SPECIFICATIONS
SYSTEM SIZE 4.680KW
MODULE TYPE
AND AMOUNT
(18) Yingli Energy YL260P-29b
MODULE
DIMENSIONS
(L/W/H) 64.57in (1640mm)/ 38.98in
(990mm)/ 1.38in (35mm) Weight
40.8lbs (18.5kg)
INVERTER TYPE
AND AMOUNT
GOVERNING CODES
ALL WORK SHALL COMPLY WITH THE CODES
BELOW
2013 CA RESIDENTIAL CODE
2013 CA MECHANICAL CODE
2013 CA ELECTRICAL CODE
2013 CA GREEN CODE
2013 CA PLUMBING CODE
2013 CA ENERGY CODE
CS1.0COVER
SHEET
SHEET
NAME:
SHEET
NUMBER:
General Notes:
1. ALL SUBMITTALS WILL COMPLY WITH 2013 CEC, CBC, AND CFC.
2. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE RETROFITTED
INTO THE EXISTING DWELLING. THE REQUIRED SMOKE ALARMS AND
CARBON MONOXIDE DETECTORS SHALL BE LOCATED AS REQUIRED
PER SECTIONS R314 & R315 WITHIN THE 2010 CRC.
3. ALL CONDUITS AND EQUIPMENT SHALL BE PAINTED TO MATCH THE
EXISTING BACKGROUND MATERIAL COLOR OF THEIR LOCATION.
4. A LADDER WILL BE PROVIDED AND SET UP FOR THE INSPECTION.
(1) SOLAR EDGE SE3800A-US-U
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
CALICENSE:973756(C46/C10)
DRAWNBY:AP
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
N
PV1.0SITE
PLAN
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561
SCALE: 1/8" = 1'-0"
PV SYSTEM SITE PLAN
LastModified:6/23/2016AR5043120
(18) Yingli Energy YL260P-29b MODULES WITH
(18) SolarEdge P300 Optimizer
ON THE BACK OF EACH MODULE.
CALIFORNIAC-46#-973756
NAME-CODYORAM
LEGEND
UTILITY METER
A/C DISCONNECT
A/C JUNCTION BOX
INVERTER
M
AC
I
M
AC
I
NOTES:
1. ALTERNATE POWER SOURCE PLACARD SHALL BE
PERMANENTLY ATTACHED TO A/C DISCONNECT WHICH
MEETS SPECIFICATIONS OUTLINED IN SAN DIEGO AREA
NEWSLETTER.
2. ELECTRICAL INSTALL SHALL COMPLY WITH 2013
CALIFORNIA ELECTRICAL CODE, 2013 CALIFORNIA
BUILDING CODE, 2013 CALIFORNIA RESIDENTIAL CODE,
2013 MECHANICAL CODE, 2013 PLUMBING CODE, 2013
EDITION OF THE CALIFORNIA ENERGY EFFICIENCY
STANDARDS, COUNTY OF SAN DIEGO CONSOLIDATED
FIRE CODE, AND CURRENT SAN DIEGO AREA
ELECTRICAL NEWSLETTER.
3. ALL SOLAR MODULES, EQUIPMENT, AND METALLIC
COMPONENTS SHALL BE BONDED.
4. IF THE EXISTING MAIN SERVICE DOES NOT HAVE
VERIFIABLE GROUNDING ELECTRODE, IT IS THE PV
CONTRACTOR'S RESPONSIBILITY TO INSTALL A
SUPPLEMENTAL GROUNDING ELECTRODE.
5. EACH MODULE SHALL BE GROUNDED USING THE
SUPPLIED CONNECTION POINTS IDENTIFIED ON THE
MODULE AND THE MANUFACTURER'S INSTRUCTIONS.
6. PV INSTALLATION SHALL NOT OBSTRUCT ANY
PLUMBING, MECHANICAL OR BUILDING ROOF VENTS.
7.ROOF ACCESS POINT WILL NOT BE PLACED OVER ANY
OPENING SUCH AS WINDOWS OR DOORS. IT WILL BE
LOCATED AT A STRONG POINT OF BUILDING
CONSTRUCTION WHERE ACCESS POINT DOES NOT
CONFLICT WITH OVERHEAD
OBSTRUCTIONS.
8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE
SERVICE DISCONNECTING MEANS OF THE OTHER
SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE
PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)]
-EACH SOURCE CONNECTION SHALL BE MADE AT A
DEDICATED CIRCUIT BREAKER OR FUSIBLE
DISCONNECTING MEANS. [NEC 690.64(B)(1)]
-THE SUM OF THE AMPERE RATING OF THE
OVERCURRENT DEVICES IN CIRCUITS SUPPLYING
POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT
EXCEED 120% OF THE RATING OF BUSBAR OR
CONDUCTOR. [NEC 690.64(B)(2)]
-THE INTERCONNECTIN POINT SHALL BE ON THE LINE
SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT.
[NEC 690.64(B)(3)]
-EQUIPMENT CONTAINING OVERCURRENT DEVICES IN
CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SHALL BE MARKED TO INDICATE THE
PRESENCE OF ALL SOURCES. [NEC 690.64(B)(4)]
-CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE
FOR SUCH OPERATION. [NEC 690.64(B)(5)]
LCLC LOAD CENTER (IF APPLICABLE)
CERTIFICATION, DECLARATION AND ACKNOWLEDGEMENT
1. I HEREBY ACKNOWLEDGE THAT I AM THE RESPONSIBLE DESIGN PROFESSIONAL FOR THIS PROJECT AND THAT I AM ACCOUNTABLE FOR THE KNOWING AND COMPLYING WITH THE GOVERNING POLICIES, REGULATIONS AND CODE REQUIREMENTS APPLICABLE FOR THIS INSTALLATION.
2. I HEREBY ACKNOWLEDGE THAT MAINTAINING MY PROFESSIONAL CERTIFICATION PRIVILEGE REQUIRES ACCURATE PLANS AND INSTALLATIONS ON A CONSISTENT BASIS.
3. AS THE RESPONSIBLE DESIGN PROFESSIONAL, I HAVE TAKEN THE PROFESSIONAL CLASS AND HAVE BEEN PLACED ON THE APPROVED LIST FOR PLAN REVIEW OF SOLAR PV PROFESSIONAL CERTIFICATION.
WITH THIS SUBMITTAL, I CONFIRM THAT THE PLANS AND DOCUMENTS SUBMITTED FOR APPROVAL COMPLY WITH THE GOVERNING POLICIES, REGULATIONS, AND CODE REQUIREMENTS THAT ARE APPLICABLE TO THE PROPOSED INSTALLATION. I UNDERSTAND THAT, IF INSTALLATION
DEVIATES FROM THE REQUIREMENTS IN SECTION IV, A CONSTRUCTION CHANGE MAY BE REQUIRED AND FINAL APPROVAL WILL BE DELAYED. I ALSO UNDERSTAND THAT SUBMITTING INACCURATE PLANS AND INSTALLATIONS MAY RESULT IN THE REVOCATION OF MY PROFESSIONAL
CERTIFICATION PRIVILEGE FOR ONE YEAR.
98' OF EMT CONDUIT
FROM JUNCTION BOX TO ELEC PANEL
JUNCTION BOX ATTACHED TO
ARRAY USING Rock It EQUIPMENT TO
KEEP JUNCTION BOX OFF ROOF.
ELECTRICAL SERVICE LOCATION
(KEEP 3' CLEARANCE FROM
NATURAL GAS EQUIPMENT),
LOCKABLE DISCONNECT SWITCH,
& COMBINER PANEL (IF APPLICABLE)
ROOF ACCESS POINT
6953MewallDr,SanDiegoCA92119
PV SYSTEM SIZE:
4.680000 kW DC
3' OFFSET FOR
ROOF ACCESS
CALICENSE:973756(C46/C10)
M AC IM AC I
3'
3'
3'
3'
3'
3'
PV2.0ROOF
PLAN
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561
SCALE: 1/8" = 1'-0"
PV SYSTEM ROOF PLAN
LastModified:6/23/2016AR5043120
CALIFORNIAC-46#-973756
NAME-CODYORAM
Roof Azimuth: 89
