PRIOR PRINTER'S NO. 1677 PRINTER'S NO. 1899
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No. 1195 Session of
2015
INTRODUCED BY WHITE, VOGEL, ARGALL, EICHELBERGER, SCARNATI, YAW,
WAGNER, HUTCHINSON, STEFANO, BARTOLOTTA, VULAKOVICH, WARD,
AUMENT, WOZNIAK, GORDNER, BREWSTER, RESCHENTHALER, ALLOWAY,
BLAKE, BROWNE, SCAVELLO, YUDICHAK, CORMAN AND BROOKS,
APRIL 8, 2016
AS AMENDED ON THIRD CONSIDERATION, JUNE 7, 2016
AN ACT
Amending the act of October 22, 2014 (P.L.2873, No.175),
entitled "An act requiring the Department of Environmental
Protection to receive approval from the General Assembly for
a State plan to regulate carbon dioxide emissions for
existing stationary sources prior to submitting the State
plan to the United States Environmental Protection Agency for
approval," further providing for submission of State plan.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Section 4 of the act of October 22, 2014
(P.L.2873, No.175), known as the Pennsylvania Greenhouse Gas
Regulation Implementation Act, is amended to read:
SECTION 1. SECTION 2 OF THE ACT OF OCTOBER 22, 2014
(P.L.2873, NO.175), KNOWN AS THE PENNSYLVANIA GREENHOUSE GAS
REGULATION IMPLEMENTATION ACT, IS AMENDED BY ADDING A DEFINITION
TO READ:
SECTION 2. DEFINITIONS.
THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL
HAVE THE MEANINGS GIVEN TO THEM IN THIS SECTION UNLESS THE
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
CONTEXT CLEARLY INDICATES OTHERWISE:
* * *
"STANDING COMMITTEE." THE ENVIRONMENTAL RESOURCES AND ENERGY
COMMITTEE OF THE SENATE OR THE ENVIRONMENTAL RESOURCES AND
ENERGY COMMITTEE OF THE HOUSE OF REPRESENTATIVES.
* * *
SECTION 2. SECTION 4 OF THE ACT IS AMENDED TO READ:
Section 4. Submission of the State plan.
(a) Submission for approval to the General Assembly.--No
less than [100] 180 calendar days prior to the department
submitting the State plan to the EPA for approval, the
department shall transmit the plan to the General Assembly for
approval.
(b) Consideration by General Assembly.--Upon transmission
under subsection (a), the State plan shall be:
(1) proposed as a resolution in each chamber;
(2) [placed on the calendar of each chamber for]
REFERRED TO THE STANDING COMMITTEE IN EACH CHAMBER the next
legislative day following transmission; [and]
(2.1) CONSIDERED BY THE STANDING COMMITTEE WITHIN 10
LEGISLATIVE DAYS OF REFERRAL UNDER PARAGRAPH (2) AT WHICH
TIME THE STANDING COMMITTEE SHALL RECOMMEND THE GENERAL
ASSEMBLY APPROVE OR DISAPPROVE THE STATE PLAN; AND
(3) considered by each chamber within 20 legislative
days after [transmission] placement under paragraph (2).
[TRANSMISSION.] CONSIDERATION OF THE STANDING COMMITTEE UNDER
PARAGRAPH (2.1).
(B.1) EXTENSION REQUEST.--IF NECESSARY TO MEET THE
REQUIREMENTS UNDER SUBSECTION (B), THE DEPARTMENT SHALL REQUEST
AN EXTENSION OF TIME FROM THE EPA BY SUBMITTING AN INITIAL STATE
20160SB1195PN1899 - 2 -
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PLAN BY THE INITIAL STATE PLAN SUBMISSION DEADLINE UNDER 40 CFR
60.5760 (RELATING TO WHAT ARE THE TIMING REQUIREMENTS FOR
SUBMITTING MY PLAN?) THAT MEETS THE MINIMUM REQUIREMENTS FOR AN
INITIAL STATE PLAN, AS SPECIFIED IN THE PLAN GUIDELINES
PUBLISHED BY THE EPA. THE DEPARTMENT SHALL TRANSMIT THE
FOLLOWING MESSAGE WITH ITS SUBMITTAL UNDER THIS PARAGRAPH:
BE ADVISED THAT THE STATE PLAN SUBMITTED BY THE
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION HAS
NOT YET MET THE REQUIREMENTS OF THE PENNSYLVANIA
GREENHOUSE GAS REGULATION IMPLEMENTATION ACT REQUIRING
AFFIRMATIVE APPROVAL OF THE GENERAL ASSEMBLY. IT IS THE
INTENTION OF THE COMMONWEALTH OF PENNSYLVANIA TO SUBMIT A
STATE PLAN WHICH CONFORMS TO THIS RULEMAKING. UNDER
SECTION 111(D) OF THE CLEAN AIR ACT, STATES MUST BE GIVEN
AN OPPORTUNITY TO MEET FEDERAL ENVIRONMENTAL STANDARDS
SET FORTH BY THE ENVIRONMENTAL PROTECTION AGENCY. THE
COMMONWEALTH OF PENNSYLVANIA HEREBY INVOKES THE AUTHORITY
