PeopleSoft Human
Capital Management 9.2
Business Process Maps




March 2013
PeopleSoft Human Capital Management 9.2 Business Process Maps
CDSKU hcm92bpms
Copyright © 1992-2013, Oracle and/or its affiliates. All rights reserved.

Trademark Notice
Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks
of their respective owners.

Intel and Intel Xeon are trademarks or registered trademarks of Intel Corporation. All SPARC trademarks
are used under license and are trademarks or registered trademarks of SPARC International, Inc.
AMD, Opteron, the AMD logo, and the AMD Opteron logo are trademarks or registered trademarks of
Advanced Micro Devices. UNIX is a registered trademark of The Open Group.

License Restrictions Warranty/Consequential Damages Disclaimer
This software and related documentation are provided under a license agreement containing restrictions
on use and disclosure and are protected by intellectual property laws. Except as expressly permitted
in your license agreement or allowed by law, you may not use, copy, reproduce, translate, broadcast,
modify, license, transmit, distribute, exhibit, perform, publish, or display any part, in any form, or by any
means. Reverse engineering, disassembly, or decompilation of this software, unless required by law for
interoperability, is prohibited.

Warranty Disclaimer
The information contained herein is subject to change without notice and is not warranted to be error-free.
If you find any errors, please report them to us in writing.

Restricted Rights Notice
If this is software or related documentation that is delivered to the U.S. Government or anyone licensing it
on behalf of the U.S. Government, the following notice is applicable:

U.S. GOVERNMENT END USERS: Oracle programs, including any operating system, integrated
software, any programs installed on the hardware, and/or documentation, delivered to U.S. Government
end users are "commercial computer software" pursuant to the applicable Federal Acquisition Regulation
and agency-specific supplemental regulations. As such, use, duplication, disclosure, modification,
and adaptation of the programs, including any operating system, integrated software, any programs
installed on the hardware, and/or documentation, shall be subject to license terms and license restrictions
applicable to the programs. No other rights are granted to the U.S. Government.

Hazardous Applications Notice
This software or hardware is developed for general use in a variety of information management
applications. It is not developed or intended for use in any inherently dangerous applications, including
applications that may create a risk of personal injury. If you use this software or hardware in dangerous
applications, then you shall be responsible to take all appropriate fail-safe, backup, redundancy, and
other measures to ensure its safe use. Oracle Corporation and its affiliates disclaim any liability for any
damages caused by use of this software or hardware in dangerous applications.
Third Party Content, Products, and Services Disclaimer
This software or hardware and documentation may provide access to or information on content, products,
and services from third parties. Oracle Corporation and its affiliates are not responsible for and expressly
disclaim all warranties of any kind with respect to third-party content, products, and services. Oracle
Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred due to your
access to or use of third-party content, products, or services.

Alpha and Beta Draft Documentation Notice
If this document is in preproduction status:

This documentation is in preproduction status and is intended for demonstration and preliminary use only.
It may not be specific to the hardware on which you are using the software. Oracle Corporation and its
affiliates are not responsible for and expressly disclaim all warranties of any kind with respect to this
documentation and will not be responsible for any loss, costs, or damages incurred due to the use of this
documentation.
Recruiting



                                                                                                                            Analyze Recruiting
         Human
      Resources VP




          Human                         Plan Recruiting
         Resource
         Manager




         Recruiter
                                                                 Recruit Applicants




                                                                                       Evaluate and       Hire and Enable
                                                                                      Select Applicants      Resources




      Line Manager




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                             5
Plan Recruiting



                                                                                                Define
                                                                                             Organization
                                                                                           Competencies and
                                                                                           Accomplishments




                                                                       Define Recruiting                        Create
                                                                                           Assess Workforce
                                    Analyze Recruiting                    Goals and                           Competency
                                                                                            Competencies
                                                                        Measurements                           Strategy

          Human
         Resource
         Manager

                                                                                            Analyze Pool of                 Create
                                                                                              Available                    Recruiting
                                                                                              Applicants                   Strategies




                                                                                               Analyze
                                                                                              Recruiting
                                                                                            Processes and
                                                                                              Channels




                                                                                                                                        Recruit Applicants




         Recruiter




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                         6
Recruit Applicants



          Human
         Resource                                                  Plan Recruiting
         Manager




         Human
                                                                                                                                                            Analyze Recruiting
      Resources VP




                                                                                     Create Job      Post Job                                                Evaluate and
      Line Manager                                                                   Requisitions   Requisitions                                            Select Applicants




                                                                                                                                        Receive and Track
         Recruiter                                                                                                 Attract Applicants
                                                                                                                                          Applications




                                                                                                                   Search for Jobs        Apply for Job
        Candidate                                                                                                   Self-Service          Self-Service




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                             7
Create Job Requisitions


         Human
        Resource                       Plan
                                     Recruiting
        Manager




                                                                                                Plan Headcount
                                                                         Yes                                                                                                                                                                                                      Resubmit for Approval
                                                                                                     (FPS)
                                                                                                                                                                                                                                    Select screening
                                                                                                                                                                                                          Associate notes
                                                                                                                                                                                   Create new job                                  questions for online     Request job opening
                                                                                                                                                                                                          and attachments
                                                                                                                                                                                      opening                                          applicants               approval
                                                                                                                                                                                                            as needed
                                                                                                                                                                                   Create New Job                                   Create New Job           Create New Job
                                                                                                                                                                                                          Create New Job
     Line Manager                                                                                                                                                       No            Opening                                           Opening                  Opening
                                                                                                                                                                                                              Opening
                                                                                                                                                                                                                                 Job Opening Screening
                                                                                                    Request                 View list of existing and/or                                                                                                                                     Check job opening
                                                                                                                                                                       Clone                                                                                                                                        Post Job
                                                         Request                                   Recruiter to            prior job openings, if needed                                                                                                                                      approval status
                                                                                 No                                 No                                              existing job                                                                                                                                   Requisitions
                                                        headcount?                                 create job                  Search Job Openings                                                                                                                                           Pending Approvals
                                                                                                                                                                     opening?
                                                                                                    opening?                   Browse Job Openings

                                                                                                                                                                                                           Modify cloned job
                                                                                                                                                                       Yes         Clone existing job
                                                                                                                                                                                                          requisition to meet
                                                                                                                                                                                       opening
                                                                                                                                                                                                            requirements
                                                                       Yes                                                                                                            Search Job
                                                                                                                                                                                                             Search Job
                                                                                                                                                                                       Openings
                                                                                                                                                                                                              Openings




                                                                                                                                                                                                                                                                Receive notification
       Recruiting                                                                                                                                                                                                                                                 of job opening
                                                                                                                                                                                                                                                                                              Review, update,
       Approval                                                                                                                                                                                                                                                                               approve or deny
                                                                                                                                                                                                                                                                 pending approval
                                                                                                                                                                                                                                                                                               request for job
       Authority                                                                                                                                                                                                                                                Pending Approvals
                                                                                                                                                                                                                                                                                             Pending Approvals
                                                                                                                                                                                                                                                                      Worklist



                                                                                                                                                                                   No


                                                                                                        Review and update
                                                                             Modify Existing           existing job opening in
                                                                               Opening                        progress
                                                                                                       Search Job Openings


                                                                                                                                          Select person or non-
                                                                                                           Create new job
                                                                              Create New                                                 person profiles for base
                                                                                                              opening
                                                                              Job Opening                                                     requirements
                                                                                                         Create Job Opening                                                                                                                                                                      Check job
                                                                                                                                          Create Job Opening                       Select pre-screening        Associate notes                                     Request job
        Recruiter                                                                                                                                                                                                                                                                                 opening
                                                                                                                                                                                      and screening            and attachments           Ready to                    opening                   approval status
                                View list of existing                                                                                                                              questions for rating           as needed              submit for       Yes       approval                      Pending
                                  and/or prior job                                                                                                                                  online applicants            Manage Job              approval?                   Pending                     Approvals
                                     openings                                                            Clone existing job           Modify cloned job requisition                     Screening                 Openings                                          Approvals
                                                             How to create        Clone Existing
                                    Search Job                                                                opening                   to meet requirements
                                                             job opening?         Job Opening
                                     Openings                                                           Search Job Openings             Search Job Openings
                                    Search Job
                                     Postings

                                                                                 Create from             Create job opening based on                                                                                                                                                       Resubmit for Approval
                                                                                Open Position                    open position
                                                                                                        Create Openings from Positions




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                              8
Post Job Requisitions


                                                                                                          Identify internal
                                                                                                            or external
                                                                                   Company Web Sites
                                                                                                            websites for
                                                                                                              posting



                                                                                                               Identify
                                                                                                              recruiting
                                                                                        Recruiting
                                                                                                            agencies for
                                                                                        Agencies
                                                                                                             posting job
                                                                                                               opening

    Line Manager
                                                                                                                                                                                                     Review job postings by
                                                                                                                                                                                 Receive posting      job board, if needed
                                                                                                            Identify job      Post job opening    Integration with third party
                                  Create Job                           Where to                                                                                                   confirmation(s)       Manage External
                                                                                             Job Board       boards for       Manage External      using PeopleSoft's Open
                                  Requisitions                         post job?                                                                                                 Manage External            Postings
                                                                                                              posting            Postings        Integration Framework (OIF)
                                                                                                                                                                                     Postings            Search Postings
                                                                                                                                                                                                    Full Text Vacancy (USF)


                                                                                                          Identify Services                       Integration with PeopleSoft
                                                                                                                              Post job opening
                                                                                         Services         Procurement for                        Services Procurement using
                                                                                                                              Manage External
                                                                                       Procurement           posting job                              PeopleSoft's Open
                                                                                                                                 Postings
                                                                                                              opening                            Integration Framework (OIF)




                                                                                                          Identify internal
                                                                                                            or external
                                                                                      Company Web Sites
                                                                                                            websites for
                                                                                                              posting


                                                                                                               Identify
                                                                                                              recruiting
                                                                                          Recruiting
                                                                                                            agencies for
                                                                                          Agencies
                                                                                                             posting job
                                                                                                               opening

       Recruiter                                                                                                                                                                                     Review job postings by
                                                                                                                                                                                 Receive posting      job board, if needed
                                                                                                            Identify job      Post job opening    Integration with third party
                                                                          Where to                                                                                                confirmation(s)       Manage External
                                                                                              Job Board      boards for       Manage External      using PeopleSoft's Open                                                                 Attract Applicants
                                                                          post job?                                                                                              Manage External            Postings
                                                                                                              posting            Postings        Integration Framework (OIF)
                                                                                                                                                                                     Postings            Search Postings
                                                                                                                                                                                                    Full Text Vacancy (USF)



                                                                                                          Identify Services                       Integration with PeopleSoft
                                                                                                                              Post job opening
                                                                                           Services       Procurement for                        Services Procurement using
                                                                                                                              Manage External
                                                                                         Procurement         posting job                              PeopleSoft's Open
                                                                                                                                 Postings
                                                                                                              opening                            Integration Framework (OIF)




                                                                                                                                                                                                                              Search for
       Candidate
                                                                                                                                                                                                                              Jobs Self-
                                                                                                                                                                                                                               Service




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                            9
Search for Jobs Self-Service


                                                                                                                     Search hard
                                                                                     Search Print Media                 copy
                                                                                                                     publications




                                                                                          Attend                   Attend recruiting
                                                                                      Recruiting Event             event or job fair




                                                                                                                                                 Register for job
                                                                        Where to                                      View job
                                                                                                                                                   board and
                                                                        search for         Visit Job Boards        postings directly
                                                                                                                                                 provide profile
                                                                          job?                                      on job board
                                                                                                                                                  information

         Candidate
                                                                                                                       View job
                                                                                          Search                     postings on
                                                                                        the Internet                other external
                                                                                                                       websites
                                                                                                                                                                                       Email job posting                                                                                                                 Apply for Job
                                                                                                                                                                         Send job                                                         Apply for job                                                                  Self Service
                                                                                                                                                                                         to a friend
                                                                                                                                                                         to friend
                                                                                                                                                                                          Careers
                                                                                                Search job postings
                                                                                 Search         directly on company                 Review job
                                                                                                                                                               Choose                                                                  Save job                    Save job to list
                                                                                Company                website                       postings
                                                                                                                                                                action                                                                  to list                       Careers
                                                                                Website                Careers                       Careers
                                                                                                    Job Search

                                                                                                                                                                                     Register as a new
                                                                                                                                                                      Register                             Choose
                                                                                                                                                                                         applicant
                                                                                                                                                                     as applicant                           action
                                                                                                                                                                                         Careers                                                          Subscribe to potential employer's   Receive and review list of
                                                                                                                                                                                                                                Set up automatic
                                                                                                                                                                                                                                                                  job search agent                  job postings
                                                                                                                                                                                                                                   job search
                                                                                                                                                                                                                                                                       Careers                        Careers




                                                                                                                                                                                                                                                                                                    Provide email
          Recruiter                                                                                                                                                                                                                                            Process applicants’
                                                                                                                                                                                                                                                                                                 notification for jobs
                                        Post Job                                                                                                                                                                                                              automatic job searches
                                                                                                                                                                                                                                                                                                  found that match
                                       Requisitions                                                                                                                                                                                                           Run Job Search Agent
                                                                                                                                                                                                                                                                                                  applicant criteria




                                                                                                                                                                                                                                                          Subscribe to potential employer's
                                                                                                                                                                                                                     Set up automatic                                                         Receive and review list of
                                                                                                                                                                                                                                                                  job search agent
                                                                                                                                                                                                                        job search                                                                  job postings
                                                                                                                                                                                                                                                                       Careers
                                                                                                                                                                                                                                                                                                      Careers

                                                                                                                                                                                                                        Save job                                   Save job to list
                                                                                                                                                                                                                         to list                                      Careers
          Employee                                                                                                                  Search job postings
                                                                                                                                                                    Review job
                                                                                             Search Company                         directly on company                                    Choose                       Send job                            Email job posting to a friend
                                                                                                                                                                     postings
                                                                                           Internal Careers Site                           website                                          action                      to friend                                     Careers
                                                                                                                                                                     Careers
                                                                                                                                           Careers

                                                                                                                                                                                                                                                                   Refer a friend
                                                                                                                                                                                                                       Refer a friend                                Careers



                                                                                                                                                                                                                       Apply for job




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                     10
Attract Applicants



                                                                                                                        Advertise job
                                                                                                                        openings in
                                                                                             Advertise
                                                                                                                           media
                                                                                                                        publications



                                                                                                                           Receive                     Track
                                                                                                                         inquiries or           correspondence and
                                                                                              Receive
                                                                                                                         referrals in                 contacts
                                                                                       Inquiries or Referrals
                                                                                                                        person or via              Contact Notes
                                                                                                                       phone or email            Manage Applicant


                                                                                                                                                                                                                                      Track             Record general
                                                                                                                                                                                                         Contact
                                                                                                                                                                          Create list of                                         correspondence            expenses
                                                                                                                        Participate in                                                                  potential
                                                                                           Participate in                                                               applicant leads to                                        and contacts          associated with   Receive and Track
                                                                                                                          job fair or                                                                 applicants by
                                                                                         Recruiting Events                                                                    qualify                                             Contact Notes            recruiting       Applications
                                                                                                                       recruiting event                                                               email, phone,
                                                                                                                                                                         Applicant Lists                                             Manage               Search Job
                                                                                                                                                                                                       fax or mail
                                                                                                                                                                                                                                    Applicant              Openings

         Recruiter
                                                                                                                       Search applicant
                                                                       Choose how                                        database for           Review applicant
                                                                                            Search Applicant
                                                                        to source                                    individuals meeting         search results
                                                                                               Database
                                                                        applicants                                          criteria            Find Applicants
                                                                                                                       Find Applicants




                                                                                                                   Search the internet for
                                                                                      Search the Internet             applicant leads
                                                                                                                      Find Applicants




                                                                                                                                                   Review hot job
                                                                                                                      Define "hot jobs"          history and update
                                                                                        Create/Review
                                                                                                                           criteria                 amounts and
                                                                                          Hot Jobs
                                                                                                                          Hot Jobs                timing of awards
                                                                                                                                                   Hot Job History




                                                 Post Job
      Line Manager                              Requisitions




                                                                                                                 Define the conditions under        Set up the amounts and          Create or update a referral
                                                                                                                                                                                                                      Select the employee eligibility
                                                                                          Create                which an employee is eligible       timing of awards in the          program ID, description,
                                                                                                                                                                                                                      and award category rules that
                                                                                     Employee Referral          for award payment under the         category for both ERPs           effective date, and some
       Employment                                                                        Program                 Employee Referral Program               and hot Jobs                     business rules
                                                                                                                                                                                                                       are in effect for the program
       Coordinator                                                                                                                                                                                                     Employee Referral Program
                                                                                                                  Employee Eligibility Rules        Award Category Rules            Employee Referral Program




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                          11
Apply for Job Self-Service

                                                                                                                                                                                       Mail hard copy
                                                                                                                                                               Mail Resume
                                                                                                                                                                                        of resume



                                                                                                                                                                                         Fax copy of
                                                                                                                                                               Fax Resume
                                                                                                                                                                                           resume



                                Search for Jobs                                                                                            Method of                  Email             Email copy of
                                                                       Prompted by Print Media or Recruiting Events
                                 Self-Service                                                                                             application?               Resume               resume

                                                                                                                                                                                                                     Provide
                                                                                                                                                                                    Upload Resume                a resume online
                                                                                                                                             Apply                                                                   Careers
                                                                                                                                         Directly Online


                                           Prompted by                                                           Transfer applicant to
                                                                                       Send applicant
                                             External                                                              online application
                                                                 Select the              profile to                                      Register as a                                                           Create a resume
                                           Job Boards                                                             form pre-populated                                 Choose
                                                                positions for            company                                         new applicant                                 Paste Resume Text              online
        Candidate                           or Internet                                                             with information                                  action
                                                               which to apply            recruiting                                        Careers                                                                   Careers
                                                                                                                      provided by
                                                                                          process
                                                                                                                        applicant                                                                                                                             No

                                                                                                                                                                                                                   Search job         Select jobs in
                                                                                                                                                                                  Search Job Postings               postings          which to apply
                                                                                                                                                                                                                    Careers              Careers
                                                                                                                                                                                                                                                                                                                                                                      Provide additional
                                                                                  Integration with third party                                                                                                                                                                                                                                                     attachments to support
                                                                                   using PeopleSoft's Open                                                                                                                                                                                                                        Provide attachments
                                                                                                                                                                                                                                                                                                                                                                       job application
                                                                                                                                                                                                                                                               Complete pre-screening
                                                                                Integration Framework (OIF)                                                                                                                           Apply for a job                                                  Pass                                                                Careers
                                                                                                                                                                                               Apply for a Job                                                    questionnaire
                                                                                                                                                                                                                                        Careers                                                     pre-screen?
                                                                                                                                                                                                                                                                     Careers
                                                                                                                                                                                                                                                                                                                                                                                                                            Receive
                                                                                                                                                                                                                                        Yes                                                                                                                                                                             confirmation that
                                                                                                                                                                                                                                                                                                                                                                                                                        the resume was
                                                                                                                                                                                                                                                                                                                                                                                                                            received
                                                                                                                                                                                                             Provide                 Provide               Provide              Provide                                                                                                                                     Careers
                                                                                                                                                                                                                                                                                                    Respond to                                                     View a summary of the
                                                                                                                                                                             Verify contact              competency and            employment            references             referral                          Submit online
                                                                                                                                                                                                                                                                                                     screening                    Choose                 View        jobs applied for, and
                                                                   Prompted by Externally Exposed Job Postings on Company Website                                             information                accomplishment            and training         and personal             source                            application
                                                                                                                                                                                                                                                                                                     questions                     action               activity    the application status
                                                                                                                                                                                Careers                    information               history                data              information                           Careers
                                                                                                                                                                                                                                                                                                      Careers                                                              Careers
                                                                                                                                                                                                             Careers                 Careers              Careers               Careers



                                                                                                                                                                                                                                                                                                                                                                        Track correspondence received from applicants
                                                                                                                                                                                                                                                                                                                                                                                        Contact Notes
                                                                                                                                                                                                                                                                                                                                                                                                                        Receive and Track
         Recruiter                                                                                                                                                                                                                                                                                                                                                                    Manage Applicant
                                                                                                                                                                                                                                                                                                                                                                                                                          Applications
                                                                                                                                                                                                                                                                                                                                                                                     Administer Referrals
                                                                                                                                                                                                                                                                                                                                                                                   Track Duplicate Referrals



                                                                                                                                                                                                                                                                        Confirm or cancel the
                                                                                                                                                                                                                                                                        referral initiated by the
                                                                                    Employee Choice to Seek Job Opportunity
                                                                                                                                                                                                                                                                               applicant
                                                                                                                                                                                                                                                                           Confirm Referral

         Employee
                                                                                                                                              Select job                                                                                                               Review the eligibility and
                                                                                                                                             opening and                                                                                                               award payment status for
                                                                       Employee Choice to Refer a Friend
                                                                                                                                           create a referral                                                                                                            each applicant referred
                                                                                                                                            Refer a Friend                                                                                                              Check Referral Status




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                        12
Receive and Track Applications


           Candidate                                   Apply for Job
                                                       Self-Service




                                                                                                                                         Extract resumes from
                                                                                                         Process Emailed Resumes
                                                                                                                                                 emails




                                                                                                                                       Load resumes received in                 Parse resume using third-party       Notify applicants that
                                                                                               Choose
                                                                                                                                           electronic format                        resume extractor and              resumes have been
                                                                               Yes             resume            Load Resumes
                                                                                                                                            Load Resume                         PeopleSoft’s Open Integration        added to the applicant
                                                                                                option
                                                                                                                                          Manage Resumes                                 Framework                         database




         Employment
         Coordinator


                                                                                                                       Create resume receipt
                                                        Resume                         Identify or update           acknowledgments and send to
                                                        parsing           No         applicant information                   applicants
                                                       available?                     Add New Applicant             Generate Recruitment Letters
                                                                                                                       Send Correspondence


                                                                                                                                                                                                  Create an
                                                                                                                                                            Add or update                 individualized checklist
                                                                                                                    Record information about how
                                                                                                                                                          competencies and                     for a particular                         Review summary of applicants
                                                                                                                    the applicant was referred to
                                                                                                                                                           accomplishments                  applicant for whom                           Applicant Summary by Job
                                                                                                                          the organization
                                                                                                                                                          Add New Applicant                recruitment activities                       Applicant Summary by Source
                                                                                                                         Add New Applicant
                                                                                                                                                          Application Details                    are tracked
                                                                                                                                                                                            Applicant Checklist




                                                        Attract
           Recruiter                                   Applicants




        Line Manager                                                                                                                                                                          Evaluate and
                                                                                                                                                                                             Select Applicants




           Human                                                                                                                                                                                                                              Analyze Recruiting
        Resources VP




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                   13
Evaluate and Select Applicants



         Recruiter                   Recruit Applicants                Source Applicants   Review Applicants   Screen Applicants
                                                                                                                                    Schedule    Perform Pre-Hire    Present and
                                                                                                                                   Interviews       Activities     Manage Offers




         Human
      Resources VP                                                                                                                                                                 Analyze Recruiting




                                                                                                                                                    Conduct
          Line                                                                                                                                   Interviews and                     Hire and Enable
         Manager                                                                                                                                   Select Final                        Resources
                                                                                                                                                   Candidates




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                    14
Source Applicants




                                                                                                                      Search leads and
                                                                                               Search Leads
                                                                                                                     contacts for potential            Attract Applicants
                                                                                               and Contacts                                                                                                                    Review applicant status, resume,
                                                                                                                          applicants
                                                                                                                                                                                                    Review applicant data          and / or applicant profile
                                    Recruit
                                                                                                                                                                                                                                     Search Applicants
                                   Applicants

                                                                                                                  Search internal database for      Review list of potential
                                                                                                                                                                                   Choose
                                                                                             Search Internal       applicant suitable for a job     candidates based on                                                         Review correspondence notes
                                                                                                                                                                                information to   Review Correspondence Notes                                      Review Applicants
                                                                                           Applicant Database              requisition                 search criteria                                                               Search Applicants
                                                                                                                                                                                    review
                                                                                                                      Search Applicants              Search Applicants

                                                                                                                                                                                                                                     Review Application
                                                                                                                                                                                                      Review Application
                                                                                                                                                                                                                                     Search Applications
                                                                                                                Define search criteria and create    Review list of potential
                                                                                                Create
                                                                                                                       automated search             candidates identified by
                                                                                              Automated
         Recruiter                                                                                                      Saved Searches              automated search agent
                                                                                             Search Agent
                                                                                                                    Run Automatch Search               Search Applicants
                                                                          Where to look
                                                                         for applicants?

                                                                                                                  Receive potential candidates      Review list of potential
                                                                                            Review Potential
                                                                                                                 identified by Job Boards using     candidates provided by
                                                                                            Candidates Sent
                                                                                                                 PeopleSoft's Open Integration           Job Boards
                                                                                            from Job Boards
                                                                                                                         Framework (OIF)              Search Applicants


                                                                                                                 Receive potential candidates
                                                                                            Review Potential                                        Review list of potential
                                                                                                                   from PeopleSoft Service
                                                                                           Contingent Workers                                       candidates provided by
                                                                                                                      Procurement using
                                                                                             from Services                                          Services Procurement
                                                                                                                 PeopleSoft's Open Integration
                                                                                              Procurement                                             Search Applicants
                                                                                                                       Framework (OIF)




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                  15
Review Applicants




                                                                                                               Route applicant information to               Receive and track reviewer                                                                             Update applicant information and
                                                                                        Route              appropriate parties for additional review       recommendations and details                                                                                    disposition status
                                                                                                                                                                                                    Choose                     Keep applicant
                                                                                      Applicant                      Manage Applicant                           Manage Applicant                                                                                         Manage Applicant
                                                                                                                                                                                                     action                   in consideration
                                                                                     Information                    Manage Job Opening                         Manage Job Opening                                                                                       Manage Job Opening
                                                                                                                    Manage Applications                        Manage Applications                                                                                      Manage Applications




      Line Manager                                                                                              Link applicants to requisitions                                                 Reject applicant
                                                                                             Link
                                                                       Choose                                         Manage Applicant
                                                                                           Applicant
                                                                        action                                      Manage Job Opening
                                                                                            to Job
                                                                                                                    Manage Applications

                                                                                                                                                                                          Update applicant disposition
                                                                                                                                                                                                for a given job
                                                                                                                                Reject
                                                                                                                                                                                              Manage Applicant
                                                                                                                               Applicant
                                                                                                                                                                                            Manage Job Opening
                                                                                                                                                                                             Manage Application




                                                                                                                                                                                          Update applicant disposition
                                                                                                                                                                                                                                 Add applicant to list               Send rejection letter to            Document
                                                                                                                                                                                                for a given job
                                                                                                                                                                     Reject                                                          of rejected                           applicant(s)               correspondence
                                                                                                                                                                                              Manage Applicant
                                                                                                                                                                    Applicant                                                        applicants                      Send Correspondence               with applicant
                                                                                                       Forward applicant to                                                                 Manage Job Opening
                                                                                                                                                                                                                                  Manage Applicant                 Generate Recruitment Letters        Contact Notes
                                 Source Applicants                                                     another recruiter or                                                                  Manage Application
                                                                                    Forward
                                                                                                            individual
                                                                                                        Forward Applicant
                                                                                                                                                                                                                              Reject Applicant

                                                                                                         Review applicant
                                                                                                       status, resume, and/
                                                                                    Review              or applicant profile
                                                                                   Application          Manage Applicant
                                                                                                       Review Questionnaire
                                                                                                              Results                                                                 Route applicant              Receive and track
                                                                                                                                                                      Route
                                                                                                                                                                                       information to                  reviewer
                                                                                                                                           Choose                   Applicant                                                                            Choose
                                                                                                                                                                                     appropriate parties           recommendations
                                                                                                                                            action                 Information                                                                            action
                                                                                                                                                                                     Manage Applicant                 and details
         Recruiter                                                                                      Add applicant to a                                                           Forward Applicant             Manage Applicant
                                                                       Choose         Add Applicant
                                                                                                              list
                                                                        action          to a List
                                                                                                        Manage Applicant

                                                                                                                                                                                                                                                   Keep applicant
                                                                                                          Review Notes /                                                                                                                          in consideration
                                                                                     Review
                                                                                                          correspondence
                                                                                 Correspondence                                                                                      Link applicants to
                                                                                                        history/attachments                                         Link Applicant
                                                                                      Notes                                                                                            job, if needed
                                                                                                           Contact Notes                                                to Job
                                                                                                                                                                                     Manage Applicant
                                                                                                                                                                                                                                                 Update applicant
                                                                                                                                                                                                                                                  information and
                                                                                                         Request further                        Document                                                                                             disposition                                                        Screen Applicants
                                                                                      Send             applicant information               correspondence sent                                                                                          status
                                                                                 Correspondence                Send                            and received                                                                                      Manage Applicant
                                                                                                         Correspondence                       Contact Notes




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                        16
Screen Applicants




                                                                                                                                                                                             Schedule Interview

                                                                                                                                                                                                                                                                                                                                                         Provide Certificate
                                                                                                                                                                                                                                                                                                                                                          of Eligibles and
                                                                                                                                                                                                                                                                                                                                                         candidate referral
                                                                                                                                                                                                                                                                                                                                                          list to the hiring
                                                                                                                                                                                                                                                                                                                                                                official



                                                                                                                                                                                                     No



                                                                                                                                                                                                                                                                                         Override rankings for
                                                                                                                                                                                                                                                                Review list of highly                                                                         Print the
                                                                                                                                                                                                                                                                                          competitive or non-    Create candidate   Create Certificate
                                                                                                                                                                                                                                                                qualified applicants;                                                                      Certificate of
                                                                                                                                                                                                                                                                                             competitive            referral list      of Eligibles
                                                                                                                                                                                                                                          No                    adjust rank if needed                                                                     Eligibles report
                                                                                                                               Review            Rate applicant          Review list of                                                                                                       applicants            Candidate         Certificate of
                                                            Review list of applicants                                                                                                                                                                               Job Opening                                                                            Certificate of
                                                                                                  Screening                 requirements       competencies and     applicants who meet or                                                                                                  Job Opening          Evaluations List       Eligibles
    Recruiter               Review Applicants               who applied for a specific                                                                                                         Screening USF                                                         Screening                                                                                Eligibles
                                                                                                     USF              No   met by applicant     accomplishments         exceed the final                                                                                                      Screening
                                                                 job requisition                                                                                                                applicants?
                                                                                                  applicants?               Job Opening       Job Opening Ranking      screening criteria
                                                             Job Opening Screening
                                                                                                                              Screening         Applicant Rating    Job Opening Screening




                                                                                                      Yes                                                                                            Yes




                                                                                                                                                                                             Validate applicant’s
                                                                                          Identify the applicants who                                                                                                                                            Categorize and rank
                                                                                                                                                                                             qualifications using                        Create ranking plan
                                                                                         have priority placement rights                                                                                             Need to rank                                applicants per ranking
                                                                                                                                                                                               Crediting Plan                      Yes      Job Opening
                                                                                            Job Opening Screening                                                                                                   candidates?                                          plan
                                                                                                                                                                                                Job Opening                                  Screening
                                                                                          Process Priority Placement                                                                                                                                           Job Opening Screening
                                                                                                                                                                                                  Screening




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                           17
Schedule Interviews



                                                                                  Review list of               Review candidate application                    Record decision to                                                                                                                                                          Conduct Interviews
                                                                                                                                                                                                         Update candidate                  Create interview                                                                                 and Select Final
                                                                             candidates associated                 information, resume,                   interview, hold, or reject the
                                                                                                                                                                                                       information, status, or           schedule for selected                                                                                Candidates
                                                  Schedule Interviews          with a job opening              disposition and status history                      candidate
                                                                                                                                                                                                             disposition                      candidates
                                                                               Manage Applicant                      Manage Applicant                          Manage Applicant
                                                                                                                                                                                                         Manage Applicant                 Schedule Interview
                                                                               Job Opening 360                      Manage Application                        Manage Application
                                                                                                                                                                                                                                                                            Send notifications to   Document correspondence
                                                                                                                                                                                                                                                                             participants of the              sent
      Line Manager                                                                                                                                                                                                                                                          scheduled interview         Manage Applicant
                                                                                                                                                                                                                                                                             Manage Applicant         Send Correspondence



                                                                                                                                                                                       Review list of candidates             Review candidate             Confirm
                                                                                                                                                                                                                                                                                                      Receive notification and
                                                                                                                                                                                          recommended for                 application information,       candidates
                                                                                                                                                                                                                                                                                                    confirm interview schedule
                                                                                                                                                                                         interview for a job              resume, disposition and       for interview
                                                                                                                                                                                                                                                                                                         Interview Calendar
                                                                                                                                                                                               opening                         status history             Manage
                                                                                                                                                                                                                                                                                                     Interview Team Schedule
                                                                                                                                                                                         Manage Applicant                    Manage Applicant             Applicant
                                                                                                                                                                                                                                                                                                       Interview Notifications




                                                                                                                                                                                                                                                                                                      Receive notification and
         Employee                                                                                                                                                                                                                                                                                   confirm interview schedule
                                                                                                                                                                                                                                                                                                         Interview Calendar
                                                                                                                                                                                                                                                                                                     Interview Team Schedule
                                                                                                                                                                                                                                                                                                       Interview Notifications




                                                                                                                                                                                                                                                                                                        Receive and manage
                                                                                                                                                                                                                                                                                                     interview notification and
        Candidate                                                                                                                                                                                                                                                                                         confirm interview
                                                                                                                                                                                                                                                                                                               Careers
                                                                                                                                                                                                                                                                                                       Interview Notifications




                                                                                                                                     Review feedback,                                                                                                                                               Route candidate
                                                                                                        Review                        resume, and/ or                                                                                                                                                                              Document
                                                                                                                                                                                                                                                                                                     information to
                                                                                                       Application                    applicant profile                                                                                                                     Send notifications to                          correspondence sent to
                                                                                                                                                                                              Route candidate                                                                                         interviewers
                                                                                                                                     Manage Applicant                                                                                                                        participants of the                               interviewers and
                                                                                                                                                                                           interview list for job to                                                                                    Manage
                                                                                                                                                                                                                                                                            scheduled interview                                   candidates
                                 Screen Applicants                                                                                                                                             hiring manager                                                                                           Applicant
                                                                                                                                                                                                                                                                             Manage Applicant                                Manage Applicant
                                                                                                                                                                                             Manage Applicant                                                                                           Forward
                                                                                                                                                                                                                                                                                                                           Send Correspondence
                                                                                                                                     Review candidate                                                                                                                                                   Applicant
                                                                                                     Review                          disposition status
                                                                                                     History                              history
                                                                                                                                     Manage Applicant
                                                         Review list of
                                                                                                                                                                                                                                                                              Create interview
         Recruiter                                    candidates for a job
                                                                                                                                                                                                                                                      Update candidate         schedule for
                                                       associated with a                                                          Review correspondence                             Record decision to interview,
                                                                                      Choose                 Review                                                                                                                                  information, status,        selected
                                                         job opening                                                              history and attachments                           hold, or reject the candidates
                                                                                       action            Correspondence                                                                                                                                 or disposition          candidates
                                                       Manage Applicant                                                                Contact Notes                                      Manage Applicant
                                                                                                                                                                                                                                                      Manage Applicant           Schedule
                                                       Job Opening 360
                                                                                                                                                                                                                                                                                 Interview
                                                       Candidate Listing
                                                                                                                                    Contact applicant for
                                                                                                                                      follow-up, further                             Document correspondence
                                                                                                Send Correspondence
                                                                                                                                  screening or information                               sent and received
                                                                                                                                   Send Correspondence                                   Manage Applicant
                                                                                                                                                                                       Send Correspondence




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                            18
Conduct Interviews and Select Final Candidate


                                                                                                                                                                                                                                                                                                                            Send rejection
                                                                                                                                                                                                                                                                                               Update applicant
                                                                                                                                                                                                                                                                                                                             notifications                Track
                                                                                                                                                                                                                                                                            Reject              disposition for a
                                                                                                                                                                                                                                                                                                                         Generate Recruitment        correspondence
                                                                                                                                                                                                                                                                           Candidate               given job
                                                                                                                                                                                                                                                                                                                               Letters                Contact Notes
                                                                                                                                                                                                                                                                                               Manage Applicant
                                                                                                                                                                                                                                                                                                                         Send Correspondence



                                                                                                                                                                                                                                                                                               Select candidates                                       Update final
                                                                                                                                                                                                                                                                                                    for pre-                                            candidate
                                                                                                                                                                                                                                                                                                                               Choose
      Line Manager                                                                                                                                                                                                                                                                               employment                                          information and
                                                                                                                                                                                                                                                                                                                                action
                                                                                                                                                                                                                                                                                                    checks                                                status
                                                                                                                                                                                                                                                                                               Manage Applicant                                     Manage Applicant
                                                                                                                                                                     Create candidate              View interview                 Perform
                                                                                              Review                   Review interview                            interview evaluation         results, ratings and       comprehensive review
                                                                                                                                             Prepare and                                                                                                    Choose                    Select
                                                                                             candidate                     schedules                                and record results           recommendations           of candidates in each
                                                                                                                                               conduct                                                                                                      potential                  Final                                    Provide
                                                                                            information           Interview Team Schedule                         Interview Evaluations          Manage Applicant          stage of the selection
                                                                                                                                              interview                                                                                                      hires                  Candidate(s)                              candidate
                                                                                              provided                Interview Calendar                             Create Interview                Evaluation                   process
                                                                                                                                                                                                                                                                                                                               selection
                                                                                                                                                                        Evaluation                   Summary                 Manage Applicant
                                                                                                                                                                                                                                                                                                                            information to
                                                                                                                                                                                                                                                                                                                               recruiter




                                                                                              Review                  Review scheduled                              Evaluate candidate and
                                                                                                                                             Prepare and
                                                                                             candidate                     interviews                              provide recommendation
                                                                                                                                               conduct
        Interviewer                                                                         information           Interview Team Schedule                            Interview Evaluations
                                                                                                                                              interview
                                                                                              provided                Interview Calendar                          Create Interview Evaluation




                                                                                                                     View a summary
                                                                                                                                                                           Provide
                                                                                                                     of their scheduled
                                                                                                                                              Prepare and                  expense
                                                                                                                      interviews, listed
        Candidate                                                                                                                           attend interview            documentation,
                                                                                                                     by job requisition
                                                                                                                                                                          if needed
                                                                                                                           Careers




                                                                                                View interview                                                                                                                     Capture costs claimed by                                                                    Select candidates
                                                                                                schedules by                                                                                                                       candidates by requisition                                                                                               Update candidate
                                                                                                                                                                                                                                                                                                                                    for pre-                                         Perform
                                                                            By                     applicant                                                                                                                        Search Job Openings                                                    Select                                           information and
                                                                                                                                                                                                                                                                                                                                 employment                                          Pre-Hire
                                                                          Applicant           Manage Applicant                                  Evaluate                                                                                Job Openings                                                  Final candidates                                           status
                                                                                                                                                                                                                                                                                                                                    checks                                           Activities
                                                                                               Interview Team                                candidate and                                                                                                                                                                                                 Manage Applicant
                                                                                                                                                                                                                                                                                                                               Manage Applicant
                                                                                                  Schedule                                      provide
                                                                                                                                            recommendation
                                                                                                                                            Create Interview
                                                                                                View interview                                 Evaluation
                                                             Choose how                         schedules by                                                                 Review candidate               View interview         Contact candidate and                 Track contacts,
         Recruiter                  Schedule                                     By               requisition
                                                                                                                           Prepare and                                                                                                                                                                    Choose
                                                               to view                                                       conduct                                        interview status and         results, ratings and      follow up on interview               conversations and
                                   Interviews                                 Requisition    Interview Calendar                                                                                                                                                                                           potential
                                                              schedule                                                      interview                                         confirm complete            recommendations                and status                      correspondence
                                                                                               Interview Team                               Create reminders                                                                                                                                               hires
                                                                                                                                                                             Manage Applicant             Manage Applicant         Send Correspondence                    Contact Notes
                                                                                                   Schedule                                 for interviewers to
                                                                                                                                                 complete
                                                                                                                                                evaluations                                                                                                                                                                    Update candidate             Send rejection
                                                                                                                                                 Interview                                                                                                                                                       Reject         disposition for a             notification     Track correspondence
                                                                                               View interview                                                                Review requisition                                                                                                                 Candidate          given job               Manage Applicant        Contact Notes
                                                                            By                                                                   Evaluation
                                                                                               schedules by                                                                 interview status and                                                                                                                               Manage Applicant          Send Correspondence
                                                                          Applicant                                                              Reminder
                                                                                                applicant list                                                                confirm complete
                                                                            List
                                                                                              Manage Applicant                                                             Search Job Openings




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                  19
Perform Pre-Hire Activities




                                                                                                     Review and/or
                                                                                                                         Access provider website                 Review status of request
                                        Conduct Interviews                   Need to               verify references                                                                                    Review results of pre-                                   Update candidate
                                                                                                                          and request candidate                    for pre-employment
                                         and Select Final                    request          No    for the selected                                                                                     employment inquiries                                         status
                                                                                                                                inquiries                                inquiries
                                           Candidates                      references?                  applicant                                                                                       Preemployment Check                                      Manage Applicant
                                                                                                                         Preemployment Check                      Preemployment Check
                                                                                                   Manage Applicant


                                                                                                                                                                                                                                                                       No
                                                                               Yes
     Line Manager

                                                                                                                        Send application information                                                       Receive applicant                                       Make offer?      Yes
                                                                                                                                                               Receive request status from
                                                                                                                       to preemployment verification                                                   information from provider
                                                                        Send an email to                                                                         provider using the Open
                                                                                                                          provider using the Open                                                     using the Open Integration
                                                                          the applicant                                                                        Integration Framework (OIF)
                                                                                                                        Integration Framework (OIF)                                                        Framework (OIF)
                                                                           requesting
                                                                           references
                                                                        Manage Applicant

                                                                                                                                                                                                    Capture pre-employment check
                                                                                                                                                                                                      expenses provided by pre-
                                                                                                                                                                                                    employment verification provider




                                                                                                   Provide reference
                                                                         Receive request
        Candidate                                                                                     information
                                                                          for references
                                                                                                        Careers




                                                                                                                                                                                             Review status of
                                                                       Send an email to the                                                                                                                                             Review results of
                                                                                                                          Review and/or               Access provider                        request for pre-
                                                                       applicant requesting             Track                                                                                                                           pre-employment           Provide feedback
                                                                                                                        references for the          website and request                        employment                                                                              Present and
                                                                            references             correspondence                                                                                                                           checks                     and
                                                                                                                        selected applicant           candidate inquiries                         checks                                                                               Manage Offers
                                                                               Send                 Contact Notes                                                                                                                       Preemployment            recommendations
                                                                                                                        Manage Applicant           Preemployment Check                       Preemployment
                                                                        Correspondence                                                                                                                                                       Check
                                                                                                                                                                                                 Check


                                                                               Yes



                                                                                                                                                Send application information                                                            Receive applicant
        Recruiter                                                            Need to                                                                                                   Receive request status from
                                                                                                                                               to preemployment verification                                                        information from provider
                                                                             request                          No                                                                         provider using the Open
                                                                                                                                                  provider using the Open                                                          using the Open Integration
                                                                           references?                                                                                                 Integration Framework (OIF)
                                                                                                                                                Integration Framework (OIF)                                                             Framework (OIF)




                                                                                                                                                                                                                                     Capture pre-employment
                                                                                                                                                                                                                                   check expenses provided by
                                                                                                                                                                                                                                   pre-employment verification
                                                                                                                                                                                                                                             provider




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                  20
Hire and Enable Resources



                                                        Evaluate and
      Line Manager                                     Select Applicants




                                                                             Close Job
         Recruiter                                                          Requisitions




                                                                           Enter New Hire   Enable New Hire
                                                                            Information       (Onboard)



          Human
         Resource
         Specialist
                                                                                                 Manage
                                                                                                Recruiting
                                                                                                Expenses




         Human                                                                                                Analyze Recruiting
      Resources VP




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                               21
Enter New Hire Information


                                     Evaluate and
     Line Manager                   Select Applicants




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Close Job
        Recruiter                                                                                                                                                                                                                                                                                                                                                                                                                                                               Requisitions




                                                                                                                                                                     Add new hire by selecting pre-
                                                                                                                                                                        configured template and
                                                                                                                                         Use Smart HR                                                                   Review transaction status                                   View transaction details                                                                                          Create list containing hiring
                                                                                                                                                                      completing simple data entry
                                                                                                                                           Template                                                                        Transaction Status                                        Manage Transactions                                                                               CAN                    information
                                                                                                                                                                          Smart HR Template
                                                                                                                                                                        Smart HR Transactions                                                                                                                                                                                                             Hire Report CAN


                                                                                                                                                                                                                 Identify work location, job, labor, payroll,                                                                                                                                        Print the letter to be signed by
                                                                                                                                                                      Identify applicant's personal
                                                                                                                                  Hire Applicant as                                                                   salary plan and compensation                                                                                                                                                  both employee and employer on
                                                                                                                                                                               information
                                                                                                                                   New Employee                                                                                  information                                                                                                                                                            or before the first day of
                                                                                                                                                                              Manage Hires                                                                                                                                                                                             ITA
                                                                                                                                                                                                                               Manage Hires                                                                                                                                                                    employment
                                                                                                                                                                                                                                                                                                                                                                                                             Job Letters (ITA)
                                   Receive notification                                                                                                                                                                                                                                                                                                                                                       Hire Letter ITA
                                    from Recruiting to                                                                                                                 Add a new employment
                                                                                                                                      Perform                                                                    Identify work location, job, labor, payroll,
                                       perform Hire                                                                                                                  organizational instance for a
                                                                                                                                   Concurrent Hire                                                                    salary plan and compensation
                                                                                                                                                                                Person
                                                                                                                                   or Hire Person                                                                                information
                                                                                                                                                                      Add Employment Instance                                                                                                                                                                                                         Create or update Contracts
                                                                                                                                    as Employee                                                                          Add Employment Instance
                                                                                                                                                                      New Employment Instance                                                                                                                                                                                        ESP                  Update Contracts
                                                                                                                                                                                                                                                                                                                                                                                                        Update Contracts ESP

                                                                                                                                                                   Create a new contingent worker
                                                                                                                                                                                                                 Identify work location, job, labor, payroll,
                                                                                                                                       Hire                          organizational instance for a                                                                                                                                                                        Country-
                                                                                                                                                                                                                      salary plan and compensation
                                                                                                                                     Contingent                                 Person                                                                                                                                                                                    specific                      Send Contrata File ESP
                                                                                                                                                                                                                          information - contingent
                                                                                                                                      Worker                       Add Contingent Worker Instance                                                                                                                                                                          tasks                      Print Contrata XML File ESP
                                       Review list of                                                                                                                                                               Add Contingent Worker Instance
                                                                                                                                                                   New Contingent Worker Instance
                                  individuals that need
                                   hiring process to be
                                        completed
                                       Manage Hires                                                                                                                                                              Identify work location, job, labor, payroll,                                                                                                                                       Manage Contrata Response File
                                                                                                                                    Hire/Transfer                   Review and/or update personal                                                                                                                                                                                                               ESP
                                                                                                                                                                                                                      salary plan and compensation
                                                                                                                                       Existing                              information                                                                                                                                                                                                             Read External XML File ESP
                                                                                                                                                                                                                           information - existing
                                                                                                                                     Employee                              Manage Hires                                                                                                                                                                                                             Review External XML File ESP
                                                                                                                                                                                                                               Manage Hires

                                                                                                                                 Create an Additional
                                                                                                                                                                    Add an assignment record for a
                                                                                                                                   Assignment for
                                                                                                                                                                                person                                                                                                                                                                                                                    Print Contracts ESP
                                                                                                                                   an Employee or
                                                                                                                                                                      Add Additional Assignment                                                                                                                                                                                                           Print Contracts ESP
                                                                                                                                     Contingent
                                                                                                                                                                        Concurrent Hire USF
                                                                                                                                       Worker

                                                                                                                                                                                                                 Identify work location, job, labor, payroll,
                                                                                                                                                                      Identify applicant's personal                                                                                                                                                                                                    Communication to Social
                                                                                                                                      Rehire                                                                          salary plan and compensation
                                                                                                                                                                          information - rehire
         Human                                                                                                                    Former Employee                                                                           information - rehire                                                                                                                                                            Security ESP
                                                                                                                                                                              Manage Hires                                                                                                                                                                                                               Create AFI File ESP
        Resource                                                                                                                                                                                                               Manage Hires
        Specialist                     Review and
                                                                                                                  Choose
                                    verify data before                                No
                                                                                                                   action
                                    performing hire?                                                                                                                                                                                                              Record the                                                Validate the hiring
                                                                                                                                                                                                               Create legal           Update the                seniority bonus                                           process by comparing
                                                                                                                                                                                                                                                                                                                                                      Track supporting
                                                                                                                                        Hire                        Create employee ID and identify       relationship between         employee                  code and the                                                the employee's
                                                                                                                                                                                                                                                                                                Headcount                                             hiring documents
                                                                                                                                    French Public                        personal information                 employee and              record                      seniority                                       Yes   competencies to those                                            End
                                                                                                                                                                                                                                                                                                allocated?                                                Supporting
                                                                                                                                       Sector                               Manage Hires                       organization            Employee                   equivalent                                               that are required for
                                           Yes                                                                                                                                                                                                                                                                                                        Documents FPS                                                                                                               Manage
                                                                                                                                                                                                          Initialize Status FPS       Record FPS                Hiring Seniority                                          the assigned job code
                                                                                                                                                                                                                                                                  Bonus FPS                                                 Validate Hire FPS                                                                                                                                    Recruiting
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Expenses
                                   Review applicant's              Check to see if                                                  Concurrent Hire                 Create new employee record, assign
                                                                                           Verify that the hire
                                       hire detail                 applicant exists                                              of Existing Employee                 status and civil service position
                                                                                           action selected is
                                      information                   previously in                                                French Public Sector                Add Concurrent Empl Record FPS                                                                                                                       Delete and archive
                                                                                              appropriate
                                     Manage Hire                       system                                                                                                                                                                                                                                  No           applicant data
                                                                                             Manage Hires
                                         Details                  Search for People                                                                                                                                                                                                                                        Delete ID FPS                                                                                                                                        Enable New
                                                                                                                                                                    Identify the terminated employee                                                                                                                                                                                                                                                                           Hire (Onboard)
                                                                                                                                       Rehire
                                                                                                                                                                                  to rehire
                                                                                                                                 French Public Sector
                                                                                                                                                                        Re-Hire Employee FPS




                                                                                                                                                                                                Record employee                                                                                                                                                                                                                   Assign Employee to Available Post
                                                                                                                                                                   Create employee ID                                    Define employee                                           Enter employee
                                                                                                                                                                                                      data                                                                                                       Enter child and family allowance                 Search Post Plan                                                Post Edit Request – Staffing (GPS)
                                                                                                                                          Hire German              and identify personal                                  grade and step            Add contract data               disability data                                                                                               Administer Post Plan
                                                                                                                                                                                                  Job Data –                                                                                                       Dependent Information (GPS)            Search Post Plan - by Payee (GPS)                                     Run Automated Post Assignments (GPS)
                                                                                                                                          Public Sector                 information                                         Grade Step              Update Contracts                   Regional                                                                                                  Administrate Plan (GPS)
                                                                                                                                                                                                 German Public                                                                                                 Child Allowance Administration (GPS)        Search Post Plan - by Post (GPS)                                       Search Unassigned Payees (GPS)
                                                                                                                                                                      Manage Hires                                      Information (GPS)                                              Disability
                                                                                                                                                                                                    Sector                                                                                                                                                                                                                       Work or Close Assignment Lists (GPS)




                                                                                                                                                                                                                                                                                                                               Identify compensation,              Identify employment-related           Identify education, union           Review new hire information and
                                                                                                                                         Create hire record for Federal employee             Print PAR request and Notice to                                                        Identify job, position, benefits
                                                                                                                    Hire New                                                                                                             Identify personal information                                                       earnings, and distribution               dates such as service               affiliations and security                     status
                                                                                                                                         and record general administrative details                      Employee                                                                      and retirement information
                                                                                                                  Employee USF                                                                                                          New Employment Instance USF                                                                     details                   computation and WIGI dates                       clearance                         New Hire USF
                                                                                                                                             New Employment Instance USF                     New Employment Instance USF                                                           New Employment Instance USF
                                                                                                                                                                                                                                        Add Employment Instance USF                                                        New Employment Instance USF           New Employment Instance USF          New Employment Instance USF                 New Hire Error USF
                                                                                                                                             Add Employment Instance USF                     Add Employment Instance USF                                                           Add Employment Instance USF
                                                                                                                                                                                                                                                                                                                           Add Employment Instance USF           Add Employment Instance USF          Add Employment Instance USF              Review New Hire Stats USF




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                            22
Close Job Requisitions


                                             Enter New Hire
                                              Information
                                                                                                                                                                         Review all active employees who
                                                                                                                                                                        were hired or rehired in a given time                                                            Analyze information on
                                                                                                                                                                                                                           Analyze ethnic and gender group
                                                                                                                                                                          period and conforms to federal                                                                 recruitment and hiring
                                                                                                                                                    USA                                                                     movement and advancements
                                                                                                                                                                              reporting requirements                                                                            practices
                                                                                                                                                                                                                            Job Group Movement Analysis
                                                                                                                                                                            PRWORA-New Hire (USA)                                                                        Adverse Impact (USA)
                                                                                                                                                                                PRWORA-Newhire



                                                                                                                                                                         Create and review DIMONA hire
                                                                                                                                                                       notifications to be sent to the Belgium
                                                                                                                                                                         Social Security office (RSZ) in the
                                                                                                                                                    BEL
                                                                                                                                                                                   form of flat files
               Human                                                                                                                                                    Create DIMONA Notification (BEL)
              Resource                                                                                                                                                  Review DIMONA Notification (BEL)
                                                                                                                         Which
              Specialist                                                                                                country?


