1. NEW PV SOLAR SYSTEM FOR
Liss Residence LOCATED AT
6953 Mewall Dr San Diego, CA 92119
PV SOLAR SYSTEM
SPECIFICATIONS
SYSTEM SIZE 4.680KW
MODULE TYPE
AND AMOUNT
(18) Yingli Energy YL260P-29b
MODULE
DIMENSIONS
(L/W/H) 64.57in (1640mm)/ 38.98in
(990mm)/ 1.38in (35mm) Weight
40.8lbs (18.5kg)
INVERTER TYPE
AND AMOUNT
GOVERNING CODES
ALL WORK SHALL COMPLY WITH THE CODES
BELOW
2013 CA RESIDENTIAL CODE
2013 CA MECHANICAL CODE
2013 CA ELECTRICAL CODE
2013 CA GREEN CODE
2013 CA PLUMBING CODE
2013 CA ENERGY CODE
CS1.0COVER
SHEET
SHEET
NAME:
SHEET
NUMBER:
General Notes:
1. ALL SUBMITTALS WILL COMPLY WITH 2013 CEC, CBC, AND CFC.
2. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE RETROFITTED
INTO THE EXISTING DWELLING. THE REQUIRED SMOKE ALARMS AND
CARBON MONOXIDE DETECTORS SHALL BE LOCATED AS REQUIRED
PER SECTIONS R314 & R315 WITHIN THE 2010 CRC.
3. ALL CONDUITS AND EQUIPMENT SHALL BE PAINTED TO MATCH THE
EXISTING BACKGROUND MATERIAL COLOR OF THEIR LOCATION.
4. A LADDER WILL BE PROVIDED AND SET UP FOR THE INSPECTION.
(1) SOLAR EDGE SE3800A-US-U
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
CALICENSE:973756(C46/C10)
DRAWNBY:AP
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
2. N
PV1.0SITE
PLAN
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561
SCALE: 1/8" = 1'-0"
PV SYSTEM SITE PLAN
LastModified:6/23/2016AR5043120
(18) Yingli Energy YL260P-29b MODULES WITH
(18) SolarEdge P300 Optimizer
ON THE BACK OF EACH MODULE.
CALIFORNIAC-46#-973756
NAME-CODYORAM
LEGEND
UTILITY METER
A/C DISCONNECT
A/C JUNCTION BOX
INVERTER
M
AC
I
M
AC
I
NOTES:
1. ALTERNATE POWER SOURCE PLACARD SHALL BE
PERMANENTLY ATTACHED TO A/C DISCONNECT WHICH
MEETS SPECIFICATIONS OUTLINED IN SAN DIEGO AREA
NEWSLETTER.
2. ELECTRICAL INSTALL SHALL COMPLY WITH 2013
CALIFORNIA ELECTRICAL CODE, 2013 CALIFORNIA
BUILDING CODE, 2013 CALIFORNIA RESIDENTIAL CODE,
2013 MECHANICAL CODE, 2013 PLUMBING CODE, 2013
EDITION OF THE CALIFORNIA ENERGY EFFICIENCY
STANDARDS, COUNTY OF SAN DIEGO CONSOLIDATED
FIRE CODE, AND CURRENT SAN DIEGO AREA
ELECTRICAL NEWSLETTER.
3. ALL SOLAR MODULES, EQUIPMENT, AND METALLIC
COMPONENTS SHALL BE BONDED.
4. IF THE EXISTING MAIN SERVICE DOES NOT HAVE
VERIFIABLE GROUNDING ELECTRODE, IT IS THE PV
CONTRACTOR'S RESPONSIBILITY TO INSTALL A
SUPPLEMENTAL GROUNDING ELECTRODE.
5. EACH MODULE SHALL BE GROUNDED USING THE
SUPPLIED CONNECTION POINTS IDENTIFIED ON THE
MODULE AND THE MANUFACTURER'S INSTRUCTIONS.
6. PV INSTALLATION SHALL NOT OBSTRUCT ANY
PLUMBING, MECHANICAL OR BUILDING ROOF VENTS.
7.ROOF ACCESS POINT WILL NOT BE PLACED OVER ANY
OPENING SUCH AS WINDOWS OR DOORS. IT WILL BE
LOCATED AT A STRONG POINT OF BUILDING
CONSTRUCTION WHERE ACCESS POINT DOES NOT
CONFLICT WITH OVERHEAD
OBSTRUCTIONS.