Roof Tilt: 20
Roof Section 1
Roof Section 2
Roof Section 3
COMP. SHINGLE
CA Fire Code Offset shall not apply to roofs
with slopes of two units verticle in 12 units
horizontal (2:12) or less.
1. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST
OUTLETS, VENTILATIONS INTAKE AIR OPENINGS SHALL
NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC
SYSTEM.
2. ALL PHOTOVOLTAIC (PV) MODULES SHALL BE MOUNTED
ON THE ROOF. ADDITIONAL EQUIPMENT OF THE PV
SYSTEM SHALL BE LOCATED OUTSIDE THE BUILDING
NEAR THE MAIN ELECTRICAL SERVICES. [NEC 690.14 (C)]
3. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED
WHENEVER EXPOSED TO LIGHT, PV CONTRACTOR
DISABLE THE ARRAY DURING INSTALLATION AND
SERVICE
BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING
THE ARRAY WITH OPAQUE COVERING. [NEC 690.18]
4.ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE
LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT.
[NEC 690.31 (B), 310.8 (D)]
5. THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR
LISTED FOR PHOTOVOLTAIC (PV) WIRE. [NEC 690.31(B)]
6. ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR
UNIQUE IDENTIFICATION.
7. PV MODULE NEGATIVE SHALL BE GROUNDED. ALL
GROUNDED CONDUCTOR SHALL BE PROPERLY COLOR
IDENTIFIED AS WHITE. [NEC 200.6]
8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE
SERVICE DISCONNECTING MEANS OF THE OTHER
SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE
PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)]
- EACH SOURCE CONNECTION SHALL BE MADE AT A
DEDICATED CIRCUIT BREAKER OR FUSIBLE
DISCONNECTING MEANS. [NEC 690.64(B)(1)]
- THE SUM OF THE AMPERE RATING OF THE
OVERCURRENT DEVICES IN CIRCUITS SUPPLYING
POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT
EXCEED 120% OF THE RATING OF BUSBAR OR
CONDUCTOR. [NEC 690.64(B)(2)]
- THE INTERCONNECTION POINT SHALL BE ON THE LINE
SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT.
[NEC 690.64(B)(3)]
- EQUIPMENT CONTAINING OVERCURRENT DEVICES IN
CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SHALL BE MARKED TO INDICATE THE
PRESENCE OF ALL SOURCES. [NEC 690.64 (B)(4)]
- CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE
FOR SUCH OPERATION. [NEC 690.64 (B)(5)]
9. THE UTILITY-INTERACTIVE INVERTERS SHALL
AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE
CONNECTED ELECTRICAL PRODUCTION AND
DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN
THE SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL
THE ELECTRICAL PRODUCTION AND DISTRIBUTION
NETWORK VOLTAGE HAS BEEN RESTORED. [NEC 690.61]
10. THE DISTANCE BETWEEN THE ROOF AND BOTTOM OF
THE CONDUIT IS 1
2 INCH.
11. ALL WIRES TO BE PROVIDED WITH STRAIN RELIEF AT ALL
ENTRY TO JUNCTION BOXES AS REQUIRED BY THE BOX
LISTINGS.
12. THE GROUNDING ELECTRODE CONDUCTOR FROM THE
MICRO INVERTER SHALL BE RUN CONTINUOUSLY TO
THE GROUNDING ELECTRODE AND CONNECTED WITH
LISTED CONNECTOR OR IRREVERSIBLY SPLICED TO
THE EXISTING GROUNDING ELECTRODE CONDUCTOR.
13. 2013 FIRE CODE " WARNING PHOTOVOLTAIC POWER
SOURCE" [NEC 605.11.12]
14. SOLAR PHOTOVOLTAIC POWER SYSTEMS SHALL BE
INSTALLED IN ACCORDANCE WITH CA FIRE CODE
SECTIONS 605.11.1 THROUGH 605.11.4 THE CA BUILDING
CODE, THE CA RESIDENTIAL CODE AND THE CA
ELECTRICAL CODE.
15. CLEAR EQUIPMENT MARKING IS NEEDED FOR
FIREFIGHTER SAFETY AND AWARENESS, AS
FIREFIGHTERS MUST WORK IN PROXIMITY TO
ENERGIZED EQUIPMENT DURING A FIRE EMERGENCY
AND MUST BE ABLE TO SAFELY ISOLATE POWER.
MARKING REQUIRED BY CFC 605.11.1 IS IN ADDITION TO
ANY IDENTIFYING MARKING REQUIRED BY THE CA
ELECTRICAL CODE.
-THE MARKING IS REQUIRED ON INTERIOR AND EXTERIOR
ELECTRICAL CONDUIT, ENCLOSURES, RACEWAYS,
CABLE ASSEMBLIES, JUNCTION BOXES, COMBINER
BOXES, AND DISCONNECTS.
-MATERIALS USED FOR MARKING SHALL BE REFLECTIVE,
WEATHER RESISTANT AND SUITABLE FOR THE
ENVIROMENT.
-THE MARKING SHALL CONTAIN THE WORDS "WARNING
PHOTOVOLTAIC POWER SOURCE"
-THE MARKING SHALL BE DISPLAYED IN THE FOLLOWING
FORMAT: RED BACKGROUND, WHITE LETTERING,
MINIMUM 3
8" LETTER HEIGHT, ALL CAPITAL LETTERS
-MARKING SHALL BE PLACED ON ALL INTERIOR AND
EXTERIOR CONDUIT
PV STRING #1:
18 MODULES
CALICENSE:973756(C46/C10)
SYMBOL KEY:
MDIA/C
TIE INTO
UTILITY METER #
05543121
DISCONNECTINVERTER
EXISTING
CONDUIT
A/C UNIT
ELECTRICAL
MAST
SATELLITE
DISH
CHIMNEYSKYLIGHT
ROOF
VENT(S)
PLUMBING
VENT(S)
3' FIRECODE
OFFSET
CONDUIT
&
JUNCTION BOX
MD I
5/16"x3/8"
HEX FLANGE BOLT
300 SERIES SS
ISOMETRIC VIEW
SIDE VIEW
5/16"x4 1/2"
SS LAG SCREW
COMP SHINGLES
METAL
FLASHING
COMP SHINGLES
SHIP LAP
METAL FLASHING
ROCK-IT SLIDE
METAL
FLASHING
COMP SHINGLES
PV 3.0
1 ROCK-IT MOUNT
NOT TO SCALE
ROCK-IT COUPLING
MID CLAMP
ROCK-IT
PEDESTAL
(1) 5/16"x4 1/2"
SS LAG SCREW
EPDM BONDED WASHER
FORMS WATERTIGHT SEAL
2
PV 3.0
SECTION VIEW
ROCK-IT SLIDE
SIDE VIEW
TOP VIEW
ISOMETRIC VIEW
ROCK-IT COUPLING
MID CLAMP
ROCK-IT COUPLING SHELF
TIE PLATE
ROCK-IT COUPLING
MID CLAMP
ROCK-IT
COUPLING SHELF
PV 3.0
2 ROCK-IT COUPLING ASSEMBLY
NOT TO SCALE
5/16"x1 1/2"
HEX FLANGE BOLT
300 SERIES SS
2 1/2" MIN
COUPLING
CLAMP + ATTACHMENT
COUPLING
CLAMP + ATTACHMENT
L=PORTRAIT
CLAMP SPACING
PERMITTED
CLAMP SPACING
MODULE
L=LANDSCAPE CLAMP SPACING
MODULE
MODULE
L=MAX 72" (6')
COUPLING
RAFTER
CLAMP RAFTER
CANTILEVER L/3 OR LESS
RAFTER
PV 3.0
5 MODULES IN PORTRAIT/LANDSPACE
NOT TO SCALE
RISE/RUN = 4
12
PV 3.0
4 PV SYSTEM MOUNTING DETAIL
NOT TO SCALE
PV 3.0
3 SECTION VIEW