                                                                                                                                                                         Review a breakdown of job offers
                                                                                                                                                                         versus application by UK-specific
                                                                                                                                                    GBR
                                                                                                                                                                           ethnic groups and by gender
                                                                                                                                                                               Adverse Impact (UK)


                                                                                                                                                                        Create report of people with special
                                                                                                                                                    ITA                          hiring categories
                                                                                                                                                                           Special Hiring Category ITA




              Human
                                                                                                                                                                                                                                                                                                   Analyze Recruiting
           Resources VP




                                                                                                                                                                                                                                                                                Review the eligibility and
                                                                                                                                                                                                                                                                                award payment status for
              Employee                                                                                                                                                                                                                                                           each applicant referred
                                                                                                                                                                                                                                                                                 Check Referral Status
                                                                                                      Perform
                                                                                                   country-specific
                                                                                                        tasks



                                                                                                                       Analyze
                                        Review requisitions, and                                                      Recruiting
                                           capture recruiting            Close requisitions for
                                               expenses                 positions that have been       Choose
                                          Job Opening Status                       filled              actions
                                           Job Opening Cost                   Job Openings
                                                Analysis



                                                                                                                                                                                     View duplicate
                                                                                                                            Evaluate and update                                                                                               View and approve
                                                                                                       Manage                                          View and override          referrals and adjust
                                                                                                                             eligibility employee                                                                  View audit list of        awards that have the
                                                                                                       referral                                       eligibility and award         award amounts
                                                                                                                            and determine award                                                                  manual overrides and          status of "Needs
                                                                                                       awards                                            information for             among eligible
                                                                                                                                     status                                                                       the change details               Approval"
                                                                                                                                                      referrals as needed              employees
                                                                                                                              Process Referral                                                                   Review Override Audit        Approve Employee
                                                                                                                                                      Administer Referrals          Track Duplicate
                                                                                                                                  Programs                                                                                                          Awards
                                                                                                                                                                                        Referrals

              Recruiter


                                                                                                                                                                                                                                                    Receive notification of payment
                                                                                                                                                                                                                            Send
                                                                                                                                                                                                                                                       published by NA Payroll
                                                                                                                                                                      Yes                                                 corrected         No
                                                                                                                                                                                                                                                      EIP Name: Payroll Issued
                                                                                                                                                                                                                          awards?
                                                                                                                                                                                                                                                          eRecruit Payment




                                                                                                                                                                                                                     Review and correct
                                                                                                                                                      Receive results of validation of requested                       awards that are
                                                                                                          Provide award payment
                                                                                                                                                          awards published by NA Payroll                           rejected by PeopleSoft
                                                                                                              data to payroll
                                                                                                                                                      EIP Name: eRecruit Request for Payment                           Payroll for North
                                                                                                             Process Referral
                                                                                                                                                      EIP Name: Acknowledgment/Verification                               America
                                                                                                                Programs
                                                                                                                                                                of eRecruit Payment                                   Review Rejected
                                                                                                                                                                                                                           Awards




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                    23
Enable New Hire (Onboard)



                                                                                             Create Global          Track Global
                                                                                              Assignment            Assignments




                                                                                               Relocate
                                                                                                               Maintain Employee Data
                                                                                               New Hire




                                                                                                Record
                                                                                             Office/Phone      Maintain Employee Data
                                                                                              Information



                                                                                Choose
        Human                                 Enter New Hire                                    Request          Provide Help Desk
                                                                               onboarding
                                               Information                                     Resources              Support
       Resource                                                                  actions
       Specialist


                                                                                               Schedule
                                                                                                                  Deliver Learning
                                                                                               Training




                                                                                                Enroll in         Manage Benefits
                                                                                                Benefits            Enrollment




                                                                                            Plan Performance    Determine Individual
                                                                                               and Career       Development Goals




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                    24
Analyze Recruiting


                   Human
                  Resource                                                                                                      Plan Recruiting
                  Manager




                                                                                       Hire and Enable
                                                                                          Resources



                  Recruiter

                                                                                       Evaluate and
                                                                                      Select Applicants




                   Human
                  Resource                                                            Recruit Applicants
                  Specialist




                                                                                                               Generate
                  Data                                                                                         Recruiting
               Administrator                                                                                  Intelligence




                   Human                                                                                   Analyze Recruiting
                                                                                                             Performance
                  Resource
                   Analyst




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                              25
Analyze Recruiting Performance


                                                                 Generate
                  Data                                           Recruiting
               Administrator                                    Intelligence




                                                                                                                                                                                                    Review all active employees who
                                                                                                                                                  Breakdown expense
                                                                                                                                                                          Analyze information on   were hired or rehired in a given time
                                                                                                        Analyze ethnic and gender group         types and amounts for a
                                                                                                                                                                          recruitment and hiring     period and conforms to federal
                                                                                         USA             movement and advancements                    job opening
                                                                                                                                                                                 practices               reporting requirements
                                                                                                         Job Group Movement Analysis               Job Opening Cost
                                                                                                                                                                           Adverse Impact USA          PRWORA-New Hire (USA)
                                                                                                                                                        Analysis
                                                                                                                                                                                                           PRWORA-Newhire

                                                                                                        Create and review DIMONA hire
                                                                                                      notifications to be sent to the Belgium
                                                                               Choose                  Social Security office (RSZ) in the
                                                                                                BEL
                                                                               country                            form of flat files
                                                                                                       Create DIMONA Notification (BEL)
                                                                                                       Review DIMONA Notification (BEL)



                                                                                                        Review a breakdown of job offers
                                                                                                        versus application by UK-specific
                                                                                         GBR
                   Human                                                                                  ethnic groups and by gender
                                                                                                              Adverse Impact (UK)
                  Resource
                  Specialist
                                                                                                      Create report of people with special
                                                                                          ITA                  hiring categories
                                                                                                         Special Hiring Category ITA




                                                                                                        List all vacant budgeted positions
                                                                                         USF
                                                                                                           Vacant Budgeted Positions




                                                                                                                    Review
                                                                                                                   additional
                                                                                                                details about the
                                                                                                                   recruiting
                                                                                                                    process




                   Human
                  Resource
                                                                                                                                                                                                                                           Plan Recruiting
                  Manager




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                         26
Deployment



                                                                             Respond to
                                                                             Employee       Maintain
                                                     Plan Deployment
                                                                              Lifecycle   Employee Data
                                                                               Actions



                                                                                                           Manage Health
                                                                                                            and Safety


                    Human
                   Resource
                   Specialist
                                                                                                            Track Global
                                                                                                            Assignments




                                                                                                          Manage Absences




               Time and Labor
                                                                                                          Manage Time and
                Administrator                                                                                 Labor




                  Payroll
                Administrator                                                                              Manage Payroll




                  Travel and
                   Expense                                                                                Manage Expenses
                   Manager




               Enterprise Help
                                                                                                          Provide Help Desk
                Desk Agent                                                                                     Support




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                          27
Plan Deployment



                                                                                                      Respond to
                                                                                        Create
                     Human                                          Define and                        Employee
                                                                                     Organizational
                                                                  Manage Positions                     Lifecycle
                    Resource                                                           Structure
                                                                                                        Actions
                    Specialist




                   Headcount
                                                                                     Plan Headcount
                    Manager                                                               FPS




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                               28
Define and Manage Positions




                                                                                                                           Review summary of
                                                                                                         Position          position information
                                                                                                                           Position Summary
                                               Define position information, including title,
                                                    description, location, company,
                                                  department, hours, headcount, etc.                                                                                                       Add or update position information and
                                                                                                                        Review information about                                              employment-related information         Update incumbents in a
                                                              Position Data                                                                                            Add/Update
                                                                                                                         employees currently or                                                  Add/Update Position Info                   position.
                                                     Classification Standards USF                                                                                       Positions
                                                                                               Review?        History   previously assigned to a                                                   Identify Key Positions            Add/Update Position Info
                                                               Job Codes
                                                                                                                                position                                                        Identify Key Positions USF
                                                       Occupational Series USF
                                                                                                                            Position History
                                                      Official Position Titles USF
                                                    Organizational Posn Titles USF
                                                           Rate Code Details
                                                                                                                         Review prior or current                                               Create department, job code, or
                                                                                                                           budget summary                                                    position budgets using total salaries
                                                                                                                              information                                                     and budgeted FTE's for positions
                                                                                                                                                        Decide               Update
                                                                                                         Budget              Budget Status                                                     with an approved budget status
                                                                                                                                                     if need to?            Department
                                                                                                         Status         Budget Check by Position                                                  Update Dept Budget Data
                                                                                                                                                                           FTE Budgets
                                                                                                                        Budget Status by Position
                                                                                                                           Budget Status by
                                                                                                                             Document ID
                    Human                           Send HR position data to FSCM
                   Resource                             EIP: POSITION DATA;                                                                                                                    Perform real-time budget check
                                                       POSITION_FULLSYNC;                                                                                          Budget Check Position                 by position
                   Specialist                             POSITION_SYNC                                                   Review a list of all
                                                                                                                                                                                                 Budget Check by Position
                                                                                                                        positions currently open
                                                                                                         Vacant
                                                                                                                            in a department
                                                                                                         Position
                                                                                                                           Vacant Budgeted
                                                                                                                                Positions
                                                                                                                                                                                                                                             Create
                                                                                                                                                                                           Build Organizational Structure                 Organizational
                                                                                                                           Review organization                                                                                              Structure
                                                                                                                             structure reports
                                                                                                                         Active/Inactive Positions
                                                                                                                         Active/Inactive Positions
                                                                                                                                   USF
                                                                                                                          Active Position History
                                                                                                                          Active Position History
                                                                                                                                   USF
                                                                                                                            Exception/Override
                                                                                                                         Exception/Override USF
                                                                                                                           Mass Org Exception
                                                                                                         Reports
                                                                                                                               Report (USF)
                                                                                                                            Incumbent History
                                                                                                                         Incumbent History USF
                                                                                                                              Job Code USF
                                                                                                                        Job Code & Position Audit
                                                                                                                        Occupational Series USF
                                                                                                                             OF8 Report USF
                                                                                                                              Position Status
                                                                                                                         Position Title Table USF
                                                                                                                              Vacant Position
                                                                                                                           Vacant Position USF




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                            29
Create Organizational Structure




                                                                                                                                                                           Create organization structure
                                                                                                                                                                                      reports
                                                                                                                                                                             Active/Inactive Positions
                                                                                                                                                                          Active/Inactive Positions USF
                                                                                                                                                                              Active Position History
                                                                                                                                                                           Active Position History USF
                                                                                                                                               Create organizational            Exception/Override
                     Human                                                                                            Create organizational   chart based on position        Exception/Override USF
                    Resource                                               Define and   Identify direct or indirect     report to validate            structure          Mass Org Exception Report (USF)
                    Specialist                                              Manage       reporting relationships            structure         Build Organization Chart          Incumbent History
                                                                            Positions   Build Position Structure      Create Organizational    Apply Changes (USF)           Incumbent History USF
                                                                                                                             Report               Build Department                Job Code USF
                                                                                                                                                Organization (USF)          Job Code & Position Audit
                                                                                                                                                                            Occupational Series USF
                                                                                                                                                                                 OF8 Report USF
                                                                                                                                                                                  Position Status
                                                                                                                                                                             Position Title Table USF
                                                                                                                                                                                  Vacant Position
                                                                                                                                                                               Vacant Position USF




                   Headcount
                    Manager                                                                                                                                                          Plan
                                                                                                                                                                                   Headcount
                                                                                                                                                                                     FPS




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                       30
Respond to
                              Human                                       Create                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  employee
                             Resource                                  Organizational                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              lifecycle
                             Specialist                                  Structure                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  actions




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          View the CAECs to which a
                                                                                                                                                                                                                                                                                                                                                                               View a summary of
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CAEC Grades            grade belongs
                                                                                                                                                                                                                                                                                                                                                                             headcount and recorded
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CAEC / Grade
                                                                                                                                                                                                                                                                                                                                                                                moves by CAEC
                                                                                                                                                                                                                                                                                                                                                                               Budget Line Detail
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           View transfers of budgeted
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            headcount that result in
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Transfers
                                                                                                                                             Identify the budget line                                                                                                                                                                                                                                                                                                                                              authorized
                                                                                                                                                                                                                                                                                                                                                                           Retrieve the AHM and all                                                                                                            Budget Line View
                                                                                                                                           information for each CAEC             Record the details of the Finance          Identify budget line data,         Calculate the authorized budget        Calculate the authorized budget                                                                               Lock in headcount on         Distribute headcount
                                                                                                                                                                                                                                                                                                                                                                         mass freezes and transaction
                                                                                                            Perform Annual                and associate a grade with a           Act, including the initial Finance      including budgeted headcount,          headcount from the budgeted          headcount management from the                                                                                  one CAEC to overstaff        between departments           Need to
                                                                                                                                                                                                                                                                                                                                                                           freezes, and view usable
                                                                                                          Headcount Planning                          CAEC                          Act and any amendments                       for each CAEC                            headcount                   authorized budgeted headcount                                                                                    another CAEC              Budgeted Headcount            review?
                                                                                                                                                                                                                                                                                                                                                                                  headcount                                                                                                                View lock-ins of authorized
                                                                                                                                                 CAE Category                       Fact with BL on Request                 Fact with BL on Request                  Budget Line Detail                      Budget Line Detail                                                                                       Budget Line Detail                  AD
                                                                                                                                                                                                                                                                                                                                                                              Budget Line Detail                                                                                                             headcount budget that
                                                                                                                                                 CAEC / Grade
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Lock-Ins           result in authorized
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            headcount management
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Budget Line View
                                                                                                                                                                                                                                                                                                                                                                           View actions captured in
                                                                                                                                                                                                                                                                                                                                                                          employee records and each
                                                                                                                                                                                                                                                                                                                                                                                actions impact                                                                                                               Review a summary of
                                                                                                                                                                                                                                                                                                                                                                              Budget Line Detail                                                                                                            headcount and recorded
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Summaries
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               moves by CAEC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Budget Line View




                                                                                                                                                                                                                                                                                                                                                       Set up CAE             Create headcount data           Build the
                                                                                                                                                                                                                                                                                                                               Create Cube                cube                   for cube analysis           CAE cube
                                                                                                                                                                                                                                                                                                                               For Analysis           CAE Cube Set             Create Waged Hdct             Calculate
                                                                                                                                                                                                                                                                                                                                                           Up                       Cube(12m.)               CAE Cube
                                                                                                                                                                                                                                                                    Review and analyze
                                                                                                                                                                           Create a list of employees in a                             Calculation
                                                                                                                                                      Nominal                                                                                                   headcount calculation results
                                                                                                                                                                                    department                                          Results
                                                                                                                                                     Headcount                                                                                                      Headcount Results                                                                   Update the counter of the
                                                                                                                                                                                Nominal Headcount                                                                                                                                                                                              Review overview of the budget
                                                                                                                                                                                                                                                                                                                             Review Budget           Finance Act for one or all budget
                                                                                                                                                                                                                                                                                                                                                                                                         line info
                                                                                                                                                                                                                                                                                                                               Line Detail                         lines
                                                                                                                                                                                                                                                                                                                                                                                                  Budget Line Summary
                                                                                                                                                                                                                                                                 Review budgeted headcount                                                                   Update Counter
                                                                                                                                                                           Calculate FTEs per grade and
                                                                                                      Calculate Workforce              Need to          FTEs by Dept                                                   Need to              Budgeted            authorized by department and
                                                                                                                                                                                    department                                                                                                                  Need to?
                                                                                                      Monthly or as Needed            calculate?         and Grade                                                     review?          Headcount by Dept         the calculated headcount
                                                                                                                                                                                   Calculate FTE                                                                                                                                                                                                 Lists the grades that do not
                                                                                                                                                                                                                                                                            BHAS                                                                           Identify CAEC grade
                                                                                                                                                                                                                                                                                                                                                                                               belong to any CAEC or grades
                                                                                                                                                                                                                                                                                                                               Audit and                discrepancies (one grade
                                                                                                                                                                                                                                                                                                                                                                                                registered in multiple CAECs
                                                                                                                                                                                                                                                                                                                             Review Grade s           registered in several CAECs)
                                                                                                                                                                              Calculate headcount per                                                            Summarize headcount per                                                                                                                Orphan Grades
                                                                                                                                                    Headcount by                                                                       Headcount                                                                                                               CAEC Audit
                                                                                                                                                                               grade and department                                                               CAEC and department                                                                                                           Grades Over Various CAEC
                                                                                                                                                   Dept and Grade                                                                      Summary
                                                                                                                                                                             Employees/Grade and Dept                                                             Headcount/CAEC/Dept.
                                                                                                                                                                                                                                                                                                                                                        Review CAEC summaries
                                                                                                                                                                                                                                                                                                                              Review CAEC
                                                                                                                                                                                                                                                                                                                                                            CAEC Summary
                                                                                                                                                                                                                                                                                                                               Summaries
                                                                                                                                                                                                                                                                                                                                                         Average Index/CAEC
                             Headcount
                              Manager                                                                                                                                                                                                                                                                                                                 Archive the CAE data
                                                                                        Need to?                                                                                                                                                                                                                                 Archive
                                                                                                                                                                                                                                                                                                                                                          CAE Storage




                                                                                                                                                                                                                                            Obtain Headcount         Request a CAE allocation based on
                                                                                                                                                                                                                                              from another             headcount available in another
                                                                                                                                                                                                                                               Department               department/budget/category
                                                                                                                                                                                                                                               or Category                  CAEC Locking Ins



                                                                                                                                                                                                                                            Exceed Budgeted           Authorizes overstaffing in a CAEC
                                                                                                                                                                                                                                               Headcount                         Overstaffing
                                                                                                                                                                                                    Request a CAE
                                                                                                                                                                                                                                How to
                                                                                                                                                        Identify Headcount                          allocation for a
                                                                                                                                                                                                                                 obtain
                                                                                                                                                           for New Hire                                 new hire
                                                                                                                                                                                                                              allocation?                             Retrieve one FTE from available
                                                                                                                                                                                                    CAE Allocation                              Available
                                                                                                                                                                                                                                                                     headcount for new hire and update
                                                                                                                                                                                                                                               Budgeted
                                                                                                                                                                                                                                                                                  balance
                                                                                                                                                                                                                                               Headcount
                                                                                                                                                                                                                                                                               CAE Allocation


                                                                                                                                                                                                                                                                      Review list of all CAE with an end                                                                                                                                                                                                                                                 Review the status of
                                                                                                                                                                                                                                                                          date or list of CAE to be                                                                                                                                                                                                                                      Allocation        the allocation or
                                                                                                                                                                                                                                             Future/Pending
                                                                                                                                                                                                                                                                                 deallocated                                                                                                                                                                             Hire and Enable                                                 Summary        deallocation procedure
                                                                                                                                                                                                                                              Deallocations                                                                                                                                                                                      New Hire
                                                                                                                                                                                                                                                                         All CAE to be Deallocated                                                                                                                                                                          Resources                                                                         Procedures
                                                                                                                                                                                                                                                                              Links Other CAE

                                                                                                                                                                                                                Deallocate the headcount in the
                                                                                                   Allocate/Deallocate                                               Identify Headcount                        current grade and reallocate to the
                                                                                                                               Need to?
                                                                                                        Headcount                                                   for Grade Promotion                                    new grade                                                                                                                                              Deletes CAE if the allocation               Need to                                        Track                                                                        Review CAE status
                                                                                                                                                                                                                          CAE Change                                                                                                                                                                                                                                                                                          Need to          Status
                                                                                                                                                                                                                                                                                                                                                                                        stamp is denied                   delete changes           Grade Change         Advancement FPS                                                                       summary
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              review?         Summary
                                                                                                                                                                                                                                                                                                                                                                                          Delete CAE                            to?                                                                                                                          Track CAE

                                                                                                                                                                                                               Deallocate active CAE, i.e., make
                                                                                                                                                            Update Allocation Due                              headcount available that has been
                                                                                                                                                               to Temporary or                                  designated for an employee that
                                                                                                                                                                                                                                                                                                                                                                                               No                                                                                                                                                        Review list of CAEs
                                                                                                                                                              Permanent Leave                                      has discontinued service
                                                                                                                                                                                                                       CAE Deallocation                                                                                                                                                                                                         Leave or                   Update Job                                                    CAEs by           allocated to an
                                                                                                                                                                                                                                                                                                                                                                                                                                               Termination                 Information                                                   Employee             employee
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CAE/Employee Inquire

                                                                                                                                                                                                                View the actions that resulting                                                                                                                                               Decide
                                                                                                                                                                   Delete                                       from the last CAE change and                                                                                                                                               if approval                                                                         Yes
                                                                                                                                                            Approved Headcount                                     delete the corresponding                                                                                                                                                   given?
                                                                                                                                                              Allocation Action                                             updates
                                                                                                                                                                                                               Delete CAE and Related Actions



                                                                                                                                                         Return Headcount Allocation                            Unlocks CAE once the margin is
                                                                                                                                                           Obtained from another                                          positive.
                                                                                                                                                          Department or Category                                    Reduction in Overstaff




                                                                                                                                                                                                                                                                                                                                                                                       Approve or deny
                                                                                                                                                                                                                                                                                                                                               Need to approve/                      headcount allocation          Hire and Enable
                                                                                                                                                                                                                                                                                                                                              deny allocation for?     New Hire
                                                                                                                                                                                                                                                                                                                                                                                         for new hire                 Resource
                                                                                                                                                                                                                                                                                                                                                                                     CAE Allocation Stamp
                              Human
                             Resource
                             Approval                                                                                                                                                                                                                                                                                                                                                                                       Approve or deny allocation            Track
                             Authority                                                                                                                                                                                                                                                                                                                                            Grade Change                                for new grade change           Advancement FPS
                                                                                                                                                                                                                                                                                                                                                                                                                               CAE Change Stamp



                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Approve or deny             Track Employee
                                                                                                                                                                                                                                                                                                                                                                                                             Leave or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        headcount deallocation            Personal
                                                                                                                                                                                                                                                                                                                                                                                                            Termination
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CAE Deallocation Stamp           Information




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           31
Maintain Employee Data


                                                                                 Update Employee
                                                                                   Information


                                                                                                                               Track
                                                                                                                              Seniority

                                                                                                                                               Update
                                                                                                                                             Compensation
                                                                                    Update Job
                                                                                    Information
                                                                                                                          Track Tenure and
                                                                                                                           Probation - USF

                                                                                                                                             Track Flexible
                                                                                                                                              Service and
                                                                                                                                                Tenure
                                                               Respond to
                                                                employee                                                   Track Faculty
                                                                 lifecycle                                                    Events
                                                                  actions
                                                                                                                                                 Track                       Manage
                                                                                                                                             Advancement -                  health and     Manage Health and
                                                                                                                                                 FPS                        safety data         Safety


                            Human                                                                                          Grant Tenure -
                           Resource                                              Track Citizenship                             FPS
                           Specialist                                               Information



                                                                                                     Track Employment                                            Decide
                                                                                                         Contracts                                            if need to?

                                                                                                                                                                            Track global     Track Global
                                                                                    Review and
                                                                                                                                                                            assignments      Assignments
                                                                                    Report Job
                                                                                     Summary
                                                                                    Information

                                                                                                        Track Labor
                                                                                                         Relations


                                                                                 Track Secondment                                                                                              Manage
                                                                                   Contributions -                                                                            Manage
                                                                                                                                                                                              Absences
                                                                                        FPS                                                                                 absence data


                                                                                                      Archive or Delete
                                                                                                     Employee Records
                                                                                                            - FPS

                                                                                 Track and Report
                                                                                    Regulatory
                                                                                    Information




                       Time and Labor                                                                                                                                       Manage time    Manage Time and
                                                                                                                                                                             and labor         Labor
                        Administrator




                          Payroll                                                                                                                                             Manage           Manage
                        Administrator                                                                                                                                         payroll          Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                           32
Update Employee Information

                                                                                                              Review list of direct reports and select
                                                                                                                       individual to review
                                                                                                                  View Employee Personal Info
                                                                                                                                                                        View manager information
                                                                                      Review direct                    Dir Rep Multi-Select
                                                                                                                                                                            Direct Line Reports
                                                                                       report data                   Direct Rep Drill-Down
                                                                                                                                                                            Pending Approvals
                                                                                                                          Direct Reports
                                                                                                                                                                                   Alerts
                                                                                                                        Employee Search
                                                                                                                                                                                 Learning
                                                                                                                     Direct Reports Phones
                                                                                                                                                                           Objective Alignment
                                                                                                                        Org Chart Viewer
                                                                                                                                                                            Company Directory
                                                                                                                                                                             My Job Openings
                                                                                Oversee managerial
                            Line Manager                                         events and data
                                                                                                                                                                              Birthday Alerts
                                                                                                                                                                            Anniversary Alerts
                                                                                                                                                                        Manager Leave Summary
                                                                                                               View employee personal information                         Organization Directory
                                                                                                                  View Employee Personal Info                               Scheduled Training
                                                                                     View personal                      Phone Numbers                                   Manager Expiring Licenses
                                                                                     information for                    Email Addresses                                       Open Positions
                                                                                      an employee                      Emergency Contact                                 Time Management Alerts
                                                                                                                        Talent Summary                                     Workforce Availability
                                                                                                                     Employee Performance
                                                                                                                     Location Change (USF)




                                                                                                           Review or update personal information - USF
                                                                                         Maintain               Review Change Requests (USF)
                                                                                         personal                    Address Change (USF)
                                                                                       information               Phone Number Change (USF)                        Review or update personal information
                                                                                       for Federal                    Marital Status (USF)                           Personal Information Summary
                                                                                                                      Name Change (USF)                                Home and Mailing Address
                                                                                                                                                                            Phone Numbers
                                                                                         Maintain                                                                           Email Addresses
                              Employee                                                   personal                                                                         Instant Message IDs
                                                                                       information                                                                        Emergency Contacts
                                                                                                                                                                              Marital Status
                                                                                                                                                                             Name Change
                                                                                                                                                                             Ethnic Groups

                                                                                                            Complete and submit Section I of I-9 Form
                                                                                                                Complete and Submit I-9 Form




                                                                                                                                                                                 Yes
                                                                                                            Complete Employee I-9 Form submission or
                                                                                                                                                                                 New                          Create list of employees whose I-9 Forms are                            Print completed
                                                                                                           reverify/update existing I-9 record by detailing                                                                                                      How
                                                                                         Complete                                                                             Section I                         due to expire or whose final I-9 document                            and submitted I-9
                                                                                                             the employee's legally required document                                               No                                                       to handle I-9   Print
                                                                                        an I-9 form                                                                          of I-9 form                               information must be received                                        Forms
                                                                                                                            information                                                                                                                        records?
                                                                                                                                                                              needed?                                  I-9 Receipt/Expiration Report                                  Print I-9 Forms
                                                                                                                   Complete/Reverify EE I-9 Form


                                                                                                                                                                                           Update Employee I-9 Record(s)


                                                                                                                                                              Identify checklist items to use as a guide
                                                                                 Complete employee                                                                      for processing people
                                                                                   checklist items                                                                         Person Checklist
                                                                                                              Locate and review a person's record by
                                                                                       Search for                    searching by national ID
                                                                                        a person                      Search by National ID
                                                                                                                                                                                                                 Identify employee's personal information
                                                                                                                                                                                                                              Emergency Contact
                                                                                                                                                                                                                         Emergency Contacts Report
                                                                                                                                                                                                                                   Disabilities
                                                                                                                                                                                                                       Maintain Accommodation Data                                                                      Manage
                                                                                                                                                                                                                             Driver's License Data                                                                     health and     Manage Health and
                                                                                                                                                                                                                                   Credit Card                                                                         safety data         Safety
                                                                                                                                                                                                                              General Comments
                                                                                                                                                                                                                              Company Property
                               Human                                                                                                                                                                                        Prior Work Experience
                                                                                                                                                                                                                          Prior Career History FPS
                              Resource                                                                                                                                                                                       Military Situation FRA
                              Specialist                                                                                                                                                                                    Dependent Information
                                                                                                                                                                                                                         Depdnt Identification Details
                                                                                                                                                                                                                       Dependent Benef History FPS                                                          Decide
                                                                                                                                                                                                              Ethnic Group and Religion THA SGP MYS CHN                                                  if need to?
                                                                                                                                                                                                                Hukou, Working Life and Living Status CHN
                                                                                                                                                                                                                   Political Status and Native Place CHN                                                               Track global     Track Global
                                                                                               Update           Update basic employee information                                                                             Volunteer Activities                                                                     assignments      Assignments
                                                                          Decide
                                                                                              employee                  Modify a Person                                                                                          Bank Accounts
                                                                       if need to?
                                                                                             information             Smart HR Transactions                                                                                    Business Expenses
                                                                                                                                                                                                                                      Badge
                                                                                                                                                                                                                               Birthdays Report
                                                                                                                                                                                                                            Home Address Report
                                                                                                                                                                                                                             Mailing Labels Report
                                                                                                                                                                                                                               Documents (ITA)
                                                                                                                                                                                                                            Company Codes (ITA)
                                                                                                                                                                                                                     Person Organizational Summary                                                                                         Manage
                                                                                                                                                                                                                                                                                                                         Manage
                                                                                                                                                                                                                       Maintain a Person's POI Reltn                                                                                      Absences
                                                                                                                                                                                                                                                                                                                       absence data
                                                                   Respond to
                                                                                                                                                                                                                                Modify a Person
                                                                    employee
                                                                                                                                                                                                                               Additional Names
                                                                     lifecycle
                                                                                                                                                                                                                           Add a POI Relationship
                                                                      actions
                                                                                                                                                                                                                           General Availability MIL
                                                                                                                                                                                                                                Disabilities BRA
                                                                                                                                                                                                                         Additional Information ARG
                                                                                                                                                                                                                         Additional Information BRA
                                                                                                                                                                                                                          Personal Information BRA
                                                                                                                                                                                                                              Security Clearance
                                                                                                                                                                                                                    Badge/Clearance Access Summary




                          Time and Labor                                                                                                                                                                                                                                                                               Manage time    Manage Time and
                           Administrator                                                                                                                                                                                                                                                                                and labor         Labor




                             Payroll                                                                                                                                                                                                                                                                                     Manage           Manage
                           Administrator                                                                                                                                                                                                                                                                                 payroll          Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                      33
Update Job Information


                                                                                                       Create personnel action request or
                                                                                                       termination of position or leave of
                       Employee                                                                                    absence
                                                                                                            Employee Request USF
                                                                                                          Request Termination (USF)




                                                                                                        Create personnel action request
                                                                                                           Supervisor Request USF
                                                                                                           Promote Employee (USF)
                                                                             Personnel                    Reassign Employee (USF)
                                                                             Action USF                    Reporting Change (USF)
                                                                                                            Retire Employee (USF)
                                                                                                        Review Change Requests (USF)
                                                                                                           Separate Employee (USF)
                                                                                                                                                       Change employee full/part time
                                                                               Full/Part                                                                         status
                                                                             Time Status                                                               Change Full/Part Time Status
                                                                                                                                                        Change FTPT Status (USF)

                                                                                                             Change employee location
                                                                              Location                       Request Location Change
                                                                                                              Location Change (USF)


                                                                                                                                                       Request employee termination
                                                                              Termination
                                                                                                                                                           Terminate Employee

                                                                                                        Initiate a request for a job change
                                                              Type of
                                                                                                            that requires Works Council
                                                          action needed           Job Change
                    Line Manager                            for direct             (Europe)
                                                                                                                      Approval
                                                                                                                Request Job Change
                                                             reports?
                                                                                                           Review Job Change Request




                                                                                                         Request an employee transfer
                                                                              Transfer
                                                                                                             Transfer Employee




                                                                                                          Request employee promotion
                                                                              Promotion
                                                                                                              Promote Employee




                                                                                                                                                       Review reporting                                                    View employee                         Review status of job
                                                                                                          Request and review reporting                                                      View status of
                                                                              Reporting                                                                 change status                                                    transfer employee                         change request
                                                                                                                   changes                                                                promotion request
                                                                               Change                                                                  View Reporting                                                       View Transfer                        Review Job Change
                                                                                                           Request Reporting Change                                                     View Promotion Status
                                                                                                                                                        Change Status                                                          Status                                 Request




                                                                                                                                                                                                                                                                                   Provide 1st level of
                                                                                                                                                                                                                                           Mass-Approve job change                                                 Provide 2nd level of
                                                                                                                                                                          Approve employee                 Approve transfer                                                      authorization required
                                                                                                             Approve reporting changes                                                                                                            requests                                                     authorization required for a
                                                                                                                                                                              promotion                       employee                                                           for a personnel action
                 Human Resource                                                                              Approve Reporting Change
                                                                                                                                                                          Approve Promotion                Approve Transfer
                                                                                                                                                                                                                                         Job Change Request Approval
                                                                                                                                                                                                                                                                                 1st Rqst Authorization
                                                                                                                                                                                                                                                                                                                    personnel action
                    Approval                                                                                                                                                                                                                WC Automatic Approval                                              2nd Rqst Authorization USF
                                                                                                                                                                                                                                                                                          USF
                    Authority

                                                                                                                                                                                                                                                                                                                 Approve/deny personnel
                                                                                                                                                                                                                                                                                                                         action
                                                                                                                                                                                                                                                                                                                 Approve Request USF




                                                                                                                            Identify personnel action details of                 Perform scheduled automatic or manual
                                                                                                                          request ready for human resources to              processing of personnel requests for future dated
                                                                                                 Personnel
                                                                                                                                          process                            transactions that have been approved and need
                                                                                                  Action
                                                                                                                                    HR Processing USF                           to be pushed to various database records
                                                                                                   USF
                                                                                                                              Cancel Personnel Action USF                                Process PAR Push USF
                                                                                                                              Correct Personnel Action USF                             Comp Actns USF (hidden)




                                                                                                                                                                              Review the status of a job change
                                                                                                                                                                              requests requiring Works Council                    Mass-Approve job change
                                                                                                 Request                  Initiate a request for a job change that
                                                                                                                                                                                          approval                                       requests
                                                                                               Job Changes                   requires Works Council approval
                                                                                                                                                                              Review My Job Change Request                      Job Change Request Approval
                                                                                                   GBR                              Request Job Change
                                                                                                                                                                              Review All Job Change Requests                       WC Automatic Approval
                                                                                                                                                                                Review Errors and Warnings




                                                Respond to                                                                   Define the type of mass job data                 Apply mass changes to employee                    Review the results of the mass
                                                                                               Job Changes
                                                 employee                                                                  update to apply to employee records                            records                                employee job record change
                                                                                                 by Mass
                                                  lifecycle                                                                        Mass Update Setup                           Mass Update Run Control Page                          Mass Update Result
                                                                                                                                                                                                                                                                                                                                                 Grant Tenure
                                                                                                                                                                                                                                                                                                                             Grant tenure
                                                                                                                                                                                                                                                                                                                                                    – FPS



                                                                                                                          Identify/update job-related information
                                                                                                                                                                                                                                                                                                                                                    Track
                                                                                               Job Changes                               Job Data                                                                                                                                                                           Track seniority
                                                                                                                                                                                                                                                                                                                                                   Seniority
                                                                                               by Individual                           Current Job
                                                                                                Employee                             Pay Rate Change
                                                                                                                                  Smart HR Transactions
                                                                                                                                                                                                                                                                                                                               Update              Update
                                                                                                                                                                                                                                                                                                                            compensation         Compensation
                 Human Resource
                   Specialist                                                    Type
                                                                                                                            Identify nature and schedule of a
                                                                                                                                                                             Re-activate or update termination for
                                                                                                      Temporary                  temporary assignment
                                                                          of action needed                                                                                              temporary jobs
                                                                                                     Assignments            Temp Assignmt due to Complete
                                                                            for employee                                                                                       Reactivate/Update Termination                                                                                                 Decide            Track           Track Advancement
                                                                                                                             Temp Assignmt w/out End Date
                                                                                                                                                                                                                                                                                                          if need to?       advancement               - FPS



                                                                                                                                                                                 Distribute the cost of a main                                                                                                              Track tenure       Track Tenure and
                                                                                               Appointments                Identify new additional appointments               appointment between its additional                                                                                                            and probation       Probation - USF
                                                                                                   JPN                         Additional Appointment JPN                                appointments
                                                                                                                                                                                        Cost Rate JPN

                                                                                                                                                                                                                                                                                                                                 Track
                                                                                                                                                                                                                                                                                                                                                 Track Flexible
                                                                                                                              Record work location and                                                                                                                                                                      flexible service
                                                                                                                                                                                                                                                                                                                                               Service and Tenure
                                                                                                                               job information changes                                                                                                                                                                         and tenure
                                                                                               Assignments
                                                                                                                               Update Assignment FPS
                                                                                                   FPS
                                                                                                                                     Job Data FPS
                                                                                                                             Merge Employee Record FPS
                                                                                                                                                                                                                                                                                                                                Track            Track Faculty
                                                                                                                                                                             Identify change in pay rate or salary                                                                                                          faculty events          Events
                                                                                                                     Compensation - FPS                                          Update Compensation FPS
                                                                                                                                                                                     Grant Premiums FPS
                                                                                                    Civil
                                                                                                                         Change and check civil service position
                                                                                              Service Position
                                                                                                                            Chg Civil Service Position FPS
                                                                                                    FPS

                                                                                                                                                                               Modify employee categorization
                                                                                                                     Categorization -FPS
                                                                                                                                                                                Update Categorization FPS

                                                                                                                              Records work time changes
                                                                                             Work Time - FPS
                                                                                                                               Update Work Time FPS

                                                                                                                                                                              Provide Personal Information File
                                                                                                                  Personal Information - CHN
                                                                                                                                                                                 Personal Information CHN


                                                                                                                          Record the date an employee resigns
                                                                                             Terminations - ITA
                                                                                                                                      Terms (ITA)




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                34
Track Seniority




                                                                                                                   Update seniority components
                                                                                               Update seniority
                                                                                                                    in compensation packages
                                                                                                 information
                                                                                                                       Update Seniority Pay




                                                                                                                   Verify workers are still eligible   Review employee records with    Review employee seniority
                                                                                                Check seniority
                                                                                                                   for seniority pay components                 multiple codes                information
                                                                                               data for a worker
                                                                                                                     Update Seniority Eligibility      Multiple Seniority Components        Seniority Report
                                                                                                                                                                                                                                     Manage
                                                               Update Job           Decide                                                                                                                                          health and    Manage Health and
                                                               Information       if need to?                                                                                                                                        safety data        Safety

                           Human
                          Resource                                                                  Identify       Identify seniority for a worker                                                                      Decide
                          Specialist                                                           Belgium seniority      Identify Seniority (BEL)                                                                       if need to?
                                                                                                                                                                                                                                   Track global     Track Global
                                                                                                                                                                                                                                   assignments      Assignments



                                                                                               Manage Claeys          Review and set Claeys               Calculate the severance
                                                                                                                                                                                       Create Notifications report
                                                                                                information for        calculation variables                      amount
                                                                                                                                                                                       Create Notification (BEL)
                                                                                               Belgium workers       Create Notification (BEL)            Create Notification (BEL)
                                                                                                                                                                                                                                                       Manage
                                                                                                                                                                                                                                     Manage
                                                                                                                                                                                                                                                      Absences
                                                                                                                                                                                                                                   absence data




                                                                                                                                                                                                                                   Manage time    Manage Time and
                                                                                                                                                                                                                                    and labor         Labor
                      Time and Labor
                       Administrator




                                                                                                                                                                                                                                    Manage            Manage
                         Payroll                                                                                                                                                                                                    payroll           Payroll
                       Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                  35
Update Compensation




                                                                                                  Refresh the
                                                                                             compensation defaults
                                                                                                  in Job Data
                                                                                             Refresh Compensation


                             Human                                                                                                    Manage
                            Resource                                                                                                 health and    Manage Health and
                            Specialist                                                                                               safety data        Safety


                                                                           Update Job                                    Decide
                                                                           Information                                if need to?
                                                                                                                                    Track global     Track Global
                                                                                                                                    assignments      Assignments




                                                                                                   Recalculate
                                                                                                                                                        Manage
                                                                                             compensation packages                    Manage
                                                                                                                                                       Absences
                                                                                             Calculate Compensation                 absence data




                        Time and Labor                                                                                              Manage time    Manage Time and
                         Administrator                                                                                               and labor         Labor




                           Payroll                                                                                                    Manage           Manage
                         Administrator                                                                                                payroll          Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                   36
Track Tenure and Probation - USF




                                                                                                                                               Identify employees who are within   Create a worklist item and notify
                                                                                                                          Identify employees
                                                                                                                                                60 days of tenure waiting period   supervisors of tenure conversion
                                                                                                                            awaiting tenure
                                                                                                                                                Process Automated Actions USF       Tenure Conversion Notice USF




                                                                                                                Identify or
                                                                                         Track Tenure - USF
                                                                                                                 convert?




                                                                                                                                                                                   Create a worklist item and notify
                                                                                                                                                   Update tenure status for
                                                                                                                         Perform tenure                                               supervisors of processed
                                                                                                                                               employees passed tenure dates
                                                                                                                          conversions                                                        conversion
                                                                                                                                               Process Automated Actions USF
                                                                                                                                                                                   Tenure Conversion Notice USF

                            Human
                           Resource                      Update Job          Decide
                                                         Information      if need to?
                           Specialist
                                                                                                                                                                                                                                       Manage
                                                                                                                                                                                                                                      health and    Manage Health and
                                                                                                                                                                                                                                      safety data        Safety
                                                                                                                                                                                   Create a worklist item and notify
                                                                                                                          Identify employees   Identify employees who are within
                                                                                                                                                                                      supervisors of probation
                                                                                                                          awaiting probation     60 days of probationary period
                                                                                                                                                                                             termination
                                                                                                                              termination       Process Automated Actions USF                                            Decide if
                                                                                                                                                                                    Probat Term-Supv Notif USF
                                                                                                                                                                                                                         need to?
                                                                                                                                                                                                                                     Track global     Track Global
                                                                                                                                                                                                                                     assignments      Assignments
                                                                                                                 Identify or
                                                                                        Track Probation - USF
                                                                                                                terminate?




                                                                                                                                                                                                                                                         Manage
                                                                                                                                                 Terminate probationary periods      Create a worklist item and notify                 Manage
                                                                                                                                Terminate                                                                                                               Absences
                                                                                                                                                for employees passed probation          supervisors of terminated                    absence data
                                                                                                                               probationary
                                                                                                                                                             dates                             probations
                                                                                                                                 periods
                                                                                                                                                Process Automated Actions USF         Probat Term-Supv Notif USF




                       Time and Labor
                                                                                                                                                                                                                                     Manage time    Manage Time and
                        Administrator
                                                                                                                                                                                                                                      and labor         Labor




                          Payroll
                                                                                                                                                                                                                                        Manage          Manage
                        Administrator                                                                                                                                                                                                   payroll         Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                    37
Track Flexible Service and Tenure


                                                                                                                       Group actions and            Define rules for service
                                                                                          Establish calendars for
                                                                                                                       reasons that count         accruals, including rounding
                                                                                 Yes      accruing service years
                                                                                                                         toward accrual                and adjustments
                                                                                                 Calendar
                                                                                                                       HR Action/Category                Service Rules




                                                                                                                                                                                        Establish academic               Identify experiences and
                                                                                                                                                        Define or Update
                                                                                                                                                                                       ranks, eligibility, and         credits from other institutions
                                                                                                                                                        Tenure Tracking
                                                                                                                                                                                       probationary periods              and apply toward tenure
                                                                                                                                                          Information
                                                                                                                                                                                         Academic Rank                   Experience/Credit Codes
                                                                                                                                                                                                                                                                                                                                                                                                                             Review processing messages
                                                                                                                                                                                                                                                                                                                                                                                                              Processing
                                                                           Update                                                                                                                                                                                                                                                                                                                                                 to ensure accuracy
                                                     Update Job                                                                                                                                                                                                                                                                                                                                               messages
                                                                       service accrual                                                                                                                                                                                                                                                                                                                                       Review Processing Messages
                                                     Information                                                                           Decide
                                                                         definitions?                               Track Tenure
                                                                                                                                        if need to?

