIVE IMPACT EXAMPLES OF CONTROL MEASURES Water pollution • Sewage treatment • Industrial waste water treatment • Erosion and sediment control for construction sites • Control of urban run off Visual pollution; Land use problems • Application of land zoning regulations • Architectural design standards • Strategic/appropriate location placement of visual construct Water and waste disposal problems • Installation of water supply and sewage disposal systems • Use of proper solid waste disposal techniques • Recycling of water where applicable Environmental hazards • Construction of adequate drainage to prevent flooding • Adequate setback of buildings from shoreline Ecological disruption • Management of visitor flow/use control • Control on collection of plants, species
  • 31. POTENTIAL SOCIO-ECONOMIC IMPACTs POSITIVE NEGATIVE • Economic benefits i.e. increased revenue generation and contribution to local economy • Creates opportunities for employment • Infrastructure/development investment • Increased carrying capacity • Increase in local tourism numbers • Loss of economic benefit through leakages and uneven distribution of benefits • Infrastructure costs • Overcrowding and loss of amenities for residents • Increase in prices e.g. local commodities, land and real estate
  • 32. SOCIO-ECONOMIc IMPACT RISK ASSESSMENT LEAKAGES INFRASTUCTURE COSTS OVERCROWDING INCREASE IN PRICES TYPE OF IMPACT EVALUATION OF IMPACT NO IMPACT MINOR IMPACT MODERATE IMPACT SERIOUS IMPACT COMMENTS
  • 33. MANAGING SOCIO-ECONOMIC IMPACTs NEGATIVE IMPACT EXAMPLES OF CONTROL MEASURES Loss of economic benefit through leakages • Provide financial incentives and trainings for local ownership • Use local products and services • Use domestic investors with development where possible Increase in prices • Create collective agreements/consortiums between similar neighbouring regions/businesses • Adopt local strategies to combat inflation • Offer cheaper alternatives to public sector Infrastructure costs • Use more than one investor • Take into consideration both private AND public stakeholders in development • Keep infrastructure construction/development relevant • Use a mix of both private and public investment Overcrowding • Establish control measures to prevent overcrowding • Promote/encourage and provide use of public transport to prevent traffic congestion • Further develop area to increase carrying capacity
  • 34. QUALMARK Those businesses wanting to be specifically recognised for their sustainable tourism practices may be further evaluated through the Qualmark Enviro Award. Businesses are awarded for meeting strict environmental and social standards, with achievement levels of Gold, Silver and Bronze. All businesses that display a Qualmark star grading or endorsed logo are evaluated on their environmental performance and have met minimum requirements including: • Having facilities in place for recycling and initiatives to reduce waste, energy or water consumption • Completing and using an environmental checklist to review the environmental impacts of the business • The ability to verify all environmental claims
  • 35. INVESTMENT AND KEY STAKEHOLDERS • Private investment of $2 billion is needed towards development of Wynyard Quarter. • The Auckland City Council has contributed $285 million towards development of the area. • $750 million will be invested towards a block of 120 apartments which will be on the corner of Daldy and Madden Street. Willis Bond Capital Partners have invested $228 million towards this project. • Expected cost of $504 million to develop area of which 5- 10% are expected to be spent on clean up of soil contamination. • $349 million going towards public infrastructure with $112 million from Auckland Regional Holdings (Auckland Regional Council) and $43 million from Auckland City Council. • $2.5 million was spent on constructing the ‘Te Wero’ Bridge. • $200 million invested by Fu Wah International Group towards the Park Hyatt Hotel with $2.5 million committed to the development of a new public space and art display in the area around the hotel in Wynyard Quarter. KEY STAKEHOLDERS • Auckland City Council • Auckland Regional Holdings • Willis Bond Capital Partners • Athfield Architects • Fu Wah International Group • Architectus • LT McGuinness • Auckland Transport • Merlin Entertainments?? KEY OWNERS • Waterfront Auckland • Viaduct Harbour Holdings Ltd • ASB, Auckland Theatre Company Fonterra, Marine Industries, Sanford’s, Viaduct Event’s Centre, Percy Vos Charitable Trust, Hyatt Corporation.
  • 36. POTENTIAL RETURN AND COMPLETION The redevelopment is projected to extend over 30 years, directly supporting 20,000 new full- time jobs in Auckland and contributing towards an additional 20,000 jobs across the region. By 2040 the waterfront redevelopment is forecast to contribute $4.29 billion to Auckland’s economy. INNOVATION PRECINCT Population: 3,000 workers Site area: 14,000m² - 16,000² Proposed GFA: up to 48,000² Project timing: 2013 - 2018 End value: $190m - $230m RESIDENTIAL DEVELOPMENT Population: 1,100 - 1500 (600-1000 dwellings) Site area: 20,000² - 22,000² Proposed GFA: 65,000² - 100,000 ² Project timing: 2014 - 2030 End value: $470m - $700m HYATT HOTEL Number of rooms: 200 - 240 Site area: 5,500² Proposed GFA: 17,000² Project timing: 2014 – 2018 End value: $70m - $90m
  • 37. 2015
  • 39. Thank you for watching our presentation!
  • 40. REFERENCES http://www.wynyard-quarter.co.nz/history (Slides 2-3) https://en.wikipedia.org/wiki/Wynyard_Quarter (Slides 2-3) http://www.aucklandcity.govt.nz/council/documents/central/pdfs/annexure14c.pdf (Slide 4) http://www.aucklandcity.govt.nz/council/documents/central/pdfs/annexure14c.pdf (Slide 5) http://www.wynyard-quarter.co.nz/living-in-wynyard (Slide 20) https://www.panuku.co.nz/wynyard-quarter (Slide 20) http://www.wynyard-quarter.co.nz/news/park-hyatt-consent-approved (Slide 21) http://www.wynyard-quarter.co.nz/getting-here (Slide 23) https://at.govt.nz/projects-roadworks/wynyard-quarter/ (Slide 22&25) http://www.mfe.govt.nz/rma (Slide 26) https://www.consumer.org.nz/articles/the-building-act (Slide 26) http://www.tourismnewzealand.com/tools-for-your-business/qualmark/getting-your-qualmark/ (Slide 33) https://www.panuku.co.nz/www/uploads/moduleresourceitems/the-waterfront-plan-2012- 9e08935901.pdf (Slide 34) https://www.panuku.co.nz/www/uploads/moduleresourceitems/sustainable-development-framework- 2013- 198fab5712.pdf (Slide 35) https://www.youtube.com/watch?v=fAQoz_n3FYo (Slides 36 & 37)