PROVIDED TO IT UNDER SECTION 111(D) OF THE CLEAN AIR ACT,
AND, IN ACCORDANCE WITH THE PENNSYLVANIA GREENHOUSE GAS
IMPLEMENTATION ACT, WILL BE MAKING A FURTHER FILING WITH
THE AGENCY.
(c) Approval.--If each chamber of the General Assembly
adopts the resolution under subsection (b), the department may
submit the State plan to the EPA for consideration.
(d) Disapproval.--If either chamber of the General Assembly
disapproves the resolution under subsection (b), the department
may not submit the State plan to the EPA for consideration. The
department shall do all of the following:
(1) [Determine] REVIEW AND CONSIDER the reasons for
disapproval and modify the State plan.
20160SB1195PN1899 - 3 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(2) Cause the State plan to be resubmitted to the
General Assembly utilizing the process delineated under
subsection (b) within 60 calendar days [of] AFTER the
[disapproval.] CLOSE OF THE COMMENT PERIOD UNDER PARAGRAPH
(2.1).
(2.1) OPEN A PUBLIC COMMENT PERIOD FOR NO LESS THAN 180
CALENDAR DAYS ON THE MODIFIED STATE PLAN DURING WHICH THE
DEPARTMENT SHALL CONDUCT AT LEAST FOUR PUBLIC HEARINGS IN
GEOGRAPHICALLY DISPERSED LOCATIONS IN THIS COMMONWEALTH.
(3) If necessary, request an extension of time from the
EPA by submitting an initial State plan by [June 30, 2016]
the initial State plan submission deadline under 40 CFR
60.5760 (relating to What are the timing requirements for
submitting my plan?), that meets the minimum requirements for
an initial State plan, as specified in the plan guidelines
published by the EPA. The department shall transmit the
following message with its submittal under this paragraph:
Be advised that the State plan submitted by the
Pennsylvania Department of Environmental Protection has
not yet met the requirements of the Pennsylvania
Greenhouse Gas Regulation Implementation Act requiring
affirmative approval of the General Assembly. It is the
intention of the Commonwealth of Pennsylvania to submit a
State plan which conforms to this rulemaking. Under
section 111(d) of the Clean Air Act, states must be given
an opportunity to meet Federal environmental standards
set forth by the Environmental Protection Agency. The
Commonwealth of Pennsylvania hereby invokes the authority
provided to it under section 111(d) of the Clean Air Act,
and, in accordance with the Pennsylvania Greenhouse Gas
20160SB1195PN1899 - 4 -
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Implementation Act, will be making a further filing with
the agency.
(e) Default approval.--If no vote is taken by either
STANDING COMMITTEE OR chamber of the General Assembly to approve
or disapprove the resolution under subsection (b) [before the
June 15, 2016, deadline] at least 14 calendar days prior to the
final State plan submission deadline under 40 CFR 60.5760, the
State plan shall be deemed approved and shall be submitted to
the EPA immediately.
(f) Default approval after time to cure.--If either chamber
of the General Assembly fails to approve a resubmitted plan
under subsection (d)(2)[,] OR within 60 calendar days of the
[extension] final State plan submission extension deadline under
40 CFR 60.5760, WHICHEVER IS SOONER, the resubmitted plan shall
be deemed approved.
(G) TIMING RELATIVE TO FEDERAL LITIGATION.--THE DEPARTMENT
SHALL NOT SUBMIT A FINAL STATE PLAN TO THE EPA FOR APPROVAL
UNTIL AFTER EXPIRATION OF THE STAY ISSUED ON FEBRUARY 9, 2016,
BY THE SUPREME COURT OF THE UNITED STATES IN WEST VIRGINIA, ET
AL. V. EPA, DOCKET NO. 15A773, CHALLENGING THE CARBON POLLUTION
EMISSION GUIDELINES FOR EXISTING STATIONARY SOURCES UNDER 40 CFR
PT. 60 SUBPT. UUUU (RELATING TO EMISSION GUIDELINES FOR
GREENHOUSE GAS EMISSIONS AND COMPLIANCE TIMES FOR ELECTRIC
UTILITY GENERATING UNITS).
Section 2 3. This act shall take effect immediately.
20160SB1195PN1899 - 5 -
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