                                                                                                                                                                                                                                                   Review or update default                                  Review changes made
                                                                                                                                                                                                                        Activate tenure                                             Track employee's                                     Review current jobs                                                                                                    Update the tenure service     Create tenure reports
                                                                                                                                                                                                                                                       tenure data, add                                      to academic rank and                                  Calculate tenure service for a                             Review temporary results of
                                                                                                                                                                                                                        tracking for an                                            service accrued from                                   that count toward                                                      Temporary                                     totals and employee service     Tenure Calculation
                                                                                                                                                                                                             No                                     additional details, and                                      tenure status                                        group or an individual        Review?                        tenure calculation
                                                                                                                                                                                                                           employee                                                  other institutions                                         tenure                                                             results                                                history            Tenure Years of Service
                                                                                                     Decide if                                                                                                                                     assign calculation group                                   Review Rank/Status                                   Perform Tenure Calculations                                Review Tenure Run Results
                                                                                         No                                                                                                                                Job Data                                                Create Tenure Data                                    Review Related Jobs                                                                                                   Perform Tenure Calculations   Employee Tenure Status
                                                                                                     need to?                                                                                                                                        Create Tenure Data                                             History
                            Human
                                                                                                                                                                                       Need new
                           Resource                                                                                                                      Assign and
                                                                                                                                                                                       calculation
                           Specialist                                                                                                                  Calculate Tenure
                                                                                                                                                                                         group?                                                                                                                                                                                                                 Tenure          Review results of tenure
                                                                                                                                                                                                                                                                                                                                                                                                              calculation    accrual for calculation process
                                                                                                                                                                                                                                                                                                                                                                                                               summary       Review Tenure Calc Summary
                                                                                                                                                                                                                       Create calculation
                                                                                                                                                                                                       Yes                  groups
                                                                                                                                                                                                                       Calculation Group
                                                                                                                                                                                                                                                                                                                                                      Review history of service
                                                                                                                                                                                                                                                                                                                                    History                   credits                                                                                                                                                   Manage
                                                                                                                                                                                                                                                                                                                                                          Service History                                                                                                                                              health and       Manage Health and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       safety data           Safety

                                                                                                                                                                 Identify service
                                                                                                                                                                                                Identify employee's            Review jobs and                                                Review accrual
                                                                                                                                                              calculation group and                                                                            Calculate service                                                                       Review flexible service
                                                                                                                                                                                                 startup credits and          positions eligible to                                          processing results                                                                                                                                                                                       Decide
                                                                                                                                                 No          FTE value for prorating                                                                               accruals                                            Review?       Calculations            calculations
                                                                                                                                                                                                     exceptions              accrue service credits                                        View Periodic Results                                                                                                                                                                                   if need to?         Track global       Track Global
                                                                                                                                                                 accrued service                                                                               Calculate Service                                                                     Flexible Service Summary
                                                                                                                                                                                                  Flexible Service            View Related Jobs                                                Message Log                                                                                                                                                                                                             assignments        Assignments
                                                                                                                                                                    Job Data

                                                                                                                                   Need new
                                                                                                              Track Service        calculation                                                                                                                                                                                                       Review employee flexible
                                                                                                                                     group?                                                                                                                                                                                                                   service
                                                                                                                                                                                                                                                                                                                                    Reports                                                                                                                                                                                                  Manage
                                                                                                                                                                                                                                                                                                                                                     Calculated Service Report                                                                                                                                             Manage
                                                                                                                                                                                                                                                                                                                                                     Employee Service Report                                                                                                                                                                Absences
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         absence data
                                                                                                                                                               Create calculation
                                                                                                                                                 Yes                groups
                                                                                                                                                               Calculation Group




                       Time and Labor                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Manage time     Manage Time and
                        Administrator                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    and labor          Labor




                          Payroll                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Manage        Manage
                        Administrator                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         payroll       Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        38
Track Faculty Events

                                                                                        Update or review my faculty
                                                                                                  events
                                                                                                 Activities
                                                                                           Administrative Posts
                                                                                               Committees
                            Employee                                                          Presentations
                                                                                           Professional Training
                                                                                               Publications
                                                                                             Student Advising
                                                                                         Teaching Responsibilities




                                                                                                                             Define committee details             Define DETYA details
                                                                                        Define administrative posts
                                                                                                                                   Committees                    Classification Code AUS             Recruiting       Recruiting
                                                                                           Administrative Posts
                                                                                                                                 Committee Type                   Organization Unit AUS




                                                                            Yes                                                            Define employee case, i. e.,                                                                                Review the final, approved
                                                                                                                                                                                                                     Review less sensitive case
                                                                                                                                           change in tenure status, title            Review case information                                                employee cases
                                                                                                                Employee cases                                                                                              information
                                                                                                                                                      change                            Case Information                                                 Review Case Status
                                                                                                                                                                                                                          Case Progress
                                                                                                                                             Identify Employee Case                                                                                     Case Review Status Rpt


                                                                                                                                                                                  Track employee's administrative
                                                      Update Job           Update                                     Administrative
                                                                                        No     Need to track?                                                                      posts, titles, and appointments
                                                      Information      tracking data?                                    posts
                                                                                                                                                                                        Administrative Posts


                                                                                                                                           Track participation in activities
                                                                                                                   Activities                     and committees
                                                                                                                and committees            Review Committee Membership
                             Human                                                                                                                    Activities
                            Resource
                                                                                                                                                                                  Track faculty competencies and
                            Specialist                                                                         Competencies                                                              accomplishments
                                                                                                            and accomplishments                                                            Presentations
                                                                                                                                                                                            Publications
                                                                                                                                         Identify courses the employee is                                                                                                             Manage
                                                                                                                   Teaching                                                                                                                                                          health and    Manage Health and
                                                                                                                                                 assigned to teach
                                                                                                                responsibilities                                                                                                                                                     safety data        Safety
                                                                                                                                            Teaching Responsibilities

                                                                                                                                                                                     Track employee's student
                                                                                                                                                                                                                                                     Decide
                                                                                                                  Advisees                                                                  advisees
                                                                                                                                                                                                                                                  if need to?
                                                                                                                                                                                       Student Advisement
                                                                                                                                                                                                                                                                                    Track global     Track Global
                                                                                                                                              Review Faculty history                                                                                                                assignments      Assignments
                                                                                                                Faculty history                     information
                                                                                                                                              Faculty Events Hist Rpt



                                                                                                                                           Identify full-time and part-time      Load and report on teaching data
                                                                                                                                                                                 Load FT Teaching Member Data                                                                                           Manage
                                                                                                                                                    member data                                                                                                                       Manage
                                                                                                                      Memberships                                                  Load Teaching Survey Data                                                                                           Absences
                                                                                                                                                 Full-Time Member                                                                                                                   absence data
                                                                                                                                                 Full-Time Surveys                  Create Survey Stats CAN
                                                                                                                                                 Part-Time Surveys                  FT Survey Stats CAN Rpt




                        Time and Labor                                                                                                                                                                                                                                              Manage time    Manage Time and
                         Administrator                                                                                                                                                                                                                                               and labor         Labor




                           Payroll                                                                                                                                                                                                                                                     Manage          Manage
                         Administrator                                                                                                                                                                                                                                                 payroll         Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                   39
Track Advancement - FPS

                                                                                                                                                 Review employees selected
                                                                                                                       Identify promotable
                                                                          Promote         Define grade promotion                                  for promotion and add or     Identify employees selected for
                                                                                                                      employee population
                                                                          Eligible                criteria                                           remove employees           promotion for a specified date
                                                                                                                        Select Promotable
                                                                         Employees        Define Promotion Rules                                     Review Promotable         Promotable Employees Report
                                                                                                                           Employees
                                                                                                                                                         Employees




                                                                                          Define reclassification    Simulate reclassification
                                                                                                                                                                               Update employee records with      Calculate promotion probation
                                                                         Reclassify           conditions and           and save the results       Validate reclassifications
                                                                                                                                                                                  valid reclassifications              period end dates
                                                                         Employees             procedures                Reclassification         Validate Reclassification
                                                                                                                                                                                      Update Career              Calculate End of Probation Pd
                                                                                          Define Reclassification          Simulation

                                                                                                                                                                                                                                                                                                                                    Plan Headcount      Decide
                                                                                                                                                                                                                                                                                                                                         - FPS       if need to?

                                                                                                                                                                                                                                                                                                                                                                                        Update career
                                                                                                                                                                                                                                                                                                                                                                                    classification data for
                                                                                                                                                                                                                                                                                                                                                                    Modify an
                                                                                                                                                                                                                                                                                                                                                                                    individual employees
                                                                                                                                                                                                                                                                                                                                                                   advancement
                                                                                                                                                                                                                                                                                                                Request new career                                               Increment Step/Promotion
                                                                                                                                                                                                                                                                                                  Promote    classification for individual                                                   FPS
                            Human                                                                                                                                                                                                                                                                   one               employees
                           Resource                                                                                                                                                                                                                                                               employee   Increment Step/Promotion
                                                                                                                     Calculate seniority and                                                                                                                                                                             FPS
                           Specialist                                                    Update seniority bonus to                                                              Identify expected step or sub                                                                                                                                                                    Delete advancement data
                                                                                                                        length of service                                                                                              Enter a                                                                                                                       Delete an
                                                              Decide          Advance     speed up advancement                                    Review career seniority           step increment dates             Decide                        Update career advancement           Decide                                                                                    Increment Step/Promotion
                                                                                                                      Calculate Seniority                                                                                             manual                                                                                                                       advancement
                                                           if need to?       Employees    Update Seniority Bonus                                  Review Career Seniority           Step Increment Date           if need to?                         Next Step Increment           if need to?                                                                                            FPS
                                                                                                                      Calculate Length of                                                                                           advancement
                                                                                                  FPS                                                                            Reset Advancement Dates
                                                                                                                            Service
                                                                                                                                                                                                                                                                                               Promote           Advance multiple
                                                                                                                                                                                                                                                                                               multiple        employees at one time
                                                                                                                                                                                                                                                                                              employees           Step Increment                                                                                                                   Manage
                                                                                                                                                                                                                                                                                                                                                                                                                                                  health and     Manage Health and
                                                                                                                                                                                                                                                     Identify employees to be
                                                                                                                                                                                                                                                                                                                                                                                                                                                  safety data         Safety
                                                                                                                                                                                                                            Advance a worker       advanced and update career
                                                                                                                                                                                                                              automatically            records automatically
                                                                                                                                                                                                                                                    Automatic Step Increment


                                                           Update Job                                                                                                                                                                                                                                                                                                                                Repair/adjust the impact of
                                                           Information                                                                                                                                                                                                                                                                                                                                                                            Track global     Track Global
                                                                                                                                                                                                                                                    Simulate advancement for a    Review advancement          Clear the advancement                                                                    inserting or deleting a                    assignments      Assignments
                                                                                                                                                                                                                                  Simulate an                                                                                                                                                                                         Decide
                                                                                                                                                                                                                                                        corps or employee               simulation                  simulations                                                                       career action with an old
                                                                                                                                                                                                                                 advancement                                                                                                                                                                                       if need to?
                                                                                                                                                                                                                                                     Step Increment Simulation   Career Simulation Report    Delete Simulation Records                                                                     effective date
                                                                                                                                                                                                                                                                                                                                                                                                      Retroactivity Processing

                                                                                                                                                                                                                                                     Update the advancement
                                                                                                                                                                                                                                    Freeze                                                                                                                                                                                                                            Manage
                                                                                                                                                                                                                                                         date or demote                                                                                                                                                                            Manage
                                                                                                                                                                                                                                   or demote                                                                                                                                                                                                                         Absences
                                                                                                                                                                                                                                                  Freeze Advancement/Demotion                                                                                                                                                                    absence data
                                                                                                                                                                                                                                an advancement
                                                                                                                                                                                                                                                               FPS




                                                                                                                                                                                                                                                                                                                                                                                                                                                 Manage time      Manage Time and
                       Time and Labor                                                                                                                                                                                                                                                                                                                                                                                                             and labor           Labor
                        Administrator




                                                                                                                                                                                                                                                                                                                                                                                                                                                  Manage             Manage
                          Payroll                                                                                                                                                                                                                                                                                                                                                                                                                 payroll            Payroll
                        Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                 40
Grant Tenure - FPS


                                                                       Update Job
                                                                                                                                                                           Terminate employee
                                                                       Information




                                                                                                                                                                                                                      Review employee's
                                                                                                                                                                                                                      competencies with
                                                                                                                                                                                                                       those required by
                                                                                                                                                                                                      Competencies                                                                                   Review a               Modify employee status
                                                                                                                                                                                                                           position
                                                                                                                                                                                                                      Validate Probation                                           Extend        probation period           and provide information
                                                                                                                                                                                                                            Period                                                probation        after the first                 on tenure
                                                                                                                                                                                                                                                                                                     rejection                Update Status FPS

                                                                                                                                            Inform managers of
                                                              Calculate tenure date      Select employees eligible                                                  Notify trainee                                                          Review trainee grade and
                                                                                                                       Review employee      trainees eligible for
                                                                for individuals or       for tenure within specified                                                supervisors of          Need to                                            step data and hold,         Decide
                                                                                                                         tenure dates              tenure
                                                                      groups                       period                                                           probation and           review?                                          validate or deny tenure    if need to?                                                                       Manage
                                                                                                                       Update Status FPS   Trainees to be Given                                                                                                                                                                                                        Manage Health and
                                                              Calculate Tenure Date      Calculate Future Tenures                                                       dates                                                               Validate Probation Period                                                                                    health and
                                                                                                                                                  Tenures                                                                                                                                                                                                                   Safety
                                                                                                                                                                                                                                                                                                                                                         safety data
                                                                                                                                                                                                                                                                                               Grant tenure and update
                                                                                                                                                                                                                                                                                  Grant                                              Decide
                                                                                                                                                                                                                                                                                                     status code
                                                                                                                                                                                                                     Compare employee's                                          tenure                                           if need to?
                                                                                                                                                                                                                                                                                              Assign Civil Servant Status
                           Human                                                                                                                                                                                     accomplishments with
                                                                                                                                                                                                                       those required by
                          Resource                                                                                                                                                                Accomplishments
                                                                                                                                                                                                                           position
                          Specialist                                                                                                                                                                                  Validate Probation                                                                                                                Track global     Track Global
                                                                                                                                                                                                                            Period                                                                                                                      assignments      Assignments




                                                                                                                                                                                                                                                                                                                                                                            Manage
                                                                                                                                                                                                                                                                                                                                                          Manage
                                                                                                                                                                                                                                                                                                                                                                           Absences
                                                                                                                                                                                                                                                                                                                                                        absence data




                      Time and Labor
                       Administrator                                                                                                                                                                                                                                                                                                                  Manage time       Manage Time and
                                                                                                                                                                                                                                                                                                                                                       and labor            Labor




                         Payroll
                       Administrator                                                                                                                                                                                                                                                                                                                    Manage             Manage
                                                                                                                                                                                                                                                                                                                                                        payroll            Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                       41
Track Citizenship Information




                                                                                                                                     Identify details about
                                                                                                                                   employee's substantial
                                                                                                       Substantial presence
                                                                                                                                      presence in the US
                                                                                                                                 Employee Presence Test USA




                                                                                                                                 Audit Passport/Visa expiration
                                                                                                     Passport/Visa expirations               dates
                                                                                                                                 Passport/Visa Expiration Audit


                                                                           Respond to     Need
                                Human                                      Employee     to test or
                                                                            Lifecycle     audit?
                               Resource
                               Specialist
                                                                                                                                 Audit citizenship/country/Visa
                                                                                                            Citizenship                   discrepancies
                                                                                                                                 Citizenship/Country/Visa Audit



                                                                                                                                                                                  Manage
                                                                                                                                                                                 health and    Manage Health and
                                                                                                                                                                                 safety data        Safety

                                                                                                                                 Review, update and validate
                                                                                                                                                                     Decide
                                                                                                        Identification data      identification data provided
                                                                                                                                                                  if need to?
                                                                                                                                     Identification Data
                                                                                                                                                                                Track global     Track Global
                                                                                                                                                                                assignments      Assignments




                                                                                                                                                                                                    Manage
                                                                                                                                                                                  Manage
                                                                                                                                                                                                   Absences
                                                                                                                                                                                absence data




                           Time and Labor                                                                                                                                       Manage time     Manage Time and
                                                                                                                                                                                 and labor          Labor
                            Administrator




                                                                                                                                                                                  Manage           Manage
                                                                                                                                                                                  payroll          Payroll
                              Payroll
                            Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                               42
Track Employment Contracts



                                                                                                                                                                                                                             Update existing contract with
                                                                                                                                                                                                                   USF          renewal information
                                                                                                                                                                                                                              Service Agreements USF


                                                                                                                                                                                                                                                                             Prepay              Identify prepay options
                                                                                                                        Define contract types
                                                                                                                                                                      Define contract templates                                                                              options           Contract Prepay Options NA
                                                                                          Define contract clauses      Define Contract Types        Create
                                                                                 Create                                                                        Yes    Define Contract Templates
                                                                                          Define Contract Clauses    Legal Contract Type BRA       Template?
                                                                                                                                                                     Define SPEE Templates ESP
                                                                                                                    Define Contract Benefits ESP

                                                   Respond to              Need to                                                                                                                                                                                                              Recalculate contract work
                                                   Employee            create or update                                                                                                           What
                                                                                                                                                                                                                  North      Update contract pay                  Decide                                  days
                                                    Lifecycle             contract?                                                                                                         contract action is                                                                Recalculate
                                                                                                                                                      No                                                         America   Update Contract Pay NA              if need to?                     Recalc Contract Work Days
                                                                                                                                                                                                needed?
                                                                                                                                                                                                                                                                                                           NA



                                                                                                                                                                     Create employment contract
                                                                                            Update contracts                                                                    reports                                                                                                             Renew pay contract
                                                                                                                                                    Create                                                                                                                   Renew
                                                                                 Update     Update Contracts                                                   Yes   Contract Information Report                                                                                                  Renew Pay Contracts NA
                                                                                                                                                    report?
                           Human                                                          Update Contracts ESP                                                       Print Contrata XML File ESP
                                                                                                                                                                         Print Contracts ESP
                          Resource
                          Specialist
                                                                                                                                                                           No                                                                                 Identify the replacement contract
                                                                                                                                                                                                                                            Replace
                                                                                                                                                                                                                                                                   Replace Contract BEL


                                                                                                                                                                                                                                                                                                                                              Manage
                                                                                                                                                                                                                                                                                                                                             health and    Manage Health and
                                                                                                                                                                                                                                                                  Track information on the
                                                                                                                                                                                                                                                                                                                               Decide        safety data        Safety
                                                                                                                                                                                                                              Decide                            termination of an employee's
                                                                                                                                                                                                                 Belgium                       Terminate
                                                                                                                                                                                                                           if need to?                                    contract                                          if need to?
                                                                                                                                                                                                                                                                   Terminate Contract BEL


                                                                                                                                                                                                                                                                                                                                          Track global       Track Global
                                                                                                                                                                                                                                                              Define contract end and reason                                              assignments
                                                                                                                                                                                                                                            Enter an            Define Contract End BEL                                                                      Assignments
                                                                                                                                                                                                                                         end and reason        Define Contract End Reason
                                                                                                                                                                                                                                                                           BEL



                                                                                                                                                                                                                                                                                                                                                                Manage
                                                                                                                                                                                                                           Update Contract Information with                                                                                 Manage
                                                                                                                                                                                                                                                                                                                                                               Absences
                                                                                                                                                                                                                           response data from official body                                                                               absence data
                                                                                                                                                                                                                  Spain
                                                                                                                                                                                                                             Read External XML File ESP
                                                                                                                                                                                                                            Review External XML File ESP




                      Time and Labor
                                                                                                                                                                                                                                                                                                                                          Manage time      Manage Time and
                       Administrator                                                                                                                                                                                                                                                                                                       and labor           Labor




                                                                                                                                                                                                                                                                                                                                             Manage            Manage
                         Payroll                                                                                                                                                                                                                                                                                                             payroll           Payroll
                       Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                           43
Review and Report Job Summary Information

                                                                                                                   Review job information
                                                                                                                   Workforce Job Summary
                                                                                                                   Multiple Jobs Summary
                                                                                        View job data
                                                                                                                     Job Summary JPN
                                                                                                                 Compensation Summary USF                  Create workforce reports
                                                                                                                    Personal Data USF                    Employee Turnover Analysis
                                                                                          Generate                                                            Primary Job Audit
                                                                                          workforce                                                         Pending Future Actions
                                                                                           reports                                                         Request Ad hoc Process
                                                                                                                                                          Department Action Notices
                                                                                                                  Create job information reports       Create As-of-Date Mass Report
                                                                                                                    Personnel Actions History            Create As-of-Date Request
                                                                                                                Employees on Leave of Absence           Create Calendar Year Request
                                                                                                                      Temporary Employees                      Database Audit
                                                                                                                         Years of Service             Create From/Thru Dates Request
                                                                                                                        Social Report BEL                   Headcount Movement
                                                                                                                         Official List ESP                Current Headcount Profile
                                                                                                                       Create AFI File ESP             Workforce Survey Result (CAN)
                                                                                                                 Establish Synchronization FRA       Groups by Emplymt Type Rpt (CAN)
                                                                                                                  Appointment Notification JPN       Groups by OCC Group Report (CAN)
                                                                                                                      Appointment List JPN            Groups/Jobs Filled/Vacated (CAN)
                                                                                          Generate                                                      Workforce Survey Stats (CAN)
                                                                                                                 Completion of IC Transfer JPN
                                                                                       job information                                                     As Of Date Request USF
                                                                                                                 Employee Assignment List JPN
                                                                                           reports
                                                                                                                       Matricula Book (ITA)
                                                                                                                   Matricula Calculation (ITA)
                                                                                                                      Employee Listing SGP
                                                                                                                 Personnel Actions History USF
                                                                                                                   Appointment Affidavits USF
                                                                                                                        Award Action USF
                           Human                                                                                  Setup Wage/Separation USF
                          Resource                                                                                 Print Wage/Separation USF
                                                                                                                 Request Personnel Action USF
                          Specialist                                                                            Notice of Personnel Action USF
                                                     Respond to
                                                                          Decide                                Request Prelim Empl Data USF
                                                     Employee
                                                                       if need to?
                                                      Lifecycle
                                                                                                                                                      Review OEE workforce survey for
                                                                                         View the OOE
                                                                                                                                                                 Canada
                                                                                     workforce survey report
                                                                                                                                                         Workforce Survey Results


                                                                                                               Create workforce reports for French
                                                                                                                           Public Sector
                                                                                                                     Part-Time Schedule FPS
                                                                                                                  CS Position Request tbc FPS
                                                                                                                 CS Position - Rqst Reject. FPS
                                                                                                                   CS Position/Employee FPS
                                                                                                                    Career - Request tbc FPS                                                            Manage
                                                                                                                                                                                                       health and     Manage Health and
                                                                                                                 Career - Request Rejected FPS           Review job information for
                                                                                                                                                                                                       safety data         Safety
                                                                                          Generate                Employee Career/Action FPS          employee of French Public Sector
                                                                                     French Public Sector        Assignment - Request tbc FPS             Merge Employees FPS
                                                                                           reports              Assignment - Rqst Rejected FPS          Review Merge Results FPS            Decide
                                                                                                                  Work Time - Request tbc FPS                  Job Data FPS              if need to?
                                                                                                                Work Time - Rqst Rejected FPS              Job Data History FPS
                                                                                                                Compensation - Request tbc FPS                                                         Track global     Track Global
                                                                                                                                                            Current Status FPS
                                                                                                                Compensatn - Rqst Reject. FPS                                                          assignments      Assignments
                                                                                                                                                          CS Position History FPS
                                                                                                                      Collective Orders FPS               Assignment History FPS
                                                                                                                   Individual Orders Edits FPS              Career History FPS
                                                                                                                 Collective Orders Updates FPS         Current and Prior Career FPS
                                                                                                                       Pending Orders FPS                  Career Seniority FPS
                                                                                                                                                          CS Position/Career FPS                                           Manage
                                                                                                                                                            Career/CS Position                           Manage
                                                                                                                                                                                                                          Absences
                                                                                                                                                        Compensation History FPS                       absence data




                      Time and Labor                                                                                                                                                                   Manage time    Manage Time and
                                                                                                                                                                                                        and labor         Labor
                       Administrator




                                                                                                                                                                                                          Manage          Manage
                         Payroll                                                                                                                                                                          payroll         Payroll
                       Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                      44
Track Labor Relations



                                                                                                 Request change in job, if desired
                           Employee
                                                                                                      Request Job Change
                                                                                                 Review My Job Change Request




                                                                                                 Identify disciplinary action, action
                                                                                                     taken, and final resolution
                                                                                 Disciplinary
                                                                                                    Record Disciplinary Actions
                                                                                    action
                                                                                                 Record Disciplinary Actions USF
                                                                                                 Record Negotiability Appeal USF
                                                     Respond to                                                                                            Create labor relations reports
                                                                       Need to
                                                     Employee                                                                                               Discipline Action Summary
                                                                       record?
                                                      Lifecycle                                                                                                  Grievance Detail
                                                                                                 Identify negotiability appeals item                       Employee Disciplinary Action
                                                                                 Negotiability           and tracking details                                  Grievance Summary
                                                                                                 Record Negotiability Appeal USF                                 Union Fees ESP
                                                                                                                                                             Union Membership USF
                                                                                                                                                                Union Membership
                                                                                                                                                             Labor Relations Letters
                                                                                                  Identify grievances filed, action
                                                                                 Grievance           taken, and final resolution
                                                                                                        Record Grievances                                                                                                                                                                                              Manage
                                                                                                                                                                                                                                                                                                                      health and    Manage Health and
                                                                                                                                                                                                                                                                                                                      safety data        Safety
                            Human                                                                                                                                                         Review earning
                           Resource                                                              Obtain time worked
                                                                                    Wage                                    Update wage progression     Review and adjust wage         period details per pay     Approve workers for wage
                                                                                                  information from                                                                                                                                      Process advancements                              Decide
                           Specialist                                            progression           payroll
                                                                                                                                 activity records         progression details          period about worker’s             progression
                                                                                                                                                                                                                                                      Process Wage Progression                         if need to?
                                                                                                                            Update Wage Progression    Review Wage Progression                 hours            Approve Employees to Advance
                                                                                                 Extract Payroll Data
                                                                                                                                                                                       Review Time Details                                                                                                           Track global     Track Global
                                                                                                                                                                                                                                                                                                                     assignments      Assignments
                                                                                                                                                                                                                                                                                 Create layoff and recall
                                                                                                  Define groups of                                                                            Process and maintain                                                                       reports
                                                                                                                                                                       Review list of laid
                                                                                 Layoffs and     workers to layoff or          Define layoff                                                  workers reemployment        Reinstate                   Rehire laid off workers     Layoff Roster Report
                                                                                                                                                Run layoff process       off workers
                                                                                   recalls             recall                   parameters                                                        (recall) rights         or recall       Reinstate           quickly               Bumping Report
                                                                                                                                                  Layoff Roster         Layoff Roster
                                                                                                   Labor Group                 Layoff Roster                                                  Process Recall Rights       workers?                    Reinstatement Roster          Seniority Report                                     Manage
                                                                                                                                                                            Report                                                                                                                                     Manage
                                                                                                     Definition                                                                                   Recall Rights                                                                  Candidate List Report                                  Absences
                                                                                                                                                                                                                                                                                                                     absence data
                                                                                                                                                                                                                                                                                  Recall Roster Report
                                                                                                                                                                                                                            Recall


                                                                                                                                                                                                                       Rehire with more
                                                                                                                                                                                                                          flexibility
                                                                                                                                                                                                                        Recall Roster




                       Time and Labor                                                                                                                                                                                                                                                                                Manage time    Manage Time and
                                                                                                                                                                                                                                                                                                                      and labor         Labor
                        Administrator




                          Payroll                                                                                                                                                                                                                                                                                      Manage           Manage
                        Administrator                                                                                                                                                                                                                                                                                  payroll          Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                    45
Track Secondment Contributions - FPS




                                                                                                                                                                                                                       Manage
                                                                                                                                                                                                                      health and     Manage Health and
                                                                                                                                                                                                                      safety data         Safety

                                                                                         Calculate retirement                                               Receive
                                                                       Respond to                                    Create contribution amount letters                    Review employees in
                                                                                    contributions for employees in                                         employee                                   Decide
                                                                       Employee                                               to employees                                     secondment
                                                                                             secondment                                                   contribution                             if need to?
                                                                        Lifecycle                                      Contribution Call Letter FPS                      Review Payment Cont FPS
                                                                                     Calculate Contribution FPS                                            payments                                                   Track global     Track Global
                                                                                                                                                                                                                      assignments      Assignments




                            Human                                                                                                                                                                                       Manage
                                                                                                                                                                                                                                          Manage
                           Resource                                                                                                                                                                                                      Absences
                                                                                                                                                                                                                      absence data
                           Specialist




                       Time and Labor                                                                                                                                                                            Manage time         Manage Time and
                        Administrator                                                                                                                                                                             and labor              Labor




                                                                                                                                                                                                                     Manage               Manage
                          Payroll                                                                                                                                                                                    payroll              Payroll
                        Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                     46
Archive or Delete Employee Records - FPS




                                                                                               Delete, and archive employee personal
                                                                                               data, civil service position, work time, or                     Manage
                                                                                                               career data                                    health and      Manage Health and
                                                                                                        Delete Career Data FPS                                safety data          Safety
                                                                                                              Delete ID FPS
                                                                                                    Personal Data Deleted ID FPS
                                                                                 Respond to             Employee File Cncl FPS
                                                                                                                                                Decide
                                                                                 Employee              Assignment Archive FPS
                                                                                                                                             if need to?
                                                                                  Lifecycle            CS Position Archive FPS                                Track global      Track Global
                                                                                                           Career Archive FPS                                 assignments       Assignments
                                                                                                        Work Time Archive FPS
                                                                                                      Compensation Archive FPS
                             Human                                                                       Premium Archive FPS
                            Resource                                                                 Seniority Bonus Archive FPS
                            Specialist                                                             EE Categorization Archive FPS
                                                                                                                                                                                   Manage
                                                                                                                                                                 Manage
                                                                                                                                                                                  Absences
                                                                                                                                                               absence data




                        Time and Labor
                                                                                                                                                           Manage time        Manage Time and
                         Administrator                                                                                                                      and labor             Labor




                                                                                                                                                              Manage              Manage
                           Payroll                                                                                                                            payroll             Payroll
                         Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                              47
Track and Report Regulatory Information

                                                                                                                                                                                                                                                Create regulatory reports - General
                                                                                                                                                                                                                                                            Workforce
                                                                                                                                                                                                                                                       Job Group Analysis
                                                                                                                                                                                                                                                  Job Group Analysis Summary
                                                                                                                                                                                                                                                  Job Group Movement Analysis
                                                                                                                                   Define regulatory reporting CAN                                                                                      Job Group Roster
                                                                                                                                     Define Canadian Pay Equity                                                                                       Terminations Analysis
                                                                                                                                                                                     General
                                                                                                                                    Define Canadian NOC Codes                                                                                           Workforce Analysis
                                                                                                                                  Define Stats CAN Location Code,                                                                                      PRWORA-New HIre
                                                                                                                                        Institution Code( E&G)                                                                                      OSHA 301 Incident Report
                                                                         Regulatory
                                                                                                                                  Define Stats CAN Faculty Code,                                                                                 OSHA 301 Incident Report Print
                                                                        requirements
                                                                                                                                         Province Code( E&G)                                                                                             OSHA-200 Log
                                                                         for Canada
                                                                                                                                    Define Stats CAN Rank Code,                                                                                      OSHA 200 Incident Log
                                                                                                                                     Responsibility Code (E&G)                                       Create regulatory reports - BRA              OSHA 300A Annual Summary
                                                                                                                                 Define Stats CAN Department CIP                                        CAGED File/Report BRA
                                                                                                                                                                                    Brazil
                                                                                                                                                  (E&G)                                              Employee Registry Report BRA
                                                                                                                                Define Stats CAN Degree Level (E&G)                                       CTPS Receipt BRA
                                                                                          Define regulatory reporting                                                                                                                                                                                 Manage
                                                                                                                                                                                                                                                  Create regulatory reports AUS
                                                                          Regulatory           requirements AUS                                                                      Australia                                                                                                       health and     Manage Health and
                                                                                                                                                                                                                                                  APS Employee Additional Data
                                                                        requirements          Define ASCO Codes                                                                                                                                                                                      safety data         Safety
                                                                                                                                                                                                                                                          ASCO Report
                                                                         for Australia       Define APS Movement                                                                                   Create and review DIMONA hire and                  Create APS PSMPC
                                                                                         Define APS Non-English Code                                                                             termination notifications to be sent to the
                                                                                                                                  Identify establishment information                              Belgium Social Security office (RSZ) in
                                                                                                                                                                       Type of                                                                                                           Decide
                                                                       Establishments                                                       Establishments                         Belgium            the form of structured XML files
                                                                                                                                                                       reports?                                                                                                       if need to?
                                                                                                                                     Review Controlled Estb Ids                                     Create DIMONA Notification (BEL)                                                                 Track global     Track Global
                                                                                                                                                                                                    Review DIMONA Notification (BEL)                Regulatory reports - UK                          assignments      Assignments
                                                                                                Identify job tasks
                                                                                                                                                                                                     Load DIMONA Notification (BEL)                     Adverse Impact
                                                                                                Job Code Tasks
                                                        Type of            Job tasks                                                                                                                                                                  Job Group Roster
                                                                                                   Job Groups
                                                       tracking?                                                                                                                  United Kingdom                                                         Joint Staffing
                                                                                                    Job Tasks
                                                                                                                                                                                                      Create regulatory reports CAN                  NI Fair Employments
                                                                                                                                Define accommodations required for
                                                                                                                                                                                                            Employment Equity                        Termination Analysis
                                                                                                                                         disability reasons                                                                                                                                                              Manage
                                                                       Accomodations                                                                                                                   National Occupation Codes                      Workforce Analysis                               Manage
                                                                                                                                   Accommodation Types (USA)                                                                                                                                                            Absences
                                                                                                                                Maintain Affirmative Actn Plan (USA)                                 Official Language Requirements                                                                  absence data
                                                                                               Define edit and field                                                               Canada                        Pay Equity
                                                                             CPDF             information for CPDF                                                                                 Canadian Academic Teaching Survey
                                                                          information           CPDF Fields USF                                                                                           Full Time Report (E&G)
                                                                                                 CPDF Edits USF                                                                                    Canadian Academic Teaching Survey
                                                                            French                                                 Identify mandate information for                                   Part-time Time Report (E&G)                 Creates regulatory reports ITA
                                                                           mandate                                                        French employees                                                                                           Equal Opportunities ITA
                                                                                                                                                                                      Italy
                                                                         information                                                        Mandates FRA                                                                                              Disability Report ITA
                            Human                                                                                                                                                                                                                       Union Report ITA
                           Resource                                                                                                                                                                 Creates reports on heavily disabled
                                                                                           Define standard diagnosis                                                               Germany                   individuals DEU
                           Specialist                                    Diagnosis
                                                                                                  information
                                                         Yes                                                                                                                                              Heavily Disabled DEU
                                                                        information
                                                                                                   Diagnosis
                                                                                                                                                                                                                                                Manage diversity compliance NLD
                                                                                                                                       Complete ERE Data                           Netherlands                                                       Diversity Registration
                                                                        Employment                                                        ERE Data ESP                                                                                                 Diversity Report
                                                                       regulations for                                               ERE Company Data ESP                                               Regulatory Reports ESP
                                                                           Spain                                                     ERE Employee Data ESP                                                 Create AFI file ESP
                                                                                                                                      Process ERE Data ESP                                            Print Contrata XML File ESP
                                                                                         Define Workforce Administration                                                                              Read External XML File ESP
                                                                                                                                                                                                                                               Regulatory reporting Information FRA
                                                                        Administration          Parameters BRA                                                                      Spain            Review External XML File ESP
                                                                                                                                                                                                                                                 Pension/Cont. Contracts Review
                                                                         Parameters             CBO Codes BRA                                                                                             Print Contracts ESP
                                                                                                                                                                                                                                                   Compute Employee Survey
                                                                          for Brazil            City Codes BRA                                                                                      ERE SPEE Communications ESP
                                                                                                                                                                                                                                                      Edit Employee Survey
                                                                                          Legal Movement Code BRA                                                                                        ERE Data Report ESP
                                                                                                                                                                                                                                                    Employee Survey Report
                                                                                                                                                                                                       ERE Activity Periods ESP
                                                                                                                                                                                                                                                             Disability
                                                                                                                                                                                     France                                                            Monthly Workforce
                                                        Need to                                                                                                                                                                                      Single Hiring Statement
                                                         define                                                            No                                                                                                                           Personal Register
                                                                                                                                                                                                          Create EEO reports
                                                       tracking?                                                                                                                                                                                     Workforce by Nationality
                                                                                                                                                                                                         EEO-1 Employer Info
                                                                                                                                                                                                                                                               BIAF
                                                                                                                                                                                                       EEO-1 Job Analysis Report
                                                                                                                                                                                                                                                         Election Report
                                                                                                                                                                                                        EEO-4 State/Local Govt
                                                                                                                                                                                    EEO                   EEO-5 Job Analysis
                                                                                                                                                                                                    EEO Groups by PATCOB/POI USF
                                                                                                                                                                                                   EEO Grps by PATCOB/SubAgcy USF                 Create veteran reports USA
                                                                                                                                                                                                     EEO Groups by Series/POI USF                     VETS-100 Analysis
                                                     Respond to                                                                                                                                     EEO Grps by Series/SubAgcy USF                    VETS-100 Process
                                                     Employee                                                                                                                                                                                         VETS-100 Submit
                                                      Lifecycle                                                                                                                                                                                  Maintain Military Dischrg Date
                                                                                                                                                                                  USA Veteran
                                                                                                                                                                                                                                                    VETS-100 by POI USF
                                                                                                                                                                                                      Create regulatory reports USA
                                                                                                                                                                                                                                                 VETS-100 by Sub Agency USF
                                                                                                                                                                                                             IPEDS-S (USA)
                                                                                                                                                                                                              SF113-A USF
                                                                                                                                                                                    USA
                                                                                                                                                                                                              SF113-G USF
                                                                                                                                                                                                              New Hire USF
                                                                                                                                                                                                                                                Create CPDF reporting information
                                                                                                                                                                                                          New Hire Error USF
                                                                                                                                                                                                                                                         Dynamic Table
                                                                                                                                                                                                                                                          Status Table
                                                                                                                                                                                      CPDF                                                               Edit Validation
                                                                                                                                                                                                                                                          Error Report
                                                                                                                                                                                                                                                       Dynamic/Status File
                                                                                                                                                                                                                                                 Organizational Component File




                       Time and Labor                                                                                                                                                                                                                                                               Manage time     Manage Time and
                                                                                                                                                                                                                                                                                                                        Labor
                        Administrator                                                                                                                                                                                                                                                                and labor




                          Payroll                                                                                                                                                                                                                                                                     Manage            Manage
                                                                                                                                                                                                                                                                                                      payroll           Payroll
                        Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                    48
Manage Health and Safety



            Human
           Resource                                                       Maintain
                                                                        Employee Data
           Specialist




                                                                                           Verify Witnesses
                                                                       Define Health and                                        Create Health and
                                                                                            or Personnel      Obtain Incident
                                                                        Safety Tracking                                         Safety Reporting
                                                                                            Involved with      Information
                                                                          Information                                              Information
                                                                                                Incident



         Health and
           Safety
        Administrator
                                                                                                                                Record Employee
                                                                                                                                 Medical Exam
                                                                                                                                    Results




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                49
Create Health and Safety Reporting Information

                                                                                                                        Create health and safety
                                                                                          Health and Safety
                                                                                                                             reports CAN
                                                                                           Reporting Data
                                                                                                                           WCB Form 7 CAN
                                                                                               Canada
                                                                                                                          WCB Incident CAN
                                                                                                                                                                Create health and safety reports
                                                                                                                       Prepare accident, incident ,
                                                                                                                                                                              DEU
                                                                                          Health and Safety            and illness data and load to
                                                                                                                                                                         Accident DEU
                                                                                           Reporting Data               temporary data table DEU
                                                                                                                                                                          Illness DEU
                                                                                             Germany                       Accident Data DEU
                                                                                                                                                                 Incident Location Summ DEU
                                                                                                                             Illness Data DEU
                                                                                                                                                                Reportable Accident/Illness DEU

                                                                                          Health and Safety            Prepare and load RIDDOR
                                                                                           Reporting Data                      data GBR
                                                                                                GBR                       RIDDOR Data GBR

                                                                                                                                                                  Public Service and Protection
                                                                                                                                      Regulatory Reports
                                                                                                                                                                  Commission Reporting AUS
                                                                                                                                            AUS
                                                                                                                                                                      Create APS PSMPC


                                                                                                                                                                 Create CAT and PPP Reports
                                                                                                                                      Regulatory Reports                    BRA
                                                                                                                                            BRA                        CAT Report BRA
                                                                                                                                                                       PPP Report BRA

                                             Obtain Incident
                                              Information                                                                                                       Create report containing accident
                                                                                                                                      Regulatory Reports
                                                                                                                                                                          details CHE
                                                                                                                                            CHE
                                                                                                                                                                         Accident CHE
         Health and
           Safety
        Administrator                                                                                                                                             Prepare BC WCB data for file       Creates and sends the BC WCB
                                                                           Need to               Regulatory            Need to             Regulatory Reports
                                                                                                                                                                         creation CAN                         EDI file CAN
                                                                           create?                Reports              create?                   CAN
                                                                                                                                                                      WCB EDI Data CAN                 Create WCB EDI File CAN


                                                                                                                                                                                                        Create legal XML files to
                                                                                                                                                                   Identify incidents that did not
                                                                                                                                      Regulatory Reports                                             communicate accidents with and
                                           Record Employee                                                                                                       result in the loss of wages ESP
                                                                                                                                             ESP                                                         without absence days
                                            Medical Exam                                                                                                          Incident w/o Lost Wages ESP
                                                                                                                                                                                                        Print Delta XML File ESP
                                               Results

                                                                                                                                                                Create a French health and safety
                                                                                                                                      Regulatory Reports
                                                                                                                                                                           report FRA
                                                                                                                                             FRA
                                                                                                                                                                       Work Accident FRA


                                                                                                                                                                    Create a report of injury or     Create a Report of a Case of a
                                                                       Work Restriction                                               Regulatory Reports
                                                                                                                                                                      dangerous occurrence                Disease report GBR
                                                                         Summary                                                            GBR
                                                                                                                                                                   Injury/Dangerous Occ GBR                   Illness GBR
                                                                                                                                                                                                                                           Create OSHA reports
                                                                                                                                                                                                                                        OSHA 301 Incident Report
                                                                                                                                                                                                                                        OSHA 301 Incident Report
                                                                                                                                                                 Create list of case numbers and
                                                                                                                                      Regulatory Reports                                                                               PrintOSHA 300 Incident Log
                                                                                                                                                                 details of the injury/illness USA
                                                                                                                                            USA                                                                                       OSHA 300A Annual Summary
                                                                                                                                                                     OSHA-200 Log (USA)
                                                                                          Review Employee With Work                                                                                                                          OSHA 300 Runs
                                                                                             Restriction summary                                                                                                                      OSHA 301 EE Incident Report
                                                                                           Employee Work Restriction                                                                                                                  OSHA 301 NE Incident Report
                                                                                                     Smry




            Human
                                                                                                                                                                                                                                                                      Measure
           Resource
                                                                                                                                                                                                                                                                     deployment
           Specialist                                                                                                                                                                                                                                               effectiveness




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                50
Define Health and Safety Tracking Information


          Human
         Resource                      Maintain
         Specialist                  Employee Data




                                                                                                                                                                                                               Define accident or injury information
                                                                                                                                                                                                                             Canada
                                                                                                                                                                                       Accident/Injury
                                                                                                                                                                                                                      Class/Subclass CAN
                                                                                                                                                                                        Information
                                                                                                                                                                                                                        Occupations CAN
                                                                                                                                                                                          Canada
                                                                                                                                                                                                                    Contributing Factors CAN
                                                                                                                                                                                                                    Preventative Actions CAN




                                                                                                                                                                                                               Define accident or injury information
                                                                                                                                                                                                                            Germany
                                                                                                                                                                                                                        Case Officer DEU
                                                                                                                                                                                                                     Corrective Actions DEU
                                                                                                                                                                                       Accident/Injury
                                                                                                                                                                                                                       Disease Class DEU
                                                                                                                                                                                        Information
                                                                                                                                                                                                                    Preventative Actions DEU
                                                                                                                                                                                         Germany
                                                                                                                                                                                                                       Unsafe Items DEU
                                                                                                                                                                                                                      Work Area Class DEU
                                                                                                                                                                                                                    Work Area Category DEU
                                                                 Define hazardous environments                                                                                                                           Work Area DEU
                                   Define accident or               Dangerous Occurrences
                                   injury information                  Job Code Hazards            Define medical data
                                    Accident Types                      Location Hazards                 Allergy           Define physicians
                                       Body Parts                Hazardous Conditions/Materials                                                  Define work restrictions                   Accident/Injury    Define accident or injury information
                                                                                                      Immunization           and facilities                                 Need to
                                    Nature of Injury                   Hazard Units BRA                                                         Codes and Effective Dates                    Information                  Great Britain
                                                                                                       Medication          Medical Facilities                               create?
                                    Source of Injury                  Hazard Concepts BRA                                                            Modified Work                           Great Britain           External Scheme GBR
                                                                                                        Diagnosis             Physicians
      Administrator                   Unsafe Acts                      Work Hazards BRA           Occupational Illnesses
                                   Animals Involved                  Job Code Hazards BRA
                                     Transportation
                                                                    Work Area Hazards BRA
                                                                                                                                                                                                              Identify details for the Mexican mixed
                                                                                                                                                                                      Mixed Committees
                                                                                                                                                                                                                            committees
                                                                                                                                                                                           Mexico
                                                                                                                                                                                                                      Mixed Committee MEX




                                                                                                                                                                                                              Define medical services Australia
                                                                                                                                                                                                               Claim Threshold - Claims AUS
                                                                                                                                                                                      Medical Services
                                                                                                                                                                                                               Claim Threshold - State AUS
                                                                                                                                                                                         Australia
                                                                                                                                                                                                               Claim Threshold - Union AUS
                                                                                                                                                                                                                Medicare Item Details AUS
                                                                                                                                                                                                                                                                         Verify Witnesses
                                                                                                                                                                                                                                                                          or Personnel
                                                                                                                                                                                                                                                                          Involved with
                                                                                                                                                                                                                                                                              Incident




                                                                                                                                                                                                                                                       Record Employee
                                                                                                                                                                                                                                                        Medical Exam
                                                                                                                                                                                                                                                           Results




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                        51
Obtain Incident Information




                                                                                                                                                                                                                                                                      Identify claims details related to a
                                                                                                                                                                                                                                                          No         rehabilitation plan for non-employee
                                                                                                                                                                                                                                                                      Create Non-Employee Rehab Plan




                                                                                 Industrial        Identify industrial hazard code      Identify assigned case officers
                                                                                  Hazard                for employee (DEU)                           (DEU)
                                                                                 Germany                 Coop Society Data                 Case Officer Assignment                                                                                                    Identify claims details related to a
                                                                                                                                                                                                                                         Rehab for
                                                                                                                                                                                                                                                               Yes             rehabilitation plan
                                                                                                                                                                                                                                         employee?
                                                                                                                                                                                                                                                                        Create Employee Rehab Plan



                                                                                                                                                                                                                                             Yes
                                                                                                  Identify basic incident information
                                                                                                            Incident Details
                                                                                                          Incident Detail (rpt)                                                                     Identify charges related to injury
                                   Verify Witnesses
                                                                                                       Incident Lost Work (rpt)                                           Identify injury details            or illness claims                Is
       Health and                   or Personnel
                                                                       Record?         Incident        Incident Summary (rpt)
                                                                                                                                                  Incident         Yes        Injury Details                   Open Claim                rehabilitation
         Safety                     Involved with                                                                                                with injury?
                                                                                                   Location Incident Summary (rpt)                                         Injury Details BRA        Claim Summary Overview (rpt)          needed?
                                        Incident
      Administrator                                                                               Non-Employees In Incidents (rpt)                                                                     Incident Claim Detail (rpt)
                                                                                                   Vehicle Incident Summary (rpt)
                                                                                                         Incident Details BRA
                                                                                                                                                                                                                                               No                                                            Identify any
                                                                                                                                                                                                                                                                                                          corrective actions
                                                                                                                                                                                                                                                                                                         and/or preventative
                                                                                                                                                                    No                                                                                                                                          actions
                                                                                                                                                                                                                                                                                                        Identify Corr/Prevent
                                                                                                                                                                                                                                                                                                               Actions