8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE
SERVICE DISCONNECTING MEANS OF THE OTHER
SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE
PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)]
-EACH SOURCE CONNECTION SHALL BE MADE AT A
DEDICATED CIRCUIT BREAKER OR FUSIBLE
DISCONNECTING MEANS. [NEC 690.64(B)(1)]
-THE SUM OF THE AMPERE RATING OF THE
OVERCURRENT DEVICES IN CIRCUITS SUPPLYING
POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT
EXCEED 120% OF THE RATING OF BUSBAR OR
CONDUCTOR. [NEC 690.64(B)(2)]
-THE INTERCONNECTIN POINT SHALL BE ON THE LINE
SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT.
[NEC 690.64(B)(3)]
-EQUIPMENT CONTAINING OVERCURRENT DEVICES IN
CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SHALL BE MARKED TO INDICATE THE
PRESENCE OF ALL SOURCES. [NEC 690.64(B)(4)]
-CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE
FOR SUCH OPERATION. [NEC 690.64(B)(5)]
LCLC LOAD CENTER (IF APPLICABLE)
CERTIFICATION, DECLARATION AND ACKNOWLEDGEMENT
1. I HEREBY ACKNOWLEDGE THAT I AM THE RESPONSIBLE DESIGN PROFESSIONAL FOR THIS PROJECT AND THAT I AM ACCOUNTABLE FOR THE KNOWING AND COMPLYING WITH THE GOVERNING POLICIES, REGULATIONS AND CODE REQUIREMENTS APPLICABLE FOR THIS INSTALLATION.
2. I HEREBY ACKNOWLEDGE THAT MAINTAINING MY PROFESSIONAL CERTIFICATION PRIVILEGE REQUIRES ACCURATE PLANS AND INSTALLATIONS ON A CONSISTENT BASIS.
3. AS THE RESPONSIBLE DESIGN PROFESSIONAL, I HAVE TAKEN THE PROFESSIONAL CLASS AND HAVE BEEN PLACED ON THE APPROVED LIST FOR PLAN REVIEW OF SOLAR PV PROFESSIONAL CERTIFICATION.
WITH THIS SUBMITTAL, I CONFIRM THAT THE PLANS AND DOCUMENTS SUBMITTED FOR APPROVAL COMPLY WITH THE GOVERNING POLICIES, REGULATIONS, AND CODE REQUIREMENTS THAT ARE APPLICABLE TO THE PROPOSED INSTALLATION. I UNDERSTAND THAT, IF INSTALLATION
DEVIATES FROM THE REQUIREMENTS IN SECTION IV, A CONSTRUCTION CHANGE MAY BE REQUIRED AND FINAL APPROVAL WILL BE DELAYED. I ALSO UNDERSTAND THAT SUBMITTING INACCURATE PLANS AND INSTALLATIONS MAY RESULT IN THE REVOCATION OF MY PROFESSIONAL
CERTIFICATION PRIVILEGE FOR ONE YEAR.
98' OF EMT CONDUIT
FROM JUNCTION BOX TO ELEC PANEL
JUNCTION BOX ATTACHED TO
ARRAY USING Rock It EQUIPMENT TO
KEEP JUNCTION BOX OFF ROOF.
ELECTRICAL SERVICE LOCATION
(KEEP 3' CLEARANCE FROM
NATURAL GAS EQUIPMENT),
LOCKABLE DISCONNECT SWITCH,
& COMBINER PANEL (IF APPLICABLE)
ROOF ACCESS POINT
6953MewallDr,SanDiegoCA92119
PV SYSTEM SIZE:
4.680000 kW DC
3' OFFSET FOR
ROOF ACCESS
CALICENSE:973756(C46/C10)
M AC IM AC I
3. 3'
3'
3'
3'
3'
3'
PV2.0ROOF
PLAN
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561
SCALE: 1/8" = 1'-0"
PV SYSTEM ROOF PLAN
LastModified:6/23/2016AR5043120
CALIFORNIAC-46#-973756
NAME-CODYORAM
Roof Azimuth: 89
Roof Tilt: 20
Roof Section 1
Roof Section 2
Roof Section 3
COMP. SHINGLE
CA Fire Code Offset shall not apply to roofs
with slopes of two units verticle in 12 units
horizontal (2:12) or less.
1. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST
OUTLETS, VENTILATIONS INTAKE AIR OPENINGS SHALL
NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC
SYSTEM.
2. ALL PHOTOVOLTAIC (PV) MODULES SHALL BE MOUNTED
ON THE ROOF. ADDITIONAL EQUIPMENT OF THE PV
SYSTEM SHALL BE LOCATED OUTSIDE THE BUILDING
NEAR THE MAIN ELECTRICAL SERVICES. [NEC 690.14 (C)]
3. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED
WHENEVER EXPOSED TO LIGHT, PV CONTRACTOR
DISABLE THE ARRAY DURING INSTALLATION AND
SERVICE
BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING
THE ARRAY WITH OPAQUE COVERING. [NEC 690.18]
4.ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE
LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT.
