DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
T-001.00
ENERGY ANALYSIS AND PROGRESS INSPECTIONS FOR RESIDENTIAL SOLAR TAX ABATEMENTS
APPLICATION TYPE: ALT-2
SCOPE OF WORK: SOLAR ELECTRICAL ARRAY
INSTALLATION
CLIMATE ZONE: 4A (RESIDENTIAL)
2016 NYCECC CHAPTER 4
(RESIDENTIAL ENERGY EFFICIENCY)
TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT, ALL WORK UNDER THIS APPLICATION IS IN COMPLIANCE WITH THE NYCECC (SECTION 101.5.2).
ITEM DESCRIPTION
ANCHOR SOLAR ELECTRIC SUPPORTING STRUCTURE TO BUILDING STRUCTURE BY
SCREWING TO STRUCTURAL MEMBERS, AS SHOWN ON DRAWINGS.
PROPOSED VALUE
SEALING ALL OPENINGS AND PENETRATIONS AS
PRESCRIBIED IN SECTION ECC 402.4.1 AND ECC
TABLE 402.4.1.1.
PRESCRIPTIVE VALUE AND CITATION
CAULKING, GASKETING, WEATHERSTRIPPING OR
OTHER MATERIAL ACCORDANCE WITH SECTION
ECC 402.4.1.1 AND TABLE R405.2(1) FOR CEILINGS
AND ATTICS.
SUPPORTING DOCUMENTATION
*SEE SHEET INDEX ON COVER SHEET
INSPECTION/ TEST (AIR SEALING AND INSULATION - VISUAL)
TR8/ IA6 - OPENINGS AND PENETRATIONS IN THE BUILDING ENVELOPE, INCLUDING
SITE-BUILT FENESTRATION AND DOORS, SHALL BE VISUALLY INSPECTED TO VERIFY
THAT THEY ARE PROPERLY SEALED, IN ACCORDANCE WITH SECTION 402.4.1 AND TABLE
402.4.1.1. (RESPONSIBLE PARTY - NARESH K MAHANGU, PE)
FREQUENCY (MINIMUM)
AS REQUIRED DURING ENVELOPE
CONSTRUCTION
REFERENCE STANDARD
APPROVED CONSTRUCTION DOCUMENTS; ASTM
E283; ASTM E84; RCNYS
ECC OR OTHER CITATION
402.4.1.
402.4.2.1.1.
TENANT SAFETY:
1. EGRESS - WE DO NOT PLAN TO BLOCK EGRESS TO THE HOUSE.
WE WILL SET UP A SAFETY ZONE AROUND THE HOUSE AND WE
WILL PLACE A HARD HAT BY THE DOOR. IF ANY CUSTOMERS
NEED TO GO IN AND OUT OF THE HOUSE, WE WILL REQUEST
THEY WEAR THE PROVIDED HARD HAT AND WE WILL ESCORT
THEM WHILE THEY ARE IN THE SAFETY ZONE. WORK RIGHT
ABOVE THE DOOR WILL BE TEMPORARILY SUSPENDED WHILE
CUSTOMERS ARE WALKING.
2. FIRE SAFETY - OUR VEHICLES ARE EQUIPPED WITH KIDDIE FIRE
EXTINGUISHERS IN CASE OF SMALL FIRES. ON TOP OF THAT, WE
HAVE PROTOCOLS FOR CALLING EMERGENCY TEAMS AND OUR
TECHNICIANS EVACUATING THE PREMISES IF FIRES ARE MORE
THAN A SMALL FIRE.
3. HEALTH REQUIREMENTS - WE TAKE ALL CONSTRUCTION TRASH
BACK WITH US. TO MINIMIZE CONSTRUCTION NOISE ISSUES, WE
START WORK AT 8 AM AND END BY 6 PM.
3.1. LEAD AND ASBESTOS - IF WE RUN INTO LEAD OR ASBESTOS
WHEN WE FIRST ASSESS THE PROPERTY, WE HIRE A
CONTRACTOR TO REMOVE IT. WE DO NOT PUT OUR
TECHNICIANS TO WORK UNTIL AFTER THE LEAD AND ASBESTOS
CONCERNS HAVE BEEN ADDRESSED.
4. COMPLIANCE WITH HOUSING STANDARDS - MOST OF OUR WORK
IS ON THE ROOF, WITH SOME ELECTRICAL WORK INSIDE. WE
WILL SET UP SAFETY ZONES AROUND THE AREA WHERE WE
WILL PERFORM THE ELECTRICAL WORK. WHILE WE ARE
WORKING, THESE AREAS WILL BE OFF LIMITS TO THE
CUSTOMER.
5. STRUCTURAL SAFETY - WE WILL NOT DO ANY WORK THAT WILL
COMPROMISE THE STRUCTURAL STABILITY OF THE HOUSE.
6. NOISE RESTRICTIONS - WE WILL WORK ONLY BETWEEN 8 AM
AND 6 PM. OUR NOISIEST TOOL IS A BIG HAMMER DRILL THAT IF
USED WILL ONLY BE USED FOR AN HOUR AT MOST.
7. MAINTAINING ESSENTIAL SERVICES - WE DO NOT CUT HEAT, HOT
WATER, COLD WATER OR GAS TO THE HOUSE. IN SOME CASES,
WE MAY NEED TO CUT ELECTRICITY FOR A PERIOD OF 2-4
HOURS. THIS IS A NECESSITY FOR ELECTRICAL SAFETY
REASONS. WHEN WE CUT POWER TO THE HOUSE WE WILL LET
THE CUSTOMER KNOW AND WORK WITH THEM TO MINIMIZE
DISRUPTIONS.
8. OTHER REQUIREMENTS - LADDER SAFETY IS SOMETHING WE
TAKE VERY SERIOUSLY. WE WILL NOT ALLOW TENANTS OR
HOME OWNERS TO GET ON THE ROOF WHILE WE ARE WORKING
UP THERE.
GENERAL STRUCTURAL NOTES:
NO ADDITIONAL STRUCTURAL WORK REQUIRED AT ROOF FOR SOLAR PANEL INSTALLATION AND THE EXISTING ROOF IS CAPABLE OF SUPPORTING
THE LOADS OF THE SOLAR ELECTRICAL GENERATION SYSTEM. SEE BELOW FOR A SUMMARY OF OUR SYSTEM. SEE S 1.0 & S 2.0 FOR ADDITIONAL
STRUCTURAL DETAILS.
1. THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THE SFM SYSTEM BY UNIRAC. THE MOUNTING FEET ARE TO BE
SPACED AS SHOWN IN THE DETAILS, AND MUST BE STAGGERED TO ADJACENT FRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD.
2. UNLESS NOTED OTHERWISE, MOUNTING ANCHORS SHALL BE 5
16" LAG SCREWS WITH A MINIMUM OF 2 1
2" PENETRATION INTO ROOF FRAMING.
3. THE PROPOSED PV SYSTEM ADDS 2.6 psf TO THE ROOF FRAMING SYSTEM.
