Optimize Project Intake, Approval, and
Prioritization
Give yourself the voice to say “no” (or “not yet”) to new projects.
Info-Tech's products and services combine actionable insight and relevant advice with ready-to-use tools
and templates that cover the full spectrum of IT concerns.© 1997 - 2015 Info-Tech Research Group
Info-Tech Research Group 2Info-Tech Research Group 2
This Research is Designed For: This Research Will Help You:
This Research Will Assist: This Research Will Help You:
This Research Is Designed For: This Research Will Help You:
This Research Will Also Assist: This Research Will Help Them:
Our understanding of the problem
Portfolio managers or PMO directors who
have trouble driving the throughput of the
highest-value projects in the portfolio.
CIOs who want to defend their project
portfolios from the malinvestment of
resources.
Reduce or eliminate portfolio waste
Align project intake and prioritization with
resource capacity
Balance proactive (high value) and reactive
(high urgency) demand
Manage and influence stakeholders more
successfully
Product owners, steering committee members,
or other senior executives who want to
become more involved in intake, approval, and
prioritization processes.
Understand IT processes and capabilities and
set more realistic expectations for their project
requests.
Info-Tech Research Group 3Info-Tech Research Group 3
Executive Summary
• As a portfolio manager, you do not have the authority to decline or defer
new projects—but you also lack the capacity to realistically say yes to
more project work.
• With your staff constantly being pulled into reactionary support roles, you
not only have trouble completing all the projects currently underway, but
you also have trouble starting any of the projects in your ever-growing
backlog.
Give yourself the voice to say “no” (or
at least “not yet”) to new projects by
aligning intake, approval, and
prioritization with the defining
constraints of strategic objectives,
portfolio capacity, and stakeholder
needs.
With intake processes geared toward
these ends, you can ensure that the
PMO is always driving the throughput
of the highest-value projects in the
portfolio and that the business side has
visibility into IT’s capacity and
processes.
• Building a centralized process that funnels requests into a single intake channel, and that eliminates confusion and doubt
for stakeholders and staff, is the first step to defending your portfolio against off-the-grid initiatives.
• Developing practices that incorporate the constraint of resource capacity to cap the amount of project approvals to that
which is realistic will help improve the throughput of projects through the portfolio.
• Establish an effective scorecard to create transparency into IT’s capacity and processes. This will help set realistic
expectations for stakeholders, eliminate “squeaky wheel” prioritization, and give primacy to the highest value requests.
Situation Info-Tech Insight
Complication
Resolution
• Stakeholders have unrealistic expectations of what IT can deliver. Too
many projects are approved, yet no one understands why their project is
delayed or in a state of suspended animation.
• Ad hoc or “off the grid” projects frequently circumvent the formal intake
processes that you have in place, robbing your already in-flight projects of
precious resources and threatening your portfolio’s strategic alignment
with business goals.
Info-Tech Research Group 4Info-Tech Research Group 4
Best-Practice
Toolkit
1.1 Make the Case
1.2 Assess Current State
2.1 Streamline Intake to Control
Stakeholder Expectations
2.2 Factor Resource Capacity when
Approving Projects
2.3 Prioritize Projects to Support
Business Objectives
3.1 Institute Intake Process Change
Guided
Implementations
Scoping Call.
Discuss the results of the current
state assessment and/or PPM
assessment.
Establish an intake workflow and
configure project request for your
organization.
Determine approval scorecard and
define stage gates for approvals
process.
Define a progressive prioritization
framework.
Develop a stakeholder management
plan for the implementation of your
optimized processes.
Prepare a communications document
to help sell the benefits to the
organization and enforce discipline on
stakeholders and staff.
Onsite
Workshop
Module 1:
Assess current intake, approval, and
prioritization capability.
Module 2:
Develop optimized intake, approval, and
prioritization processes.
Module 3:
Implement and communicate new
processes.
Phase 1 Outcome:
• An overview of your intake capability
level current state, target state, and
gap analysis.
Phase 2 Outcome:
• Clearly defined workflow and
customized tools for intake, approval,
and prioritization.
Phase 3 Outcome:
• Define standard operating procedures
and create a communications
document to achieve stakeholder buy-
in.
1. Assess Current State 2. Optimize Processes
3. Communicate
Processes
