The new rules for unconventional oil and gas wells in Pennsylvania are finally here. The regulations in Chapter
78a, relating to unconventional wells, were published in the Pennsylvania Bulletin on October 8, 2016.1
Recent headlines may have focused on legal challenges to new regulations for unconventional oil and gas wells in
Pennsylvania, but it is important to recognize that the regulations are effective immediately, despite ongoing efforts
to block them. This Client Alert, which will be the first in a series, provides a brief background on the rules and
then highlights a few of the sections involving planning and permitting. Future Client Alerts will describe other
aspects of the rules.
BackgroundBackgroundBackgroundBackground
These rules are the culmination of a long process that began in 2011, when Pennsylvania’s Department of
Environmental Protection (“DEP”) began developing rules to amend existing oil and gas regulations. That
process also included codifying environmental provisions required by the 2012 Oil and Gas Act.2
After years of
work, the regulations neared final form. Late in the process, amendments to the rules for conventional oil and gas
wells were removed. For unconventional wells, Chapter 78a supersedes the previous Chapter 78.3
Some of the rules simply codify existing guidance or describe practices that have already been adopted.4
The DEP
provided some training and resources on the new rules before their release.5
While the industry must comply with the new rules, as written, the controversy over them – which played out
over the years that they were in development – continues. The Pennsylvania Independent Oil and Gas
Association (“PIOGA”) filed a challenge to the regulations before they were published, but lost at the
Commonwealth Court.6
That lawsuit is on appeal to the Pennsylvania Supreme Court.7
The Marcellus Shale
Coalition filed a separate challenge one week after they were issued.8
The 2012 Oil and Gas Act, known as Act 13, has been subject to legal challenges since it was passed. The latest in
the Robinson Township series of cases, dealing with these challenges, was published on September 28, 2016. That
decision enjoined certain sections of Act 13.9
The industry challenges to the regulations rest in part on the Robinson
Township decisions and their impact on the enabling legislation behind the new rules.
Planning and PermittingPlanning and PermittingPlanning and PermittingPlanning and Permitting
There is nothing new to the concept that drilling an unconventional well requires significant planning – but there
are some new, or at least expanded, planning requirements interspersed throughout the regulations. Some of the
significant changes include:
1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources
The application requirements impose various obligations for determining the potential impacts of the well. One
concern is whether the proposed limit of disturbance of the well site is within 100 feet of “any watercourse or any
ENERGYALERT
Page 2222 of 4444
high quality or exceptional value body of water or any wetland 1 acre or greater in size.” If so, the applicant needs
to demonstrate that those water resources will be protected. § 78a.15(b.1).10
To make that demonstration, the
applicant may rely on plans developed under other sections of these regulations, such as the site containment plan,
or plans approved by the DEP pursuant to other regulations. § 78a.15(b.1)(1) – (5).
Another area of concern is whether the proposed well will have an impact on endangered species. § 78a.15(d). The
well permit application must include a “detailed analysis of the impact of the well, well site and access road on
threatened and endangered species.” Id. An applicant that identifies a potential impact on a threatened or
endangered species must submit a written document demonstrating how the impact “will be avoided or minimized
and mitigated” in accordance with relevant state and federal laws. § 78a.15(d)(2).11
The regulations establish a process for identifying potentially impacted public resources, then notifying any
appropriate public resource agencies about them. § 78a.15(f). The list of “public resources” that fall within this
process has been expanded.12
The subsection applies if the proposed limit of disturbance of the well site is located:
“(i) In or within 200 feet of a publicly owned park, forest, game land or wildlife area.
(ii) In or within the corridor of a State or National scenic river.
(iii) Within 200 feet of a National natural landmark.
(iv) In a location that will impact other critical communities.
(v) Within 200 feet of a historical or archeological site listed on the Federal or State list of historic places.
(vi) Within 200 feet of common areas on a school’s property or a playground.
(vii) Within zones 1 or 2 of a wellhead protection area as part of a wellhead protection program approved under
§ 109.713 (relating to wellhead protection program).
(viii) Within 1,000 feet of a water well, surface water intake, reservoir or other water supply extraction point
used by a water purveyor.”
§ 78a.15(f)(1). Understanding this section requires referring back to the “definitions” section of the regulations.
See § 78a.1. In particular, “other critical communities” are “[s]pecies of special concern identified on PNDI
[Pennsylvania Natural Diversity Inventory] receipt.” § 78a.1 (“Other critical communities”). These species
include plant or animal species “[i]n a proposed status categorized as proposed endangered, proposed threatened,
proposed rare or candidate,” and species “[t]hat are classified as rare or tentatively undetermined.” Id.13
The
definitions section also addresses “Wellhead protection area.” § 78a.1.14
This section of the regulations has been particularly controversial. Both PIOGA and the Marcellus Shale
Coalition objected to this section in their lawsuits challenging the regulations.15
2.2.2.2. Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”)
Operators are all-too-familiar with concerns raised by the prospect of drilling a new well near existing wells. New
drilling around an old well can cause problems such as methane migration. DEP estimates that there are
approximately 300,000 abandoned wells across the state.16
The new “Area of Review” regulations are targeted at
addressing potential problems with existing wells. See §§ 78a.52a. and 78a.73. Before drilling, operators must
identify active, inactive, orphan, and abandoned wells within 1,000 feet of the vertical and horizontal wellbore.
§ 78a.52a(a)-(b). The report summarizing that effort must include a monitoring plan for certain types of wells.
ENERGYALERT
Page 3333 of 4444
§ 78a.52a(c)-(d). Notifications to adjacent operators are required. § 78a.73(c). Previously, the DEP discussed the
implementation schedule for these regulations and provided charts showing when they apply to wells at different
stages in the drilling process.17
