The Largest Undeveloped
Oxide Gold Deposit in West Africa Q2-2013
2
Forward Looking Statements
This Presentation may contain “forward-looking information” which may include, but is not limited to, statements with respect to: political conditions and
government regulations in foreign countries; timing of the receipt of governmental approvals and/or acceptances; targets, estimates and assumptions in
respect of future gold production and prices; amount and type of future capital expenditures and capital resources; mineral reserves and mineral
resources; anticipated grades; recovery rates; future financial or operating performance; costs and timing of the development of new deposits; costs,
timing and location of future drilling; earning of future interests in various permits; production decisions; costs and timing of construction; project
economics; operating expenditures; costs, timing and nature of future exploration; environmental and reclamation expenses. Often, but not always,
forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”,
“forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions,
events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause the actual results, performance or achievements of the Company and/or its subsidiaries and/or its
affiliated companies to be materially different from any future results, performance or achievements expressed or implied by the forward-looking
statements. Such factors include risks related to changes in, and volatility of, the price of gold; risks associated with operating in foreign jurisdictions; the
speculative nature of gold exploration and development projects; permitting and title risks; risks relating to potential changes to governmental regulation;
risks associated with the accuracy of mineral resource and reserve estimates; risks related to the fact that the Company has a history of losses and
expects to incur losses for the foreseeable future; risks related to the reliance on the Company’s management team and outside contractors; risks
related to drill shortages; risks associated with sample backlogs at assay laboratory facilities; risks related to the Company’s ability to finance the
exploration and development of its mineral properties; risks relating to misrepresentations; uncertainties related to title to the Company’s mineral
properties; risks relating to health concerns; environmental risks; operational risks and hazards inherent in the mining industry; risks associated with the
potential inability to maintain available infrastructure; risks related to the potential unavailability of insurance to cover certain risks; risks related to
increased competition in the mining industry; risks related to currency fluctuations; risks related to the fact the Company does not intend to pay
dividends in the foreseeable future; risks that shareholders’ interest in the Company may be diluted in the future; factors that have historically made the
Company’s share price volatile; risks for United States investors associated with possible PFIC status, as well as those risk factors identified in the
Company’s publicly filed disclosure documents available at www.sedar.com. Although the Company has attempted to identify important factors that
could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that
cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the
date of the applicable public record document which the information is derived from and the Company has disclaimed any obligation to update any
forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-
looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on forward-looking statements due to the inherent uncertainty therein.
All Dollars in US currency (except share price and market capitalization)
The cash balance presented is as at March 31, 2013, while all other financial information is as of May 13, 2013.
3
Orezone Gold
Background
Essakane
1.5  5.3 Moz
Orezone Resources
Bomboré
0.9  5.3 Moz
Including 2.0 Moz oxide
Buys Orezone (OZN.T)
$350 M
Same team
+ 2 gold projects
Market Cap
1995 - 2009 2009 (ORE.T )
Progress
 Permits
 Debt Facility
 Start Construction
Jan. 2009 $20 M
May 2013 $62 M
4
Bomboré - World-class deposit and location
• 5.3 Moz (4.6 M&I at 1.0 g/t + 0.7 Inferred at 1.2 g/t)
• Located 85 km from Capital City along major highway
• 120 m avg. drill depth to date & open below
• plus 29,000 m of expansion and infill drilling completed
Solid financials
• $11.0 million cash, 85.7 million shares, no warrants
• +$3.9 million in shares of Amara Mining
Strong institutional & retail investor support
• Van Eck, Sun Valley, JP Morgan, Tocqueville...
Near-term catalysts
Q2 – 2013
Drilling results, Trade off studies
2H - 2013
Full Feasibility Study
Analyst coverage: Target Price $1.35 - $3.50
• NB, RBC, BMO, CIBC, GMP, Desjardins, Canaccord, Ray J, Casimir, Jennings, Standard Bank
Highlights
4
5
Corporate Structure
ORE.TSX
Shares Issued 85.7 M
Shares Fully Diluted 92.4 M
Cash + Securities $11.0 M + $3.9 M*
Debt None
Market Cap $ 62 M
Average Daily Volume 228,000
Share Price $ 0.72
Shareholders
5% Management
+ 50% Institutional
Sun Valley AGF
Van Eck CIBC
JP Morgan IG
Beutel Goodman BMO
Tocqueville TAL
First Eagle Sprott
• Included in S&P / TSX Small Cap Index
* Current value of 11M shares of Amara
Mining representing ~ 6% holding.
• Cash as of March 31, 2013
6
Experienced Team
Board of Directors
Mike Halvorson Orezone Chairman, also was Director for Viceroy, Nova Gold … 40
Patrick Downey CEO Elgin, also Aura, Viceroy, Yamana, Canico… 30
Keith Peck Previously SVP at RBC Dominion Securities, Haywood, Yorkton… 25
Alain Krushnisky Audit Com Chair, CFO Reunion Gold, Palmarejo, Cambior… 25
Ron Little Previous operations Lac Minerals, St. Joe Minerals, Bond Gold 25
Senior Management Years Experience
Ron Little P.Eng Founder, CEO & President 25
Pascal Marquis Ph.D., P.Geo SVP Exploration 25
Sean Homuth CPA, CA CFO 12
Claude Poulin MBA, P.Geo Bomboré Project Manager 25
7
Burkina Faso
2nd Best region in Africa for exploration
(Fraser Institute, 2012)
7 New gold mines since 2007
4th Largest African gold producer
2004 Modernized mining code
17 Million people
1987 Stable democracy
Capital: OuagadougouRe-elected
2010
Cotton Producer+ 1 Moz / yr
8
Gold Deposits
Youga
1.5 Moz
Samira Hill
2.5 Moz
Kiaka
5.9 Moz
Bondi
0.4 Moz
Kalsaka/ 1.2 Moz
Sega
Mana
7.6 Moz
Essakane
6.2 Moz
Inata
5.5 Moz
Gold Mine (including past production)
Gold Deposit (total MI&I)
Orezone Deposits
0 100 200 km
Cote d’Ivoire
Ghana
Togo
Benin
Niger
Mali
OUAGADOUGOU
Markoye Fault
Konkera
3.3 Moz
Banfora
4.6 Moz
Taparko 1.7 Moz
Bomboré
5.3 Moz
Vindaloo
2.2 Moz
Karma 2.4 Moz
Tongon
4.5 Moz
Tanlouka 1.2 Moz
Ronguen
0.5Moz
Bissa
5.0 Moz
Nabanga 0.7 Moz
Yaramoko
0.9 Moz
9
Bomboré Resource Growth
9
Au g/t
0.99
0.99
0.59
0.59
0.81
1.06
1.06
0.82
0.65
0.60
0.96
1.00
