SlideShare a Scribd company logo
HOUSE AMENDED
PRIOR PRINTER'S NOS. 609, 731 PRINTER'S NO. 1897
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No. 562 Session of
2015
INTRODUCED BY GORDNER, SCARNATI, CORMAN, MENSCH, ARGALL, VOGEL,
FOLMER, STEFANO, SCAVELLO, AUMENT, HUTCHINSON, WHITE, WARD,
RAFFERTY AND DINNIMAN, MARCH 13, 2015
AS AMENDED ON SECOND CONSIDERATION, HOUSE OF REPRESENTATIVES,
JUNE 7, 2016
AN ACT
Amending the act of June 25, 1982 (P.L.633, No.181), entitled,
as reenacted, "An act providing for independent oversight and
review of regulations, creating an Independent Regulatory
Review Commission, providing for its powers and duties and
making repeals," further providing for definitions, for
proposed regulations and procedures for review, for final-
form regulations and final-omitted regulations and procedures
for review and for procedures for subsequent review of
disapproved final-form or final-omitted regulations by the
commission.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Section 3 of the act of June 25, 1982 (P.L.633,
No.181), known as the Regulatory Review Act, is amended by
adding definitions to read:
Section 3. Definitions.
The following words and phrases when used in this act shall
have, unless the context clearly indicates otherwise, the
meanings given to them in this section:
* * *
"Committee chairperson." Any of the following:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
(1) The Senator appointed by the President pro tempore
of the Senate to serve as a majority chairperson of the
committee.
(2) The Senator appointed by the Minority Leader of the
Senate to serve as a minority chairperson of the committee.
(3) The Representative appointed by the Speaker of the
House of Representatives to serve as a majority chairperson
of the committee.
(4) The Representative appointed by the Minority Leader
of the House of Representatives to serve as a minority
chairperson of the committee.
* * *
"Legislative day." A day when both houses of the General
Assembly are in voting session.
* * *
Section 2. Section 5(a), (c), (d) and (g) of the act,
amended December 6, 2002 (P.L.1227, No.148) and June 29, 2012
(P.L.657, No.76), are amended and the section is amended by
adding a subsection to read:
Section 5. Proposed regulations; procedures for review.
(a) On the same date that an agency submits a proposed
regulation to the Legislative Reference Bureau for publication
of notice of proposed rulemaking in the Pennsylvania Bulletin as
required by the Commonwealth Documents Law, the agency shall
submit to the commission and the [committees] committee
chairpersons a copy of the proposed regulation and a regulatory
analysis form which includes the following:
(1) The title of the agency and the names, office
addresses and telephone numbers of the agency officials
responsible for responding to questions regarding the
20150SB0562PN1897 - 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
regulation or for receiving comments relating to the
regulation.
(1.1) A specific citation to the Federal or State
statutory or regulatory authority or the decision of a
Federal or State court under which the agency is proposing
the regulation, which the regulation is designed to implement
or which may mandate or affect compliance with the
regulation.
(2) A concise and, when possible, nontechnical
explanation of the proposed regulation.
(3) A statement of the need for the regulation.
(4) Estimates of the direct and indirect costs to the
Commonwealth, to its political subdivisions and to the
private sector. Insofar as the proposed regulation relates to
costs to the Commonwealth, the agency may submit in lieu of
its own statement the fiscal note prepared by the Office of
the Budget pursuant to section 612 of the act of April 9,
1929 (P.L.177, No.175), known as "The Administrative Code of
1929."
(5) A statement of legal, accounting or consulting
procedures and additional reporting, recordkeeping or other
paperwork, including copies of forms or reports, which will
be required for implementation of the regulation and an
explanation of measures which have been taken to minimize
these requirements.
(7) A schedule for review of the proposed regulation,
including the date by which the agency must receive comments;
the date or dates on which public hearings will be held; the
expected date of promulgation of the proposed regulation as a
final-form regulation; the expected effective date of the
20150SB0562PN1897 - 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
final-form regulation; the date by which compliance with the
final-form regulation will be required; and the date by which
required permits, licenses or other approvals must be
obtained.
(9) An identification of the types of persons, small
businesses, businesses and organizations which would be
affected by the regulation.
(10) An identification of the financial, economic and
social impact of the regulation on individuals, small
businesses, business and labor communities and other public
and private organizations and, when practicable, an
evaluation of the benefits expected as a result of the
regulation.
(10.1) For any proposed regulation that may have an
adverse impact on small businesses, an economic impact
statement that includes the following:
(i) An identification and estimate of the number of
the small businesses subject to the proposed regulation.
(ii) The projected reporting, recordkeeping and
other administrative costs required for compliance with
the proposed regulation, including the type of
professional skills necessary for preparation of the
report or record.
(iii) A statement of the probable effect on impacted
small businesses.
(iv) A description of any less intrusive or less
costly alternative methods of achieving the purpose of
the proposed regulation.
(11) A description of any special provisions which have
been developed to meet the particular needs of affected
20150SB0562PN1897 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
groups and persons, including minorities, the elderly, small
businesses and farmers.
(12) A description of any alternative regulatory
provisions which have been considered and rejected and a
statement that the least burdensome acceptable alternative
has been selected.
(12.1) A regulatory flexibility analysis in which the
agency shall, where consistent with health, safety,
environmental and economic welfare, consider utilizing
regulatory methods that will accomplish the objectives of
applicable statutes while minimizing adverse impact on small
businesses. The agency shall consider, without limitation,
each of the following methods of reducing the impact of the
proposed regulation on small businesses:
(i) the establishment of less stringent compliance
or reporting requirements for small businesses;
(ii) the establishment of less stringent schedules
or deadlines for compliance or reporting requirements for
small businesses;
(iii) the consolidation or simplification of
compliance or reporting requirements for small
businesses;
(iv) the establishment of performance standards for