More Related Content

What's hot

Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981
Leo Lukose
 
Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974
ACS Shalu Saraf
 
Haryana pollution control board
Haryana pollution control boardHaryana pollution control board
Haryana pollution control board
Dewesh Singh
 
provisions of water cess act 1977
provisions of water cess act 1977provisions of water cess act 1977
provisions of water cess act 1977
RABINARAYANPRUSTY
 
2013 Senate Continuing Resolution
2013 Senate Continuing Resolution2013 Senate Continuing Resolution
2013 Senate Continuing Resolution
Tom "Blad" Lindblad
 
AAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-ApplicationAAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-Application
Maureen Kirkpatrick
 
Environmental impact assessment_notification_2006
Environmental impact assessment_notification_2006Environmental impact assessment_notification_2006
Environmental impact assessment_notification_2006
Southern Railway
 

What's hot (20)

Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981
 
(1) wateract1974
(1) wateract1974 (1) wateract1974
(1) wateract1974
 
Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974Water (prevention & control of pollution) act, 1974
Water (prevention & control of pollution) act, 1974
 
Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974
 
the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981 the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981
 
Introduction to Assembly
Introduction to AssemblyIntroduction to Assembly
Introduction to Assembly
 
AIR POLLUTION CONTROL ACT 1981
AIR POLLUTION CONTROL ACT 1981AIR POLLUTION CONTROL ACT 1981
AIR POLLUTION CONTROL ACT 1981
 
Haryana pollution control board
Haryana pollution control boardHaryana pollution control board
Haryana pollution control board
 
provisions of water cess act 1977
provisions of water cess act 1977provisions of water cess act 1977
provisions of water cess act 1977
 
2013 Senate Continuing Resolution
2013 Senate Continuing Resolution2013 Senate Continuing Resolution
2013 Senate Continuing Resolution
 
Water act 1974
Water act 1974Water act 1974
Water act 1974
 
Vermont House Calendar Tuesday January 7, 2020
Vermont House Calendar Tuesday January 7, 2020Vermont House Calendar Tuesday January 7, 2020
Vermont House Calendar Tuesday January 7, 2020
 
Salient provisions of water act
Salient provisions of water actSalient provisions of water act
Salient provisions of water act
 
Statistics For Management 3 October
Statistics For Management 3 OctoberStatistics For Management 3 October
Statistics For Management 3 October
 
Vro 458
Vro 458Vro 458
Vro 458
 
12 air act
12 air act12 air act
12 air act
 
AAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-ApplicationAAN-PEI-050116-Draft-Notice-of-Application
AAN-PEI-050116-Draft-Notice-of-Application
 
Environmental impact assessment_notification_2006
Environmental impact assessment_notification_2006Environmental impact assessment_notification_2006
Environmental impact assessment_notification_2006
 
COVID-19 money bill
COVID-19 money bill COVID-19 money bill
COVID-19 money bill
 
Final report on SABC inquiry
Final report on SABC inquiryFinal report on SABC inquiry
Final report on SABC inquiry
 