4. ROOF LIVE LOAD = 20 psf TYPICAL, 0 psf UNDER NEW PV SYSTEM.
5. GROUND SNOW LOAD = 30 psf
6. WIND SPEED = 130 mph
7. EXPOSURE CATEGORY = B
GOVERNING CODES
ALL WORK SHALL CONFORM TO THE FOLLOWING CODES
1. 2011 NYC ELECTRICAL CODE
2. 2016 NYC ENERGY CONSERVATION CODE
2.1. SECTION 101
3. 2014 NYC CONSTRUCTION CODE
3.1. BUILDING CODE
3.2. MECHANICAL CODE
3.3. PLUMBING CODE
4. 2014 FDNY FIRE CODE
5. 2014 ADMINISTRATIVE CODE
5.1. SECTION 28-101.4.3
6. ANY OTHER LOCAL AMENDMENTS
SCOPE OF WORK:
SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF
BUILDINGS.
FIRE CODE NOTE: PER FC 512.4.2 AND FC 504.4.7:
ALL CONDUITS AND PIPING INSTALLATIONS WILL BE COLOR-CODED WITH CONTINUOUS, DURABLE AND WATERPROOF REFLECTIVE OR LUMINESCENT MARKINGS AS FOLLOWS AND CONTINUOUSLY LABELED IN AN
APPROVED MANNER TO INDICATE ITS CONTENTS:
1. HIGH VOLTAGE WIRING - RED
2. LOW VOLTAGE WIRING - ORANGE ITEMS 3., 4., AND 5 ARE FOR GAS AND FUEL OIL PIPING.
NYCECC NOTES:
1. THE SOLAR ELECTRIC GENERATING SYSTEM MEETS ALL THE REQUIREMENTS SET FORTH AND DOES NOT INCLUDE ANY EQUIPMENT CONNECTED TO THE SOLAR ELECTRIC GENERATING SYSTEM THAT IS A
COMPONENT OF PARTS OF AN NON-SOLAR ELECTRIC GENERATING SYSTEM OR THAT USES ANY SORT OF RECREATIONAL FACILITY OR EQUIPMENT AS A STORAGE MEDIUM.
2. THERE ARE NO TREES ON OR NEAR THE SUBJECT PARCEL THAT WILL BLOCK THE SOLAR PANELS, OR WITHIN THE HAZARD AREA.
ADDITIONAL SPECIAL/ PROGRESS INSPECTIONS (TR1)
STRUCTURAL STABILITY - EXISTING BUILDINGS (BC 1704.20.1)
FIRE-RESISTANT PENETRATIONS AND JOINTS (BC 1704.27)
ENERGY CODE COMPLIANCE PROGRESS INSPECTIONS (BC 110.3.5)
FINAL INSPECTION ( 28-116.2.4.2, BC 110.5, DIRECTIVE 14 OF 1975, AND 1 RCNY SEC.101-10)
RESPONSIBLE PARTY
................................................................................NARESH K MAHANGU, PE
......................................................................................NARESH K MAHANGU, PE
......................................................................NARESH K MAHANGU, PE
.............................NARESH K MAHANGU, PE
PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS:
PV SYSTEM SIZE - 5.120kW DC | 3.680kW AC
PV INTERCONNECTION METHOD -
PV MODULE - (16) Hanwha Solar: Q.PEAK DUO BLK-G5 320w
PV MODULE DIMENSIONS - (L/W/H) 66.34"/ 39.37"/ 1.26"
MICRO-INVERTER*- (16) ENPHASE ENERGY IQ6-60-2-US *MOUNTED TO THE BACK OF MODULES
EXISTING INTERIOR ELECTRICAL PANEL LOCATIONS - SEE A 100, A 101, A 102
PAGE 1 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
GENERAL ELECTRICAL NOTES:
ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS
DESIGNED AND LISTED FOR SUCH USE. FOR ROOF-MOUNTED SYSTEMS, WIRING MUST
BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF SURFACE.
1. ANY CODE VIOLATIONS EVIDENT IN THE INTERCONNECTION PANEL WILL BE
CORRECTED ON INSTALLATION.
2. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL RELEVANT CODE
3. RAPID SHUTDOWN INITIATION TAKES PLACE AT THE AC DISCONNECT. RAPID
SHUTDOWN COMMENCES UPON LOSS OF UTILITY SOURCE VOLTAGE.
4. SEE *E-100 AND *E-101 FOR DIAGRAMS, CALCULATIONS, SCHEDULE AND
SPECIFICATIONS.
SHEET INDEX:
T 001 - COVER SHEET
A 100 - PLOT PLAN
A 101 - SITE PLAN
A 102 - FLOOR PLAN
A 200 - ELEVATION(S)
A 300 - MOUNT DETAILS
A 400 - WARNING LABELS
A 500 - WARNING LABEL LOCATIONS
E 100 - ELECTRICAL DIAGRAM
E 101 - ELECTRICAL NOTES
SUPPLY TAP
N
PLOT PLAN
SCALE: 3/32" = 1'-0"
A-100.00
PAGE 2 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
PLOT LEGEND
DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
16 NEW HANWHA SOLAR: Q.PEAK DUO
BLK-G5 320W MODULES, WITH
IQ6-60-2-US INVERTERS
LOT SIZE: 0.046 ACRES
BLOCK NUMBER: 7904
LOT NUMBER: 72
ZONE: R3-2
COMMERCIAL OVERLAY: N/A
EXISTING 2 STORY HOME
BUILDING CLASS: 1-FAMILY
RESIDENTIAL Attached
BUILDING HEIGHT: 0'-0"
FLOOD EVACUATION ZONE: 3
N
EXISTING EXTERIOR UTILITY METER
PROPOSED LOCATION OF DEDICATED PV
COMBINER PANEL(S) & AC DISCONNECT(S)
PROPERTY LINE
FENCE LINE
DRIVEWAY
30'-0"
MIN. REAR YARD
15'-0"
MIN. FRONT YARD
N
100'-0"
20'-6"
ADJACENT STRUCTURE
DRIVEWAY
MAIN HOME
GARAGE
N
SITE PLAN
SCALE: 1/8" = 1'-0"
MC
AC
DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
ROOF VENT
CHIMNEY
A-101.00
PAGE 3 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
SYSTEM LEGEND
M
AC
C
EXISTING INTERIOR MAIN SERVICE PANEL(S) &