small businesses to replace design or operational
standards required in the proposed regulation; and
(v) the exemption of small businesses from all or
any part of the requirements contained in the proposed
regulation.
(13) A description of the plan developed for evaluating
the continuing effectiveness of the regulation after its
20150SB0562PN1897 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
implementation.
(14) A description of any data upon which a regulation
is based with a detailed explanation of how the data was
obtained and why the data is acceptable data. An agency
advocating that any data is acceptable data shall have the
burden of proving that the data is acceptable.
(a.1) The committee chairpersons shall, within five business
days, distribute to each committee member of the committee
chairperson's caucus a copy of the information submitted to the
committee chairpersons pursuant to subsection (a). Committee
chairpersons may distribute an electronic copy of the
information in lieu of a paper copy. The information required
under subsection (a)(3) or any other statement of purpose for
the regulation may be submitted to the commission and the
committee chairpersons, but may not be submitted to the
Legislative Reference Bureau for publication of notice of
proposed rulemaking in the Pennsylvania Bulletin.
* * *
(c) From the date of submission of the proposed regulation,
the agency shall submit to the commission and the [committees]
committee chairpersons, within five business days of receipt, a
copy of comments which the agency receives relating to the
proposed regulation. The agency shall also, upon request, submit
to the commission and the [committees] committee chairpersons
copies of reports from advisory groups and other documents
received from or disseminated to the public relating to the
proposed regulation and public notices or announcements relating
to solicitation of public comments or meetings which the agency
held or will hold relating to the proposed regulation. The
committee chairpersons shall, within five business days of
20150SB0562PN1897 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
receipt, distribute to each committee member of the committee
chairperson's caucus any information received pursuant to this
subsection. A committee chairperson may distribute an electronic
copy of the information in lieu of a paper copy.
(d) [The] Any member of the committees may, at any time
prior to the submittal of the regulation in final-form, convey
to the agency and the commission their comments, recommendations
and objections to the proposed regulation and a copy of any
staff reports deemed pertinent. The comments, recommendations
and objections may refer to the criteria in section 5.2. A
committee member making a comment, recommendation or objection
to the proposed regulation must also submit the comments to each
committee chairperson. The majority committee chairperson may
convene a meeting of the committee to adopt any comment,
recommendation or objection to the proposed regulations or may
conduct an informational hearing on the proposed regulations.
The majority committee chairperson must conduct an informational
hearing if petitioned to do so by a majority of the committee
members.
* * *
(g) The commission may, within thirty days after the close
of the public comment period, convey to the agency and
[committees] committee chairpersons any comments,
recommendations and objections to the proposed regulation. The
committee chairpersons shall, within five business days of
receipt, distribute the commission's comments, recommendations
or objections to the proposed regulation to the committee
members of the committee chairperson's caucus. The comments,
recommendations and objections shall specify the regulatory
review criterion set forth in section 5.2 which the proposed
20150SB0562PN1897 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
regulation has not met. If the commission does not comment on,
make recommendations regarding or object to any portion of the
proposed regulation within the time provided in this subsection,
the commission shall be deemed to have approved that portion of
the proposed regulation. Disapproval of the final-form
regulation by the commission shall relate only to comments,
recommendations and objections raised by the commission to the
proposed regulation; to changes which the agency made to the
proposed regulation; or to recommendations, comments or
objections which a committee conveyed to the agency or the
commission.
* * *
Section 3. Sections 5.1(a), (e) and (j.2) and 7(d) of the
act, amended December 6, 2002 (P.L.1227, No.148), are amended to
read:
Section 5.1. Final-form regulations and final-omitted
regulations; procedures for review.
(a) The agency shall review and consider public comments and
the comments of the committees and commission pursuant to this
section. Within five business days of receipt of a public
comment, the agency shall notify the commentator of the agency's
address and telephone number where the commentator may submit a
request for the information concerning the final-form regulation
under subsection (b). Upon completion of the agency's review of
comments, the agency shall submit to the commission and the
[committees] committee chairpersons a copy of its response to
the comments received, the names and addresses of commentators
who have requested additional information relating to the final-
form regulation and the text of the final-form regulation which
the agency intends to adopt. A committee chairperson must,
20150SB0562PN1897 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
within five business days of receipt, distribute the information
required under this subsection to the committee members of the
committee chairperson's caucus. If an agency does not submit or
withdraws and does not resubmit the final-form regulation within
two years of the close of the public comment period but still
desires to promulgate the final-form regulation, the agency
shall republish the regulation as a proposed regulation with a
new public comment period in accordance with the Commonwealth
Documents Law. If the agency is prevented from delivering its
final-form regulation to the commission and the committees
within the time period provided for in this subsection because
of the adjournment sine die or expiration of the legislative
session in an even-numbered year, the agency shall deliver its
final-form regulation in accordance with subsection (f).
* * *
(e) The commission may have until its next scheduled meeting
which occurs no less than 30 days after receipt of the final-
form or final-omitted regulation to approve or disapprove the
final-form or final-omitted regulation. Notwithstanding
subsections (j.1) and (j.2), at any time prior to 24 hours
before the commission's meeting to consider a regulation, a
committee may notify the commission and the agency that the
committee disapproves or intends to further review the final-
form regulation. If notified by a committee that it disapproves
of a regulation, the commission may not approve or disapprove