NOT TO SCALE
PV 3.0
6 PV ARRAY TYP. ELEVATION
NOT TO SCALE
PV MODULE, TYP. MOUNT
TO FRAMING OF EXISTING
ROOF TYPE, PARALLEL
WITH PLANE OF ROOF
1
PV 3.0
PV 3.0
7 CONDUIT MOUNTING DETAIL
NOT TO SCALE
3" MIN AND 8" MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE
CONDUITONE HOLE STEEL STRAP
CONDUIT MOUNT BRACKET
FLASHING OR TILE STRAP
1 1/2"
PV3.0
MOUNT.
DETAILS
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
CALICENSE:973756(C46/C10)
Tag # Description Wire Gauge # of Conductors/Color Conduit Type Conduit Size
1 PV Wire 10 AWG 2(V+, V-) N/A-Free Air N/A-Free Air
1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A-Free Air N/A-Free Air
2 THWN - 2 10 AWG 2(1L1, 1L2) EMT 3/4"
2 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4"
3 THWN - 2 10 AWG 3(1L1, 1L2, 1N) EMT 3/4"
3 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4"
Created:6/23/16
Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER)
DAVIDLISSResidence
6953MEWALLDR
SANDIEGO,CA92119
UtilityAccount:47404199561
SHEET
NUMBER:
E.1
5043120
CALICENSE:973756(C46&C10)
INSTALLERNUMBER:1.877.404.4129
INSTALLER:VIVINTSOLAR
3-Line
Drawing
SHEET
NAME:
Photovoltaic System
DC System Size
AC System Size
Total Module Count
4680
3800
18
Existing 240V/200A,
175A Main Disconnect
Service Panel Single
Phase - CENTER FED -
Square D DU221RB
240V/30A UNFUSED
NEMA3 OR EQUIVALENT
Solar Edge
SE3800A-US
VISIBLE/LOCKABLE 'KNIFE' A/C
DISCONNECT
3
3
MINIMUM GEC SIZE 4 AWG
COPPER
20A
Point of Interconnection, Load Side
705.12(D)(2), Conforms to CEC 2013
175A
Breakers dependent upon the Continuous Maximum Output. PV circuit nominal current
based off # of modules per Circuit X (1.25(NEC code 210.19(A)(1)(a) X (.9 Max AC
current per micro-inverter)
Inverter 1: SE3800 A-US-U Max Output = 15.83 A x 1.25 (NEC code 210.19(A)(1)(a))
= 19.79 A < 20 A (OCPD)
system output current w/ continuous duty = 19.79 < 20A (System OCPD)
- Wire Gauge Calculated from NEC code 310.15(B)(16) with ambient temperature calculations from NEC 310.15(2)(a) using the 90C column (On the Roof)
or 75C column (Off the Roof), 310.15(B)(3)(c) for *1/2 off roof, and raceway fill adjustment 310.15(B)(16).Rating of conductor after adjustments MUST be
Greater than output current
On Roof - Calculation - Wire Rating (90C) x Ambient(*+22C) x Conduit Fill Derate
(On Roof): 10 gauge wire rated for 40 A, 40 A x 0.82 x 1 (2 Conductors) = 32.8 > 18
(Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 32.8 > 20
(Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 35 > 20
18
18PV MODULES PER INVERTER = 4680 WATTS
STC
STRING 1: 18 PV
MODULES
2
3
1
1.) Integrated module grounding method: Rock It, racking grounding provided by burndy lay in lugs (CL 501-TN) or equally UL list product.
2.) All conductor enclosures and raceways shall be connected to the equipment grounding conductor (250.86). Bonding jumpers shall be used around impaired
connections. Continuity shall be ensured by methods listed in 250.92 (B) (1) through (4),which includes but are not limited to grounding ","bushings, bonding-
type lock nuts, and other listed bonding methods.
3.) In compliance with CEC 250.64 (C) conductor splices will only be allowed with compression connectors or exothermic welding.
4.) The Gec / EGC shall be Continuous, or when spliced, the splice shall be made by irreversible crimp or exothermic weld.
All ampacity calculations are made in compliance with NEC 220.5B
Placard will be installed on
Panel that says: "This panel has
been de-rated to 175A. Do not
install larger breaker"
Optimizer Solar Edge P300
DC Input Power 300 Watts
DC Max Input Voltage 48 Volts
DC Max Input Current 12.5 Amps
DC Max Output Current 15 Amps
Max String Rating 5250 Watts
Inverter Make/Model
PV Module Rating @ STC
Module Make/Model YL260P-29b
Max Power-Point Current (Imp) 8.59 Amps
Max Power-Point Voltage (Vmp) 30.3 Volts
Open-Circuit Voltage (Voc) 37.7 Volts
Short-Circuit Current (Isc) 9.09 Amps
Max Series Fuse (OCPD) 15 Amps
Nom. Maximum Power at STC (Pmax) 260 Watts
Maximum System Voltage 1000 V (IEC) / 600 V (UL)
Voc Temperature Coefficient -0.32 %/C
DC Safety Switch
Rated for max operating condition of inverter NEC
690.35 compliant
AC Output Current According to NEC 690.8(B)(1) 20 Amps
Nominal AC Voltage 240 Volts
THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR)
Conductor Calculations
OCPD Calculations
Other Notes
ROOFTOP CONDUCTOR AMPACITIES DESIGNED IN
COMPLIANCE WITH NEC 690.8, TABLES 310.15(B)(2)(a),
310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), CHAPTER 9
TABLE 4, 5, & 9. LOCATION SPECIFIC TEMPERATURE
OBTAINED FROM ASHRAE 2013 DATA TABLES.
ASHRAE 2013 -
Highest Monthly 2% DB Design Temp: 27.5 Celsius
Lowest Min. Mean Extreme DB: 3.1 Celsius
SE3800A-US
CEC Efficiency 98 %
AC Operating Voltage 240 Volts
Continuous Max Output Current 16 Amps
DC Maximum Input Current 13 Amps
Short Circuit Current 17.5 Amps
Max Output Fault Current 17.5 A/20ms
Inverter Make/Model
PV4.0
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
CALIFORNIAC-46#-973756
NAME-CODYORAM
DESIGN
LOGIC
USAGE CONSTRAINT
EST. ANNUAL CONSUMPTION: 7413
EST. ANNUAL PRODUCTION: 7160.4
PV SYSTEM OFFSET: 96.6%
7 MODULES AT 1627 SUN HOURS
4 MODULES AT 1653.6 SUN HOURS
7 MODULES AT 1362 SUN HOURS
CALICENSE:973756(C46/C10)
All other roof sections not
used. Usage was reached
with other roof sections