DEP has issued an interim final technical guidance document on the Area of
Review requirements; written comments are due by December 7, 2016.18
3. Drafting Water Management Plans3. Drafting Water Management Plans3. Drafting Water Management Plans3. Drafting Water Management Plans
Unconventional operators need to develop water management plans before withdrawing water for fracking.
§ 78a.69. The rulemaking is designed to ensure that requirements “are consistent Statewide, regardless of which
river basin an operator withdraws water from.”19
4.4.4.4. Conducting PreConducting PreConducting PreConducting Pre----Drilling Water SurveysDrilling Water SurveysDrilling Water SurveysDrilling Water Surveys
Operators are already familiar with issues surrounding the protection of water supplies. The concept of the
“rebuttable presumption,” under which the operator is responsible for the pollution of a water supply under certain
circumstances, is not new. See 58 Pa. C.S. § 3218(d)(2).20
There are some new provisions, however, that must be
followed to avoid impairing the assertion of defenses to the rebuttable presumption. See § 78a.52. For example, the
operator must provide an electronic report containing a copy of all of the sample results to the DEP 10 business
days before drilling, and to the landowner or water purveyor within 10 business days of receipt of the sample
results. § 78a.52(d).21
Looking AheadLooking AheadLooking AheadLooking Ahead
This client alert provided an overview of a few of the new rules related to planning and permitting. Watch for
future client alerts on other aspects of the regulations. Cohen & Grigsby’s Energy and Environmental Practice
Groups will monitor the implementation of these new regulations, which will significantly impact operators in
Pennsylvania. For more information, please contact Julie Vanneman at (412) 297-4715 or
jvanneman@cohenlaw.com. To receive future bulletins and news alerts, please send an e-mail to
bulletins@cohenlaw.com.
Copyright © 2016 by Cohen & Grigsby, P.C. (No claim to original U.S. Governmental material.)
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of Cohen & Grigsby, P.C. and is intended to alert the recipients to new developments in the
areas of energy and environmental law. The hiring of a lawyer is an important decision that should not be based solely on advertisements. Before you decide, ask us to
send you free written information about Cohen & Grigsby's qualifications and experience.
1
46 Pa. Bull. 6431 (Oct. 8, 2016), http://www.pabulletin.com/secure/data/vol46/46-41/1757.html.
2
DEP, 2015 Oil and Gas Annual Report, at 23,
http://www.dep.pa.gov/Business/Energy/OilandGasPrograms/OilandGasMgmt/Pages/Annual-Report.aspx.
3
46 Pa. Bull. 6431 (explaining that the “revised final-form rulemaking” includes a new section, § 78a.2, “to clarify that Chapter 78a
supersedes Chapter 78 for unconventional wells to avoid any potential conflict between the requirements in Chapter 78 and Chapter
78a regarding unconventional wells.”); id. § D (“The amendments in Chapter 78 are limited to deletions of the provisions regarding
unconventional wells.”).
4
See, e.g., 46 Pa. Bull 6431, at § D.
5
See DEP, http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx.
6
See Pennsylvania Independent Oil & Gas Ass’n v. Commonwealth of Pennsylvania, No. 321 M.D. 2015 (Pa. Commonw. Ct. Sept. 1, 2016).
The opinion is available at http://www.pacourts.us/courts/commonwealth-court/court-opinions/.
ENERGYALERT
Page 4444 of 4444
7
See, e.g., Marie Cusick, Trade Group Seeks to Block New Drilling Rules, StateImpact Pennsylvania, Oct. 3, 2016, at
https://stateimpact.npr.org/pennsylvania/2016/10/03/trade-group-seeks-to-block-new-drilling-rules/.
8
See, e.g., Laura Legere, Shale Gas Industry Challenges Pennsylvania Drilling Rules in Court, Pittsburgh Post-Gazette, Oct. 15, 2016, at
http://powersource.post-gazette.com/powersource/policy-powersource/2016/10/14/Gas-industry-files-suit-challenging-new-drilling-
rules-in-Pennsylvania/stories/201610140177.
9
See Robinson Township, et al. v. Commonwealth of Pennsylvania, No. 104 MAP 2014 (Pa. Sept. 28, 2016), available at
http://www.pacourts.us/assets/opinions/Supreme/out/J-34A-2016mo%20-%2010282684312019871.pdf?cb=1.
10
References are to 25 Pa. Code Chapter 78a, available as printed in the Pennsylvania Bulletin, 46 Pa. Bull. 6431 (Oct. 8, 2016), at
http://www.pabulletin.com/secure/data/vol46/46-41/1757.html.
11
See also DEP, Chapter 78a Training: Application Requirements and Public Resources Webinar (pdf), at p. 10, via link at
http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx.
12
See 46 Pa. Bull. 6431, at § F (“Public resources to be considered in § 78a.15(f)”) (“Based on comments received, ‘common areas of a
school’s property,’ ‘playgrounds’ and ‘wellhead protection areas’ were added because these resources are similar in nature to the other
listed public resources.”).
13
See also DEP, Chapter 78a Training: Application Requirements and Public Resources FAQ, ¶ 4, via link at
http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx (“The Pennsylvania Natural Heritage Program
maintains a list of species and communities used as the basis for Environmental Review within the PNDI Tool at
http://www.naturalheritage.state.pa.us/docs/PNDI_SpeciesList_Jan2014.pdf. This list covers plant and animal species included in
the definition of ‘other critical communities’ in Section 78a.1. (posted 10/11/16)”).
14
See also id. ¶ 5 (noting that the definition of the phrase is cross-referenced to drinking water regulations, and providing further
information on Zone 2).
15
See supra notes 6-8.
16
See Regulatory Review Commission, Final Regulation #3042, Environmental Quality Board #7-484, Regulatory Analysis Form
(March 3, 2016), at 19, http://www.irrc.state.pa.us/docs/3042/AGENCY/3042FF.pdf.
17
See DEP, Chapter 78a Training, Area of Review Webinar (pdf), pp. 8-11, via link at
http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx.
18
See 46 Pa. Bull. 6392 (Oct. 8, 2016), at http://www.pabulletin.com/secure/data/vol46/46-41/1725.html (describing technical guidance
documents related to the regulations and providing directions for accessing those documents).
19
46 Pa. Bull. 6431, § E (“§ 78a.69. Water management plans”).
20
This reference is to Act 13, which was codified at 58 Pa. C.S. §§ 2301-3504. See also DEP, Chapter 78a Training: Protection of Water
Supplies FAQ, via link at http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx.
21
See also 46 Pa. Bull. 6431, at § E (“§ 78a.52. Predrilling or prealteration survey”) (the previous practice was to require submission
within 10 days of receipt of each sample result, which led to “piecemeal submissions”); Chapter 78a Training: Protection of Water
Supplies FAQ, at ¶ 3; id. ¶ 4 (the operator should submit testing results within 10 days of drilling, not within 10 days of receiving the
results from the laboratory).

