Cluster benchmark DT report before and after swap
2011 All rights reserved Page 1 of 26
Cluster Benchmark DT Report
Before and After swap
For GrameenPhone
Phase-1 Cluster-11
Huawei Wireless Network Planning Department
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 2 of 26
Table of Contents
1. Test information ......................................................................................................................3 
2. Purpose of the test ...................................................................................................................3 
3. Test manner instruction..........................................................................................................3 
4. Cluster test result before and after swap..............................................................................4 
5. C/I Table before and after swap ............................................................................................5 
6. Internal FTP before and after swap......................................................................................6 
6.1  MAXIMUM & MINIMUM SPEED BEFORE AND AFTER SWAP..……………………......…..6 
6.2  SUMMARY OF EVENTS BEFORE AND AFTER SWAP...........................................................6 
7.DT Statistic and Plots before and after swap........................................................................8 
7.1 DT ROUTE:..........................................................................................................................8 
7.2 MEASURED ROAD BEFORE AND AFTER SWAP: ....................................................................8 
7.3 RX LEVEL SUB DBM BEFORE AND AFTER SWAP (IDLE MODE)............................................9 
7.4 RX QUAL SUB (LONG CALL) BEFORE AND AFTER SWAP:..................................................10 
7.5 THEMATIC MAP FOR MOS BEFORE AND AFTER SWAP:....................................................13 
7.6 THEMATIC MAP FOR C/I BEFORE AND AFTER SWAP: .....................................................144 
7.7.THEMATIC MAP FOR DATA TEST BEFORE AND AFTER SWAP..........................................166 
7.8 EVENTS AND STATISTIC BEFORE AND AFTER SWAP ......................................................178 
8. Cluster Audit Report.............................................................................................................23
9. Annotations ............................................................................................................................25
10. Benchmark cluster DT swap Approval.............................................................................26 
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 3 of 26
1. Test information
Drive test start date (Pre) 13/03/2011 Drive test finish date (Pre) 14/03/2011
Drive test start date (Post) 24/04/2011 Drive test finish date (Post) 27/04/2011
Report date 20/05/2011 Engineer Md. Mahbubul Alam
Cluster No. HS2PH1CL011 Total Count of Sites 51
Cluster Scenario Dense Urban BSC Name GPHBS203
Table 1: Test information
2. Purpose of the test
In order to check the network quality status of the existing network before swap, we have
finished one DT work in Phase-1 Cluster-11 to collect the coverage, CESR & Dropped
Call information, as a reference for the Swap benchmark KPI. The two tests will be done
under the same test equipment’s including PC, test mobile, call manner, test route and so on.
3. Test manner instruction
Test software: TEMS Investigation 10.0.5
Test PC: Lenovo
Test mobile: W995
Extra antenna: External antennas (0 gains) mounted on car roof
Max car speed: 40 km/hr
Avg. Car speed:30 km/hr
SIM card information: GP SIM card (1st) IMSI: 470010030152429;
GP SIM card (2nd) IMSI: 470010030152427;
GP SIM card (3rd) IMSI: 470010030152421;
GP SIM card (4th) IMSI: 470010030152428;
GP SIM card (5th) IMSI: 470010550393471;
GP SIM card (6th) IMSI: 470010550393463;
Call manner:
MS 1 is for long call
MS 2 is for short call.
MS 3 is for idle mode
MS 4 is for terminating from mobile two (not connected to TEMS).
MS 5 is for MOS (master)
MS 6 is for MOS (slave)
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 4 of 26
Long call instruction: Call duration = unlimited.
Short call instruction: Call duration = 15s; Call interval: 5s.
Originating number: MS 1 GP SIM card number: 01755502550;
MS 2 GP SIM card number: 01755502548;
MS 5 GP SIM card number: 01755502563;
Terminating number:
Long call terminating number: 444555
Short call terminating number: MS 4 GP SIM card number: 01755502545;
MOS Call terminating number: MS 5 GP SIM card number: 01755502563; (Loop Back)
MS 6 GP SIM card number: 01755502555;
Instruction: All services will be measured under voice call mode and idle mode.
4. Cluster test result before and after swap
KPI Unit
Dense Urban
Formula
Before After
Retain ability
Dropped Call
(No)
0 0
Changed to Dropped calls as per
Acceptance proposal from GP
Integrity
MOS
(Average)
3.135
3.477 For discussion with Acceptance team
C/I 9~35(%)
89.6
86.9
RxQual 0~5 (%) 97.2 96.1
sample of RxQual from 0 to 5 / sample
of total RxQual
Rx level
(street level)
-75 dBm
25659
22328
sample of Rx level no less than target
Rx level / sample of total Rx level.Coverage area
Probability
%
91.7
92.0
E2E call Setup
time(e2e Voice)
ms 5199.17 5440.89
MO Call setup time. Channel Request
to Alerting Message
E2E Call
Establishment
success Rate
CESR (%)
91.48
95.69
No. of Call Establish / No. of Call
attempts
Table 2: Cluster test final target & statistic standard
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 5 of 26
5. C/I Table before and after swap
C/I No of samples %
<10 7039 12.5
10-15 10226 18.2
16-25 24248 43.1
>25 14709 26.2
Table 3: C/I (From Long Call) before swap
C/I No of samples %
<10 8390 15.3
10-15 9815 17.9
16-25 21637 39.5
>25 14949 27.3
Table 4: C/I (From Long Call) after swap
6. Internal FTP before and after swap
Table 5: Internal FTP DL for all location (From Data Test)
Table 6: External FTP DL for all location (From Data Test)
Protocol Used Speed Threshold(kbps) Service Status
No of Location out of 9
Before After
Internal FTP
>= 192  Excellent  0  1 
128‐192  Very Good  8  5 
64‐128  Good  1  3 
32‐64  Fair  0  0 
Protocol Used Speed Threshold(kbps) Service Status
No of Location out of 9
Before After
External FTP
>= 192  Excellent  1  0 
128‐192  Very Good  6  3 
64‐128  Good  2  6 
32‐64  Fair  0  0 