                                                                                                     Identify information about
                                                                                  Vehicle/
                                                                                                       vehicles or equipment
                                                                                 Equipment
                                                                                                    Vehicles/Equipment Involved
                                                                                                                                                                                                                                                                                                  Review all incidents by specific
                                                                                                                                                                                                                                                                                                   individual has been involved
                                                                                                                                                                                                                                                                                                 Review Employee Injury Summary
                                                                                                                                                                                                                                                                                                   Employees In Incidents (rpt)
                                                                                                                                                                                                                                                                                                   Review Injury Summary BRA




                                                                                                                                                                                                                                                                                                         Create Health and
                                                                                                                                                                                                                                                                                                         Safety Reporting
                                                                                                                                                                                                                                                                                                            Information




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                 52
Record Employee Medical Exam Results




                                                                                                                                           Identify basic exam and physician
                                                                                                                         Health card          information, test results and
                                                                                                                         information                   comments
                                                                                                                                                   Health Card (USF)


                                                                           Define Health and
                                                                            Safety Tracking
                                                                              Information                                                  Identify hearing exam classification
                                                                                                                         Audio exam
                                                                                                                                                    Audiometric Exam




                                                                                                                                             Identify basic exam information
                                                                                                                          Eye exam
                                                                                                                                                        Eye Exam




                                                                                Need to                                                                                                                          Create Health and
                                                                                                              Need             Physical      Identify basic exam information
                                                                             review health            No                                                                                                         Safety Reporting
                                                                                                           to record?           exam                  Physical Exam
                                                                               card info?                                                                                                                           Information



         Health and
           Safety                                                                                                        Respiratory      Identify respiratory exam information
                                                                                                                           exam                      Respiratory Exam
        Administrator



                                                                                  Yes                                                      Identify basic exam and physician
                                                                                                                                             information such as name and
                                                                                                                        Drug test data     address and drug sensitivities from
                                                                                                                                               previous test administered
                                                                                                                                                     Drug Test (USF)




                                                                                                                                           Identify medical examination dates
                                                                                                                    Exam dates/status
                                                                            Review employee                                               and exam status for employee (DEU)
                                                                                                                       Germany
                                                                          information, position                                                    Employee Checklist
                                                                         information, physician
                                                                            information, drug
                                                                        sensitivities and previous
                                                                       tests, and drug test results
                                                                        Review Health Card Info                                              Identify data to track employee
                                                                                                                           Illness                                                Identify case officers (DEU)
                                                                                   (USF)                                                              illnesses (DEU)
                                                                                                                          Germany                                                  Case Officer Assignment
                                                                                                                                                     Illness Tracking




                                                                                                                         Exam results     Identify medical exam results (BRA)
                                                                                                                            Brazil            Medical Exam Results BRA




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                 53
Verify Witnesses or Personnel Involved with Incident




                                                                                                                                        Identify additional employee
                                                                                                                 Employee information            information
                                                                                                                                                  Employee




                                                                                                                                            Identify employment
                                                                                                                       Employment               information
                                                                                                                                                Employment


                                                                            Define Health and
                                                                                                                                                                        Obtain Incident
                                                                             Safety Tracking          Need to track?
                                                                                                                                                                         Information
          Health and                                                           Information
            Safety
         Administrator
                                                                                                                                          Identify employee family
                                                                                                                  Family information             information
                                                                                                                                                    Family




                                                                                                                                        Identify personal information
                                                                                                                       Non-employee      for non-employees involved
                                                                                                                        information              in incidents
                                                                                                                                                Non-Employee




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                      54
Track Global Assignments




                                                Respond to                                                                          Complete
                                                                       Notify Employee   Identify Global   Identify Travel and
                                                Employee                                                                         Assignment and
                                                                          of Global        Assignment          Education
                                                 Lifecycle                                                                           Update
                                                                         Assignment        Information        Allowances
                                                  Actions                                                                         Competencies

          Human
         Resource
         Specialist




                                                                                                                                  Perform and
                                                                           Receive
                                                                                          Prepare for                              Complete
         Employee                                                        Assignment
                                                                                          Assignment                                Global
                                                                         Information
                                                                                                                                  Assignment




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                              55
Identify Global Assignment Information



                                                                                                                         Review information on
                                                                                                     Immediate         dependents in employee's
                                                                                                       Family              immediate family
                                                                                                                     Review Immediate Family Data




                                                                                                                        Identify basic assignment
                                                                                                                     information such as type, dates     Identify new host
                                                                                                     Assignment
                                                                                                                            and host contact           Add a Host Assignment
                                                                                                                            Assignment Data




                                                                                                                     Identify information about the
            Human                                                                        What                                                                                  Identify Travel and
                                                                                                                     disposition of employee home
                                                                                    information is       Home/Host                                                                 Education
           Resource                                                                                                             residences
                                                                                       needed?                                                                                    Allowances
           Specialist                                                                                                    Home and Host Data




                                                                                                                       Identify dependents and
                                                                                                                     beneficiaries, addresses, and
                                                                                                     Dependents
                                                                                                                         personal information
                                                                                                                           Dependent Data



                                                                                                                     Review a summary of employee's
                                                                                                                      assignment and organizational
                                                                                                      Summary                  relationships
                                                                                                                      Review Assignment Summary
                                                                                                                     Person Organizational Summary




           Employee
                                                               Prepare for
                                                               Assignment




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                 56
Identify Travel and Education Allowances




                                                                                                                  Employee
                                                                                                                                      Identify company-paid
                                                                                                                  Company
                                                                                                                                               travel
                                                                                                                    Paid
                                                                                                                                      Company Paid Travel
                                                                                                                   Travel




                                                                                                                 Dependent             Identify additional
                                                                                                                 Company              company-paid travel
                                                                                                                    Paid            Dependent Company Paid
                                                                                                                   Travel                    Travel




                                                                                                                                    Identify employee financial    Identify supplemental       Complete
                                                                Identify Global                    Update             Employee
              Human                                                                                                                   assistance information      earnings and deductions   Assignment and
                                                                  Assignment                      additional         Educational
                                                                                                                                       International School/            Assignment              Update
             Resource                                             Information                    information       Reimbursements
                                                                                                                                              Program                  Compensation          Competencies
             Specialist


                                                                                                                                         Identify financial
                                                                                                                 Dependent          assistance information for
                                                                                                                 Educational               a dependent
                                                                                                               Reimbursements        Dependent International
                                                                                                                                              School




                                                                                                                                       Identify employee's
                                                                                                               Accompanying         dependents who will travel
                                                                                                                Dependent               with the employee
                                                                                                                                    Dependent Accompanying




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                         57
Complete Assignment and Update Competencies




                                                                                                                         Create report of       Record information
                                                                                             Track job information
            Human                                                      Identify Travel and
                                                                                             while on assignment
                                                                                                                      employee's on global     regarding completed
                                                                                                                                                                      Maintain profiles
                                                                                                                                                                                             Measure
           Resource                                                        Education                                      assignments         assignment and close                         deployment
                                                                                                  Home/Host                                                           Person Profiles
                                                                          Allowances                                 Employee on Assignment        host record                            effectiveness
           Specialist                                                                             Information
                                                                                                                             Report           Home/Host Information




                                                                                                 Perform and
                                                                                                  Complete
                                                                                                   Global
           Employee                                                                              Assignment




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                      58
PeopleSoft Manage Absences


                                               Maintain                 Manage Leaves
                                             Employee Data                  USF




                                                                         Authorize and
                                                                       Track FMLA Leave




                                                                        Manage Leave
                                                                          Transfers
           Human
          Resource
          Specialist
                                                                                          Record Absences,   Analyze Absence       Measure
                                                                        Define Absence
                                                                                             Vacations,       Information and    Deployment
                                                                         Tracking and
                                                                                            Accruals and       Identify Trends   Effectiveness
                                                                       Assign Schedules
                                                                                            Entitlements        and Patterns




                                                                                          Provide Absences
                                                                                              to Payroll




                                                                          Request and
       Line Manager                                                    Approve Absences
                                                                         and Vacations




                                                                                                             Manage Time and
      Time and Labor                                                                                             Labor
       Administrator




                                                                                                                                        Manage
                                                                                                                                        Payroll
         Payroll
       Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                              59
Manage Leaves USF



                                    Request leave USF
                                 Request Leave of Absence                                                  Create an application to
                                                                                                            donate to leave bank or
                                                                              Leave Donations            transfer program to be used
                                                                                 External                 by an employee outside of
                                                                                                              the agency (USF)                                                                                                         Review by effective date hours
                                                                                                          External Leave Donations                                                                                                     contributed to or withdraw from
                                                                                                                                                                                                                    Leave Bank
                                                                                                                                                                                                                                     employees participating in the leave
                                                                                                                                                                                                                      Ledger
                                                                                                                                                                                                                                            bank program (USF)
                                                                                                           Create an application to                                                                                                     Review Leave Bank Ledger
                                                                Create
                                                                                    Leave Donations       donate leave to the leave
                                                              applications
                                                                                        Internal           transfer program (USF)
                                                                  for?                                                                                             Process donations and update
                                                                                                             Voluntary Donations
                                                                                                                                                                    accruals, additional pay, and
                                                                                                                                                                                                                                      Review donations made to a leave
                                                                                                                                                                        leave ledgers (USF)
                                                                                                                                                                                                                  Leave Donations      transfer program recipient (USF)
                                                                                                                                                                   Request Leave Bank/Transfers
                                                                                                                                                                                                                                            Track Leave Donation
                                         Applications
                                                                                                         Create application to receive               Update
                                                                                    Leave                hours from a leave program                Leave Bank
                                                                                   Requests                        (USF)                                                                                                                                                     Leave Admin USF reports (USF)
                                                                                                         Create Leave Recipient App                                                                                                                                          Leave Acceptance Notifications
                                                                                                                                                                                                                                                                                 Leave Bank Participants
         Human                                                                                                                                                                                                                      Inquire on automatic leave enrollment
                                                                                                                                           Decide if                                                    Need to       Leave                                                     Leave Denial Notifications
                                                                                                                                                                                                                                                history (USF)
        Resource                         Maintain
                                                                                                                                           need to?                                                     review?     Enrollment                                                 Leave Transfer Participants
                                                                                                                                                                                                                                        Track Auto Leave Enrollment
        Specialist                                                                                                                                                                                                                                                           Leave Bank Application/Donate
                                       Employee Data
                                                                                                                                                                                                                                                                                        FEFFLA
                                                                                                                                                                                                                                                                                   Leave Audit SF1150

                                                                                                                                                     Update
                                                                                                                                                  Leave Accruals                                                                    Review summary leave contributions,
                                                                                                                                                                    Initiate leave accrual process                    General
                                                                                                                                                                                                                                     withdrawals, and balances by leave
                                                                                                                                                                      balance for all employees                   Leave Summary
                                                                                           Review and adjust employee enrollment in                                                                                                         program type (USF)
                                                                                                                                                                   currently enrolled in the selected               Information
                                                                                          earnings accrual classes or manually enroll                                                                                                 Review Leave Program Summary                                              Measure
                                                                                                                                                                           benefit plan (USF)
                                                                             No              employees in accrual classes (USF)                                       Calculate Leave Accruals                                                                                                                Deployment
                                                                                                Employee Accruals Enrollment                                                                                                                                                                                  Effectiveness
                                           Accruals                                             Update Leave Accrual Elections

                                                                                                                                                                                                                                    Review leave balances and totals for a
                                                                                                                                                                                                                  Leave Balances         particular employee (USF)
                                                              Using auto                                                                                                                                                                     Leave Accruals (rpt)
                                                          enrollment for leave
                                                               accruals?




                                                                                           Automatically enroll employees in earnings
                                                                                          accrual classes based on the PAR or leave
                                                                             Yes
                                                                                        program activity and the leave class rules (USF)
                                                                                               Request Auto Leave Enrollment




        Employee




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                          60
Authorize and Track FMLA Leave




         Human
        Resource
        Specialist




                                                                            Authorize or deny FMLA request                                                                           Review FMLA reports (USF)
                                                                                                                                             Record significant events that affect                                 Measure
                                                              Maintain                   (USF)                     Schedule FMLA                                                           Status Report
                                                                                                                                                       FMLA leaves                                               Deployment
                                                            Employee Data   Request/Authorize/Track Leave    Request/Authorize/Track Leave                                              Payroll Audit Report
                                                                                                                                              Request/Authorize/Track Leave                                      Effectiveness
                                                                                 Process FMLA Leave                                                                                            FMLA




                                                                                   Request time off
                                                                                      to care for                   Take requested
                                                                                    themselves or                    time off from
                                                                                       a family                      employment
                                                                                       member




        Employee




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                             61
Manage Leave Transfers


                                                                       Request to Donate Leave
                                                                                 GBL
                                                                        Donate Leave Request



                                                                         Request to Receive
                                                                           Donated Leave
                                                                        Receive Donate Leave
                                                                              Request
                                                                                                                                               Requests need
                                                                                                                                                                           No
                                               Maintain                                                                                          approval?
          Employee                           Employee Data
                                                                         Request to Return
                                                                           Unused Leave
                                                                        Return Unused Leave
                                                                              Request
                                                                                                            View Self Service
                                                                                                           Transaction History                      Yes
                                                                                                         Leave Transfer Request
                                                                                                                 History
                                                                         Request to Terminate
                                                                        Participation in Program
                                                                       End Participation Request




                                                                           Define Leave Program and
                                                                          Leave Transfer Entitlements
                                                                           Leave Program Definition




                                                                             Define Leave Transfer
                                                                                 Configuration
                                                                          Leave Transfer Configuration




                                                                             Define Leave Transfer
                                                                                   Recipients
           Human                             Define Absence                Leave Transfer Recipients
                                              Tracking and
          Resource                          Assign Schedules
          Specialist

                                                                             Initiate Leave Transfer                                       Approve Leave Transfer
                                                                                                                 Requests need                                                            Process Leave Donations
                                                                                      Requests                                    Yes            Requests                                                           Manage Payroll
                                                                                                                   approval?                                                                Run Leave Donations
                                                                                 Initiate Requests                                      Manage and Approve Requests




                                                                                                                                                                 View Leave Transfer
                                                                                                                       No                                        Transactions History
                                                                                                                                                               View Transaction History

                                                                             Adjust Leave Balances
                                                                                    Programs
                                                                             Adjust Leave Program
                                                                                    Balances




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                 62
Define Absence Tracking and Assign Schedules

                                                                                                                                                                                                                                     Assign
                                                                                                                                                                                                                                                                  Track Time and
                                                                                                                          Define calculation rules etc. for         Define absence entitlement plans                             Work Schedule
                                                                                                                                                                                                                                                                      Labor
                                                                                                     Entitlements          Absence Entitlements GBL                 Absence Entitlement Plans CHE                            (Using Time and Labor)
                                                                                                                              Absence Entitlements                  Absence Entitlement Plans DEU




                                                                                                                             Define absence types and
                                                                                                    Absence Types              take parameters GBL                          Map absence to
                                                                                                      and Takes                Absence Take Types                              Payroll                                                                     Assign or override a specific
                                                                                                                                  Absence Takes                                                                                                           employee's long-term, alternate
                                                                                                                                                                                                                            Assign or Override
                                                                                                                                                                                                                                                                or daily schedule
                                                                                                                                                                                                                             Work Schedules
                                                                                                                                                                                                                                                             Assign Work Schedule
                                                                                                                                                                                                                          (Using Global Payroll)
                                                                                                                                                                                                                                                              Daily Work Schedules
                                                                                                                                Define absence take                                                                                                                Pay Groups
                                                                                         Need to           Absence                                                                                           Need to
                                                                                                                                 parameters NLD
                                                                                         define?          Takes - NLD                                                                                        assign?
                                                                                                                                Absence Takes NLD


                                                                                                                                                                                                                                                          Add and update an entitlement
                                                                                                       Absence             Define absence reasons GBR                                                                            Assign                       for a global employee
                                                                             Yes                    Reasons - GBR            Absence Reasons GBR                                                                               Entitlements               Assign Entitlements and Takes
                                                                                                                                                                                                                                                         Vacation Entitlm and Takes BRA
                                                                                                                                                                                                                                                                                            Record Absences,
                                                                                                                                                                                                                                                                                            Vacations, Accruals
                                                                                                                              Define the payee's prior                                                                                                                                       and Entitlements
                                                                                                                             services to be used in the
                                                                                                   Prior Service AUS                                                                                                             Assign                     Identify information used by
                                                                                                                                     calculation
                                                                                                                             Define Prior Service AUS                                                                          Entitlements                   Global Payroll for France
                                                                                                                                                                                                                                   FRA                         Dependent Information
                                                                        Using Global
                                Maintain Employee
                                                                       Payroll Absence
                                       Data
                                                                        Management?
                                                                                                                                                    Define absence classes, types
         Human                                                                                                                                            and specific details
                                                                                                                           Monitor
                                                                                                                                                           Absence Classes
        Resource                                                                                                          Absences
                                                                                                                                                            Absence Types
        Specialist                                                                                                                                       Absence Parameters

                                                                             No
                                                                                                                                                                                                                                               Assign vacation plans to
                                                                                                                       Leave Plans and              Create vacation and leave plans                                      Vacation Plan               employees
                                                                                                                    Vacation Buy/Sell Plans                Vacation Benefits                                                                        Vacation Plan
                                                                                                                                                             Leave Plans



                                                                                                                                                        Create holiday and work                                                                 Assign holiday and work
                                                                                                                                                                                                                         Holiday/Work
                                                                                                                             Schedules                        schedules                                                                       schedules using PeopleSoft
                                                                                                          Need to                                                                                  Need to                Schedules
                                                                                                                               (Using                     Holiday Schedules                                                                       Human Resources
                                                                                                          define?                                                                                  assign?                  (Using
                                                                                                                          Human Resources)                 Work Templates                                                                        Assign Work/Holiday
                                                                                                                                                                                                                       Human Resources)
                                                                                                                                                           Work Schedules                                                                             Schedules


                                                                                                                                                        Create work schedules
                                                                                                                          Schedules
                                                                                                                                                        Create Work Schedules
                                                                                                                    (Using Time and Labor)

                                                                                                                                                                                                                                  Assign
                                                                                                                        Working Time                 Define working time directive                                            Work Schedule                Track Time and Labor
                                                                                                                         Directive                 reporting parameters and default                                       (Using Time and Labor)
                                                                                                                         Reporting                              settings
                                                                                                                            UK                        Working Time Directive UK



                                                                                                                                                       Define benefits plan and
                                                                                                                                                               programs
                                                                                                                           Benefits
                                                                                                                                                              Benefit Plan
                                                                                                                                                      Benefit/Deduction Program




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                              63
Request and Approve Absences and Vacations




                                                                                                                                                                                       View absence balances and
                                                                                                                                                                                                                              Approve absence
                                                                                                                                                   View absence requests                        history
                                                                                                                                                                                                                                  requests
                                                                                                                                                  Absence Request History                  Absence Balances
                                                                                                                                                                                                                              Absence Requests
                                                                                                                                                                                        Absence Request History



                                                                                                                                                            Yes
                                                                                     Request                 Request absence on behalf of
                                                                                    Employee                         direct report
                                                                                    Absence                      Absence Requests
        Line Manager                                                                                                                                                                   View absence balances and
                                                                                                                                                          Is upper
                                                                                                                                                                                                                              Approve absence
                                                                                                                                                       management's                     history from direct reports
                                                                                                                                                                            No                                            requests from direct reports
                                                                                                                                                          approval                          Absence Balances
                                                                                                                                                                                                                              Absence Requests
                                                                                                                                                         required?                      Absence Request History
                                                                                         Review              View absence requests from
                                                                        And/Or?         Absence                     direct reports
                                                                                        Requests              Absence Request History




                                                                                     Review                  Review absence entitlement
                                                                                    Absence                          balances
                                                                                    Balances                     Absence Balances




                                                    Maintain Employee
                                                           Data


                                                                                  Request Extended Absence                View Extended Absence History
            Human                                                                 Extended Absence Request               Extended Absence Request History
           Resource
           Specialist                                                                                                                                                      Approve absence
                                                                                                                                                                                                                                                         Manage
                                                                                                                                                                                requests
                                                                                                                                                                                                                                                         Payroll
                                                                                                                                                                      Administer Extended Absence




                                                                                                                                                                        Review absence history
                                                                                                                                                                                                                         View absence request status
                                                                                                                                                                       Absence Request History
                                                                                                                                                                                                                         View Absence Request Detail
                                                                                                                                                                   Extended Absence Request History




          Employee                                                                                  Request time off from work
                                                                                                                                                                  Review absence entitlement balances
                                                                                                        Request Absence
                                                                                                                                                                          Absence Balances
                                                                                                    Request Extended Absence



                                                                                                                                                                      Forecast Absence Balances
                                                                                                                                                                                                                      View Forecast Balance Results
                                                                                                                                                                          Request Absence
                                                                                                                                                                                                                      View Forecast Balance Results
                                                                                                                                                                      Request Extended Absence




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                               64
Provide Absences to Payroll


                                                                                                         Global Payroll




                                                                                                                                  Provide absence information to
                                                                                                          North American
                                                                                                                                     North American Payroll
                                                                                                              Payroll
                                                                                                                                   To Payroll for North America


                                                                       Record Absences,
         Human                                                            Vacations,           Payroll
        Resource                                                         Accruals, and        system?
        Specialist                                                       Entitlements

                                                                                                                                    Provide absence to Payroll
                                                                                                              Payroll
                                                                                                                                             Interface
                                                                                                             Interface
                                                                                                                                       To Payroll Interface




                                                                                                           Time and Labor




                                                                          Request and
     Line Manager                                                      Approve Absences
                                                                         and Vacations




    Time and Labor
     Administrator                                                                                                          Manage Time and
                                                                                                                                Labor




       Payroll                                                                                                                                                     Manage
     Administrator                                                                                                                                                 Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                         65
Record Absences, Vacations, Accruals and Entitlements


                                                                                                                                                                                                                                                                                                                 Provide approval decision
       Line Manager                                                                                                                                                                                                                                                                                                 for vacation request
                                                                                                                                                                                                                                                                                                                 Request/Approve Vacation



                                                                                                                                                                                                                                                                                                                                              Run payroll
                                                                                                                                                                                                                                                                                                 Update employees'                           before leave
                                                                                                                                                                                                                              Absences                  Need to                                                                                 accrual
                                                                                                                                                                                                                                             Leave                                              accrual records after
                                                                                                                                                                                                                               or leave                review or       Vacation Accruals                                                     balances are
                                                                                                                                                                                                                                            Accruals                                                 payroll run
                                                                                                                                                                                                                              accruals?                 update?                                                                               calculated
                                                                                                                                                                                                                                                                                                  Accrue Vacation
                                                                                                                 Record information and
                                                                                                              comments about the maternity                                                                                                                                                                                        Review leave accrual
                                                                                                                    or parental leave                                                                                                                                                            Initiate leave accrual
                                                                                                                                                                                                                                                                                                                                 balances and totals for a
                                                                                        Maternity Leave       Maintain Maternity Leave (UK)                                                                                                                                                        process balance
                                                                                                                                                                                                                                                                   Leave Accruals                                                  particular employee
                                                                                                              Maintain Parental Leave (UK)                                                                                                                                                        Calculate Periodic
                                                                                                                                                                                                                                                                                                                                 Review Accrual Balances
                                                                                                                  Maternity Leave CHE                                                                                                                                                                    Accrual
                                                                                                                                                                                                                                                                                                                                      Leave Accrual
                                                                                                                  Maternity Leave DEU
                                                                                                                                                                                                     Adjust a payee's
                                                                                                                                                                                                     frequency-based
                                                                                                                                                                                                        entitlement                                                                                                         Consolidate company workforce
                                                                                                                                                                                                                                                                                       Identify details of the
                                                                                                            Add and update an absence                                                              Absences Entitlement                                                                                                                data - NLD
                                                                                                                                                   Track employee's                                                                                                Incidental           absence, follow-up
                                                                                                            event for a global employee                                                            and Take Assignment                                                                                                         Export Company Data NLD
                                                                                                                                                 first day of absence                                                                                               Absence           actions and comments
                                                                                                                  Absence Event                                                                                                                                                                                            Employee Illness Notification NLD
                                                                                                                                                       and salary                Absences                                                                                             Create/Update Absence
                                                                                                                Absence Event AUS                                                                                                                                                                                          Illness Notification by Group NLD
                                                                                                                                                     information for             Entitlement
                                                                                                                Absence Event BRA                      WAO NLD
                                                                                                                Absence Event ESP                   WAO Data NLD
                                                                                   Absence Event                                                                            Need to
                                                                                                                Absence Event GBR
                                                                                                                                                                            update?                                                                                Protected               Identify absence as                                                  Analyze Absence
           Human                                                                                                Absence Event MEX
                                                                                                                Absence Event NLD                                                                                                                                  Absence                    protected BEL                                                  Information and Identify
          Resource                                                                                                                               Track employee's                                                                                                    BEL                    Create Protection                                                  Trends and Patterns
                                           No                                                                   Absence Event NZL                                                                       Review or adjust
          Specialist                                                                                      Vacation Acquis Prd-Sched BRA         pay in advance data                                absences or entitlements
                                                                                                                                                                                         Absence
                                                                                                           Maintain Acquisitive Prd BRA         Pay in Advance AUS                                     for reduced hours
                                                                                                                                                                                         Balance
                                                                                                                                                Pay in Advance NZL                                 Adjust Absence Balances
                                                                                                                                                                                                                                                                                       Record information about the
                                                                                                                                                                                                   Define Payee Data NLD
                                                                                                                                                                                                                                                                                       maternity or parental leave -
                                                                                                                                                                                                                                                                                                CHE, DEU                      Review maternity and parental leave
                                      Using Global                        Need to                                                                                                                                                                                     Maternity/       Maintain Maternity Leave UK                         details                               Provide Absences to
                                                                                             Extended     Request Extended Absence             Approve Extended Absence                                                                   Absences     And/or?
                                     Payroll Absence         Yes       record details                                                                                                                                                                                 Parental         Maintain Parental Leave UK             Review Parental Leave by Dept UK                         Payroll
                                                                                             Absence      Extended Absence Request            Administer Extended Absence                          Insert an absence event
                                      Management?                           for?                                                                                                                                                                                                           Maternity Leave CHE                Review Parental Leave by Emp UK
                                                                                                                                                                                                       into the GP Core
                                                                                                                                                                                                                                                                                           Maternity Leave DEU
                                                                                                                                                                                                          component
                                                                                                                                                                                                                                                                                      Illness/Maternity S503 Dtl ITA
                                                                                                                                                                                                     EIP CI: GP BRAZIL -
                                                                                                                Record vacation details - BRA                                                        VACATION ENTRY
                                                                                           Vacations
                                                                                                               Vacation Entitlm and Takes BRA
                                                                                                                                                                                   Provide
                                                                                                                                                                                  Approved                                                                         Absence                  Updates absences
                                                                                                                                                                                  Absence                                                                            FPS                     Absences FPS
                                     Define Absence                                         Mass                                                                                    Data
                                                                                                              Request collective vacations - BRA
                                      Tracking and                                         Vacation
                                                                                                              Mass Vacation Programming BRA
                                         Assign                                            Requests
                                                                                                                                                                                                                                                                                        Verify time available to
                                       Schedules                                                                                                                                                                                                                                                                                      Identify reason for vacation                                 Provide approved
                                                                                                                                                                                                                                                                   Vacation              request for vacation
                                                                                                                                                                                                                                                                                                                                      Capture Vacation Absence                                    absence to Oracle
                                                                                             Mass            Generate a massive absence event -                                                                                                                                        Request/Approve Vacation
                                                                                                                                                                                                                                                                                                                                                                                                 Workforce Scheduling
                                                                                           Absence                         MEX                                                                                                                                                                                                                                                                  Publish Absence Data to
                                                                                           Request            Create Mass Absence Rqst MEX                                                                                                                                                                                                                                                               OWS




                                                                                                                                                                                                                                                                                                  Request
                                                                                                                                                                                                                                                                                                  vacation
          Employee




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                      66
Analyze Absence Information and Identify Trends and Patterns


                                                                                                                  Review and forecast absence
                                                                                                    Absence
                                                                                                                           balances
                                                                                                    Balances
                                                                                                                   Review Absence Balances
                                                                                                      AUS
                                                                                                                 Review Absence Balances AUS

                                                                         No
                                                                                                     Absence     Review exception details, absence
                                                                                                    Exceptions      dates, and payment details
                                                                                                      GBR        Review Absence Exceptions GBR                                                                                                         Review all types of
                                                                                                                                                                                                                                                     employee absences in a
                                 Record Absences,                                                                                                                                               Create absence reports GBL               Absence
                                                                    Using Global                                                                                                                                                                        graphical format
                                    Vacations,                                                                                                                                                        Absence Listing                    Calendar
                                                                   Payroll Absence   Yes                                                                                                                                                                Review Absence
                                   Accruals, and                                                     Absence                                                                                         Absence Periods                                       Calendar
                                                                    Management?                                     Create absence reports GBL
                                   Entitlements                                                      Reports                                                                                     Time Lost Due to Absence
                                                                                                                     Absence Results Register
                                                                                                      GBL
                                                                                                                                                                                Global Payroll Core

                                                                                                                                                                                                 Create absence reports NLD
                                                                                                     Absence      Create absence history reports -                                                                                                      Review a list of all
                                                                                                                                                     Need to                                     Create Illness Statistics NLD          Summary
                                                                                                      History                  AUS                                         Absence                                                                       absences for an
                                                                                                                                                     create or   Create                 NLD         Illnesses by Group NLD                by
                                                                                                     Reports            Leave History AUS                                   reports                                                                         employee
                                                                                                                                                     review?                                     Illnesses by Employee NLD              Employee
                                                                                                       AUS              Leave Liability AUS                                   for?                                                                    Summary by Employee
                                                                                                                                                                                                   Long-term Illnesses NLD


                                                Calculate,                                                                                                                                                                   Decide
                                                                                                      Family      Create family allowance reports
                                               Confirm, and                                                                                                                                                                   info to
                                                                        Absences        Review      Allowance                   BRA                                                    GBR                                                             Review all employee
                                              Provide Payroll                                                                                                                                                                review?     Summary
                                                                        Calculated     or report?    Reports      Family Allow. Term of Resp BRA                                                                                                        absences within a
                                             Using PeopleSoft                                                                                                                                                                              by
                                                                                                       BRA        Family Allowance Registry BRA                                                                                                            department
                                              Global Payroll                                                                                                                                                                            Department
                                                                                                                                                                                                                                                     Summary by Department

                                                                                                                                                                                              Create absence reports GBR
           Human                                                                                     Absence        Create absence reports BRA                                                   Bradford Score GBR
          Resource                                                                                   Reports        Vacation Receipt/Notice BRA                                                                                                        Review all employee
                                                                                                      BRA           Vacation Credit Report BRA                                                                                           Summary
          Specialist                                                                                                                                                                                                                        by
                                                                                                                                                                                                                                                        absences within a
                                                                                                                                                                                                                                                         department and
                                                                                                                                                                                                                                        Department
                                                                                                                                                                                         Review working time for the UK                              subordinate departments
                                                                                                                                                                                                                                           Tree
                                                                                                                                                                                             Working Time Directive                                   Summary by Dept Tree
                                                                                                                    Create absence reports MEX                    Review
                                                                                                     Absence                                                                               Review Dept Time Directive
                                                                                                                       Absence History MEX                                               Review Employee Time Directive
                                                                                                     Reports
                                                                                                                          Vacations MEX
                                                                                                      MEX
                                                                                                                     Vacations Summary MEX




                                                                                                     Absence        Create absence reports SGP
                                                                                                     Reports            Leave Liability SGP
                                                                                                      SGP               Leave History SGP




                                                                                                     Absence         Create absence reports NZL                                                                                                                                  Measure
                                                                                                     Reports             Leave History NZL                                                                                                                                     Deployment
                                                                                                       NZL               Leave Liability NZL                                                                                                                                   Effectiveness




                                                                                                     Absence         Create absence reports MYS
                                                                                                     Reports            Leave History (MYS)
                                                                                                      MYS               Leave Liability (MYS)


                                                                                                    Absence
                                                                                                                     Create absence reports USA
                                                                                                    Reports
                                                                                                                           Results Register
                                                                                                     USA




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                           67
Manage Time and Labor


          Human
                                            Maintain                                                                                      Manage
         Resource                         Employee Data                                                                                  Absences
         Specialist




                                                                                                     Report to Work
                                                                                  Review Schedules                                        Report
                                                                                                      and Perform
                                                                                   and Forecasts                                           Time
                                                                                                        Duties




                                                                                                                      Request Overtime
         Employee                                                                                                        and Obtain
                                                                                                                         Approvals




                                                                                                                      Request Absences
                                                                                                                       and Approvals




                                                                                                                                                      Review and
                                                                                                                                                                                                         Approve
                                                                                                                                                     Resolve Time
      Line Manager                                                                                                                                  Entry Exceptions
                                                                                                                                                                                                          Time




                                                                                                                                                                                        Resolve Time
                                                                                                                                                                                        Administration
                                                                                                                                                                                         Exceptions


                                                                 Enroll Time
     Time and Labor                                           Reporters, Assign                                                                                        Create Payable
      Administrator                                            Schedules, and                                                                                               Time
                                                                 Setup TCD


                                                                                                                                                                                                                   Distribute Time   Review and Adjust
                                                                                                                                                                                                                     Information     Time Summaries




        Payroll                                                                                                                                                                                                       Manage
                                                                                                                                                                                                                      Payroll
      Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                     68
Enroll Time Reporters, Assign Schedules and Setup TCD


     Human
                               Maintain
    Resource
                             Employee Data
    Specialist




                                                                                                                                                                                                                                                                                                                            Review Schedules
    Employee                                                                                                                                                                                                                                                                                                                 and Forecasts




                                                                                                                                                                                                                                         Update dynamic
                                                                                                                                                                                Update       Update existing                     Yes    group membership
                                                                                                                                                                                Existing      time reporter                              Refresh Dynamic
                                                                                                                                                                                 Time        Maintain Time                                    Group
                                                                                                                                                                                Reporter     Reporter Data
                               Create or
                            update calendars,                                                                                                                   Determine                                               Using
                                                                                                      No                                                                                                               dynamic
                               groups or                                                                                                                       action to take
                                security?                                                                                                                                                                              groups?
                                                                                                                                                                                             Enroll new time                           Assign time reporter's
                                                                                                                                                                                 Enroll
                                                                                                                                                                                                reporter                                long term schedule            Enroll time reporter in     Review compensatory
                                                                                                                                                                                 New
                                                                                                                                                                                              Create Time                               Assign Schedule to             compensatory plan            plan assignments
                                                                                                                                            Associate security                  Reporter                                     No
                                                                                                                                                                                             Reporter Data                                     Group                       Comp Plan              Time Reporter Status
                                                                                                                                 Group        using groups                                                                             Assign Work Schedule                Enrollment              Comp Plan History
                                                                                                Create static
                                   Yes                                               Static                                     Security    TL Permission List                                                                         Scheduled Hours (Rpt)
                                                                                                   groups
                                                                                     Groups                                                     Security                         Setup
                                                                                                Static Group
                                                                                                                                                                                  Time       Send Time & Labor setup
                                                                                                                                                                                Collection         data to TCD
                                                        Create or             Static or                                                                                          Device        Send Setup to TCD
                                                                                                                       Apply security
                                                     Update Groups for        Dynamic                                                                                            (TCD)
                                                                                                                          using?
                                                     Reporting Security       Groups?

   Time and                                                                                   Create dynamic
                                                                                   Dynamic
     Labor                                                                         Groups
                                                                                                  groups                         HR Tree     Assign security
 Administrator                                                                                Dynamic Group                      Security    using HR Tree
                                               Create or                                                                                                                                                                                                                                                                     Apply override
                                             update what?                                                                                                                                                                                                                                                                     rules to time
                                                                                                                                                                                                                                                                                                                  No            reporter
                                                                                                                                                                                                                                                                                                                             Override Rules
                                                                                              Create time periods
                                                                                                     Daily
                                                                                                    Weekly                                                                                                                                                                         Review or update
                                                                                                                                                                                                                                                        Static or
                                                                  Create                            Monthly                                                                                                                                                              Static      static groups               Apply            Yes
                                                                                                                                                                                                                                                        Dynamic
                                                               Time Periods                        Repeating                                                                                                                                                             group     Time Reporters in           overrides?
                                                                                                                                                                                                                                                        Group?
                                                                                                   Complex                                                                                                                                                                              Groups
                                                                                          Build Time Period Calendar
                                                                                          View Time Period Calendar
                                                                                                                                                                                                                                                                                   Review dynamic           Refresh dynamic
                                                                                                                                                                                                                                                                    Dynamic       group membership         group membership
                                                                                                                                                                                                                                                                     group        Time Reporters in         Refresh Dynamic
                                                                                          Create or update schedules                                                                                                                                                                   Groups                    Group
                                                                                               Schedule Group
                                                               Create or                             Shifts
                                                            Update Schedules                      Workdays
                                                                                                  Definitions
                                                                                          Schedules to be Validated




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                           69
Review Schedules and Forecasts


                                                    Enroll Time
        Time and                                  Reporters and
          Labor                                  Assign Schedules




                                                                            Employee                     Configure Schedule             Provide time reporter schedule preference
                                                                             Schedule                       Preference                    data to Oracle Workforce Scheduling
                                                                            Preference                    User Preferences               EIP (AM):SCH_PREFERENCE_SYNC



                                                                                                                                                                                                                           Report to Work
                                                                                                                                                                                                                            and Perform
                                                                                                                                                                                                                              Duties
       Employee                                                                          Employee
                                                                       Need to                       Review work schedule by day
                                                                                           Work
                                                                       review?                            Monthly Schedule
                                                                                         Schedule



                                                                                                        Review forecast time
                                                                                                                                                    Provide
                                                                                      Time           Forecasted Time Summary
                                                                                                                                                  scheduling
                                                                                    Forecasts        Time and Labor Launch Pad
                                                                                                                                                   feedback
                                                                                                       Forecasted Time Detail




                                                                                                                                                                                                   Override employee's
                                                                                                                                                                        Continue                   schedule for one or                                 Retrieve time reporter schedule data from
                                                                                                                                                                                                                                            Override
                                                                                                                                                                                                   many employees for                                        Oracle Workforce Scheduling
                                                                                                                                                                                                                                            Schedule
                                                                                                                                                                                       Override     one or many days                                      EIP (AM):SCH_OWS_SCHEDULE
                                                                                                        Review employee work                                                           Schedule    Manage Schedules
                                                                                     Employee
                                                                                                              schedule                                                 Determine
                                                                                       Work
                                                                                                         Manage Schedules                                             action to take
                                                                                     Schedule                                                                                           Assign
                                                                                                       Manage Schedule Options
                                                                                                                                                                                       Schedule   Assign time reporter's
                                                                                                                                                                                                   long-term schedule
                                                                                                                                                                                                  Assign Work Schedule

                                                                                                         Review time forecasts          Review time detail
                                                                        Need to            Time
                                                                                                      Forecasted Time Summary         Forecasted Time Detail
                                                                        review?          Forecasts
     Line Manager                                                                                     Time and Labor Launch Pad     Time and Labor Launch Pad




                                                                                                       Review time management
                                                                                       Time                   Calendars
                                                                                    Management          Monthly Time Calendar
                                                                                     Calendars          Weekly Time Calendar
                                                                                                         Daily Time Calendar



                                                                       Employee                           Configure Schedule             Provide time reporter schedule preference
                                                                        Schedule                               Preference                  data to Oracle Workforce Scheduling
                                                                       Preference                     Publish Schedule Preference       EIP (AM):SCH_PREFERENCE_FULLSYNC




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                               70
Report Time


        Human                          Manage
       Resource                       Absences
       Specialist




                                                                          Report Using
                                    Report to Work                                                                                Receive mobile time entries from PeopleSoft
                                                                           Expenses            Prepare and
                                     and Perform                                                                                                   Expenses
                                                                            Mobile           Submit Expenses
                                       Duties                                                                                          EIP (AM): ELAPSED_TIME_ADD
                                                                             Client



                                  Request Overtime
                                     and Obtain                                                                                    Retrieve time reporter data from collection
                                     Approvals                                              Time Collection                                         devices
                                                                                               Device                                   EIP (AM):ELAPSED_TIME_ADD
       Employee                                                                                                                        EIP (AM): PUNCHED_TIME_ADD

                                 Request Absences
                                                                                               Report Mass Time using date
                                  and Approvals                           Report Using
                                                                                                         ranges
                                                                          Date Ranges
                                                                                                       Mass Time



                                                          Select time
                                                           reporting                                Report Time Online
                                                                             Report
                                                            method                                     Web Clock
                                                                             Online
                                                                                                       Timesheet




                                                                                                                                                                                                                 Review and                                Approve time
                                                                          Report Using                  Report time                                                                                                                Approvals
                                                                                                                                                                                                              Resolve Time Entry               Yes          Mass Time
                                                                          Date Ranges                   Mass Time                                                                                                                  required?
                                                                                                                                                                                                                 Exceptions                                 Timesheet

     Line Manager


                                                                           Provide to          Report time by Time Reporter
                                                                           Manager                       Timesheet




                                                                                                                                                                                                                                                     No   Create Payable
                                                                                                                                                                                                                                                               Time
                                                                                                    Report or modify employee                                                     Insert multiple rows into
                                                                                                                                       Calculate, Confirm, and
                                                          Determine       Report Overtime             overtime information                                                             Positive Input
                                                                                                                                        Provide Payroll using
                                                         action to take     (CHE/MEX)                 Enter Overtime CHE                                                          EIP (CI): GP MEXICO -
                                                                                                                                      PeopleSoft Global Payroll
                                                                                                      Enter Overtime MEX                                                         OVERTIME DATA ENTRY                                                                       Provide “SB” and “AP”
                                                                                                                                                                                                                                                                            punch time to Oracle
      Time and                                                                                                                                                                                                                                                             Workforce Scheduling
                                                                                                                                                                                                                                                                           Publish Reported Time
        Labor
    Administrator
                                                                          Report                  Manually record reported time
                                                                           Time                           Rapid Time

                                                                                                                                                                                                                                                                      Provide punch data to Oracle
                                                                                                                                                                                                                                                                         Workforce Scheduling
                                                                                                                                                                                                                                                                                  EIP
                                                                                                                                                                                                                                                                      TL_REPORTED_TIME_SYNC




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                 71
Request Overtime and Obtain Approvals



                                                                                                                                                                                                                       Report
                                                                                                                                                                                     No
                                                                                                                                                                                                                        Time




                                                                                                                                                                       Request Overtime                          View the status of a
                                                                Report to Work                                                                   Need to
                                                                                   Reporting for                                                                      Overtime Requests                          request for overtime
      Employee                                                   and Perform                                      No                        request overtime   Yes
                                                                                      CHE?                                                                           Request Overtime Add                           View Overtime
                                                                   Duties                                                                     in advance?
                                                                                                                                                                     Request Overtime List                             Request

                                                                                       Yes

                                                                                  Report overtime
                                                                                                    View submitted TO
                                                                                    online CHE
                                                                                                      approval status
                                                                                 Request Overtime
                                                                                                    View Overtime CHE
                                                                                        CHE




                                                                                  View overtime                                                                          View overtime                           Approve Overtime
                                                                                                                 Calculate, Confirm, and                                                      View Overtime
                                                                                      CHE                                                                                   requests                                 Overtime
                                                                                                                  Provide Payroll Using                                                          balances
                                                                                  View Overtime                                                                            Overtime                                 Requests
                                                                                                                PeopleSoft Global Payroll                                                    Overtime Balances
    Line Manager                                                                  CHE (hidden)                                                                             Requests                              Approve Overtime




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                    72
Request Absences and Approvals




                                                                                                          Review absence balances
                                                                       Report to Work
                                                                                        Request absence         and history
                                                                        and Perform                                                 Report Time
                                                                                        Absence Request      Absence Balances
                                                                          Duties
                                                                                                          Absence Request History



      Employee




                                                                                                             Review absences
                                                                                        Record absences      Absence Request
    Line Manager
                                                                                        Absence Request           History
                                                                                                             Absence Balances




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                              73
Review and Resolve Time Entry Exceptions


                                                                                                 Review time entry
       Employee                                     Report Time                                     exceptions
                                                                                                   Exceptions




                                                                                                                                          Make Changes       Make changes
                                                                                                                                          to Setup Data      to setup data




                                                                                                 Review and                                                                                       Retain or delete
                                                                                                                        Change setup
         Line                                                                                 resolve exceptions                                                                                resolved exception
                                                                                                                        data or correct
                                                                                                    online                                                                                       history (cleanup)
        Manager                                                                                   Exceptions
                                                                                                                        time reported?
                                                                                                                                                                                                    Exceptions



                                                                                                                                                              Correct time
                                                                                                                                             Correct
                                                                                                                                                                reported
                                                                                                                                          Time Reported
                                                                                                                                                               Timesheet




                                                                                                                           Review and correct TCD
                                                                                                                                    errors
                                                                                                                                                                                                                     Create Payable
                                                                                                        TCD Reporting        Review TCD Errors
                                                                                                                                                                                                                          Time
                                                                                                                         Correct Punched Time Errors
                                                                                                                         Correct Elapsed Time Errors


                                                                                                                                                                            Make Changes      Make changes
                                                                         System             Review
                                                                                                                                                                            to Setup Data     to setup data
                                                                        detected     Yes   exceptions
      Time and                                                         exceptions?            for?
        Labor
    Administrator
                                                                                                                             Review Rapid Time
                                                                                                           Rapid                                          Change setup
                                                                                                                                 exceptions
                                                                                                            Time                                          data or correct
                                                                                                                                Exceptions
                                                                                                          Reporting                                       time reported?
                                                                                                                             Exceptions History
                                                                           No

                                                                                                                                                                                            Review and resolve
                                                                                                                                                                           Correct
                                                                                                                                                                                                exceptions
                                                                                                                                                                        Time Reported
                                                                                                                                                                                               Rapid Time




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                  74
Create Payable Time



                               Report Time
     Employee




                              Review and
       Line
                             Resolve Time
      Manager               Entry Exceptions




                                                                                                Submit all rapid
                                                                                                     time
                                                                          Submit rapid time
                                                                                                Submit All Rapid
                                                                                                    Time




                                                                                                Forecast payable
                                                                       Forecast payable time          time
                                                                                                 Request Time
                                                                                                 Administration



                                                                                                                                                                                                      Perform validations
                                                                                                                                                                                                      and calculate gross
                                                                                                                                                                                                           amounts
                                                                                                                                                                                                                                                                                  Distribute Time
                                                                                                                                                                                                        Request Time
                                                                                                                                                                                                                                                                                    Information
                                                Determine                                                                                                                                               Administration
    Time and                                   action to take
      Labor
  Administrator                                                 Create
                                                                payable
                                                                 time           Select time                                                                                                                                                         Review reported
                                                                                                   Build rule map and                              Create                                                Update task          Finalize payable
                                                                               reporters and                             Build time reporter                        Track        Apply rules to TRC                                                 time that did not
                                                                                                    identify period of                          intermediate                                          profiles and apply    time for distribution
                                                                               combine into                                     profile                          attendance        and task data                                                     get to Payable
                                                                                                         interest                              payable time                                             rounding rules           and review
                                                                                  batches                                  Request Time                         Request Time       Request Time                                                           Time
                                                                                                      Request Time                             Request Time                                             Request Time           Request Time
                                                                               Request Time                               Administration                        Administration     Administration                                                     Unprocessed
                                                                                                      Administration                           Administration                                           Administration         Administration
                                                                               Administration                                                                                                                                                        Reported Time



                                                                                                                                                                                                       Calculate gross
                                                                                                                                                                                                          amounts
                                                                                                                                                                                                                                                                 Resolve Time
                                                                                                                                                                                                       Request Time
                                                                                                                                                                                                                                                                 Administration
                                                                                                                                                                                                       Administration
                                                                                                                                                                                                                                                                  Exceptions




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                75
Resolve Time Administration Exceptions



                                                                                                                         No



                                                                                                                                 Make Changes            Make changes                 Decide if
        Time and                                                                                                                 to Setup Data           to setup data                satisfied?
          Labor
                                                                                           Review Rapid Time
      Administrator
                                                                        Create Payable         exceptions                Decide if
                                                                             Time              Exceptions                need to?                                                                                     Yes
                                                                                           Exceptions History

                                                                                                                                                          Correct Rapid
                                                                                                                                        Correct
                                                                                                                                                          Time reported
                                                                                                                                     Time Reported
                                                                                                                                                           Rapid Time