POINT OF INTERCONNECTION. TIED TO UTILITY
METER(S). (*SEE A-102 FOR DETAILS)
NEW PV SYSTEM AC DISCONNECT(S) (RSD).
LOCATED WITHIN 10' OF MSP.
NEW DEDICATED PV SYSTEM COMBINER PANEL(S).
16 NEW HANWHA SOLAR: Q.PEAK DUO BLK-G5
320W MODULES
NEW ENPHASE ENERGY IQ6-60-2-US INVERTERS,
MOUNTED ON THE BACK OF EACH MODULE.
PV SYSTEM SIZE:
NEW 5.120kW DC | 3.680kW AC
NEW PV CONDUIT RUN.*SEE EE1.0 CONDUIT SCHEDULE
= EXTERIOR RUN = ATTIC RUN
ALL CONDUITS AND PIPING INSTALLATIONS WILL BE
COLOR-CODED WITH CONTINUOUS, DURABLE AND
WATERPROOF REFLECTIVE OR LUMINESCENT
MARKINGS AS FOLLOWS AND CONTINUOUSLY LABELED
IN AN APPROVED MANNER TO INDICATE ITS CONTENTS:
1. HIGH VOLTAGE WIRING - RED
2. LOW VOLTAGE WIRING - ORANGE
*ITEMS 3., 4., AND 5 ARE FOR GAS AND FUEL OIL PIPING.
CLEAR ACCESS
PATHWAY PER
FDNY FC512.3
ROOF RIDGE
PV CIRCUIT(S):
#1) 16 MODULES
ROOF SECTION(S):
1 SLOPE- 40
AZIMUTH- 175.66
MATERIAL- COMPOSITION SHINGLE
2 SLOPE- 40
AZIMUTH- 355.66
MATERIAL- COMPOSITION SHINGLE
FRONT
A 200
SIDE
A 201
NEW JUNCTION BOX. (MOUNTED WITH SOLADECK)
3'-0"
3'-0"
1
ROOF VENT
ADJACENT BUILDING
UP
N
DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
A-102.00
PAGE 4 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
FLOOR PLAN LEGEND
STAIRWAY
EXISTING
BASEMENT LEVEL
M1
LOCATION OF UTILITY METER #9516279.
POINT OF INTERCONNECT AT EXISTING
INTERIOR MAIN SERVICE PANEL.
PROPOSED CONDUIT
M1
AC
C
AC
C
1 STAND-ALONE UTILITY METER #9516279.
DOOR
NEW PV SYSTEM AC DISCONNECT(S) (RSD).
NEW DEDICATED PV SYSTEM COMBINER PANEL(S).
FLOOR PLAN
SCALE: 3/16" = 1'-0"
1
DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
A-200.00
PAGE 5 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
ELEVATION LEGEND
*SOLAR PANEL INSTALLATION COMPLIES WITH
NYC ZONING RESOLUTION 23-62(m)
(16 TOTAL) PV SOLAR MODULES TO BE
INSTALLED A MAX. 6" PARALLEL TO
ROOF SURFACE.
WINDOW(S)
ROOF MATERIAL:COMPOSITION SHINGLE
EXISTING METER(S)
PROPOSED LOCATION OF
DEDICATED PV COMBINER PANEL(S)
PROPOSED LOCTION OF AC
DISCONNECT(S)
6'-7"
MAX. ALLOWABLE
PV EQUIPMENT HEIGHT
20'-11"
PERIMETERWALLHEIGHT
21'-0"
MAX.ALLOWABLEPERIMETERWALLHEIGHT
27'-4"
SOLARPVMODULEHEIGHT
29'-3"
BUILDINGHEIGHT
35'-0"
MAX.ALLOWABLEBUILDINGHEIGHT
12
10
FRONT ELEVATION
SCALE: 1/4" = 1'-0"
DOOR
ADJACENT BUILDING
SKY EXPOSURE PLANE
DATE: 7.24.2019
DRAWN BY: CARSON BUNNELL
A-200.00
PAGE 5 OF 11
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
ELEVATION LEGEND
*SOLAR PANEL INSTALLATION COMPLIES WITH
NYC ZONING RESOLUTION 23-62(m)
(16 TOTAL) PV SOLAR MODULES TO BE
INSTALLED A MAX. 6" PARALLEL TO
ROOF SURFACE.
WINDOW(S)
ROOF MATERIAL:COMPOSITION SHINGLE
EXISTING METER(S)
PROPOSED LOCATION OF
DEDICATED PV COMBINER PANEL(S)
PROPOSED LOCTION OF AC
DISCONNECT(S)
SKY EXPOSURE PLANE
4'-5"
MAX. ALLOWABLE
PV EQUIPMENT HEIGHT
20'-11"
PERIMETERWALLHEIGHT
21'-0"
MAX.ALLOWABLEPERIMETERWALLHEIGHT
27'-4"
SOLARPVMODULEHEIGHT
29'-3"
BUILDINGHEIGHT
35'-0"
MAX.ALLOWABLEBUILDINGHEIGHT
ROOF VENT
STAIRS WITH RAILING
10:12 SLOPE
SIDE ELEVATION
SCALE: 1/8" = 1'-0"
5/16"Ø LAG SCREW
PER MFR.
FLASHING
MODULE
38"
38"
35mm PROFILE
40mm PROFILE
3
5
5/16"Ø LAG SCREW
PER MFR.
COUPLING
CLAMP + ATTACHMENT
COUPLING
CLAMP + ATTACHMENT
MODULE
MODULE
RAFTER
RAFTER
SFM 9" SPLICE
SFM 9" ATTACHED SPLICE
SFM 3"
TRIMRAIL
TRIMRAIL SPLICE
TRIMRAIL ROOF ATTACHMENT, SEE TABLE
5/16"Ø LAG SCREW
PER MFR.
MODULE
COUPLING
RAFTER
CLAMP
CANTILEVER L/3 OR LESS
6" MAX
2 1/2" MIN
1
UNIRAC SFM MOUNT
NOT TO SCALE
2
SFM 9" SPLICE
NOT TO SCALE
3
SFM TRIMRAIL
NOT TO SCALE4
PV SYSTEM MOUNTING DETAIL
NOT TO SCALE
5
MODULES IN PORTRAIT/ LANDSCAPE
NOT TO SCALE
6
SFM LAYOUT
NOT TO SCALE
7
ILSCO SGB-4 GROUNDING LUG
NOT TO SCALE
EPDM BONDED
WASHER FORMS
WATERTIGHT SEAL
WATERPROOFING SEALANT
LANDSCAPE=MAX 48" (4'-0"')
PORTRAIT=MAX 48" (4'-0")
MOUNT DETAILS
SCALE: NOT TO SCALE
DATE: 7/24/2019
DRAWN BY: CARSON BUNNELL
A-300.00
AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE
MOUNT/RACKING LEGEND
PAGE 7 OF 11
4' 4' 4' 4' 4' 4' 4' 4' 4' 2'
4' 4'
S 1.1
MOUNTING LEGEND
MOUNT DIAGRAM
SCALE: 1/4" = 1'-0"
ROOF SECTION(S):
1 SLOPE- 40
AZIMUTH- 175.66
MATERIAL- COMPOSITION SHINGLE
2 SLOPE- 40
AZIMUTH- 355.66
MATERIAL- COMPOSITION SHINGLE
1
2
DATE: 5.22.2018
DRAWN BY: CARSON BUNNELL
RAFTER =
MOUNTING FEET =