the regulation for a period of 30 days or 9 legislative days,
whichever is longer. If notified by a committee that the
committee intends to further review a final-form regulation, the
commission may not approve or disapprove the regulation for a
period of 14 days or 6 legislative days, whichever is longer.
20150SB0562PN1897 - 9 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
The commission shall notify the agency and the committees of its
approval or disapproval. If the commission does not disapprove
the final-form or final-omitted regulation within the time
allotted in this subsection, the commission shall be deemed to
have approved the final-form or final-omitted regulation.
* * *
(j.2) At any time during the commission's review period up
to 24 hours prior to the opening of the commission's public
meeting, a committee may notify the commission and the agency
that it has approved or disapproved a final-form or final-
omitted regulation or that it intends to review the regulation.
[If the commission approves a regulation and a committee has not
notified the commission and the agency that it has disapproved
the regulation or that it intends to review the regulation, the
agency may promulgate the regulation.] If the commission
approves a regulation and a committee has notified the
commission and the agency that it has disapproved the regulation
or that it intends to review the regulation, the agency may not
promulgate the regulation for 14 days or 6 legislative days,
whichever is longer, after the committee has received the
commission's approval order. During this 14-day [period] or six-
legislative-day period, whichever is longer, the committee may
take action on the regulation pursuant to section 7(d). If at
the expiration of the 14-day [period] or six-legislative-day
period, whichever is longer, the committee has not taken action
on the regulation pursuant to section 7(d), the agency may
promulgate the regulation.
* * *
Section 7. Procedures for subsequent review of disapproved
final-form or final-omitted regulations.
20150SB0562PN1897 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
* * *
(d) Upon receipt of the commission's order pursuant to
subsection (c.1) or at the expiration of the commission's review
period if the commission does not act on the regulation or does
not deliver its order pursuant to subsection (c.1), one or both
NOT DELIVER ITS ORDER PURSUANT TO SUBSECTION (C.1), [ONE] THE
FOLLOWING APPLY:
(1) ONE OR BOTH of the committees may, within 14 calendar
days or 6 legislative days, whichever is longer, report to the
House of Representatives or Senate a concurrent resolution and
notify the agency. During the [14-calendar-day] or 6-
legislative-day period SPECIFIED IN THIS PARAGRAPH, the agency
may not promulgate the final-form or final-omitted regulation.
If, by the expiration of the [14-calendar-day] or 6-legislative-
day period SPECIFIED IN THIS PARAGRAPH, neither committee
reports a concurrent resolution, the committees shall be deemed
to have approved the final-form or final-omitted regulation, and
the agency may promulgate that regulation. If either committee
reports a PROMULGATE THAT REGULATION.
(2) IF EITHER COMMITTEE REPORTS A concurrent resolution
before the expiration of the [14-day] 14-calendar-day or 6-
legislative-day period, the Senate [and] or the House of
Representatives shall each have 30 calendar days or PERIOD
SPECIFIED IN PARAGRAPH (1), THE [SENATE AND THE HOUSE OF
REPRESENTATIVES] CHAMBER TO WHICH THE CONCURRENT RESOLUTION IS
REPORTED SHALL [EACH] HAVE 30 CALENDAR DAYS OR ten legislative
days, whichever is longer, from the date on which the concurrent
resolution has been reported, to adopt the concurrent
resolution. If the General Assembly adopts the CONCURRENT
RESOLUTION[.] AND TRANSMIT IT TO THE OTHER CHAMBER. THE OTHER
20150SB0562PN1897 - 11 -
<--
<--
<--
<--
<--
<--
<--
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CHAMBER SHALL HAVE 30 CALENDAR DAYS OR TEN LEGISLATIVE DAYS,
WHICHEVER IS LONGER, FROM THE DATE ON WHICH THE CONCURRENT
RESOLUTION HAS BEEN TRANSMITTED, TO ADOPT THE CONCURRENT
RESOLUTION.
(3) IF THE GENERAL ASSEMBLY ADOPTS THE concurrent resolution
by majority vote in both the Senate and the House of
Representatives within 60 calendar days or 15 20 legislative
days, whichever is longer, from the date on which a concurrent
resolution has been reported out by a committee, the concurrent
resolution shall be presented to the Governor in accordance with
section 9 of Article III of the Constitution of Pennsylvania. If
the Governor does not return the concurrent PENNSYLVANIA.
(4) IF THE GOVERNOR DOES NOT RETURN THE CONCURRENT
resolution to the General Assembly within ten calendar days
after it is presented, the Governor shall be deemed to have
approved the concurrent resolution. If the Governor vetoes the
APPROVED THE CONCURRENT RESOLUTION.
(5) IF THE GOVERNOR VETOES THE concurrent resolution, the
General Assembly may override that veto by a two-thirds vote in
each house. The Senate and the House of Representatives shall
each have 30 calendar days or ten legislative days, whichever is
longer, to override the veto. If the General Assembly does not
adopt the concurrent resolution or override the veto in the time
prescribed in this [subsection] PARAGRAPH, it shall be deemed to
have approved the final-form or final-omitted regulation. Notice
as to any final disposition of a concurrent REGULATION.
(6) NOTICE AS TO ANY FINAL DISPOSITION OF A CONCURRENT
resolution considered in accordance with this [section]
SUBSECTION shall be published in the Pennsylvania Bulletin. The
bar on promulgation PUBLISHED IN THE PENNSYLVANIA BULLETIN.
20150SB0562PN1897 - 12 -
<--
<--
<--
<--
<--
<--
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(7) THE BAR ON PROMULGATION of the final-form or final-
omitted regulation shall continue until that regulation has been
approved or deemed approved in accordance with this subsection.
If the General Assembly adopts ACCORDANCE WITH THIS SUBSECTION.
(8) IF THE GENERAL ASSEMBLY ADOPTS the concurrent resolution
and the Governor approves or is deemed to have approved the
concurrent resolution or if the General Assembly overrides the
Governor's veto of the concurrent resolution, the agency shall
be barred from promulgating the final-form or final-omitted
regulation. If the General Assembly FINAL-FORM OR FINAL-OMITTED
REGULATION.
(9) IF THE GENERAL ASSEMBLY does not adopt the concurrent
resolution or if the Governor vetoes the concurrent resolution
and the General Assembly does not override the Governor's veto,
the agency may promulgate the final-form or final-omitted
regulation. The General Assembly FINAL-FORM OR FINAL-OMITTED
REGULATION.
(10) THE GENERAL ASSEMBLY may, at its discretion, adopt a
concurrent resolution disapproving the final-form or final-
omitted regulation to indicate the intent of the General
Assembly but permit the agency to promulgate that regulation.
Section 4. This act shall take effect in 60 days.
20150SB0562PN1897 - 13 -
<--
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