Similar to PA Senate Bill (SB) 1195 - On Plans to Comply with Federal Clean Power Plan

New microsoft word document (2)
New microsoft word document (2)New microsoft word document (2)
New microsoft word document (2)
BABLI1973
 

Similar to PA Senate Bill (SB) 1195 - On Plans to Comply with Federal Clean Power Plan (7)

Iroquois Gas Transmission Proposed Rate Settlement Agreement to Charge Custom...
Iroquois Gas Transmission Proposed Rate Settlement Agreement to Charge Custom...Iroquois Gas Transmission Proposed Rate Settlement Agreement to Charge Custom...
Iroquois Gas Transmission Proposed Rate Settlement Agreement to Charge Custom...
 
Finance bill 2015 16_Changes Proposed in Sales Tax Act, 1990
Finance bill 2015 16_Changes Proposed in Sales Tax Act, 1990Finance bill 2015 16_Changes Proposed in Sales Tax Act, 1990
Finance bill 2015 16_Changes Proposed in Sales Tax Act, 1990
 
September 17, 2013 Agenda packet
September 17, 2013 Agenda packetSeptember 17, 2013 Agenda packet
September 17, 2013 Agenda packet
 
SENATE BILL 76: Domestic Energy Jobs Act
SENATE BILL 76: Domestic Energy Jobs ActSENATE BILL 76: Domestic Energy Jobs Act
SENATE BILL 76: Domestic Energy Jobs Act
 
SB10
SB10SB10
SB10
 
New microsoft word document (2)
New microsoft word document (2)New microsoft word document (2)
New microsoft word document (2)
 
PA Senate Bill 1044 - Rural Pennsylvania Pipeline Safety Act
PA Senate Bill 1044 - Rural Pennsylvania Pipeline Safety ActPA Senate Bill 1044 - Rural Pennsylvania Pipeline Safety Act
PA Senate Bill 1044 - Rural Pennsylvania Pipeline Safety Act
 

More from Marcellus Drilling News

More from Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Recently uploaded

PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
Faga1939
 

Recently uploaded (16)

Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1
 
26052024_First India Newspaper Jaipur.pdf
26052024_First India Newspaper Jaipur.pdf26052024_First India Newspaper Jaipur.pdf
26052024_First India Newspaper Jaipur.pdf
 
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-ShirtNika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
 
May 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdfMay 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdf
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
 
Draft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdfDraft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdf
 
ys jagan mohan reddy political career, Biography.pdf
ys jagan mohan reddy political career, Biography.pdfys jagan mohan reddy political career, Biography.pdf
ys jagan mohan reddy political career, Biography.pdf
 
Textile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste ManagementTextile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste Management
 
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptxHISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
HISTORY- XII-Theme 3 - Kinship, Caste and Class.pptx
 
25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf
 
24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf
 
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptxChapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
 
27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf
 
23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf
 
Meta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejololMeta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejolol
 
role of women and girls in various terror groups
role of women and girls in various terror groupsrole of women and girls in various terror groups
role of women and girls in various terror groups
 

