Guidance for preparing a Pre-feasibility study under
the Simplified Approval Process (SAP)
by Green Climate Fund (GCF)
• Prof. KB Adhikari, PhD
I. Introduction
1. GCF has introduced the Simplified Approval Process Pilot Scheme (SAP) as a way
to apply for GCF funding for smaller-scale projects or programmes. It is
specifically designed for adaptation or mitigation initiatives that require a GCF
contribution of no more than USD 10 million which have minimal environmental
and social risks.
2. This guidance provides a snapshot of how to compile a pre-feasibility study, a
requirement for all SAP funding proposals - based on GCF Board Decision. The
pre-feasibility study is designed to demonstrate that the proposed
project/programme is sound on technical, economic, social and environmental
grounds.
I. Introduction
Cont…
3. This document provides a step by step guide to show:
• what is a pre-feasibility study and what is its role;
• what studies should be included to allow GCF to access the merits of the SAP funding proposal
while considering the project development process/cycle;
• the level of “granularity” expected in the data and information reported in the feasibility study. This
guidance should be viewed as a general example.
4. GCF can provide guidance and clarification about the pre-feasibility study after receiving the SAP
concept note, which represents the starting point of the SAP application process. The preparation of
background information for the SAP pre-feasibility study is less resource-intensive than standard
funding proposals since SAP projects are smaller in monetary value and carry less risk
1. Key considerations
5. When preparing a pre-feasibility study under the SAP, Accredited Entities may consider
the following:
1. The study can make use of existing information and data from secondary sources and
complement these with primary data as needed.
2. Technical studies, data and information can be collected from previously implemented
projects, or projects that are approaching the end of their implementation.
3. If evaluation reports and previous feasibility studies from those previously
implemented/ongoing projects are available, they can be used in the preparation of the
pre-feasibility, assuring that the technologies and solutions proposed are tailored and
assessed to be feasible and viable in the context of the proposed SAP project
5. When preparing a pre-feasibility study under the SAP,
Accredited Entities may consider the following:
Cont…
4. Information presented in the funding proposal and pre-
feasibility study should be presented in a succinct and
structured manner, in a way that information does not
duplicate and is complementary to each other. Please ensure
the SAP funding proposal refers to the pre-feasibility document
page and paragraph where additional details and in-depth
information are provided.
5. The length of the pre-feasibility study is not restricted.
2. Difference between feasibility and pre-
feasibility studies
6. Projects and programs that are eligible for SAP are micro- or small-scale with minimal to no adverse
environmental and/or social risks and/or impacts. This means a full feasibility study (such as large-scale
infrastructure) is not needed by default.
7. The role of the pre-feasibility study should be to present an assessment of the proposed project/programme’s
interventions in terms of the soundness of their :
- Technical design;
- Costs and benefits;
- Social and Environmental impacts; and
- Legal and Regulatory environments.
In which the proposed interventions/activities are expected to be implemented, institutional and financial aspects,
and any other analysis to assess feasibility of the investment. The pre-feasibility study should provide a clear
conclusion, with recommendations that explain the underlying logic of the project structure and activities.
2. Difference between feasibility and pre-feasibility studies
Cont…
8. While both feasibility and pre-feasibility studies serve the
same purpose, there are some differences in terms of their
contents, as presented in the Table below:
Table 1. Same feature and key differences between feasibility and pre-
feasibility studies
Feasibility study Pre-feasibility study
Same feature
(concept/
purpose)
Presenting technical, environmental, social, policy assessment of feasible options/solutions for
the proposed project/programme, and proposing outcomes and recommendations with the
most feasible and sound options for the project/programs
Key differences • Uses primary and secondary data
sources
• Incorporates in-depth technical design
studies for the proposed technological
solutions
• May involve detailed engineering
study/analysis with testing work and
on-site appraisals
• Includes deeper analysis and testing of
each feasible option
• Can rely on secondary data sources
complemented by primary sources (as needed)
• Makes use of existing evaluation reports for
previously implemented/ongoing projects
• Uses proven technologies and solutions with
track record to demonstrate the feasibility of