Optimize project intake, approval, and prioritization—project
overview
Info-Tech Research Group 5Info-Tech Research Group 5
Day 1 Day 2 Day 3 Day 4 Day 5
Preparation Workshop Day Workshop Day Workshop Day Working Session
Workshop Preparation
Define goals and success
criteria.
Finalize agenda.
Gather information: intake
and prioritization artifacts,
project and resource lists,
and a list of items currently
in the backlog.
Morning Itinerary
Assess current state
(including a review of
current intake prioritization
artifacts).
Discuss and analyze
SWOT around intake,
approval, and prioritization.
Afternoon Itinerary
Define target state.
Create an intake charter to
govern your optimization
efforts.
Morning Itinerary
Review and configure
project request form.
Define standards / SOP /
processes for intake.
Afternoon Itinerary
Develop an approval and
prioritization scorecard.
Define standards / SOP /
processes for approval.
Morning Itinerary
Configure prioritization tool.
Define standards / SOP /
processes for prioritization.
Afternoon Itinerary
Prepare communications
template to convey your
new processes to business
stakeholders.
Review best practices for
organizational change
management.
Workshop Debrief
Plan for ongoing evaluation
and improvement.
Next Steps
Pilot new intake and
prioritization processes.
Evaluate and refine
processes as needed.
Workshop overview
This workshop can be deployed as either a four or five day engagement depending on the level of preparation completed by
the client prior to the facilitator arriving onsite.
The light blue slides at the end of each section highlight the key activities and exercises that will be
completed during the engagement with our analyst team.
Contact your account representative or email Workshops@InfoTech.com for more information.
Info-Tech Research Group 6Info-Tech Research Group 6
Phase 1: Assess Current State
Optimize
Processes
Communicate
Processes
Phase 2: Phase 3:
Assess Current State
Phase 1:
Info-Tech Research Group 7Info-Tech Research Group 7
Phase 1 outline
Complete these steps on your own, or call us to complete a guided implementation. A guided implementation is a series of 2-
3 advisory calls that help you execute each phase of a project. They are included in most advisory memberships.
Guided Implementation 1: Assess Current State
Proposed Time to Completion (in weeks): 2 weeks
Step 1.1: Make the Case Step 1.2: Assess Current State
Start with an analyst kick off call:
• Scoping call to discuss pain points and set expectations
and goals for the project.
Review findings with analyst:
• Discuss the results of the diagnostic report and Current
State Assessment.
Then complete these activities…
 Estimate the benefits of optimizing intake, approval, and
prioritization.
 Perform an Estimated Value Assessment.
 Gauge the effort required to implement this blueprint.
Then complete these activities…
 Establish your current and target states for intake and
prioritization.
 Conduct a SWOT analysis.
 Rate your satisfaction with key areas of your intake
processes.
 Define success factors.
With these tools & templates:
Estimated Value Assessment (Activity 1.1.2 within this
blueprint)
With these tools & templates:
SWOT Analysis (Activity 1.2.3 within this blueprint)
Intake Satisfaction Survey (Activity 1.2.4 within this
blueprint)
Define Success Factors (Activity 1.2.6 within this blueprint)
Call 1-888-670-8889 or email GuidedImplementations@InfoTech.com for more information.
Info-Tech Research Group 8Info-Tech Research Group 8
Ensure IT is executing on the right things. Focus on projects that align with business goals and available
resource capacity. With optimized intake, approval, and prioritization you can set the portfolio up for
success by ensuring that you are spending time and resources on the most valuable projects.
Activities in this Step
 Activity 1.1.1: Estimate the benefits of optimizing intake, approval, and prioritization
 Activity 1.1.2: Perform an Estimated Value Assessment for optimizing your intake processes
 Activity 1.1.3: Gauge the effort required to implement this blueprint
Info-Tech Insight
Much of the waste that occurs around delayed and cancelled projects could be eliminated through better
project intake. In this section we define the nomenclature around project intake and demonstrate how
optimized project intake, approval, and prioritization can drive portfolio success.
Outcome
Description
A measured value assessment that will help you establish the benefits of optimized intake and
prioritization for your organization.
Step 1.1: Make the case
Info-Tech Research Group 9Info-Tech Research Group 9
Approval is the process by
which business cases are
evaluated and selected (or
declined) for investment, based
on estimated value and
feasibility. Approvals should be
aligned with business goals and
resource capacity.
All project offices perform intake, approval, and prioritization, whether they have formal