More Related Content

What's hot

South carolina
South carolinaSouth carolina
South carolina
Jim Werner
 
Contaminated Land in Ireland - A Consultant’s Perspective
Contaminated Land in Ireland - A Consultant’s PerspectiveContaminated Land in Ireland - A Consultant’s Perspective
Contaminated Land in Ireland - A Consultant’s Perspective
Padraic Mulroy
 

What's hot (13)

TKPOA RFP Q&A Addendum
TKPOA RFP Q&A AddendumTKPOA RFP Q&A Addendum
TKPOA RFP Q&A Addendum
 
August 2015 reg update ch2m
August 2015 reg update ch2mAugust 2015 reg update ch2m
August 2015 reg update ch2m
 
Puerto rico
Puerto ricoPuerto rico
Puerto rico
 
Kentucky
KentuckyKentucky
Kentucky
 
Environmental Assessments for Energy, Infrastructure and Resource projects ...
Environmental Assessments for Energy, Infrastructure and Resource projects   ...Environmental Assessments for Energy, Infrastructure and Resource projects   ...
Environmental Assessments for Energy, Infrastructure and Resource projects ...
 
Philippine Energy Investor's Guidebook
Philippine Energy Investor's GuidebookPhilippine Energy Investor's Guidebook
Philippine Energy Investor's Guidebook
 
Nevada
NevadaNevada
Nevada
 
South carolina
South carolinaSouth carolina
South carolina
 
FONSI
FONSIFONSI
FONSI
 
Contaminated Land in Ireland - A Consultant’s Perspective
Contaminated Land in Ireland - A Consultant’s PerspectiveContaminated Land in Ireland - A Consultant’s Perspective
Contaminated Land in Ireland - A Consultant’s Perspective
 
EPA Permitting Guidance for Oil & Gas Fracking Using Diesel Fuels
EPA Permitting Guidance for Oil & Gas Fracking Using Diesel FuelsEPA Permitting Guidance for Oil & Gas Fracking Using Diesel Fuels
EPA Permitting Guidance for Oil & Gas Fracking Using Diesel Fuels
 
Idaho
IdahoIdaho
Idaho
 
Chevron Case: Re 23 - Public-Redacted - lbg Expert Report (nov. 7, 2014)
Chevron Case: Re 23 - Public-Redacted - lbg Expert Report (nov. 7, 2014)Chevron Case: Re 23 - Public-Redacted - lbg Expert Report (nov. 7, 2014)
Chevron Case: Re 23 - Public-Redacted - lbg Expert Report (nov. 7, 2014)
 

Viewers also liked

Reproductor de audio vlc
Reproductor de audio vlcReproductor de audio vlc
Reproductor de audio vlc
salud-katiasosa
 
resumeHirokoOtao_20161023
resumeHirokoOtao_20161023resumeHirokoOtao_20161023
resumeHirokoOtao_20161023
Hiroko Otao
 