[NEC 690.31 (B), 310.8 (D)]
5. THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR
LISTED FOR PHOTOVOLTAIC (PV) WIRE. [NEC 690.31(B)]
6. ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR
UNIQUE IDENTIFICATION.
7. PV MODULE NEGATIVE SHALL BE GROUNDED. ALL
GROUNDED CONDUCTOR SHALL BE PROPERLY COLOR
IDENTIFIED AS WHITE. [NEC 200.6]
8. PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE
SERVICE DISCONNECTING MEANS OF THE OTHER
SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE
PREMISES SHALL MEET THE FOLLOWING [NEC 690.64(B)]
- EACH SOURCE CONNECTION SHALL BE MADE AT A
DEDICATED CIRCUIT BREAKER OR FUSIBLE
DISCONNECTING MEANS. [NEC 690.64(B)(1)]
- THE SUM OF THE AMPERE RATING OF THE
OVERCURRENT DEVICES IN CIRCUITS SUPPLYING
POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT
EXCEED 120% OF THE RATING OF BUSBAR OR
CONDUCTOR. [NEC 690.64(B)(2)]
- THE INTERCONNECTION POINT SHALL BE ON THE LINE
SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT.
[NEC 690.64(B)(3)]
- EQUIPMENT CONTAINING OVERCURRENT DEVICES IN
CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SHALL BE MARKED TO INDICATE THE
PRESENCE OF ALL SOURCES. [NEC 690.64 (B)(4)]
- CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE
FOR SUCH OPERATION. [NEC 690.64 (B)(5)]
9. THE UTILITY-INTERACTIVE INVERTERS SHALL
AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE
CONNECTED ELECTRICAL PRODUCTION AND
DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN
THE SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL
THE ELECTRICAL PRODUCTION AND DISTRIBUTION
NETWORK VOLTAGE HAS BEEN RESTORED. [NEC 690.61]
10. THE DISTANCE BETWEEN THE ROOF AND BOTTOM OF
THE CONDUIT IS 1
2 INCH.
11. ALL WIRES TO BE PROVIDED WITH STRAIN RELIEF AT ALL
ENTRY TO JUNCTION BOXES AS REQUIRED BY THE BOX
LISTINGS.
12. THE GROUNDING ELECTRODE CONDUCTOR FROM THE
MICRO INVERTER SHALL BE RUN CONTINUOUSLY TO
THE GROUNDING ELECTRODE AND CONNECTED WITH
LISTED CONNECTOR OR IRREVERSIBLY SPLICED TO
THE EXISTING GROUNDING ELECTRODE CONDUCTOR.
13. 2013 FIRE CODE " WARNING PHOTOVOLTAIC POWER
SOURCE" [NEC 605.11.12]
14. SOLAR PHOTOVOLTAIC POWER SYSTEMS SHALL BE
INSTALLED IN ACCORDANCE WITH CA FIRE CODE
SECTIONS 605.11.1 THROUGH 605.11.4 THE CA BUILDING
CODE, THE CA RESIDENTIAL CODE AND THE CA
ELECTRICAL CODE.
15. CLEAR EQUIPMENT MARKING IS NEEDED FOR
FIREFIGHTER SAFETY AND AWARENESS, AS
FIREFIGHTERS MUST WORK IN PROXIMITY TO
ENERGIZED EQUIPMENT DURING A FIRE EMERGENCY
AND MUST BE ABLE TO SAFELY ISOLATE POWER.
MARKING REQUIRED BY CFC 605.11.1 IS IN ADDITION TO
ANY IDENTIFYING MARKING REQUIRED BY THE CA
ELECTRICAL CODE.
-THE MARKING IS REQUIRED ON INTERIOR AND EXTERIOR
ELECTRICAL CONDUIT, ENCLOSURES, RACEWAYS,
CABLE ASSEMBLIES, JUNCTION BOXES, COMBINER
BOXES, AND DISCONNECTS.
-MATERIALS USED FOR MARKING SHALL BE REFLECTIVE,
WEATHER RESISTANT AND SUITABLE FOR THE
ENVIROMENT.