structures in place or not. These processes are the means by which PMO directors
decide what to work on and through which project requestors submit ideas and wait—
patiently or otherwise—for those ideas to be validated.
The benefits of doing intake and prioritization well read like a litmus test of portfolio
success itself: more successful, high-value projects, less portfolio waste and strong
stakeholder relations.
Anyone who has ever waited in an inefficient waiting room will understand the costs of
poor intake: bad decisions, wasted resources, and disgruntled stakeholders.
Prioritize the right projects by streamlining the intake process
Intake is the process by which
project requests are submitted,
received, triaged, and scoped in
preparation for approval and
prioritization. Some business
case development begins in the
intake phase.
Prioritization is the process by
which work is scheduled to
begin, based on relative value,
urgency, and availability of
resources. Prioritization is an
ongoing process for both
approved and active projects.
Key Definitions:
Waiting is frustrating,
demoralizing, agonizing,
aggravating, annoying,
time consuming, and
incredibly expensive.
- 1980’s Federal Express
Advertisement
Source: Maister
Renovate your portfolio’s waiting room to ensure portfolio success.
Info-Tech Research Group 10Info-Tech Research Group 10
Most organizations are good at approving projects, but bad at
starting them—and even worse at finishing them
76%
76% of organizations say they have
too many projects on the go and an
unmanageable and ever-growing
backlog of things to get to.
Most organizations approve more
projects than they can finish. In fact,
many approve more than they can
even start, leading to an ever-growing
backlog where project ideas—often
good ones—are never heard from
again.
The appetite to approve more runs
directly counter to the shortage of
resources that plagues most IT
departments. This tension of wanting
more from less suggests that IT
departments need to be far more
disciplined in choosing what to initiate.
Establishing intake discipline should
be a top priority from a long-term
strategy and near-term tactical
perspective. IT departments that
remain stuck in a near-term
operational perspective will continue
to “approve”—and fool themselves
into thinking they’ve actually started—
too many projects.
Source: Cooper
Establishing intake discipline is easier
said than done. Intake, approval, and
prioritization are multifaceted practices
involving the coordination of various
departments and requiring buy-in and
compliance from multiple stakeholders
and senior executives. Establishing intake
discipline requires a great degree of
cooperation and conformity that must be
cultivated through strong processes.
Further, many PMOs and IT departments
simply lack the ability to decline or defer
new projects, making this as much an
issue of stakeholder management as a
matter of establishing discipline.
Info-Tech Research Group 11Info-Tech Research Group 11
Don’t weigh your portfolio down by starting more than you
can finish
Focus instead on what you can deliver and what will deliver value to the
organization.
80%
80% of organizations feel that
their portfolios are dominated
by low-value initiatives that do
not deliver value to the
business.
Source: Cooper
Most of the problems that arise during the lifecycle of a
project can be traced back to issues that could have been
mitigated and excised during the initiation phase.
More than simply a means of early problem detection at the
project-level, optimizing your initiation processes is also the
best way to ensure the success of your portfolio. With
optimized intake processes you can better guarantee:
• The projects you are working on are of high value
• Your project list aligns with available resource capacity
• Stakeholder needs are addressed, but stakeholders do
not determine the direction of the portfolio
Optimized intake is not about making it easier to request and approve more projects; it’s about improving the
throughput of projects in the portfolio. This is done by making sure that what you are working on provides
value to the business and can be completed in a reasonable timeframe.
(S)uccessful organisations select projects
on the basis of desirability and their
capability to deliver them, not just
desirability.
- John Ward, Delivering Value from Information
Systems and Technology Investments
Info-Tech Research Group 12Info-Tech Research Group 12
Info-Tech Research Group Helps IT Professionals To:
Sign up for free trial membership to get practical
solutions for your IT challenges
 Quickly get up to speed
with new technologies
 Make the right technology
purchasing decisions – fast
 Deliver critical IT
projects, on time and
within budget
 Manage business expectations
 Justify IT spending and
prove the value of IT
 Train IT staff and effectively
manage an IT department