1.22
0
1
2
3
4
5
6
2006 2008 Q1 2008 Q4 2010 Q4 2012 Q3 2013 Q2
MillionOz
Inferred
Indicated
Measured
Estimate Drilling
Date RC DD TOTAL
2006 41,757 1,080 42,837
2008 – Q1 44,050 1,080 45,130
2008 – Q4 63,003 6,794 69,797
2010 – Q4 105,459 14,533 119,992
2012 – Q3 221,613 115,853 337,466
2013 – Q2 259,422 146,091 405,513
10
Bomboré Gold Resources (2013)
Category NI 43-101 Tonnes
(millions)
Grade
(Au g/t)
Gold Content
(ounces)
Bomboré Total Resource (constrained to $1400 pit shell)
Measured & Indicated 139.8 1.01 4,560,000
Inferred 18.4 1.22 723,000
Bomboré Oxidized Resource (oxide + semi-oxidized)
Measured & Indicated 67.1 0.91 1,963,000
Inferred 6.4 0.92 189,000
Figures rounded to the nearest 1,000 oz using a lower cut-off of 0.45 g/t for the oxide and semi-oxidized material and
0.50 g/t for the fresh material
“Oxidized Resources occur within 50 m from surface and present an
opportunity to start operations with lower initial capital, lower operating
costs and higher recoveries”
11
Bomboré Optimization Parameters
Category 2013 2012
Gold Price $1400 $1400
NSR $70 $70
Lower Cut-off g/t g/t
Oxide 0.45 0.45
Transition 0.45 0.45
Fresh 0.55 0.50
Process Recovery % %
Oxide 92L 94
Transition 89L 92
Fresh 82L 82
Overall Pit slopes Degrees Degrees
Oxide 36* 35
Transition 44* 40
Fresh 51* 45
Category 2013 2012
Mining Costs $/t $/t
Oxide 1.67* 1.90
Transition 2.23* 2.35
Fresh 2.32* 2.44
Processing Costs $/t $/t
Oxide 6.60 7.21
Transition 7.83 9.76
Fresh 15.02 12.66
G&A $/t $/t
Oxide 3.72 3.84
Transition 3.72 3.84
Fresh 3.72 3.84
“The updated parameters are recent, relevant and well studied. They are the
basis for the 2013 FS and estimation of reserves.”
Note: * Weighted average number, see March 27/13 release for detail
L includes additional losses for preg. carbon and solutions to tailings
12
Bomboré Whittle Pit Sensitivity
“Resources are highly leveraged to improvements in gold price”
Measured and Indicated
Oxide + Transition + Fresh
Measured and Indicated
Oxide & Transition Only
Gold
Price
US$/oz
Total
Tonnage
(Mt)
Au
Metal
(Moz)
Au
Grade
(g/t)
Strip
Ratio
*
Total Oxide
Tonnage
(Mt)
Au
Metal
(Moz
Au
Grade
(g/t)
Strip
Ratio
*
1000 69.8 2.44 1.09 2.1 50.0 1.48 0.92 1.6
1100 91.4 2.95 1.00 2.0 61.5 1.67 0.85 1.5
1200 114.3 3.44 0.94 1.9 74.0 1.86 0.78 1.4
1300 140.6 3.96 0.88 1.9 87.3 2.03 0.73 1.3
1400 165.5 4.42 0.83 1.8 98.9 2.18 0.68 1.2
1500 193.0 4.88 0.79 1.7 113.2 2.34 0.64 1.1
1600 226.2 5.43 0.75 1.7 128.4 2.49 0.60 1.0
1700 260.6 5.98 0.71 1.6 143.0 2.64 0.57 1.0
Notes: Resources are inclusive of 5% mining losses and 5% dilution with zero grade. Total tonnage is from pit shells optimized on Measured and Indicated blocks of
oxide, transition and fresh material. Oxide tonnage is from pit shells optimized only on the Measured and Indicated blocks of oxide and transition material. The
economic cut-offs averaged 0.29, 0.33 and 0.57 g/t for oxide, transition and fresh resources respectively. *The strip ratio is that of the whittle shell and is expected to
increase for the detailed pit designs.
13
Bomboré Overview
11 km
168 km²
The Marquis Bridge
Current Mine Plan
B
W
S
14
Bomboré Drilling Cross Section
Gold mineralization continues at depth
>0.5 g/t
>0.2 g/t
Au Grades 50 m
200 m
CIL Pit
(2012)
15
Resource Drilling Summary
• Deposit still open at depth and along strike
• 29,000 m of new drilling since Apr 2013 Resource
Program Total
(m)
Depth
(m)
RC
(m)
Core
(m)
Up to 2010 120,000 60 105,000 15,000
2012-08 217,000 120 116,000 101,000
2013-04 67,000 150 37,000 30,000
Excluded 29,000 150 19,000 10,000
Total 433,000 120 277,000 156,000
11 km
Expansion potential
500
100
50
0
ppb Au
2012 Pit shells
using $1400 gold
Gold in Soil
Geochemistry
16
2010 vs 2013 Drilling Results
11 km
Oxide Drill Results Projected to Surface All Assays > 3 g/t
Oct. 2010
1000 m
> 1.00
> 0.35
Gold Grade
g/t
Apr. 2013
+29,000 m of new
results+280,000 m
drilling
17
Oxide Expansion Potential - North
1 km
P17
P16
P17NSiga
P11
CFU
Maga KT
P8P9
P13
INF on HW
SW Extension
Maga
CFU
18
Oxide Expansion Potential - South
1 km
P17
P16
P17N
Siga
P11
CFU
Maga KT
P8P9
P13
Siga South
HW
Siga East
15m @ 1.3 g/t 16m @ 3 g/t
18m @ 2.4 g/t
.P17S
19
Potential 2-Phase Build Scenario
• Process only oxides
• Smaller grinding/leach circuit
• Capacity 150,000 oz/year
• Recoveries + 90%
• Lower strip ratio (~2:1)
• Process oxides & sulphides
• Increase crushing, grinding
and leaching circuits
• Capacity 250,000 oz/year
• Funding to come from cash flow
Possible Improvements to 2011 PEA
 Lower initial capex, shorter construction period
 Higher recoveries and lower operating costs
- Lower power, mining and process costs
 Lower strip ratios Feasibility
in progress
Oxide Plant1 Sulphide Expansion2
20
Bomboré Schedule
2012 2013 2014 2015
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Drilling: Infill & Expansion ● ● ● ● ● ●
Prelim Economic Study
Detailed Metallurgy ● ● ● ● ●
Resource Update ● ● ●
Full Feasibility Study ● ● ● ● ● ● ●
Permitting ● ●
Construction ● ● ● ● ● ● ●
Production ●
Our Goal:
up to 250,000 oz / yr
Phase 1: 150,000
Phase 2: +250,000
21
Orezone Infrastructure
Ouaga Office
New Access
Bomboré Camp
Onsite prep-lab
22
Bondi Gold Project
• 4 km trend, open along strike
• 282,000 oz Ind & 150,000 oz Inf at 2.0 g/t
• Metallurgical testwork update Q2 2013
• Drill program update Q2 2013
• Higher Grades up to 20 g/t
Zone 2 Drill Hole Highlights (results over 4 g/t)
Hole # from to m g/t Section
BRC130 8.0 16.0 8.0 4.4 2925
BRC100 4.0 27.0 23.0 7.5 2975
BRC104 9.0 35.0 26.0 4.4 3025
BRC147D 133.5 164.0 30.5 5.2 3075
BRC110 13.0 25.0 12.0 5.5 3125
BRC113 48.0 63.0 15.0 5.7 3175
BRC057 40.0 69.0 29.0 6.3 3200
BRC116 20.0 39.0 19.0 4.3 3300
BRC283 33.0 52.0 19.0 10.4 3375
BRC204 8.0 21.0 13.0 20.3 3400
BRC278 51.0 57.0 6.0 14.8 3500
Near-surface, heap leachable, with potential at depth
1km
23
Corporate Social Responsibility
Water for Communities
• Support communities by establishing
water and sanitation services
• Over $650,000 raised and spent to
date for water projects / Ryan’s Well
Foundation a partner
Education and Training
• Over $200,000 invested to date
• Collaborative research with Universities
• Local schools and supplies
• Several PhD students supported
• Microscope donated to
University of Ouagadougou
24
Analyst Coverage
Institution Analyst Updated Target C$
Adam Melnyk Mar - 2013 3.50
Jeff Killeen Feb - 2013 3.35
Andrew Mikitchook Mar - 2013 3.25
Brad Humphrey Aug - 2012 3.00
Stuart McDougall Mar - 2013 3.00
Dan Hrushewsky May - 2013 2.65
Paolo Lostritto Mar - 2013 2.50
Nicholas Campbell Apr - 2013 2.25
Jonathan Guy Mar - 2013 1.80
Andrew Breichmanas Apr - 2013 1.50
Michael Starke May - 2013 1.35
Orezone Gold Corporation
290 Picton Avenue, Suite 201
Ottawa, Ontario, Canada K1Z 8P8
www.orezone.com info@orezone.com
Tel: 1 (613) 241 3699 Toll Free: 1 (888) 673 0663