More Related Content

What's hot

Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981
Leo Lukose
 
Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974
ACS Shalu Saraf
 
2013 Senate Continuing Resolution
2013 Senate Continuing Resolution2013 Senate Continuing Resolution
2013 Senate Continuing Resolution
Tom "Blad" Lindblad
 
Haryana pollution control board
Haryana pollution control boardHaryana pollution control board
Haryana pollution control board
Dewesh Singh
 
provisions of water cess act 1977
provisions of water cess act 1977provisions of water cess act 1977
provisions of water cess act 1977
RABINARAYANPRUSTY
 
AAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-ApplicationAAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-Application
Maureen Kirkpatrick
 

What's hot (20)

(1) wateract1974
(1) wateract1974 (1) wateract1974
(1) wateract1974
 
Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981
 
Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974
 
Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974
 
Introduction to Assembly
Introduction to AssemblyIntroduction to Assembly
Introduction to Assembly
 
the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981 the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981
 
2013 Senate Continuing Resolution
2013 Senate Continuing Resolution2013 Senate Continuing Resolution
2013 Senate Continuing Resolution
 
Haryana pollution control board
Haryana pollution control boardHaryana pollution control board
Haryana pollution control board
 
provisions of water cess act 1977
provisions of water cess act 1977provisions of water cess act 1977
provisions of water cess act 1977
 
AIR POLLUTION CONTROL ACT 1981
AIR POLLUTION CONTROL ACT 1981AIR POLLUTION CONTROL ACT 1981
AIR POLLUTION CONTROL ACT 1981
 
Vermont House Calendar Tuesday January 7, 2020
Vermont House Calendar Tuesday January 7, 2020Vermont House Calendar Tuesday January 7, 2020
Vermont House Calendar Tuesday January 7, 2020
 
Water act 1974
Water act 1974Water act 1974
Water act 1974
 
Salient provisions of water act
Salient provisions of water actSalient provisions of water act
Salient provisions of water act
 
Vro 458
Vro 458Vro 458
Vro 458
 
Statistics For Management 3 October
Statistics For Management 3 OctoberStatistics For Management 3 October
Statistics For Management 3 October
 
AAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-ApplicationAAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-Application
 
12 air act
12 air act12 air act
12 air act
 
Final report on SABC inquiry
Final report on SABC inquiryFinal report on SABC inquiry
Final report on SABC inquiry
 
COVID-19 money bill
COVID-19 money bill COVID-19 money bill
COVID-19 money bill
 
mybudgetjustifications2005
mybudgetjustifications2005mybudgetjustifications2005
mybudgetjustifications2005
 

Similar to PA Senate Bill (SB) 562 - Increases Legislative Oversight of Environmental Regulatory Review

Statutory meeting of company
Statutory meeting of companyStatutory meeting of company
Statutory meeting of company
Yousuf Adil
 
Revised rules on administrative cases in the civil service
Revised rules on administrative cases in the civil serviceRevised rules on administrative cases in the civil service
Revised rules on administrative cases in the civil service
SheruelDelRey
 
Alec ntu-council-on-efficient-government-model-bill
Alec ntu-council-on-efficient-government-model-billAlec ntu-council-on-efficient-government-model-bill
Alec ntu-council-on-efficient-government-model-bill
DeepDude
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industry
jbonvier
 

Similar to PA Senate Bill (SB) 562 - Increases Legislative Oversight of Environmental Regulatory Review (20)

118/2011 On conditions and procedures to grant authorization to offer access ...
118/2011 On conditions and procedures to grant authorization to offer access ...118/2011 On conditions and procedures to grant authorization to offer access ...
118/2011 On conditions and procedures to grant authorization to offer access ...
 