More Related Content

What's hot

100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMOJack Brown
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
PMO Presentation
PMO PresentationPMO Presentation
PMO PresentationTURKI , PMP
 
PMO - Added value instead of administration
PMO - Added value instead of administrationPMO - Added value instead of administration
PMO - Added value instead of administrationAndreas Splett
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
PMP Certification Presentation
PMP Certification PresentationPMP Certification Presentation
PMP Certification PresentationSimplilearn
 
How To Use a Structured Project Intake Process to Improve your Project Portfolio
How To Use a Structured Project Intake Process to Improve your Project PortfolioHow To Use a Structured Project Intake Process to Improve your Project Portfolio
How To Use a Structured Project Intake Process to Improve your Project PortfolioDon Clarke, PMP, CSM, CSP
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOAnthony Natoli
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 

What's hot (20)

AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
AXELOS - P3O® - Portfolio, Programme and Project Offices - FoundationAXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO
 
Intake Process Itpmo
Intake Process ItpmoIntake Process Itpmo
Intake Process Itpmo
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
PMO - Added value instead of administration
PMO - Added value instead of administrationPMO - Added value instead of administration
PMO - Added value instead of administration
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
PMO services
PMO servicesPMO services
PMO services
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
PMP Certification Presentation
PMP Certification PresentationPMP Certification Presentation
PMP Certification Presentation
 
How To Use a Structured Project Intake Process to Improve your Project Portfolio
How To Use a Structured Project Intake Process to Improve your Project PortfolioHow To Use a Structured Project Intake Process to Improve your Project Portfolio
How To Use a Structured Project Intake Process to Improve your Project Portfolio
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
Project management office value
Project management office valueProject management office value
Project management office value
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Project charter-template
Project charter-templateProject charter-template
Project charter-template
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 

Similar to Optimize Project Intake Approval and Prioritization

How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service IntroductionKeith Rackley
 
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptxit-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptxssuserf016f4
 
Info-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationInfo-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationHilary Carney Badoian
 
IT Project Methodologies That Is Used On A Everyday Issues
 IT Project Methodologies That Is Used On A Everyday Issues  IT Project Methodologies That Is Used On A Everyday Issues
IT Project Methodologies That Is Used On A Everyday Issues Jeffery Brown
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Walgreens Boots Alliance, Inc.
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEWSven Krause
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailBarbara Franks
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best PracticesJeff McClay
 
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docxBUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docxhumphrieskalyn
 
Enterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesEnterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesKaali Dass PMP, PhD.
 
Practical Product Management for new Product Managers
Practical Product Management for new Product ManagersPractical Product Management for new Product Managers
Practical Product Management for new Product ManagersAmarpreet Kalkat
 
Project Management Playbook
Project Management PlaybookProject Management Playbook
Project Management PlaybookDemand Metric
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docxDhineshkumarPrakasam
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)flexibleresources
 

Similar to Optimize Project Intake Approval and Prioritization (20)

How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptxit-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
it-Define-and-Deploy-an-Enterprise-PMO-Phase-1-Gather.pptx
 
Info-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationInfo-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop Presentation
 
IT Project Methodologies That Is Used On A Everyday Issues
 IT Project Methodologies That Is Used On A Everyday Issues  IT Project Methodologies That Is Used On A Everyday Issues
IT Project Methodologies That Is Used On A Everyday Issues
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEW
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
 
Create a Winning BPI Playbook
Create a Winning BPI PlaybookCreate a Winning BPI Playbook
Create a Winning BPI Playbook
 
project management essentials
project management essentialsproject management essentials
project management essentials
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docxBUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
 
Enterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesEnterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning Strategies
 
Practical Product Management for new Product Managers
Practical Product Management for new Product ManagersPractical Product Management for new Product Managers
Practical Product Management for new Product Managers
 
Project Management Playbook
Project Management PlaybookProject Management Playbook
Project Management Playbook
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docx
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 

More from Info-Tech Research Group

Select and Implement a Next Generation Endpoint Protection Solution
Select and Implement a Next Generation Endpoint Protection SolutionSelect and Implement a Next Generation Endpoint Protection Solution
Select and Implement a Next Generation Endpoint Protection SolutionInfo-Tech Research Group
 
Master Contract Review and Negotiation For Software Agreements-sample
Master Contract Review and Negotiation For Software Agreements-sampleMaster Contract Review and Negotiation For Software Agreements-sample
Master Contract Review and Negotiation For Software Agreements-sampleInfo-Tech Research Group
 
Improve IT Business Alignment With An Infrastructure Roadmap
Improve IT Business Alignment With An Infrastructure RoadmapImprove IT Business Alignment With An Infrastructure Roadmap
Improve IT Business Alignment With An Infrastructure RoadmapInfo-Tech Research Group
 
