Aga Khan Award for Architecture (2002-2004)
PETRONAS
OFFICE
TOWER
ENVIRONMENTAL CONTROL SYSTEM-ll
NAME : UZAIR IQBAL
ID: F2018101064
INTRODUCTION
ABOUT THE
PROJECT
PROJECT
STAGES
Climatic conditions
Local architectural
character
Site and surroundings
FUNCTIONAL
REQUIREMENTS
BUILDING
ASSESSMENTS
CLIMATIC
PERFORMANCE
AGEING AND
MAINTENANCE
DESIGN
FEATURES
GOAL 1
GOAL 2
DESIGN
FEATURES
GOAL 3
GOAL 4
DESIGN
FEATURES
GOAL 5
GOAL 6
DESIGN
FEATURES
GOAL 7
GOAL 8
SUSTAINABILITY
FEATURES
EFFICIENT
LIGHTING
INSTALLATION
OF
MOTION
SENSORS
GENERATION
OF
SOLAR
ENERGY
WASTE
MANAGEMENT
WATER
MANAGEMENT
MASTER PLAN
FLOOR
PLANS
CONCEPT
THANKS