El mundo feudal ccss 2ºeso.unidad didáctica
El mundo feudal  ccss 2ºeso.unidad didácticaEl mundo feudal  ccss 2ºeso.unidad didáctica
El mundo feudal ccss 2ºeso.unidad didáctica
vanesablancocalderon
 
Manual de uso King design
Manual de uso King designManual de uso King design
Manual de uso King design
kozone
 
Teoria sobre los ciclos economicos final
Teoria sobre los ciclos economicos finalTeoria sobre los ciclos economicos final
Teoria sobre los ciclos economicos final
Anahy Brucela
 
Internalizacion derecho comercial
Internalizacion derecho comercialInternalizacion derecho comercial
Internalizacion derecho comercial
AngeLik MorEno
 
El club de la comedia
El club de la comediaEl club de la comedia
El club de la comedia
Patri Infame
 
MCP a l'institut de l'aigua i+d
MCP a l'institut de l'aigua i+dMCP a l'institut de l'aigua i+d
MCP a l'institut de l'aigua i+d
lcs13262
 

Viewers also liked (17)

Reproductor de audio vlc
Reproductor de audio vlcReproductor de audio vlc
Reproductor de audio vlc
 
NASIR HABIB
NASIR HABIBNASIR HABIB
NASIR HABIB
 
resumeHirokoOtao_20161023
resumeHirokoOtao_20161023resumeHirokoOtao_20161023
resumeHirokoOtao_20161023
 
El mundo feudal ccss 2ºeso.unidad didáctica
El mundo feudal  ccss 2ºeso.unidad didácticaEl mundo feudal  ccss 2ºeso.unidad didáctica
El mundo feudal ccss 2ºeso.unidad didáctica
 
Manual de uso King design
Manual de uso King designManual de uso King design
Manual de uso King design
 
The Questionable Revolution of Ad-Blocking
The Questionable Revolution of Ad-Blocking The Questionable Revolution of Ad-Blocking
The Questionable Revolution of Ad-Blocking
 
Virus y antivirus
Virus y antivirusVirus y antivirus
Virus y antivirus
 
Teoria sobre los ciclos economicos final
Teoria sobre los ciclos economicos finalTeoria sobre los ciclos economicos final
Teoria sobre los ciclos economicos final
 
Cesar augustopulidopulgarin actividad1_2mapac.pdf
Cesar augustopulidopulgarin actividad1_2mapac.pdfCesar augustopulidopulgarin actividad1_2mapac.pdf
Cesar augustopulidopulgarin actividad1_2mapac.pdf
 
Ciencias Sociales
Ciencias SocialesCiencias Sociales
Ciencias Sociales
 
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
 
Internalizacion derecho comercial
Internalizacion derecho comercialInternalizacion derecho comercial
Internalizacion derecho comercial
 
Festival arabesques
Festival arabesquesFestival arabesques
Festival arabesques
 
El club de la comedia
El club de la comediaEl club de la comedia
El club de la comedia
 
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
 
Internet
InternetInternet
Internet
 
MCP a l'institut de l'aigua i+d
MCP a l'institut de l'aigua i+dMCP a l'institut de l'aigua i+d
MCP a l'institut de l'aigua i+d
 

Similar to Pennsylvania’s New Oil and Gas Regulations for Unconventional Wells – Part 1: Planning and Permitting

Fracking - AWMA Presentation
Fracking  - AWMA PresentationFracking  - AWMA Presentation
Fracking - AWMA Presentation
kwtght
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
Chad Colton
 
Regulatory Update 2015
Regulatory Update 2015Regulatory Update 2015
Regulatory Update 2015
Jane Besch
 
20 04 03 letter cipa to cal gem 2020_relief_letter_final
20 04 03 letter cipa to cal gem 2020_relief_letter_final20 04 03 letter cipa to cal gem 2020_relief_letter_final
20 04 03 letter cipa to cal gem 2020_relief_letter_final
Nicole Levin
 
05 shoemaker us german workshop presentation
05 shoemaker us german workshop presentation05 shoemaker us german workshop presentation
05 shoemaker us german workshop presentation
leann_mays
 

Similar to Pennsylvania’s New Oil and Gas Regulations for Unconventional Wells – Part 1: Planning and Permitting (20)

Energy Bulletin - Pennsylvania’s New Oil and Gas Regulations for Unconvention...
Energy Bulletin - Pennsylvania’s New Oil and Gas Regulations for Unconvention...Energy Bulletin - Pennsylvania’s New Oil and Gas Regulations for Unconvention...
Energy Bulletin - Pennsylvania’s New Oil and Gas Regulations for Unconvention...
 
PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...
PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...
PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...
 