Build a Business-Driven IT Risk Management Program
Build a Business-Driven IT Risk Management ProgramBuild a Business-Driven IT Risk Management Program
Build a Business-Driven IT Risk Management ProgramInfo-Tech Research Group
 
Modernize Communications and Collaboration Infrastructure
Modernize Communications and Collaboration InfrastructureModernize Communications and Collaboration Infrastructure
Modernize Communications and Collaboration InfrastructureInfo-Tech Research Group
 
Craft an End-to-End Data Center Consolidation Strategy to Maximize Benefits
Craft an End-to-End Data Center Consolidation Strategy to Maximize BenefitsCraft an End-to-End Data Center Consolidation Strategy to Maximize Benefits
Craft an End-to-End Data Center Consolidation Strategy to Maximize BenefitsInfo-Tech Research Group
 
Develop a Project Portfolio Management Strategy
Develop a Project Portfolio Management StrategyDevelop a Project Portfolio Management Strategy
Develop a Project Portfolio Management StrategyInfo-Tech Research Group
 
Implement an enterprise service bus revised
Implement an enterprise service bus    revisedImplement an enterprise service bus    revised
Implement an enterprise service bus revisedInfo-Tech Research Group
 
Stay on Top of Today’s and Tomorrow’s Mobile App Trends
Stay on Top of Today’s and Tomorrow’s Mobile App TrendsStay on Top of Today’s and Tomorrow’s Mobile App Trends
Stay on Top of Today’s and Tomorrow’s Mobile App TrendsInfo-Tech Research Group
 

More from Info-Tech Research Group (20)

Select and Implement a Next Generation Endpoint Protection Solution
Select and Implement a Next Generation Endpoint Protection SolutionSelect and Implement a Next Generation Endpoint Protection Solution
Select and Implement a Next Generation Endpoint Protection Solution
 
Master Contract Review and Negotiation For Software Agreements-sample
Master Contract Review and Negotiation For Software Agreements-sampleMaster Contract Review and Negotiation For Software Agreements-sample
Master Contract Review and Negotiation For Software Agreements-sample
 
Optimize Change Management
Optimize Change ManagementOptimize Change Management
Optimize Change Management
 
Improve IT Business Alignment With An Infrastructure Roadmap
Improve IT Business Alignment With An Infrastructure RoadmapImprove IT Business Alignment With An Infrastructure Roadmap
Improve IT Business Alignment With An Infrastructure Roadmap
 
Build a Business-Driven IT Risk Management Program
Build a Business-Driven IT Risk Management ProgramBuild a Business-Driven IT Risk Management Program
Build a Business-Driven IT Risk Management Program
 
Standardize the Service Desk
Standardize the Service DeskStandardize the Service Desk
Standardize the Service Desk
 
Modernize Communications and Collaboration Infrastructure
Modernize Communications and Collaboration InfrastructureModernize Communications and Collaboration Infrastructure
Modernize Communications and Collaboration Infrastructure
 
Optimize the IT Operating Model
Optimize the IT Operating ModelOptimize the IT Operating Model
Optimize the IT Operating Model
 
Info-Tech Membership Overview
Info-Tech Membership OverviewInfo-Tech Membership Overview
Info-Tech Membership Overview
 
Define an EA Operating Model
Define an EA Operating ModelDefine an EA Operating Model
Define an EA Operating Model
 
Become a Transformational CIO
Become a Transformational CIOBecome a Transformational CIO
Become a Transformational CIO
 
Craft an End-to-End Data Center Consolidation Strategy to Maximize Benefits
Craft an End-to-End Data Center Consolidation Strategy to Maximize BenefitsCraft an End-to-End Data Center Consolidation Strategy to Maximize Benefits
Craft an End-to-End Data Center Consolidation Strategy to Maximize Benefits
 
Build and Information Security Strategy
Build and Information Security StrategyBuild and Information Security Strategy
Build and Information Security Strategy
 
Build an Application Integration Strategy
Build an Application Integration StrategyBuild an Application Integration Strategy
Build an Application Integration Strategy
 
Develop a Project Portfolio Management Strategy
Develop a Project Portfolio Management StrategyDevelop a Project Portfolio Management Strategy
Develop a Project Portfolio Management Strategy
 
Implement an enterprise service bus revised
Implement an enterprise service bus    revisedImplement an enterprise service bus    revised
Implement an enterprise service bus revised
 