Council Rules 2015
Council Rules 2015Council Rules 2015
Council Rules 2015
 
Companies (Incorporation) Third Amendment Rules, 2016
Companies (Incorporation) Third Amendment Rules, 2016Companies (Incorporation) Third Amendment Rules, 2016
Companies (Incorporation) Third Amendment Rules, 2016
 
Admin law eo172
Admin law eo172Admin law eo172
Admin law eo172
 
Item #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance RegulationsItem #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance Regulations
 
Secretarial standard 2
Secretarial standard 2Secretarial standard 2
Secretarial standard 2
 
Statutory meeting of company
Statutory meeting of companyStatutory meeting of company
Statutory meeting of company
 
GFZB ACT.
GFZB ACT.GFZB ACT.
GFZB ACT.
 
rraccs.pdf
rraccs.pdfrraccs.pdf
rraccs.pdf
 
Revised rules on administrative cases in the civil service
Revised rules on administrative cases in the civil serviceRevised rules on administrative cases in the civil service
Revised rules on administrative cases in the civil service
 
Compromises and arrangements under companies act, 2013
Compromises and arrangements under companies act, 2013Compromises and arrangements under companies act, 2013
Compromises and arrangements under companies act, 2013
 
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
 
Isri scrap circular
Isri scrap circularIsri scrap circular
Isri scrap circular
 
Alec ntu-council-on-efficient-government-model-bill
Alec ntu-council-on-efficient-government-model-billAlec ntu-council-on-efficient-government-model-bill
Alec ntu-council-on-efficient-government-model-bill
 
Archidply Annual report 2009
Archidply Annual report 2009Archidply Annual report 2009
Archidply Annual report 2009
 
Fiscal responsibility law
Fiscal responsibility lawFiscal responsibility law
Fiscal responsibility law
 
SC Judgment march 25, 2022.pdf
SC Judgment march 25, 2022.pdfSC Judgment march 25, 2022.pdf
SC Judgment march 25, 2022.pdf
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industry
 
Lessons Learned From Reg Flex
Lessons Learned From Reg FlexLessons Learned From Reg Flex
Lessons Learned From Reg Flex
 
Eo1008
Eo1008Eo1008
Eo1008
 

More from Marcellus Drilling News

More from Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Recently uploaded

PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
Faga1939
 

Recently uploaded (16)

25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf
 
27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf
 
Meta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejololMeta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejolol
 
Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1
 
ys jagan mohan reddy political career, Biography.pdf
ys jagan mohan reddy political career, Biography.pdfys jagan mohan reddy political career, Biography.pdf
ys jagan mohan reddy political career, Biography.pdf
 
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptxHISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
 
Textile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste ManagementTextile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste Management
 
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-ShirtNika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
 
23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf
 
26052024_First India Newspaper Jaipur.pdf
26052024_First India Newspaper Jaipur.pdf26052024_First India Newspaper Jaipur.pdf
26052024_First India Newspaper Jaipur.pdf
 
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptxChapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
 
Draft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdfDraft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdf
 
role of women and girls in various terror groups
role of women and girls in various terror groupsrole of women and girls in various terror groups
role of women and girls in various terror groups
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
 
24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf
 
May 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdfMay 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdf
 

PA Senate Bill (SB) 562 - Increases Legislative Oversight of Environmental Regulatory Review