Fracking - AWMA Presentation
Fracking  - AWMA PresentationFracking  - AWMA Presentation
Fracking - AWMA Presentation
 
B july-04
B july-04B july-04
B july-04
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
EPA Comments on Revised Draft NYSDEC Revised dSGEIS
EPA Comments on Revised Draft NYSDEC Revised dSGEISEPA Comments on Revised Draft NYSDEC Revised dSGEIS
EPA Comments on Revised Draft NYSDEC Revised dSGEIS
 
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
 
SPCC 2015
SPCC 2015SPCC 2015
SPCC 2015
 
Applying federal environmental laws to co2 enhanced oil recovery ppt
Applying federal environmental laws to co2 enhanced oil recovery pptApplying federal environmental laws to co2 enhanced oil recovery ppt
Applying federal environmental laws to co2 enhanced oil recovery ppt
 
MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements
 
Regulatory Update 2015
Regulatory Update 2015Regulatory Update 2015
Regulatory Update 2015
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
20 04 03 letter cipa to cal gem 2020_relief_letter_final
20 04 03 letter cipa to cal gem 2020_relief_letter_final20 04 03 letter cipa to cal gem 2020_relief_letter_final
20 04 03 letter cipa to cal gem 2020_relief_letter_final
 
Beeching, Thomas, Conestoga-Rovers & Associates, Illinois Hydraulic Fracturin...
Beeching, Thomas, Conestoga-Rovers & Associates, Illinois Hydraulic Fracturin...Beeching, Thomas, Conestoga-Rovers & Associates, Illinois Hydraulic Fracturin...
Beeching, Thomas, Conestoga-Rovers & Associates, Illinois Hydraulic Fracturin...
 
05 shoemaker us german workshop presentation
05 shoemaker us german workshop presentation05 shoemaker us german workshop presentation
05 shoemaker us german workshop presentation
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
Untangling the Web of Confusion Around the ASTM E1527-13 Phase I Standard
Untangling the Web of Confusion Around the ASTM E1527-13 Phase I StandardUntangling the Web of Confusion Around the ASTM E1527-13 Phase I Standard
Untangling the Web of Confusion Around the ASTM E1527-13 Phase I Standard
 
Center for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal RegulationsCenter for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal Regulations
 
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
 
FERC Approval for ESNG's System Reliability Project
FERC Approval for ESNG's System Reliability ProjectFERC Approval for ESNG's System Reliability Project
FERC Approval for ESNG's System Reliability Project
 

Recently uploaded

Agrarian Reform Policies in the Philippines: a quiz
Agrarian Reform Policies in the Philippines: a quizAgrarian Reform Policies in the Philippines: a quiz
Agrarian Reform Policies in the Philippines: a quiz
gaelcabigunda
 
Notes-on-Prescription-Obligations-and-Contracts.doc
Notes-on-Prescription-Obligations-and-Contracts.docNotes-on-Prescription-Obligations-and-Contracts.doc
Notes-on-Prescription-Obligations-and-Contracts.doc
BRELGOSIMAT
 

Recently uploaded (20)

VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
VIETNAM - DIRECT POWER PURCHASE AGREEMENTS (DPPA) - Latest development - What...
 
Abdul Hakim Shabazz Deposition Hearing in Federal Court
Abdul Hakim Shabazz Deposition Hearing in Federal CourtAbdul Hakim Shabazz Deposition Hearing in Federal Court
Abdul Hakim Shabazz Deposition Hearing in Federal Court
 
Military Commissions details LtCol Thomas Jasper as Detailed Defense Counsel
Military Commissions details LtCol Thomas Jasper as Detailed Defense CounselMilitary Commissions details LtCol Thomas Jasper as Detailed Defense Counsel
Military Commissions details LtCol Thomas Jasper as Detailed Defense Counsel
 
indian evidence act.pdf.......very helpful for law student
indian evidence act.pdf.......very helpful for law studentindian evidence act.pdf.......very helpful for law student
indian evidence act.pdf.......very helpful for law student
 
Everything You Should Know About Child Custody and Parenting While Living in ...
Everything You Should Know About Child Custody and Parenting While Living in ...Everything You Should Know About Child Custody and Parenting While Living in ...
Everything You Should Know About Child Custody and Parenting While Living in ...
 
The Main Procedures for Obtaining Cypriot Citizenship
The Main Procedures for Obtaining Cypriot CitizenshipThe Main Procedures for Obtaining Cypriot Citizenship
The Main Procedures for Obtaining Cypriot Citizenship
 
Agrarian Reform Policies in the Philippines: a quiz
Agrarian Reform Policies in the Philippines: a quizAgrarian Reform Policies in the Philippines: a quiz
Agrarian Reform Policies in the Philippines: a quiz
 
Casa Tradicion v. Casa Azul Spirits (S.D. Tex. 2024)
Casa Tradicion v. Casa Azul Spirits (S.D. Tex. 2024)Casa Tradicion v. Casa Azul Spirits (S.D. Tex. 2024)
Casa Tradicion v. Casa Azul Spirits (S.D. Tex. 2024)
 
Solidarity and Taxation: the Ubuntu approach in South Africa
Solidarity and Taxation: the Ubuntu approach in South AfricaSolidarity and Taxation: the Ubuntu approach in South Africa
Solidarity and Taxation: the Ubuntu approach in South Africa
 
Notes-on-Prescription-Obligations-and-Contracts.doc
Notes-on-Prescription-Obligations-and-Contracts.docNotes-on-Prescription-Obligations-and-Contracts.doc
Notes-on-Prescription-Obligations-and-Contracts.doc
 
Application of Doctrine of Renvoi by foreign courts under conflict of laws
Application of Doctrine of Renvoi by foreign courts under conflict of lawsApplication of Doctrine of Renvoi by foreign courts under conflict of laws
Application of Doctrine of Renvoi by foreign courts under conflict of laws
 