More Related Content

What's hot

Presentacion english 20200714_tfg_sergio_garcia
Presentacion english 20200714_tfg_sergio_garciaPresentacion english 20200714_tfg_sergio_garcia
Presentacion english 20200714_tfg_sergio_garciaSergioGarcaLpez7
 
Casos de uso Cisco 6500 VSS
Casos de uso Cisco 6500 VSSCasos de uso Cisco 6500 VSS
Casos de uso Cisco 6500 VSSperceo81
 
Data Center Security Case-Study
Data Center Security Case-StudyData Center Security Case-Study
Data Center Security Case-StudyR. James Brownlow
 
LayerZero Series 70: ePanel-2 Wall-Mounted Power Panel
LayerZero Series 70: ePanel-2 Wall-Mounted Power PanelLayerZero Series 70: ePanel-2 Wall-Mounted Power Panel
LayerZero Series 70: ePanel-2 Wall-Mounted Power PanelLayerZero Power Systems, Inc.
 
06 pinze di-terra-eng
06 pinze di-terra-eng06 pinze di-terra-eng
06 pinze di-terra-engHai Pham
 
RF Solutions Protext System
RF Solutions Protext SystemRF Solutions Protext System
RF Solutions Protext SystemRFSolutions
 
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power Panel
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power PanelLayerZero Series 70: eRPP-FS Front/Side Access Remote Power Panel
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power PanelLayerZero Power Systems, Inc.
 
American Fibertek MR404C User Manual
American Fibertek MR404C User ManualAmerican Fibertek MR404C User Manual
American Fibertek MR404C User ManualJMAC Supply
 
RoHS_Certification
RoHS_CertificationRoHS_Certification
RoHS_CertificationMax Slatiner
 
ComNet NWK1 Data Sheet
ComNet NWK1 Data SheetComNet NWK1 Data Sheet
ComNet NWK1 Data SheetJMAC Supply
 
Optoacoplador 817a
Optoacoplador  817aOptoacoplador  817a
Optoacoplador 817aDario Acosta
 
American Fibertek MR440CSL User Manual
American Fibertek MR440CSL User ManualAmerican Fibertek MR440CSL User Manual
American Fibertek MR440CSL User ManualJMAC Supply
 
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...Thorne & Derrick International
 
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...LayerZero Power Systems, Inc.
 