  • 1. HOUSE AMENDED PRIOR PRINTER'S NOS. 609, 731 PRINTER'S NO. 1897 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. 562 Session of 2015 INTRODUCED BY GORDNER, SCARNATI, CORMAN, MENSCH, ARGALL, VOGEL, FOLMER, STEFANO, SCAVELLO, AUMENT, HUTCHINSON, WHITE, WARD, RAFFERTY AND DINNIMAN, MARCH 13, 2015 AS AMENDED ON SECOND CONSIDERATION, HOUSE OF REPRESENTATIVES, JUNE 7, 2016 AN ACT Amending the act of June 25, 1982 (P.L.633, No.181), entitled, as reenacted, "An act providing for independent oversight and review of regulations, creating an Independent Regulatory Review Commission, providing for its powers and duties and making repeals," further providing for definitions, for proposed regulations and procedures for review, for final- form regulations and final-omitted regulations and procedures for review and for procedures for subsequent review of disapproved final-form or final-omitted regulations by the commission. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Section 3 of the act of June 25, 1982 (P.L.633, No.181), known as the Regulatory Review Act, is amended by adding definitions to read: Section 3. Definitions. The following words and phrases when used in this act shall have, unless the context clearly indicates otherwise, the meanings given to them in this section: * * * "Committee chairperson." Any of the following: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
  • 2. (1) The Senator appointed by the President pro tempore of the Senate to serve as a majority chairperson of the committee. (2) The Senator appointed by the Minority Leader of the Senate to serve as a minority chairperson of the committee. (3) The Representative appointed by the Speaker of the House of Representatives to serve as a majority chairperson of the committee. (4) The Representative appointed by the Minority Leader of the House of Representatives to serve as a minority chairperson of the committee. * * * "Legislative day." A day when both houses of the General Assembly are in voting session. * * * Section 2. Section 5(a), (c), (d) and (g) of the act, amended December 6, 2002 (P.L.1227, No.148) and June 29, 2012 (P.L.657, No.76), are amended and the section is amended by adding a subsection to read: Section 5. Proposed regulations; procedures for review. (a) On the same date that an agency submits a proposed regulation to the Legislative Reference Bureau for publication of notice of proposed rulemaking in the Pennsylvania Bulletin as required by the Commonwealth Documents Law, the agency shall submit to the commission and the [committees] committee chairpersons a copy of the proposed regulation and a regulatory analysis form which includes the following: (1) The title of the agency and the names, office addresses and telephone numbers of the agency officials responsible for responding to questions regarding the 20150SB0562PN1897 - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 3. regulation or for receiving comments relating to the regulation. (1.1) A specific citation to the Federal or State statutory or regulatory authority or the decision of a Federal or State court under which the agency is proposing the regulation, which the regulation is designed to implement or which may mandate or affect compliance with the regulation. (2) A concise and, when possible, nontechnical explanation of the proposed regulation. (3) A statement of the need for the regulation. (4) Estimates of the direct and indirect costs to the Commonwealth, to its political subdivisions and to the private sector. Insofar as the proposed regulation relates to costs to the Commonwealth, the agency may submit in lieu of its own statement the fiscal note prepared by the Office of the Budget pursuant to section 612 of the act of April 9, 1929 (P.L.177, No.175), known as "The Administrative Code of 1929." (5) A statement of legal, accounting or consulting procedures and additional reporting, recordkeeping or other paperwork, including copies of forms or reports, which will be required for implementation of the regulation and an explanation of measures which have been taken to minimize these requirements. (7) A schedule for review of the proposed regulation, including the date by which the agency must receive comments; the date or dates on which public hearings will be held; the expected date of promulgation of the proposed regulation as a final-form regulation; the expected effective date of the 20150SB0562PN1897 - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 4. final-form regulation; the date by which compliance with the final-form regulation will be required; and the date by which required permits, licenses or other approvals must be obtained. (9) An identification of the types of persons, small businesses, businesses and organizations which would be affected by the regulation. (10) An identification of the financial, economic and social impact of the regulation on individuals, small businesses, business and labor communities and other public and private organizations and, when practicable, an evaluation of the benefits expected as a result of the regulation. (10.1) For any proposed regulation that may have an adverse impact on small businesses, an economic impact statement that includes the following: (i) An identification and estimate of the number of the small businesses subject to the proposed regulation. (ii) The projected reporting, recordkeeping and other administrative costs required for compliance with the proposed regulation, including the type of professional skills necessary for preparation of the report or record. (iii) A statement of the probable effect on impacted small businesses. (iv) A description of any less intrusive or less costly alternative methods of achieving the purpose of the proposed regulation. (11) A description of any special provisions which have been developed to meet the particular needs of affected 20150SB0562PN1897 - 4 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 5. groups and persons, including minorities, the elderly, small businesses and farmers. (12) A description of any alternative regulatory provisions which have been considered and rejected and a statement that the least burdensome acceptable alternative has been selected. (12.1) A regulatory flexibility analysis in which the agency shall, where consistent with health, safety, environmental and economic welfare, consider utilizing regulatory methods that will accomplish the objectives of applicable statutes while minimizing adverse impact on small businesses. The agency shall consider, without limitation, each of the following methods of reducing the impact of the proposed regulation on small businesses: (i) the establishment of less stringent compliance or reporting requirements for small businesses; (ii) the establishment of less stringent schedules or deadlines for compliance or reporting requirements for small businesses; (iii) the consolidation or simplification of compliance or reporting requirements for small businesses; (iv) the establishment of performance standards for small businesses to replace design or operational