RIGHTS OF VICTIM EDITED PRESENTATION(SAIF JAVED).pptx
RIGHTS OF VICTIM EDITED PRESENTATION(SAIF JAVED).pptxRIGHTS OF VICTIM EDITED PRESENTATION(SAIF JAVED).pptx
RIGHTS OF VICTIM EDITED PRESENTATION(SAIF JAVED).pptx
 
Book review - Amartya Sen's Idea of Justice
Book review - Amartya Sen's Idea of JusticeBook review - Amartya Sen's Idea of Justice
Book review - Amartya Sen's Idea of Justice
 
PRECEDENT AS A SOURCE OF LAW (SAIF JAVED).pptx
PRECEDENT AS A SOURCE OF LAW (SAIF JAVED).pptxPRECEDENT AS A SOURCE OF LAW (SAIF JAVED).pptx
PRECEDENT AS A SOURCE OF LAW (SAIF JAVED).pptx
 
DNA Testing in Civil and Criminal Matters.pptx
DNA Testing in Civil and Criminal Matters.pptxDNA Testing in Civil and Criminal Matters.pptx
DNA Testing in Civil and Criminal Matters.pptx
 
Charge and its essentials rules Under the CRPC, 1898
Charge and its essentials rules Under the CRPC, 1898Charge and its essentials rules Under the CRPC, 1898
Charge and its essentials rules Under the CRPC, 1898
 
EMPLOYMENT LAW AN OVERVIEW in Malawi.pptx
EMPLOYMENT LAW  AN OVERVIEW in Malawi.pptxEMPLOYMENT LAW  AN OVERVIEW in Malawi.pptx
EMPLOYMENT LAW AN OVERVIEW in Malawi.pptx
 
Debt Mapping Camp bebas riba to know how much our debt
Debt Mapping Camp bebas riba to know how much our debtDebt Mapping Camp bebas riba to know how much our debt
Debt Mapping Camp bebas riba to know how much our debt
 
ALL EYES ON RAFAH BUT WHY Explain more.pdf
ALL EYES ON RAFAH BUT WHY Explain more.pdfALL EYES ON RAFAH BUT WHY Explain more.pdf
ALL EYES ON RAFAH BUT WHY Explain more.pdf
 
Donald_J_Trump_katigoritirio_stormi_daniels.pdf
Donald_J_Trump_katigoritirio_stormi_daniels.pdfDonald_J_Trump_katigoritirio_stormi_daniels.pdf
Donald_J_Trump_katigoritirio_stormi_daniels.pdf
 

Pennsylvania’s New Oil and Gas Regulations for Unconventional Wells – Part 1: Planning and Permitting