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 6 of 26
Table 7: HTTP DL for all location (From Data Test)
6.1 Maximum & Minimum Speed before and after swap
Test Type 
Before  After 
Max(Kbps)(Avg.)  Area  Max(Kbps)(Avg.)  Area 
Internal 169.82 GULSHA 2 SWIDISH AMBASY
196.03 GULSHA 2 SWIDISH AMBASY
External 193.80 GULSHA 2 SWIDISH AMBASY
187.77 GULSHA 2 SWIDISH AMBASY
HTTP 121.64 GULSHA 2 SWIDISH AMBASY
121.47 GULSHA 2 SWIDISH AMBASY
Test Type 
Before  After 
Min(Kbps)(Avg.)  Area  Min(Kbps)(Avg.)  Area 
Internal 76.94 GULSHAN AJAD MOSQUE 70.08 MALDIP AMBASY BARIDHARA
External 71.95 GULSHAN AJAD MOSQUE 72.3 GULSHAN 2 UNITED HOSPITAL
HTTP 88.99 AMERICAN AMBASY & NEPAL AMBASY BADDA 63.91 GULSHAN 2 UNITED HOSPITAL
Table 8: Internal FTP, External FTP & HTTP speed
Protocol Used Speed Threshold(kbps) Service Status
No of Location out of 9
Before After
HTTP
>= 192  Excellent  0  0 
128‐192  Very Good  0  0 
64‐128  Good  9  8 
32‐64  Fair  0  1 
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 7 of 26
6.2 Summary of Events before and after swap
Table 9: Table of Summary of Events (Internal FTP DL)
Events
# [no. of]
Before  After 
RAS Error 1 1
Session Start 45 44
Session Error 8 2
Session End 37 41
PDP Context Activation 46 44
PDP Context Activation Failure 0 1
PDP Context Deactivation 47 43
Routing Area Update 2 0
Routing Area Update Failure 0 0
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 8 of 26
7. DT Statistic and Plots before and after swap
7.1 DT Route:
Figure 1: Drive route
7.2 Measured Road before and after swap
Figure 2: Measured Road before swap
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 9 of 26
Figure 3: Measured Road after swap
7.3 Rx Level Sub dBm (Idle Mode) before and after swap
Figure 4: RxLev Sub (dBm) before Swap
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 10 of 26
Figure 5: RxLev Sub (dBm) after Swap
Bar chart 1: RxLev statistic before swap Bar chart 2: RxLev statistic after swap
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 11 of 26
7.4 RxQual Sub (Long Call) before and after swap
Figure 6: RxQual Sub before Swap
Figure 7: RxQual Sub after Swap
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 12 of 26
Bar chart 3: RxQual Sub statistic before swap Bar chart 4: RxQual Sub statistic after swap
Cluster benchmark DT report before and after swap
2011 All rights reserved Page 13 of 26
7.5 Thematic MAP for MOS before and after swap
Figure 8: MOS plot before Swap
Figure 9: MOS plot after Swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 14 of 26
Bar chart 5: MOS statistic before swap Bar chart 6: MOS statistic after swap
7.6 Thematic MAP for C/I (Long call) before and after swap
Figure 10: C/I before Swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 15 of 26
Figure 11: C/I after Swap
Bar chart 7: C/I statistic before swap Bar chart 8: C/I statistic after swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 16 of 26
7.7 Thematic Map for Data Test before and after swap
Figure 12: Location-wise data Speed (kbps) before swap
Figure 13: Location-wise data Speed (kbps) after swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 17 of 26
Bar Chart 9: Distribution graphs of Current Bar Chart 10: Distribution graphs of
MCS DL before swap Current MCS DL after swap
7.8 Events and statistic before Swap before and after swap
CLUTTER
Name
Status
Dedicated Mode
Total no. of
Drive test
samples
RxQual (Long
Call)
Total no. of
samples
RxQual = 0~5
(Long Call)
Total No. of
Call Attempt
(Short Call)
Total no. of call
Established
(Short Call)
Total no. of
blocked calls
(Short Call)
Total no. of
Call Dropped
(Long call)
Dense Urban
Before swap 56136 54553 904 827 18 0
After swap 55920 53713 719 688 32 0
CLUTTER
Name
Status
Idle Mode
Required RxLevel Total no. of Rxlev samples
Total No. of Required RxLev
samples
Dense Urban
Before swap -75 27989 25659
After swap -75 24281 22328
Table 8: Samples according to events
Bar Chart 11: Distribution graphs of Session
App. Mean Throughput before swap
Bar Chart 12: Distribution graphs of Session
App. Mean Throughput after swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 18 of 26
Table for MOS Samples:
CLUTTER
Name
Status
Mode
Total no. of Drive test samples
Dense Urban Before Swap 2319
After swap 2542
Table 9: MOS Samples according to events
Event
Before swap After swap
Number Log file List Number Log file List
Handover 510 459
Handover
Failure (Long
Call)
2
PH1CL11_0314_02 (85).log;PH1CL11_0314_02 (97).log;
2
P1CL11_0426_03 (42).log;P1CL11_0427_04 (46).log
Blocked Call
(Short Call)
18
PH1CL11_0313_01 (14).log;PH1CL11_0313_01 (16).log;
PH1CL11_0313_01 (26).log;PH1CL11_0313_01 (30).log;
PH1CL11_0313_01 (34).log;PH1CL11_0313_01 (36).log;
PH1CL11_0313_01 (52).log;PH1CL11_0313_01 (58).log;
PH1CL11_0313_01 (72).log;PH1CL11_0313_01 (85).log;
PH1CL11_0313_01 (94).log;PH1CL11_0313_01 (105).log;
32
P1CL11_0424_01 (1).log;P1CL11_0424_01 (2).log;
P1CL11_0424_01(6).log;P1CL11_0424_01(9).log;
P1CL11_0424_01 (10).log;P1CL11_0424_01 (11).log,
P1CL11_0424_01 (13).log;P1CL11_0424_01 (14).log,
P1CL11_0424_01 (15).log;P1CL11_0424_01 (17).log,
P1CL11_0424_01 (20).log;P1CL11_0425_02 (23).log,
P1CL11_0425_02 (24).log;P1CL11_0425_02 (26).log,
P1CL11_0425_02 (27).log;P1CL11_0425_02 (30).log,
P1CL11_0426_03 (33).log;P1CL11_0426_03 (34).log,
P1CL11_0426_03 (35).log;P1CL11_0426_03 (40).log,
P1CL11_0426_03 (41).log;P1CL11_0427_04 (47).log,
P1CL11_0427_04 (53).log; P1CL11_0427_04 (56).log,
P1CL11_0427_04 (60).log;
Call Attempt
(Short Call)
904 719
Call End (Short
Call)
883 715
Call
Established
(Short Call)
827 688
Call Setup
(Short Call)
852 687
Cell reselection
(Idle Mode)
585 645
Cluster benchmark DT report before swap
2011 All rights reserved Page 19 of 26
Table 10: Other events statistics before and after swap
Dropped Call
(Long Call)
0 0
Location Area
Update (Idle
Mode)
63 46
Location Area
Update Failure
(Idle Mode)
0 0
Handover
Intracell (Long
call)
95 109
Handover
Intracell Failure
(Long call)
0 4
P1CL11_0424_01 (1).log;P1CL11_0424_01 (21).log;
P1CL11_0425_02 (26).log;P1CL11_0426_03 (40).log;
Cluster benchmark DT report before swap
2011 All rights reserved Page 20 of 26
SlNo
Location
ServingCell
RxQual
C/I
NoofTimeSlot
CodingScheme
Performance Status
PerformanceEvaluation
[InternalFTP]
Performance Status
[INTERNAL FTP]
Connectivity
Speed(Kbps)
TIME
EXTERNAL
FTP
HTTP
Browsing
Speed
(kbps)
Speed (kbps)
1 Point-1 DHBAR3A 0 13.87 3
MCS