American Fibertek MR-10 User Manual
American Fibertek MR-10 User ManualAmerican Fibertek MR-10 User Manual
American Fibertek MR-10 User ManualJMAC Supply
 
G&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsG&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsThorne & Derrick International
 
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands Thorne & Derrick International
 
Breaking the rules! bicsi
Breaking the rules! bicsi  Breaking the rules! bicsi
Breaking the rules! bicsi Jeffrey Lam
 

What's hot (20)

Presentacion english 20200714_tfg_sergio_garcia
Presentacion english 20200714_tfg_sergio_garciaPresentacion english 20200714_tfg_sergio_garcia
Presentacion english 20200714_tfg_sergio_garcia
 
Casos de uso Cisco 6500 VSS
Casos de uso Cisco 6500 VSSCasos de uso Cisco 6500 VSS
Casos de uso Cisco 6500 VSS
 
Data Center Security Case-Study
Data Center Security Case-StudyData Center Security Case-Study
Data Center Security Case-Study
 
LayerZero Series 70: ePanel-2 Wall-Mounted Power Panel
LayerZero Series 70: ePanel-2 Wall-Mounted Power PanelLayerZero Series 70: ePanel-2 Wall-Mounted Power Panel
LayerZero Series 70: ePanel-2 Wall-Mounted Power Panel
 
06 pinze di-terra-eng
06 pinze di-terra-eng06 pinze di-terra-eng
06 pinze di-terra-eng
 
RF Solutions Protext System
RF Solutions Protext SystemRF Solutions Protext System
RF Solutions Protext System
 
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power Panel
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power PanelLayerZero Series 70: eRPP-FS Front/Side Access Remote Power Panel
LayerZero Series 70: eRPP-FS Front/Side Access Remote Power Panel
 
LayerZero Series 70: eRPP Remote Power Panel
LayerZero Series 70: eRPP Remote Power PanelLayerZero Series 70: eRPP Remote Power Panel
LayerZero Series 70: eRPP Remote Power Panel
 
American Fibertek MR404C User Manual
American Fibertek MR404C User ManualAmerican Fibertek MR404C User Manual
American Fibertek MR404C User Manual
 
RoHS_Certification
RoHS_CertificationRoHS_Certification
RoHS_Certification
 
ComNet NWK1 Data Sheet
ComNet NWK1 Data SheetComNet NWK1 Data Sheet
ComNet NWK1 Data Sheet
 
Optoacoplador 817a
Optoacoplador  817aOptoacoplador  817a
Optoacoplador 817a
 
American Fibertek MR440CSL User Manual
American Fibertek MR440CSL User ManualAmerican Fibertek MR440CSL User Manual
American Fibertek MR440CSL User Manual
 
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...
CMP BW LSF Brass Cable Glands - CMP Solo Cable Glands Low Smoke & Fume, Zero ...
 
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...
LayerZero Series 70 ePODs: Type-X Power Distribution Unit with Transformer an...
 
American Fibertek MR-10 User Manual
American Fibertek MR-10 User ManualAmerican Fibertek MR-10 User Manual
American Fibertek MR-10 User Manual
 
G&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsG&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & Terminations
 
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands
CMP PX2K-20S/16 Barrier Glands Exd Flameproof (ATEX) Cable Glands
 
Breaking the rules! bicsi
Breaking the rules! bicsi  Breaking the rules! bicsi
Breaking the rules! bicsi
 
Access point
Access pointAccess point
Access point
 

Similar to 5043120_CAD_1_Updated

Photovoltaic Permit Packet
Photovoltaic Permit PacketPhotovoltaic Permit Packet
Photovoltaic Permit PacketCarsonBunnell
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdfJovenalTuplano
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal KristyDyer
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revisedBasudev patra
 
5178015 daewoo-cm-101 s-dth-21s7-dth-21s8
5178015 daewoo-cm-101 s-dth-21s7-dth-21s85178015 daewoo-cm-101 s-dth-21s7-dth-21s8
5178015 daewoo-cm-101 s-dth-21s7-dth-21s8victor blas estrada
 
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsJames S Nasby
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enMunir Kaderbhai
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...Institution of Lighting Professionals
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
 
National Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code ChangesNational Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code ChangesSchneider Electric
 
Rapid shutdown arc fault presentation SPI 2014
Rapid shutdown arc fault presentation SPI 2014Rapid shutdown arc fault presentation SPI 2014
Rapid shutdown arc fault presentation SPI 2014Claude Colp
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system componentsChirag Jain
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_advertsKhalid Sithari
 
Wiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildingsWiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildingsducusin_kevin07
 
228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summaryJoaquin Oronan
 
Specifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfSpecifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfAmjiShah
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15Antoinette Pope
 

Similar to 5043120_CAD_1_Updated (20)

Photovoltaic Permit Packet
Photovoltaic Permit PacketPhotovoltaic Permit Packet
Photovoltaic Permit Packet
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf
 
Code questions
Code questionsCode questions
Code questions
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
 
5178015 daewoo-cm-101 s-dth-21s7-dth-21s8
5178015 daewoo-cm-101 s-dth-21s7-dth-21s85178015 daewoo-cm-101 s-dth-21s7-dth-21s8
5178015 daewoo-cm-101 s-dth-21s7-dth-21s8
 
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-en
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
National Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code ChangesNational Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code Changes
 
Rapid shutdown arc fault presentation SPI 2014
Rapid shutdown arc fault presentation SPI 2014Rapid shutdown arc fault presentation SPI 2014
Rapid shutdown arc fault presentation SPI 2014
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system components
 
Rec installation-manual
Rec installation-manualRec installation-manual
Rec installation-manual
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts
 
Wiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildingsWiring design for commercial and industrial buildings
Wiring design for commercial and industrial buildings
 
228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary
 
Specifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfSpecifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdf
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 