More Related Content

What's hot

12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Proposed Changes & Revisions to the 2017 National Electrical Code©
Proposed Changes & Revisions to the 2017 National Electrical Code©Proposed Changes & Revisions to the 2017 National Electrical Code©
Proposed Changes & Revisions to the 2017 National Electrical Code©
Nicole Kearney
 
Access control basics-7
Access control basics-7Access control basics-7
Access control basics-7
grantlerc
 
Electrical Wiring
Electrical WiringElectrical Wiring
Electrical Wiring
Ali Warraich
 
3.automatic street light abstract
3.automatic street light abstract3.automatic street light abstract
3.automatic street light abstract
Kamesh Mtec
 
Mobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur RahmanMobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur Rahman
IEEEP Karachi
 
Robert McNamara Resume 2015
Robert McNamara Resume 2015Robert McNamara Resume 2015
Robert McNamara Resume 2015Robert McNamara
 

What's hot (9)

12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
Proposed Changes & Revisions to the 2017 National Electrical Code©
Proposed Changes & Revisions to the 2017 National Electrical Code©Proposed Changes & Revisions to the 2017 National Electrical Code©
Proposed Changes & Revisions to the 2017 National Electrical Code©
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Access control basics-7
Access control basics-7Access control basics-7
Access control basics-7
 
Electrical Wiring
Electrical WiringElectrical Wiring
Electrical Wiring
 
3.automatic street light abstract
3.automatic street light abstract3.automatic street light abstract
3.automatic street light abstract
 
Mobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur RahmanMobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur Rahman
 
Robert McNamara Resume 2015
Robert McNamara Resume 2015Robert McNamara Resume 2015
Robert McNamara Resume 2015
 
Thermal Power Plant Safety
Thermal Power Plant SafetyThermal Power Plant Safety
Thermal Power Plant Safety
 