Implement a Shared Services Model
Implement a Shared Services ModelImplement a Shared Services Model
Implement a Shared Services Model
 
Assess and Optimize EA Capability
Assess and Optimize EA CapabilityAssess and Optimize EA Capability
Assess and Optimize EA Capability
 
Survive an Impending Audit
Survive an Impending AuditSurvive an Impending Audit
Survive an Impending Audit
 
Stay on Top of Today’s and Tomorrow’s Mobile App Trends
Stay on Top of Today’s and Tomorrow’s Mobile App TrendsStay on Top of Today’s and Tomorrow’s Mobile App Trends
Stay on Top of Today’s and Tomorrow’s Mobile App Trends
 

Recently uploaded

JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformLess Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformWSO2
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseWSO2
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Recently uploaded (20)

Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformLess Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Optimize Project Intake Approval and Prioritization

  • 1. Info-Tech Research Group 1Info-Tech Research Group 1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine actionable insight and relevant advice with ready-to-use tools and templates that cover the full spectrum of IT concerns. © 1997-2015 Info-Tech Research Group Inc. Optimize Project Intake, Approval, and Prioritization Give yourself the voice to say “no” (or “not yet”) to new projects. Info-Tech's products and services combine actionable insight and relevant advice with ready-to-use tools and templates that cover the full spectrum of IT concerns.© 1997 - 2015 Info-Tech Research Group
  • 2. Info-Tech Research Group 2Info-Tech Research Group 2 This Research is Designed For: This Research Will Help You: This Research Will Assist: This Research Will Help You: This Research Is Designed For: This Research Will Help You: This Research Will Also Assist: This Research Will Help Them: Our understanding of the problem Portfolio managers or PMO directors who have trouble driving the throughput of the highest-value projects in the portfolio. CIOs who want to defend their project portfolios from the malinvestment of resources. Reduce or eliminate portfolio waste Align project intake and prioritization with resource capacity Balance proactive (high value) and reactive (high urgency) demand Manage and influence stakeholders more successfully Product owners, steering committee members, or other senior executives who want to become more involved in intake, approval, and prioritization processes. Understand IT processes and capabilities and set more realistic expectations for their project requests.
  • 3. Info-Tech Research Group 3Info-Tech Research Group 3 Executive Summary • As a portfolio manager, you do not have the authority to decline or defer new projects—but you also lack the capacity to realistically say yes to more project work. • With your staff constantly being pulled into reactionary support roles, you not only have trouble completing all the projects currently underway, but you also have trouble starting any of the projects in your ever-growing backlog. Give yourself the voice to say “no” (or at least “not yet”) to new projects by aligning intake, approval, and prioritization with the defining constraints of strategic objectives, portfolio capacity, and stakeholder needs. With intake processes geared toward these ends, you can ensure that the PMO is always driving the throughput of the highest-value projects in the portfolio and that the business side has visibility into IT’s capacity and processes. • Building a centralized process that funnels requests into a single intake channel, and that eliminates confusion and doubt for stakeholders and staff, is the first step to defending your portfolio against off-the-grid initiatives. • Developing practices that incorporate the constraint of resource capacity to cap the amount of project approvals to that which is realistic will help improve the throughput of projects through the portfolio. • Establish an effective scorecard to create transparency into IT’s capacity and processes. This will help set realistic expectations for stakeholders, eliminate “squeaky wheel” prioritization, and give primacy to the highest value requests. Situation Info-Tech Insight Complication Resolution • Stakeholders have unrealistic expectations of what IT can deliver. Too many projects are approved, yet no one understands why their project is delayed or in a state of suspended animation. • Ad hoc or “off the grid” projects frequently circumvent the formal intake processes that you have in place, robbing your already in-flight projects of precious resources and threatening your portfolio’s strategic alignment with business goals.