More Related Content

What's hot

Seabridge corp pres614
Seabridge corp pres614Seabridge corp pres614
Seabridge corp pres614
Company Spotlight
 
Seabridge presentation13
Seabridge presentation13Seabridge presentation13
Seabridge presentation13
Company Spotlight
 
Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016
GoldQuest Mining Corp.
 
Seabridge Gold - Corporate Presentation May 2014
Seabridge Gold - Corporate Presentation May 2014Seabridge Gold - Corporate Presentation May 2014
Seabridge Gold - Corporate Presentation May 2014
Company Spotlight
 
West kirkapr13presentation
West kirkapr13presentationWest kirkapr13presentation
West kirkapr13presentation
Company Spotlight
 
Seabridge April 2014
Seabridge April 2014Seabridge April 2014
Seabridge April 2014
Company Spotlight
 
Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014
Company Spotlight
 
August 2021 mnd ir ppt
August 2021 mnd ir pptAugust 2021 mnd ir ppt
August 2021 mnd ir ppt
MandalayResources
 
Millrock Resources - Corporate Presentation - October 2014 (without notes)
Millrock Resources - Corporate Presentation - October 2014 (without notes)Millrock Resources - Corporate Presentation - October 2014 (without notes)
Millrock Resources - Corporate Presentation - October 2014 (without notes)
Millrock Resources
 
Gold quest corporate-presentation-september 2016
Gold quest corporate-presentation-september 2016Gold quest corporate-presentation-september 2016
Gold quest corporate-presentation-september 2016
GoldQuest Mining Corp.
 
Gold quest corporate presentation September 28, 2016
Gold quest corporate presentation September 28, 2016Gold quest corporate presentation September 28, 2016
Gold quest corporate presentation September 28, 2016
GoldQuest Mining Corp.
 