1,3,5,6,7,8,9
5/5 135.23 5:10 PM Very Good 146.23 88.99
2 Point-2 DHBARBC 0 25.73 4
MCS
3,5,6,7,8,9
5/5 165.47 6:15 PM Very Good 168.88 109.82
3 Point-3 DHGUL5A 0 28.39 4
MCS
1,3,5,6,7,8,9
6/6 169.82 7:20 PM Very Good 193.8 121.64
4 Point-4 DHGULQC 0 20.16 3
MCS
1,3,5,6,7,8,9
5/5 137.41 8:25 PM Very Good 134.72 115.79
5 Point-5 DHGULUA 0 10.5 2
CS1; MCS
1,3,5,6,7,8,9
5/6 76.94 9:30 PM Good 71.95 92.83
6 Point-6 DHGULHC 0 21.76 3
MCS
5,6,7,8,9
5/5 132.72 4:35 PM Very Good 120.26 115.03
7 Point-7 DHGSCIG 0 23.64 4
MCS
3,5,6,7,8,9
5/5 159.97 3:40 PM Very Good 190.49 117.6
8 Point-8 DHGULQB 0 14.86 4
MCS
3,5,6,7,8,9
5/5 155.07 2:45 PM Very Good 161.42 102.74
9 Point-9 DHBADSA 0 26.4 4
MCS
1,3,5,6,7,8,9
5/5 155.64 1:45 PM Very Good 156.04 102.47
Table 11: Summary of Data Test Performance at different location before swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 21 of 26
SlNo
Location
ServingCell
RxQual
C/I
NoofTimeSlot
CodingScheme
Performance Status
PerformanceEvaluation
[InternalFTP]
Performance Status
[INTERNAL FTP]
Connectivity
Speed(Kbps)
TIME
EXTERNAL
FTP
HTTP
Browsing
Speed
(kbps)
Speed (kbps)
1 Point-1 DHGUL8B 0 10.36 3
CS 1; MCS
1,3,5,6,7,8,9
5/5 120.08 2:35 PM Good 119.03 66.57
2 Point-2 DHGULHC 0 15.12 2
CS 1; MCS
1,5,6,7,8,9
5/5 93.78 7:11 PM Good 112.32 87.69
3 Point-3 DHBAR3C 0 27.27 4
CS 1; MCS
1,2,5,6,7,8,9
5/5 170.73 1:39 PM Very Good 187.77 121.47
4 Point-4 DHBARBC 0 4.78 3
CS 1; MCS
1,5,6,7,8,9
5/5 109.93 5:42 PM Good 72.3 63.91
5 Point-5 DHGULQC 0 14 4
CS 1; MCS
1,5,6,7,8,9
5/5 130.4 6:09 PM Very Good 152.39 98.23
6 Point-6 DHGULQB 0 24.06 4
CS 1; MCS
1,2,5,6,7,8,9
5/5 182.81 4:37 PM Very Good 142.83 77.04
7 Point-7 DHGUL5A 0 27.59 4
CS 1; MCS
1,5,6,7,8,9
5/5 196.03 1:25 PM Excellent 119.72 105.69
8 Point-8 DHBNNCC 0 6.37 2
CS 1; MCS
1,2,3,4,5,6,7,8,9
5/5 70.08 12:11PM Good 95.06 66.21
9 Point-9 DHBNN3A 0 8.42 2
CS 1; MCS
2,3,4,5,6,7,8,9
5/5 97.99 2:54 PM Good 104.67 69.18
Table 13: Summary of Data Test Performance at different location after swap
Cluster benchmark DT report before swap
2011 All rights reserved Page 22 of 26
Location Address Latitude Longitude
Point-1 AMERICAN AMBASY & NEPAL AMBASY BADDA 23.795803 90.421055
Point-2 BARIDHARA LAKESIDE 23.801915 90.418941
Point-3 GULSHA 2 SWIDISH AMBASY 23.79843 90.411781
Point-4 GULSHAN 2 UNITED HOSPITAL 23.805438 90.415471
Point-5 GULSHAN AJAD MOSQUE 23.789976 90.415676
Point-6 GULSHAN CIRCLE 2 23.79485 90.415061
Point-7 GULSHAN CLUB 23.794606 90.410518
Point-8 MALDIP AMBASY BARIDHARA 23.806318 90.417053
Point-9 NORTH BADDA 23.785263 90.425836
Table 13: Address & Co-ordinate of test location
Cluster benchmark DT report before swap
2011 All rights reserved Page 23 of 26
Annex:
Internal FTP : Definition of Terms
8. Cluster Audit Report
SL. No. Site Lon Lat Cluster Status
1 DHGULH 90.41572 23.79558 HS2PH1CL011  On-Air
2 DHBADF 90.4276 23.79178 HS2PH1CL011 On-Air
3 DHBAR4 90.42117 23.80808 HS2PH1CL011 On-Air
4 DHBAR3 90.42444 23.79703 HS2PH1CL011 On-Air
5 DHCNT5 90.39919 23.80489 HS2PH1CL011 On-Air
6 DHBARF 90.42931 23.79627 HS2PH1CL011 On-Air
7 DHBAR1 90.42499 23.79332 HS2PH1CL011 On-Air
8 DHBHA1 90.3956 23.81178 HS2PH1CL011 On-Air
9 DHBAR9 90.42986 23.79296 HS2PH1CL011 On-Air
10 DHJSHE 90.41502 23.81151 HS2PH1CL011 On-Air
11 DHCNT8 90.39861 23.81411 HS2PH1CL011 On-Air
12 DHGULC 90.41417 23.79389 HS2PH1CL011 On-Air
13 DHGSN4 90.41353 23.79578 HS2PH1CL011 On-Air
Value Definition
No of Successful
attempts out of 5
Speed in
kbps
Excellent 5 &  >= 192
Very
Good
4-5 &  128-192
Good 4-5
3
&  64-128
128-192
Fair 3-4
2
&  32-64
64-128
Poor 2-3 &  16-32
Very
Poor
1-2 &  <16
Cluster benchmark DT report before swap
2011 All rights reserved Page 24 of 26
14 DHBARE 90.43318 23.79908 HS2PH1CL011 On-Air
15 DHDOH1 90.41024 23.81381 HS2PH1CL011 On-Air
16 DHBAR6 90.43197 23.80353 HS2PH1CL011 On-Air
17 DHBAR5 90.41956 23.80499 HS2PH1CL011 On-Air
18 DHBAR8 90.42559 23.80595 HS2PH1CL011 On-Air
19 DHGULD 90.41227 23.80254 HS2PH1CL011 On-Air
20 DHBARA 90.42811 23.80036 HS2PH1CL011 On-Air
21 DHCNT6 90.40914 23.80916 HS2PH1CL011 On-Air
22 DHBARD 90.42353 23.80169 HS2PH1CL011 On-Air
23 DHCNT1 90.39311 23.80072 HS2PH1CL011 On-Air
24 DHJSHD 90.41384 23.80988 HS2PH1CL011 On-Air
25 DHGULQ 90.41559 23.8061 HS2PH1CL011 On-Air
26 DHBARJ 90.43389 23.79225 HS2PH1CL011 On-Air
27 DHGULF 90.40844 23.79903 HS2PH1CL011 On-Air
28 DHBNNC 90.40302 23.80043 HS2PH1CL011 On-Air
29 DHMKT1 90.39363 23.81862 HS2PH1CL011 On-Air
30 DHDOH2 90.41167 23.81106 HS2PH1CL011 On-Air
31 DHBNN2 90.40477 23.79788 HS2PH1CL011 On-Air
32 DHGSN5 90.41416 23.79216 HS2PH1CL011 On-Air
33 DHBARB 90.41994 23.80253 HS2PH1CL011 On-Air
34 DHGUL8 90.41782 23.79419 HS2PH1CL011 On-Air
35 DHBBD1 90.46928 23.79808 HS2PH1CL011 On-Air
36 DHGULW 90.40842 23.80464 HS2PH1CL011 On-Air
37 DHGUL5 90.41245 23.79817 HS2PH1CL011 On-Air
38 DHAPLI 90.43078 23.81106 HS2PH1CL011 On-Air
39 DHGULK 90.41113 23.79654 HS2PH1CL011 On-Air
40 DHASCI 90.41347 23.8092 HS2PH1CL011 On-Air
41 DHGU4M 90.41439 23.79439 HS2PH1CL011 On-Air
Cluster benchmark DT report before swap
2011 All rights reserved Page 25 of 26
42 DHPNKI 90.41581 23.79236 HS2PH1CL011 On-Air
43 DHPBLI 90.41325 23.79444 HS2PH1CL011 On-Air
44 DHGUTI 90.41337 23.79597 HS2PH1CL011 On-Air
45 DHWTNI 90.41424 23.793 HS2PH1CL011 On-Air
46 DHLNVI 90.4145 23.79461 HS2PH1CL011 On-Air
47 DHLNMI 90.41383 23.79469 HS2PH1CL011 On-Air
48 DHLAGI 90.41288 23.79414 HS2PH1CL011 On-Air
49 DHGSCI 90.41257 23.79485 HS2PH1CL011 On-Air
50 DHDOHD 90.41314 23.81201 HS2PH1CL011 Under con.
51 DHBNN7 90.4081 23.7967 HS2PH1CL011 On-Air
Table 7: sites in cluster before and after swap
9. Annotations:
Cantonment Area
Cluster benchmark DT report before swap
2011 All rights reserved Page 26 of 26
10. Benchmark cluster DT after swap Approval
It is hereby agreed that the cluster named below meet the specifications Huawei and GP,
by signing this paper, confirmation that the cluster’s service status is as related above.
Cluster No. HS2PH1CL011 Sites number 51
Performing
date
Pre
13/03/2011 to
14/03/2011
Result approve
Post
24/04/2011 to
27/04/2011
Additional
information
On behalf of Huawei On behalf of GP
Originator:…………………………. Approved by:…………………………..
Signature:………………………….. Signature:………………………………..
Date: ………………………….. Date: ………………………………..
On behalf of Huawei On behalf of GP
Originator:…………………………. Approved by:…………………………..
Signature:………………………….. Signature:………………………………..
Date: ………………………….. Date: ………………………………..

