Embed presentation
Download to read offline






















This document discusses the environmental control system of the Petronas Twin Towers office building in Kuala Lumpur, Malaysia. It describes the project stages and goals of the system, which included considering the local climate and architecture, assessing building functions and performance, and designing features to maximize efficiency, sustainability, and maintenance over time such as motion-sensor lighting, solar energy generation, and water management.





