Millrock Presentation - Spring 2021
Millrock Presentation - Spring 2021Millrock Presentation - Spring 2021
Millrock Presentation - Spring 2021
Millrock Resources
 
Corporate presentation february2015-master
Corporate presentation february2015-masterCorporate presentation february2015-master
Corporate presentation february2015-master
Adam Martin
 
LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013
Agnico Eagle Mines
 
Bitterroot Resources - LM Project December 17, 2021
Bitterroot Resources - LM Project December 17, 2021Bitterroot Resources - LM Project December 17, 2021
Bitterroot Resources - LM Project December 17, 2021
Adnet Communications
 
Bitterroot Resources - LM Project Presentation December 2021
Bitterroot Resources - LM Project Presentation December 2021Bitterroot Resources - LM Project Presentation December 2021
Bitterroot Resources - LM Project Presentation December 2021
Adnet Communications
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
Joe Gray
 
19 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may1519 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may15
Kirkland Lake Gold Inc.
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
Adnet Communications
 

What's hot (19)

Seabridge corp pres614
Seabridge corp pres614Seabridge corp pres614
Seabridge corp pres614
 
Seabridge presentation13
Seabridge presentation13Seabridge presentation13
Seabridge presentation13
 
Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016
 
Seabridge Gold - Corporate Presentation May 2014
Seabridge Gold - Corporate Presentation May 2014Seabridge Gold - Corporate Presentation May 2014
Seabridge Gold - Corporate Presentation May 2014
 
West kirkapr13presentation
West kirkapr13presentationWest kirkapr13presentation
West kirkapr13presentation
 
Seabridge April 2014
Seabridge April 2014Seabridge April 2014
Seabridge April 2014
 
Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014
 
August 2021 mnd ir ppt
August 2021 mnd ir pptAugust 2021 mnd ir ppt
August 2021 mnd ir ppt
 
Millrock Resources - Corporate Presentation - October 2014 (without notes)
Millrock Resources - Corporate Presentation - October 2014 (without notes)Millrock Resources - Corporate Presentation - October 2014 (without notes)
Millrock Resources - Corporate Presentation - October 2014 (without notes)
 
Gold quest corporate-presentation-september 2016
Gold quest corporate-presentation-september 2016Gold quest corporate-presentation-september 2016
Gold quest corporate-presentation-september 2016
 
Gold quest corporate presentation September 28, 2016
Gold quest corporate presentation September 28, 2016Gold quest corporate presentation September 28, 2016
Gold quest corporate presentation September 28, 2016
 
Millrock Presentation - Spring 2021
Millrock Presentation - Spring 2021Millrock Presentation - Spring 2021
Millrock Presentation - Spring 2021
 
Corporate presentation february2015-master
Corporate presentation february2015-masterCorporate presentation february2015-master
Corporate presentation february2015-master
 
LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013
 
Bitterroot Resources - LM Project December 17, 2021
Bitterroot Resources - LM Project December 17, 2021Bitterroot Resources - LM Project December 17, 2021
Bitterroot Resources - LM Project December 17, 2021
 
Bitterroot Resources - LM Project Presentation December 2021
Bitterroot Resources - LM Project Presentation December 2021Bitterroot Resources - LM Project Presentation December 2021
Bitterroot Resources - LM Project Presentation December 2021
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
19 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may1519 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may15
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 

Viewers also liked

Obesitythunderbay power point may 1 vancouver
Obesitythunderbay power point may 1 vancouverObesitythunderbay power point may 1 vancouver
Obesitythunderbay power point may 1 vancouver
MrFattman
 
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
Ivan Covic
 
Puerto Rico Tsunami Decision Tool
Puerto Rico Tsunami Decision ToolPuerto Rico Tsunami Decision Tool
Puerto Rico Tsunami Decision Tool
Pedromiguel Pagán Rivera
 
Cypress jun13pres
Cypress jun13presCypress jun13pres
Cypress jun13pres
Company Spotlight
 
Venha ser uma revendedora dos produtos irezende designer
Venha ser uma revendedora dos produtos irezende designerVenha ser uma revendedora dos produtos irezende designer
Venha ser uma revendedora dos produtos irezende designer
Inês Rezende
 
Act corporate-bioeuropemarch13
Act corporate-bioeuropemarch13Act corporate-bioeuropemarch13
Act corporate-bioeuropemarch13
Company Spotlight
 
Twenty dollars
Twenty dollarsTwenty dollars
Twenty dollars
Diana Summers
 
El signo linguistico
El signo linguisticoEl signo linguistico
El signo linguistico
cesarkgua
 
WWP PSC Presentation
WWP PSC PresentationWWP PSC Presentation
WWP PSC Presentation
Taylor Samuels
 
Parques tematicos de disney world
Parques tematicos de disney worldParques tematicos de disney world
Parques tematicos de disney world
Paula Carrillo
 
STI Sequences, Innovation Networks, and Accelerators
STI Sequences, Innovation Networks, and AcceleratorsSTI Sequences, Innovation Networks, and Accelerators
STI Sequences, Innovation Networks, and Accelerators
Scott Dempwolf
 
монетизация мобильных приложений
монетизация мобильных приложениймонетизация мобильных приложений
монетизация мобильных приложений
omegalerts
 
resume (1)
resume (1)resume (1)
resume (1)
edito jr lim
 
LinkedIn Employer brand playbook
LinkedIn Employer brand playbookLinkedIn Employer brand playbook
LinkedIn Employer brand playbook
Fredrik Hammarsten
 
External strokes - Transactional Analysis - Manu Melwin Joy
External strokes - Transactional Analysis - Manu Melwin JoyExternal strokes - Transactional Analysis - Manu Melwin Joy
External strokes - Transactional Analysis - Manu Melwin Joy
Manu Melwin Joy
 
Filosofía de la ciencia leon olives y ana r. pérez 453
Filosofía de la ciencia leon olives y ana r. pérez 453Filosofía de la ciencia leon olives y ana r. pérez 453
Filosofía de la ciencia leon olives y ana r. pérez 453
Climer
 
St James Horse Show at Knoll Farm 7/3015
St James Horse Show at Knoll Farm 7/3015St James Horse Show at Knoll Farm 7/3015
St James Horse Show at Knoll Farm 7/3015
elisen82
 
Dinamika Rotasi dan Kesetimbangan Benda Tegar
Dinamika Rotasi dan Kesetimbangan Benda TegarDinamika Rotasi dan Kesetimbangan Benda Tegar
Dinamika Rotasi dan Kesetimbangan Benda Tegar
Rizka A. Hutami
 
Group work management
Group work managementGroup work management
Group work management
Tommy Saputra
 