More Related Content

What's hot

Day1 slot3 br radio configuration assessment and bss radio configurationv0.4
Day1 slot3   br radio configuration assessment and bss radio configurationv0.4Day1 slot3   br radio configuration assessment and bss radio configurationv0.4
Day1 slot3 br radio configuration assessment and bss radio configurationv0.4fdr1975
 
Modul 5 bss parameter
Modul 5   bss parameterModul 5   bss parameter
Modul 5 bss parameterWijaya Kusuma
 
Drive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actixDrive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actixSyed Muhammad Zaidi
 
Modul 4 signalling dimensioning
Modul 4   signalling dimensioningModul 4   signalling dimensioning
Modul 4 signalling dimensioningWijaya Kusuma
 
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUESEMERSON EDUARDO RODRIGUES
 
2 g parameters_guidelines1
2 g parameters_guidelines12 g parameters_guidelines1
2 g parameters_guidelines1James Mutuku
 
Drive test from a to z
Drive test from a to zDrive test from a to z
Drive test from a to ztrimba
 
Sdcch 12704657711474-phpapp02
Sdcch 12704657711474-phpapp02Sdcch 12704657711474-phpapp02
Sdcch 12704657711474-phpapp02Tapiwa Munetsi
 
Gsm product training technical cases
Gsm product training technical casesGsm product training technical cases
Gsm product training technical casesBez Lemma
 
Drive test analysis
Drive test analysisDrive test analysis
Drive test analysisducnm1977
 
Gsm dt reports making tutorial
Gsm dt reports making tutorialGsm dt reports making tutorial
Gsm dt reports making tutorialINAYAT ULHAQ
 
Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901sivakumar D
 
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libre
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libreTems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libre
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libreTue Phan
 
Wcdma ps service_optimization_guide
Wcdma ps service_optimization_guideWcdma ps service_optimization_guide
Wcdma ps service_optimization_guideazee_shah
 

What's hot (19)

Day1 slot3 br radio configuration assessment and bss radio configurationv0.4
Day1 slot3   br radio configuration assessment and bss radio configurationv0.4Day1 slot3   br radio configuration assessment and bss radio configurationv0.4
Day1 slot3 br radio configuration assessment and bss radio configurationv0.4
 
Modul 5 bss parameter
Modul 5   bss parameterModul 5   bss parameter
Modul 5 bss parameter
 
coverage_enhancement
coverage_enhancementcoverage_enhancement
coverage_enhancement
 
Xcap post processing tool
Xcap post processing toolXcap post processing tool
Xcap post processing tool
 
dual_band_features
dual_band_featuresdual_band_features
dual_band_features
 
Drive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actixDrive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actix
 
Modul 4 signalling dimensioning
Modul 4   signalling dimensioningModul 4   signalling dimensioning
Modul 4 signalling dimensioning
 
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES
05 c rrm ul amc atb pc ENGINEERING EMERSON EDUARDO RODRIGUES
 
2 g parameters_guidelines1
2 g parameters_guidelines12 g parameters_guidelines1
2 g parameters_guidelines1
 
Drive test from a to z
Drive test from a to zDrive test from a to z
Drive test from a to z
 
Sdcch 12704657711474-phpapp02
Sdcch 12704657711474-phpapp02Sdcch 12704657711474-phpapp02
Sdcch 12704657711474-phpapp02
 
Gsm product training technical cases
Gsm product training technical casesGsm product training technical cases
Gsm product training technical cases
 
Umts signaling
Umts signalingUmts signaling
Umts signaling
 
Ch 04 HANDOVER_gvl
Ch 04 HANDOVER_gvlCh 04 HANDOVER_gvl
Ch 04 HANDOVER_gvl
 
Drive test analysis
Drive test analysisDrive test analysis
Drive test analysis
 
Gsm dt reports making tutorial
Gsm dt reports making tutorialGsm dt reports making tutorial
Gsm dt reports making tutorial
 
Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901
 
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libre
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libreTems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libre
Tems pocket 7.2_for_sony_ericsson_w995_and_w995a_--_user_s_manual-libre
 
Wcdma ps service_optimization_guide
Wcdma ps service_optimization_guideWcdma ps service_optimization_guide
Wcdma ps service_optimization_guide
 

Viewers also liked

วันแม่แห่งชาติ
วันแม่แห่งชาติวันแม่แห่งชาติ
วันแม่แห่งชาติNanownaja
 
วันแม่แห่งชาติ
วันแม่แห่งชาติวันแม่แห่งชาติ
วันแม่แห่งชาติNanownaja
 
בית המנעול והמפתח
בית המנעול והמפתחבית המנעול והמפתח
בית המנעול והמפתחlockkeycoil
 
Warta Euca 63rd Edition, 14-21 June 2013
Warta Euca 63rd Edition, 14-21 June 2013Warta Euca 63rd Edition, 14-21 June 2013
Warta Euca 63rd Edition, 14-21 June 2013perdanaent
 
Kotamobagu dalam angka 2013
Kotamobagu dalam angka 2013Kotamobagu dalam angka 2013
Kotamobagu dalam angka 2013yarlishatam
 