                                                                                                                                                                                                                Approve Time
                                                                                                                                         No




                                                                                                                 Make Changes         Make changes
                                                                                                                 to Setup Data        to setup data

      Line Manager

                                                                                                    Change setup                                                   Retain or delete
                                                                       Review exceptions
                                                                                                  data or correct time                                           resolved exception                Decide if
                                                                          Exceptions                                                                                                                            Yes
                                                                                                       reported?                                                  history (cleanup)                satisfied?
                                                                                                                                                                     Exceptions




                                                                                                                                         Review and
                                                                                                                   Correct               correct time
                                                                                                                Time Reported          reported errors
                                                                                                                                          Timesheet




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                           76
Approve Time




                                                                                                                      Approve payable        Approve payable
                                                                                                                           Time                   time
                                                                                                                        Self Service          Payable Time




         Line
                                                                                                                               Approve      Approve reported
        Manager                                                                          Approval?   Yes
                                                                                                           Approval
                                                                                                                               reported           time
                                                                                                           method?
                                                                                                                                 time        Reported Time




                                                                                                                                    Approve payable
                                                                                                                    Approve
                                                                                                                                         time
                                                                                                                  payable time
                                                                                                                                     Payable Time



                                                                                                                                                               Edit reported
                                                                                                                                                                                    Yes    Report Time
                                                                                                                                                                   time?
                                                                        Resolve Time
                                                                        Administration
                                                                         Exceptions                                                                                            No
      Time and                                                                                                                   Approve time by batch
                                                                                                                Approve time
        Labor                                                                                                     by batch
                                                                                                                                    Request Batch
    Administrator                                                                                                                  Approval Process
                                                                                                                                                                                          Distribute Time
                                                                                                                                                                                            Information




                                                                                                                                            No




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                        77
Distribute Time Information



          Line                           Approve
         Manager                          Time




                                                                                      Review and adjust
                                                                                       time summaries


                                                                                                                      Receive request to provide estimated labor                                       Send Estimated Costs to Projects or Other
                                                                                                                                                                                    Send estimated
                                                                                                                                         cost                                                                          Systems
                                                                                      Estimated                                                                                     payable time to
                                                                                                                        Service: Estimate and Forecast Time                                                  Service: T&L Estimated Time
                                                                                    Labor Costs to                                                                                      Projects
                                                                                                                                      Request                                                           EIP s(AM): ESTIMATED_TIME_BATCH
                                                                                       Projects                                                                                    Publish Estimated
                                                                                                                                      EIP (AM):                                                                         ADD;
                                                                                                                                                                                     Payable Time
                                                                                                                      ESTIMATE_FORECAST_TIME_REQUEST                                                     FORECASTED_TIME_BATCH_ADD


                                     Create Payable                                                                  Send Actual Costs to Projects Systems once
                                          Time                                                                            payable time has been approved
                                                                                  Actuals to Projects
                                                                                                                             Service: T&L Actual Time
                                                                                     (Not Payroll)
                                                                                                                         EIPs (AM): ACTUAL_TIME_ADD;
                                                                                                                           ACTUAL_TIME_BATCH _ADD

        Time and                                                       Need to
                                                                                                                                                                                                                                                   Review and Adjust
          Labor                                                        provide?
                                                                                                                        Review Payable Time that              Send payable time to North American            Receive payroll costs from North      Time Summaries
      Administrator                                                                 Payable Time to                    did not get to Payroll or was                      Payroll System                   American Payroll System and trigger
                                                                                      NA Payroll                            rejected by Payroll               Integration (COBOL): Load Time and               labor distribution and dilution
                                                                                                                       Unprocessed Payable Time                               Labor                         Integration (AE): Extract TL Costs




                                                                                                               "Closed"
                                                                                                                                                                   Send "closed" payable time to
                                                                                                          Actuals to Projects
                                                                                                                                                                     Projects as actual costs
                                                                                                            without Labor
                                                                                                                                                                   Publish Actual Payable Time
                                                                                                             Distribution




                                                                                                                                                               Send payable time to Global Payroll           Receive payroll costs from Global
                                                                                                        Payable Time to                                                      System                           Payroll System and trigger labor
                                                                                                         Global Payroll                                       Integration (COBOL): Process Payroll/               distribution and dilution
                                                                                                                                                                             Absence                         Integration (AE): Time and Labor




        Payroll                                                        Manage
      Administrator                                                    Payroll




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                   78
Review and Adjust Time Summaries

                                                                                                                   Review time summaries for
                                                                                                                          employees
                                                                                            Employee
                                                                                                                    Payable Time Summary                     End
                                                                                         Self-Service Info
        Employee                                                                                                      Payable Time Detail
                                                                                                                     Compensatory Time




                                                                                                                Review time summaries for direct
                                                                                                                             reports
                                                                                                                    Payable Time Summary
                                                                                                                      Payable Time Detail
          Line                                                                                                        Compensatory Time
                                                                                            Manager
                                                                                                                         Accumulators
         Manager                                                                        Self-Service Info
                                                                                                                      Overtime Balances
                                                                                                                  Time and Labor Launch Pad
                                                                                                                    Monthly Time Calendar
                                                                                                                     Weekly Time Calendar
                                                                                                                      Daily Time Calendar




                                                                                                                  Review attendance
                                                                                                                      information
                                                                                          Attendance
                                                                                                                  Attendance History
                                                                                                                  Attendance Actions



                                                                                                              Review compensatory time
                                                                                          Comp Time                                                                       Adjust payable
                                                                                                                Compensatory Time                                                                                   Manage
                                                                                                                                                                               time         Payable Time Adjusted
                                                                                                                                                                                                                    Projects
                                                                                                                                                                         Adjust Paid Time
                                                                                                                                                                   Yes
                                                                                                                    Review status
                                                            Distribute Time                                                                        Need to
                                                                              Review?             Status         Time Reporter Status
                                                              Information                                                                          Adjust?
                                                                                                                    Payable Status

        Time and
          Labor                                                                                               Review time administration
      Administrator                                                                                                processing data
                                                                                                             Time Administration Statistics
                                                                                          Processing
                                                                                                                  Archived Batches
                                                                                          Information
                                                                                                                 Archived Rule Maps
                                                                                                             Unprocessed Reported Time
                                                                                                              Unprocessed Payable Time



                                                                                                                  Review timecards                                 No
                                                                                          Time Cards
                                                                                                                     TimeCard


                                                                                              Time
                                                                                                                Audit time information
                                                                                          Information
                                                                                                                Reported Time Audit
                                                                                             Audit




         Human                                                                                                                                                               Measure
        Resource                                                                                                                                                           deployment
        Specialist                                                                                                                                                        effectiveness




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                           79
Manage Payroll



                  Human                                                  Maintain
                                                                                       Manage Absences
                                                                       Employee Data
                 Resource
                 Specialist




                                                                                                                               Manage Time and
             Time and Labor                                                                                                        Labor
              Administrator




                                                                                                                                                                                               Create Payroll
                                                                                                                                                    Calculate, Confirm    Reconcile and
                                                                                                           Create Payroll                                                                      Regulatory and
                                                                                                                                                       and Provide       Distribute Payroll
                                                                                                            Information                                                                        Tax Reporting
                                                                                                                                                         Payroll            Information
                                                                                                                                                                                                Information



                Payroll
              Administrator
                                                                                                                                                                                                                   Provide Employee
                                                                                                                                                                          Reconcile and       Create US Federal
                                                                                                                                                    Calculate, Confirm                                                 Individual
                                                                                                         Create US Federal                                                 Distribute US      Payroll Regulatory
                                                                                                                                                     and Provide US                                                    Retirement
                                                                                                         Payroll Information                                              Federal Payroll     and Tax Reporting
                                                                                                                                                     Federal Payroll                                                 Information to
                                                                                                                                                                            Information          Information
                                                                                                                                                                                                                          OPM




                                                                                                                                                      Create GBL
                                                                                                           Create GBL          Calculate, Confirm
                                                                                                                                                    Payroll Regulatory
              Global Payroll                                                                             Employee Payroll      and Distribute GBL
                                                                                                                                                    Reporting and Tax
                                                                                                           Information              Payroll
              Administrator                                                                                                                            Information




                                                                                                          Send Employee
                 Payroll                                                                                  Data to External
                                                                                                          Payroll System
                Interface
              Administrator




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                  80
Create Employee Payroll Information Using PeopleSoft Payroll for North America

                    Human                                      Maintain
                                                                               Manage
                   Resource                                   Employee
                                                                              Absences
                   Specialist                                   Data




                                                                                                                     Request W-2 reissue
                                                                                                                     W-2 Reissue Request
                                                                                                                   W-2 Reissue Request USA
                                                                                                                                                          Add or update direct deposit information
                                                                                                                                                                      Direct Deposit
                                                                                                                                                                                                                           Send employee direct deposit information to
                                                                                                                                                                                                                                    PeopleSoft Expenses
                                                                                                            Add or update your voluntary deductions
                                                                                                                                                                                                                                          EIP (AM):
                   Employee                                                                                          Voluntary Deductions
                                                                                                                                                                                                                               DIRECT_DEPOSIT_FULLSYNC;
                                                                                                                                                                                                                                  DIRECT_DEPOSIT_SYNC
                                                                                                                                                            Review or change W-4 information
                                                                                                                                                                  W-4 Tax Information
                                                                                                                                                                W-4 Tax Information USA
                                                                                                           Update consent to receiving tax information
                                                                                                                        electronically
                                                                                                                       T4/T4A Consent
                                                                                                                      W-2/W-2c Consent



                                                                                                                                                                                                                                                      Update payroll options and/or
                                                                                                                 Create employee deductions
                                                                                                                                                                                                                                                          create additional pay
                                                                                                                 Override Benefits Deductions                                                  Send employee direct deposit information
                                                                                                                                                                                                                                                         Update Payroll Options
                                                                                                                      Create Garnishments                                                             to PeopleSoft Expenses
                                                                                                                                                                                                                                                          Create Additional Pay
                                                                                                                     Review Garnishments                                                                    EIP (AM):
                                                                                                                                                                                                                                                        Contract Payment Details
                                                                                                                  Create General Deductions                                                       DIRECT_DEPOSIT_FULLSYNC;
                                                                                                                                                                                                                                                      Update Payroll Options (CAN)
                                                                                                                 Override General Deductions                                                         DIRECT_DEPOSIT_SYNC
                                                                                                                                                                                                                                                      Create Additional Pay (CAN)
                                                                                                                  Review U.S. Savings Bonds
                                                                                                                                                                                                                                                     Contract Payment Details (CAN)
                                                                                                                     Request Direct Deposit
                                                                                                            Purchase Canada Savings Bonds (CAN)
                                                                                                              Override Benefits Deductions (CAN)         Record federal, state and local tax data and
                                                                                                                  Create Garnishments (CAN)                            create reports
                                                                                                                 Review Garnishments (CAN)                        Default Tax Data Report
                                                                                                               Create General Deductions (CAN)                Employee Tax Information Rpt
                                                                                                              Override General Deductions (CAN)                   W-4 Exemptions Report
                                                                                                                 Request Direct Deposit (CAN)                        W-4 Audit Report
                                                                                                                                                             Determine W-4 Exempt Renewal
                                                                                                                                                                Update Employee Tax Data
                                                                                                                                                                  Update Tax Distribution
                                                                                                           Initiate mass employee updates                          Reset W-4 Exempt List
                                                                                                                      of tax data                                Employee SSN Verification
                  Payroll                                                                                        Update Mass Tax Data                            Reset W-2 Consent Status
                Administrator                                                                                Update Two-Tier Suppl Data                      Year-End Consent Status Report
                                                                                                                                                              Default Tax Data Report (CAN)
                                                                                                                                                           Employee Tax Information Rpt (CAN)
                                                                                            No                                                                    Exemption Report (CAN)
                                                                                                                                                            Update Employee Tax Data (CAN)
                                                                                                                                                              Update Tax Distribution (CAN)
                                                                                                                                                           Review T4/T4A Consent Status (CAN)
                                                                                                                                                           Reset T4/T4A Consent Status (CAN)                                                                                          Calculate, Confirm
                                                                                            Tips                                                          Year-End Consent Status Report (CAN)                                                                                           and Provide
                                                                                         involved?                                                                                                                                                                                         Payroll


                                                                                                                                                                                                                                                  Review employee tip records
                                                                                                                                                                                                                                                            and status
                                                                                                                                                                 Calculate and approve tip                                                       Review Allocation by Employee
                                                                                                                          Identify tip gross receipt               allocations and create                  Update company allocated              Allocation by Employee Report
                                                                                                     Yes                         information                           balances report                            tip balances                        Employee Receipt Rpt
                                                                                                                      Update Employee Gross Receipts            Calculate/Approve Allocation               Update Allocation Balances                   Review Allctns by
                                                                                                                                                                Balance Verification Report                                                               Establishment
                                                                                                                                                                                                                                                 Allctn by Establishment Report
                                                                                                                                                                                                                                                    Review Allocation Status




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                       81
Calculate, Confirm, and Provide Payroll Using PeopleSoft Payroll for North America


                    Time and Labor              Manage Time
                                                 and Labor
                     Administrator



                                                                                                                                                                                                                                                                                                                               Yes
                                                                                                            Need to                                                                                                                                                                                                                                                                                                                                                         Review summary reports of retro pay
                                                                       Create Payroll
                                                                                                          create retro                                                                                                                                                                                                                                                                                                                                                                   requests
                                                                        Information
                                                                                                             pay?                                                                                                                                                                                                                                                                         Change the individual and mass                                                  Retro Pay Request and Trigger Summary
                                                                                                                                                                                                                                                                                                                                                                                                                                              Re-create
                                                                                                                                                                                                                                                   Review a summary of                                                                                                                     retroactive pay process flag.                                            No              Retro Pay Summary                                  End
                                                                                                                                                                              Yes                       Process mass retro pay request                                                                                                                                                                                                        retro pay?
                                                                                                                                                                                                                                               retroactive pay requests and                                                     Review retro pay                                          Change Retro Pay Process Flag                                                           Retro Pay Calculations
                                                                                                                                                                                                        Process Mass Retroactive Pay                                               Calculate retro pay and review                                                            Yes
                                                                                                               No                                                                                                                                         triggers                                                            processing messages                                                                                                                                 Retro Pay Interest Limit
                                                                                                                                                                                                                                                                                               results                                                          Need
                                                                                                                                                                                                                      or                                                                                                      Retro Pay Messages                                                                                                                                  Retro Pay Terminations
                                                                                                                                                                                                                                                   Retro Pay Request and             Calculate Retroactive Pay                                               corrections?
                                                                                                                                                                                                        Create Retro Request in Job or                                                                                        Retro Pay Messages
                                                                                                                                                                                                                                                     Trigger Summary               Update Retro Pay Calc Results
                                                                                                                                                                                                         Addl Pay via Event Handler                                                                                                  Report
                                                                                           Receive request for Payment on a Variable                                                                                                                                                                                                                                                      Load retro pay data to paysheets
                                                                                                                                                     Validate variable                                                                                                                                                                                                             No
                                                                                                     Compensation Award                                                                                                                                                                                                                                                                    Load Retro Pay to Paysheets
                                                                                                                                                compensation award data
                                                                                                          EIP (AM):
                                                                                                                                                 Validate Variable Comp
                                                                                             VAR_COMP_PAYMENT_REQUEST
                                                                                                                                                      Awards (NA)



                                                                                        Receive request for payment of employee referral
                                                                                                                                                                                                                                                                           Create paysheets by pay calendar                                                                         Create final check
                                                                                           program awards and acknowledge receipt                                                                        Create Contract Pay                                                       Create Paysheets                                                                                     paysheets
                                                                                                           EIPs (AM):                                                                                      Create Contract                                                      Review Pay Calendars                                                                               Create Final Check                                  Print Earnings          Print paysheet earnings distribution
                                                                                              PAYMENT_ERECRUIT_REQUEST;                                                               Contract                                                                                                                                                                         Yes
                                                                                                                                                                                                            Projected Pay                                                      Create Paysheets (CAN)                                                                                   Paysheet                                        Distribution               Print Paysheet Earnings Dist                          End
                                                                                          PAYMENT_ERECRUIT_ACKNOWLEDGE                                                                  Pay
                                                                                                                                                                                                           Create Contract                                                   Review Pay Calendars (CAN)                        Apply payment                                       Create Final Cheque                                    for Audit            Print Paysheet Earnings Dist (CAN)
                                                                                                                                                                                                         Projected Pay (CAN)                                                                                                 request information                                     Paysheet (CAN)
                                                                                                                                                                                                                                                                                                                               Load Paysheet
                                                                                                                                                                                                                                          Perform pre sheet audit
                                                                                        Receive request for payment of employee expense                                       Customer                                                                                                                                          Transactions
                                                                                                                                                             On-Cycle                                                                     Presheet Audit Report            Record hours and amounts from Rapid                                                 Need final                                                                                          Print paysheets
                                                                                         advances and reimbursements and acknowledge                                           type?                                                                                                                                              Paysheet
                                                                                                                                                                                                                                          Presheet Audit Report                           Entry                                                             paysheets for final                                                       Print Paysheets               Print Paysheets
                                                                                                            EIPs (AM):                                                                                                                                                                                                       Transactions Report                                          No                  Need to...
                                                                                                                                                                                                                                                  (CAN)                       Create Rapid Entry Paysheets                                                       check                                                                                          Print Paysheets (CAN)
                                                                                              PAYMENT_EXPENSES_REQUEST                                                                                                                                                                                                         Load Paysheet
                                                                                                                                                                                                         Budget Check Reports                                              Create Rapid Entry Paysheets (CAN)                                                  requests?
                                                                                           PAYMENT_EXPENSES_ACKNOWLEDGE                                                                                                                                                                                                      Transactions (CAN)
                                                                                                                                                                                                         Employee Budget Log                                                                                                      Paysheet
                                                                                                                                                                                        Commitment
                                                                                                                                                                                                         Position Budget Check                                                                                               Transactions Report                                                                                                                                                                                                      Review and update payline earnings
                                                                                                                                                                                        Accounting
                                                                                                                                                                                                                   Log                                                                                                             (CAN)                                                                                                                                                                                                                      By Payline Security
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Review and update or
                                                                                                                                                                                                           Budget Check log                                                                                                                                                                                                                                                                                                                                  By Payline Earnings
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   override paysheets                     Review and update                                                                                                                    Request process to
                                                                                         Receive sales commission information for payout                                                                                                                                    Record hours and amounts from                                                                                                                                                                                                                                                By Payline Earnings Security
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      By Paysheet                         payline by employee                                                                                        Need                           unsheet
                                                                                                             EIP                                                                                                                                                                       PSHUP                                                                                                                                          Adjust Paysheets                                                                                                  By Paysheet Earns Short Form                                                Yes
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  By Add Balance Page                          By Payline                                                                                        to unsheet?                      Pay Unsheet
                                                                                                                                                                                                                                                                            Update Paysheet Transactions                                                                                                                                                                                                                                                  By Payline Security (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   By Paysheet (CAN)                       By Payline (CAN)                                                                                                                    Pay Unsheet (CAN)
                                                                                                                                                                                                                                                                          Update Paysheet Transactions (CAN)                                                                                                                                                                                                                                              By Payline Earnings (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                               By Add Balance Page (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      By Payline Earnings Security (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     By Paysheet Earns Short Form (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     No
                                                                                        Advise Variable Compensation of awards that have
                                                                                                    been accepted or rejected
                                                                                                           EIP (AM):
                                                                                           VAR_COMP_PAYMENT_ACKNOWLEDGE



                                                                                                                                                                                                                                                                                                                                                                                                                                   Make adjustments to paysheets
                                                                                                                                                                                                                                                                                                                                                                                                                                            By Paysheet
                                                                                        Advise Expenses of info that has been accepted or                                                                                                                                                                                                                                                                                                                                                                                                                                                Review pay calculation or confirmation
                                                                                                                                                                                                                                                                                                                                                                                                                                       By Add Balance Page
                                                                                                            rejected                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     results
                                                                                                                                                                                                                                                                                                                                                                                                                                             By Payline
                                                                                                               EIP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Deduction Register
                                                                                                                                                                                                                                                                                                                                                                                                                                         By Payline Security
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Payroll Register
                                                                                                                                                                                                                                                                                                                                                                                                                                        By Payline Earnings
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Cost Center
                                                                                                                                                                                                                                                                                                                                                                                                                                    By Payline Earnings Security
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Other Earnings Register
                                                                                                                                                                                                                                                                                                                                                                                                                Yes                By Paysheet Earns Short Form
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Deductions in Arrears
                                                                                                                                                                                                                                                                                                                                                                                                                                         By Paysheet (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Deductions Not Taken
                                                                                                                                                                                                                                                                                                                                                                                                                                    By Add Balance Page (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  No                                                               Payroll Summary
                                                                                                                                                                                                                                   Perform pre-calculation              Review and update actuals                                                     Review payroll error messages                                                       By Payline (CAN)
                                                                                                                                                                                                     Add new paysheet                                                                                              Create on or off-cycle                                                                                                                                                                                                                                                   Employer Benefit Contributions
                                                                                                                                                                                                                                            audit                       Review Actuals Distribution                                                   Review Payroll Error Messages                   Correct                        By Payline Security (CAN)
                                                                                                                                                                                                      page and payline                                                                                               pay calculations                                                                                                                                                                                                                                                           Garnishment Prorations
                                                                                                                                                                          Off-Cycle                                              Precalculation Audit Report               Contract Pay Details                                                        Payroll Error Message Report                  calculation                     By Payline Earnings (CAN)
                                                                                                                                                                                                        By Paysheet                                                                                                  Calculate Payroll                                                                                                                                                                                                                                                     Employees Not Processed Report
                                                                                                                                                                                                                                 Precalculation Audit Report         Review Actuals Distribution (CAN)                                             Review Payroll Error Messages (CAN)                 errors?                   By Payline Earnings Security (CAN)
                                                                                                                                                                                                     By Paysheet (CAN)                                                                                            Calculate Payroll (CAN)                                                                                                                                                                                                                                                  Contract Pay Discrepancy Report
                                                                                                                                                                                                                                           (CAN)                       Contract Pay Details (CAN)                                                   Payroll Error Message Report (CAN)                                          By Paysheet Earns Short Form (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Perform pre confirmation audit                                           Confirm pay                  Canada Payroll Savings File (CAN)                     Must                       Reverse pay confirmation
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Ready to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Preconfirm Audit Report                                 Yes        Confirm Payroll                      Deduction Register (CAN)                     reverse pay           Yes         Unconfirm Payroll
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               confirm?
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Preconfirm Audit Report (CAN)                                       Confirm Payroll (CAN)                    Payroll Register (CAN)                       confirm?                     Unconfirm Payroll (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Cost Centre (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Other Earnings Register (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                         Calculate final earnings                                                                                                                             Deductions in Arrears (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                          deductions and taxes                                                                                                                               Deductions Not Taken (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                No
                                                                                                                                                                                                                                                                                                                                                                                                                                            Calculate Payroll                                                                                                                                   Payroll Summary (CAN)                             No
                                                                                                                                                                                                                                                                                                                                                                                                                                         Calculate Payroll (CAN)                                                                                                                         Employer Benefit Contributions (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Stats Can Non-Educ Institute (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Overtime Bank (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Business Payrolls Survey File (CAN)
                                                                                                                                                                                                                                                                                   Save and Print
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Stats Can Educ Institute (CAN)
                                                                                                                                            Payroll type?                                                                                                                          with Off-Cycle
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Canada Savings Bond Purchases (CAN)
                                                                                                                                                                                                                                                                                      Pay Run
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Employees Not Processed Report (CAN)
                                                                   Integration: Time and Labor Interface                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Contract Pay Discrepancy Report (CAN)
                                                                     retrieves and consolidates payable
                                                                      time information for selected time
                                                                    reporters and sends cross reference                                                                                                                                                                                                                                                                  Confirm and print
                                                                             numbers back to TL                                                                                                                                                                                                                                                       Confirm        Review/Print Online Check
                        Payroll                                                                                                                                                                                                                                                                                                                       and Print         Review/Print Online
                                                                                                                                                                                                                                                            Create or update
                                                                                                                                                                                                                                                                                                                                                                          Cheque (CAN)
                      Administrator                                                                                                                                                                                                                      paysheets and calculate               Review online pay
                                                                                                                                                                                                                                                          Create Online Check                  calculation results
                                                                                                                                                                                                                                          Manual            Online Paysheet                 View/Print Online Check                  Need to...
                                                                   Load time reporter payable time from                                                                                                                                                   Create Online Cheque             View/Print Online Cheque                                                   Delete check information
                                                                                                                          Review TL load history                                                                                                                                                                                                                                                                                                                                                                                                                                               Verify that wages were
                                                                             Time and Labor                                                                                                                                                                      (CAN)                               (CAN)                                                           Review/Print Online Check
                                                                                                                      Review Time and Labor Load                                                                                                                                                                                                       Delete                                                                                                                                                                                                                                         overstated
                                                                           Load Time and Labor                                                                                                                                                           Online Paysheet (CAN)                                                                                          Review/Print Online
                                                                                                                    Review Time and Labor Load (CAN)                                                                                                                                                                                                                                                                                                                                                                                                                                       Review Payroll Error Messages                                          Record adjustment            Calculate pay for
                                                                      Load Time and Labor (CAN)                                                                                                                                                                                                                                                                            Cheque (CAN)                                           Review and reverse original check
                                                                                                                                                                           Single Paycheck for                        Create                                                                                                                                                                                                                                                                                                                                        Employee Pay            Payroll Error Message Report               Create                        on paysheet                  adjustment
                                                                                                                                                                                                                                                                                                                                                                                                                                    and create off-cycle paysheet                                                                                                                                                                                       Yes
                                                                                                                                                                           Individual Employee                       paysheet                                                                                                                                                                                                                                                                                                                                        Overstated            Review Payroll Error Messages              payback?                       By Paysheet               Calculate Payroll
                                                                                                                                                                           Immediate Payment                         method?                                                                                                                                                                                                         Review Paycheck Summary                                                                                                                                            (CAN)                                                     By Paysheet (CAN)         Calculate Payroll (CAN)
                                                                                                                                                                                                                                                        Create online check data                                                                                                                                                       Review FLSA Pay Data                                               Calculate pay for                                                                 Payroll Error Message Report
                                                                                                                                                                                                                                                                                                                                                                       Reverse and confirm                                                                                     Record adjustment                                               Was
                                                                                                                                                                                                                                                        using automated process                                                                                                                                                      Reverse/Adjust Paychecks                                               adjustment                                                                                  (CAN)
                                                                                                                                                                                                                                                                                                                                                                             reversal                                                                                             on paysheet                                               employee
                                                                                                                                                                                                                                                          Create Online Check                                                                         Reverse                                                                       Review Paycheque Summary                                              Calculate Payroll
                                                                                                                                                                                                                                                                                                                                                                     Review/Print Online Check                                                                                    By Paysheet                                           pay under or over
                                                                                                                                                                                                                                         Automatic          Online Paysheet                                                                         and Confirm                                                                                (CAN)                                                      Calculate Payroll
                                                                                                                                                                                                                                                                                                                                                                        Review/Print Online                                                                                    By Paysheet (CAN)                                             stated?                                                                                      No
                                                                                                                                                                                                                                                         Create Online Cheque                                                                                                                                                      Review ROE Insurable Earnings                                               (CAN)
                                                                                                                                                                                                                                                                                                                                                                          Cheque (CAN)                                                                                                                                                                                                        Create pay calculations for                                                                       Confirm pay for
                                                                                                                                                                                                                                                                 (CAN)                                                                                                                                                                         (CAN)
                                                                                                                                                                                                                                                         Online Paysheet (CAN)                                                                                                                                                                                                                                                                                      Employee Pay                    underpayment                                                                                   adjustment
                                                                                                                                                                                                                                                                                                                                                                                                                                    Reverse/Adjust Paycheques
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Understated                  Calculate Payroll                                                                             Confirm Payroll
                                                                                                                                                                                                                                                                                                                                                                                                                                               (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Calculate Payroll (CAN)                                                                       Confirm Payroll (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                         End

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Reconcile and
                                                                                                                                                                                                                                                                                                                                                                                                                                                 Adjust
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Distribute Payroll
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Information


                                                                                                                                                                                                               Add new paysheet and               Calculate employer              Confirm pay for                    Review pay                                                                                                                                                                                         Review reversal                 Confirm check
                                                                                                                                                                                                                     payline                     taxes and deductions              manual check                     calculation or                                                                                                                                                     Reverse paycheck                                                                               Review pay
                                                                                                                                                                             Manual Check                                                                                                                                                                                                                                                                                                                                   results                        reversal
                                                                                                                                                                                                                   By Paysheet                     Calculate Payroll              Confirm Payroll                   confirmation                                                                                                                Adjust or                          Reverse/Adjust Paychecks                                                                          calculation or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Reverse                                           Review Paycheck                  Confirm Payroll                                               End
                                                                                                                                                                                                                By Paysheet (CAN)               Calculate Payroll (CAN)         Confirm Payroll (CAN)                  results                                                                                                                  reverse?                           Reverse/Adjust Paycheques                                                                         confirmation
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Review Paycheque                 Confirm Payroll
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            (CAN)                                                                                       results
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            (CAN)                           (CAN)


                                                                                                                                                                                                                                                                                                                                                                                                                                 Manage
                                                                                                                                                                                                                                                                                                                                                                                                                                  check
                                                                                                                                                                                                                                                                                                                                                                                                                                 results
                                                                                                                                                                                                                                                                                                                        Create final check
                                                                                                                                                                                                                                                                                                                         paysheets online                                                                                                                                                                                                    Paycheck
                                                                                                                                                                                                                                                                                                         Online        Request Final Check
                                                                                                                                                                                                                                                                                                                       Request Final Cheque                                                                                                                                                                                                                                                                                                                                                                                                   Adjust employee balances
                                                                                                                                                                                                                                                    Request final check                                                      (CAN)                                                                                                                                                                                                                                                                                                                                                                                                                   1042 Taxes
                                                                                                                                                                                                                                                                                     Create
                                                                                                                                                                                                                            Request                Request Final Check                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PrePays
                                                                                                                                                                                                                                                                                    paysheet
                                                                                                                                                                                                                             Check                 Request Final Cheque                                                                                                                         Need to...                                                                                                                                                                                                                                                                                                                                             Arrears
                                                                                                                                                                                                                                                                                    method?
                                                                                                                                                                                                                                                          (CAN)                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Balance Adjustment Report
                                                                                                                                                                                                                                                                                                                         Create and review                                                                                                                                                                                                                                                                                                                                                                                                       Check Year-to-Date
                                                                                                                                                                                                                                                                                                                        paysheet and payline                                                                                                                                                                       Review check register and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Deductions
                                                                                                                                                                                                                                                                                                        Pay Run         Request Final Check                                                                                                                                                                          reconciliation reports                                                                                                                               Review employee balances
                                                                                                                                                                                                                                                                                                                                                                                                                                                              Print checks                                                                                                                                                                                                                                                                             Earnings
                                                                                                                                                                                                                                                                                                                        Request Final Cheque                                                                                                                                                                            Check Register                                                                              Advise HR                                                      PrePays
                                                                                                                                                                                                                                                                                                                                                                                                                                                             Print Checks                                                                                     Review and                                                                                                                                                                            Garnishments
                                                                                                                                                                                                                                                                                                                               (CAN)                                                                                                       Printed                                                                Employee Check Information                                                                       Helpdesk of            Need to                                1042 Taxes
                                                                                                                                                                                                                Create                                                                                                                                                                                                                                  Create PDF Paychecks            Need reprinted    No                                                  verify printed             Errors?          Yes                                                                                                                                   Special Accumulators
                                                                                                                                                                                                                                                                                                                                                                                                                                           Check                                                                            Report                                                                                discrepancy, if         adjust...                                 Arrears
                                                                                                                                                                                Final                           check                                                                                                                                                                                                                                    Print Cheques (CAN)              checks?                                                                checks                                                                                                                                                                                 Taxes
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Cheque Register (CAN)                                                                             needed                                                 Check Year-to-Date
                                                                                                                                                                                                               method?                                                                                                                                                                                                                                  Create PDF Paycheques                                                                                                                                                                                                                                                                      PrePays (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Employee Cheque Information                                                                                                                                      Deductions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Employee            Balance Adjustment Report (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Report (CAN)                                                                                                                                              Earnings
                                                                                                                                                                                                                                                                                                                                                                                                Manage                                                                                                                                                                                     No                                                          Balances                                                       Balances                     Arrears (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Yes                                                                                                                                                                                Garnishments
                                                                                                                                                                                                                                                Create paysheet for           Calculate earnings                                         Create final check reports and review                  payment                                                                                                                                                                                                                                                                                                                                     Cheque Year-To-Date (CAN)
                                                                                                                                                                                                                                                                                                            Confirm pay for                                                                                                                                                                                                                                                                                                                                                 Special Accumulators
                                                                                                                                                                                                                                                    final check               deductions, taxes,                                                         results                               distribution                                                                                                                                                                                                                                                                                                                                       Deductions (CAN)
                                                                                                                                                                                                                                                                                                              final check                                                                                                                                                                                                                                                                                                                                                           Taxes
                                                                                                                                                                                                                             Create             Create Final Check               and net pay                                                 Final Check Reconcile Report                                                                                                                                                                                                                                                                                                                                                                          Earnings (CAN)
                                                                                                                                                                                                                                                                                                            Confirm Payroll                                                                                                                                                          Create replacement                    Print checks                                                                                                                                Employee Earnings Snapshot Rpt
                                                                                                                                                                                                                            Paysheet                Paysheets                  Calculate Payroll                                             Final Check Requests Report                                                                                                                                                                                                                                                                                                                                               Need to              Special Accumulators (CAN)
                                                                                                                                                                                                                                                                                                            Confirm Payroll                                                                                                                                                               checks                          Print Checks                                                 Distribute                                                                       Employee Earnings Record Rpt
                                                                                                                                                                                                                                                Create Final Cheque            Calculate Payroll                                         Final Cheque Reconcile Report (CAN)                                                                                                                                                                                                                                                                                                                                           adjust...                     Taxes (CAN)
                                                                                                                                                                                                                                                                                                                 (CAN)                                                                                                                                                                Reprint Checks                 Create PDF Paychecks                                              paychecks                                                                               PrePays (CAN)
                                                                                                                                                                                                                                                 Paysheets (CAN)                    (CAN)                                                Final Cheque Requests Report (CAN)                                                                                                                                                                                                                                                                                                                                                                     Garnishments (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Reprint Cheques                 Print Cheques (CAN)                                                                                                                                       Arrears (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ROE (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           (CAN)                     Create PDF Paycheques                                                                                                                               Cheque Year-to-Date (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Deductions (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                       Method of                                                                                                                                                                                                                                               Earnings (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                        payment                                    Create check for employee                                                                                                                                                                             Special Accumulators (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                      distribution?                             Create Slf Srvc Manual Cheques                                                                                                                                                                                                                                                     Delete obsolete balances
                                                                                                                                                                                                                                                                                                                                                                                                                                              Manual                                                                                                                                            Print pre-note                                                                   Taxes (CAN)                                       Obsolete
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Create PDF Paycheques                                                                 Provide pre-notification                                                                                                                                                                     Delete Balances
                                                                                                                                                                                                                                                                                                                                                                                                                                              Check                                                                                                                                                memos                                                                    Garnishments (CAN)                                     Balances
                                                                                                                                                                                                                                                                                                                                                                                                                                                             Create Slf Srvc Manual Cheques (CAN)                                                         Prenotification Report                                                                                                                                                                    Delete Balances (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Prenote Memo                                                                     ROE (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                Create PDF Paycheques (CAN)                                                                                                                                                                         Employee Earnings Snapshot Rpt (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Employee Earnings Record Rpt (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Format information and                                      Create direct deposit                                                                                                                                                                   Adjust imputed income
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              advice registers                                                                                                                                                     Imputed
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 print direct deposit file                                                                                                                                                                                                                          Calculate Adjustments
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Advice Register                                                                                                                                                       Income
                                                                                                                                                                                                                                                                                                                                                                                                                                                              Create direct deposit file           Print Advice Forms                                                                                                                                                                                                                                Adjustment Report
                                                                                                                                                                                                                                                                                                                                                                                                                                               Direct         Create Direct Deposit File          Create PDF Advice                                        Advice Register (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Review
                                                                                                                                                                                                                                                                                                                                                                                                                                              Deposit         Create Direct Deposit File                  Forms
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       (CAN)                   Print Advice Forms (CAN)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Create PDF Advice                                        Review direct deposits                                                                                                                                                                    Review and adjust
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Forms                                                 by company                                                                                                                                                                          garnishment balances
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Direct Deposit Register                                                                                                                                             Garnishments           and create report
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Direct Deposit Register                  Distribute
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Garnishments
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (CAN)                              advice
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Garnishment Prorations
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Create EFT file for                                                 information
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              direct deposit of child
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                support payments
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Child Support - EFT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Review payroll supporting                                                                           End
                        Employee                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        documentation
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        View Paycheck                                         Contact HR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Direct Deposit                                         Helpdesk
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Voluntary Deductions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Paycheck Modeling




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          82
Reconcile and Distribute Payroll Information Using PeopleSoft Payroll for North America


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Review actuals distribution                                      Create accounting lines -                                                Send payroll accounting transactions to the
                                                                                                                                                                                                                                                                                                                                                                                                       Update retro distribution information                                             Review Actuals Distribution                                                                                Create accounting line
                                                                                                                                                                                                                                                                                                                                                                                             Update                                                                                                                                      Actuals                   actuals                                                                 PeopleSoft General Ledger
                                                                                                                                                                                                                                                                                                                                                                                                          Update Actuals Distribution                                 Actuals         Review Actuals Distribution (CAN)                                                                                     report
                                                                                                                                                                                                                                                                                                                                                                                              info                                                                                                                                     GL interface        Commitment Accounting                                                                    EIPs (AM):
                                                                                                                                                                                                                                                                                                                                                                                                        Update Actuals Distribution (CAN)                                              Review Actuals Dist Summary                                                                                HR Accounting Line Report
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Actuals (NA)                                                         PAYROLL_ACCTG_TRANSACTION;
                                                                                                                                                                                                                                                                                          Create retro distribution information              Review retro distribution                                                                                                               Review Actuals Dist Summary (CAN)
                                                                                                                                                                                                                         Create actuals distribution                                                                                                                                    Update
                                                                                                                                                                                                  Actuals                                                                                     Process Direct Retro Dist                            information
                                                                                                                                                                                                                              Distribute Actuals                                                                                                                                          info
                                                                                                                                                                                                   Dist                                                                         Yes        Process Direct Retro Dist (CAN)                   Review Retro Distribution
                                                                                                                                                                                                                          Distribute Actuals (CAN)                                                                                                                                     or create
                                                                                                                                                                                                                                                                                           Review Retro Distribution Msgs                    Review Retro Distribution                                                                                                                                                                                                                            Create accounting lines –
                                                                                                                                    Prepare distribution information                                                                                                                                                                                                                    report?                                                                                      Review suspense account information                                     Batch
                                                                                       Provide Payroll Information                                                                                                                                                                       Review Retro Distribution Msgs (CAN)                         (CAN)                                                                                                             Suspense                                                                                                                 encumbrances GL interface
                                                                                                                                     Predistribution Audit Report                                                                                                                                                                                                                                                                                         Review...                   Review Suspense ComboCode Dist       Create...      Encumbrances    encumbrance
                                                                                         to the General Ledger                                                                     Create?                                                                                                                                                                                                                                                                               account                                                                                                                    Encumbrances (NA)
                                                                                                                                     Predistribution Audit Report                                                                                                       Adjust                                                                                                                                                                                                     Review Suspense ComboCode Dist (CAN)                                    Calculation
                                                                                       (Commitment Accounting)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Encumbrance Message (NA)
                                                                                                                                                (CAN)                                                                                                                 previously                                                                                                                            Create retro distribution report
                                                                                                                                                                                                                                                                                                                                                                                              Create
                                                                                                                                                                                                                                                                      distributed                                                                                                                             Retro Distribution Audit Rpt
                                                                                                                                                                                                                                                                                                                                                                                              report
                                                                                                                                                                                                                       Create actuals distribution with                  pay?                                                                                                                              Retro Distribution Audit Rpt (CAN)
                                                                                                                                                                                                  Actuals                      time and labor                                                                                                                                                                                                                                             Review budget actuals                                          Report budget definitions and            Create report for earnings,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Budget                                                           Gross / Fringe
                                                                                                                                                                                                Dist with TL             Actuals Distrib TL Extract                                                                                                                                                                                                                                    Review Budget Actuals (NA)                                                 amounts                       deductions, and tax distributions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      actuals                                                             report
                                                                                                                                                                                                                      Actuals Distrib TL Extract (CAN)                                                                                                           No                                                                                                                    Review Budget Actuals (CAN)                                         Load Gross/Fringe Data                      Gross and Fringe




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Create reconciliation report
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Reconciliation
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Reconciliation Report
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          report
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Reconciliation Report (CAN)


                                                                                                                                                                                           Create payroll accounting
                                                                                                                                                                                       transactions for non-commitment
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Print fiscal year budget definitions and amounts
                                                                                                                                                                                                  accounting
                                                                                                                                               Non-Commit to NA                                                                                                                                                                                                                                                                                                                                                                        Budget amount               Fiscal Year Budget Report (NA)
                                                                                                                                                                                       Non-Commit Accounting Info (NA)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Fiscal Year Budget Report (CAN)
                                                                                                                                                                                      Non-Commit Reset Processing (NA)                                                                               Create and review GL distribution                                                                      Send payroll accounting transactions to the
                                                                                                                                                                                            Payroll Error Messages                                                                                               summary                               Create GL interface reports                                 PeopleSoft General Ledger
                                                                                                                                                                                                                                                       Create pay types
                                                                                                                                                  Pay Types                                                                                                                                             GL Distribution Summary                         HR Accounting Line (NA)                                            EIPs (AM) :
                                                                                                                                                                                                                                                          Pay Type
                                                                                                                                                                                                                                                                                                        Review Payroll Distribution                     Payroll Accounting Line                               PAYROLL_ACCTG_TRANSACTION;
                                                                                                                                                                                                                                                        Pay Type CAN
                                                                                                                                                                                                                                                                                                      GL Distribution Summary CAN                      Populate Chartkey Values                              PAYROLL_DEDUCTION_REQUESTM;
                                                                                                                                                                                                                                                                                                     Review Payroll Distribution (CAN)                                                                            PAYROLL_DISBURSEMENT
                                                                                       Prepare Payroll                                                                                    Create cost center information
                                                                                                                         Which type
                                                                                   Information for the GL -                                            Cost Center                                Cost Center
                                                                                                                           info?
                                                                                      Non-Commit Acct                                                                                           Cost Center CAN
                                                                                                                                                                                                                                            Create payroll transactions for non-
                                                                                                                                                   Non-Commit for SAP                                                                        commitment accounting for SAP                                 End
                                                                                                                                                                                                                                             Non-Commit Rev/Repost for SAP

                                                                                                                                                                                       Create payroll transactions for non-
                                                                                                                                                   Non-Commit for GL                     commitment accounting for GL
                                                                                                                                                                                          Non-Commit Posting for GL




                                                            Calculate, Confirm
                                                               and Provide
                                                                 Payroll
                                                                                                                                                                                                                                                                                                                                         Review vendor listing
                                                                                                                                                                                                                                                                                                                 Vendor
                                                                                                                                                                                                                                                                                                                                          AP Vendor Listing
                                                                                                                                                                                                             Extract Canadian tax
                                                                                                                                                                                Canadian
                                                                                                                                                                                                                  information
                                                                                                                                                                                 Taxes
                                                                                                                                                                                                        Extract Canadian Taxes (CAN)
                                                                                                                                                                                                                                                                                                                                  Create AP Extract Audit report
                                                                                                                                                                                                                                                                                                                 Audit
                                                                                                                                                                                                                                                Extract non-tax deductions                                                           AP Extract Audit Report
                                                                                                                                                                                      Non-Tax
                                                                                                                                                                                     Deductions                                                 Non-Tax Deductions Extract


                                                                                                               Prepare payroll distribution data for
                                                                                    Provide Payroll                                                                                                          Extract U.S. Federal tax                                                                                             Review and update proposed                                                          Review payroll distribution to AP
                                                                       Which                                                AP extract                        Type of data            Federal                                                                                                                                                                                        Send vouchers to AP
                                                                                   Info to Accounts                                                                                                                 information                                                                  Review?           By Vendor         payments by voucher                                                                Review Payroll Distribution
                                                                       action?                                    Distribute Payroll Data for AP               to extract?             Tax                                                                                                                                                                                           Send Vouchers to AP
                                                                                       Payable                                                                                                              Extract U.S. Federal Taxes                                                                                            Review AP Extract-Headers                                                           Review Payroll Distribution (CAN)
                                                                                                               Distribute Payroll Data for AP (CAN)

                                                                                                                                                                                                                                                   Extract U.S. Local tax
                                                                                                                                                                                       Local                                                             information
                                  Payroll                                                                                                                                               Tax                                                       Extract U.S. Local Taxes
                                                                                                                                                                                                                                                                                                                                  Review and update proposed
                                Administrator                                                                                                                                                                                                                                                                By Voucher               payments by vendor
                                                                                                                                                                                                             Extract U.S. State tax
                                                                                                                                                                                  State                                                                                                                                             Review AP Extract-Lines
                                                                                                                                                                                                                   information
                                                                                                                                                                                   Tax
                                                                                                                                                                                                            Extract U.S. State Taxes
                                                                                                                                                                                                                                                                                                                                                                          Send tax, garnishment, and voluntary
                                                                                                                                                                                                                                                                                                                                                                          deduction withholding information to
                                                                                                                                                                                                                                                                                                                                                                           PeopleSoft Payables for payment
                                                                                                                                                                                                                                                                                                                                                                                       EIP (AM):
                                                                                                                                                                                                                                                                                                                                                                                  VOUCHER_BUILD




                                                                                                                                                                                                                                Export the Time and Labor costs from Payroll for North
                                                                                                                                               Time and                       Extract time and labor costs                             America into Time and Labor Integration
                                                                                                                                              Labor Costs                    Extract Time and Labor Costs                                             EIP (AE):
                                                                                                                                                                                                                                            Extract Time and Labor Costs



                                                                                        Provide Payroll                       Decide                                         Create Variable Comp Award                        Send a verification of payment to Variable Compensation
                                                                                                                                                 Variable Comp
                                                                                          Completion                          what is                                             payment notification                                                  EIP (AM):
                                                                                                                                               Payment Notification
                                                                                          Information                         needed                                         Notify Var Comp of Payments                             VAR_COMP_PAYMENT_ACKNOWLEDGE



                                                                                                                                                                           Create recruiting referral program                          Send a verification of payment to eRecruit
                                                                                                                                          Recruiting Payment
                                                                                                                                                                              award payment notification                                                EIP (AM):
                                                                                                                                             Notification
                                                                                                                                                                            Notify Recruiting of Payments                                 PAYMENT_ERECRUIT_ISSUED



                                                                                                                                                                                                                             Create payment notification to               Send a verification of payment to PeopleSoft Expenses
                                                                                                                                          Payment Verification                 Run GL Interface to identify
                                                                                                                                                                                                                                       expenses                                                   EIP (AM):
                                                                                                                                             for Expenses                          expense accounts
                                                                                                                                                                                                                           Notify Expenses of Payments (NA)                          PAYMENT_EXPENSES_ISSUE




                                                                                                                                                                                                                                                                                                                                                                                                                                    End



                                                                                                                                    Identify participating             Create business activities
                                                                                            Provide Payroll                                                                                                     Define Business Payroll           Create BPS summary report and
                                                                                                                                  companies and contacts                 defined by Statistics
                                                                                             Information to                                                                                                          Survey (BPS)                     EDR file for transmission
                                                                                                                                   Business Information                         Canada
                                                                                           Statistics Canada                                                                                                   Reporting Unit Table (CAN)        Business Payrolls Survey File (CAN)
                                                                                                                                            (CAN)                        Activity Table (CAN)




                                                                                         Create and Distribute                       Create Canada Payroll Savings                   Specify parameters for EDR file                 Create CPS file for transmission to
                                                                                           Payroll Savings                               (CPS) organization ID                                transmission                                   Bank of Canada
                                                                                         Deductions - Canada                       Canada Payroll Savings Org ID CAN                Canada Payroll Savings Table CAN                 Canada Payroll Savings File (CAN)




                                                                                                                                      Reconcile payroll checks with bank                    Create match exception                    Create check reconciliation                   Review results of check reprint                                                                                                                                                                                                                                                                                                                                                                Create Payroll
                                                                                            Reconcile Check
                                                                                                                                                   records                                            report                                    report                                        process                                                                                                                                                                                                                                                                                                                                                                                Regulatory
                                                                                            Information with
                                                                                                                                           Request Reconciliation                            Reconciliation Report                      Check Reconciliation                            Review Dead Checks                                                                                                                                                                                                                                                                                                                                                                        Reporting and Tax
                                                                                             Bank Records
                                                                                                                                        Request Reconciliation (CAN)                       Reconciliation Report (CAN)               Cheque Reconciliation (CAN)                    Review Dead Cheques (CAN)                                                                                                                                                                                                                                                                                                                                                                        Information