Машинное обучение на платформе .NET
Машинное обучение на платформе .NETМашинное обучение на платформе .NET
Машинное обучение на платформе .NET
Roman Nevolin
 

Viewers also liked (20)

Obesitythunderbay power point may 1 vancouver
Obesitythunderbay power point may 1 vancouverObesitythunderbay power point may 1 vancouver
Obesitythunderbay power point may 1 vancouver
 
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
SITETALK OPN NEW BUSINESS PRESENTATION v3 english 010613
 
Puerto Rico Tsunami Decision Tool
Puerto Rico Tsunami Decision ToolPuerto Rico Tsunami Decision Tool
Puerto Rico Tsunami Decision Tool
 
Cypress jun13pres
Cypress jun13presCypress jun13pres
Cypress jun13pres
 
Venha ser uma revendedora dos produtos irezende designer
Venha ser uma revendedora dos produtos irezende designerVenha ser uma revendedora dos produtos irezende designer
Venha ser uma revendedora dos produtos irezende designer
 
Act corporate-bioeuropemarch13
Act corporate-bioeuropemarch13Act corporate-bioeuropemarch13
Act corporate-bioeuropemarch13
 
Twenty dollars
Twenty dollarsTwenty dollars
Twenty dollars
 
El signo linguistico
El signo linguisticoEl signo linguistico
El signo linguistico
 
WWP PSC Presentation
WWP PSC PresentationWWP PSC Presentation
WWP PSC Presentation
 
Parques tematicos de disney world
Parques tematicos de disney worldParques tematicos de disney world
Parques tematicos de disney world
 
STI Sequences, Innovation Networks, and Accelerators
STI Sequences, Innovation Networks, and AcceleratorsSTI Sequences, Innovation Networks, and Accelerators
STI Sequences, Innovation Networks, and Accelerators
 
монетизация мобильных приложений
монетизация мобильных приложениймонетизация мобильных приложений
монетизация мобильных приложений
 
resume (1)
resume (1)resume (1)
resume (1)
 
LinkedIn Employer brand playbook
LinkedIn Employer brand playbookLinkedIn Employer brand playbook
LinkedIn Employer brand playbook
 
External strokes - Transactional Analysis - Manu Melwin Joy
External strokes - Transactional Analysis - Manu Melwin JoyExternal strokes - Transactional Analysis - Manu Melwin Joy
External strokes - Transactional Analysis - Manu Melwin Joy
 
Filosofía de la ciencia leon olives y ana r. pérez 453
Filosofía de la ciencia leon olives y ana r. pérez 453Filosofía de la ciencia leon olives y ana r. pérez 453
Filosofía de la ciencia leon olives y ana r. pérez 453
 
St James Horse Show at Knoll Farm 7/3015
St James Horse Show at Knoll Farm 7/3015St James Horse Show at Knoll Farm 7/3015
St James Horse Show at Knoll Farm 7/3015
 
Dinamika Rotasi dan Kesetimbangan Benda Tegar
Dinamika Rotasi dan Kesetimbangan Benda TegarDinamika Rotasi dan Kesetimbangan Benda Tegar
Dinamika Rotasi dan Kesetimbangan Benda Tegar
 
Group work management
Group work managementGroup work management
Group work management
 
Машинное обучение на платформе .NET
Машинное обучение на платформе .NETМашинное обучение на платформе .NET
Машинное обучение на платформе .NET
 

Similar to Orezone goldmay13invpres

Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
DetourGold
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentation
guygold2016
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials Conference
DetourGold
 
Investor Presentation July 2013
Investor Presentation July 2013Investor Presentation July 2013
Investor Presentation July 2013
Company Spotlight
 
Dpm investorppt july2013
Dpm investorppt july2013Dpm investorppt july2013
Dpm investorppt july2013
Company Spotlight
 
Investor Presentation July 2013
Investor Presentation July 2013Investor Presentation July 2013
Investor Presentation July 2013
Company Spotlight
 
Dpm investor ppt june 2013
Dpm investor ppt june 2013Dpm investor ppt june 2013
Dpm investor ppt june 2013
Company Spotlight
 
Investor Presentation June 2013
Investor Presentation June 2013Investor Presentation June 2013
Investor Presentation June 2013
Company Spotlight
 
Investor Presentation June 2013
Investor Presentation June 2013Investor Presentation June 2013
Investor Presentation June 2013
Company Spotlight
 
Gold quest corporate-presentation-september 2016 (Updated)
Gold quest corporate-presentation-september 2016 (Updated)Gold quest corporate-presentation-september 2016 (Updated)
Gold quest corporate-presentation-september 2016 (Updated)
GoldQuest Mining Corp.
 
Guyana Goldfields Inc. March 2017 IR Presentation
Guyana Goldfields Inc. March 2017 IR PresentationGuyana Goldfields Inc. March 2017 IR Presentation
Guyana Goldfields Inc. March 2017 IR Presentation
guygold2016
 
Dgc 13 05_09_agm
Dgc 13 05_09_agmDgc 13 05_09_agm
Dgc 13 05_09_agm
DetourGold
 
Tri star mar 2021 ppt final
Tri star   mar 2021 ppt finalTri star   mar 2021 ppt final
Tri star mar 2021 ppt final
AdnetNew
 
Tristar -mar_2021_ppt_final-v2
Tristar  -mar_2021_ppt_final-v2Tristar  -mar_2021_ppt_final-v2
Tristar -mar_2021_ppt_final-v2
AdnetNew
 
140724 rab sample short diff font
140724 rab sample short diff font140724 rab sample short diff font
140724 rab sample short diff font
sparky263
 
Dalradian corporate presentation july 15 2013
Dalradian corporate presentation july 15 2013Dalradian corporate presentation july 15 2013
Dalradian corporate presentation july 15 2013
DalradianResource
 
Tri star apr 2021 ppt-original
Tri star   apr 2021 ppt-originalTri star   apr 2021 ppt-original
Tri star apr 2021 ppt-original
AdnetNew
 
2013 05-28-alder presentation
2013 05-28-alder presentation2013 05-28-alder presentation
2013 05-28-alder presentation
AlderResources
 
TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021
Adnet Communications
 
2013 05-07-alder presentation
2013 05-07-alder presentation2013 05-07-alder presentation
2013 05-07-alder presentation
AlderResources
 

Similar to Orezone goldmay13invpres (20)

Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentation
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials Conference
 
Investor Presentation July 2013
Investor Presentation July 2013Investor Presentation July 2013
Investor Presentation July 2013
 
Dpm investorppt july2013
Dpm investorppt july2013Dpm investorppt july2013
Dpm investorppt july2013
 
Investor Presentation July 2013
Investor Presentation July 2013Investor Presentation July 2013
Investor Presentation July 2013
 
Dpm investor ppt june 2013
Dpm investor ppt june 2013Dpm investor ppt june 2013
Dpm investor ppt june 2013
 
Investor Presentation June 2013
Investor Presentation June 2013Investor Presentation June 2013
Investor Presentation June 2013
 
Investor Presentation June 2013
Investor Presentation June 2013Investor Presentation June 2013
Investor Presentation June 2013
 
Gold quest corporate-presentation-september 2016 (Updated)
Gold quest corporate-presentation-september 2016 (Updated)Gold quest corporate-presentation-september 2016 (Updated)
Gold quest corporate-presentation-september 2016 (Updated)
 
Guyana Goldfields Inc. March 2017 IR Presentation
Guyana Goldfields Inc. March 2017 IR PresentationGuyana Goldfields Inc. March 2017 IR Presentation
Guyana Goldfields Inc. March 2017 IR Presentation
 
Dgc 13 05_09_agm
Dgc 13 05_09_agmDgc 13 05_09_agm
Dgc 13 05_09_agm
 
Tri star mar 2021 ppt final
Tri star   mar 2021 ppt finalTri star   mar 2021 ppt final
Tri star mar 2021 ppt final
 
Tristar -mar_2021_ppt_final-v2
Tristar  -mar_2021_ppt_final-v2Tristar  -mar_2021_ppt_final-v2
Tristar -mar_2021_ppt_final-v2
 
140724 rab sample short diff font
140724 rab sample short diff font140724 rab sample short diff font
140724 rab sample short diff font
 
Dalradian corporate presentation july 15 2013
Dalradian corporate presentation july 15 2013Dalradian corporate presentation july 15 2013
Dalradian corporate presentation july 15 2013
 
Tri star apr 2021 ppt-original
Tri star   apr 2021 ppt-originalTri star   apr 2021 ppt-original
Tri star apr 2021 ppt-original
 
2013 05-28-alder presentation
2013 05-28-alder presentation2013 05-28-alder presentation
2013 05-28-alder presentation
 
TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021
 
2013 05-07-alder presentation
2013 05-07-alder presentation2013 05-07-alder presentation
2013 05-07-alder presentation
 

More from Company Spotlight

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Company Spotlight
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
Company Spotlight
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
Company Spotlight
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
Company Spotlight
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 

More from Company Spotlight (20)