proposed technological solutions
• Assesses feasible options using
existing/available data, studies, resources
2. Difference between feasibility and pre-feasibility studies
Cont…
9. Every GCF’s SAP funding proposal is different. So the type and
quantity (granularity) of information and data needed varies for
different projects and sectors covered. The GCF publishes specific
SAP technical guidance documents for each sector on the SAP.
3. Approach
10. This is a general diagram which shows the elements of a SAP pre-feasibility
study.
Context
setting
Objectiv
es of the
project
Assessm
ent
Implement
Arrangments
Recomme
ndations
Referenc
es
11. Regular GCF funding proposals need to address particular climate rationale.
This is also the case with SAP proposals. The climate rationale should
include scientific analysis. The table below could provide general guidance
on how to present a scientifically-based climate rationale:
• Why responding to climate change is important for the country, people and
economy?
• Which type of discernable changes have been influenced/forced by climate-related
parameters in the target region(s), and which impacts can be linked and by how
much (emphasising on attribution) for the sector and different demographic groups
in the target region(s)?
• What projected impacts are likely to occur in the working locations under climate
change within a time frame of the project cycle (say, between now and 2030s or
2040s)?
11. Regular GCF funding proposals need to address particular climate rationale.
This is also the case with SAP proposals. The climate rationale should
include scientific analysis. The table below could provide general guidance
on how to present a scientifically-based climate rationale: Cont…
• What general responses (i.e., interventions) are proposed and considered to address
the changes and related impacts (for adaptation projects, please emphasize on
changing sensitivity to impacts and/or change in adaptive capacity)?
• Can there be viable alternative responses/interventions for the same climate
change-related problems, and which one is chosen and what is the rationale for
such choices being made?
• An analysis of the barriers, as perceived within the prevailing context of the
country/region, to the implementation of the chosen/proposed intervention(s).
4. Example of the structure of a pre-
feasibility study
Structure Pre-feasibility Study
1. Executive Summary
2. Context setting:
• Baseline assessment and situation Analysis/SWOT
• Analysis of climate change risks, impacts, and vulnerability analysis at national/regional level
and location of the project.
• Policy landscape (ADS, APP, etc)
• Legal and regulatory landscape
• Current and recently closed projects related to climate change that the proposed SAP scale up
or/and build upon/complement or if project preparation was supported by Readiness or
other preparation support activities;
4. Example of the structure of a pre-feasibility study
cont..
Structure Pre-feasibility Study
3. Pre-feasibility assessment:
• Technical assessment (technical options proposed and specifications
for equipment, infrastructures, etc).
• Environmental, economic and social assessments
• Financing options, reasoning for the concessional
• Economic and/or financial viability
• Exit strategy and sustainability
4. Example of the structure of a pre-feasibility study
Cont…
Structure Pre-feasibility Study
4. Specific information on the project (should not be duplication with the
funding proposal):
• Climate rationale
• Incremental cost reasoning (if needed)
• Theory of change
• Project objective, logic of action and components.
• Use of logframe and indicators
• Timeline of the implementation/Calendar of Operations
4. Example of the structure of a pre-feasibility study
Cont…
Structure Pre-feasibility Study
5. Implementation arrangements:
• Stakeholders analysis and evidence of consultations and stakeholder
engagement plan
• Capacity assessment and due diligence on the executing entities
• Implementation arrangements and governance of the project (e.g. national
implementing modalities, steering committees, project implementation unit
composition, etc.)
• Institutional and programme/project level grievance redness mechanism(s)
Recommendations
Brief conclusions of what has been presented as part of the pre-feasibility study
describing how factors (such as solutions, technologies, implementation plan):
• fit the context where the project is intended to be implemented,
• can achieve the climate results envisaged,
• provide the sustainability of those climate results overtime, once GCF
exits the project.
References
12. List of the studies, reports, media sources, books,
articles, published and unpublished that have been used
as second source of information.
Other possible annexes
13. The following are other type of sections/information that could be
attached if/as needed or appropriate:
• Technical specifications of equipment
• Proceedings of stakeholder consultations
In General : PRE-FEASIBILITY STUDIES
THANK YOU