Power point presentation {nazareth}
Power point presentation {nazareth}Power point presentation {nazareth}
Power point presentation {nazareth}tayln
 
Non banking services
Non banking servicesNon banking services
Non banking servicesBarotlaxman
 

Viewers also liked (14)

My presentation
My presentationMy presentation
My presentation
 
My presentation
My presentationMy presentation
My presentation
 
Magnaflux testing
Magnaflux testingMagnaflux testing
Magnaflux testing
 
วันแม่แห่งชาติ
วันแม่แห่งชาติวันแม่แห่งชาติ
วันแม่แห่งชาติ
 
วันแม่แห่งชาติ
วันแม่แห่งชาติวันแม่แห่งชาติ
วันแม่แห่งชาติ
 
Magnaflux testing
Magnaflux testingMagnaflux testing
Magnaflux testing
 
בית המנעול והמפתח
בית המנעול והמפתחבית המנעול והמפתח
בית המנעול והמפתח
 
Ratio analysis
Ratio analysisRatio analysis
Ratio analysis
 
My presentation
My presentationMy presentation
My presentation
 
Warta Euca 63rd Edition, 14-21 June 2013
Warta Euca 63rd Edition, 14-21 June 2013Warta Euca 63rd Edition, 14-21 June 2013
Warta Euca 63rd Edition, 14-21 June 2013
 
My presentation
My presentationMy presentation
My presentation
 
Kotamobagu dalam angka 2013
Kotamobagu dalam angka 2013Kotamobagu dalam angka 2013
Kotamobagu dalam angka 2013
 
Power point presentation {nazareth}
Power point presentation {nazareth}Power point presentation {nazareth}
Power point presentation {nazareth}
 
Non banking services
Non banking servicesNon banking services
Non banking services
 

Similar to P1 cl11 bm_dt kpi_acceptance report

University of benin gra 15082012
University of benin gra 15082012University of benin gra 15082012
University of benin gra 15082012Ogundiran Joseph
 
wcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-librewcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-libreNarcisse FOIDIENG
 
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01Dieu Tran Hoang
 
3G network post analysis for Tolay Final report.pdf
3G network post analysis for Tolay Final report.pdf3G network post analysis for Tolay Final report.pdf
3G network post analysis for Tolay Final report.pdfmameyesuf22
 
NetSim Technology Library- Lte and-lte-a
NetSim Technology Library- Lte and-lte-aNetSim Technology Library- Lte and-lte-a
NetSim Technology Library- Lte and-lte-aVishal Sharma
 
Drive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdfDrive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdfhamdi_saif
 
Rf network design
Rf network designRf network design
Rf network designNguyen Le
 
dokumen.tips_nokia-gsm-optimization.ppt
dokumen.tips_nokia-gsm-optimization.pptdokumen.tips_nokia-gsm-optimization.ppt
dokumen.tips_nokia-gsm-optimization.pptEyeonallthings
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysisa8us
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.pptMohamedShabana37
 
Final Presentation Divyansh Gupta
Final Presentation Divyansh GuptaFinal Presentation Divyansh Gupta
Final Presentation Divyansh GuptaDivyansh Gupta
 
393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptx393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptxLibaBali
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)derejew
 
Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011Muhammad Noor Ifansyah
 
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdf
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdfMoog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdf
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdfpatriciamontecinos6
 

Similar to P1 cl11 bm_dt kpi_acceptance report (20)

University of benin gra 15082012
University of benin gra 15082012University of benin gra 15082012
University of benin gra 15082012
 
wcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-librewcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-libre
 
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
 
3G network post analysis for Tolay Final report.pdf
3G network post analysis for Tolay Final report.pdf3G network post analysis for Tolay Final report.pdf
3G network post analysis for Tolay Final report.pdf
 
NetSim Technology Library- Lte and-lte-a
NetSim Technology Library- Lte and-lte-aNetSim Technology Library- Lte and-lte-a
NetSim Technology Library- Lte and-lte-a
 
Drive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdfDrive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdf
 
Rf network design
Rf network designRf network design
Rf network design
 
Drive procedure
Drive procedureDrive procedure
Drive procedure
 
dokumen.tips_nokia-gsm-optimization.ppt
dokumen.tips_nokia-gsm-optimization.pptdokumen.tips_nokia-gsm-optimization.ppt
dokumen.tips_nokia-gsm-optimization.ppt
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysis
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt
 
Optimization
OptimizationOptimization
Optimization
 
Final Presentation Divyansh Gupta
Final Presentation Divyansh GuptaFinal Presentation Divyansh Gupta
Final Presentation Divyansh Gupta
 
393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptx393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptx
 
Commisioning.pptx
Commisioning.pptxCommisioning.pptx
Commisioning.pptx
 
Call flow umts
Call flow umtsCall flow umts
Call flow umts
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)
 
Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011
 
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdf
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdfMoog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdf
Moog-ServoDrives-MSD_Doc_CB40859_2020_11-en.pdf
 
Project
ProjectProject
Project
 

Recently uploaded

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 

Recently uploaded (20)