Similar to Photovoltaic Permit Packet

5043120_CAD_1_Updated
5043120_CAD_1_Updated5043120_CAD_1_Updated
5043120_CAD_1_UpdatedAndrew Powley
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf
JovenalTuplano
 
Electricty wiring code 2016
Electricty wiring code 2016Electricty wiring code 2016
Electricty wiring code 2016
Manikandan Mani
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
KristyDyer
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
Anonymouscj7JdRbDb
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
Saurabh Biswas
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
MoturiVinodKumar
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
Djuan Jackson, NOMA, CDT
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
AgohaChinonso
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
Tej Raj Upreti
 
ROMER ENOVA SURETA ( latest resume PDF)
ROMER ENOVA SURETA ( latest resume  PDF)ROMER ENOVA SURETA ( latest resume  PDF)
ROMER ENOVA SURETA ( latest resume PDF)Romer Sureta
 
Over/Under Voltage Protection Circuit
Over/Under Voltage Protection CircuitOver/Under Voltage Protection Circuit
Over/Under Voltage Protection Circuit
MuhammadFazilMemon
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
Mahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
Mahesh Chandra Manav
 
Wiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildingsWiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildings
ducusin_kevin07
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
Aneel-k Suthar
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Mahesh Chandra Manav
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking GarageTurner Solterman
 
Electrical protection in mines John Ainsworth
Electrical protection in mines   John AinsworthElectrical protection in mines   John Ainsworth
Electrical protection in mines John Ainsworth
NSW Environment and Planning
 

Similar to Photovoltaic Permit Packet (20)

5043120_CAD_1_Updated
5043120_CAD_1_Updated5043120_CAD_1_Updated
5043120_CAD_1_Updated
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf
 
Electricty wiring code 2016
Electricty wiring code 2016Electricty wiring code 2016
Electricty wiring code 2016
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
E3.pdf
E3.pdfE3.pdf
E3.pdf
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
ROMER ENOVA SURETA ( latest resume PDF)
ROMER ENOVA SURETA ( latest resume  PDF)ROMER ENOVA SURETA ( latest resume  PDF)
ROMER ENOVA SURETA ( latest resume PDF)
 
Over/Under Voltage Protection Circuit
Over/Under Voltage Protection CircuitOver/Under Voltage Protection Circuit
Over/Under Voltage Protection Circuit
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Wiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildingsWiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildings
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking Garage
 
Electrical protection in mines John Ainsworth
Electrical protection in mines   John AinsworthElectrical protection in mines   John Ainsworth
Electrical protection in mines John Ainsworth
 

Recently uploaded

一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 

Recently uploaded (20)