-THE MARKING SHALL CONTAIN THE WORDS "WARNING
PHOTOVOLTAIC POWER SOURCE"
-THE MARKING SHALL BE DISPLAYED IN THE FOLLOWING
FORMAT: RED BACKGROUND, WHITE LETTERING,
MINIMUM 3
8" LETTER HEIGHT, ALL CAPITAL LETTERS
-MARKING SHALL BE PLACED ON ALL INTERIOR AND
EXTERIOR CONDUIT
PV STRING #1:
18 MODULES
CALICENSE:973756(C46/C10)
SYMBOL KEY:
MDIA/C
TIE INTO
UTILITY METER #
05543121
DISCONNECTINVERTER
EXISTING
CONDUIT
A/C UNIT
ELECTRICAL
MAST
SATELLITE
DISH
CHIMNEYSKYLIGHT
ROOF
VENT(S)
PLUMBING
VENT(S)
3' FIRECODE
OFFSET
CONDUIT
&
JUNCTION BOX
MD I
4. 5/16"x3/8"
HEX FLANGE BOLT
300 SERIES SS
ISOMETRIC VIEW
SIDE VIEW
5/16"x4 1/2"
SS LAG SCREW
COMP SHINGLES
METAL
FLASHING
COMP SHINGLES
SHIP LAP
METAL FLASHING
ROCK-IT SLIDE
METAL
FLASHING
COMP SHINGLES
PV 3.0
1 ROCK-IT MOUNT
NOT TO SCALE
ROCK-IT COUPLING
MID CLAMP
ROCK-IT
PEDESTAL
(1) 5/16"x4 1/2"
SS LAG SCREW
EPDM BONDED WASHER
FORMS WATERTIGHT SEAL
2
PV 3.0
SECTION VIEW
ROCK-IT SLIDE
SIDE VIEW
TOP VIEW
ISOMETRIC VIEW
ROCK-IT COUPLING
MID CLAMP
ROCK-IT COUPLING SHELF
TIE PLATE
ROCK-IT COUPLING
MID CLAMP
ROCK-IT
COUPLING SHELF
PV 3.0
2 ROCK-IT COUPLING ASSEMBLY
NOT TO SCALE
5/16"x1 1/2"
HEX FLANGE BOLT
300 SERIES SS
2 1/2" MIN
COUPLING
CLAMP + ATTACHMENT
COUPLING
CLAMP + ATTACHMENT
L=PORTRAIT
CLAMP SPACING
PERMITTED
CLAMP SPACING
MODULE
L=LANDSCAPE CLAMP SPACING
MODULE
MODULE
L=MAX 72" (6')
COUPLING
RAFTER
CLAMP RAFTER
CANTILEVER L/3 OR LESS
RAFTER
PV 3.0
5 MODULES IN PORTRAIT/LANDSPACE
NOT TO SCALE
RISE/RUN = 4
12
PV 3.0
4 PV SYSTEM MOUNTING DETAIL
NOT TO SCALE
PV 3.0
3 SECTION VIEW
NOT TO SCALE
PV 3.0
6 PV ARRAY TYP. ELEVATION
NOT TO SCALE
PV MODULE, TYP. MOUNT
TO FRAMING OF EXISTING
ROOF TYPE, PARALLEL
WITH PLANE OF ROOF
1
PV 3.0
PV 3.0
7 CONDUIT MOUNTING DETAIL
NOT TO SCALE
3" MIN AND 8" MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE
CONDUITONE HOLE STEEL STRAP
CONDUIT MOUNT BRACKET
FLASHING OR TILE STRAP
1 1/2"
PV3.0
MOUNT.