More Related Content

Similar to 3. Pre-feasibility Study.pptx of project

Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility reportJignesh Ruperi
 
feasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdffeasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdfJainishBhagat2
 
Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...ILRI
 
The Ocean of Tomorrow 2013 - modalities
The Ocean of Tomorrow 2013  - modalitiesThe Ocean of Tomorrow 2013  - modalities
The Ocean of Tomorrow 2013 - modalitiesjagotcha
 
Course Assignment: Financing and Initiating Major Engineering Projects
Course Assignment: Financing and Initiating Major Engineering ProjectsCourse Assignment: Financing and Initiating Major Engineering Projects
Course Assignment: Financing and Initiating Major Engineering ProjectsFragoso Josue Muhae
 
Marie curie local help with applications
Marie curie local help with applicationsMarie curie local help with applications
Marie curie local help with applicationskingkatz
 
Project and project management
Project and project managementProject and project management
Project and project managementwodato
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0Ly Smith
 
Towards a Software Engineering Research Framework: Extending Design Science R...
Towards a Software Engineering Research Framework: Extending Design Science R...Towards a Software Engineering Research Framework: Extending Design Science R...
Towards a Software Engineering Research Framework: Extending Design Science R...IRJET Journal
 
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned The European GNSS Agency (GSA)
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolNAP Events
 
PCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtPCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtEla Gerthnerova
 
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...Climate Action Network South Asia
 
Baseline Basics 2013
Baseline Basics 2013Baseline Basics 2013
Baseline Basics 2013sgchaplowe
 
NAP Training Viet Nam - Stock Taking for National Adaptation Planning
NAP Training Viet Nam - Stock Taking for National Adaptation PlanningNAP Training Viet Nam - Stock Taking for National Adaptation Planning
NAP Training Viet Nam - Stock Taking for National Adaptation PlanningUNDP Climate
 

Similar to 3. Pre-feasibility Study.pptx of project (20)

Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility report
 
feasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdffeasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdf
 
Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...
 
The Ocean of Tomorrow 2013 - modalities
The Ocean of Tomorrow 2013  - modalitiesThe Ocean of Tomorrow 2013  - modalities
The Ocean of Tomorrow 2013 - modalities
 
Feasibility study
Feasibility studyFeasibility study
Feasibility study
 
Course Assignment: Financing and Initiating Major Engineering Projects
Course Assignment: Financing and Initiating Major Engineering ProjectsCourse Assignment: Financing and Initiating Major Engineering Projects
Course Assignment: Financing and Initiating Major Engineering Projects
 
Marie curie local help with applications
Marie curie local help with applicationsMarie curie local help with applications
Marie curie local help with applications
 
Project and project management
Project and project managementProject and project management
Project and project management
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0
 
project management
project managementproject management
project management
 
Towards a Software Engineering Research Framework: Extending Design Science R...
Towards a Software Engineering Research Framework: Extending Design Science R...Towards a Software Engineering Research Framework: Extending Design Science R...
Towards a Software Engineering Research Framework: Extending Design Science R...
 
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned
Horizon 2020 LEIT-Space 2016-participaton rules and lessons learned
 
REPORT.pptx
REPORT.pptxREPORT.pptx
REPORT.pptx
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E Tool
 
PCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtPCM+LFA-_food.forthought
PCM+LFA-_food.forthought
 
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
 
Baseline Basics 2013
Baseline Basics 2013Baseline Basics 2013
Baseline Basics 2013
 
NAP Training Viet Nam - Stock Taking for National Adaptation Planning
NAP Training Viet Nam - Stock Taking for National Adaptation PlanningNAP Training Viet Nam - Stock Taking for National Adaptation Planning
NAP Training Viet Nam - Stock Taking for National Adaptation Planning
 
Agriculture Public Expenditure Workshop Module 4
Agriculture Public Expenditure Workshop Module 4Agriculture Public Expenditure Workshop Module 4
Agriculture Public Expenditure Workshop Module 4
 

Recently uploaded

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Recently uploaded (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 