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 

P1 cl11 bm_dt kpi_acceptance report

  • 1. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 1 of 26 Cluster Benchmark DT Report Before and After swap For GrameenPhone Phase-1 Cluster-11 Huawei Wireless Network Planning Department
  • 2. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 2 of 26 Table of Contents 1. Test information ......................................................................................................................3  2. Purpose of the test ...................................................................................................................3  3. Test manner instruction..........................................................................................................3  4. Cluster test result before and after swap..............................................................................4  5. C/I Table before and after swap ............................................................................................5  6. Internal FTP before and after swap......................................................................................6  6.1  MAXIMUM & MINIMUM SPEED BEFORE AND AFTER SWAP..……………………......…..6  6.2  SUMMARY OF EVENTS BEFORE AND AFTER SWAP...........................................................6  7.DT Statistic and Plots before and after swap........................................................................8  7.1 DT ROUTE:..........................................................................................................................8  7.2 MEASURED ROAD BEFORE AND AFTER SWAP: ....................................................................8  7.3 RX LEVEL SUB DBM BEFORE AND AFTER SWAP (IDLE MODE)............................................9  7.4 RX QUAL SUB (LONG CALL) BEFORE AND AFTER SWAP:..................................................10  7.5 THEMATIC MAP FOR MOS BEFORE AND AFTER SWAP:....................................................13  7.6 THEMATIC MAP FOR C/I BEFORE AND AFTER SWAP: .....................................................144  7.7.THEMATIC MAP FOR DATA TEST BEFORE AND AFTER SWAP..........................................166  7.8 EVENTS AND STATISTIC BEFORE AND AFTER SWAP ......................................................178  8. Cluster Audit Report.............................................................................................................23 9. Annotations ............................................................................................................................25 10. Benchmark cluster DT swap Approval.............................................................................26 
  • 3. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 3 of 26 1. Test information Drive test start date (Pre) 13/03/2011 Drive test finish date (Pre) 14/03/2011 Drive test start date (Post) 24/04/2011 Drive test finish date (Post) 27/04/2011 Report date 20/05/2011 Engineer Md. Mahbubul Alam Cluster No. HS2PH1CL011 Total Count of Sites 51 Cluster Scenario Dense Urban BSC Name GPHBS203 Table 1: Test information 2. Purpose of the test In order to check the network quality status of the existing network before swap, we have finished one DT work in Phase-1 Cluster-11 to collect the coverage, CESR & Dropped Call information, as a reference for the Swap benchmark KPI. The two tests will be done under the same test equipment’s including PC, test mobile, call manner, test route and so on. 3. Test manner instruction Test software: TEMS Investigation 10.0.5 Test PC: Lenovo Test mobile: W995 Extra antenna: External antennas (0 gains) mounted on car roof Max car speed: 40 km/hr Avg. Car speed:30 km/hr SIM card information: GP SIM card (1st) IMSI: 470010030152429; GP SIM card (2nd) IMSI: 470010030152427; GP SIM card (3rd) IMSI: 470010030152421; GP SIM card (4th) IMSI: 470010030152428; GP SIM card (5th) IMSI: 470010550393471; GP SIM card (6th) IMSI: 470010550393463; Call manner: MS 1 is for long call MS 2 is for short call. MS 3 is for idle mode MS 4 is for terminating from mobile two (not connected to TEMS). MS 5 is for MOS (master) MS 6 is for MOS (slave)
  • 4. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 4 of 26 Long call instruction: Call duration = unlimited. Short call instruction: Call duration = 15s; Call interval: 5s. Originating number: MS 1 GP SIM card number: 01755502550; MS 2 GP SIM card number: 01755502548; MS 5 GP SIM card number: 01755502563; Terminating number: Long call terminating number: 444555 Short call terminating number: MS 4 GP SIM card number: 01755502545; MOS Call terminating number: MS 5 GP SIM card number: 01755502563; (Loop Back) MS 6 GP SIM card number: 01755502555; Instruction: All services will be measured under voice call mode and idle mode. 4. Cluster test result before and after swap KPI Unit Dense Urban Formula Before After Retain ability Dropped Call (No) 0 0 Changed to Dropped calls as per Acceptance proposal from GP Integrity MOS (Average) 3.135 3.477 For discussion with Acceptance team C/I 9~35(%) 89.6 86.9 RxQual 0~5 (%) 97.2 96.1 sample of RxQual from 0 to 5 / sample of total RxQual Rx level (street level) -75 dBm 25659 22328 sample of Rx level no less than target Rx level / sample of total Rx level.Coverage area Probability % 91.7 92.0 E2E call Setup time(e2e Voice) ms 5199.17 5440.89 MO Call setup time. Channel Request to Alerting Message E2E Call Establishment success Rate CESR (%) 91.48 95.69 No. of Call Establish / No. of Call attempts Table 2: Cluster test final target & statistic standard
  • 5. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 5 of 26 5. C/I Table before and after swap C/I No of samples % <10 7039 12.5 10-15 10226 18.2 16-25 24248 43.1 >25 14709 26.2 Table 3: C/I (From Long Call) before swap C/I No of samples % <10 8390 15.3 10-15 9815 17.9 16-25 21637 39.5 >25 14949 27.3 Table 4: C/I (From Long Call) after swap 6. Internal FTP before and after swap Table 5: Internal FTP DL for all location (From Data Test) Table 6: External FTP DL for all location (From Data Test) Protocol Used Speed Threshold(kbps) Service Status No of Location out of 9 Before After Internal FTP >= 192  Excellent  0  1  128‐192  Very Good  8  5  64‐128  Good  1  3  32‐64  Fair  0  0  Protocol Used Speed Threshold(kbps) Service Status No of Location out of 9 Before After External FTP >= 192  Excellent  1  0  128‐192  Very Good  6  3  64‐128  Good  2  6  32‐64  Fair  0  0 