DETAILS
INSTALLER:VIVINTSOLAR
INSTALLERNUMBER:1.877.404.4129
DRAWNBY:AP
SHEET
NAME:
SHEET
NUMBER:
LissResidence
6953MewallDr
SanDiego,CA92119
UTILITYACCOUNTNUMBER:47404199561LastModified:6/23/2016AR5043120
CALICENSE:973756(C46/C10)
5. Tag # Description Wire Gauge # of Conductors/Color Conduit Type Conduit Size
1 PV Wire 10 AWG 2(V+, V-) N/A-Free Air N/A-Free Air
1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A-Free Air N/A-Free Air
2 THWN - 2 10 AWG 2(1L1, 1L2) EMT 3/4"
2 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4"
3 THWN - 2 10 AWG 3(1L1, 1L2, 1N) EMT 3/4"
3 THWN - 2 - Ground 8 AWG 1(GRN) EMT 3/4"
Created:6/23/16
Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER)
DAVIDLISSResidence
6953MEWALLDR
SANDIEGO,CA92119
UtilityAccount:47404199561
SHEET
NUMBER:
E.1
5043120
CALICENSE:973756(C46&C10)
INSTALLERNUMBER:1.877.404.4129
INSTALLER:VIVINTSOLAR
3-Line
Drawing
SHEET
NAME:
Photovoltaic System
DC System Size
AC System Size
Total Module Count
4680
3800
18
Existing 240V/200A,
175A Main Disconnect
Service Panel Single
Phase - CENTER FED -
Square D DU221RB
240V/30A UNFUSED
NEMA3 OR EQUIVALENT
Solar Edge
SE3800A-US
VISIBLE/LOCKABLE 'KNIFE' A/C
DISCONNECT
3
3
MINIMUM GEC SIZE 4 AWG
COPPER
20A
Point of Interconnection, Load Side
705.12(D)(2), Conforms to CEC 2013
175A
Breakers dependent upon the Continuous Maximum Output. PV circuit nominal current
based off # of modules per Circuit X (1.25(NEC code 210.19(A)(1)(a) X (.9 Max AC
current per micro-inverter)
Inverter 1: SE3800 A-US-U Max Output = 15.83 A x 1.25 (NEC code 210.19(A)(1)(a))
= 19.79 A < 20 A (OCPD)
system output current w/ continuous duty = 19.79 < 20A (System OCPD)
- Wire Gauge Calculated from NEC code 310.15(B)(16) with ambient temperature calculations from NEC 310.15(2)(a) using the 90C column (On the Roof)
or 75C column (Off the Roof), 310.15(B)(3)(c) for *1/2 off roof, and raceway fill adjustment 310.15(B)(16).Rating of conductor after adjustments MUST be
Greater than output current
On Roof - Calculation - Wire Rating (90C) x Ambient(*+22C) x Conduit Fill Derate
(On Roof): 10 gauge wire rated for 40 A, 40 A x 0.82 x 1 (2 Conductors) = 32.8 > 18
(Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 32.8 > 20
(Off Roof): 10 gauge wire rated for 40 A, 40 A x 1 (3 Conductors) = 35 > 20
18
18PV MODULES PER INVERTER = 4680 WATTS
STC
STRING 1: 18 PV
MODULES
2
3
1
1.) Integrated module grounding method: Rock It, racking grounding provided by burndy lay in lugs (CL 501-TN) or equally UL list product.
2.) All conductor enclosures and raceways shall be connected to the equipment grounding conductor (250.86). Bonding jumpers shall be used around impaired
connections. Continuity shall be ensured by methods listed in 250.92 (B) (1) through (4),which includes but are not limited to grounding ","bushings, bonding-
type lock nuts, and other listed bonding methods.
3.) In compliance with CEC 250.64 (C) conductor splices will only be allowed with compression connectors or exothermic welding.
4.) The Gec / EGC shall be Continuous, or when spliced, the splice shall be made by irreversible crimp or exothermic weld.
All ampacity calculations are made in compliance with NEC 220.5B
Placard will be installed on
Panel that says: "This panel has
been de-rated to 175A. Do not
install larger breaker"
Optimizer Solar Edge P300
DC Input Power 300 Watts
DC Max Input Voltage 48 Volts
DC Max Input Current 12.5 Amps
DC Max Output Current 15 Amps
Max String Rating 5250 Watts
Inverter Make/Model
PV Module Rating @ STC
Module Make/Model YL260P-29b
Max Power-Point Current (Imp) 8.59 Amps
Max Power-Point Voltage (Vmp) 30.3 Volts
Open-Circuit Voltage (Voc) 37.7 Volts
Short-Circuit Current (Isc) 9.09 Amps
Max Series Fuse (OCPD) 15 Amps
Nom. Maximum Power at STC (Pmax) 260 Watts
Maximum System Voltage 1000 V (IEC) / 600 V (UL)
Voc Temperature Coefficient -0.32 %/C
DC Safety Switch
Rated for max operating condition of inverter NEC
690.35 compliant
AC Output Current According to NEC 690.8(B)(1) 20 Amps
Nominal AC Voltage 240 Volts
THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR)
Conductor Calculations
OCPD Calculations
Other Notes
ROOFTOP CONDUCTOR AMPACITIES DESIGNED IN
COMPLIANCE WITH NEC 690.8, TABLES 310.15(B)(2)(a),
310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), CHAPTER 9
TABLE 4, 5, & 9. LOCATION SPECIFIC TEMPERATURE
OBTAINED FROM ASHRAE 2013 DATA TABLES.
ASHRAE 2013 -
Highest Monthly 2% DB Design Temp: 27.5 Celsius
Lowest Min. Mean Extreme DB: 3.1 Celsius
SE3800A-US
CEC Efficiency 98 %
AC Operating Voltage 240 Volts
Continuous Max Output Current 16 Amps
DC Maximum Input Current 13 Amps
Short Circuit Current 17.5 Amps
Max Output Fault Current 17.5 A/20ms
Inverter Make/Model