3. Pre-feasibility Study.pptx of project

  • 1. Guidance for preparing a Pre-feasibility study under the Simplified Approval Process (SAP) by Green Climate Fund (GCF) • Prof. KB Adhikari, PhD
  • 2. I. Introduction 1. GCF has introduced the Simplified Approval Process Pilot Scheme (SAP) as a way to apply for GCF funding for smaller-scale projects or programmes. It is specifically designed for adaptation or mitigation initiatives that require a GCF contribution of no more than USD 10 million which have minimal environmental and social risks. 2. This guidance provides a snapshot of how to compile a pre-feasibility study, a requirement for all SAP funding proposals - based on GCF Board Decision. The pre-feasibility study is designed to demonstrate that the proposed project/programme is sound on technical, economic, social and environmental grounds.
  • 3. I. Introduction Cont… 3. This document provides a step by step guide to show: • what is a pre-feasibility study and what is its role; • what studies should be included to allow GCF to access the merits of the SAP funding proposal while considering the project development process/cycle; • the level of “granularity” expected in the data and information reported in the feasibility study. This guidance should be viewed as a general example. 4. GCF can provide guidance and clarification about the pre-feasibility study after receiving the SAP concept note, which represents the starting point of the SAP application process. The preparation of background information for the SAP pre-feasibility study is less resource-intensive than standard funding proposals since SAP projects are smaller in monetary value and carry less risk
  • 4. 1. Key considerations 5. When preparing a pre-feasibility study under the SAP, Accredited Entities may consider the following: 1. The study can make use of existing information and data from secondary sources and complement these with primary data as needed. 2. Technical studies, data and information can be collected from previously implemented projects, or projects that are approaching the end of their implementation. 3. If evaluation reports and previous feasibility studies from those previously implemented/ongoing projects are available, they can be used in the preparation of the pre-feasibility, assuring that the technologies and solutions proposed are tailored and assessed to be feasible and viable in the context of the proposed SAP project
  • 5. 5. When preparing a pre-feasibility study under the SAP, Accredited Entities may consider the following: Cont… 4. Information presented in the funding proposal and pre- feasibility study should be presented in a succinct and structured manner, in a way that information does not duplicate and is complementary to each other. Please ensure the SAP funding proposal refers to the pre-feasibility document page and paragraph where additional details and in-depth information are provided. 5. The length of the pre-feasibility study is not restricted.
  • 6. 2. Difference between feasibility and pre- feasibility studies 6. Projects and programs that are eligible for SAP are micro- or small-scale with minimal to no adverse environmental and/or social risks and/or impacts. This means a full feasibility study (such as large-scale infrastructure) is not needed by default. 7. The role of the pre-feasibility study should be to present an assessment of the proposed project/programme’s interventions in terms of the soundness of their : - Technical design; - Costs and benefits; - Social and Environmental impacts; and - Legal and Regulatory environments. In which the proposed interventions/activities are expected to be implemented, institutional and financial aspects, and any other analysis to assess feasibility of the investment. The pre-feasibility study should provide a clear conclusion, with recommendations that explain the underlying logic of the project structure and activities.
  • 7. 2. Difference between feasibility and pre-feasibility studies Cont… 8. While both feasibility and pre-feasibility studies serve the same purpose, there are some differences in terms of their contents, as presented in the Table below:
  • 8. Table 1. Same feature and key differences between feasibility and pre- feasibility studies Feasibility study Pre-feasibility study Same feature (concept/ purpose) Presenting technical, environmental, social, policy assessment of feasible options/solutions for the proposed project/programme, and proposing outcomes and recommendations with the most feasible and sound options for the project/programs Key differences • Uses primary and secondary data sources • Incorporates in-depth technical design studies for the proposed technological solutions • May involve detailed engineering study/analysis with testing work and on-site appraisals • Includes deeper analysis and testing of each feasible option • Can rely on secondary data sources complemented by primary sources (as needed) • Makes use of existing evaluation reports for previously implemented/ongoing projects • Uses proven technologies and solutions with track record to demonstrate the feasibility of proposed technological solutions • Assesses feasible options using existing/available data, studies, resources