  • 1. ENERGYALERT Page 1111 of 4444 Pennsylvania’s New Oil and Gas RegulationsPennsylvania’s New Oil and Gas RegulationsPennsylvania’s New Oil and Gas RegulationsPennsylvania’s New Oil and Gas Regulations for Unconventional Wellsfor Unconventional Wellsfor Unconventional Wellsfor Unconventional Wells –––– Part 1: Planning and Permitting The new rules for unconventional oil and gas wells in Pennsylvania are finally here. The regulations in Chapter 78a, relating to unconventional wells, were published in the Pennsylvania Bulletin on October 8, 2016.1 Recent headlines may have focused on legal challenges to new regulations for unconventional oil and gas wells in Pennsylvania, but it is important to recognize that the regulations are effective immediately, despite ongoing efforts to block them. This Client Alert, which will be the first in a series, provides a brief background on the rules and then highlights a few of the sections involving planning and permitting. Future Client Alerts will describe other aspects of the rules. BackgroundBackgroundBackgroundBackground These rules are the culmination of a long process that began in 2011, when Pennsylvania’s Department of Environmental Protection (“DEP”) began developing rules to amend existing oil and gas regulations. That process also included codifying environmental provisions required by the 2012 Oil and Gas Act.2 After years of work, the regulations neared final form. Late in the process, amendments to the rules for conventional oil and gas wells were removed. For unconventional wells, Chapter 78a supersedes the previous Chapter 78.3 Some of the rules simply codify existing guidance or describe practices that have already been adopted.4 The DEP provided some training and resources on the new rules before their release.5 While the industry must comply with the new rules, as written, the controversy over them – which played out over the years that they were in development – continues. The Pennsylvania Independent Oil and Gas Association (“PIOGA”) filed a challenge to the regulations before they were published, but lost at the Commonwealth Court.6 That lawsuit is on appeal to the Pennsylvania Supreme Court.7 The Marcellus Shale Coalition filed a separate challenge one week after they were issued.8 The 2012 Oil and Gas Act, known as Act 13, has been subject to legal challenges since it was passed. The latest in the Robinson Township series of cases, dealing with these challenges, was published on September 28, 2016. That decision enjoined certain sections of Act 13.9 The industry challenges to the regulations rest in part on the Robinson Township decisions and their impact on the enabling legislation behind the new rules. Planning and PermittingPlanning and PermittingPlanning and PermittingPlanning and Permitting There is nothing new to the concept that drilling an unconventional well requires significant planning – but there are some new, or at least expanded, planning requirements interspersed throughout the regulations. Some of the significant changes include: 1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources1. Assessing impacts on watercourses and public resources The application requirements impose various obligations for determining the potential impacts of the well. One concern is whether the proposed limit of disturbance of the well site is within 100 feet of “any watercourse or any
  • 2. ENERGYALERT Page 2222 of 4444 high quality or exceptional value body of water or any wetland 1 acre or greater in size.” If so, the applicant needs to demonstrate that those water resources will be protected. § 78a.15(b.1).10 To make that demonstration, the applicant may rely on plans developed under other sections of these regulations, such as the site containment plan, or plans approved by the DEP pursuant to other regulations. § 78a.15(b.1)(1) – (5). Another area of concern is whether the proposed well will have an impact on endangered species. § 78a.15(d). The well permit application must include a “detailed analysis of the impact of the well, well site and access road on threatened and endangered species.” Id. An applicant that identifies a potential impact on a threatened or endangered species must submit a written document demonstrating how the impact “will be avoided or minimized and mitigated” in accordance with relevant state and federal laws. § 78a.15(d)(2).11 The regulations establish a process for identifying potentially impacted public resources, then notifying any appropriate public resource agencies about them. § 78a.15(f). The list of “public resources” that fall within this process has been expanded.12 The subsection applies if the proposed limit of disturbance of the well site is located: “(i) In or within 200 feet of a publicly owned park, forest, game land or wildlife area. (ii) In or within the corridor of a State or National scenic river. (iii) Within 200 feet of a National natural landmark. (iv) In a location that will impact other critical communities. (v) Within 200 feet of a historical or archeological site listed on the Federal or State list of historic places. (vi) Within 200 feet of common areas on a school’s property or a playground. (vii) Within zones 1 or 2 of a wellhead protection area as part of a wellhead protection program approved under § 109.713 (relating to wellhead protection program). (viii) Within 1,000 feet of a water well, surface water intake, reservoir or other water supply extraction point used by a water purveyor.” § 78a.15(f)(1). Understanding this section requires referring back to the “definitions” section of the regulations. See § 78a.1. In particular, “other critical communities” are “[s]pecies of special concern identified on PNDI [Pennsylvania Natural Diversity Inventory] receipt.” § 78a.1 (“Other critical communities”). These species include plant or animal species “[i]n a proposed status categorized as proposed endangered, proposed threatened, proposed rare or candidate,” and species “[t]hat are classified as rare or tentatively undetermined.” Id.13 The definitions section also addresses “Wellhead protection area.” § 78a.1.14 This section of the regulations has been particularly controversial. Both PIOGA and the Marcellus Shale Coalition objected to this section in their lawsuits challenging the regulations.15 2.2.2.2. Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”)Identifying Orphan or Abandoned Wells (“Area of Review”) Operators are all-too-familiar with concerns raised by the prospect of drilling a new well near existing wells. New drilling around an old well can cause problems such as methane migration. DEP estimates that there are approximately 300,000 abandoned wells across the state.16 The new “Area of Review” regulations are targeted at addressing potential problems with existing wells. See §§ 78a.52a. and 78a.73. Before drilling, operators must identify active, inactive, orphan, and abandoned wells within 1,000 feet of the vertical and horizontal wellbore. § 78a.52a(a)-(b). The report summarizing that effort must include a monitoring plan for certain types of wells.