一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 

Photovoltaic Permit Packet

  • 1. DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL T-001.00 ENERGY ANALYSIS AND PROGRESS INSPECTIONS FOR RESIDENTIAL SOLAR TAX ABATEMENTS APPLICATION TYPE: ALT-2 SCOPE OF WORK: SOLAR ELECTRICAL ARRAY INSTALLATION CLIMATE ZONE: 4A (RESIDENTIAL) 2016 NYCECC CHAPTER 4 (RESIDENTIAL ENERGY EFFICIENCY) TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT, ALL WORK UNDER THIS APPLICATION IS IN COMPLIANCE WITH THE NYCECC (SECTION 101.5.2). ITEM DESCRIPTION ANCHOR SOLAR ELECTRIC SUPPORTING STRUCTURE TO BUILDING STRUCTURE BY SCREWING TO STRUCTURAL MEMBERS, AS SHOWN ON DRAWINGS. PROPOSED VALUE SEALING ALL OPENINGS AND PENETRATIONS AS PRESCRIBIED IN SECTION ECC 402.4.1 AND ECC TABLE 402.4.1.1. PRESCRIPTIVE VALUE AND CITATION CAULKING, GASKETING, WEATHERSTRIPPING OR OTHER MATERIAL ACCORDANCE WITH SECTION ECC 402.4.1.1 AND TABLE R405.2(1) FOR CEILINGS AND ATTICS. SUPPORTING DOCUMENTATION *SEE SHEET INDEX ON COVER SHEET INSPECTION/ TEST (AIR SEALING AND INSULATION - VISUAL) TR8/ IA6 - OPENINGS AND PENETRATIONS IN THE BUILDING ENVELOPE, INCLUDING SITE-BUILT FENESTRATION AND DOORS, SHALL BE VISUALLY INSPECTED TO VERIFY THAT THEY ARE PROPERLY SEALED, IN ACCORDANCE WITH SECTION 402.4.1 AND TABLE 402.4.1.1. (RESPONSIBLE PARTY - NARESH K MAHANGU, PE) FREQUENCY (MINIMUM) AS REQUIRED DURING ENVELOPE CONSTRUCTION REFERENCE STANDARD APPROVED CONSTRUCTION DOCUMENTS; ASTM E283; ASTM E84; RCNYS ECC OR OTHER CITATION 402.4.1. 402.4.2.1.1. TENANT SAFETY: 1. EGRESS - WE DO NOT PLAN TO BLOCK EGRESS TO THE HOUSE. WE WILL SET UP A SAFETY ZONE AROUND THE HOUSE AND WE WILL PLACE A HARD HAT BY THE DOOR. IF ANY CUSTOMERS NEED TO GO IN AND OUT OF THE HOUSE, WE WILL REQUEST THEY WEAR THE PROVIDED HARD HAT AND WE WILL ESCORT THEM WHILE THEY ARE IN THE SAFETY ZONE. WORK RIGHT ABOVE THE DOOR WILL BE TEMPORARILY SUSPENDED WHILE CUSTOMERS ARE WALKING. 2. FIRE SAFETY - OUR VEHICLES ARE EQUIPPED WITH KIDDIE FIRE EXTINGUISHERS IN CASE OF SMALL FIRES. ON TOP OF THAT, WE HAVE PROTOCOLS FOR CALLING EMERGENCY TEAMS AND OUR TECHNICIANS EVACUATING THE PREMISES IF FIRES ARE MORE THAN A SMALL FIRE. 3. HEALTH REQUIREMENTS - WE TAKE ALL CONSTRUCTION TRASH BACK WITH US. TO MINIMIZE CONSTRUCTION NOISE ISSUES, WE START WORK AT 8 AM AND END BY 6 PM. 3.1. LEAD AND ASBESTOS - IF WE RUN INTO LEAD OR ASBESTOS WHEN WE FIRST ASSESS THE PROPERTY, WE HIRE A CONTRACTOR TO REMOVE IT. WE DO NOT PUT OUR TECHNICIANS TO WORK UNTIL AFTER THE LEAD AND ASBESTOS CONCERNS HAVE BEEN ADDRESSED. 4. COMPLIANCE WITH HOUSING STANDARDS - MOST OF OUR WORK IS ON THE ROOF, WITH SOME ELECTRICAL WORK INSIDE. WE WILL SET UP SAFETY ZONES AROUND THE AREA WHERE WE WILL PERFORM THE ELECTRICAL WORK. WHILE WE ARE WORKING, THESE AREAS WILL BE OFF LIMITS TO THE CUSTOMER. 5. STRUCTURAL SAFETY - WE WILL NOT DO ANY WORK THAT WILL COMPROMISE THE STRUCTURAL STABILITY OF THE HOUSE. 6. NOISE RESTRICTIONS - WE WILL WORK ONLY BETWEEN 8 AM AND 6 PM. OUR NOISIEST TOOL IS A BIG HAMMER DRILL THAT IF USED WILL ONLY BE USED FOR AN HOUR AT MOST. 7. MAINTAINING ESSENTIAL SERVICES - WE DO NOT CUT HEAT, HOT WATER, COLD WATER OR GAS TO THE HOUSE. IN SOME CASES, WE MAY NEED TO CUT ELECTRICITY FOR A PERIOD OF 2-4 HOURS. THIS IS A NECESSITY FOR ELECTRICAL SAFETY REASONS. WHEN WE CUT POWER TO THE HOUSE WE WILL LET THE CUSTOMER KNOW AND WORK WITH THEM TO MINIMIZE DISRUPTIONS. 8. OTHER REQUIREMENTS - LADDER SAFETY IS SOMETHING WE TAKE VERY SERIOUSLY. WE WILL NOT ALLOW TENANTS OR HOME OWNERS TO GET ON THE ROOF WHILE WE ARE WORKING UP THERE. GENERAL STRUCTURAL NOTES: NO ADDITIONAL STRUCTURAL WORK REQUIRED AT ROOF FOR SOLAR PANEL INSTALLATION AND THE EXISTING ROOF IS CAPABLE OF SUPPORTING THE LOADS OF THE SOLAR ELECTRICAL GENERATION SYSTEM. SEE BELOW FOR A SUMMARY OF OUR SYSTEM. SEE S 1.0 & S 2.0 FOR ADDITIONAL STRUCTURAL DETAILS. 1. THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THE SFM SYSTEM BY UNIRAC. THE MOUNTING FEET ARE TO BE SPACED AS SHOWN IN THE DETAILS, AND MUST BE STAGGERED TO ADJACENT FRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD. 2. UNLESS NOTED OTHERWISE, MOUNTING ANCHORS SHALL BE 5 16" LAG SCREWS WITH A MINIMUM OF 2 1 2" PENETRATION INTO ROOF FRAMING. 