  • 4. Info-Tech Research Group 4Info-Tech Research Group 4 Best-Practice Toolkit 1.1 Make the Case 1.2 Assess Current State 2.1 Streamline Intake to Control Stakeholder Expectations 2.2 Factor Resource Capacity when Approving Projects 2.3 Prioritize Projects to Support Business Objectives 3.1 Institute Intake Process Change Guided Implementations Scoping Call. Discuss the results of the current state assessment and/or PPM assessment. Establish an intake workflow and configure project request for your organization. Determine approval scorecard and define stage gates for approvals process. Define a progressive prioritization framework. Develop a stakeholder management plan for the implementation of your optimized processes. Prepare a communications document to help sell the benefits to the organization and enforce discipline on stakeholders and staff. Onsite Workshop Module 1: Assess current intake, approval, and prioritization capability. Module 2: Develop optimized intake, approval, and prioritization processes. Module 3: Implement and communicate new processes. Phase 1 Outcome: • An overview of your intake capability level current state, target state, and gap analysis. Phase 2 Outcome: • Clearly defined workflow and customized tools for intake, approval, and prioritization. Phase 3 Outcome: • Define standard operating procedures and create a communications document to achieve stakeholder buy- in. 1. Assess Current State 2. Optimize Processes 3. Communicate Processes Optimize project intake, approval, and prioritization—project overview
  • 5. Info-Tech Research Group 5Info-Tech Research Group 5 Day 1 Day 2 Day 3 Day 4 Day 5 Preparation Workshop Day Workshop Day Workshop Day Working Session Workshop Preparation Define goals and success criteria. Finalize agenda. Gather information: intake and prioritization artifacts, project and resource lists, and a list of items currently in the backlog. Morning Itinerary Assess current state (including a review of current intake prioritization artifacts). Discuss and analyze SWOT around intake, approval, and prioritization. Afternoon Itinerary Define target state. Create an intake charter to govern your optimization efforts. Morning Itinerary Review and configure project request form. Define standards / SOP / processes for intake. Afternoon Itinerary Develop an approval and prioritization scorecard. Define standards / SOP / processes for approval. Morning Itinerary Configure prioritization tool. Define standards / SOP / processes for prioritization. Afternoon Itinerary Prepare communications template to convey your new processes to business stakeholders. Review best practices for organizational change management. Workshop Debrief Plan for ongoing evaluation and improvement. Next Steps Pilot new intake and prioritization processes. Evaluate and refine processes as needed. Workshop overview This workshop can be deployed as either a four or five day engagement depending on the level of preparation completed by the client prior to the facilitator arriving onsite. The light blue slides at the end of each section highlight the key activities and exercises that will be completed during the engagement with our analyst team. Contact your account representative or email Workshops@InfoTech.com for more information.
  • 6. Info-Tech Research Group 6Info-Tech Research Group 6 Phase 1: Assess Current State Optimize Processes Communicate Processes Phase 2: Phase 3: Assess Current State Phase 1:
  • 7. Info-Tech Research Group 7Info-Tech Research Group 7 Phase 1 outline Complete these steps on your own, or call us to complete a guided implementation. A guided implementation is a series of 2- 3 advisory calls that help you execute each phase of a project. They are included in most advisory memberships. Guided Implementation 1: Assess Current State Proposed Time to Completion (in weeks): 2 weeks Step 1.1: Make the Case Step 1.2: Assess Current State Start with an analyst kick off call: • Scoping call to discuss pain points and set expectations and goals for the project. Review findings with analyst: • Discuss the results of the diagnostic report and Current State Assessment. Then complete these activities…  Estimate the benefits of optimizing intake, approval, and prioritization.  Perform an Estimated Value Assessment.  Gauge the effort required to implement this blueprint. Then complete these activities…  Establish your current and target states for intake and prioritization.  Conduct a SWOT analysis.  Rate your satisfaction with key areas of your intake processes.  Define success factors. With these tools & templates: Estimated Value Assessment (Activity 1.1.2 within this blueprint) With these tools & templates: SWOT Analysis (Activity 1.2.3 within this blueprint) Intake Satisfaction Survey (Activity 1.2.4 within this blueprint) Define Success Factors (Activity 1.2.6 within this blueprint) Call 1-888-670-8889 or email GuidedImplementations@InfoTech.com for more information.
  • 8. Info-Tech Research Group 8Info-Tech Research Group 8 Ensure IT is executing on the right things. Focus on projects that align with business goals and available resource capacity. With optimized intake, approval, and prioritization you can set the portfolio up for success by ensuring that you are spending time and resources on the most valuable projects. Activities in this Step  Activity 1.1.1: Estimate the benefits of optimizing intake, approval, and prioritization  Activity 1.1.2: Perform an Estimated Value Assessment for optimizing your intake processes  Activity 1.1.3: Gauge the effort required to implement this blueprint Info-Tech Insight Much of the waste that occurs around delayed and cancelled projects could be eliminated through better project intake. In this section we define the nomenclature around project intake and demonstrate how optimized project intake, approval, and prioritization can drive portfolio success. Outcome Description A measured value assessment that will help you establish the benefits of optimized intake and prioritization for your organization. Step 1.1: Make the case