                               Time and Labor                                                                                                                                                                                                                                                                                                          Manage Time and
                                Administrator                                                                                                                                                                                                                                                                                                              Labor




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  83
Create Payroll Regulatory Reporting and Tax Information Using PeopleSoft Payroll for North America


                                                                                                                                 Create pay period tax reporting
                                                                                                                                      information for USA
                                                                                                                                     Federal Tax Summary
                                                                                                                                      State Tax Summary
                                                                                             Create                                 Federal Liability by State
                                                                                           pay period                              Reconciliation-Ohio Local
                                                                                            reports                                    Local Tax Deposit
                                                                                              USA                                                                                         Create tax reports - USF
                                                                                                                                     Tax Deposit Summary
                                                                                                                                                                                          Federal Liability by State
                                                                                                                                     Tax Summary-PA EIT
                                                                                                                                                                                             Local Tax Deposit
                                                                                                                                     Tax Summary-PA LST
                                                                                                                                                                                           Tax Deposit Summary
                                                                                                                                    Form 1042 Audit Report
                                                                                               Create                                                                                      Tax Summary-PA EIT
                                                                                          periodic payment                                                                                 Tax Summary-PA LST
                                                                                               reports                                                                                       Tax Balance Audit
                                                                                                CAN                                                                                       Reconciliation-Ohio Local


                                                                                                                 Create
                                                                                                                                                                                   Create pay period tax reports CAN
                                                                                                               Pay Period
                                                                                                                                                                                      Tax Submission Summary
                                                                                                                Reports
                                                                                                                                                                                      Health Insurance Premium
                                                                                                                  CAN                                                                                                                                                                                               W-2 reporting
                                                                                             Create                                Create periodic payment                                                                                                                                                     Print Year End Forms
                                                                                               tax                                       reports CAN                                                                                                                                                           Print Forms Prior 2001
                                                                                                                                                                                                                                                                  Create Year End Data
                                                                                             reports                              Workers Comp Assessments                                                                                                                                                    Create Federal W-2 File
                                                                                                                                                                                                                                                             Update Year End Reporting Info                                                                                                        W-2c Reporting
                                                                                              USF                                                                              Create quarterly tax reporting                                                                                                  Create State W-2 File           Create W-2 Adjustments
                                                                                                                                                                                                                                                                   Load Year End Data                                                                                                        Print W-2c US/Territories
                                                                                                                                                                                     information USA                                                                                                           Create Local W-2 File          Create W-2c US/Territories
                                                                                                                                                                                                                                                              Review/Update Year End Data                                                                                                      Print W-2c Puerto Rico
                                                                                                                                                                                Tax Reporting Parameters                                                                                                   Create Puerto Rico W-2PR File      Create W-2cPR Puerto Rico
                                                                                                                                                                                                                                                             Review Year End Data Combined                                                                                                  Create Federal W-2c File US
                                                                                                                                                                                  Electronic Parameters                                                                                                    W-3/W-3SS Transmittal Report         Create W-2c Prior 2001
                                                                                                                                                                                                                                             Create           W-2/W-2 Summary Prior 2001                                                                                                      Create W-2c PDF Forms
                                                                                                                                                                                    Tax Balance Audit                                                                                                      W-3PR Transmittal Totals Rpt
                                                                                                                                                                                                                                            year end              View W-2/W-2c Forms
                                                                                                                                                                              Create Qtrly Wage File AK-ID                                                                                                  State W-2 Tax Totals Report
                                                                                                            Create                                                             Create Qtrly Wage File IL-NC                                   data                                                          Local W-2 Tax Totals Report
                                                                                                    quarterly tax reporting                                                   Create Qtrly Wage File ND-RI                                                                                                    Create W-2 PDF Forms             Audit and Error Reports
                                                                                                         information                                                          Create Qtrly Wage File SD-WY                                                                                                                                           Error Listing
                                                                                                             USA                                                                     Employee Count                                                                                                                                             Year End Record Error
                                                                                                                                                                                    Multiple Worksite                                                                                                                                            Year End Data Audit
                                                                                                                                                                                   State Tax Summary                                                                                                                                            Federal W-2 File Audit
                                                                                                                                                                                State Unemployment Tax                                                                                                                                           State W-2 File Audit
                                                                                                                                                                                  Federal Tax Summary                                                                                                                                            Local W-2 File Audit
                                                                                                                                                                                   Local Tax Summary                                                                                                                                         Puerto Rico W-2PR File Audit
                                                                                                                                                                                                                                                                                                                                               W-2c Audit US/Territories
                                                                                                                                                                                                                                                                                                                                              W-2cPR Audit Puerto Rico
                                                                                                                                                                               Adjust                                                                                          Create 8027 TIP Electronic Report                              W-2c Data Audit Prior 2001
                                                                                                                                                                                                 Adjustment closed pay period                          Create 8027 TIP                 Create 8027 file
                                                                                                                                                                                pay                                                                                                                                                           Federal W-2c File Audit US
                                                                                                                                                                                                  Open/Close Pay Calendar                                                          Form 8027 Audit Report
                                                                                                                                                                               period                                                                                                                                                            Tax Form Definitions
                                                                                                                                                                                                                                                                                                                                              Tax Form Print Parameters
                                                                                                                          Manage employee consent
                                                                                             Manage
                                                                                                                                 information
                                                                                      year end tax reporting                                                        Which                                                                                                     Create 1099R reporting information
                                                                                                                       Review W-2/W-2c Consent Status                                           Update tax reporting forms and
                                                                                           information                                                              action?                                                                                    Create             Form 1099-R Audit Report
                                                                                                                          Reset W-2 Consent Status                                                        definitions                        Create?
                                                                                               USA                                                                                                                                                             1099R                   Create 1099-R
                                                                                                                       Year-End Consent Status Report                                                Tax Form Definitions                                                             Form 1096 Report
                                                                                                                                                                                                  Tax Form Print Parameters
                                                 Reconcile and
                 Payroll                                                                                                                                                       Update
                                                                                                                                                                                                  Tax Reporting Parameters
                                                Distribute Payroll       Need to...                                                                                                                  W-2 Company Data
               Administrator                       Information                                                                                                                   tax
                                                                                                                                                                                                    Electronic Parameters
                                                                                                                                                                              reporting                                                                                        Create 1042 reporting information
                                                                                                                                                                                                   Tax Form Definition Rpt
                                                                                                                                                                                                                                                            Create                Form 1042 Data Summary
                                                                                                                                                                                                Tax Form Print Parameters Rpt
                                                                                                                                                                                                                                                             1042                 Define 1042-S Parameters
                                                                                                                                                                                                     Year End Form Text
                                                                                                                                                                                                                                                                                        Create 1042-S
                                                                                                                                                                                                   Tax Form XMLP Options
                                                                                                                                                                                                   Year End Form Options

                                                                                                                                                                                                                                                          Create FUTA
                                                                                                                                                                                                                                                                                 Create FUTA reconciliation
                                                                                                                                                                                                                                                            reconcile
                                                                                                                                                                                                                                                                                FUTA Wage Reconciliation Rpt

                                                                                                                                                                                                                                                                                                                                                                    Create T4 reporting information
                                                                                                                                                                                                                                                                                                                                                                     Create T4/T4A Electronic File
                                                                                                                                                                                                                                                                                                                                            T4 reporting                     Print T4 Slips
                                                                                                                                                                                                                                  Audit, correct, and load employee                                                                                                    T4/T4A Electronic Audit
                                                                                                                                                                                                                                                                                                                                             information
                                                                                                                                                                                                                                       data and balances CAN                                                                                                          T4 Summary/Segment Rpt                                                   End
                                                                                                                                                    Apply year end                  Apply year end adjustments to
                                                                                                                                                                                          closed pay period                               Year-to-Date Edits                                                                                                             Create T4 PDF Slips
                                                                                                                                                     adjustments to
                                                                                                                                                                                   Open/Close Pay Calendar (CAN)                   Year-End Personal Data Audit
                                                                                                                                                   closed pay period
                                                                                                                                                                                                                                         Load Year-End Slips
                                                                                                                                                                                                                                   Load Selective Year-End Slips
                                                                                                                                                                                                                                           Year-End Errors                                                                                                         Create T4A reporting information
                                                                                                                                                                                   Update tax reporting forms and
                                                                                                                                                                                                                                      T4,T4A,RL-1,RL-2 Audit                                                              Create?                                   Create T4/T4A Electronic File
                                                                                                                                                                                          definitions CAN                                                                                                                                   T4A reporting
                                                                                                                                                                                                                                   Review/Update Slip Information                                                                                                          Print T4A Slips
                                                                                                                                                                                       Tax Form Definitions                                                                                                                                  information
                                                                                                                                                                                                                                      Default Tax Data Report                                                                                                          T4/T4A Electronic Audit
                                                                                                                                                                                     Tax Reporting Parameters
                                                                                                                                                                                                                                          Exemption Report                                 No                                                                        T4A Summary/Segment Rpt
                                                                                                                                                                                   T4,T4A Mag Media Reporting                                                                                                                                                                                                Amend, cancel and reissue year-
                                                                                              Manage                                                                                                                               Review T4/T4A Consent Status                                                                                                         Create T4A PDF Slips
                                                                                                                                                                                     RL Mag Media Reporting                                                                  Calculate                                                                                                                                 end slips
                                                                                       year end tax reporting                                      Update tax reporting               T4 Reporting Definitions                     Reset T4/T4A Consent Status                pension                                                                                                                         Amend/Cancel Year-End Slips
                                                                                            information                       Need to...           forms and definitions                 RL Slip Numbers                          Year-End Consent Status Report            adjustment?                                                                                                                         Amend/Cancel Slip Audit
                                                                                                CAN                                                                                  Tax Form Definitions (rpt)                                                                                                                                                    Create RL-1 reporting information         Amend/Cancel YE Slip Summary
                                                                                                                                                                                     Tax Form Footnotes (rpt)                                                                                                                                                        Create RL-1 Mag Media File                Delete Void Year-End Slips
                                                                                                                                                                                                                                                                                          Yes                                              RL-1 reporting
                                                                                                                                                                                        Year End Form Text                                                                                                                                                                 Print RL-1 Slips
                                                                                                                                                                                                                                  Update and verify slip information                                                                        information
                                                                                                                                                                                      Tax Form XMLP Options                                                                                                                                                           RL-1 Magnetic Media Audit
                                                                                                                                                                                      Year End Form Options                                    CAN                                                    Calculate and report pension                                      RL-1 Summary Report
                                                                                                                                                                                   Tax Form BI Publisher Options                        Year-to-Date Edits                                                  adjustment CAN
                                                                                                                                                                                                                                   Year-End Personal Data Audit                                       Calculate Pension Adjustment
                                                                                                                                                                                                                                       Load Year-End Slips
                                                                                                                                                                                     Create annual tax reports                     Load Selective Year-End Slips                                                                                                   Create RL-2 reporting information
                                                                                                                                                                                    Employer Contribution to CNT                        Year-End Error (rpt)                                                                                                         Create RL-2 Mag Media File
                                                                                                                                                 Create annual                                                                                                                                                                              RL-2 reporting
                                                                                                                                                                                             El Rebate                                T4/T4A/RL-1/RL-2 Audit                                                                                                               Print RL-2 Slips
                                                                                                                                                  tax reports                                                                                                                                                                                information
                                                                                                                                                                                     NW Territories Payroll Tax                          View T4,T4A Slips                                                                                                            RL-2 Magnetic Media Audit
                                                                                                                                                                                        Nunavut Payroll Tax                                                                                                                                                             RL-2 Summary Report




                                                                                                                                                                   Automatically           Create ROEs automatically
                                                                                                                                                                                          Create Mass ROE Data (CAN)
                                                                                                                                                                                                                                                                         Review ROE insurable
                                                                                            Create record of                                      How                                                                             Review or update ROE                                                        Review and resolve ROE
                                                                                                                                                                                                                                                                          earnings and hours                                               Print ROE information on form         Create ROE data record summary
                                                                                           employment (ROE)                                        to                                                                                    details                                                                    exceptions
                                                                                                                                                                                                                                                                         Review ROE Insurable                                                    Print ROEs (CAN)                  ROE Summary Report (CAN)
                                                                                                Canada                                          create?                                                                          Update ROE Data (CAN)                                                      ROE Exceptions Report (CAN)
                                                                                                                                                                                                                                                                            Earnings (CAN)
                                                                                                                                                                                             Create ROEs manually
                                                                                                                                                                   Manually
                                                                                                                                                                                            Update ROE Data (CAN)




                                                                                                                                 Request duplicate W-2
                                                                                                                                 W-2 Reissue Request

                 Employee
                                                                                                                                                                     View electronic T4/
                                                                                                                                                                   T4A slips or W-2/W-2c
                                                                                                                                                                           forms
                                                                                                                                                                     View T4/T4A Slips
                                                                                                                                                                   View W-2/W-2c Forms




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                                                                                                                                                                 84
Create Employee US Federal Payroll Information Using PeopleSoft Payroll for North America


                    Human                                    Maintain
                                                                            Manage
                   Resource                                 Employee
                                                                           Absences
                   Specialist                                 Data




                                                                                                         Reissue                             Request W-2 reissued
                                                                                                          W-2                                W-2 Reissue Request



                                                                                                          Manage                  Create or update direct deposit information
                                                                                                       direct deposit                          Direct Deposit

                   Employee                                                                                                                                                                 Send employee direct deposit information to
                                                                                                         Manage                                                                                      PeopleSoft Expenses
                                                                                                                                   Add or update your voluntary deductions
                                                                                                         voluntary                                                                                         EIP (AM):
                                                                                                                                            Voluntary Deductions
                                                                                                        deductions                                                                              DIRECT_DEPOSIT_FULLSYNC;
                                                                                                                                                                                                   DIRECT_DEPOSIT_SYNC

                                                                                                          Update                      Update tax withholding information
                                                                                                      tax withholding                       W-4 Tax Information




                                                                                                                                      Create employee deductions
                                                                                                                                                 USF
                                                                                                                                         Create Garnishments
                                                                                                          Create                      Review U.S. Savings Bonds
                                                                                                        deductions                    Override Benefits Deductions
                                                                                                                                       Create General Deduction
                                                                                                                                      Override General Deductions
                                                                                                                                                                                                         Update payroll options and/
                                                                                                                                        Request Direct Deposit
                                                                                                                                                                                                         or create additional pay and/
                                                                                                                                                                                                                                                    Send employee direct deposit
                                                                                                                                                                                                          or Leave Accrual Elections
                                                                                                                                                                                                                                                information to PeopleSoft Expenses
                                                                                                                                                                                                                     USF
                                                                                      Need to...                                                                                                                                                              EIP (AM):
                                                                                                                                                                                                            Update Payroll Options
                                                                                                                                                                                                                                                  DIRECT_DEPOSIT_FULLSYNC;
                                                                                                                                                                                                             Create Additional Pay
                                                                                                                                                              Record tax data and create reports                                                     DIRECT_DEPOSIT_SYNC
                                                                                                                                                                                                            Update Leave Accrual
                                                                                                                                                                            USF
                                                                                                                                                                                                                   Elections
                                                                                                                                                                Employee Tax Information Rpt
                                                                                                                                                                   W-4 Exemptions Report
                                                                                                                       Initiate mass employee updates                                                                                                                                Calculate, Confirm
                                                                                                Manage                                                                W-4 Audit Report
                  Payroll                                                                                                         of tax data                                                                                                                                         and Provide US
                                                                                                mass tax                                                       Determine W-4 Exempt Renewal
                                                                                                                       Create Mass Tax Data Updates                                                                                                                                   Federal Payroll
                Administrator                                                                  data update
                                                                                                                         Update Two-Tier Suppl Data
                                                                                                                                                                 Update Employee Tax Data
                                                                                                                                                                   Update Tax Distribution
                                                                                                                                                                   Reset W-4 Exempt List
                                                                                                                                                                 Employee SSN Verification
                                                                                                                                                                   W-4 Print - Self Service



                                                                                                                                                                                             Apply unscheduled payments
                                                                                                                                                                                Payments                 USF
                                                                                                                                                                                               Military Service Deposit
                                                                                                                                                                                                                                          Create military service
                                                                                                                             Identify Military Service
                                                                                                                                                                                                                                              deposit reports
                                                                                                        Manage                 Account detail and
                                                                                                                                                               Need to                                                                            USF
                                                                                                   military deposits                deductions
                                                                                                                                                               apply...                       Calculate interest, review             Military Deposit OPM-1514 Rpt
                                                                                                          USF                          USF
                                                                                                                                                                                             balance and create IRR for              Military Deposit Closed Accts
                                                                                                                             Military Service Deposit
                                                                                                                                                                                 Interest    accounts with zero balance
                                                                                                                                                                                                          USF
                                                                                                                                                                                             Calc Military Service Interest




Copyright © 2013, Oracle and/or its affiliates. All rights reserved.                                                                                                                                                                                                                                      85
Calculate, Confirm, and Provide US Federal Payroll Using PeopleSoft Payroll for North America


                    Time and Labor                Manage Time
                                                   and Labor
                     Administrator




                                                                                                                                                                                                                                                                                                                                                                                                                                       Yes

                                                                                                                                                                                          Process mass retro pay request                 Review a summary of                                                          Review retro pay                                                                                                                         Review summary of retro pay
                                                                                                                                                                                                                                                                           Calculate retro pay and review
                                                                                                                           Need to                                                        Process Mass Retroactive Pay                  retroactive pay requests                                                    processing messages                                              Change the individual and mass                                                      requests
                                                               Create NA Payroll                                                                                                                                                                                                       results                                                           Need                                                                         Recreate
                                                                                                                         create retro              Yes                                                  or                                     and triggers                                                         Retro Pay Messages                                Yes             retroactive pay process flag.                                    No      Retro Pay Calc Summary (NA)
                                                                  Information                                                                                                                                                                                                Calculate Retroactive Pay                                                corrections?                                                                   retro pay?
                                                                                                                            pay?                                                          Create Retro Request in Job or                Retro Pay Request and                                                       Retro Pay Messages                                               Change Retro Pay Process Flag                                              Pay All Calculated (rpt) (NA)
                                                                                                                                                                                                                                                                           Update Retro Pay Calc Results
                                                                                                                                                                                            Addl Pay via Event Handler                      Trigger Summary                                                                Report                                                                                                                                 Retro Pay Terminations

                                                                                                             No
                                                                                                                                                                                                                                                                                                                                                                                  Load retro pay data to paysheets
                                                                                                                                                                                                                                                                                                                                                                      No
                                                                                                                                                                                                                                                                                                                                                                                   Load Retro Pay to Paysheets
                                                                         Receive request for Payment on a Variable                          Validate variable
                                                                                   Compensation Award                                   compensation award data
                                                                                         EIP (AM):                                       Validate Variable Comp
                                                                           VAR_COMP_PAYMENT_REQUEST                                           Awards (GBL)



                                                                         Receive request for payment of employee
                                                                         referral program awards and acknowledge
                                                                                           receipt                                                                                                                                                                                                                                                                                                                    Print paysheet earnings
                                                                                                                                                                                                                                                                                                                                 Create final check paysheets                                 Print Earnings
                                                                                         EIPs (AM):                                                                                                                                                                                                                                                                                                                        distribution USF
                                                                                                                                                                                                                                                                                                                        Yes                   USF                                              Distribution
                                                                            PAYMENT_ERECRUIT_REQUEST;                                                                                                                           Create paysheets by pay                                                                                                                                                             Print Paysheet Earnings Dist
                                                                                                                                                                                                                                                                                                                                 Create Final Check Paysheets
                                                                         PAYMENT_ERECRUIT_ACKNOWLEDGE                                                                     Create                                                     calendar USF
                                                                                                                                                                        On-Cycle                                                   Create Paysheets                    Apply payment request
                                                                                                                                                                                       Perform pre sheet audit                                                                                                     Need                                                                                              Print paysheets
                                                                                                                                                                       Paysheets                                                 Review Pay Calendars                     information USF                                                                               Decide                    Adjust
                                                                                                                                                                                                USF                                                                                                             final check                      No                                                                        USF
                                                                          Receive request for payment of employee                                                      for Existing                                                                                  Load Paysheet Transactions                                                                      if need to...              Paysheets
                                                                                                                                                                                       Presheet Audit Report                                                                                                    paysheets?                                                                                           Print Paysheets
                                                                         expense advances and reimbursements and                                                       Final Check                                                                                  Paysheet Transactions Report
                                                                                       acknowledge                                                                      Requests                                             Record hours and amounts
                                                                                        EIPs (AM):                                                                                                                             from Rapid Entry USF                                                                                                                                                                                                                                      Review and update payline
                                                                            PAYMENT_EXPENSES_REQUEST                                                                                                                        Create Rapid Entry Paysheets                                                                                                                                                             Review and update or                   Review and update                  earnings USF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Request process to
                                                                         PAYMENT_EXPENSES_ACKNOWLEDGE                                                                                                                                                                                                                                                                                            Adjust             override paysheets USF                 payline by employee              By Payline Security                            Need
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Yes          unsheet USF
                                                                                                                                                                                                                                                                                                                                                                                                Paysheets                 By Paysheet                              USF                      By Payline Earnings                        to unsheet?
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Pay Unsheet
                                                                                                                                                                                                                            Record hours and amounts                                                                                                                                                                 By Add Balance Page                        By Payline              By Payline Earnings Security
                                                                                                                                                                                                                                   from PSHUP                                                                                                                                                                                                                                          By Paysheet Earns Short Form
                                                                          Receive sales commission information for                                                                                                         Update Paysheet Transactions
                                                                                          payout
                                                                                           EIP                                                                                                                                                                                                                                                                                                                                                                                                                                               No




                                                                        Advise Variable Compensation of awards that
                                                                              have been accepted or rejected
                                                                                         EIP (AM):
                                                                         VAR_COMP_PAYMENT_ACKNOWLEDGE                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Review pay calculation or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 confirmation results USF
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps
PeopleSoft HCM 9.2 Business Process Maps