standards required in the proposed regulation; and (v) the exemption of small businesses from all or any part of the requirements contained in the proposed regulation. (13) A description of the plan developed for evaluating the continuing effectiveness of the regulation after its 20150SB0562PN1897 - 5 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 6. implementation. (14) A description of any data upon which a regulation is based with a detailed explanation of how the data was obtained and why the data is acceptable data. An agency advocating that any data is acceptable data shall have the burden of proving that the data is acceptable. (a.1) The committee chairpersons shall, within five business days, distribute to each committee member of the committee chairperson's caucus a copy of the information submitted to the committee chairpersons pursuant to subsection (a). Committee chairpersons may distribute an electronic copy of the information in lieu of a paper copy. The information required under subsection (a)(3) or any other statement of purpose for the regulation may be submitted to the commission and the committee chairpersons, but may not be submitted to the Legislative Reference Bureau for publication of notice of proposed rulemaking in the Pennsylvania Bulletin. * * * (c) From the date of submission of the proposed regulation, the agency shall submit to the commission and the [committees] committee chairpersons, within five business days of receipt, a copy of comments which the agency receives relating to the proposed regulation. The agency shall also, upon request, submit to the commission and the [committees] committee chairpersons copies of reports from advisory groups and other documents received from or disseminated to the public relating to the proposed regulation and public notices or announcements relating to solicitation of public comments or meetings which the agency held or will hold relating to the proposed regulation. The committee chairpersons shall, within five business days of 20150SB0562PN1897 - 6 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 7. receipt, distribute to each committee member of the committee chairperson's caucus any information received pursuant to this subsection. A committee chairperson may distribute an electronic copy of the information in lieu of a paper copy. (d) [The] Any member of the committees may, at any time prior to the submittal of the regulation in final-form, convey to the agency and the commission their comments, recommendations and objections to the proposed regulation and a copy of any staff reports deemed pertinent. The comments, recommendations and objections may refer to the criteria in section 5.2. A committee member making a comment, recommendation or objection to the proposed regulation must also submit the comments to each committee chairperson. The majority committee chairperson may convene a meeting of the committee to adopt any comment, recommendation or objection to the proposed regulations or may conduct an informational hearing on the proposed regulations. The majority committee chairperson must conduct an informational hearing if petitioned to do so by a majority of the committee members. * * * (g) The commission may, within thirty days after the close of the public comment period, convey to the agency and [committees] committee chairpersons any comments, recommendations and objections to the proposed regulation. The committee chairpersons shall, within five business days of receipt, distribute the commission's comments, recommendations or objections to the proposed regulation to the committee members of the committee chairperson's caucus. The comments, recommendations and objections shall specify the regulatory review criterion set forth in section 5.2 which the proposed 20150SB0562PN1897 - 7 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 8. regulation has not met. If the commission does not comment on, make recommendations regarding or object to any portion of the proposed regulation within the time provided in this subsection, the commission shall be deemed to have approved that portion of the proposed regulation. Disapproval of the final-form regulation by the commission shall relate only to comments, recommendations and objections raised by the commission to the proposed regulation; to changes which the agency made to the proposed regulation; or to recommendations, comments or objections which a committee conveyed to the agency or the commission. * * * Section 3. Sections 5.1(a), (e) and (j.2) and 7(d) of the act, amended December 6, 2002 (P.L.1227, No.148), are amended to read: Section 5.1. Final-form regulations and final-omitted regulations; procedures for review. (a) The agency shall review and consider public comments and the comments of the committees and commission pursuant to this section. Within five business days of receipt of a public comment, the agency shall notify the commentator of the agency's address and telephone number where the commentator may submit a request for the information concerning the final-form regulation under subsection (b). Upon completion of the agency's review of comments, the agency shall submit to the commission and the [committees] committee chairpersons a copy of its response to the comments received, the names and addresses of commentators who have requested additional information relating to the final- form regulation and the text of the final-form regulation which the agency intends to adopt. A committee chairperson must, 20150SB0562PN1897 - 8 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 9. within five business days of receipt, distribute the information required under this subsection to the committee members of the committee chairperson's caucus. If an agency does not submit or withdraws and does not resubmit the final-form regulation within two years of the close of the public comment period but still desires to promulgate the final-form regulation, the agency shall republish the regulation as a proposed regulation with a new public comment period in accordance with the Commonwealth Documents Law. If the agency is prevented from delivering its final-form regulation to the commission and the committees within the time period provided for in this subsection because of the adjournment sine die or expiration of the legislative session in an even-numbered year, the agency shall deliver its final-form regulation in accordance with subsection (f). * * * (e) The commission may have until its next scheduled meeting which occurs no less than 30 days after receipt of the final- form or final-omitted regulation to approve or disapprove the final-form or final-omitted regulation. Notwithstanding subsections (j.1) and (j.2), at any time prior to 24 hours before the commission's meeting to consider a regulation, a committee may notify the commission and the agency that the committee disapproves or intends to further review the final- form regulation. If notified by a committee that it disapproves of a regulation, the commission may not approve or disapprove the regulation for a period of 30 days or 9 legislative days, whichever is longer. If notified by a committee that the committee intends to further review a final-form regulation, the commission may not approve or disapprove the regulation for a period of 14 days or 6 legislative days, whichever is longer. 