  • 9. Info-Tech Research Group 9Info-Tech Research Group 9 Approval is the process by which business cases are evaluated and selected (or declined) for investment, based on estimated value and feasibility. Approvals should be aligned with business goals and resource capacity. All project offices perform intake, approval, and prioritization, whether they have formal structures in place or not. These processes are the means by which PMO directors decide what to work on and through which project requestors submit ideas and wait— patiently or otherwise—for those ideas to be validated. The benefits of doing intake and prioritization well read like a litmus test of portfolio success itself: more successful, high-value projects, less portfolio waste and strong stakeholder relations. Anyone who has ever waited in an inefficient waiting room will understand the costs of poor intake: bad decisions, wasted resources, and disgruntled stakeholders. Prioritize the right projects by streamlining the intake process Intake is the process by which project requests are submitted, received, triaged, and scoped in preparation for approval and prioritization. Some business case development begins in the intake phase. Prioritization is the process by which work is scheduled to begin, based on relative value, urgency, and availability of resources. Prioritization is an ongoing process for both approved and active projects. Key Definitions: Waiting is frustrating, demoralizing, agonizing, aggravating, annoying, time consuming, and incredibly expensive. - 1980’s Federal Express Advertisement Source: Maister Renovate your portfolio’s waiting room to ensure portfolio success.
  • 10. Info-Tech Research Group 10Info-Tech Research Group 10 Most organizations are good at approving projects, but bad at starting them—and even worse at finishing them 76% 76% of organizations say they have too many projects on the go and an unmanageable and ever-growing backlog of things to get to. Most organizations approve more projects than they can finish. In fact, many approve more than they can even start, leading to an ever-growing backlog where project ideas—often good ones—are never heard from again. The appetite to approve more runs directly counter to the shortage of resources that plagues most IT departments. This tension of wanting more from less suggests that IT departments need to be far more disciplined in choosing what to initiate. Establishing intake discipline should be a top priority from a long-term strategy and near-term tactical perspective. IT departments that remain stuck in a near-term operational perspective will continue to “approve”—and fool themselves into thinking they’ve actually started— too many projects. Source: Cooper Establishing intake discipline is easier said than done. Intake, approval, and prioritization are multifaceted practices involving the coordination of various departments and requiring buy-in and compliance from multiple stakeholders and senior executives. Establishing intake discipline requires a great degree of cooperation and conformity that must be cultivated through strong processes. Further, many PMOs and IT departments simply lack the ability to decline or defer new projects, making this as much an issue of stakeholder management as a matter of establishing discipline.
  • 11. Info-Tech Research Group 11Info-Tech Research Group 11 Don’t weigh your portfolio down by starting more than you can finish Focus instead on what you can deliver and what will deliver value to the organization. 80% 80% of organizations feel that their portfolios are dominated by low-value initiatives that do not deliver value to the business. Source: Cooper Most of the problems that arise during the lifecycle of a project can be traced back to issues that could have been mitigated and excised during the initiation phase. More than simply a means of early problem detection at the project-level, optimizing your initiation processes is also the best way to ensure the success of your portfolio. With optimized intake processes you can better guarantee: • The projects you are working on are of high value • Your project list aligns with available resource capacity • Stakeholder needs are addressed, but stakeholders do not determine the direction of the portfolio Optimized intake is not about making it easier to request and approve more projects; it’s about improving the throughput of projects in the portfolio. This is done by making sure that what you are working on provides value to the business and can be completed in a reasonable timeframe. (S)uccessful organisations select projects on the basis of desirability and their capability to deliver them, not just desirability. - John Ward, Delivering Value from Information Systems and Technology Investments
  • 12. Info-Tech Research Group 12Info-Tech Research Group 12 Info-Tech Research Group Helps IT Professionals To: Sign up for free trial membership to get practical solutions for your IT challenges  Quickly get up to speed with new technologies  Make the right technology purchasing decisions – fast  Deliver critical IT projects, on time and within budget  Manage business expectations  Justify IT spending and prove the value of IT  Train IT staff and effectively manage an IT department