3. THE PROPOSED PV SYSTEM ADDS 2.6 psf TO THE ROOF FRAMING SYSTEM. 4. ROOF LIVE LOAD = 20 psf TYPICAL, 0 psf UNDER NEW PV SYSTEM. 5. GROUND SNOW LOAD = 30 psf 6. WIND SPEED = 130 mph 7. EXPOSURE CATEGORY = B GOVERNING CODES ALL WORK SHALL CONFORM TO THE FOLLOWING CODES 1. 2011 NYC ELECTRICAL CODE 2. 2016 NYC ENERGY CONSERVATION CODE 2.1. SECTION 101 3. 2014 NYC CONSTRUCTION CODE 3.1. BUILDING CODE 3.2. MECHANICAL CODE 3.3. PLUMBING CODE 4. 2014 FDNY FIRE CODE 5. 2014 ADMINISTRATIVE CODE 5.1. SECTION 28-101.4.3 6. ANY OTHER LOCAL AMENDMENTS SCOPE OF WORK: SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS. FIRE CODE NOTE: PER FC 512.4.2 AND FC 504.4.7: ALL CONDUITS AND PIPING INSTALLATIONS WILL BE COLOR-CODED WITH CONTINUOUS, DURABLE AND WATERPROOF REFLECTIVE OR LUMINESCENT MARKINGS AS FOLLOWS AND CONTINUOUSLY LABELED IN AN APPROVED MANNER TO INDICATE ITS CONTENTS: 1. HIGH VOLTAGE WIRING - RED 2. LOW VOLTAGE WIRING - ORANGE ITEMS 3., 4., AND 5 ARE FOR GAS AND FUEL OIL PIPING. NYCECC NOTES: 1. THE SOLAR ELECTRIC GENERATING SYSTEM MEETS ALL THE REQUIREMENTS SET FORTH AND DOES NOT INCLUDE ANY EQUIPMENT CONNECTED TO THE SOLAR ELECTRIC GENERATING SYSTEM THAT IS A COMPONENT OF PARTS OF AN NON-SOLAR ELECTRIC GENERATING SYSTEM OR THAT USES ANY SORT OF RECREATIONAL FACILITY OR EQUIPMENT AS A STORAGE MEDIUM. 2. THERE ARE NO TREES ON OR NEAR THE SUBJECT PARCEL THAT WILL BLOCK THE SOLAR PANELS, OR WITHIN THE HAZARD AREA. ADDITIONAL SPECIAL/ PROGRESS INSPECTIONS (TR1) STRUCTURAL STABILITY - EXISTING BUILDINGS (BC 1704.20.1) FIRE-RESISTANT PENETRATIONS AND JOINTS (BC 1704.27) ENERGY CODE COMPLIANCE PROGRESS INSPECTIONS (BC 110.3.5) FINAL INSPECTION ( 28-116.2.4.2, BC 110.5, DIRECTIVE 14 OF 1975, AND 1 RCNY SEC.101-10) RESPONSIBLE PARTY ................................................................................NARESH K MAHANGU, PE ......................................................................................NARESH K MAHANGU, PE ......................................................................NARESH K MAHANGU, PE .............................NARESH K MAHANGU, PE PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS: PV SYSTEM SIZE - 5.120kW DC | 3.680kW AC PV INTERCONNECTION METHOD - PV MODULE - (16) Hanwha Solar: Q.PEAK DUO BLK-G5 320w PV MODULE DIMENSIONS - (L/W/H) 66.34"/ 39.37"/ 1.26" MICRO-INVERTER*- (16) ENPHASE ENERGY IQ6-60-2-US *MOUNTED TO THE BACK OF MODULES EXISTING INTERIOR ELECTRICAL PANEL LOCATIONS - SEE A 100, A 101, A 102 PAGE 1 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE GENERAL ELECTRICAL NOTES: ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE. FOR ROOF-MOUNTED SYSTEMS, WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF SURFACE. 1. ANY CODE VIOLATIONS EVIDENT IN THE INTERCONNECTION PANEL WILL BE CORRECTED ON INSTALLATION. 2. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL RELEVANT CODE 3. RAPID SHUTDOWN INITIATION TAKES PLACE AT THE AC DISCONNECT. RAPID SHUTDOWN COMMENCES UPON LOSS OF UTILITY SOURCE VOLTAGE. 4. SEE *E-100 AND *E-101 FOR DIAGRAMS, CALCULATIONS, SCHEDULE AND SPECIFICATIONS. SHEET INDEX: T 001 - COVER SHEET A 100 - PLOT PLAN A 101 - SITE PLAN A 102 - FLOOR PLAN A 200 - ELEVATION(S) A 300 - MOUNT DETAILS A 400 - WARNING LABELS A 500 - WARNING LABEL LOCATIONS E 100 - ELECTRICAL DIAGRAM E 101 - ELECTRICAL NOTES SUPPLY TAP
  • 2. N PLOT PLAN SCALE: 3/32" = 1'-0" A-100.00 PAGE 2 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE PLOT LEGEND DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL 16 NEW HANWHA SOLAR: Q.PEAK DUO BLK-G5 320W MODULES, WITH IQ6-60-2-US INVERTERS LOT SIZE: 0.046 ACRES BLOCK NUMBER: 7904 LOT NUMBER: 72 ZONE: R3-2 COMMERCIAL OVERLAY: N/A EXISTING 2 STORY HOME BUILDING CLASS: 1-FAMILY RESIDENTIAL Attached BUILDING HEIGHT: 0'-0" FLOOD EVACUATION ZONE: 3 N EXISTING EXTERIOR UTILITY METER PROPOSED LOCATION OF DEDICATED PV COMBINER PANEL(S) & AC DISCONNECT(S) PROPERTY LINE FENCE LINE DRIVEWAY 30'-0" MIN. REAR YARD 15'-0" MIN. FRONT YARD N 100'-0" 20'-6" ADJACENT STRUCTURE DRIVEWAY MAIN HOME GARAGE