20150SB0562PN1897 - 9 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 10. The commission shall notify the agency and the committees of its approval or disapproval. If the commission does not disapprove the final-form or final-omitted regulation within the time allotted in this subsection, the commission shall be deemed to have approved the final-form or final-omitted regulation. * * * (j.2) At any time during the commission's review period up to 24 hours prior to the opening of the commission's public meeting, a committee may notify the commission and the agency that it has approved or disapproved a final-form or final- omitted regulation or that it intends to review the regulation. [If the commission approves a regulation and a committee has not notified the commission and the agency that it has disapproved the regulation or that it intends to review the regulation, the agency may promulgate the regulation.] If the commission approves a regulation and a committee has notified the commission and the agency that it has disapproved the regulation or that it intends to review the regulation, the agency may not promulgate the regulation for 14 days or 6 legislative days, whichever is longer, after the committee has received the commission's approval order. During this 14-day [period] or six- legislative-day period, whichever is longer, the committee may take action on the regulation pursuant to section 7(d). If at the expiration of the 14-day [period] or six-legislative-day period, whichever is longer, the committee has not taken action on the regulation pursuant to section 7(d), the agency may promulgate the regulation. * * * Section 7. Procedures for subsequent review of disapproved final-form or final-omitted regulations. 20150SB0562PN1897 - 10 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 11. * * * (d) Upon receipt of the commission's order pursuant to subsection (c.1) or at the expiration of the commission's review period if the commission does not act on the regulation or does not deliver its order pursuant to subsection (c.1), one or both NOT DELIVER ITS ORDER PURSUANT TO SUBSECTION (C.1), [ONE] THE FOLLOWING APPLY: (1) ONE OR BOTH of the committees may, within 14 calendar days or 6 legislative days, whichever is longer, report to the House of Representatives or Senate a concurrent resolution and notify the agency. During the [14-calendar-day] or 6- legislative-day period SPECIFIED IN THIS PARAGRAPH, the agency may not promulgate the final-form or final-omitted regulation. If, by the expiration of the [14-calendar-day] or 6-legislative- day period SPECIFIED IN THIS PARAGRAPH, neither committee reports a concurrent resolution, the committees shall be deemed to have approved the final-form or final-omitted regulation, and the agency may promulgate that regulation. If either committee reports a PROMULGATE THAT REGULATION. (2) IF EITHER COMMITTEE REPORTS A concurrent resolution before the expiration of the [14-day] 14-calendar-day or 6- legislative-day period, the Senate [and] or the House of Representatives shall each have 30 calendar days or PERIOD SPECIFIED IN PARAGRAPH (1), THE [SENATE AND THE HOUSE OF REPRESENTATIVES] CHAMBER TO WHICH THE CONCURRENT RESOLUTION IS REPORTED SHALL [EACH] HAVE 30 CALENDAR DAYS OR ten legislative days, whichever is longer, from the date on which the concurrent resolution has been reported, to adopt the concurrent resolution. If the General Assembly adopts the CONCURRENT RESOLUTION[.] AND TRANSMIT IT TO THE OTHER CHAMBER. THE OTHER 20150SB0562PN1897 - 11 - <-- <-- <-- <-- <-- <-- <-- <-- <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 12. CHAMBER SHALL HAVE 30 CALENDAR DAYS OR TEN LEGISLATIVE DAYS, WHICHEVER IS LONGER, FROM THE DATE ON WHICH THE CONCURRENT RESOLUTION HAS BEEN TRANSMITTED, TO ADOPT THE CONCURRENT RESOLUTION. (3) IF THE GENERAL ASSEMBLY ADOPTS THE concurrent resolution by majority vote in both the Senate and the House of Representatives within 60 calendar days or 15 20 legislative days, whichever is longer, from the date on which a concurrent resolution has been reported out by a committee, the concurrent resolution shall be presented to the Governor in accordance with section 9 of Article III of the Constitution of Pennsylvania. If the Governor does not return the concurrent PENNSYLVANIA. (4) IF THE GOVERNOR DOES NOT RETURN THE CONCURRENT resolution to the General Assembly within ten calendar days after it is presented, the Governor shall be deemed to have approved the concurrent resolution. If the Governor vetoes the APPROVED THE CONCURRENT RESOLUTION. (5) IF THE GOVERNOR VETOES THE concurrent resolution, the General Assembly may override that veto by a two-thirds vote in each house. The Senate and the House of Representatives shall each have 30 calendar days or ten legislative days, whichever is longer, to override the veto. If the General Assembly does not adopt the concurrent resolution or override the veto in the time prescribed in this [subsection] PARAGRAPH, it shall be deemed to have approved the final-form or final-omitted regulation. Notice as to any final disposition of a concurrent REGULATION. (6) NOTICE AS TO ANY FINAL DISPOSITION OF A CONCURRENT resolution considered in accordance with this [section] SUBSECTION shall be published in the Pennsylvania Bulletin. The bar on promulgation PUBLISHED IN THE PENNSYLVANIA BULLETIN. 20150SB0562PN1897 - 12 - <-- <-- <-- <-- <-- <-- <-- <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 13. (7) THE BAR ON PROMULGATION of the final-form or final- omitted regulation shall continue until that regulation has been approved or deemed approved in accordance with this subsection. If the General Assembly adopts ACCORDANCE WITH THIS SUBSECTION. (8) IF THE GENERAL ASSEMBLY ADOPTS the concurrent resolution and the Governor approves or is deemed to have approved the concurrent resolution or if the General Assembly overrides the Governor's veto of the concurrent resolution, the agency shall be barred from promulgating the final-form or final-omitted regulation. If the General Assembly FINAL-FORM OR FINAL-OMITTED REGULATION. (9) IF THE GENERAL ASSEMBLY does not adopt the concurrent resolution or if the Governor vetoes the concurrent resolution and the General Assembly does not override the Governor's veto, the agency may promulgate the final-form or final-omitted regulation. The General Assembly FINAL-FORM OR FINAL-OMITTED REGULATION. (10) THE GENERAL ASSEMBLY may, at its discretion, adopt a concurrent resolution disapproving the final-form or final- omitted regulation to indicate the intent of the General Assembly but permit the agency to promulgate that regulation. Section 4. This act shall take effect in 60 days. 20150SB0562PN1897 - 13 - <-- <-- <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22