PA Senate Bill (SB) 1195 - On Plans to Comply with Federal Clean Power Plan

  • 1. PRIOR PRINTER'S NO. 1677 PRINTER'S NO. 1899 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. 1195 Session of 2015 INTRODUCED BY WHITE, VOGEL, ARGALL, EICHELBERGER, SCARNATI, YAW, WAGNER, HUTCHINSON, STEFANO, BARTOLOTTA, VULAKOVICH, WARD, AUMENT, WOZNIAK, GORDNER, BREWSTER, RESCHENTHALER, ALLOWAY, BLAKE, BROWNE, SCAVELLO, YUDICHAK, CORMAN AND BROOKS, APRIL 8, 2016 AS AMENDED ON THIRD CONSIDERATION, JUNE 7, 2016 AN ACT Amending the act of October 22, 2014 (P.L.2873, No.175), entitled "An act requiring the Department of Environmental Protection to receive approval from the General Assembly for a State plan to regulate carbon dioxide emissions for existing stationary sources prior to submitting the State plan to the United States Environmental Protection Agency for approval," further providing for submission of State plan. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Section 4 of the act of October 22, 2014 (P.L.2873, No.175), known as the Pennsylvania Greenhouse Gas Regulation Implementation Act, is amended to read: SECTION 1. SECTION 2 OF THE ACT OF OCTOBER 22, 2014 (P.L.2873, NO.175), KNOWN AS THE PENNSYLVANIA GREENHOUSE GAS REGULATION IMPLEMENTATION ACT, IS AMENDED BY ADDING A DEFINITION TO READ: SECTION 2. DEFINITIONS. THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL HAVE THE MEANINGS GIVEN TO THEM IN THIS SECTION UNLESS THE <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
  • 2. CONTEXT CLEARLY INDICATES OTHERWISE: * * * "STANDING COMMITTEE." THE ENVIRONMENTAL RESOURCES AND ENERGY COMMITTEE OF THE SENATE OR THE ENVIRONMENTAL RESOURCES AND ENERGY COMMITTEE OF THE HOUSE OF REPRESENTATIVES. * * * SECTION 2. SECTION 4 OF THE ACT IS AMENDED TO READ: Section 4. Submission of the State plan. (a) Submission for approval to the General Assembly.--No less than [100] 180 calendar days prior to the department submitting the State plan to the EPA for approval, the department shall transmit the plan to the General Assembly for approval. (b) Consideration by General Assembly.--Upon transmission under subsection (a), the State plan shall be: (1) proposed as a resolution in each chamber; (2) [placed on the calendar of each chamber for] REFERRED TO THE STANDING COMMITTEE IN EACH CHAMBER the next legislative day following transmission; [and] (2.1) CONSIDERED BY THE STANDING COMMITTEE WITHIN 10 LEGISLATIVE DAYS OF REFERRAL UNDER PARAGRAPH (2) AT WHICH TIME THE STANDING COMMITTEE SHALL RECOMMEND THE GENERAL ASSEMBLY APPROVE OR DISAPPROVE THE STATE PLAN; AND (3) considered by each chamber within 20 legislative days after [transmission] placement under paragraph (2). [TRANSMISSION.] CONSIDERATION OF THE STANDING COMMITTEE UNDER PARAGRAPH (2.1). (B.1) EXTENSION REQUEST.--IF NECESSARY TO MEET THE REQUIREMENTS UNDER SUBSECTION (B), THE DEPARTMENT SHALL REQUEST AN EXTENSION OF TIME FROM THE EPA BY SUBMITTING AN INITIAL STATE 20160SB1195PN1899 - 2 - <-- <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 3. PLAN BY THE INITIAL STATE PLAN SUBMISSION DEADLINE UNDER 40 CFR 60.5760 (RELATING TO WHAT ARE THE TIMING REQUIREMENTS FOR SUBMITTING MY PLAN?) THAT MEETS THE MINIMUM REQUIREMENTS FOR AN INITIAL STATE PLAN, AS SPECIFIED IN THE PLAN GUIDELINES PUBLISHED BY THE EPA. THE DEPARTMENT SHALL TRANSMIT THE FOLLOWING MESSAGE WITH ITS SUBMITTAL UNDER THIS PARAGRAPH: BE ADVISED THAT THE STATE PLAN SUBMITTED BY THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION HAS NOT YET MET THE REQUIREMENTS OF THE PENNSYLVANIA GREENHOUSE GAS REGULATION IMPLEMENTATION ACT REQUIRING AFFIRMATIVE APPROVAL OF THE GENERAL ASSEMBLY. IT IS THE INTENTION OF THE COMMONWEALTH OF PENNSYLVANIA TO SUBMIT A STATE PLAN WHICH CONFORMS TO THIS RULEMAKING. UNDER SECTION 111(D) OF THE CLEAN AIR ACT, STATES MUST BE GIVEN AN OPPORTUNITY TO MEET FEDERAL ENVIRONMENTAL STANDARDS SET FORTH BY THE ENVIRONMENTAL PROTECTION AGENCY. THE COMMONWEALTH OF PENNSYLVANIA HEREBY INVOKES THE AUTHORITY PROVIDED TO IT UNDER SECTION 111(D) OF THE CLEAN AIR ACT, AND, IN ACCORDANCE WITH THE PENNSYLVANIA GREENHOUSE GAS IMPLEMENTATION ACT, WILL BE MAKING A FURTHER FILING WITH THE AGENCY. (c) Approval.