  • 3. N SITE PLAN SCALE: 1/8" = 1'-0" MC AC DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL ROOF VENT CHIMNEY A-101.00 PAGE 3 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE SYSTEM LEGEND M AC C EXISTING INTERIOR MAIN SERVICE PANEL(S) & POINT OF INTERCONNECTION. TIED TO UTILITY METER(S). (*SEE A-102 FOR DETAILS) NEW PV SYSTEM AC DISCONNECT(S) (RSD). LOCATED WITHIN 10' OF MSP. NEW DEDICATED PV SYSTEM COMBINER PANEL(S). 16 NEW HANWHA SOLAR: Q.PEAK DUO BLK-G5 320W MODULES NEW ENPHASE ENERGY IQ6-60-2-US INVERTERS, MOUNTED ON THE BACK OF EACH MODULE. PV SYSTEM SIZE: NEW 5.120kW DC | 3.680kW AC NEW PV CONDUIT RUN.*SEE EE1.0 CONDUIT SCHEDULE = EXTERIOR RUN = ATTIC RUN ALL CONDUITS AND PIPING INSTALLATIONS WILL BE COLOR-CODED WITH CONTINUOUS, DURABLE AND WATERPROOF REFLECTIVE OR LUMINESCENT MARKINGS AS FOLLOWS AND CONTINUOUSLY LABELED IN AN APPROVED MANNER TO INDICATE ITS CONTENTS: 1. HIGH VOLTAGE WIRING - RED 2. LOW VOLTAGE WIRING - ORANGE *ITEMS 3., 4., AND 5 ARE FOR GAS AND FUEL OIL PIPING. CLEAR ACCESS PATHWAY PER FDNY FC512.3 ROOF RIDGE PV CIRCUIT(S): #1) 16 MODULES ROOF SECTION(S): 1 SLOPE- 40 AZIMUTH- 175.66 MATERIAL- COMPOSITION SHINGLE 2 SLOPE- 40 AZIMUTH- 355.66 MATERIAL- COMPOSITION SHINGLE FRONT A 200 SIDE A 201 NEW JUNCTION BOX. (MOUNTED WITH SOLADECK) 3'-0" 3'-0" 1 ROOF VENT ADJACENT BUILDING
  • 4. UP N DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL A-102.00 PAGE 4 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE FLOOR PLAN LEGEND STAIRWAY EXISTING BASEMENT LEVEL M1 LOCATION OF UTILITY METER #9516279. POINT OF INTERCONNECT AT EXISTING INTERIOR MAIN SERVICE PANEL. PROPOSED CONDUIT M1 AC C AC C 1 STAND-ALONE UTILITY METER #9516279. DOOR NEW PV SYSTEM AC DISCONNECT(S) (RSD). NEW DEDICATED PV SYSTEM COMBINER PANEL(S). FLOOR PLAN SCALE: 3/16" = 1'-0" 1
  • 5. DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL A-200.00 PAGE 5 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE ELEVATION LEGEND *SOLAR PANEL INSTALLATION COMPLIES WITH NYC ZONING RESOLUTION 23-62(m) (16 TOTAL) PV SOLAR MODULES TO BE INSTALLED A MAX. 6" PARALLEL TO ROOF SURFACE. WINDOW(S) ROOF MATERIAL:COMPOSITION SHINGLE EXISTING METER(S) PROPOSED LOCATION OF DEDICATED PV COMBINER PANEL(S) PROPOSED LOCTION OF AC DISCONNECT(S) 6'-7" MAX. ALLOWABLE PV EQUIPMENT HEIGHT 20'-11" PERIMETERWALLHEIGHT 21'-0" MAX.ALLOWABLEPERIMETERWALLHEIGHT 27'-4" SOLARPVMODULEHEIGHT 29'-3" BUILDINGHEIGHT 35'-0" MAX.ALLOWABLEBUILDINGHEIGHT 12 10 FRONT ELEVATION SCALE: 1/4" = 1'-0" DOOR ADJACENT BUILDING SKY EXPOSURE PLANE
  • 6. DATE: 7.24.2019 DRAWN BY: CARSON BUNNELL A-200.00 PAGE 5 OF 11 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE ELEVATION LEGEND *SOLAR PANEL INSTALLATION COMPLIES WITH NYC ZONING RESOLUTION 23-62(m) (16 TOTAL) PV SOLAR MODULES TO BE INSTALLED A MAX. 6" PARALLEL TO ROOF SURFACE. WINDOW(S) ROOF MATERIAL:COMPOSITION SHINGLE EXISTING METER(S) PROPOSED LOCATION OF DEDICATED PV COMBINER PANEL(S) PROPOSED LOCTION OF AC DISCONNECT(S) SKY EXPOSURE PLANE 4'-5" MAX. ALLOWABLE PV EQUIPMENT HEIGHT 20'-11" PERIMETERWALLHEIGHT 21'-0" MAX.ALLOWABLEPERIMETERWALLHEIGHT 27'-4" SOLARPVMODULEHEIGHT 29'-3" BUILDINGHEIGHT 35'-0" MAX.ALLOWABLEBUILDINGHEIGHT ROOF VENT STAIRS WITH RAILING 10:12 SLOPE SIDE ELEVATION SCALE: 1/8" = 1'-0"
  • 7. 5/16"Ø LAG SCREW PER MFR. FLASHING MODULE 38" 38" 35mm PROFILE 40mm PROFILE 3 5 5/16"Ø LAG SCREW PER MFR. COUPLING CLAMP + ATTACHMENT COUPLING CLAMP + ATTACHMENT MODULE MODULE RAFTER RAFTER SFM 9" SPLICE SFM 9" ATTACHED SPLICE SFM 3" TRIMRAIL TRIMRAIL SPLICE TRIMRAIL ROOF ATTACHMENT, SEE TABLE 5/16"Ø LAG SCREW PER MFR. MODULE COUPLING RAFTER CLAMP CANTILEVER L/3 OR LESS 6" MAX 2 1/2" MIN 1 UNIRAC SFM MOUNT NOT TO SCALE 2 SFM 9" SPLICE NOT TO SCALE 3 SFM TRIMRAIL NOT TO SCALE4 PV SYSTEM MOUNTING DETAIL NOT TO SCALE 5 MODULES IN PORTRAIT/ LANDSCAPE NOT TO SCALE 6 SFM LAYOUT NOT TO SCALE 7 ILSCO SGB-4 GROUNDING LUG NOT TO SCALE EPDM BONDED WASHER FORMS WATERTIGHT SEAL WATERPROOFING SEALANT LANDSCAPE=MAX 48" (4'-0"') PORTRAIT=MAX 48" (4'-0") MOUNT DETAILS SCALE: NOT TO SCALE DATE: 7/24/2019 DRAWN BY: CARSON BUNNELL A-300.00 AREA BELOW TO BE FILLED BY NYC DOB EMPLOYEE MOUNT/RACKING LEGEND PAGE 7 OF 11
  • 8. 4' 4' 4' 4' 4' 4' 4' 4' 4' 2' 4' 4' S 1.1 MOUNTING LEGEND MOUNT DIAGRAM SCALE: 1/4" = 1'-0" ROOF SECTION(S): 1 SLOPE- 40 AZIMUTH- 175.66 MATERIAL- COMPOSITION SHINGLE 2 SLOPE- 40 AZIMUTH- 355.66 MATERIAL- COMPOSITION SHINGLE 1 2 DATE: 5.22.2018 DRAWN BY: CARSON BUNNELL RAFTER = MOUNTING FEET =