5043120_CAD_1_Updated

  • 1. NEW PV SOLAR SYSTEM FOR Liss Residence LOCATED AT 6953 Mewall Dr San Diego, CA 92119 PV SOLAR SYSTEM SPECIFICATIONS SYSTEM SIZE 4.680KW MODULE TYPE AND AMOUNT (18) Yingli Energy YL260P-29b MODULE DIMENSIONS (L/W/H) 64.57in (1640mm)/ 38.98in (990mm)/ 1.38in (35mm) Weight 40.8lbs (18.5kg) INVERTER TYPE AND AMOUNT GOVERNING CODES ALL WORK SHALL COMPLY WITH THE CODES BELOW 2013 CA RESIDENTIAL CODE 2013 CA MECHANICAL CODE 2013 CA ELECTRICAL CODE 2013 CA GREEN CODE 2013 CA PLUMBING CODE 2013 CA ENERGY CODE CS1.0COVER SHEET SHEET NAME: SHEET NUMBER: General Notes: 1. ALL SUBMITTALS WILL COMPLY WITH 2013 CEC, CBC, AND CFC. 2. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE RETROFITTED INTO THE EXISTING DWELLING. THE REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS SHALL BE LOCATED AS REQUIRED PER SECTIONS R314 & R315 WITHIN THE 2010 CRC. 3. ALL CONDUITS AND EQUIPMENT SHALL BE PAINTED TO MATCH THE EXISTING BACKGROUND MATERIAL COLOR OF THEIR LOCATION. 4. A LADDER WILL BE PROVIDED AND SET UP FOR THE INSPECTION. (1) SOLAR EDGE SE3800A-US-U INSTALLER:VIVINTSOLAR INSTALLERNUMBER:1.877.404.4129 CALICENSE:973756(C46/C10) DRAWNBY:AP LissResidence 6953MewallDr SanDiego,CA92119 UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
  • 2. N PV1.0SITE PLAN INSTALLER:VIVINTSOLAR INSTALLERNUMBER:1.877.404.4129 DRAWNBY:AP SHEET NAME: SHEET NUMBER: LissResidence 6953MewallDr SanDiego,CA92119 UTILITYACCOUNTNUMBER:47404199561 SCALE: 1/8" = 1'-0" PV SYSTEM SITE PLAN LastModified:6/23/2016AR5043120 (18) Yingli Energy YL260P-29b MODULES WITH (18) SolarEdge P300 Optimizer ON THE BACK OF EACH MODULE. CALIFORNIAC-46#-973756 NAME-CODYORAM LEGEND UTILITY METER A/C DISCONNECT A/C JUNCTION BOX INVERTER M AC I M AC I NOTES: 1. ALTERNATE POWER SOURCE PLACARD SHALL BE PERMANENTLY ATTACHED TO A/C DISCONNECT WHICH MEETS SPECIFICATIONS OUTLINED IN SAN DIEGO AREA NEWSLETTER. 2. ELECTRICAL INSTALL SHALL COMPLY WITH 2013 CALIFORNIA ELECTRICAL CODE, 2013 CALIFORNIA BUILDING CODE, 2013 CALIFORNIA RESIDENTIAL CODE, 2013 MECHANICAL CODE, 2013 PLUMBING CODE, 2013 EDITION OF THE CALIFORNIA ENERGY EFFICIENCY STANDARDS, COUNTY OF SAN DIEGO CONSOLIDATED FIRE CODE, AND CURRENT SAN DIEGO AREA ELECTRICAL NEWSLETTER. 3. ALL SOLAR MODULES, EQUIPMENT, AND METALLIC COMPONENTS SHALL BE BONDED. 4. IF THE EXISTING MAIN SERVICE DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE, IT IS THE PV CONTRACTOR'S RESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. 5. EACH MODULE SHALL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED ON THE MODULE AND THE MANUFACTURER'S INSTRUCTIONS. 6. PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. 7.ROOF ACCESS POINT WILL NOT BE PLACED OVER ANY OPENING SUCH AS WINDOWS OR DOORS. IT WILL BE LOCATED AT A STRONG POINT OF BUILDING CONSTRUCTION WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS. 8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)] -EACH SOURCE CONNECTION SHALL BE MADE AT A DEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECTING MEANS. [NEC 690.64(B)(1)] -THE SUM OF THE AMPERE RATING OF THE OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT EXCEED 120% OF THE RATING OF BUSBAR OR CONDUCTOR. [NEC 690.64(B)(2)] -THE INTERCONNECTIN POINT SHALL BE ON THE LINE SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT. [NEC 690.64(B)(3)] -EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES. [NEC 690.64(B)(4)] -CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE FOR SUCH OPERATION. [NEC 690.64(B)(5)] LCLC LOAD CENTER (IF APPLICABLE) CERTIFICATION, DECLARATION AND ACKNOWLEDGEMENT 1. I HEREBY ACKNOWLEDGE THAT I AM THE RESPONSIBLE DESIGN PROFESSIONAL FOR THIS PROJECT AND THAT I AM ACCOUNTABLE FOR THE KNOWING AND COMPLYING WITH THE GOVERNING POLICIES, REGULATIONS AND CODE REQUIREMENTS APPLICABLE FOR THIS INSTALLATION. 2. I HEREBY ACKNOWLEDGE THAT MAINTAINING MY PROFESSIONAL CERTIFICATION PRIVILEGE REQUIRES ACCURATE PLANS AND INSTALLATIONS ON A CONSISTENT BASIS. 3. AS THE RESPONSIBLE DESIGN PROFESSIONAL, I HAVE TAKEN THE PROFESSIONAL CLASS AND HAVE BEEN PLACED ON THE APPROVED LIST FOR PLAN REVIEW OF SOLAR PV PROFESSIONAL CERTIFICATION. WITH THIS SUBMITTAL, I CONFIRM THAT THE PLANS AND DOCUMENTS SUBMITTED FOR APPROVAL COMPLY WITH THE GOVERNING POLICIES, REGULATIONS, AND CODE REQUIREMENTS THAT ARE APPLICABLE TO THE PROPOSED INSTALLATION. I UNDERSTAND THAT, IF INSTALLATION DEVIATES FROM THE REQUIREMENTS IN SECTION IV, A CONSTRUCTION CHANGE MAY BE REQUIRED AND FINAL APPROVAL WILL BE DELAYED. I ALSO UNDERSTAND THAT SUBMITTING INACCURATE PLANS AND INSTALLATIONS MAY RESULT IN THE REVOCATION OF MY PROFESSIONAL CERTIFICATION PRIVILEGE FOR ONE YEAR. 98' OF EMT CONDUIT FROM JUNCTION BOX TO ELEC PANEL JUNCTION BOX ATTACHED TO ARRAY USING Rock It EQUIPMENT TO KEEP JUNCTION BOX OFF ROOF. ELECTRICAL SERVICE LOCATION (KEEP 3' CLEARANCE FROM NATURAL GAS EQUIPMENT), LOCKABLE DISCONNECT SWITCH, & COMBINER PANEL (IF APPLICABLE) ROOF ACCESS POINT 6953MewallDr,SanDiegoCA92119 PV SYSTEM SIZE: 4.680000 kW DC 3' OFFSET FOR ROOF ACCESS CALICENSE:973756(C46/C10) M AC IM AC I