PeopleSoft HCM 9.2 Business Process Maps

  • 1.
    PeopleSoft Human Capital Management9.2 Business Process Maps March 2013
  • 2.
    PeopleSoft Human CapitalManagement 9.2 Business Process Maps CDSKU hcm92bpms Copyright © 1992-2013, Oracle and/or its affiliates. All rights reserved. Trademark Notice Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. Intel and Intel Xeon are trademarks or registered trademarks of Intel Corporation. All SPARC trademarks are used under license and are trademarks or registered trademarks of SPARC International, Inc. AMD, Opteron, the AMD logo, and the AMD Opteron logo are trademarks or registered trademarks of Advanced Micro Devices. UNIX is a registered trademark of The Open Group. License Restrictions Warranty/Consequential Damages Disclaimer This software and related documentation are provided under a license agreement containing restrictions on use and disclosure and are protected by intellectual property laws. Except as expressly permitted in your license agreement or allowed by law, you may not use, copy, reproduce, translate, broadcast, modify, license, transmit, distribute, exhibit, perform, publish, or display any part, in any form, or by any means. Reverse engineering, disassembly, or decompilation of this software, unless required by law for interoperability, is prohibited. Warranty Disclaimer The information contained herein is subject to change without notice and is not warranted to be error-free. If you find any errors, please report them to us in writing. Restricted Rights Notice If this is software or related documentation that is delivered to the U.S. Government or anyone licensing it on behalf of the U.S. Government, the following notice is applicable: U.S. GOVERNMENT END USERS: Oracle programs, including any operating system, integrated software, any programs installed on the hardware, and/or documentation, delivered to U.S. Government end users are "commercial computer software" pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. As such, use, duplication, disclosure, modification, and adaptation of the programs, including any operating system, integrated software, any programs installed on the hardware, and/or documentation, shall be subject to license terms and license restrictions applicable to the programs. No other rights are granted to the U.S. Government. Hazardous Applications Notice This software or hardware is developed for general use in a variety of information management applications. It is not developed or intended for use in any inherently dangerous applications, including applications that may create a risk of personal injury. If you use this software or hardware in dangerous applications, then you shall be responsible to take all appropriate fail-safe, backup, redundancy, and other measures to ensure its safe use. Oracle Corporation and its affiliates disclaim any liability for any damages caused by use of this software or hardware in dangerous applications.
  • 3.
    Third Party Content,Products, and Services Disclaimer This software or hardware and documentation may provide access to or information on content, products, and services from third parties. Oracle Corporation and its affiliates are not responsible for and expressly disclaim all warranties of any kind with respect to third-party content, products, and services. Oracle Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred due to your access to or use of third-party content, products, or services. Alpha and Beta Draft Documentation Notice If this document is in preproduction status: This documentation is in preproduction status and is intended for demonstration and preliminary use only. It may not be specific to the hardware on which you are using the software. Oracle Corporation and its affiliates are not responsible for and expressly disclaim all warranties of any kind with respect to this documentation and will not be responsible for any loss, costs, or damages incurred due to the use of this documentation.
  • 5.
    Recruiting Analyze Recruiting Human Resources VP Human Plan Recruiting Resource Manager Recruiter Recruit Applicants Evaluate and Hire and Enable Select Applicants Resources Line Manager Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 5
  • 6.
    Plan Recruiting Define Organization Competencies and Accomplishments Define Recruiting Create Assess Workforce Analyze Recruiting Goals and Competency Competencies Measurements Strategy Human Resource Manager Analyze Pool of Create Available Recruiting Applicants Strategies Analyze Recruiting Processes and Channels Recruit Applicants Recruiter Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 6
  • 7.
    Recruit Applicants Human Resource Plan Recruiting Manager Human Analyze Recruiting Resources VP Create Job Post Job Evaluate and Line Manager Requisitions Requisitions Select Applicants Receive and Track Recruiter Attract Applicants Applications Search for Jobs Apply for Job Candidate Self-Service Self-Service Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 7
  • 8.
    Create Job Requisitions Human Resource Plan Recruiting Manager Plan Headcount Yes Resubmit for Approval (FPS) Select screening Associate notes Create new job questions for online Request job opening and attachments opening applicants approval as needed Create New Job Create New Job Create New Job Create New Job Line Manager No Opening Opening Opening Opening Job Opening Screening Request View list of existing and/or Check job opening Clone Post Job Request Recruiter to prior job openings, if needed approval status No No existing job Requisitions headcount? create job Search Job Openings Pending Approvals opening? opening? Browse Job Openings Modify cloned job Yes Clone existing job requisition to meet opening requirements Yes Search Job Search Job Openings Openings Receive notification Recruiting of job opening Review, update, Approval approve or deny pending approval request for job Authority Pending Approvals Pending Approvals Worklist No Review and update Modify Existing existing job opening in Opening progress Search Job Openings Select person or non- Create new job Create New person profiles for base opening Job Opening requirements Create Job Opening Check job Create Job Opening Select pre-screening Associate notes Request job Recruiter opening and screening and attachments Ready to opening approval status View list of existing questions for rating as needed submit for Yes approval Pending and/or prior job online applicants Manage Job approval? Pending Approvals openings Clone existing job Modify cloned job requisition Screening Openings Approvals How to create Clone Existing Search Job opening to meet requirements job opening? Job Opening Openings Search Job Openings Search Job Openings Search Job Postings Create from Create job opening based on Resubmit for Approval Open Position open position Create Openings from Positions Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 8
  • 9.
    Post Job Requisitions Identify internal or external Company Web Sites websites for posting Identify recruiting Recruiting agencies for Agencies posting job opening Line Manager Review job postings by Receive posting job board, if needed Identify job Post job opening Integration with third party Create Job Where to confirmation(s) Manage External Job Board boards for Manage External using PeopleSoft's Open Requisitions post job? Manage External Postings posting Postings Integration Framework (OIF) Postings Search Postings Full Text Vacancy (USF) Identify Services Integration with PeopleSoft Post job opening Services Procurement for Services Procurement using Manage External Procurement posting job PeopleSoft's Open Postings opening Integration Framework (OIF) Identify internal or external Company Web Sites websites for posting Identify recruiting Recruiting agencies for Agencies posting job opening Recruiter Review job postings by Receive posting job board, if needed Identify job Post job opening Integration with third party Where to confirmation(s) Manage External Job Board boards for Manage External using PeopleSoft's Open Attract Applicants post job? Manage External Postings posting Postings Integration Framework (OIF) Postings Search Postings Full Text Vacancy (USF) Identify Services Integration with PeopleSoft Post job opening Services Procurement for Services Procurement using Manage External Procurement posting job PeopleSoft's Open Postings opening Integration Framework (OIF) Search for Candidate Jobs Self- Service Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 9
  • 10.
    Search for JobsSelf-Service Search hard Search Print Media copy publications Attend Attend recruiting Recruiting Event event or job fair Register for job Where to View job board and search for Visit Job Boards postings directly provide profile job? on job board information Candidate View job Search postings on the Internet other external websites Email job posting Apply for Job Send job Apply for job Self Service to a friend to friend Careers Search job postings Search directly on company Review job Choose Save job Save job to list Company website postings action to list Careers Website Careers Careers Job Search Register as a new Register Choose applicant as applicant action Careers Subscribe to potential employer's Receive and review list of Set up automatic job search agent job postings job search Careers Careers Provide email Recruiter Process applicants’ notification for jobs Post Job automatic job searches found that match Requisitions Run Job Search Agent applicant criteria Subscribe to potential employer's Set up automatic Receive and review list of job search agent job search job postings Careers Careers Save job Save job to list to list Careers Employee Search job postings Review job Search Company directly on company Choose Send job Email job posting to a friend postings Internal Careers Site website action to friend Careers Careers Careers Refer a friend Refer a friend Careers Apply for job Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 10
  • 11.
    Attract Applicants Advertise job openings in Advertise media publications Receive Track inquiries or correspondence and Receive referrals in contacts Inquiries or Referrals person or via Contact Notes phone or email Manage Applicant Track Record general Contact Create list of correspondence expenses Participate in potential Participate in applicant leads to and contacts associated with Receive and Track job fair or applicants by Recruiting Events qualify Contact Notes recruiting Applications recruiting event email, phone, Applicant Lists Manage Search Job fax or mail Applicant Openings Recruiter Search applicant Choose how database for Review applicant Search Applicant to source individuals meeting search results Database applicants criteria Find Applicants Find Applicants Search the internet for Search the Internet applicant leads Find Applicants Review hot job Define "hot jobs" history and update Create/Review criteria amounts and Hot Jobs Hot Jobs timing of awards Hot Job History Post Job Line Manager Requisitions Define the conditions under Set up the amounts and Create or update a referral Select the employee eligibility Create which an employee is eligible timing of awards in the program ID, description, and award category rules that Employee Referral for award payment under the category for both ERPs effective date, and some Employment Program Employee Referral Program and hot Jobs business rules are in effect for the program Coordinator Employee Referral Program Employee Eligibility Rules Award Category Rules Employee Referral Program Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 11
  • 12.
    Apply for JobSelf-Service Mail hard copy Mail Resume of resume Fax copy of Fax Resume resume Search for Jobs Method of Email Email copy of Prompted by Print Media or Recruiting Events Self-Service application? Resume resume Provide Upload Resume a resume online Apply Careers Directly Online Prompted by Transfer applicant to Send applicant External online application Select the profile to Register as a Create a resume Job Boards form pre-populated Choose positions for company new applicant Paste Resume Text online Candidate or Internet with information action which to apply recruiting Careers Careers provided by process applicant No Search job Select jobs in Search Job Postings postings which to apply Careers Careers Provide additional Integration with third party attachments to support using PeopleSoft's Open Provide attachments job application Complete pre-screening Integration Framework (OIF) Apply for a job Pass Careers Apply for a Job questionnaire Careers pre-screen? Careers Receive Yes confirmation that the resume was received Provide Provide Provide Provide Careers Respond to View a summary of the Verify contact competency and employment references referral Submit online screening Choose View jobs applied for, and Prompted by Externally Exposed Job Postings on Company Website information accomplishment and training and personal source application questions action activity the application status Careers information history data information Careers Careers Careers Careers Careers Careers Careers Track correspondence received from applicants Contact Notes Receive and Track Recruiter Manage Applicant Applications Administer Referrals Track Duplicate Referrals Confirm or cancel the referral initiated by the Employee Choice to Seek Job Opportunity applicant Confirm Referral Employee Select job Review the eligibility and opening and award payment status for Employee Choice to Refer a Friend create a referral each applicant referred Refer a Friend Check Referral Status Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 12
  • 13.
    Receive and TrackApplications Candidate Apply for Job Self-Service Extract resumes from Process Emailed Resumes emails Load resumes received in Parse resume using third-party Notify applicants that Choose electronic format resume extractor and resumes have been Yes resume Load Resumes Load Resume PeopleSoft’s Open Integration added to the applicant option Manage Resumes Framework database Employment Coordinator Create resume receipt Resume Identify or update acknowledgments and send to parsing No applicant information applicants available? Add New Applicant Generate Recruitment Letters Send Correspondence Create an Add or update individualized checklist Record information about how competencies and for a particular Review summary of applicants the applicant was referred to accomplishments applicant for whom Applicant Summary by Job the organization Add New Applicant recruitment activities Applicant Summary by Source Add New Applicant Application Details are tracked Applicant Checklist Attract Recruiter Applicants Line Manager Evaluate and Select Applicants Human Analyze Recruiting Resources VP Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 13
  • 14.
    Evaluate and SelectApplicants Recruiter Recruit Applicants Source Applicants Review Applicants Screen Applicants Schedule Perform Pre-Hire Present and Interviews Activities Manage Offers Human Resources VP Analyze Recruiting Conduct Line Interviews and Hire and Enable Manager Select Final Resources Candidates Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 14
  • 15.
    Source Applicants Search leads and Search Leads contacts for potential Attract Applicants and Contacts Review applicant status, resume, applicants Review applicant data and / or applicant profile Recruit Search Applicants Applicants Search internal database for Review list of potential Choose Search Internal applicant suitable for a job candidates based on Review correspondence notes information to Review Correspondence Notes Review Applicants Applicant Database requisition search criteria Search Applicants review Search Applicants Search Applicants Review Application Review Application Search Applications Define search criteria and create Review list of potential Create automated search candidates identified by Automated Recruiter Saved Searches automated search agent Search Agent Run Automatch Search Search Applicants Where to look for applicants? Receive potential candidates Review list of potential Review Potential identified by Job Boards using candidates provided by Candidates Sent PeopleSoft's Open Integration Job Boards from Job Boards Framework (OIF) Search Applicants Receive potential candidates Review Potential Review list of potential from PeopleSoft Service Contingent Workers candidates provided by Procurement using from Services Services Procurement PeopleSoft's Open Integration Procurement Search Applicants Framework (OIF) Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 15
  • 16.
    Review Applicants Route applicant information to Receive and track reviewer Update applicant information and Route appropriate parties for additional review recommendations and details disposition status Choose Keep applicant Applicant Manage Applicant Manage Applicant Manage Applicant action in consideration Information Manage Job Opening Manage Job Opening Manage Job Opening Manage Applications Manage Applications Manage Applications Line Manager Link applicants to requisitions Reject applicant Link Choose Manage Applicant Applicant action Manage Job Opening to Job Manage Applications Update applicant disposition for a given job Reject Manage Applicant Applicant Manage Job Opening Manage Application Update applicant disposition Add applicant to list Send rejection letter to Document for a given job Reject of rejected applicant(s) correspondence Manage Applicant Applicant applicants Send Correspondence with applicant Forward applicant to Manage Job Opening Manage Applicant Generate Recruitment Letters Contact Notes Source Applicants another recruiter or Manage Application Forward individual Forward Applicant Reject Applicant Review applicant status, resume, and/ Review or applicant profile Application Manage Applicant Review Questionnaire Results Route applicant Receive and track Route information to reviewer Choose Applicant Choose appropriate parties recommendations action Information action Manage Applicant and details Recruiter Add applicant to a Forward Applicant Manage Applicant Choose Add Applicant list action to a List Manage Applicant Keep applicant Review Notes / in consideration Review correspondence Correspondence Link applicants to history/attachments Link Applicant Notes job, if needed Contact Notes to Job Manage Applicant Update applicant information and Request further Document disposition Screen Applicants Send applicant information correspondence sent status Correspondence Send and received Manage Applicant Correspondence Contact Notes Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 16
  • 17.
    Screen Applicants Schedule Interview Provide Certificate of Eligibles and candidate referral list to the hiring official No Override rankings for Review list of highly Print the competitive or non- Create candidate Create Certificate qualified applicants; Certificate of competitive referral list of Eligibles No adjust rank if needed Eligibles report Review Rate applicant Review list of applicants Candidate Certificate of Review list of applicants Job Opening Certificate of Screening requirements competencies and applicants who meet or Job Opening Evaluations List Eligibles Recruiter Review Applicants who applied for a specific Screening USF Screening Eligibles USF No met by applicant accomplishments exceed the final Screening job requisition applicants? applicants? Job Opening Job Opening Ranking screening criteria Job Opening Screening Screening Applicant Rating Job Opening Screening Yes Yes Validate applicant’s Identify the applicants who Categorize and rank qualifications using Create ranking plan have priority placement rights Need to rank applicants per ranking Crediting Plan Yes Job Opening Job Opening Screening candidates? plan Job Opening Screening Process Priority Placement Job Opening Screening Screening Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 17
  • 18.
    Schedule Interviews Review list of Review candidate application Record decision to Conduct Interviews Update candidate Create interview and Select Final candidates associated information, resume, interview, hold, or reject the information, status, or schedule for selected Candidates Schedule Interviews with a job opening disposition and status history candidate disposition candidates Manage Applicant Manage Applicant Manage Applicant Manage Applicant Schedule Interview Job Opening 360 Manage Application Manage Application Send notifications to Document correspondence participants of the sent Line Manager scheduled interview Manage Applicant Manage Applicant Send Correspondence Review list of candidates Review candidate Confirm Receive notification and recommended for application information, candidates confirm interview schedule interview for a job resume, disposition and for interview Interview Calendar opening status history Manage Interview Team Schedule Manage Applicant Manage Applicant Applicant Interview Notifications Receive notification and Employee confirm interview schedule Interview Calendar Interview Team Schedule Interview Notifications Receive and manage interview notification and Candidate confirm interview Careers Interview Notifications Review feedback, Route candidate Review resume, and/ or Document information to Application applicant profile Send notifications to correspondence sent to Route candidate interviewers Manage Applicant participants of the interviewers and interview list for job to Manage scheduled interview candidates Screen Applicants hiring manager Applicant Manage Applicant Manage Applicant Manage Applicant Forward Send Correspondence Review candidate Applicant Review disposition status History history Manage Applicant Review list of Create interview Recruiter candidates for a job Update candidate schedule for associated with a Review correspondence Record decision to interview, Choose Review information, status, selected job opening history and attachments hold, or reject the candidates action Correspondence or disposition candidates Manage Applicant Contact Notes Manage Applicant Manage Applicant Schedule Job Opening 360 Interview Candidate Listing Contact applicant for follow-up, further Document correspondence Send Correspondence screening or information sent and received Send Correspondence Manage Applicant Send Correspondence Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 18
  • 19.
    Conduct Interviews andSelect Final Candidate Send rejection Update applicant notifications Track Reject disposition for a Generate Recruitment correspondence Candidate given job Letters Contact Notes Manage Applicant Send Correspondence Select candidates Update final for pre- candidate Choose Line Manager employment information and action checks status Manage Applicant Manage Applicant Create candidate View interview Perform Review Review interview interview evaluation results, ratings and comprehensive review Prepare and Choose Select candidate schedules and record results recommendations of candidates in each conduct potential Final Provide information Interview Team Schedule Interview Evaluations Manage Applicant stage of the selection interview hires Candidate(s) candidate provided Interview Calendar Create Interview Evaluation process selection Evaluation Summary Manage Applicant information to recruiter Review Review scheduled Evaluate candidate and Prepare and candidate interviews provide recommendation conduct Interviewer information Interview Team Schedule Interview Evaluations interview provided Interview Calendar Create Interview Evaluation View a summary Provide of their scheduled Prepare and expense interviews, listed Candidate attend interview documentation, by job requisition if needed Careers View interview Capture costs claimed by Select candidates schedules by candidates by requisition Update candidate for pre- Perform By applicant Search Job Openings Select information and employment Pre-Hire Applicant Manage Applicant Evaluate Job Openings Final candidates status checks Activities Interview Team candidate and Manage Applicant Manage Applicant Schedule provide recommendation Create Interview View interview Evaluation Choose how schedules by Review candidate View interview Contact candidate and Track contacts, Recruiter Schedule By requisition Prepare and Choose to view conduct interview status and results, ratings and follow up on interview conversations and Interviews Requisition Interview Calendar potential schedule interview confirm complete recommendations and status correspondence Interview Team Create reminders hires Manage Applicant Manage Applicant Send Correspondence Contact Notes Schedule for interviewers to complete evaluations Update candidate Send rejection Interview Reject disposition for a notification Track correspondence View interview Review requisition Candidate given job Manage Applicant Contact Notes By Evaluation schedules by interview status and Manage Applicant Send Correspondence Applicant Reminder applicant list confirm complete List Manage Applicant Search Job Openings Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 19
  • 20.
    Perform Pre-Hire Activities Review and/or Access provider website Review status of request Conduct Interviews Need to verify references Review results of pre- Update candidate and request candidate for pre-employment and Select Final request No for the selected employment inquiries status inquiries inquiries Candidates references? applicant Preemployment Check Manage Applicant Preemployment Check Preemployment Check Manage Applicant No Yes Line Manager Send application information Receive applicant Make offer? Yes Receive request status from to preemployment verification information from provider Send an email to provider using the Open provider using the Open using the Open Integration the applicant Integration Framework (OIF) Integration Framework (OIF) Framework (OIF) requesting references Manage Applicant Capture pre-employment check expenses provided by pre- employment verification provider Provide reference Receive request Candidate information for references Careers Review status of Send an email to the Review results of Review and/or Access provider request for pre- applicant requesting Track pre-employment Provide feedback references for the website and request employment Present and references correspondence checks and selected applicant candidate inquiries checks Manage Offers Send Contact Notes Preemployment recommendations Manage Applicant Preemployment Check Preemployment Correspondence Check Check Yes Send application information Receive applicant Recruiter Need to Receive request status from to preemployment verification information from provider request No provider using the Open provider using the Open using the Open Integration references? Integration Framework (OIF) Integration Framework (OIF) Framework (OIF) Capture pre-employment check expenses provided by pre-employment verification provider Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 20
  • 21.
    Hire and EnableResources Evaluate and Line Manager Select Applicants Close Job Recruiter Requisitions Enter New Hire Enable New Hire Information (Onboard) Human Resource Specialist Manage Recruiting Expenses Human Analyze Recruiting Resources VP Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 21
  • 22.
    Enter New HireInformation Evaluate and Line Manager Select Applicants Close Job Recruiter Requisitions Add new hire by selecting pre- configured template and Use Smart HR Review transaction status View transaction details Create list containing hiring completing simple data entry Template Transaction Status Manage Transactions CAN information Smart HR Template Smart HR Transactions Hire Report CAN Identify work location, job, labor, payroll, Print the letter to be signed by Identify applicant's personal Hire Applicant as salary plan and compensation both employee and employer on information New Employee information or before the first day of Manage Hires ITA Manage Hires employment Job Letters (ITA) Receive notification Hire Letter ITA from Recruiting to Add a new employment Perform Identify work location, job, labor, payroll, perform Hire organizational instance for a Concurrent Hire salary plan and compensation Person or Hire Person information Add Employment Instance Create or update Contracts as Employee Add Employment Instance New Employment Instance ESP Update Contracts Update Contracts ESP Create a new contingent worker Identify work location, job, labor, payroll, Hire organizational instance for a Country- salary plan and compensation Contingent Person specific Send Contrata File ESP information - contingent Worker Add Contingent Worker Instance tasks Print Contrata XML File ESP Review list of Add Contingent Worker Instance New Contingent Worker Instance individuals that need hiring process to be completed Manage Hires Identify work location, job, labor, payroll, Manage Contrata Response File Hire/Transfer Review and/or update personal ESP salary plan and compensation Existing information Read External XML File ESP information - existing Employee Manage Hires Review External XML File ESP Manage Hires Create an Additional Add an assignment record for a Assignment for person Print Contracts ESP an Employee or Add Additional Assignment Print Contracts ESP Contingent Concurrent Hire USF Worker Identify work location, job, labor, payroll, Identify applicant's personal Communication to Social Rehire salary plan and compensation information - rehire Human Former Employee information - rehire Security ESP Manage Hires Create AFI File ESP Resource Manage Hires Specialist Review and Choose verify data before No action performing hire? Record the Validate the hiring Create legal Update the seniority bonus process by comparing Track supporting Hire Create employee ID and identify relationship between employee code and the the employee's Headcount hiring documents French Public personal information employee and record seniority Yes competencies to those End allocated? Supporting Sector Manage Hires organization Employee equivalent that are required for Yes Documents FPS Manage Initialize Status FPS Record FPS Hiring Seniority the assigned job code Bonus FPS Validate Hire FPS Recruiting Expenses Review applicant's Check to see if Concurrent Hire Create new employee record, assign Verify that the hire hire detail applicant exists of Existing Employee status and civil service position action selected is information previously in French Public Sector Add Concurrent Empl Record FPS Delete and archive appropriate Manage Hire system No applicant data Manage Hires Details Search for People Delete ID FPS Enable New Identify the terminated employee Hire (Onboard) Rehire to rehire French Public Sector Re-Hire Employee FPS Record employee Assign Employee to Available Post Create employee ID Define employee Enter employee data Enter child and family allowance Search Post Plan Post Edit Request – Staffing (GPS) Hire German and identify personal grade and step Add contract data disability data Administer Post Plan Job Data – Dependent Information (GPS) Search Post Plan - by Payee (GPS) Run Automated Post Assignments (GPS) Public Sector information Grade Step Update Contracts Regional Administrate Plan (GPS) German Public Child Allowance Administration (GPS) Search Post Plan - by Post (GPS) Search Unassigned Payees (GPS) Manage Hires Information (GPS) Disability Sector Work or Close Assignment Lists (GPS) Identify compensation, Identify employment-related Identify education, union Review new hire information and Create hire record for Federal employee Print PAR request and Notice to Identify job, position, benefits Hire New Identify personal information earnings, and distribution dates such as service affiliations and security status and record general administrative details Employee and retirement information Employee USF New Employment Instance USF details computation and WIGI dates clearance New Hire USF New Employment Instance USF New Employment Instance USF New Employment Instance USF Add Employment Instance USF New Employment Instance USF New Employment Instance USF New Employment Instance USF New Hire Error USF Add Employment Instance USF Add Employment Instance USF Add Employment Instance USF Add Employment Instance USF Add Employment Instance USF Add Employment Instance USF Review New Hire Stats USF Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 22
  • 23.
    Close Job Requisitions Enter New Hire Information Review all active employees who were hired or rehired in a given time Analyze information on Analyze ethnic and gender group period and conforms to federal recruitment and hiring USA movement and advancements reporting requirements practices Job Group Movement Analysis PRWORA-New Hire (USA) Adverse Impact (USA) PRWORA-Newhire Create and review DIMONA hire notifications to be sent to the Belgium Social Security office (RSZ) in the BEL form of flat files Human Create DIMONA Notification (BEL) Resource Review DIMONA Notification (BEL) Which Specialist country? Review a breakdown of job offers versus application by UK-specific GBR ethnic groups and by gender Adverse Impact (UK) Create report of people with special ITA hiring categories Special Hiring Category ITA Human Analyze Recruiting Resources VP Review the eligibility and award payment status for Employee each applicant referred Check Referral Status Perform country-specific tasks Analyze Review requisitions, and Recruiting capture recruiting Close requisitions for expenses positions that have been Choose Job Opening Status filled actions Job Opening Cost Job Openings Analysis View duplicate Evaluate and update View and approve Manage View and override referrals and adjust eligibility employee View audit list of awards that have the referral eligibility and award award amounts and determine award manual overrides and status of "Needs awards information for among eligible status the change details Approval" referrals as needed employees Process Referral Review Override Audit Approve Employee Administer Referrals Track Duplicate Programs Awards Referrals Recruiter Receive notification of payment Send published by NA Payroll Yes corrected No EIP Name: Payroll Issued awards? eRecruit Payment Review and correct Receive results of validation of requested awards that are Provide award payment awards published by NA Payroll rejected by PeopleSoft data to payroll EIP Name: eRecruit Request for Payment Payroll for North Process Referral EIP Name: Acknowledgment/Verification America Programs of eRecruit Payment Review Rejected Awards Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 23
  • 24.
    Enable New Hire(Onboard) Create Global Track Global Assignment Assignments Relocate Maintain Employee Data New Hire Record Office/Phone Maintain Employee Data Information Choose Human Enter New Hire Request Provide Help Desk onboarding Information Resources Support Resource actions Specialist Schedule Deliver Learning Training Enroll in Manage Benefits Benefits Enrollment Plan Performance Determine Individual and Career Development Goals Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 24
  • 25.
    Analyze Recruiting Human Resource Plan Recruiting Manager Hire and Enable Resources Recruiter Evaluate and Select Applicants Human Resource Recruit Applicants Specialist Generate Data Recruiting Administrator Intelligence Human Analyze Recruiting Performance Resource Analyst Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 25
  • 26.
    Analyze Recruiting Performance Generate Data Recruiting Administrator Intelligence Review all active employees who Breakdown expense Analyze information on were hired or rehired in a given time Analyze ethnic and gender group types and amounts for a recruitment and hiring period and conforms to federal USA movement and advancements job opening practices reporting requirements Job Group Movement Analysis Job Opening Cost Adverse Impact USA PRWORA-New Hire (USA) Analysis PRWORA-Newhire Create and review DIMONA hire notifications to be sent to the Belgium Choose Social Security office (RSZ) in the BEL country form of flat files Create DIMONA Notification (BEL) Review DIMONA Notification (BEL) Review a breakdown of job offers versus application by UK-specific GBR Human ethnic groups and by gender Adverse Impact (UK) Resource Specialist Create report of people with special ITA hiring categories Special Hiring Category ITA List all vacant budgeted positions USF Vacant Budgeted Positions Review additional details about the recruiting process Human Resource Plan Recruiting Manager Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 26
  • 27.
    Deployment Respond to Employee Maintain Plan Deployment Lifecycle Employee Data Actions Manage Health and Safety Human Resource Specialist Track Global Assignments Manage Absences Time and Labor Manage Time and Administrator Labor Payroll Administrator Manage Payroll Travel and Expense Manage Expenses Manager Enterprise Help Provide Help Desk Desk Agent Support Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 27
  • 28.
    Plan Deployment Respond to Create Human Define and Employee Organizational Manage Positions Lifecycle Resource Structure Actions Specialist Headcount Plan Headcount Manager FPS Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 28
  • 29.
    Define and ManagePositions Review summary of Position position information Position Summary Define position information, including title, description, location, company, department, hours, headcount, etc. Add or update position information and Review information about employment-related information Update incumbents in a Position Data Add/Update employees currently or Add/Update Position Info position. Classification Standards USF Positions Review? History previously assigned to a Identify Key Positions Add/Update Position Info Job Codes position Identify Key Positions USF Occupational Series USF Position History Official Position Titles USF Organizational Posn Titles USF Rate Code Details Review prior or current Create department, job code, or budget summary position budgets using total salaries information and budgeted FTE's for positions Decide Update Budget Budget Status with an approved budget status if need to? Department Status Budget Check by Position Update Dept Budget Data FTE Budgets Budget Status by Position Budget Status by Document ID Human Send HR position data to FSCM Resource EIP: POSITION DATA; Perform real-time budget check POSITION_FULLSYNC; Budget Check Position by position Specialist POSITION_SYNC Review a list of all Budget Check by Position positions currently open Vacant in a department Position Vacant Budgeted Positions Create Build Organizational Structure Organizational Review organization Structure structure reports Active/Inactive Positions Active/Inactive Positions USF Active Position History Active Position History USF Exception/Override Exception/Override USF Mass Org Exception Reports Report (USF) Incumbent History Incumbent History USF Job Code USF Job Code & Position Audit Occupational Series USF OF8 Report USF Position Status Position Title Table USF Vacant Position Vacant Position USF Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 29
  • 30.
    Create Organizational Structure Create organization structure reports Active/Inactive Positions Active/Inactive Positions USF Active Position History Active Position History USF Create organizational Exception/Override Human Create organizational chart based on position Exception/Override USF Resource Define and Identify direct or indirect report to validate structure Mass Org Exception Report (USF) Specialist Manage reporting relationships structure Build Organization Chart Incumbent History Positions Build Position Structure Create Organizational Apply Changes (USF) Incumbent History USF Report Build Department Job Code USF Organization (USF) Job Code & Position Audit Occupational Series USF OF8 Report USF Position Status Position Title Table USF Vacant Position Vacant Position USF Headcount Manager Plan Headcount FPS Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 30
  • 31.
    Respond to Human Create employee Resource Organizational lifecycle Specialist Structure actions View the CAECs to which a View a summary of CAEC Grades grade belongs headcount and recorded CAEC / Grade moves by CAEC Budget Line Detail View transfers of budgeted headcount that result in Transfers Identify the budget line authorized Retrieve the AHM and all Budget Line View information for each CAEC Record the details of the Finance Identify budget line data, Calculate the authorized budget Calculate the authorized budget Lock in headcount on Distribute headcount mass freezes and transaction Perform Annual and associate a grade with a Act, including the initial Finance including budgeted headcount, headcount from the budgeted headcount management from the one CAEC to overstaff between departments Need to freezes, and view usable Headcount Planning CAEC Act and any amendments for each CAEC headcount authorized budgeted headcount another CAEC Budgeted Headcount review? headcount View lock-ins of authorized CAE Category Fact with BL on Request Fact with BL on Request Budget Line Detail Budget Line Detail Budget Line Detail AD Budget Line Detail headcount budget that CAEC / Grade Lock-Ins result in authorized headcount management Budget Line View View actions captured in employee records and each actions impact Review a summary of Budget Line Detail headcount and recorded Summaries moves by CAEC Budget Line View Set up CAE Create headcount data Build the Create Cube cube for cube analysis CAE cube For Analysis CAE Cube Set Create Waged Hdct Calculate Up Cube(12m.) CAE Cube Review and analyze Create a list of employees in a Calculation Nominal headcount calculation results department Results Headcount Headcount Results Update the counter of the Nominal Headcount Review overview of the budget Review Budget Finance Act for one or all budget line info Line Detail lines Budget Line Summary Review budgeted headcount Update Counter Calculate FTEs per grade and Calculate Workforce Need to FTEs by Dept Need to Budgeted authorized by department and department Need to? Monthly or as Needed calculate? and Grade review? Headcount by Dept the calculated headcount Calculate FTE Lists the grades that do not BHAS Identify CAEC grade belong to any CAEC or grades Audit and discrepancies (one grade registered in multiple CAECs Review Grade s registered in several CAECs) Calculate headcount per Summarize headcount per Orphan Grades Headcount by Headcount CAEC Audit grade and department CAEC and department Grades Over Various CAEC Dept and Grade Summary Employees/Grade and Dept Headcount/CAEC/Dept. Review CAEC summaries Review CAEC CAEC Summary Summaries Average Index/CAEC Headcount Manager Archive the CAE data Need to? Archive CAE Storage Obtain Headcount Request a CAE allocation based on from another headcount available in another Department department/budget/category or Category CAEC Locking Ins Exceed Budgeted Authorizes overstaffing in a CAEC Headcount Overstaffing Request a CAE How to Identify Headcount allocation for a obtain for New Hire new hire allocation? Retrieve one FTE from available CAE Allocation Available headcount for new hire and update Budgeted balance Headcount CAE Allocation Review list of all CAE with an end Review the status of date or list of CAE to be Allocation the allocation or Future/Pending deallocated Hire and Enable Summary deallocation procedure Deallocations New Hire All CAE to be Deallocated Resources Procedures Links Other CAE Deallocate the headcount in the Allocate/Deallocate Identify Headcount current grade and reallocate to the Need to? Headcount for Grade Promotion new grade Deletes CAE if the allocation Need to Track Review CAE status CAE Change Need to Status stamp is denied delete changes Grade Change Advancement FPS summary review? Summary Delete CAE to? Track CAE Deallocate active CAE, i.e., make Update Allocation Due headcount available that has been to Temporary or designated for an employee that No Review list of CAEs Permanent Leave has discontinued service CAE Deallocation Leave or Update Job CAEs by allocated to an Termination Information Employee employee CAE/Employee Inquire View the actions that resulting Decide Delete from the last CAE change and if approval Yes Approved Headcount delete the corresponding given? Allocation Action updates Delete CAE and Related Actions Return Headcount Allocation Unlocks CAE once the margin is Obtained from another positive. Department or Category Reduction in Overstaff Approve or deny Need to approve/ headcount allocation Hire and Enable deny allocation for? New Hire for new hire Resource CAE Allocation Stamp Human Resource Approval Approve or deny allocation Track Authority Grade Change for new grade change Advancement FPS CAE Change Stamp Approve or deny Track Employee Leave or headcount deallocation Personal Termination CAE Deallocation Stamp Information Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 31
  • 32.
    Maintain Employee Data Update Employee Information Track Seniority Update Compensation Update Job Information Track Tenure and Probation - USF Track Flexible Service and Tenure Respond to employee Track Faculty lifecycle Events actions Track Manage Advancement - health and Manage Health and FPS safety data Safety Human Grant Tenure - Resource Track Citizenship FPS Specialist Information Track Employment Decide Contracts if need to? Track global Track Global Review and assignments Assignments Report Job Summary Information Track Labor Relations Track Secondment Manage Contributions - Manage Absences FPS absence data Archive or Delete Employee Records - FPS Track and Report Regulatory Information Time and Labor Manage time Manage Time and and labor Labor Administrator Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 32
  • 33.
    Update Employee Information Review list of direct reports and select individual to review View Employee Personal Info View manager information Review direct Dir Rep Multi-Select Direct Line Reports report data Direct Rep Drill-Down Pending Approvals Direct Reports Alerts Employee Search Learning Direct Reports Phones Objective Alignment Org Chart Viewer Company Directory My Job Openings Oversee managerial Line Manager events and data Birthday Alerts Anniversary Alerts Manager Leave Summary View employee personal information Organization Directory View Employee Personal Info Scheduled Training View personal Phone Numbers Manager Expiring Licenses information for Email Addresses Open Positions an employee Emergency Contact Time Management Alerts Talent Summary Workforce Availability Employee Performance Location Change (USF) Review or update personal information - USF Maintain Review Change Requests (USF) personal Address Change (USF) information Phone Number Change (USF) Review or update personal information for Federal Marital Status (USF) Personal Information Summary Name Change (USF) Home and Mailing Address Phone Numbers Maintain Email Addresses Employee personal Instant Message IDs information Emergency Contacts Marital Status Name Change Ethnic Groups Complete and submit Section I of I-9 Form Complete and Submit I-9 Form Yes Complete Employee I-9 Form submission or New Create list of employees whose I-9 Forms are Print completed reverify/update existing I-9 record by detailing How Complete Section I due to expire or whose final I-9 document and submitted I-9 the employee's legally required document No to handle I-9 Print an I-9 form of I-9 form information must be received Forms information records? needed? I-9 Receipt/Expiration Report Print I-9 Forms Complete/Reverify EE I-9 Form Update Employee I-9 Record(s) Identify checklist items to use as a guide Complete employee for processing people checklist items Person Checklist Locate and review a person's record by Search for searching by national ID a person Search by National ID Identify employee's personal information Emergency Contact Emergency Contacts Report Disabilities Maintain Accommodation Data Manage Driver's License Data health and Manage Health and Credit Card safety data Safety General Comments Company Property Human Prior Work Experience Prior Career History FPS Resource Military Situation FRA Specialist Dependent Information Depdnt Identification Details Dependent Benef History FPS Decide Ethnic Group and Religion THA SGP MYS CHN if need to? Hukou, Working Life and Living Status CHN Political Status and Native Place CHN Track global Track Global Update Update basic employee information Volunteer Activities assignments Assignments Decide employee Modify a Person Bank Accounts if need to? information Smart HR Transactions Business Expenses Badge Birthdays Report Home Address Report Mailing Labels Report Documents (ITA) Company Codes (ITA) Person Organizational Summary Manage Manage Maintain a Person's POI Reltn Absences absence data Respond to Modify a Person employee Additional Names lifecycle Add a POI Relationship actions General Availability MIL Disabilities BRA Additional Information ARG Additional Information BRA Personal Information BRA Security Clearance Badge/Clearance Access Summary Time and Labor Manage time Manage Time and Administrator and labor Labor Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 33
  • 34.
    Update Job Information Create personnel action request or termination of position or leave of Employee absence Employee Request USF Request Termination (USF) Create personnel action request Supervisor Request USF Promote Employee (USF) Personnel Reassign Employee (USF) Action USF Reporting Change (USF) Retire Employee (USF) Review Change Requests (USF) Separate Employee (USF) Change employee full/part time Full/Part status Time Status Change Full/Part Time Status Change FTPT Status (USF) Change employee location Location Request Location Change Location Change (USF) Request employee termination Termination Terminate Employee Initiate a request for a job change Type of that requires Works Council action needed Job Change Line Manager for direct (Europe) Approval Request Job Change reports? Review Job Change Request Request an employee transfer Transfer Transfer Employee Request employee promotion Promotion Promote Employee Review reporting View employee Review status of job Request and review reporting View status of Reporting change status transfer employee change request changes promotion request Change View Reporting View Transfer Review Job Change Request Reporting Change View Promotion Status Change Status Status Request Provide 1st level of Mass-Approve job change Provide 2nd level of Approve employee Approve transfer authorization required Approve reporting changes requests authorization required for a promotion employee for a personnel action Human Resource Approve Reporting Change Approve Promotion Approve Transfer Job Change Request Approval 1st Rqst Authorization personnel action Approval WC Automatic Approval 2nd Rqst Authorization USF USF Authority Approve/deny personnel action Approve Request USF Identify personnel action details of Perform scheduled automatic or manual request ready for human resources to processing of personnel requests for future dated Personnel process transactions that have been approved and need Action HR Processing USF to be pushed to various database records USF Cancel Personnel Action USF Process PAR Push USF Correct Personnel Action USF Comp Actns USF (hidden) Review the status of a job change requests requiring Works Council Mass-Approve job change Request Initiate a request for a job change that approval requests Job Changes requires Works Council approval Review My Job Change Request Job Change Request Approval GBR Request Job Change Review All Job Change Requests WC Automatic Approval Review Errors and Warnings Respond to Define the type of mass job data Apply mass changes to employee Review the results of the mass Job Changes employee update to apply to employee records records employee job record change by Mass lifecycle Mass Update Setup Mass Update Run Control Page Mass Update Result Grant Tenure Grant tenure – FPS Identify/update job-related information Track Job Changes Job Data Track seniority Seniority by Individual Current Job Employee Pay Rate Change Smart HR Transactions Update Update compensation Compensation Human Resource Specialist Type Identify nature and schedule of a Re-activate or update termination for Temporary temporary assignment of action needed temporary jobs Assignments Temp Assignmt due to Complete for employee Reactivate/Update Termination Decide Track Track Advancement Temp Assignmt w/out End Date if need to? advancement - FPS Distribute the cost of a main Track tenure Track Tenure and Appointments Identify new additional appointments appointment between its additional and probation Probation - USF JPN Additional Appointment JPN appointments Cost Rate JPN Track Track Flexible Record work location and flexible service Service and Tenure job information changes and tenure Assignments Update Assignment FPS FPS Job Data FPS Merge Employee Record FPS Track Track Faculty Identify change in pay rate or salary faculty events Events Compensation - FPS Update Compensation FPS Grant Premiums FPS Civil Change and check civil service position Service Position Chg Civil Service Position FPS FPS Modify employee categorization Categorization -FPS Update Categorization FPS Records work time changes Work Time - FPS Update Work Time FPS Provide Personal Information File Personal Information - CHN Personal Information CHN Record the date an employee resigns Terminations - ITA Terms (ITA) Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 34
  • 35.
    Track Seniority Update seniority components Update seniority in compensation packages information Update Seniority Pay Verify workers are still eligible Review employee records with Review employee seniority Check seniority for seniority pay components multiple codes information data for a worker Update Seniority Eligibility Multiple Seniority Components Seniority Report Manage Update Job Decide health and Manage Health and Information if need to? safety data Safety Human Resource Identify Identify seniority for a worker Decide Specialist Belgium seniority Identify Seniority (BEL) if need to? Track global Track Global assignments Assignments Manage Claeys Review and set Claeys Calculate the severance Create Notifications report information for calculation variables amount Create Notification (BEL) Belgium workers Create Notification (BEL) Create Notification (BEL) Manage Manage Absences absence data Manage time Manage Time and and labor Labor Time and Labor Administrator Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 35
  • 36.
    Update Compensation Refresh the compensation defaults in Job Data Refresh Compensation Human Manage Resource health and Manage Health and Specialist safety data Safety Update Job Decide Information if need to? Track global Track Global assignments Assignments Recalculate Manage compensation packages Manage Absences Calculate Compensation absence data Time and Labor Manage time Manage Time and Administrator and labor Labor Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 36
  • 37.
    Track Tenure andProbation - USF Identify employees who are within Create a worklist item and notify Identify employees 60 days of tenure waiting period supervisors of tenure conversion awaiting tenure Process Automated Actions USF Tenure Conversion Notice USF Identify or Track Tenure - USF convert? Create a worklist item and notify Update tenure status for Perform tenure supervisors of processed employees passed tenure dates conversions conversion Process Automated Actions USF Tenure Conversion Notice USF Human Resource Update Job Decide Information if need to? Specialist Manage health and Manage Health and safety data Safety Create a worklist item and notify Identify employees Identify employees who are within supervisors of probation awaiting probation 60 days of probationary period termination termination Process Automated Actions USF Decide if Probat Term-Supv Notif USF need to? Track global Track Global assignments Assignments Identify or Track Probation - USF terminate? Manage Terminate probationary periods Create a worklist item and notify Manage Terminate Absences for employees passed probation supervisors of terminated absence data probationary dates probations periods Process Automated Actions USF Probat Term-Supv Notif USF Time and Labor Manage time Manage Time and Administrator and labor Labor Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 37
  • 38.
    Track Flexible Serviceand Tenure Group actions and Define rules for service Establish calendars for reasons that count accruals, including rounding Yes accruing service years toward accrual and adjustments Calendar HR Action/Category Service Rules Establish academic Identify experiences and Define or Update ranks, eligibility, and credits from other institutions Tenure Tracking probationary periods and apply toward tenure Information Academic Rank Experience/Credit Codes Review processing messages Processing Update to ensure accuracy Update Job messages service accrual Review Processing Messages Information Decide definitions? Track Tenure if need to? Review or update default Review changes made Activate tenure Track employee's Review current jobs Update the tenure service Create tenure reports tenure data, add to academic rank and Calculate tenure service for a Review temporary results of tracking for an service accrued from that count toward Temporary totals and employee service Tenure Calculation No additional details, and tenure status group or an individual Review? tenure calculation employee other institutions tenure results history Tenure Years of Service Decide if assign calculation group Review Rank/Status Perform Tenure Calculations Review Tenure Run Results No Job Data Create Tenure Data Review Related Jobs Perform Tenure Calculations Employee Tenure Status need to? Create Tenure Data History Human Need new Resource Assign and calculation Specialist Calculate Tenure group? Tenure Review results of tenure calculation accrual for calculation process summary Review Tenure Calc Summary Create calculation Yes groups Calculation Group Review history of service History credits Manage Service History health and Manage Health and safety data Safety Identify service Identify employee's Review jobs and Review accrual calculation group and Calculate service Review flexible service startup credits and positions eligible to processing results Decide No FTE value for prorating accruals Review? Calculations calculations exceptions accrue service credits View Periodic Results if need to? Track global Track Global accrued service Calculate Service Flexible Service Summary Flexible Service View Related Jobs Message Log assignments Assignments Job Data Need new Track Service calculation Review employee flexible group? service Reports Manage Calculated Service Report Manage Employee Service Report Absences absence data Create calculation Yes groups Calculation Group Time and Labor Manage time Manage Time and Administrator and labor Labor Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 38
  • 39.
    Track Faculty Events Update or review my faculty events Activities Administrative Posts Committees Employee Presentations Professional Training Publications Student Advising Teaching Responsibilities Define committee details Define DETYA details Define administrative posts Committees Classification Code AUS Recruiting Recruiting Administrative Posts Committee Type Organization Unit AUS Yes Define employee case, i. e., Review the final, approved Review less sensitive case change in tenure status, title Review case information employee cases Employee cases information change Case Information Review Case Status Case Progress Identify Employee Case Case Review Status Rpt Track employee's administrative Update Job Update Administrative No Need to track? posts, titles, and appointments Information tracking data? posts Administrative Posts Track participation in activities Activities and committees and committees Review Committee Membership Human Activities Resource Track faculty competencies and Specialist Competencies accomplishments and accomplishments Presentations Publications Identify courses the employee is Manage Teaching health and Manage Health and assigned to teach responsibilities safety data Safety Teaching Responsibilities Track employee's student Decide Advisees advisees if need to? Student Advisement Track global Track Global Review Faculty history assignments Assignments Faculty history information Faculty Events Hist Rpt Identify full-time and part-time Load and report on teaching data Load FT Teaching Member Data Manage member data Manage Memberships Load Teaching Survey Data Absences Full-Time Member absence data Full-Time Surveys Create Survey Stats CAN Part-Time Surveys FT Survey Stats CAN Rpt Time and Labor Manage time Manage Time and Administrator and labor Labor Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 39
  • 40.
    Track Advancement -FPS Review employees selected Identify promotable Promote Define grade promotion for promotion and add or Identify employees selected for employee population Eligible criteria remove employees promotion for a specified date Select Promotable Employees Define Promotion Rules Review Promotable Promotable Employees Report Employees Employees Define reclassification Simulate reclassification Update employee records with Calculate promotion probation Reclassify conditions and and save the results Validate reclassifications valid reclassifications period end dates Employees procedures Reclassification Validate Reclassification Update Career Calculate End of Probation Pd Define Reclassification Simulation Plan Headcount Decide - FPS if need to? Update career classification data for Modify an individual employees advancement Request new career Increment Step/Promotion Promote classification for individual FPS Human one employees Resource employee Increment Step/Promotion Calculate seniority and FPS Specialist Update seniority bonus to Identify expected step or sub Delete advancement data length of service Enter a Delete an Decide Advance speed up advancement Review career seniority step increment dates Decide Update career advancement Decide Increment Step/Promotion Calculate Seniority manual advancement if need to? Employees Update Seniority Bonus Review Career Seniority Step Increment Date if need to? Next Step Increment if need to? FPS Calculate Length of advancement FPS Reset Advancement Dates Service Promote Advance multiple multiple employees at one time employees Step Increment Manage health and Manage Health and Identify employees to be safety data Safety Advance a worker advanced and update career automatically records automatically Automatic Step Increment Update Job Repair/adjust the impact of Information Track global Track Global Simulate advancement for a Review advancement Clear the advancement inserting or deleting a assignments Assignments Simulate an Decide corps or employee simulation simulations career action with an old advancement if need to? Step Increment Simulation Career Simulation Report Delete Simulation Records effective date Retroactivity Processing Update the advancement Freeze Manage date or demote Manage or demote Absences Freeze Advancement/Demotion absence data an advancement FPS Manage time Manage Time and Time and Labor and labor Labor Administrator Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 40
  • 41.
    Grant Tenure -FPS Update Job Terminate employee Information Review employee's competencies with those required by Competencies Review a Modify employee status position Validate Probation Extend probation period and provide information Period probation after the first on tenure rejection Update Status FPS Inform managers of Calculate tenure date Select employees eligible Notify trainee Review trainee grade and Review employee trainees eligible for for individuals or for tenure within specified supervisors of Need to step data and hold, Decide tenure dates tenure groups period probation and review? validate or deny tenure if need to? Manage Update Status FPS Trainees to be Given Manage Health and Calculate Tenure Date Calculate Future Tenures dates Validate Probation Period health and Tenures Safety safety data Grant tenure and update Grant Decide status code Compare employee's tenure if need to? Assign Civil Servant Status Human accomplishments with those required by Resource Accomplishments position Specialist Validate Probation Track global Track Global Period assignments Assignments Manage Manage Absences absence data Time and Labor Administrator Manage time Manage Time and and labor Labor Payroll Administrator Manage Manage payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 41
  • 42.
    Track Citizenship Information Identify details about employee's substantial Substantial presence presence in the US Employee Presence Test USA Audit Passport/Visa expiration Passport/Visa expirations dates Passport/Visa Expiration Audit Respond to Need Human Employee to test or Lifecycle audit? Resource Specialist Audit citizenship/country/Visa Citizenship discrepancies Citizenship/Country/Visa Audit Manage health and Manage Health and safety data Safety Review, update and validate Decide Identification data identification data provided if need to? Identification Data Track global Track Global assignments Assignments Manage Manage Absences absence data Time and Labor Manage time Manage Time and and labor Labor Administrator Manage Manage payroll Payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 42
  • 43.
    Track Employment Contracts Update existing contract with USF renewal information Service Agreements USF Prepay Identify prepay options Define contract types Define contract templates options Contract Prepay Options NA Define contract clauses Define Contract Types Create Create Yes Define Contract Templates Define Contract Clauses Legal Contract Type BRA Template? Define SPEE Templates ESP Define Contract Benefits ESP Respond to Need to Recalculate contract work Employee create or update What North Update contract pay Decide days Lifecycle contract? contract action is Recalculate No America Update Contract Pay NA if need to? Recalc Contract Work Days needed? NA Create employment contract Update contracts reports Renew pay contract Create Renew Update Update Contracts Yes Contract Information Report Renew Pay Contracts NA report? Human Update Contracts ESP Print Contrata XML File ESP Print Contracts ESP Resource Specialist No Identify the replacement contract Replace Replace Contract BEL Manage health and Manage Health and Track information on the Decide safety data Safety Decide termination of an employee's Belgium Terminate if need to? contract if need to? Terminate Contract BEL Track global Track Global Define contract end and reason assignments Enter an Define Contract End BEL Assignments end and reason Define Contract End Reason BEL Manage Update Contract Information with Manage Absences response data from official body absence data Spain Read External XML File ESP Review External XML File ESP Time and Labor Manage time Manage Time and Administrator and labor Labor Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 43
  • 44.
    Review and ReportJob Summary Information Review job information Workforce Job Summary Multiple Jobs Summary View job data Job Summary JPN Compensation Summary USF Create workforce reports Personal Data USF Employee Turnover Analysis Generate Primary Job Audit workforce Pending Future Actions reports Request Ad hoc Process Department Action Notices Create job information reports Create As-of-Date Mass Report Personnel Actions History Create As-of-Date Request Employees on Leave of Absence Create Calendar Year Request Temporary Employees Database Audit Years of Service Create From/Thru Dates Request Social Report BEL Headcount Movement Official List ESP Current Headcount Profile Create AFI File ESP Workforce Survey Result (CAN) Establish Synchronization FRA Groups by Emplymt Type Rpt (CAN) Appointment Notification JPN Groups by OCC Group Report (CAN) Appointment List JPN Groups/Jobs Filled/Vacated (CAN) Generate Workforce Survey Stats (CAN) Completion of IC Transfer JPN job information As Of Date Request USF Employee Assignment List JPN reports Matricula Book (ITA) Matricula Calculation (ITA) Employee Listing SGP Personnel Actions History USF Appointment Affidavits USF Award Action USF Human Setup Wage/Separation USF Resource Print Wage/Separation USF Request Personnel Action USF Specialist Notice of Personnel Action USF Respond to Decide Request Prelim Empl Data USF Employee if need to? Lifecycle Review OEE workforce survey for View the OOE Canada workforce survey report Workforce Survey Results Create workforce reports for French Public Sector Part-Time Schedule FPS CS Position Request tbc FPS CS Position - Rqst Reject. FPS CS Position/Employee FPS Career - Request tbc FPS Manage health and Manage Health and Career - Request Rejected FPS Review job information for safety data Safety Generate Employee Career/Action FPS employee of French Public Sector French Public Sector Assignment - Request tbc FPS Merge Employees FPS reports Assignment - Rqst Rejected FPS Review Merge Results FPS Decide Work Time - Request tbc FPS Job Data FPS if need to? Work Time - Rqst Rejected FPS Job Data History FPS Compensation - Request tbc FPS Track global Track Global Current Status FPS Compensatn - Rqst Reject. FPS assignments Assignments CS Position History FPS Collective Orders FPS Assignment History FPS Individual Orders Edits FPS Career History FPS Collective Orders Updates FPS Current and Prior Career FPS Pending Orders FPS Career Seniority FPS CS Position/Career FPS Manage Career/CS Position Manage Absences Compensation History FPS absence data Time and Labor Manage time Manage Time and and labor Labor Administrator Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 44
  • 45.
    Track Labor Relations Request change in job, if desired Employee Request Job Change Review My Job Change Request Identify disciplinary action, action taken, and final resolution Disciplinary Record Disciplinary Actions action Record Disciplinary Actions USF Record Negotiability Appeal USF Respond to Create labor relations reports Need to Employee Discipline Action Summary record? Lifecycle Grievance Detail Identify negotiability appeals item Employee Disciplinary Action Negotiability and tracking details Grievance Summary Record Negotiability Appeal USF Union Fees ESP Union Membership USF Union Membership Labor Relations Letters Identify grievances filed, action Grievance taken, and final resolution Record Grievances Manage health and Manage Health and safety data Safety Human Review earning Resource Obtain time worked Wage Update wage progression Review and adjust wage period details per pay Approve workers for wage information from Process advancements Decide Specialist progression payroll activity records progression details period about worker’s progression Process Wage Progression if need to? Update Wage Progression Review Wage Progression hours Approve Employees to Advance Extract Payroll Data Review Time Details Track global Track Global assignments Assignments Create layoff and recall Define groups of Process and maintain reports Review list of laid Layoffs and workers to layoff or Define layoff workers reemployment Reinstate Rehire laid off workers Layoff Roster Report Run layoff process off workers recalls recall parameters (recall) rights or recall Reinstate quickly Bumping Report Layoff Roster Layoff Roster Labor Group Layoff Roster Process Recall Rights workers? Reinstatement Roster Seniority Report Manage Report Manage Definition Recall Rights Candidate List Report Absences absence data Recall Roster Report Recall Rehire with more flexibility Recall Roster Time and Labor Manage time Manage Time and and labor Labor Administrator Payroll Manage Manage Administrator payroll Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 45
  • 46.
    Track Secondment Contributions- FPS Manage health and Manage Health and safety data Safety Calculate retirement Receive Respond to Create contribution amount letters Review employees in contributions for employees in employee Decide Employee to employees secondment secondment contribution if need to? Lifecycle Contribution Call Letter FPS Review Payment Cont FPS Calculate Contribution FPS payments Track global Track Global assignments Assignments Human Manage Manage Resource Absences absence data Specialist Time and Labor Manage time Manage Time and Administrator and labor Labor Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 46
  • 47.