  • 3. ENERGYALERT Page 3333 of 4444 § 78a.52a(c)-(d). Notifications to adjacent operators are required. § 78a.73(c). Previously, the DEP discussed the implementation schedule for these regulations and provided charts showing when they apply to wells at different stages in the drilling process.17 DEP has issued an interim final technical guidance document on the Area of Review requirements; written comments are due by December 7, 2016.18 3. Drafting Water Management Plans3. Drafting Water Management Plans3. Drafting Water Management Plans3. Drafting Water Management Plans Unconventional operators need to develop water management plans before withdrawing water for fracking. § 78a.69. The rulemaking is designed to ensure that requirements “are consistent Statewide, regardless of which river basin an operator withdraws water from.”19 4.4.4.4. Conducting PreConducting PreConducting PreConducting Pre----Drilling Water SurveysDrilling Water SurveysDrilling Water SurveysDrilling Water Surveys Operators are already familiar with issues surrounding the protection of water supplies. The concept of the “rebuttable presumption,” under which the operator is responsible for the pollution of a water supply under certain circumstances, is not new. See 58 Pa. C.S. § 3218(d)(2).20 There are some new provisions, however, that must be followed to avoid impairing the assertion of defenses to the rebuttable presumption. See § 78a.52. For example, the operator must provide an electronic report containing a copy of all of the sample results to the DEP 10 business days before drilling, and to the landowner or water purveyor within 10 business days of receipt of the sample results. § 78a.52(d).21 Looking AheadLooking AheadLooking AheadLooking Ahead This client alert provided an overview of a few of the new rules related to planning and permitting. Watch for future client alerts on other aspects of the regulations. Cohen & Grigsby’s Energy and Environmental Practice Groups will monitor the implementation of these new regulations, which will significantly impact operators in Pennsylvania. For more information, please contact Julie Vanneman at (412) 297-4715 or jvanneman@cohenlaw.com. To receive future bulletins and news alerts, please send an e-mail to bulletins@cohenlaw.com. Copyright © 2016 by Cohen & Grigsby, P.C. (No claim to original U.S. Governmental material.) All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of Cohen & Grigsby, P.C. and is intended to alert the recipients to new developments in the areas of energy and environmental law. The hiring of a lawyer is an important decision that should not be based solely on advertisements. Before you decide, ask us to send you free written information about Cohen & Grigsby's qualifications and experience. 1 46 Pa. Bull. 6431 (Oct. 8, 2016), http://www.pabulletin.com/secure/data/vol46/46-41/1757.html. 2 DEP, 2015 Oil and Gas Annual Report, at 23, http://www.dep.pa.gov/Business/Energy/OilandGasPrograms/OilandGasMgmt/Pages/Annual-Report.aspx. 3 46 Pa. Bull. 6431 (explaining that the “revised final-form rulemaking” includes a new section, § 78a.2, “to clarify that Chapter 78a supersedes Chapter 78 for unconventional wells to avoid any potential conflict between the requirements in Chapter 78 and Chapter 78a regarding unconventional wells.”); id. § D (“The amendments in Chapter 78 are limited to deletions of the provisions regarding unconventional wells.”). 4 See, e.g., 46 Pa. Bull 6431, at § D. 5 See DEP, http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx. 6 See Pennsylvania Independent Oil & Gas Ass’n v. Commonwealth of Pennsylvania, No. 321 M.D. 2015 (Pa. Commonw. Ct. Sept. 1, 2016). The opinion is available at http://www.pacourts.us/courts/commonwealth-court/court-opinions/.
  • 4. ENERGYALERT Page 4444 of 4444 7 See, e.g., Marie Cusick, Trade Group Seeks to Block New Drilling Rules, StateImpact Pennsylvania, Oct. 3, 2016, at https://stateimpact.npr.org/pennsylvania/2016/10/03/trade-group-seeks-to-block-new-drilling-rules/. 8 See, e.g., Laura Legere, Shale Gas Industry Challenges Pennsylvania Drilling Rules in Court, Pittsburgh Post-Gazette, Oct. 15, 2016, at http://powersource.post-gazette.com/powersource/policy-powersource/2016/10/14/Gas-industry-files-suit-challenging-new-drilling- rules-in-Pennsylvania/stories/201610140177. 9 See Robinson Township, et al. v. Commonwealth of Pennsylvania, No. 104 MAP 2014 (Pa. Sept. 28, 2016), available at http://www.pacourts.us/assets/opinions/Supreme/out/J-34A-2016mo%20-%2010282684312019871.pdf?cb=1. 10 References are to 25 Pa. Code Chapter 78a, available as printed in the Pennsylvania Bulletin, 46 Pa. Bull. 6431 (Oct. 8, 2016), at http://www.pabulletin.com/secure/data/vol46/46-41/1757.html. 11 See also DEP, Chapter 78a Training: Application Requirements and Public Resources Webinar (pdf), at p. 10, via link at http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx. 12 See 46 Pa. Bull. 6431, at § F (“Public resources to be considered in § 78a.15(f)”) (“Based on comments received, ‘common areas of a school’s property,’ ‘playgrounds’ and ‘wellhead protection areas’ were added because these resources are similar in nature to the other listed public resources.”). 13 See also DEP, Chapter 78a Training: Application Requirements and Public Resources FAQ, ¶ 4, via link at http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx (“The Pennsylvania Natural Heritage Program maintains a list of species and communities used as the basis for Environmental Review within the PNDI Tool at http://www.naturalheritage.state.pa.us/docs/PNDI_SpeciesList_Jan2014.pdf. This list covers plant and animal species included in the definition of ‘other critical communities’ in Section 78a.1. (posted 10/11/16)”). 14 See also id. ¶ 5 (noting that the definition of the phrase is cross-referenced to drinking water regulations, and providing further information on Zone 2). 15 See supra notes 6-8. 16 See Regulatory Review Commission, Final Regulation #3042, Environmental Quality Board #7-484, Regulatory Analysis Form (March 3, 2016), at 19, http://www.irrc.state.pa.us/docs/3042/AGENCY/3042FF.pdf. 17 See DEP, Chapter 78a Training, Area of Review Webinar (pdf), pp. 8-11, via link at http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx. 18 See 46 Pa. Bull. 6392 (Oct. 8, 2016), at http://www.pabulletin.com/secure/data/vol46/46-41/1725.html (describing technical guidance documents related to the regulations and providing directions for accessing those documents). 19 46 Pa. Bull. 6431, § E (“§ 78a.69. Water management plans”). 20 This reference is to Act 13, which was codified at 58 Pa. C.S. §§ 2301-3504. See also DEP, Chapter 78a Training: Protection of Water Supplies FAQ, via link at http://www.dep.pa.gov/DataandTools/Webinars/Pages/Oil-and-Gas.aspx. 21 See also 46 Pa. Bull. 6431, at § E (“§ 78a.52. Predrilling or prealteration survey”) (the previous practice was to require submission within 10 days of receipt of each sample result, which led to “piecemeal submissions”); Chapter 78a Training: Protection of Water Supplies FAQ, at ¶ 3; id. ¶ 4 (the operator should submit testing results within 10 days of drilling, not within 10 days of receiving the results from the laboratory).