--If each chamber of the General Assembly adopts the resolution under subsection (b), the department may submit the State plan to the EPA for consideration. (d) Disapproval.--If either chamber of the General Assembly disapproves the resolution under subsection (b), the department may not submit the State plan to the EPA for consideration. The department shall do all of the following: (1) [Determine] REVIEW AND CONSIDER the reasons for disapproval and modify the State plan. 20160SB1195PN1899 - 3 - <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 4. (2) Cause the State plan to be resubmitted to the General Assembly utilizing the process delineated under subsection (b) within 60 calendar days [of] AFTER the [disapproval.] CLOSE OF THE COMMENT PERIOD UNDER PARAGRAPH (2.1). (2.1) OPEN A PUBLIC COMMENT PERIOD FOR NO LESS THAN 180 CALENDAR DAYS ON THE MODIFIED STATE PLAN DURING WHICH THE DEPARTMENT SHALL CONDUCT AT LEAST FOUR PUBLIC HEARINGS IN GEOGRAPHICALLY DISPERSED LOCATIONS IN THIS COMMONWEALTH. (3) If necessary, request an extension of time from the EPA by submitting an initial State plan by [June 30, 2016] the initial State plan submission deadline under 40 CFR 60.5760 (relating to What are the timing requirements for submitting my plan?), that meets the minimum requirements for an initial State plan, as specified in the plan guidelines published by the EPA. The department shall transmit the following message with its submittal under this paragraph: Be advised that the State plan submitted by the Pennsylvania Department of Environmental Protection has not yet met the requirements of the Pennsylvania Greenhouse Gas Regulation Implementation Act requiring affirmative approval of the General Assembly. It is the intention of the Commonwealth of Pennsylvania to submit a State plan which conforms to this rulemaking. Under section 111(d) of the Clean Air Act, states must be given an opportunity to meet Federal environmental standards set forth by the Environmental Protection Agency. The Commonwealth of Pennsylvania hereby invokes the authority provided to it under section 111(d) of the Clean Air Act, and, in accordance with the Pennsylvania Greenhouse Gas 20160SB1195PN1899 - 4 - <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 5. Implementation Act, will be making a further filing with the agency. (e) Default approval.--If no vote is taken by either STANDING COMMITTEE OR chamber of the General Assembly to approve or disapprove the resolution under subsection (b) [before the June 15, 2016, deadline] at least 14 calendar days prior to the final State plan submission deadline under 40 CFR 60.5760, the State plan shall be deemed approved and shall be submitted to the EPA immediately. (f) Default approval after time to cure.--If either chamber of the General Assembly fails to approve a resubmitted plan under subsection (d)(2)[,] OR within 60 calendar days of the [extension] final State plan submission extension deadline under 40 CFR 60.5760, WHICHEVER IS SOONER, the resubmitted plan shall be deemed approved. (G) TIMING RELATIVE TO FEDERAL LITIGATION.--THE DEPARTMENT SHALL NOT SUBMIT A FINAL STATE PLAN TO THE EPA FOR APPROVAL UNTIL AFTER EXPIRATION OF THE STAY ISSUED ON FEBRUARY 9, 2016, BY THE SUPREME COURT OF THE UNITED STATES IN WEST VIRGINIA, ET AL. V. EPA, DOCKET NO. 15A773, CHALLENGING THE CARBON POLLUTION EMISSION GUIDELINES FOR EXISTING STATIONARY SOURCES UNDER 40 CFR PT. 60 SUBPT. UUUU (RELATING TO EMISSION GUIDELINES FOR GREENHOUSE GAS EMISSIONS AND COMPLIANCE TIMES FOR ELECTRIC UTILITY GENERATING UNITS). Section 2 3. This act shall take effect immediately. 20160SB1195PN1899 - 5 - <-- <-- <-- <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25