  • 3. 3' 3' 3' 3' 3' 3' PV2.0ROOF PLAN INSTALLER:VIVINTSOLAR INSTALLERNUMBER:1.877.404.4129 DRAWNBY:AP SHEET NAME: SHEET NUMBER: LissResidence 6953MewallDr SanDiego,CA92119 UTILITYACCOUNTNUMBER:47404199561 SCALE: 1/8" = 1'-0" PV SYSTEM ROOF PLAN LastModified:6/23/2016AR5043120 CALIFORNIAC-46#-973756 NAME-CODYORAM Roof Azimuth: 89 Roof Tilt: 20 Roof Section 1 Roof Section 2 Roof Section 3 COMP. SHINGLE CA Fire Code Offset shall not apply to roofs with slopes of two units verticle in 12 units horizontal (2:12) or less. 1. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 2. ALL PHOTOVOLTAIC (PV) MODULES SHALL BE MOUNTED ON THE ROOF. ADDITIONAL EQUIPMENT OF THE PV SYSTEM SHALL BE LOCATED OUTSIDE THE BUILDING NEAR THE MAIN ELECTRICAL SERVICES. [NEC 690.14 (C)] 3. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER EXPOSED TO LIGHT, PV CONTRACTOR DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH OPAQUE COVERING. [NEC 690.18] 4.ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT. [NEC 690.31 (B), 310.8 (D)] 5. THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR LISTED FOR PHOTOVOLTAIC (PV) WIRE. [NEC 690.31(B)] 6. ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR UNIQUE IDENTIFICATION. 7. PV MODULE NEGATIVE SHALL BE GROUNDED. ALL GROUNDED CONDUCTOR SHALL BE PROPERLY COLOR IDENTIFIED AS WHITE. [NEC 200.6] 8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)] - EACH SOURCE CONNECTION SHALL BE MADE AT A DEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECTING MEANS. [NEC 690.64(B)(1)] - THE SUM OF THE AMPERE RATING OF THE OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT EXCEED 120% OF THE RATING OF BUSBAR OR CONDUCTOR. [NEC 690.64(B)(2)] - THE INTERCONNECTION POINT SHALL BE ON THE LINE SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT. [NEC 690.64(B)(3)] - EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES. [NEC 690.64 (B)(4)] - CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE FOR SUCH OPERATION. [NEC 690.64 (B)(5)] 9. THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED. [NEC 690.61] 10. THE DISTANCE BETWEEN THE ROOF AND BOTTOM OF THE CONDUIT IS 1 2 INCH. 11. ALL WIRES TO BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY TO JUNCTION BOXES AS REQUIRED BY THE BOX LISTINGS. 12. THE GROUNDING ELECTRODE CONDUCTOR FROM THE MICRO INVERTER SHALL BE RUN CONTINUOUSLY TO THE GROUNDING ELECTRODE AND CONNECTED WITH LISTED CONNECTOR OR IRREVERSIBLY SPLICED TO THE EXISTING GROUNDING ELECTRODE CONDUCTOR. 13. 2013 FIRE CODE " WARNING PHOTOVOLTAIC POWER SOURCE" [NEC 605.11.12] 14. SOLAR PHOTOVOLTAIC POWER SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH CA FIRE CODE SECTIONS 605.11.1 THROUGH 605.11.4 THE CA BUILDING CODE, THE CA RESIDENTIAL CODE AND THE CA ELECTRICAL CODE. 15. CLEAR EQUIPMENT MARKING IS NEEDED FOR FIREFIGHTER SAFETY AND AWARENESS, AS FIREFIGHTERS MUST WORK IN PROXIMITY TO ENERGIZED EQUIPMENT DURING A FIRE EMERGENCY AND MUST BE ABLE TO SAFELY ISOLATE POWER. MARKING REQUIRED BY CFC 605.11.1 IS IN ADDITION TO ANY IDENTIFYING MARKING REQUIRED BY THE CA ELECTRICAL CODE. -THE MARKING IS REQUIRED ON INTERIOR AND EXTERIOR ELECTRICAL CONDUIT, ENCLOSURES, RACEWAYS, CABLE ASSEMBLIES, JUNCTION BOXES, COMBINER BOXES, AND DISCONNECTS. -MATERIALS USED FOR MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIROMENT. -THE MARKING SHALL CONTAIN THE WORDS "WARNING PHOTOVOLTAIC POWER SOURCE" -THE MARKING SHALL BE DISPLAYED IN THE FOLLOWING FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3 8" LETTER HEIGHT, ALL CAPITAL LETTERS -MARKING SHALL BE PLACED ON ALL INTERIOR AND EXTERIOR CONDUIT PV STRING #1: 18 MODULES CALICENSE:973756(C46/C10) SYMBOL KEY: MDIA/C TIE INTO UTILITY METER # 05543121 DISCONNECTINVERTER EXISTING CONDUIT A/C UNIT ELECTRICAL MAST SATELLITE DISH CHIMNEYSKYLIGHT ROOF VENT(S) PLUMBING VENT(S) 3' FIRECODE OFFSET CONDUIT & JUNCTION BOX MD I
  • 4. 5/16"x3/8" HEX FLANGE BOLT 300 SERIES SS ISOMETRIC VIEW SIDE VIEW 5/16"x4 1/2" SS LAG SCREW COMP SHINGLES METAL FLASHING COMP SHINGLES SHIP LAP METAL FLASHING ROCK-IT SLIDE METAL FLASHING COMP SHINGLES PV 3.0 1 ROCK-IT MOUNT NOT TO SCALE ROCK-IT COUPLING MID CLAMP ROCK-IT PEDESTAL (1) 5/16"x4 1/2" SS LAG SCREW EPDM BONDED WASHER FORMS WATERTIGHT SEAL 2 PV 3.0 SECTION VIEW ROCK-IT SLIDE SIDE VIEW TOP VIEW ISOMETRIC VIEW ROCK-IT COUPLING MID CLAMP ROCK-IT COUPLING SHELF TIE PLATE ROCK-IT COUPLING MID CLAMP ROCK-IT COUPLING SHELF PV 3.0 2 ROCK-IT COUPLING ASSEMBLY NOT TO SCALE 5/16"x1 1/2" HEX FLANGE BOLT 300 SERIES SS 2 1/2" MIN COUPLING CLAMP + ATTACHMENT COUPLING CLAMP + ATTACHMENT L=PORTRAIT CLAMP SPACING PERMITTED CLAMP SPACING MODULE L=LANDSCAPE CLAMP SPACING MODULE MODULE L=MAX 72" (6') COUPLING RAFTER CLAMP RAFTER CANTILEVER L/3 OR LESS RAFTER PV 3.0 5 MODULES IN PORTRAIT/LANDSPACE NOT TO SCALE RISE/RUN = 4 12 PV 3.0 4 PV SYSTEM MOUNTING DETAIL NOT TO SCALE PV 3.0 3 SECTION VIEW NOT TO SCALE PV 3.0 6 PV ARRAY TYP. ELEVATION NOT TO SCALE PV MODULE, TYP. MOUNT TO FRAMING OF EXISTING ROOF TYPE, PARALLEL WITH PLANE OF ROOF 1 PV 3.0 PV 3.0 7 CONDUIT MOUNTING DETAIL NOT TO SCALE 3" MIN AND 8" MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE CONDUITONE HOLE STEEL STRAP CONDUIT MOUNT BRACKET FLASHING OR TILE STRAP 1 1/2" PV3.0 MOUNT. DETAILS INSTALLER:VIVINTSOLAR INSTALLERNUMBER:1.877.404.4129 DRAWNBY:AP SHEET NAME: SHEET NUMBER: LissResidence 6953MewallDr SanDiego,CA92119 UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120 CALICENSE:973756(C46/C10)