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 

Orezone goldmay13invpres

  • 1. The Largest Undeveloped Oxide Gold Deposit in West Africa Q2-2013
  • 2. 2 Forward Looking Statements This Presentation may contain “forward-looking information” which may include, but is not limited to, statements with respect to: political conditions and government regulations in foreign countries; timing of the receipt of governmental approvals and/or acceptances; targets, estimates and assumptions in respect of future gold production and prices; amount and type of future capital expenditures and capital resources; mineral reserves and mineral resources; anticipated grades; recovery rates; future financial or operating performance; costs and timing of the development of new deposits; costs, timing and location of future drilling; earning of future interests in various permits; production decisions; costs and timing of construction; project economics; operating expenditures; costs, timing and nature of future exploration; environmental and reclamation expenses. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company and/or its subsidiaries and/or its affiliated companies to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include risks related to changes in, and volatility of, the price of gold; risks associated with operating in foreign jurisdictions; the speculative nature of gold exploration and development projects; permitting and title risks; risks relating to potential changes to governmental regulation; risks associated with the accuracy of mineral resource and reserve estimates; risks related to the fact that the Company has a history of losses and expects to incur losses for the foreseeable future; risks related to the reliance on the Company’s management team and outside contractors; risks related to drill shortages; risks associated with sample backlogs at assay laboratory facilities; risks related to the Company’s ability to finance the exploration and development of its mineral properties; risks relating to misrepresentations; uncertainties related to title to the Company’s mineral properties; risks relating to health concerns; environmental risks; operational risks and hazards inherent in the mining industry; risks associated with the potential inability to maintain available infrastructure; risks related to the potential unavailability of insurance to cover certain risks; risks related to increased competition in the mining industry; risks related to currency fluctuations; risks related to the fact the Company does not intend to pay dividends in the foreseeable future; risks that shareholders’ interest in the Company may be diluted in the future; factors that have historically made the Company’s share price volatile; risks for United States investors associated with possible PFIC status, as well as those risk factors identified in the Company’s publicly filed disclosure documents available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of the applicable public record document which the information is derived from and the Company has disclaimed any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward- looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements due to the inherent uncertainty therein. All Dollars in US currency (except share price and market capitalization) The cash balance presented is as at March 31, 2013, while all other financial information is as of May 13, 2013.
  • 3. 3 Orezone Gold Background Essakane 1.5  5.3 Moz Orezone Resources Bomboré 0.9  5.3 Moz Including 2.0 Moz oxide Buys Orezone (OZN.T) $350 M Same team + 2 gold projects Market Cap 1995 - 2009 2009 (ORE.T ) Progress  Permits  Debt Facility  Start Construction Jan. 2009 $20 M May 2013 $62 M
  • 4. 4 Bomboré - World-class deposit and location • 5.3 Moz (4.6 M&I at 1.0 g/t + 0.7 Inferred at 1.2 g/t) • Located 85 km from Capital City along major highway • 120 m avg. drill depth to date & open below • plus 29,000 m of expansion and infill drilling completed Solid financials • $11.0 million cash, 85.7 million shares, no warrants • +$3.9 million in shares of Amara Mining Strong institutional & retail investor support • Van Eck, Sun Valley, JP Morgan, Tocqueville... Near-term catalysts Q2 – 2013 Drilling results, Trade off studies 2H - 2013 Full Feasibility Study Analyst coverage: Target Price $1.35 - $3.50 • NB, RBC, BMO, CIBC, GMP, Desjardins, Canaccord, Ray J, Casimir, Jennings, Standard Bank Highlights 4
  • 5. 5 Corporate Structure ORE.TSX Shares Issued 85.7 M Shares Fully Diluted 92.4 M Cash + Securities $11.0 M + $3.9 M* Debt None Market Cap $ 62 M Average Daily Volume 228,000 Share Price $ 0.72 Shareholders 5% Management + 50% Institutional Sun Valley AGF Van Eck CIBC JP Morgan IG Beutel Goodman BMO Tocqueville TAL First Eagle Sprott • Included in S&P / TSX Small Cap Index * Current value of 11M shares of Amara Mining representing ~ 6% holding. • Cash as of March 31, 2013
  • 6. 6 Experienced Team Board of Directors Mike Halvorson Orezone Chairman, also was Director for Viceroy, Nova Gold … 40 Patrick Downey CEO Elgin, also Aura, Viceroy, Yamana, Canico… 30 Keith Peck Previously SVP at RBC Dominion Securities, Haywood, Yorkton… 25 Alain Krushnisky Audit Com Chair, CFO Reunion Gold, Palmarejo, Cambior… 25 Ron Little Previous operations Lac Minerals, St. Joe Minerals, Bond Gold 25 Senior Management Years Experience Ron Little P.Eng Founder, CEO & President 25 Pascal Marquis Ph.D., P.Geo SVP Exploration 25 Sean Homuth CPA, CA CFO 12 Claude Poulin MBA, P.Geo Bomboré Project Manager 25
  • 7. 7 Burkina Faso 2nd Best region in Africa for exploration (Fraser Institute, 2012) 7 New gold mines since 2007 4th Largest African gold producer 2004 Modernized mining code 17 Million people 1987 Stable democracy Capital: OuagadougouRe-elected 2010 Cotton Producer+ 1 Moz / yr
  • 8. 8 Gold Deposits Youga 1.5 Moz Samira Hill 2.5 Moz Kiaka 5.9 Moz Bondi 0.4 Moz Kalsaka/ 1.2 Moz Sega Mana 7.6 Moz Essakane 6.2 Moz Inata 5.5 Moz Gold Mine (including past production) Gold Deposit (total MI&I) Orezone Deposits 0 100 200 km Cote d’Ivoire Ghana Togo Benin Niger Mali OUAGADOUGOU Markoye Fault Konkera 3.3 Moz Banfora 4.6 Moz Taparko 1.7 Moz Bomboré 5.3 Moz Vindaloo 2.2 Moz Karma 2.4 Moz Tongon 4.5 Moz Tanlouka 1.2 Moz Ronguen 0.5Moz Bissa 5.0 Moz Nabanga 0.7 Moz Yaramoko 0.9 Moz
  • 9. 9 Bomboré Resource Growth 9 Au g/t 0.99 0.99 0.59 0.59 0.81 1.06 1.06 0.82 0.65 0.60 0.96 1.00 1.22 0 1 2 3 4 5 6 2006 2008 Q1 2008 Q4 2010 Q4 2012 Q3 2013 Q2 MillionOz Inferred Indicated Measured Estimate Drilling Date RC DD TOTAL 2006 41,757 1,080 42,837 2008 – Q1 44,050 1,080 45,130 2008 – Q4 63,003 6,794 69,797 2010 – Q4 105,459 14,533 119,992 2012 – Q3 221,613 115,853 337,466 2013 – Q2 259,422 146,091 405,513