  • 9. 2. Difference between feasibility and pre-feasibility studies Cont… 9. Every GCF’s SAP funding proposal is different. So the type and quantity (granularity) of information and data needed varies for different projects and sectors covered. The GCF publishes specific SAP technical guidance documents for each sector on the SAP.
  • 10. 3. Approach 10. This is a general diagram which shows the elements of a SAP pre-feasibility study. Context setting Objectiv es of the project Assessm ent Implement Arrangments Recomme ndations Referenc es
  • 11. 11. Regular GCF funding proposals need to address particular climate rationale. This is also the case with SAP proposals. The climate rationale should include scientific analysis. The table below could provide general guidance on how to present a scientifically-based climate rationale: • Why responding to climate change is important for the country, people and economy? • Which type of discernable changes have been influenced/forced by climate-related parameters in the target region(s), and which impacts can be linked and by how much (emphasising on attribution) for the sector and different demographic groups in the target region(s)? • What projected impacts are likely to occur in the working locations under climate change within a time frame of the project cycle (say, between now and 2030s or 2040s)?
  • 12. 11. Regular GCF funding proposals need to address particular climate rationale. This is also the case with SAP proposals. The climate rationale should include scientific analysis. The table below could provide general guidance on how to present a scientifically-based climate rationale: Cont… • What general responses (i.e., interventions) are proposed and considered to address the changes and related impacts (for adaptation projects, please emphasize on changing sensitivity to impacts and/or change in adaptive capacity)? • Can there be viable alternative responses/interventions for the same climate change-related problems, and which one is chosen and what is the rationale for such choices being made? • An analysis of the barriers, as perceived within the prevailing context of the country/region, to the implementation of the chosen/proposed intervention(s).
  • 13. 4. Example of the structure of a pre- feasibility study Structure Pre-feasibility Study 1. Executive Summary 2. Context setting: • Baseline assessment and situation Analysis/SWOT • Analysis of climate change risks, impacts, and vulnerability analysis at national/regional level and location of the project. • Policy landscape (ADS, APP, etc) • Legal and regulatory landscape • Current and recently closed projects related to climate change that the proposed SAP scale up or/and build upon/complement or if project preparation was supported by Readiness or other preparation support activities;
  • 14. 4. Example of the structure of a pre-feasibility study cont.. Structure Pre-feasibility Study 3. Pre-feasibility assessment: • Technical assessment (technical options proposed and specifications for equipment, infrastructures, etc). • Environmental, economic and social assessments • Financing options, reasoning for the concessional • Economic and/or financial viability • Exit strategy and sustainability
  • 15. 4. Example of the structure of a pre-feasibility study Cont… Structure Pre-feasibility Study 4. Specific information on the project (should not be duplication with the funding proposal): • Climate rationale • Incremental cost reasoning (if needed) • Theory of change • Project objective, logic of action and components. • Use of logframe and indicators • Timeline of the implementation/Calendar of Operations
  • 16. 4. Example of the structure of a pre-feasibility study Cont… Structure Pre-feasibility Study 5. Implementation arrangements: • Stakeholders analysis and evidence of consultations and stakeholder engagement plan • Capacity assessment and due diligence on the executing entities • Implementation arrangements and governance of the project (e.g. national implementing modalities, steering committees, project implementation unit composition, etc.) • Institutional and programme/project level grievance redness mechanism(s)
  • 17. Recommendations Brief conclusions of what has been presented as part of the pre-feasibility study describing how factors (such as solutions, technologies, implementation plan): • fit the context where the project is intended to be implemented, • can achieve the climate results envisaged, • provide the sustainability of those climate results overtime, once GCF exits the project.
  • 18. References 12. List of the studies, reports, media sources, books, articles, published and unpublished that have been used as second source of information.
  • 19. Other possible annexes 13. The following are other type of sections/information that could be attached if/as needed or appropriate: • Technical specifications of equipment • Proceedings of stakeholder consultations
  • 20. In General : PRE-FEASIBILITY STUDIES
  • 21.