  • 5. Tag # Description Wire Gauge # of Conductors/Color Conduit Type Conduit Size 1 PV Wire 10 AWG 2(V+, V-) N/A-Free Air N/A-Free Air 1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A-Free Air N/A-Free Air 2 THWN - 2 10 AWG 2(1L1, 1L2) EMT 3/4" 2 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4" 3 THWN - 2 10 AWG 3(1L1, 1L2, 1N) EMT 3/4" 3 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4" Created:6/23/16 Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) DAVIDLISSResidence 6953MEWALLDR SANDIEGO,CA92119 UtilityAccount:47404199561 SHEET NUMBER: E.1 5043120 CALICENSE:973756(C46&C10) INSTALLERNUMBER:1.877.404.4129 INSTALLER:VIVINTSOLAR 3-Line Drawing SHEET NAME: Photovoltaic System DC System Size AC System Size Total Module Count 4680 3800 18 Existing 240V/200A, 175A Main Disconnect Service Panel Single Phase - CENTER FED - Square D DU221RB 240V/30A UNFUSED NEMA3 OR EQUIVALENT Solar Edge SE3800A-US VISIBLE/LOCKABLE 'KNIFE' A/C DISCONNECT 3 3 MINIMUM GEC SIZE 4 AWG COPPER 20A Point of Interconnection, Load Side 705.12(D)(2), Conforms to CEC 2013 175A Breakers dependent upon the Continuous Maximum Output. PV circuit nominal current based off # of modules per Circuit X (1.25(NEC code 210.19(A)(1)(a) X (.9 Max AC current per micro-inverter) Inverter 1: SE3800 A-US-U Max Output = 15.83 A x 1.25 (NEC code 210.19(A)(1)(a)) = 19.79 A < 20 A (OCPD) system output current w/ continuous duty = 19.79 < 20A (System OCPD) - Wire Gauge Calculated from NEC code 310.15(B)(16) with ambient temperature calculations from NEC 310.15(2)(a) using the 90C column (On the Roof) or 75C column (Off the Roof), 310.15(B)(3)(c) for *1/2 off roof, and raceway fill adjustment 310.15(B)(16).Rating of conductor after adjustments MUST be Greater than output current On Roof - Calculation - Wire Rating (90C) x Ambient(*+22C) x Conduit Fill Derate (On Roof): 10 gauge wire rated for 40 A, 40 A x 0.82 x 1 (2 Conductors) = 32.8 > 18 (Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 32.8 > 20 (Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 35 > 20 18 18PV MODULES PER INVERTER = 4680 WATTS STC STRING 1: 18 PV MODULES 2 3 1 1.) Integrated module grounding method: Rock It, racking grounding provided by burndy lay in lugs (CL 501-TN) or equally UL list product. 2.) All conductor enclosures and raceways shall be connected to the equipment grounding conductor (250.86). Bonding jumpers shall be used around impaired connections. Continuity shall be ensured by methods listed in 250.92 (B) (1) through (4),which includes but are not limited to grounding ","bushings, bonding- type lock nuts, and other listed bonding methods. 3.) In compliance with CEC 250.64 (C) conductor splices will only be allowed with compression connectors or exothermic welding. 4.) The Gec / EGC shall be Continuous, or when spliced, the splice shall be made by irreversible crimp or exothermic weld. All ampacity calculations are made in compliance with NEC 220.5B Placard will be installed on Panel that says: "This panel has been de-rated to 175A. Do not install larger breaker" Optimizer Solar Edge P300 DC Input Power 300 Watts DC Max Input Voltage 48 Volts DC Max Input Current 12.5 Amps DC Max Output Current 15 Amps Max String Rating 5250 Watts Inverter Make/Model PV Module Rating @ STC Module Make/Model YL260P-29b Max Power-Point Current (Imp) 8.59 Amps Max Power-Point Voltage (Vmp) 30.3 Volts Open-Circuit Voltage (Voc) 37.7 Volts Short-Circuit Current (Isc) 9.09 Amps Max Series Fuse (OCPD) 15 Amps Nom. Maximum Power at STC (Pmax) 260 Watts Maximum System Voltage 1000 V (IEC) / 600 V (UL) Voc Temperature Coefficient -0.32 %/C DC Safety Switch Rated for max operating condition of inverter NEC 690.35 compliant AC Output Current According to NEC 690.8(B)(1) 20 Amps Nominal AC Voltage 240 Volts THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Conductor Calculations OCPD Calculations Other Notes ROOFTOP CONDUCTOR AMPACITIES DESIGNED IN COMPLIANCE WITH NEC 690.8, TABLES 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), CHAPTER 9 TABLE 4, 5, & 9. LOCATION SPECIFIC TEMPERATURE OBTAINED FROM ASHRAE 2013 DATA TABLES. ASHRAE 2013 - Highest Monthly 2% DB Design Temp: 27.5 Celsius Lowest Min. Mean Extreme DB: 3.1 Celsius SE3800A-US CEC Efficiency 98 % AC Operating Voltage 240 Volts Continuous Max Output Current 16 Amps DC Maximum Input Current 13 Amps Short Circuit Current 17.5 Amps Max Output Fault Current 17.5 A/20ms Inverter Make/Model
  • 6.
  • 7. PV4.0 INSTALLER:VIVINTSOLAR INSTALLERNUMBER:1.877.404.4129 DRAWNBY:AP SHEET NAME: SHEET NUMBER: LissResidence 6953MewallDr SanDiego,CA92119 UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120 CALIFORNIAC-46#-973756 NAME-CODYORAM DESIGN LOGIC USAGE CONSTRAINT EST. ANNUAL CONSUMPTION: 7413 EST. ANNUAL PRODUCTION: 7160.4 PV SYSTEM OFFSET: 96.6% 7 MODULES AT 1627 SUN HOURS 4 MODULES AT 1653.6 SUN HOURS 7 MODULES AT 1362 SUN HOURS CALICENSE:973756(C46/C10) All other roof sections not used. Usage was reached with other roof sections