  • 6. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 6 of 26 Table 7: HTTP DL for all location (From Data Test) 6.1 Maximum & Minimum Speed before and after swap Test Type  Before  After  Max(Kbps)(Avg.)  Area  Max(Kbps)(Avg.)  Area  Internal 169.82 GULSHA 2 SWIDISH AMBASY 196.03 GULSHA 2 SWIDISH AMBASY External 193.80 GULSHA 2 SWIDISH AMBASY 187.77 GULSHA 2 SWIDISH AMBASY HTTP 121.64 GULSHA 2 SWIDISH AMBASY 121.47 GULSHA 2 SWIDISH AMBASY Test Type  Before  After  Min(Kbps)(Avg.)  Area  Min(Kbps)(Avg.)  Area  Internal 76.94 GULSHAN AJAD MOSQUE 70.08 MALDIP AMBASY BARIDHARA External 71.95 GULSHAN AJAD MOSQUE 72.3 GULSHAN 2 UNITED HOSPITAL HTTP 88.99 AMERICAN AMBASY & NEPAL AMBASY BADDA 63.91 GULSHAN 2 UNITED HOSPITAL Table 8: Internal FTP, External FTP & HTTP speed Protocol Used Speed Threshold(kbps) Service Status No of Location out of 9 Before After HTTP >= 192  Excellent  0  0  128‐192  Very Good  0  0  64‐128  Good  9  8  32‐64  Fair  0  1 
  • 7. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 7 of 26 6.2 Summary of Events before and after swap Table 9: Table of Summary of Events (Internal FTP DL) Events # [no. of] Before  After  RAS Error 1 1 Session Start 45 44 Session Error 8 2 Session End 37 41 PDP Context Activation 46 44 PDP Context Activation Failure 0 1 PDP Context Deactivation 47 43 Routing Area Update 2 0 Routing Area Update Failure 0 0
  • 8. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 8 of 26 7. DT Statistic and Plots before and after swap 7.1 DT Route: Figure 1: Drive route 7.2 Measured Road before and after swap Figure 2: Measured Road before swap
  • 9. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 9 of 26 Figure 3: Measured Road after swap 7.3 Rx Level Sub dBm (Idle Mode) before and after swap Figure 4: RxLev Sub (dBm) before Swap
  • 10. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 10 of 26 Figure 5: RxLev Sub (dBm) after Swap Bar chart 1: RxLev statistic before swap Bar chart 2: RxLev statistic after swap
  • 11. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 11 of 26 7.4 RxQual Sub (Long Call) before and after swap Figure 6: RxQual Sub before Swap Figure 7: RxQual Sub after Swap
  • 12. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 12 of 26 Bar chart 3: RxQual Sub statistic before swap Bar chart 4: RxQual Sub statistic after swap
  • 13. Cluster benchmark DT report before and after swap 2011 All rights reserved Page 13 of 26 7.5 Thematic MAP for MOS before and after swap Figure 8: MOS plot before Swap Figure 9: MOS plot after Swap
  • 14. Cluster benchmark DT report before swap 2011 All rights reserved Page 14 of 26 Bar chart 5: MOS statistic before swap Bar chart 6: MOS statistic after swap 7.6 Thematic MAP for C/I (Long call) before and after swap Figure 10: C/I before Swap
  • 15. Cluster benchmark DT report before swap 2011 All rights reserved Page 15 of 26 Figure 11: C/I after Swap Bar chart 7: C/I statistic before swap Bar chart 8: C/I statistic after swap
  • 16. Cluster benchmark DT report before swap 2011 All rights reserved Page 16 of 26 7.7 Thematic Map for Data Test before and after swap Figure 12: Location-wise data Speed (kbps) before swap Figure 13: Location-wise data Speed (kbps) after swap
  • 17. Cluster benchmark DT report before swap 2011 All rights reserved Page 17 of 26 Bar Chart 9: Distribution graphs of Current Bar Chart 10: Distribution graphs of MCS DL before swap Current MCS DL after swap 7.8 Events and statistic before Swap before and after swap CLUTTER Name Status Dedicated Mode Total no. of Drive test samples RxQual (Long Call) Total no. of samples RxQual = 0~5 (Long Call) Total No. of Call Attempt (Short Call) Total no. of call Established (Short Call) Total no. of blocked calls (Short Call) Total no. of Call Dropped (Long call) Dense Urban Before swap 56136 54553 904 827 18 0 After swap 55920 53713 719 688 32 0 CLUTTER Name Status Idle Mode Required RxLevel Total no. of Rxlev samples Total No. of Required RxLev samples Dense Urban Before swap -75 27989 25659 After swap -75 24281 22328 Table 8: Samples according to events Bar Chart 11: Distribution graphs of Session App. Mean Throughput before swap Bar Chart 12: Distribution graphs of Session App. Mean Throughput after swap
  • 18. Cluster benchmark DT report before swap 2011 All rights reserved Page 18 of 26 Table for MOS Samples: CLUTTER Name Status Mode Total no. of Drive test samples Dense Urban Before Swap 2319 After swap 2542 Table 9: MOS Samples according to events Event Before swap After swap Number Log file List Number Log file List Handover 510 459 Handover Failure (Long Call) 2 PH1CL11_0314_02 (85).log;PH1CL11_0314_02 (97).log; 2 P1CL11_0426_03 (42).log;P1CL11_0427_04 (46).log Blocked Call (Short Call) 18 PH1CL11_0313_01 (14).log;PH1CL11_0313_01 (16).log; PH1CL11_0313_01 (26).log;PH1CL11_0313_01 (30).log; PH1CL11_0313_01 (34).log;PH1CL11_0313_01 (36).log; PH1CL11_0313_01 (52).log;PH1CL11_0313_01 (58).log; PH1CL11_0313_01 (72).log;PH1CL11_0313_01 (85).log; PH1CL11_0313_01 (94).log;PH1CL11_0313_01 (105).log; 32 P1CL11_0424_01 (1).log;P1CL11_0424_01 (2).log; P1CL11_0424_01(6).log;P1CL11_0424_01(9).log; P1CL11_0424_01 (10).log;P1CL11_0424_01 (11).log, P1CL11_0424_01 (13).log;P1CL11_0424_01 (14).log, P1CL11_0424_01 (15).log;P1CL11_0424_01 (17).log, P1CL11_0424_01 (20).log;P1CL11_0425_02 (23).log, P1CL11_0425_02 (24).log;P1CL11_0425_02 (26).log, P1CL11_0425_02 (27).log;P1CL11_0425_02 (30).log, P1CL11_0426_03 (33).log;P1CL11_0426_03 (34).log, P1CL11_0426_03 (35).log;P1CL11_0426_03 (40).log, P1CL11_0426_03 (41).log;P1CL11_0427_04 (47).log, P1CL11_0427_04 (53).log; P1CL11_0427_04 (56).log, P1CL11_0427_04 (60).log; Call Attempt (Short Call) 904 719 Call End (Short Call) 883 715 Call Established (Short Call) 827 688 Call Setup (Short Call) 852 687 Cell reselection (Idle Mode) 585 645
  • 19. Cluster benchmark DT report before swap 2011 All rights reserved Page 19 of 26 Table 10: Other events statistics before and after swap Dropped Call (Long Call) 0 0 Location Area Update (Idle Mode) 63 46 Location Area Update Failure (Idle Mode) 0 0 Handover Intracell (Long call) 95 109 Handover Intracell Failure (Long call) 0 4 P1CL11_0424_01 (1).log;P1CL11_0424_01 (21).log; P1CL11_0425_02 (26).log;P1CL11_0426_03 (40).log;