  • 10. 10 Bomboré Gold Resources (2013) Category NI 43-101 Tonnes (millions) Grade (Au g/t) Gold Content (ounces) Bomboré Total Resource (constrained to $1400 pit shell) Measured & Indicated 139.8 1.01 4,560,000 Inferred 18.4 1.22 723,000 Bomboré Oxidized Resource (oxide + semi-oxidized) Measured & Indicated 67.1 0.91 1,963,000 Inferred 6.4 0.92 189,000 Figures rounded to the nearest 1,000 oz using a lower cut-off of 0.45 g/t for the oxide and semi-oxidized material and 0.50 g/t for the fresh material “Oxidized Resources occur within 50 m from surface and present an opportunity to start operations with lower initial capital, lower operating costs and higher recoveries”
  • 11. 11 Bomboré Optimization Parameters Category 2013 2012 Gold Price $1400 $1400 NSR $70 $70 Lower Cut-off g/t g/t Oxide 0.45 0.45 Transition 0.45 0.45 Fresh 0.55 0.50 Process Recovery % % Oxide 92L 94 Transition 89L 92 Fresh 82L 82 Overall Pit slopes Degrees Degrees Oxide 36* 35 Transition 44* 40 Fresh 51* 45 Category 2013 2012 Mining Costs $/t $/t Oxide 1.67* 1.90 Transition 2.23* 2.35 Fresh 2.32* 2.44 Processing Costs $/t $/t Oxide 6.60 7.21 Transition 7.83 9.76 Fresh 15.02 12.66 G&A $/t $/t Oxide 3.72 3.84 Transition 3.72 3.84 Fresh 3.72 3.84 “The updated parameters are recent, relevant and well studied. They are the basis for the 2013 FS and estimation of reserves.” Note: * Weighted average number, see March 27/13 release for detail L includes additional losses for preg. carbon and solutions to tailings
  • 12. 12 Bomboré Whittle Pit Sensitivity “Resources are highly leveraged to improvements in gold price” Measured and Indicated Oxide + Transition + Fresh Measured and Indicated Oxide & Transition Only Gold Price US$/oz Total Tonnage (Mt) Au Metal (Moz) Au Grade (g/t) Strip Ratio * Total Oxide Tonnage (Mt) Au Metal (Moz Au Grade (g/t) Strip Ratio * 1000 69.8 2.44 1.09 2.1 50.0 1.48 0.92 1.6 1100 91.4 2.95 1.00 2.0 61.5 1.67 0.85 1.5 1200 114.3 3.44 0.94 1.9 74.0 1.86 0.78 1.4 1300 140.6 3.96 0.88 1.9 87.3 2.03 0.73 1.3 1400 165.5 4.42 0.83 1.8 98.9 2.18 0.68 1.2 1500 193.0 4.88 0.79 1.7 113.2 2.34 0.64 1.1 1600 226.2 5.43 0.75 1.7 128.4 2.49 0.60 1.0 1700 260.6 5.98 0.71 1.6 143.0 2.64 0.57 1.0 Notes: Resources are inclusive of 5% mining losses and 5% dilution with zero grade. Total tonnage is from pit shells optimized on Measured and Indicated blocks of oxide, transition and fresh material. Oxide tonnage is from pit shells optimized only on the Measured and Indicated blocks of oxide and transition material. The economic cut-offs averaged 0.29, 0.33 and 0.57 g/t for oxide, transition and fresh resources respectively. *The strip ratio is that of the whittle shell and is expected to increase for the detailed pit designs.
  • 13. 13 Bomboré Overview 11 km 168 km² The Marquis Bridge Current Mine Plan B W S
  • 14. 14 Bomboré Drilling Cross Section Gold mineralization continues at depth >0.5 g/t >0.2 g/t Au Grades 50 m 200 m CIL Pit (2012)
  • 15. 15 Resource Drilling Summary • Deposit still open at depth and along strike • 29,000 m of new drilling since Apr 2013 Resource Program Total (m) Depth (m) RC (m) Core (m) Up to 2010 120,000 60 105,000 15,000 2012-08 217,000 120 116,000 101,000 2013-04 67,000 150 37,000 30,000 Excluded 29,000 150 19,000 10,000 Total 433,000 120 277,000 156,000 11 km Expansion potential 500 100 50 0 ppb Au 2012 Pit shells using $1400 gold Gold in Soil Geochemistry
  • 16. 16 2010 vs 2013 Drilling Results 11 km Oxide Drill Results Projected to Surface All Assays > 3 g/t Oct. 2010 1000 m > 1.00 > 0.35 Gold Grade g/t Apr. 2013 +29,000 m of new results+280,000 m drilling
  • 17. 17 Oxide Expansion Potential - North 1 km P17 P16 P17NSiga P11 CFU Maga KT P8P9 P13 INF on HW SW Extension Maga CFU
  • 18. 18 Oxide Expansion Potential - South 1 km P17 P16 P17N Siga P11 CFU Maga KT P8P9 P13 Siga South HW Siga East 15m @ 1.3 g/t 16m @ 3 g/t 18m @ 2.4 g/t .P17S
  • 19. 19 Potential 2-Phase Build Scenario • Process only oxides • Smaller grinding/leach circuit • Capacity 150,000 oz/year • Recoveries + 90% • Lower strip ratio (~2:1) • Process oxides & sulphides • Increase crushing, grinding and leaching circuits • Capacity 250,000 oz/year • Funding to come from cash flow Possible Improvements to 2011 PEA  Lower initial capex, shorter construction period  Higher recoveries and lower operating costs - Lower power, mining and process costs  Lower strip ratios Feasibility in progress Oxide Plant1 Sulphide Expansion2
  • 20. 20 Bomboré Schedule 2012 2013 2014 2015 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Drilling: Infill & Expansion ● ● ● ● ● ● Prelim Economic Study Detailed Metallurgy ● ● ● ● ● Resource Update ● ● ● Full Feasibility Study ● ● ● ● ● ● ● Permitting ● ● Construction ● ● ● ● ● ● ● Production ● Our Goal: up to 250,000 oz / yr Phase 1: 150,000 Phase 2: +250,000
  • 21. 21 Orezone Infrastructure Ouaga Office New Access Bomboré Camp Onsite prep-lab
  • 22. 22 Bondi Gold Project • 4 km trend, open along strike • 282,000 oz Ind & 150,000 oz Inf at 2.0 g/t • Metallurgical testwork update Q2 2013 • Drill program update Q2 2013 • Higher Grades up to 20 g/t Zone 2 Drill Hole Highlights (results over 4 g/t) Hole # from to m g/t Section BRC130 8.0 16.0 8.0 4.4 2925 BRC100 4.0 27.0 23.0 7.5 2975 BRC104 9.0 35.0 26.0 4.4 3025 BRC147D 133.5 164.0 30.5 5.2 3075 BRC110 13.0 25.0 12.0 5.5 3125 BRC113 48.0 63.0 15.0 5.7 3175 BRC057 40.0 69.0 29.0 6.3 3200 BRC116 20.0 39.0 19.0 4.3 3300 BRC283 33.0 52.0 19.0 10.4 3375 BRC204 8.0 21.0 13.0 20.3 3400 BRC278 51.0 57.0 6.0 14.8 3500 Near-surface, heap leachable, with potential at depth 1km
  • 23. 23 Corporate Social Responsibility Water for Communities • Support communities by establishing water and sanitation services • Over $650,000 raised and spent to date for water projects / Ryan’s Well Foundation a partner Education and Training • Over $200,000 invested to date • Collaborative research with Universities • Local schools and supplies • Several PhD students supported • Microscope donated to University of Ouagadougou
  • 24. 24 Analyst Coverage Institution Analyst Updated Target C$ Adam Melnyk Mar - 2013 3.50 Jeff Killeen Feb - 2013 3.35 Andrew Mikitchook Mar - 2013 3.25 Brad Humphrey Aug - 2012 3.00 Stuart McDougall Mar - 2013 3.00 Dan Hrushewsky May - 2013 2.65 Paolo Lostritto Mar - 2013 2.50 Nicholas Campbell Apr - 2013 2.25 Jonathan Guy Mar - 2013 1.80 Andrew Breichmanas Apr - 2013 1.50 Michael Starke May - 2013 1.35
  • 25. Orezone Gold Corporation 290 Picton Avenue, Suite 201 Ottawa, Ontario, Canada K1Z 8P8 www.orezone.com info@orezone.com Tel: 1 (613) 241 3699 Toll Free: 1 (888) 673 0663