    Archive or DeleteEmployee Records - FPS Delete, and archive employee personal data, civil service position, work time, or Manage career data health and Manage Health and Delete Career Data FPS safety data Safety Delete ID FPS Personal Data Deleted ID FPS Respond to Employee File Cncl FPS Decide Employee Assignment Archive FPS if need to? Lifecycle CS Position Archive FPS Track global Track Global Career Archive FPS assignments Assignments Work Time Archive FPS Compensation Archive FPS Human Premium Archive FPS Resource Seniority Bonus Archive FPS Specialist EE Categorization Archive FPS Manage Manage Absences absence data Time and Labor Manage time Manage Time and Administrator and labor Labor Manage Manage Payroll payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 47
  • 48.
    Track and ReportRegulatory Information Create regulatory reports - General Workforce Job Group Analysis Job Group Analysis Summary Job Group Movement Analysis Define regulatory reporting CAN Job Group Roster Define Canadian Pay Equity Terminations Analysis General Define Canadian NOC Codes Workforce Analysis Define Stats CAN Location Code, PRWORA-New HIre Institution Code( E&G) OSHA 301 Incident Report Regulatory Define Stats CAN Faculty Code, OSHA 301 Incident Report Print requirements Province Code( E&G) OSHA-200 Log for Canada Define Stats CAN Rank Code, OSHA 200 Incident Log Responsibility Code (E&G) Create regulatory reports - BRA OSHA 300A Annual Summary Define Stats CAN Department CIP CAGED File/Report BRA Brazil (E&G) Employee Registry Report BRA Define Stats CAN Degree Level (E&G) CTPS Receipt BRA Define regulatory reporting Manage Create regulatory reports AUS Regulatory requirements AUS Australia health and Manage Health and APS Employee Additional Data requirements Define ASCO Codes safety data Safety ASCO Report for Australia Define APS Movement Create and review DIMONA hire and Create APS PSMPC Define APS Non-English Code termination notifications to be sent to the Identify establishment information Belgium Social Security office (RSZ) in Type of Decide Establishments Establishments Belgium the form of structured XML files reports? if need to? Review Controlled Estb Ids Create DIMONA Notification (BEL) Track global Track Global Review DIMONA Notification (BEL) Regulatory reports - UK assignments Assignments Identify job tasks Load DIMONA Notification (BEL) Adverse Impact Job Code Tasks Type of Job tasks Job Group Roster Job Groups tracking? United Kingdom Joint Staffing Job Tasks Create regulatory reports CAN NI Fair Employments Define accommodations required for Employment Equity Termination Analysis disability reasons Manage Accomodations National Occupation Codes Workforce Analysis Manage Accommodation Types (USA) Absences Maintain Affirmative Actn Plan (USA) Official Language Requirements absence data Define edit and field Canada Pay Equity CPDF information for CPDF Canadian Academic Teaching Survey information CPDF Fields USF Full Time Report (E&G) CPDF Edits USF Canadian Academic Teaching Survey French Identify mandate information for Part-time Time Report (E&G) Creates regulatory reports ITA mandate French employees Equal Opportunities ITA Italy information Mandates FRA Disability Report ITA Human Union Report ITA Resource Creates reports on heavily disabled Define standard diagnosis Germany individuals DEU Specialist Diagnosis information Yes Heavily Disabled DEU information Diagnosis Manage diversity compliance NLD Complete ERE Data Netherlands Diversity Registration Employment ERE Data ESP Diversity Report regulations for ERE Company Data ESP Regulatory Reports ESP Spain ERE Employee Data ESP Create AFI file ESP Process ERE Data ESP Print Contrata XML File ESP Define Workforce Administration Read External XML File ESP Regulatory reporting Information FRA Administration Parameters BRA Spain Review External XML File ESP Pension/Cont. Contracts Review Parameters CBO Codes BRA Print Contracts ESP Compute Employee Survey for Brazil City Codes BRA ERE SPEE Communications ESP Edit Employee Survey Legal Movement Code BRA ERE Data Report ESP Employee Survey Report ERE Activity Periods ESP Disability France Monthly Workforce Need to Single Hiring Statement define No Personal Register Create EEO reports tracking? Workforce by Nationality EEO-1 Employer Info BIAF EEO-1 Job Analysis Report Election Report EEO-4 State/Local Govt EEO EEO-5 Job Analysis EEO Groups by PATCOB/POI USF EEO Grps by PATCOB/SubAgcy USF Create veteran reports USA EEO Groups by Series/POI USF VETS-100 Analysis Respond to EEO Grps by Series/SubAgcy USF VETS-100 Process Employee VETS-100 Submit Lifecycle Maintain Military Dischrg Date USA Veteran VETS-100 by POI USF Create regulatory reports USA VETS-100 by Sub Agency USF IPEDS-S (USA) SF113-A USF USA SF113-G USF New Hire USF Create CPDF reporting information New Hire Error USF Dynamic Table Status Table CPDF Edit Validation Error Report Dynamic/Status File Organizational Component File Time and Labor Manage time Manage Time and Labor Administrator and labor Payroll Manage Manage payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 48
  • 49.
    Manage Health andSafety Human Resource Maintain Employee Data Specialist Verify Witnesses Define Health and Create Health and or Personnel Obtain Incident Safety Tracking Safety Reporting Involved with Information Information Information Incident Health and Safety Administrator Record Employee Medical Exam Results Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 49
  • 50.
    Create Health andSafety Reporting Information Create health and safety Health and Safety reports CAN Reporting Data WCB Form 7 CAN Canada WCB Incident CAN Create health and safety reports Prepare accident, incident , DEU Health and Safety and illness data and load to Accident DEU Reporting Data temporary data table DEU Illness DEU Germany Accident Data DEU Incident Location Summ DEU Illness Data DEU Reportable Accident/Illness DEU Health and Safety Prepare and load RIDDOR Reporting Data data GBR GBR RIDDOR Data GBR Public Service and Protection Regulatory Reports Commission Reporting AUS AUS Create APS PSMPC Create CAT and PPP Reports Regulatory Reports BRA BRA CAT Report BRA PPP Report BRA Obtain Incident Information Create report containing accident Regulatory Reports details CHE CHE Accident CHE Health and Safety Administrator Prepare BC WCB data for file Creates and sends the BC WCB Need to Regulatory Need to Regulatory Reports creation CAN EDI file CAN create? Reports create? CAN WCB EDI Data CAN Create WCB EDI File CAN Create legal XML files to Identify incidents that did not Regulatory Reports communicate accidents with and Record Employee result in the loss of wages ESP ESP without absence days Medical Exam Incident w/o Lost Wages ESP Print Delta XML File ESP Results Create a French health and safety Regulatory Reports report FRA FRA Work Accident FRA Create a report of injury or Create a Report of a Case of a Work Restriction Regulatory Reports dangerous occurrence Disease report GBR Summary GBR Injury/Dangerous Occ GBR Illness GBR Create OSHA reports OSHA 301 Incident Report OSHA 301 Incident Report Create list of case numbers and Regulatory Reports PrintOSHA 300 Incident Log details of the injury/illness USA USA OSHA 300A Annual Summary OSHA-200 Log (USA) Review Employee With Work OSHA 300 Runs Restriction summary OSHA 301 EE Incident Report Employee Work Restriction OSHA 301 NE Incident Report Smry Human Measure Resource deployment Specialist effectiveness Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 50
  • 51.
    Define Health andSafety Tracking Information Human Resource Maintain Specialist Employee Data Define accident or injury information Canada Accident/Injury Class/Subclass CAN Information Occupations CAN Canada Contributing Factors CAN Preventative Actions CAN Define accident or injury information Germany Case Officer DEU Corrective Actions DEU Accident/Injury Disease Class DEU Information Preventative Actions DEU Germany Unsafe Items DEU Work Area Class DEU Work Area Category DEU Define hazardous environments Work Area DEU Define accident or Dangerous Occurrences injury information Job Code Hazards Define medical data Accident Types Location Hazards Allergy Define physicians Body Parts Hazardous Conditions/Materials Define work restrictions Accident/Injury Define accident or injury information Immunization and facilities Need to Nature of Injury Hazard Units BRA Codes and Effective Dates Information Great Britain Medication Medical Facilities create? Source of Injury Hazard Concepts BRA Modified Work Great Britain External Scheme GBR Diagnosis Physicians Administrator Unsafe Acts Work Hazards BRA Occupational Illnesses Animals Involved Job Code Hazards BRA Transportation Work Area Hazards BRA Identify details for the Mexican mixed Mixed Committees committees Mexico Mixed Committee MEX Define medical services Australia Claim Threshold - Claims AUS Medical Services Claim Threshold - State AUS Australia Claim Threshold - Union AUS Medicare Item Details AUS Verify Witnesses or Personnel Involved with Incident Record Employee Medical Exam Results Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 51
  • 52.
    Obtain Incident Information Identify claims details related to a No rehabilitation plan for non-employee Create Non-Employee Rehab Plan Industrial Identify industrial hazard code Identify assigned case officers Hazard for employee (DEU) (DEU) Germany Coop Society Data Case Officer Assignment Identify claims details related to a Rehab for Yes rehabilitation plan employee? Create Employee Rehab Plan Yes Identify basic incident information Incident Details Incident Detail (rpt) Identify charges related to injury Verify Witnesses Incident Lost Work (rpt) Identify injury details or illness claims Is Health and or Personnel Record? Incident Incident Summary (rpt) Incident Yes Injury Details Open Claim rehabilitation Safety Involved with with injury? Location Incident Summary (rpt) Injury Details BRA Claim Summary Overview (rpt) needed? Incident Administrator Non-Employees In Incidents (rpt) Incident Claim Detail (rpt) Vehicle Incident Summary (rpt) Incident Details BRA No Identify any corrective actions and/or preventative No actions Identify Corr/Prevent Actions Identify information about Vehicle/ vehicles or equipment Equipment Vehicles/Equipment Involved Review all incidents by specific individual has been involved Review Employee Injury Summary Employees In Incidents (rpt) Review Injury Summary BRA Create Health and Safety Reporting Information Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 52
  • 53.
    Record Employee MedicalExam Results Identify basic exam and physician Health card information, test results and information comments Health Card (USF) Define Health and Safety Tracking Information Identify hearing exam classification Audio exam Audiometric Exam Identify basic exam information Eye exam Eye Exam Need to Create Health and Need Physical Identify basic exam information review health No Safety Reporting to record? exam Physical Exam card info? Information Health and Safety Respiratory Identify respiratory exam information exam Respiratory Exam Administrator Yes Identify basic exam and physician information such as name and Drug test data address and drug sensitivities from previous test administered Drug Test (USF) Identify medical examination dates Exam dates/status Review employee and exam status for employee (DEU) Germany information, position Employee Checklist information, physician information, drug sensitivities and previous tests, and drug test results Review Health Card Info Identify data to track employee Illness Identify case officers (DEU) (USF) illnesses (DEU) Germany Case Officer Assignment Illness Tracking Exam results Identify medical exam results (BRA) Brazil Medical Exam Results BRA Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 53
  • 54.
    Verify Witnesses orPersonnel Involved with Incident Identify additional employee Employee information information Employee Identify employment Employment information Employment Define Health and Obtain Incident Safety Tracking Need to track? Information Health and Information Safety Administrator Identify employee family Family information information Family Identify personal information Non-employee for non-employees involved information in incidents Non-Employee Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 54
  • 55.
    Track Global Assignments Respond to Complete Notify Employee Identify Global Identify Travel and Employee Assignment and of Global Assignment Education Lifecycle Update Assignment Information Allowances Actions Competencies Human Resource Specialist Perform and Receive Prepare for Complete Employee Assignment Assignment Global Information Assignment Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 55
  • 56.
    Identify Global AssignmentInformation Review information on Immediate dependents in employee's Family immediate family Review Immediate Family Data Identify basic assignment information such as type, dates Identify new host Assignment and host contact Add a Host Assignment Assignment Data Identify information about the Human What Identify Travel and disposition of employee home information is Home/Host Education Resource residences needed? Allowances Specialist Home and Host Data Identify dependents and beneficiaries, addresses, and Dependents personal information Dependent Data Review a summary of employee's assignment and organizational Summary relationships Review Assignment Summary Person Organizational Summary Employee Prepare for Assignment Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 56
  • 57.
    Identify Travel andEducation Allowances Employee Identify company-paid Company travel Paid Company Paid Travel Travel Dependent Identify additional Company company-paid travel Paid Dependent Company Paid Travel Travel Identify employee financial Identify supplemental Complete Identify Global Update Employee Human assistance information earnings and deductions Assignment and Assignment additional Educational International School/ Assignment Update Resource Information information Reimbursements Program Compensation Competencies Specialist Identify financial Dependent assistance information for Educational a dependent Reimbursements Dependent International School Identify employee's Accompanying dependents who will travel Dependent with the employee Dependent Accompanying Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 57
  • 58.
    Complete Assignment andUpdate Competencies Create report of Record information Track job information Human Identify Travel and while on assignment employee's on global regarding completed Maintain profiles Measure Resource Education assignments assignment and close deployment Home/Host Person Profiles Allowances Employee on Assignment host record effectiveness Specialist Information Report Home/Host Information Perform and Complete Global Employee Assignment Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 58
  • 59.
    PeopleSoft Manage Absences Maintain Manage Leaves Employee Data USF Authorize and Track FMLA Leave Manage Leave Transfers Human Resource Specialist Record Absences, Analyze Absence Measure Define Absence Vacations, Information and Deployment Tracking and Accruals and Identify Trends Effectiveness Assign Schedules Entitlements and Patterns Provide Absences to Payroll Request and Line Manager Approve Absences and Vacations Manage Time and Time and Labor Labor Administrator Manage Payroll Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 59
  • 60.
    Manage Leaves USF Request leave USF Request Leave of Absence Create an application to donate to leave bank or Leave Donations transfer program to be used External by an employee outside of the agency (USF) Review by effective date hours External Leave Donations contributed to or withdraw from Leave Bank employees participating in the leave Ledger bank program (USF) Create an application to Review Leave Bank Ledger Create Leave Donations donate leave to the leave applications Internal transfer program (USF) for? Process donations and update Voluntary Donations accruals, additional pay, and Review donations made to a leave leave ledgers (USF) Leave Donations transfer program recipient (USF) Request Leave Bank/Transfers Track Leave Donation Applications Create application to receive Update Leave hours from a leave program Leave Bank Requests (USF) Leave Admin USF reports (USF) Create Leave Recipient App Leave Acceptance Notifications Leave Bank Participants Human Inquire on automatic leave enrollment Decide if Need to Leave Leave Denial Notifications history (USF) Resource Maintain need to? review? Enrollment Leave Transfer Participants Track Auto Leave Enrollment Specialist Leave Bank Application/Donate Employee Data FEFFLA Leave Audit SF1150 Update Leave Accruals Review summary leave contributions, Initiate leave accrual process General withdrawals, and balances by leave balance for all employees Leave Summary Review and adjust employee enrollment in program type (USF) currently enrolled in the selected Information earnings accrual classes or manually enroll Review Leave Program Summary Measure benefit plan (USF) No employees in accrual classes (USF) Calculate Leave Accruals Deployment Employee Accruals Enrollment Effectiveness Accruals Update Leave Accrual Elections Review leave balances and totals for a Leave Balances particular employee (USF) Using auto Leave Accruals (rpt) enrollment for leave accruals? Automatically enroll employees in earnings accrual classes based on the PAR or leave Yes program activity and the leave class rules (USF) Request Auto Leave Enrollment Employee Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 60
  • 61.
    Authorize and TrackFMLA Leave Human Resource Specialist Authorize or deny FMLA request Review FMLA reports (USF) Record significant events that affect Measure Maintain (USF) Schedule FMLA Status Report FMLA leaves Deployment Employee Data Request/Authorize/Track Leave Request/Authorize/Track Leave Payroll Audit Report Request/Authorize/Track Leave Effectiveness Process FMLA Leave FMLA Request time off to care for Take requested themselves or time off from a family employment member Employee Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 61
  • 62.
    Manage Leave Transfers Request to Donate Leave GBL Donate Leave Request Request to Receive Donated Leave Receive Donate Leave Request Requests need No Maintain approval? Employee Employee Data Request to Return Unused Leave Return Unused Leave Request View Self Service Transaction History Yes Leave Transfer Request History Request to Terminate Participation in Program End Participation Request Define Leave Program and Leave Transfer Entitlements Leave Program Definition Define Leave Transfer Configuration Leave Transfer Configuration Define Leave Transfer Recipients Human Define Absence Leave Transfer Recipients Tracking and Resource Assign Schedules Specialist Initiate Leave Transfer Approve Leave Transfer Requests need Process Leave Donations Requests Yes Requests Manage Payroll approval? Run Leave Donations Initiate Requests Manage and Approve Requests View Leave Transfer No Transactions History View Transaction History Adjust Leave Balances Programs Adjust Leave Program Balances Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 62
  • 63.
    Define Absence Trackingand Assign Schedules Assign Track Time and Define calculation rules etc. for Define absence entitlement plans Work Schedule Labor Entitlements Absence Entitlements GBL Absence Entitlement Plans CHE (Using Time and Labor) Absence Entitlements Absence Entitlement Plans DEU Define absence types and Absence Types take parameters GBL Map absence to and Takes Absence Take Types Payroll Assign or override a specific Absence Takes employee's long-term, alternate Assign or Override or daily schedule Work Schedules Assign Work Schedule (Using Global Payroll) Daily Work Schedules Define absence take Pay Groups Need to Absence Need to parameters NLD define? Takes - NLD assign? Absence Takes NLD Add and update an entitlement Absence Define absence reasons GBR Assign for a global employee Yes Reasons - GBR Absence Reasons GBR Entitlements Assign Entitlements and Takes Vacation Entitlm and Takes BRA Record Absences, Vacations, Accruals Define the payee's prior and Entitlements services to be used in the Prior Service AUS Assign Identify information used by calculation Define Prior Service AUS Entitlements Global Payroll for France FRA Dependent Information Using Global Maintain Employee Payroll Absence Data Management? Define absence classes, types Human and specific details Monitor Absence Classes Resource Absences Absence Types Specialist Absence Parameters No Assign vacation plans to Leave Plans and Create vacation and leave plans Vacation Plan employees Vacation Buy/Sell Plans Vacation Benefits Vacation Plan Leave Plans Create holiday and work Assign holiday and work Holiday/Work Schedules schedules schedules using PeopleSoft Need to Need to Schedules (Using Holiday Schedules Human Resources define? assign? (Using Human Resources) Work Templates Assign Work/Holiday Human Resources) Work Schedules Schedules Create work schedules Schedules Create Work Schedules (Using Time and Labor) Assign Working Time Define working time directive Work Schedule Track Time and Labor Directive reporting parameters and default (Using Time and Labor) Reporting settings UK Working Time Directive UK Define benefits plan and programs Benefits Benefit Plan Benefit/Deduction Program Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 63
  • 64.
    Request and ApproveAbsences and Vacations View absence balances and Approve absence View absence requests history requests Absence Request History Absence Balances Absence Requests Absence Request History Yes Request Request absence on behalf of Employee direct report Absence Absence Requests Line Manager View absence balances and Is upper Approve absence management's history from direct reports No requests from direct reports approval Absence Balances Absence Requests required? Absence Request History Review View absence requests from And/Or? Absence direct reports Requests Absence Request History Review Review absence entitlement Absence balances Balances Absence Balances Maintain Employee Data Request Extended Absence View Extended Absence History Human Extended Absence Request Extended Absence Request History Resource Specialist Approve absence Manage requests Payroll Administer Extended Absence Review absence history View absence request status Absence Request History View Absence Request Detail Extended Absence Request History Employee Request time off from work Review absence entitlement balances Request Absence Absence Balances Request Extended Absence Forecast Absence Balances View Forecast Balance Results Request Absence View Forecast Balance Results Request Extended Absence Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 64
  • 65.
    Provide Absences toPayroll Global Payroll Provide absence information to North American North American Payroll Payroll To Payroll for North America Record Absences, Human Vacations, Payroll Resource Accruals, and system? Specialist Entitlements Provide absence to Payroll Payroll Interface Interface To Payroll Interface Time and Labor Request and Line Manager Approve Absences and Vacations Time and Labor Administrator Manage Time and Labor Payroll Manage Administrator Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 65
  • 66.
    Record Absences, Vacations,Accruals and Entitlements Provide approval decision Line Manager for vacation request Request/Approve Vacation Run payroll Update employees' before leave Absences Need to accrual Leave accrual records after or leave review or Vacation Accruals balances are Accruals payroll run accruals? update? calculated Accrue Vacation Record information and comments about the maternity Review leave accrual or parental leave Initiate leave accrual balances and totals for a Maternity Leave Maintain Maternity Leave (UK) process balance Leave Accruals particular employee Maintain Parental Leave (UK) Calculate Periodic Review Accrual Balances Maternity Leave CHE Accrual Leave Accrual Maternity Leave DEU Adjust a payee's frequency-based entitlement Consolidate company workforce Identify details of the Add and update an absence Absences Entitlement data - NLD Track employee's Incidental absence, follow-up event for a global employee and Take Assignment Export Company Data NLD first day of absence Absence actions and comments Absence Event Employee Illness Notification NLD and salary Absences Create/Update Absence Absence Event AUS Illness Notification by Group NLD information for Entitlement Absence Event BRA WAO NLD Absence Event ESP WAO Data NLD Absence Event Need to Absence Event GBR update? Protected Identify absence as Analyze Absence Human Absence Event MEX Absence Event NLD Absence protected BEL Information and Identify Resource Track employee's BEL Create Protection Trends and Patterns No Absence Event NZL Review or adjust Specialist Vacation Acquis Prd-Sched BRA pay in advance data absences or entitlements Absence Maintain Acquisitive Prd BRA Pay in Advance AUS for reduced hours Balance Pay in Advance NZL Adjust Absence Balances Record information about the Define Payee Data NLD maternity or parental leave - CHE, DEU Review maternity and parental leave Using Global Need to Maternity/ Maintain Maternity Leave UK details Provide Absences to Extended Request Extended Absence Approve Extended Absence Absences And/or? Payroll Absence Yes record details Parental Maintain Parental Leave UK Review Parental Leave by Dept UK Payroll Absence Extended Absence Request Administer Extended Absence Insert an absence event Management? for? Maternity Leave CHE Review Parental Leave by Emp UK into the GP Core Maternity Leave DEU component Illness/Maternity S503 Dtl ITA EIP CI: GP BRAZIL - Record vacation details - BRA VACATION ENTRY Vacations Vacation Entitlm and Takes BRA Provide Approved Absence Updates absences Absence FPS Absences FPS Define Absence Mass Data Request collective vacations - BRA Tracking and Vacation Mass Vacation Programming BRA Assign Requests Verify time available to Schedules Identify reason for vacation Provide approved Vacation request for vacation Capture Vacation Absence absence to Oracle Mass Generate a massive absence event - Request/Approve Vacation Workforce Scheduling Absence MEX Publish Absence Data to Request Create Mass Absence Rqst MEX OWS Request vacation Employee Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 66
  • 67.
    Analyze Absence Informationand Identify Trends and Patterns Review and forecast absence Absence balances Balances Review Absence Balances AUS Review Absence Balances AUS No Absence Review exception details, absence Exceptions dates, and payment details GBR Review Absence Exceptions GBR Review all types of employee absences in a Record Absences, Create absence reports GBL Absence Using Global graphical format Vacations, Absence Listing Calendar Payroll Absence Yes Review Absence Accruals, and Absence Absence Periods Calendar Management? Create absence reports GBL Entitlements Reports Time Lost Due to Absence Absence Results Register GBL Global Payroll Core Create absence reports NLD Absence Create absence history reports - Review a list of all Need to Create Illness Statistics NLD Summary History AUS Absence absences for an create or Create NLD Illnesses by Group NLD by Reports Leave History AUS reports employee review? Illnesses by Employee NLD Employee AUS Leave Liability AUS for? Summary by Employee Long-term Illnesses NLD Calculate, Decide Family Create family allowance reports Confirm, and info to Absences Review Allowance BRA GBR Review all employee Provide Payroll review? Summary Calculated or report? Reports Family Allow. Term of Resp BRA absences within a Using PeopleSoft by BRA Family Allowance Registry BRA department Global Payroll Department Summary by Department Create absence reports GBR Human Absence Create absence reports BRA Bradford Score GBR Resource Reports Vacation Receipt/Notice BRA Review all employee BRA Vacation Credit Report BRA Summary Specialist by absences within a department and Department Review working time for the UK subordinate departments Tree Working Time Directive Summary by Dept Tree Create absence reports MEX Review Absence Review Dept Time Directive Absence History MEX Review Employee Time Directive Reports Vacations MEX MEX Vacations Summary MEX Absence Create absence reports SGP Reports Leave Liability SGP SGP Leave History SGP Absence Create absence reports NZL Measure Reports Leave History NZL Deployment NZL Leave Liability NZL Effectiveness Absence Create absence reports MYS Reports Leave History (MYS) MYS Leave Liability (MYS) Absence Create absence reports USA Reports Results Register USA Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 67
  • 68.
    Manage Time andLabor Human Maintain Manage Resource Employee Data Absences Specialist Report to Work Review Schedules Report and Perform and Forecasts Time Duties Request Overtime Employee and Obtain Approvals Request Absences and Approvals Review and Approve Resolve Time Line Manager Entry Exceptions Time Resolve Time Administration Exceptions Enroll Time Time and Labor Reporters, Assign Create Payable Administrator Schedules, and Time Setup TCD Distribute Time Review and Adjust Information Time Summaries Payroll Manage Payroll Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 68
  • 69.
    Enroll Time Reporters,Assign Schedules and Setup TCD Human Maintain Resource Employee Data Specialist Review Schedules Employee and Forecasts Update dynamic Update Update existing Yes group membership Existing time reporter Refresh Dynamic Time Maintain Time Group Reporter Reporter Data Create or update calendars, Determine Using No dynamic groups or action to take security? groups? Enroll new time Assign time reporter's Enroll reporter long term schedule Enroll time reporter in Review compensatory New Create Time Assign Schedule to compensatory plan plan assignments Associate security Reporter No Reporter Data Group Comp Plan Time Reporter Status Group using groups Assign Work Schedule Enrollment Comp Plan History Create static Yes Static Security TL Permission List Scheduled Hours (Rpt) groups Groups Security Setup Static Group Time Send Time & Labor setup Collection data to TCD Create or Static or Device Send Setup to TCD Apply security Update Groups for Dynamic (TCD) using? Reporting Security Groups? Time and Create dynamic Dynamic Labor Groups groups HR Tree Assign security Administrator Dynamic Group Security using HR Tree Create or Apply override update what? rules to time No reporter Override Rules Create time periods Daily Weekly Review or update Static or Create Monthly Static static groups Apply Yes Dynamic Time Periods Repeating group Time Reporters in overrides? Group? Complex Groups Build Time Period Calendar View Time Period Calendar Review dynamic Refresh dynamic Dynamic group membership group membership group Time Reporters in Refresh Dynamic Create or update schedules Groups Group Schedule Group Create or Shifts Update Schedules Workdays Definitions Schedules to be Validated Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 69
  • 70.
    Review Schedules andForecasts Enroll Time Time and Reporters and Labor Assign Schedules Employee Configure Schedule Provide time reporter schedule preference Schedule Preference data to Oracle Workforce Scheduling Preference User Preferences EIP (AM):SCH_PREFERENCE_SYNC Report to Work and Perform Duties Employee Employee Need to Review work schedule by day Work review? Monthly Schedule Schedule Review forecast time Provide Time Forecasted Time Summary scheduling Forecasts Time and Labor Launch Pad feedback Forecasted Time Detail Override employee's Continue schedule for one or Retrieve time reporter schedule data from Override many employees for Oracle Workforce Scheduling Schedule Override one or many days EIP (AM):SCH_OWS_SCHEDULE Review employee work Schedule Manage Schedules Employee schedule Determine Work Manage Schedules action to take Schedule Assign Manage Schedule Options Schedule Assign time reporter's long-term schedule Assign Work Schedule Review time forecasts Review time detail Need to Time Forecasted Time Summary Forecasted Time Detail review? Forecasts Line Manager Time and Labor Launch Pad Time and Labor Launch Pad Review time management Time Calendars Management Monthly Time Calendar Calendars Weekly Time Calendar Daily Time Calendar Employee Configure Schedule Provide time reporter schedule preference Schedule Preference data to Oracle Workforce Scheduling Preference Publish Schedule Preference EIP (AM):SCH_PREFERENCE_FULLSYNC Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 70
  • 71.
    Report Time Human Manage Resource Absences Specialist Report Using Report to Work Receive mobile time entries from PeopleSoft Expenses Prepare and and Perform Expenses Mobile Submit Expenses Duties EIP (AM): ELAPSED_TIME_ADD Client Request Overtime and Obtain Retrieve time reporter data from collection Approvals Time Collection devices Device EIP (AM):ELAPSED_TIME_ADD Employee EIP (AM): PUNCHED_TIME_ADD Request Absences Report Mass Time using date and Approvals Report Using ranges Date Ranges Mass Time Select time reporting Report Time Online Report method Web Clock Online Timesheet Review and Approve time Report Using Report time Approvals Resolve Time Entry Yes Mass Time Date Ranges Mass Time required? Exceptions Timesheet Line Manager Provide to Report time by Time Reporter Manager Timesheet No Create Payable Time Report or modify employee Insert multiple rows into Calculate, Confirm, and Determine Report Overtime overtime information Positive Input Provide Payroll using action to take (CHE/MEX) Enter Overtime CHE EIP (CI): GP MEXICO - PeopleSoft Global Payroll Enter Overtime MEX OVERTIME DATA ENTRY Provide “SB” and “AP” punch time to Oracle Time and Workforce Scheduling Publish Reported Time Labor Administrator Report Manually record reported time Time Rapid Time Provide punch data to Oracle Workforce Scheduling EIP TL_REPORTED_TIME_SYNC Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 71
  • 72.
    Request Overtime andObtain Approvals Report No Time Request Overtime View the status of a Report to Work Need to Reporting for Overtime Requests request for overtime Employee and Perform No request overtime Yes CHE? Request Overtime Add View Overtime Duties in advance? Request Overtime List Request Yes Report overtime View submitted TO online CHE approval status Request Overtime View Overtime CHE CHE View overtime View overtime Approve Overtime Calculate, Confirm, and View Overtime CHE requests Overtime Provide Payroll Using balances View Overtime Overtime Requests PeopleSoft Global Payroll Overtime Balances Line Manager CHE (hidden) Requests Approve Overtime Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 72
  • 73.
    Request Absences andApprovals Review absence balances Report to Work Request absence and history and Perform Report Time Absence Request Absence Balances Duties Absence Request History Employee Review absences Record absences Absence Request Line Manager Absence Request History Absence Balances Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 73
  • 74.
    Review and ResolveTime Entry Exceptions Review time entry Employee Report Time exceptions Exceptions Make Changes Make changes to Setup Data to setup data Review and Retain or delete Change setup Line resolve exceptions resolved exception data or correct online history (cleanup) Manager Exceptions time reported? Exceptions Correct time Correct reported Time Reported Timesheet Review and correct TCD errors Create Payable TCD Reporting Review TCD Errors Time Correct Punched Time Errors Correct Elapsed Time Errors Make Changes Make changes System Review to Setup Data to setup data detected Yes exceptions Time and exceptions? for? Labor Administrator Review Rapid Time Rapid Change setup exceptions Time data or correct Exceptions Reporting time reported? Exceptions History No Review and resolve Correct exceptions Time Reported Rapid Time Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 74
  • 75.
    Create Payable Time Report Time Employee Review and Line Resolve Time Manager Entry Exceptions Submit all rapid time Submit rapid time Submit All Rapid Time Forecast payable Forecast payable time time Request Time Administration Perform validations and calculate gross amounts Distribute Time Request Time Information Determine Administration Time and action to take Labor Administrator Create payable time Select time Review reported Build rule map and Create Update task Finalize payable reporters and Build time reporter Track Apply rules to TRC time that did not identify period of intermediate profiles and apply time for distribution combine into profile attendance and task data get to Payable interest payable time rounding rules and review batches Request Time Request Time Request Time Time Request Time Request Time Request Time Request Time Request Time Administration Administration Administration Unprocessed Administration Administration Administration Administration Administration Reported Time Calculate gross amounts Resolve Time Request Time Administration Administration Exceptions Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 75
  • 76.
    Resolve Time AdministrationExceptions No Make Changes Make changes Decide if Time and to Setup Data to setup data satisfied? Labor Review Rapid Time Administrator Create Payable exceptions Decide if Time Exceptions need to? Yes Exceptions History Correct Rapid Correct Time reported Time Reported Rapid Time Approve Time No Make Changes Make changes to Setup Data to setup data Line Manager Change setup Retain or delete Review exceptions data or correct time resolved exception Decide if Exceptions Yes reported? history (cleanup) satisfied? Exceptions Review and Correct correct time Time Reported reported errors Timesheet Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 76
  • 77.
    Approve Time Approve payable Approve payable Time time Self Service Payable Time Line Approve Approve reported Manager Approval? Yes Approval reported time method? time Reported Time Approve payable Approve time payable time Payable Time Edit reported Yes Report Time time? Resolve Time Administration Exceptions No Time and Approve time by batch Approve time Labor by batch Request Batch Administrator Approval Process Distribute Time Information No Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 77
  • 78.
    Distribute Time Information Line Approve Manager Time Review and adjust time summaries Receive request to provide estimated labor Send Estimated Costs to Projects or Other Send estimated cost Systems Estimated payable time to Service: Estimate and Forecast Time Service: T&L Estimated Time Labor Costs to Projects Request EIP s(AM): ESTIMATED_TIME_BATCH Projects Publish Estimated EIP (AM): ADD; Payable Time ESTIMATE_FORECAST_TIME_REQUEST FORECASTED_TIME_BATCH_ADD Create Payable Send Actual Costs to Projects Systems once Time payable time has been approved Actuals to Projects Service: T&L Actual Time (Not Payroll) EIPs (AM): ACTUAL_TIME_ADD; ACTUAL_TIME_BATCH _ADD Time and Need to Review and Adjust Labor provide? Review Payable Time that Send payable time to North American Receive payroll costs from North Time Summaries Administrator Payable Time to did not get to Payroll or was Payroll System American Payroll System and trigger NA Payroll rejected by Payroll Integration (COBOL): Load Time and labor distribution and dilution Unprocessed Payable Time Labor Integration (AE): Extract TL Costs "Closed" Send "closed" payable time to Actuals to Projects Projects as actual costs without Labor Publish Actual Payable Time Distribution Send payable time to Global Payroll Receive payroll costs from Global Payable Time to System Payroll System and trigger labor Global Payroll Integration (COBOL): Process Payroll/ distribution and dilution Absence Integration (AE): Time and Labor Payroll Manage Administrator Payroll Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 78
  • 79.
    Review and AdjustTime Summaries Review time summaries for employees Employee Payable Time Summary End Self-Service Info Employee Payable Time Detail Compensatory Time Review time summaries for direct reports Payable Time Summary Payable Time Detail Line Compensatory Time Manager Accumulators Manager Self-Service Info Overtime Balances Time and Labor Launch Pad Monthly Time Calendar Weekly Time Calendar Daily Time Calendar Review attendance information Attendance Attendance History Attendance Actions Review compensatory time Comp Time Adjust payable Compensatory Time Manage time Payable Time Adjusted Projects Adjust Paid Time Yes Review status Distribute Time Need to Review? Status Time Reporter Status Information Adjust? Payable Status Time and Labor Review time administration Administrator processing data Time Administration Statistics Processing Archived Batches Information Archived Rule Maps Unprocessed Reported Time Unprocessed Payable Time Review timecards No Time Cards TimeCard Time Audit time information Information Reported Time Audit Audit Human Measure Resource deployment Specialist effectiveness Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 79
  • 80.
    Manage Payroll Human Maintain Manage Absences Employee Data Resource Specialist Manage Time and Time and Labor Labor Administrator Create Payroll Calculate, Confirm Reconcile and Create Payroll Regulatory and and Provide Distribute Payroll Information Tax Reporting Payroll Information Information Payroll Administrator Provide Employee Reconcile and Create US Federal Calculate, Confirm Individual Create US Federal Distribute US Payroll Regulatory and Provide US Retirement Payroll Information Federal Payroll and Tax Reporting Federal Payroll Information to Information Information OPM Create GBL Create GBL Calculate, Confirm Payroll Regulatory Global Payroll Employee Payroll and Distribute GBL Reporting and Tax Information Payroll Administrator Information Send Employee Payroll Data to External Payroll System Interface Administrator Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 80
  • 81.
    Create Employee PayrollInformation Using PeopleSoft Payroll for North America Human Maintain Manage Resource Employee Absences Specialist Data Request W-2 reissue W-2 Reissue Request W-2 Reissue Request USA Add or update direct deposit information Direct Deposit Send employee direct deposit information to PeopleSoft Expenses Add or update your voluntary deductions EIP (AM): Employee Voluntary Deductions DIRECT_DEPOSIT_FULLSYNC; DIRECT_DEPOSIT_SYNC Review or change W-4 information W-4 Tax Information W-4 Tax Information USA Update consent to receiving tax information electronically T4/T4A Consent W-2/W-2c Consent Update payroll options and/or Create employee deductions create additional pay Override Benefits Deductions Send employee direct deposit information Update Payroll Options Create Garnishments to PeopleSoft Expenses Create Additional Pay Review Garnishments EIP (AM): Contract Payment Details Create General Deductions DIRECT_DEPOSIT_FULLSYNC; Update Payroll Options (CAN) Override General Deductions DIRECT_DEPOSIT_SYNC Create Additional Pay (CAN) Review U.S. Savings Bonds Contract Payment Details (CAN) Request Direct Deposit Purchase Canada Savings Bonds (CAN) Override Benefits Deductions (CAN) Record federal, state and local tax data and Create Garnishments (CAN) create reports Review Garnishments (CAN) Default Tax Data Report Create General Deductions (CAN) Employee Tax Information Rpt Override General Deductions (CAN) W-4 Exemptions Report Request Direct Deposit (CAN) W-4 Audit Report Determine W-4 Exempt Renewal Update Employee Tax Data Update Tax Distribution Initiate mass employee updates Reset W-4 Exempt List of tax data Employee SSN Verification Payroll Update Mass Tax Data Reset W-2 Consent Status Administrator Update Two-Tier Suppl Data Year-End Consent Status Report Default Tax Data Report (CAN) Employee Tax Information Rpt (CAN) No Exemption Report (CAN) Update Employee Tax Data (CAN) Update Tax Distribution (CAN) Review T4/T4A Consent Status (CAN) Reset T4/T4A Consent Status (CAN) Calculate, Confirm Tips Year-End Consent Status Report (CAN) and Provide involved? Payroll Review employee tip records and status Calculate and approve tip Review Allocation by Employee Identify tip gross receipt allocations and create Update company allocated Allocation by Employee Report Yes information balances report tip balances Employee Receipt Rpt Update Employee Gross Receipts Calculate/Approve Allocation Update Allocation Balances Review Allctns by Balance Verification Report Establishment Allctn by Establishment Report Review Allocation Status Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 81
  • 82.
    Calculate, Confirm, andProvide Payroll Using PeopleSoft Payroll for North America Time and Labor Manage Time and Labor Administrator Yes Need to Review summary reports of retro pay Create Payroll create retro requests Information pay? Change the individual and mass Retro Pay Request and Trigger Summary Re-create Review a summary of retroactive pay process flag. No Retro Pay Summary End Yes Process mass retro pay request retro pay? retroactive pay requests and Review retro pay Change Retro Pay Process Flag Retro Pay Calculations Process Mass Retroactive Pay Calculate retro pay and review Yes No triggers processing messages Retro Pay Interest Limit results Need or Retro Pay Messages Retro Pay Terminations Retro Pay Request and Calculate Retroactive Pay corrections? Create Retro Request in Job or Retro Pay Messages Trigger Summary Update Retro Pay Calc Results Addl Pay via Event Handler Report Receive request for Payment on a Variable Load retro pay data to paysheets Validate variable No Compensation Award Load Retro Pay to Paysheets compensation award data EIP (AM): Validate Variable Comp VAR_COMP_PAYMENT_REQUEST Awards (NA) Receive request for payment of employee referral Create paysheets by pay calendar Create final check program awards and acknowledge receipt Create Contract Pay Create Paysheets paysheets EIPs (AM): Create Contract Review Pay Calendars Create Final Check Print Earnings Print paysheet earnings distribution PAYMENT_ERECRUIT_REQUEST; Contract Yes Projected Pay Create Paysheets (CAN) Paysheet Distribution Print Paysheet Earnings Dist End PAYMENT_ERECRUIT_ACKNOWLEDGE Pay Create Contract Review Pay Calendars (CAN) Apply payment Create Final Cheque for Audit Print Paysheet Earnings Dist (CAN) Projected Pay (CAN) request information Paysheet (CAN) Load Paysheet Perform pre sheet audit Receive request for payment of employee expense Customer Transactions On-Cycle Presheet Audit Report Record hours and amounts from Rapid Need final Print paysheets advances and reimbursements and acknowledge type? Paysheet Presheet Audit Report Entry paysheets for final Print Paysheets Print Paysheets EIPs (AM): Transactions Report No Need to... (CAN) Create Rapid Entry Paysheets check Print Paysheets (CAN) PAYMENT_EXPENSES_REQUEST Load Paysheet Budget Check Reports Create Rapid Entry Paysheets (CAN) requests? PAYMENT_EXPENSES_ACKNOWLEDGE Transactions (CAN) Employee Budget Log Paysheet Commitment Position Budget Check Transactions Report Review and update payline earnings Accounting Log (CAN) By Payline Security Review and update or Budget Check log By Payline Earnings override paysheets Review and update Request process to Receive sales commission information for payout Record hours and amounts from By Payline Earnings Security By Paysheet payline by employee Need unsheet EIP PSHUP Adjust Paysheets By Paysheet Earns Short Form Yes By Add Balance Page By Payline to unsheet? Pay Unsheet Update Paysheet Transactions By Payline Security (CAN) By Paysheet (CAN) By Payline (CAN) Pay Unsheet (CAN) Update Paysheet Transactions (CAN) By Payline Earnings (CAN) By Add Balance Page (CAN) By Payline Earnings Security (CAN) By Paysheet Earns Short Form (CAN) No Advise Variable Compensation of awards that have been accepted or rejected EIP (AM): VAR_COMP_PAYMENT_ACKNOWLEDGE Make adjustments to paysheets By Paysheet Advise Expenses of info that has been accepted or Review pay calculation or confirmation By Add Balance Page rejected results By Payline EIP Deduction Register By Payline Security Payroll Register By Payline Earnings Cost Center By Payline Earnings Security Other Earnings Register Yes By Paysheet Earns Short Form Deductions in Arrears By Paysheet (CAN) Deductions Not Taken By Add Balance Page (CAN) No Payroll Summary Perform pre-calculation Review and update actuals Review payroll error messages By Payline (CAN) Add new paysheet Create on or off-cycle Employer Benefit Contributions audit Review Actuals Distribution Review Payroll Error Messages Correct By Payline Security (CAN) page and payline pay calculations Garnishment Prorations Off-Cycle Precalculation Audit Report Contract Pay Details Payroll Error Message Report calculation By Payline Earnings (CAN) By Paysheet Calculate Payroll Employees Not Processed Report Precalculation Audit Report Review Actuals Distribution (CAN) Review Payroll Error Messages (CAN) errors? By Payline Earnings Security (CAN) By Paysheet (CAN) Calculate Payroll (CAN) Contract Pay Discrepancy Report (CAN) Contract Pay Details (CAN) Payroll Error Message Report (CAN) By Paysheet Earns Short Form (CAN) Perform pre confirmation audit Confirm pay Canada Payroll Savings File (CAN) Must Reverse pay confirmation Ready to Preconfirm Audit Report Yes Confirm Payroll Deduction Register (CAN) reverse pay Yes Unconfirm Payroll confirm? Preconfirm Audit Report (CAN) Confirm Payroll (CAN) Payroll Register (CAN) confirm? Unconfirm Payroll (CAN) Cost Centre (CAN) Other Earnings Register (CAN) Calculate final earnings Deductions in Arrears (CAN) deductions and taxes Deductions Not Taken (CAN) No Calculate Payroll Payroll Summary (CAN) No Calculate Payroll (CAN) Employer Benefit Contributions (CAN) Stats Can Non-Educ Institute (CAN) Overtime Bank (CAN) Business Payrolls Survey File (CAN) Save and Print Stats Can Educ Institute (CAN) Payroll type? with Off-Cycle Canada Savings Bond Purchases (CAN) Pay Run Employees Not Processed Report (CAN) Integration: Time and Labor Interface Contract Pay Discrepancy Report (CAN) retrieves and consolidates payable time information for selected time reporters and sends cross reference Confirm and print numbers back to TL Confirm Review/Print Online Check Payroll and Print Review/Print Online Create or update Cheque (CAN) Administrator paysheets and calculate Review online pay Create Online Check calculation results Manual Online Paysheet View/Print Online Check Need to... Load time reporter payable time from Create Online Cheque View/Print Online Cheque Delete check information Review TL load history Verify that wages were Time and Labor (CAN) (CAN) Review/Print Online Check Review Time and Labor Load Delete overstated Load Time and Labor Online Paysheet (CAN) Review/Print Online Review Time and Labor Load (CAN) Review Payroll Error Messages Record adjustment Calculate pay for Load Time and Labor (CAN) Cheque (CAN) Review and reverse original check Single Paycheck for Create Employee Pay Payroll Error Message Report Create on paysheet adjustment and create off-cycle paysheet Yes Individual Employee paysheet Overstated Review Payroll Error Messages payback? By Paysheet Calculate Payroll Immediate Payment method? Review Paycheck Summary (CAN) By Paysheet (CAN) Calculate Payroll (CAN) Create online check data Review FLSA Pay Data Calculate pay for Payroll Error Message Report Reverse and confirm Record adjustment Was using automated process Reverse/Adjust Paychecks adjustment (CAN) reversal on paysheet employee Create Online Check Reverse Review Paycheque Summary Calculate Payroll Review/Print Online Check By Paysheet pay under or over Automatic Online Paysheet and Confirm (CAN) Calculate Payroll Review/Print Online By Paysheet (CAN) stated? No Create Online Cheque Review ROE Insurable Earnings (CAN) Cheque (CAN) Create pay calculations for Confirm pay for (CAN) (CAN) Online Paysheet (CAN) Employee Pay underpayment adjustment Reverse/Adjust Paycheques Understated Calculate Payroll Confirm Payroll (CAN) Calculate Payroll (CAN) Confirm Payroll (CAN) End Reconcile and Adjust Distribute Payroll Information Add new paysheet and Calculate employer Confirm pay for Review pay Review reversal Confirm check payline taxes and deductions manual check calculation or Reverse paycheck Review pay Manual Check results reversal By Paysheet Calculate Payroll Confirm Payroll confirmation Adjust or Reverse/Adjust Paychecks calculation or Reverse Review Paycheck Confirm Payroll End By Paysheet (CAN) Calculate Payroll (CAN) Confirm Payroll (CAN) results reverse? Reverse/Adjust Paycheques confirmation Review Paycheque Confirm Payroll (CAN) results (CAN) (CAN) Manage check results Create final check paysheets online Paycheck Online Request Final Check Request Final Cheque Adjust employee balances Request final check (CAN) 1042 Taxes Create Request Request Final Check PrePays paysheet Check Request Final Cheque Need to... Arrears method? (CAN) Balance Adjustment Report Create and review Check Year-to-Date paysheet and payline Review check register and Deductions Pay Run Request Final Check reconciliation reports Review employee balances Print checks Earnings Request Final Cheque Check Register Advise HR PrePays Print Checks Review and Garnishments (CAN) Printed Employee Check Information Helpdesk of Need to 1042 Taxes Create Create PDF Paychecks Need reprinted No verify printed Errors? Yes Special Accumulators Check Report discrepancy, if adjust... Arrears Final check Print Cheques (CAN) checks? checks Taxes Cheque Register (CAN) needed Check Year-to-Date method? Create PDF Paycheques PrePays (CAN) Employee Cheque Information Deductions Employee Balance Adjustment Report (CAN) Report (CAN) Earnings Manage No Balances Balances Arrears (CAN) Yes Garnishments Create paysheet for Calculate earnings Create final check reports and review payment Cheque Year-To-Date (CAN) Confirm pay for Special Accumulators final check deductions, taxes, results distribution Deductions (CAN) final check Taxes Create Create Final Check and net pay Final Check Reconcile Report Earnings (CAN) Confirm Payroll Create replacement Print checks Employee Earnings Snapshot Rpt Paysheet Paysheets Calculate Payroll Final Check Requests Report Need to Special Accumulators (CAN) Confirm Payroll checks Print Checks Distribute Employee Earnings Record Rpt Create Final Cheque Calculate Payroll Final Cheque Reconcile Report (CAN) adjust... Taxes (CAN) (CAN) Reprint Checks Create PDF Paychecks paychecks PrePays (CAN) Paysheets (CAN) (CAN) Final Cheque Requests Report (CAN) Garnishments (CAN) Reprint Cheques Print Cheques (CAN) Arrears (CAN) ROE (CAN) (CAN) Create PDF Paycheques Cheque Year-to-Date (CAN) Deductions (CAN) Method of Earnings (CAN) payment Create check for employee Special Accumulators (CAN) distribution? Create Slf Srvc Manual Cheques Delete obsolete balances Manual Print pre-note Taxes (CAN) Obsolete Create PDF Paycheques Provide pre-notification Delete Balances Check memos Garnishments (CAN) Balances Create Slf Srvc Manual Cheques (CAN) Prenotification Report Delete Balances (CAN) Prenote Memo ROE (CAN) Create PDF Paycheques (CAN) Employee Earnings Snapshot Rpt (CAN) Employee Earnings Record Rpt (CAN) Format information and Create direct deposit Adjust imputed income advice registers Imputed print direct deposit file Calculate Adjustments Advice Register Income Create direct deposit file Print Advice Forms Adjustment Report Direct Create Direct Deposit File Create PDF Advice Advice Register (CAN) Review Deposit Create Direct Deposit File Forms (CAN) Print Advice Forms (CAN) Create PDF Advice Review direct deposits Review and adjust Forms by company garnishment balances Direct Deposit Register Garnishments and create report Direct Deposit Register Distribute Garnishments (CAN) advice Garnishment Prorations Create EFT file for information direct deposit of child support payments Child Support - EFT Review payroll supporting End Employee documentation View Paycheck Contact HR Direct Deposit Helpdesk Voluntary Deductions Paycheck Modeling Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 82
  • 83.
    Reconcile and DistributePayroll Information Using PeopleSoft Payroll for North America Review actuals distribution Create accounting lines - Send payroll accounting transactions to the Update retro distribution information Review Actuals Distribution Create accounting line Update Actuals actuals PeopleSoft General Ledger Update Actuals Distribution Actuals Review Actuals Distribution (CAN) report info GL interface Commitment Accounting EIPs (AM): Update Actuals Distribution (CAN) Review Actuals Dist Summary HR Accounting Line Report Actuals (NA) PAYROLL_ACCTG_TRANSACTION; Create retro distribution information Review retro distribution Review Actuals Dist Summary (CAN) Create actuals distribution Update Actuals Process Direct Retro Dist information Distribute Actuals info Dist Yes Process Direct Retro Dist (CAN) Review Retro Distribution Distribute Actuals (CAN) or create Review Retro Distribution Msgs Review Retro Distribution Create accounting lines – Prepare distribution information report? Review suspense account information Batch Provide Payroll Information Review Retro Distribution Msgs (CAN) (CAN) Suspense encumbrances GL interface Predistribution Audit Report Review... Review Suspense ComboCode Dist Create... Encumbrances encumbrance to the General Ledger Create? account Encumbrances (NA) Predistribution Audit Report Adjust Review Suspense ComboCode Dist (CAN) Calculation (Commitment Accounting) Encumbrance Message (NA) (CAN) previously Create retro distribution report Create distributed Retro Distribution Audit Rpt report Create actuals distribution with pay? Retro Distribution Audit Rpt (CAN) Actuals time and labor Review budget actuals Report budget definitions and Create report for earnings, Budget Gross / Fringe Dist with TL Actuals Distrib TL Extract Review Budget Actuals (NA) amounts deductions, and tax distributions actuals report Actuals Distrib TL Extract (CAN) No Review Budget Actuals (CAN) Load Gross/Fringe Data Gross and Fringe Create reconciliation report Reconciliation Reconciliation Report report Reconciliation Report (CAN) Create payroll accounting transactions for non-commitment Print fiscal year budget definitions and amounts accounting Non-Commit to NA Budget amount Fiscal Year Budget Report (NA) Non-Commit Accounting Info (NA) Fiscal Year Budget Report (CAN) Non-Commit Reset Processing (NA) Create and review GL distribution Send payroll accounting transactions to the Payroll Error Messages summary Create GL interface reports PeopleSoft General Ledger Create pay types Pay Types GL Distribution Summary HR Accounting Line (NA) EIPs (AM) : Pay Type Review Payroll Distribution Payroll Accounting Line PAYROLL_ACCTG_TRANSACTION; Pay Type CAN GL Distribution Summary CAN Populate Chartkey Values PAYROLL_DEDUCTION_REQUESTM; Review Payroll Distribution (CAN) PAYROLL_DISBURSEMENT Prepare Payroll Create cost center information Which type Information for the GL - Cost Center Cost Center info? Non-Commit Acct Cost Center CAN Create payroll transactions for non- Non-Commit for SAP commitment accounting for SAP End Non-Commit Rev/Repost for SAP Create payroll transactions for non- Non-Commit for GL commitment accounting for GL Non-Commit Posting for GL Calculate, Confirm and Provide Payroll Review vendor listing Vendor AP Vendor Listing Extract Canadian tax Canadian information Taxes Extract Canadian Taxes (CAN) Create AP Extract Audit report Audit Extract non-tax deductions AP Extract Audit Report Non-Tax Deductions Non-Tax Deductions Extract Prepare payroll distribution data for Provide Payroll Extract U.S. Federal tax Review and update proposed Review payroll distribution to AP Which AP extract Type of data Federal Send vouchers to AP Info to Accounts information Review? By Vendor payments by voucher Review Payroll Distribution action? Distribute Payroll Data for AP to extract? Tax Send Vouchers to AP Payable Extract U.S. Federal Taxes Review AP Extract-Headers Review Payroll Distribution (CAN) Distribute Payroll Data for AP (CAN) Extract U.S. Local tax Local information Payroll Tax Extract U.S. Local Taxes Review and update proposed Administrator By Voucher payments by vendor Extract U.S. State tax State Review AP Extract-Lines information Tax Extract U.S. State Taxes Send tax, garnishment, and voluntary deduction withholding information to PeopleSoft Payables for payment EIP (AM): VOUCHER_BUILD Export the Time and Labor costs from Payroll for North Time and Extract time and labor costs America into Time and Labor Integration Labor Costs Extract Time and Labor Costs EIP (AE): Extract Time and Labor Costs Provide Payroll Decide Create Variable Comp Award Send a verification of payment to Variable Compensation Variable Comp Completion what is payment notification EIP (AM): Payment Notification Information needed Notify Var Comp of Payments VAR_COMP_PAYMENT_ACKNOWLEDGE Create recruiting referral program Send a verification of payment to eRecruit Recruiting Payment award payment notification EIP (AM): Notification Notify Recruiting of Payments PAYMENT_ERECRUIT_ISSUED Create payment notification to Send a verification of payment to PeopleSoft Expenses Payment Verification Run GL Interface to identify expenses EIP (AM): for Expenses expense accounts Notify Expenses of Payments (NA) PAYMENT_EXPENSES_ISSUE End Identify participating Create business activities Provide Payroll Define Business Payroll Create BPS summary report and companies and contacts defined by Statistics Information to Survey (BPS) EDR file for transmission Business Information Canada Statistics Canada Reporting Unit Table (CAN) Business Payrolls Survey File (CAN) (CAN) Activity Table (CAN) Create and Distribute Create Canada Payroll Savings Specify parameters for EDR file Create CPS file for transmission to Payroll Savings (CPS) organization ID transmission Bank of Canada Deductions - Canada Canada Payroll Savings Org ID CAN Canada Payroll Savings Table CAN Canada Payroll Savings File (CAN) Reconcile payroll checks with bank Create match exception Create check reconciliation Review results of check reprint Create Payroll Reconcile Check records report report process Regulatory Information with Request Reconciliation Reconciliation Report Check Reconciliation Review Dead Checks Reporting and Tax Bank Records Request Reconciliation (CAN) Reconciliation Report (CAN) Cheque Reconciliation (CAN) Review Dead Cheques (CAN) Information Time and Labor Manage Time and Administrator Labor Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 83
  • 84.
    Create Payroll RegulatoryReporting and Tax Information Using PeopleSoft Payroll for North America Create pay period tax reporting information for USA Federal Tax Summary State Tax Summary Create Federal Liability by State pay period Reconciliation-Ohio Local reports Local Tax Deposit USA Create tax reports - USF Tax Deposit Summary Federal Liability by State Tax Summary-PA EIT Local Tax Deposit Tax Summary-PA LST Tax Deposit Summary Form 1042 Audit Report Create Tax Summary-PA EIT periodic payment Tax Summary-PA LST reports Tax Balance Audit CAN Reconciliation-Ohio Local Create Create pay period tax reports CAN Pay Period Tax Submission Summary Reports Health Insurance Premium CAN W-2 reporting Create Create periodic payment Print Year End Forms tax reports CAN Print Forms Prior 2001 Create Year End Data reports Workers Comp Assessments Create Federal W-2 File Update Year End Reporting Info W-2c Reporting USF Create quarterly tax reporting Create State W-2 File Create W-2 Adjustments Load Year End Data Print W-2c US/Territories information USA Create Local W-2 File Create W-2c US/Territories Review/Update Year End Data Print W-2c Puerto Rico Tax Reporting Parameters Create Puerto Rico W-2PR File Create W-2cPR Puerto Rico Review Year End Data Combined Create Federal W-2c File US Electronic Parameters W-3/W-3SS Transmittal Report Create W-2c Prior 2001 Create W-2/W-2 Summary Prior 2001 Create W-2c PDF Forms Tax Balance Audit W-3PR Transmittal Totals Rpt year end View W-2/W-2c Forms Create Qtrly Wage File AK-ID State W-2 Tax Totals Report Create Create Qtrly Wage File IL-NC data Local W-2 Tax Totals Report quarterly tax reporting Create Qtrly Wage File ND-RI Create W-2 PDF Forms Audit and Error Reports information Create Qtrly Wage File SD-WY Error Listing USA Employee Count Year End Record Error Multiple Worksite Year End Data Audit State Tax Summary Federal W-2 File Audit State Unemployment Tax State W-2 File Audit Federal Tax Summary Local W-2 File Audit Local Tax Summary Puerto Rico W-2PR File Audit W-2c Audit US/Territories W-2cPR Audit Puerto Rico Adjust Create 8027 TIP Electronic Report W-2c Data Audit Prior 2001 Adjustment closed pay period Create 8027 TIP Create 8027 file pay Federal W-2c File Audit US Open/Close Pay Calendar Form 8027 Audit Report period Tax Form Definitions Tax Form Print Parameters Manage employee consent Manage information year end tax reporting Which Create 1099R reporting information Review W-2/W-2c Consent Status Update tax reporting forms and information action? Create Form 1099-R Audit Report Reset W-2 Consent Status definitions Create? USA 1099R Create 1099-R Year-End Consent Status Report Tax Form Definitions Form 1096 Report Tax Form Print Parameters Reconcile and Payroll Update Tax Reporting Parameters Distribute Payroll Need to... W-2 Company Data Administrator Information tax Electronic Parameters reporting Create 1042 reporting information Tax Form Definition Rpt Create Form 1042 Data Summary Tax Form Print Parameters Rpt 1042 Define 1042-S Parameters Year End Form Text Create 1042-S Tax Form XMLP Options Year End Form Options Create FUTA Create FUTA reconciliation reconcile FUTA Wage Reconciliation Rpt Create T4 reporting information Create T4/T4A Electronic File T4 reporting Print T4 Slips Audit, correct, and load employee T4/T4A Electronic Audit information data and balances CAN T4 Summary/Segment Rpt End Apply year end Apply year end adjustments to closed pay period Year-to-Date Edits Create T4 PDF Slips adjustments to Open/Close Pay Calendar (CAN) Year-End Personal Data Audit closed pay period Load Year-End Slips Load Selective Year-End Slips Year-End Errors Create T4A reporting information Update tax reporting forms and T4,T4A,RL-1,RL-2 Audit Create? Create T4/T4A Electronic File definitions CAN T4A reporting Review/Update Slip Information Print T4A Slips Tax Form Definitions information Default Tax Data Report T4/T4A Electronic Audit Tax Reporting Parameters Exemption Report No T4A Summary/Segment Rpt T4,T4A Mag Media Reporting Amend, cancel and reissue year- Manage Review T4/T4A Consent Status Create T4A PDF Slips RL Mag Media Reporting Calculate end slips year end tax reporting Update tax reporting T4 Reporting Definitions Reset T4/T4A Consent Status pension Amend/Cancel Year-End Slips information Need to... forms and definitions RL Slip Numbers Year-End Consent Status Report adjustment? Amend/Cancel Slip Audit CAN Tax Form Definitions (rpt) Create RL-1 reporting information Amend/Cancel YE Slip Summary Tax Form Footnotes (rpt) Create RL-1 Mag Media File Delete Void Year-End Slips Yes RL-1 reporting Year End Form Text Print RL-1 Slips Update and verify slip information information Tax Form XMLP Options RL-1 Magnetic Media Audit Year End Form Options CAN Calculate and report pension RL-1 Summary Report Tax Form BI Publisher Options Year-to-Date Edits adjustment CAN Year-End Personal Data Audit Calculate Pension Adjustment Load Year-End Slips Create annual tax reports Load Selective Year-End Slips Create RL-2 reporting information Employer Contribution to CNT Year-End Error (rpt) Create RL-2 Mag Media File Create annual RL-2 reporting El Rebate T4/T4A/RL-1/RL-2 Audit Print RL-2 Slips tax reports information NW Territories Payroll Tax View T4,T4A Slips RL-2 Magnetic Media Audit Nunavut Payroll Tax RL-2 Summary Report Automatically Create ROEs automatically Create Mass ROE Data (CAN) Review ROE insurable Create record of How Review or update ROE Review and resolve ROE earnings and hours Print ROE information on form Create ROE data record summary employment (ROE) to details exceptions Review ROE Insurable Print ROEs (CAN) ROE Summary Report (CAN) Canada create? Update ROE Data (CAN) ROE Exceptions Report (CAN) Earnings (CAN) Create ROEs manually Manually Update ROE Data (CAN) Request duplicate W-2 W-2 Reissue Request Employee View electronic T4/ T4A slips or W-2/W-2c forms View T4/T4A Slips View W-2/W-2c Forms Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 84
  • 85.
    Create Employee USFederal Payroll Information Using PeopleSoft Payroll for North America Human Maintain Manage Resource Employee Absences Specialist Data Reissue Request W-2 reissued W-2 W-2 Reissue Request Manage Create or update direct deposit information direct deposit Direct Deposit Employee Send employee direct deposit information to Manage PeopleSoft Expenses Add or update your voluntary deductions voluntary EIP (AM): Voluntary Deductions deductions DIRECT_DEPOSIT_FULLSYNC; DIRECT_DEPOSIT_SYNC Update Update tax withholding information tax withholding W-4 Tax Information Create employee deductions USF Create Garnishments Create Review U.S. Savings Bonds deductions Override Benefits Deductions Create General Deduction Override General Deductions Update payroll options and/ Request Direct Deposit or create additional pay and/ Send employee direct deposit or Leave Accrual Elections information to PeopleSoft Expenses USF Need to... EIP (AM): Update Payroll Options DIRECT_DEPOSIT_FULLSYNC; Create Additional Pay Record tax data and create reports DIRECT_DEPOSIT_SYNC Update Leave Accrual USF Elections Employee Tax Information Rpt W-4 Exemptions Report Initiate mass employee updates Calculate, Confirm Manage W-4 Audit Report Payroll of tax data and Provide US mass tax Determine W-4 Exempt Renewal Create Mass Tax Data Updates Federal Payroll Administrator data update Update Two-Tier Suppl Data Update Employee Tax Data Update Tax Distribution Reset W-4 Exempt List Employee SSN Verification W-4 Print - Self Service Apply unscheduled payments Payments USF Military Service Deposit Create military service Identify Military Service deposit reports Manage Account detail and Need to USF military deposits deductions apply... Calculate interest, review Military Deposit OPM-1514 Rpt USF USF balance and create IRR for Military Deposit Closed Accts Military Service Deposit Interest accounts with zero balance USF Calc Military Service Interest Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 85
  • 86.
    Calculate, Confirm, andProvide US Federal Payroll Using PeopleSoft Payroll for North America Time and Labor Manage Time and Labor Administrator Yes Process mass retro pay request Review a summary of Review retro pay Review summary of retro pay Calculate retro pay and review Need to Process Mass Retroactive Pay retroactive pay requests processing messages Change the individual and mass requests Create NA Payroll results Need Recreate create retro Yes or and triggers Retro Pay Messages Yes retroactive pay process flag. No Retro Pay Calc Summary (NA) Information Calculate Retroactive Pay corrections? retro pay? pay? Create Retro Request in Job or Retro Pay Request and Retro Pay Messages Change Retro Pay Process Flag Pay All Calculated (rpt) (NA) Update Retro Pay Calc Results Addl Pay via Event Handler Trigger Summary Report Retro Pay Terminations No Load retro pay data to paysheets No Load Retro Pay to Paysheets Receive request for Payment on a Variable Validate variable Compensation Award compensation award data EIP (AM): Validate Variable Comp VAR_COMP_PAYMENT_REQUEST Awards (GBL) Receive request for payment of employee referral program awards and acknowledge receipt Print paysheet earnings Create final check paysheets Print Earnings EIPs (AM): distribution USF Yes USF Distribution PAYMENT_ERECRUIT_REQUEST; Create paysheets by pay Print Paysheet Earnings Dist Create Final Check Paysheets PAYMENT_ERECRUIT_ACKNOWLEDGE Create calendar USF On-Cycle Create Paysheets Apply payment request Perform pre sheet audit Need Print paysheets Paysheets Review Pay Calendars information USF Decide Adjust USF final check No USF Receive request for payment of employee for Existing Load Paysheet Transactions if need to... Paysheets Presheet Audit Report paysheets? Print Paysheets expense advances and reimbursements and Final Check Paysheet Transactions Report acknowledge Requests Record hours and amounts EIPs (AM): from Rapid Entry USF Review and update payline PAYMENT_EXPENSES_REQUEST Create Rapid Entry Paysheets Review and update or Review and update earnings USF Request process to PAYMENT_EXPENSES_ACKNOWLEDGE Adjust override paysheets USF payline by employee By Payline Security Need Yes unsheet USF Paysheets By Paysheet USF By Payline Earnings to unsheet? Pay Unsheet Record hours and amounts By Add Balance Page By Payline By Payline Earnings Security from PSHUP By Paysheet Earns Short Form Receive sales commission information for Update Paysheet Transactions payout EIP No Advise Variable Compensation of awards that have been accepted or rejected EIP (AM): VAR_COMP_PAYMENT_ACKNOWLEDGE Review pay calculation or confirmation results USF