  • 20. Cluster benchmark DT report before swap 2011 All rights reserved Page 20 of 26 SlNo Location ServingCell RxQual C/I NoofTimeSlot CodingScheme Performance Status PerformanceEvaluation [InternalFTP] Performance Status [INTERNAL FTP] Connectivity Speed(Kbps) TIME EXTERNAL FTP HTTP Browsing Speed (kbps) Speed (kbps) 1 Point-1 DHBAR3A 0 13.87 3 MCS 1,3,5,6,7,8,9 5/5 135.23 5:10 PM Very Good 146.23 88.99 2 Point-2 DHBARBC 0 25.73 4 MCS 3,5,6,7,8,9 5/5 165.47 6:15 PM Very Good 168.88 109.82 3 Point-3 DHGUL5A 0 28.39 4 MCS 1,3,5,6,7,8,9 6/6 169.82 7:20 PM Very Good 193.8 121.64 4 Point-4 DHGULQC 0 20.16 3 MCS 1,3,5,6,7,8,9 5/5 137.41 8:25 PM Very Good 134.72 115.79 5 Point-5 DHGULUA 0 10.5 2 CS1; MCS 1,3,5,6,7,8,9 5/6 76.94 9:30 PM Good 71.95 92.83 6 Point-6 DHGULHC 0 21.76 3 MCS 5,6,7,8,9 5/5 132.72 4:35 PM Very Good 120.26 115.03 7 Point-7 DHGSCIG 0 23.64 4 MCS 3,5,6,7,8,9 5/5 159.97 3:40 PM Very Good 190.49 117.6 8 Point-8 DHGULQB 0 14.86 4 MCS 3,5,6,7,8,9 5/5 155.07 2:45 PM Very Good 161.42 102.74 9 Point-9 DHBADSA 0 26.4 4 MCS 1,3,5,6,7,8,9 5/5 155.64 1:45 PM Very Good 156.04 102.47 Table 11: Summary of Data Test Performance at different location before swap
  • 21. Cluster benchmark DT report before swap 2011 All rights reserved Page 21 of 26 SlNo Location ServingCell RxQual C/I NoofTimeSlot CodingScheme Performance Status PerformanceEvaluation [InternalFTP] Performance Status [INTERNAL FTP] Connectivity Speed(Kbps) TIME EXTERNAL FTP HTTP Browsing Speed (kbps) Speed (kbps) 1 Point-1 DHGUL8B 0 10.36 3 CS 1; MCS 1,3,5,6,7,8,9 5/5 120.08 2:35 PM Good 119.03 66.57 2 Point-2 DHGULHC 0 15.12 2 CS 1; MCS 1,5,6,7,8,9 5/5 93.78 7:11 PM Good 112.32 87.69 3 Point-3 DHBAR3C 0 27.27 4 CS 1; MCS 1,2,5,6,7,8,9 5/5 170.73 1:39 PM Very Good 187.77 121.47 4 Point-4 DHBARBC 0 4.78 3 CS 1; MCS 1,5,6,7,8,9 5/5 109.93 5:42 PM Good 72.3 63.91 5 Point-5 DHGULQC 0 14 4 CS 1; MCS 1,5,6,7,8,9 5/5 130.4 6:09 PM Very Good 152.39 98.23 6 Point-6 DHGULQB 0 24.06 4 CS 1; MCS 1,2,5,6,7,8,9 5/5 182.81 4:37 PM Very Good 142.83 77.04 7 Point-7 DHGUL5A 0 27.59 4 CS 1; MCS 1,5,6,7,8,9 5/5 196.03 1:25 PM Excellent 119.72 105.69 8 Point-8 DHBNNCC 0 6.37 2 CS 1; MCS 1,2,3,4,5,6,7,8,9 5/5 70.08 12:11PM Good 95.06 66.21 9 Point-9 DHBNN3A 0 8.42 2 CS 1; MCS 2,3,4,5,6,7,8,9 5/5 97.99 2:54 PM Good 104.67 69.18 Table 13: Summary of Data Test Performance at different location after swap
  • 22. Cluster benchmark DT report before swap 2011 All rights reserved Page 22 of 26 Location Address Latitude Longitude Point-1 AMERICAN AMBASY & NEPAL AMBASY BADDA 23.795803 90.421055 Point-2 BARIDHARA LAKESIDE 23.801915 90.418941 Point-3 GULSHA 2 SWIDISH AMBASY 23.79843 90.411781 Point-4 GULSHAN 2 UNITED HOSPITAL 23.805438 90.415471 Point-5 GULSHAN AJAD MOSQUE 23.789976 90.415676 Point-6 GULSHAN CIRCLE 2 23.79485 90.415061 Point-7 GULSHAN CLUB 23.794606 90.410518 Point-8 MALDIP AMBASY BARIDHARA 23.806318 90.417053 Point-9 NORTH BADDA 23.785263 90.425836 Table 13: Address & Co-ordinate of test location
  • 23. Cluster benchmark DT report before swap 2011 All rights reserved Page 23 of 26 Annex: Internal FTP : Definition of Terms 8. Cluster Audit Report SL. No. Site Lon Lat Cluster Status 1 DHGULH 90.41572 23.79558 HS2PH1CL011  On-Air 2 DHBADF 90.4276 23.79178 HS2PH1CL011 On-Air 3 DHBAR4 90.42117 23.80808 HS2PH1CL011 On-Air 4 DHBAR3 90.42444 23.79703 HS2PH1CL011 On-Air 5 DHCNT5 90.39919 23.80489 HS2PH1CL011 On-Air 6 DHBARF 90.42931 23.79627 HS2PH1CL011 On-Air 7 DHBAR1 90.42499 23.79332 HS2PH1CL011 On-Air 8 DHBHA1 90.3956 23.81178 HS2PH1CL011 On-Air 9 DHBAR9 90.42986 23.79296 HS2PH1CL011 On-Air 10 DHJSHE 90.41502 23.81151 HS2PH1CL011 On-Air 11 DHCNT8 90.39861 23.81411 HS2PH1CL011 On-Air 12 DHGULC 90.41417 23.79389 HS2PH1CL011 On-Air 13 DHGSN4 90.41353 23.79578 HS2PH1CL011 On-Air Value Definition No of Successful attempts out of 5 Speed in kbps Excellent 5 &  >= 192 Very Good 4-5 &  128-192 Good 4-5 3 &  64-128 128-192 Fair 3-4 2 &  32-64 64-128 Poor 2-3 &  16-32 Very Poor 1-2 &  <16
  • 24. Cluster benchmark DT report before swap 2011 All rights reserved Page 24 of 26 14 DHBARE 90.43318 23.79908 HS2PH1CL011 On-Air 15 DHDOH1 90.41024 23.81381 HS2PH1CL011 On-Air 16 DHBAR6 90.43197 23.80353 HS2PH1CL011 On-Air 17 DHBAR5 90.41956 23.80499 HS2PH1CL011 On-Air 18 DHBAR8 90.42559 23.80595 HS2PH1CL011 On-Air 19 DHGULD 90.41227 23.80254 HS2PH1CL011 On-Air 20 DHBARA 90.42811 23.80036 HS2PH1CL011 On-Air 21 DHCNT6 90.40914 23.80916 HS2PH1CL011 On-Air 22 DHBARD 90.42353 23.80169 HS2PH1CL011 On-Air 23 DHCNT1 90.39311 23.80072 HS2PH1CL011 On-Air 24 DHJSHD 90.41384 23.80988 HS2PH1CL011 On-Air 25 DHGULQ 90.41559 23.8061 HS2PH1CL011 On-Air 26 DHBARJ 90.43389 23.79225 HS2PH1CL011 On-Air 27 DHGULF 90.40844 23.79903 HS2PH1CL011 On-Air 28 DHBNNC 90.40302 23.80043 HS2PH1CL011 On-Air 29 DHMKT1 90.39363 23.81862 HS2PH1CL011 On-Air 30 DHDOH2 90.41167 23.81106 HS2PH1CL011 On-Air 31 DHBNN2 90.40477 23.79788 HS2PH1CL011 On-Air 32 DHGSN5 90.41416 23.79216 HS2PH1CL011 On-Air 33 DHBARB 90.41994 23.80253 HS2PH1CL011 On-Air 34 DHGUL8 90.41782 23.79419 HS2PH1CL011 On-Air 35 DHBBD1 90.46928 23.79808 HS2PH1CL011 On-Air 36 DHGULW 90.40842 23.80464 HS2PH1CL011 On-Air 37 DHGUL5 90.41245 23.79817 HS2PH1CL011 On-Air 38 DHAPLI 90.43078 23.81106 HS2PH1CL011 On-Air 39 DHGULK 90.41113 23.79654 HS2PH1CL011 On-Air 40 DHASCI 90.41347 23.8092 HS2PH1CL011 On-Air 41 DHGU4M 90.41439 23.79439 HS2PH1CL011 On-Air
  • 25. Cluster benchmark DT report before swap 2011 All rights reserved Page 25 of 26 42 DHPNKI 90.41581 23.79236 HS2PH1CL011 On-Air 43 DHPBLI 90.41325 23.79444 HS2PH1CL011 On-Air 44 DHGUTI 90.41337 23.79597 HS2PH1CL011 On-Air 45 DHWTNI 90.41424 23.793 HS2PH1CL011 On-Air 46 DHLNVI 90.4145 23.79461 HS2PH1CL011 On-Air 47 DHLNMI 90.41383 23.79469 HS2PH1CL011 On-Air 48 DHLAGI 90.41288 23.79414 HS2PH1CL011 On-Air 49 DHGSCI 90.41257 23.79485 HS2PH1CL011 On-Air 50 DHDOHD 90.41314 23.81201 HS2PH1CL011 Under con. 51 DHBNN7 90.4081 23.7967 HS2PH1CL011 On-Air Table 7: sites in cluster before and after swap 9. Annotations: Cantonment Area
  • 26. Cluster benchmark DT report before swap 2011 All rights reserved Page 26 of 26 10. Benchmark cluster DT after swap Approval It is hereby agreed that the cluster named below meet the specifications Huawei and GP, by signing this paper, confirmation that the cluster’s service status is as related above. Cluster No. HS2PH1CL011 Sites number 51 Performing date Pre 13/03/2011 to 14/03/2011 Result approve Post 24/04/2011 to 27/04/2011 Additional information On behalf of Huawei On behalf of GP Originator:…………………………. Approved by:………………………….. Signature:………………………….. Signature:……………………………….. Date: ………………………….. Date: ……………………………….. On behalf of Huawei On behalf of GP Originator:…………………………. Approved by:………………………….. Signature:………………………….. Signature:……………………………….. Date: ………………………….. Date: ………………………………..