Study Process Flow Chart
Tier 3
Detailed Evaluation
of Alternatives
Define No-Build
Alternatives
(current year &
horizon year)
Detailed
Alternatives
Screening Methodology &
Evaluation Criteria
Public Involvement and
Agency Coordination
Goals and
Objectives
Detailed Evaluation
Methodology
(FTA rating criteria)
Needs
Define Detailed
Build Alternatives
Identify Long List of
Multi-Modal
Alternatives
Conceptual
Alternatives
Tier 1 & Tier 2
Screening Steps
Locally Preferred
Alternative
Alternatives Analysis Study Process
Fatal Flaw Analysis – Tier 1 Screening
Establish Universe (Long List) of Alternatives
Apply Purpose and Need Test and Market Assessment (transit mode)
Reasonable Test #1 and Test #2
Fatal Flaw Results (Tier 1 Results)
Public Open House Meeting – November 2014
Conceptual Analysis – Tier 2 Screening
Identify Alternatives that Advance to Tier 2
Provide High Level Conceptual Engineering and Apply Evaluation
Criteria to Screen Alternatives
Conceptual Analysis (Tier 2) Results
Public Open House Meeting
Detailed Analysis – Tier 3 Screening
Identify Reasonable Range of Alternatives that Advance to Detailed
Level Analysis
Conduct Detailed Definition of Alternatives
Apply Evaluation Criteria to Alternatives
Alternatives Analysis Results (Tier 3 Results)
Public Open House Meeting – Fall 2015
Recommendation of a Locally Preferred Alternative
Step 1
Step 2
Step 3
Step 4
Step 5
Fall2014Winter2014–Spring
2015
Summer2015–Winter
2015
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 1
Step 2
Step 3
Step 4 We Are Here
Draft Purpose and Need
Purpose
• Provide a fast, reliable, safe, and convenient
transit ride in the Amherst-Buffalo corridor
• Link activity centers
• Support planned regional economic
development
Need
• Expanded transit service is needed to serve:
» Ongoing development and redevelopment
» Existing and new activity centers
» Transit-dependent populations in the study
area
Study Area
• Conventional buses or special BRT
vehicles
• Interior (seats, doors) for:
» Efficient boarding, alighting
» Easy internal
circulation
• Permanent, weather
protected
• Passenger information, amenities
• Secure, well-lit
• Convey system identity with branding
Stations & Terminals
• Variety of sizes, floor heights
Priority Bus Lanes
• Operate in a broad
variety of physical and
operating environments
• Vehicles receive priority to move
faster than general traffic
• Critical design parameters:
» Safely supports rapid, reliable
service, enforcement
» System identity
Systems
• Passenger information
• Off-board, advanced fare
collection
• Traffic signal prioritization
• Automatic Vehicle
Location
Vehicles
What is Bus Rapid Transit (BRT)?
What is Light Rail Transit? (LRT)
• Buffalo’s Metro Rail is an example of LRT
• Can operate on streets or dedicated Right-of-Way
• Can have raised platforms or street-level boarding
of passengers
• High passenger capacity
• Increased reliability
Buffalo, NY NFTA Metro LRT
Long List of LRT Alternatives
Proposed LRT Alternatives Advancing to Tier 2
Niagara Falls Blvd. Bailey Avenue Millersport Highway
Long List of BRT Alternatives
Proposed BRT Alternatives Advancing to Tier 2
Niagara Falls Blvd. Bailey Avenue Millersport Highway
Preferential and Enhanced Bus Alternatives
to be Evaluated in Tier 3
Preferential Bus Alternative Enhanced Bus Alternative
Tier 2 Screening Criteria
SUPPORT FOR
TOD
Consistency with local and
regional plans and strategies
Number of stations with
transit supportive zoning -
total of high and medium
stations
SYSTEM
CONNECTIVITY
Connecting NFTA bus routes
Number of park and
recreation areas served
ENGINEERING/
RIGHT-OF-WAY
NEEDS
Percent mixed traffic
operations
Percent signalized intersec-
tions of total intersections
Private land area affected
by guideway (acres)
ENVIRONMENTAL/
COMMUNITY
IMPACTS
Impacts to parks, recreation,
open space (acres)
Impacts to water resources
Floodplains (acres)
Wetlands (acres)
Streams (feet)
Number of properties
affected
RIDERSHIP/
MARKET
2035 total project boardings
(avg. weekday)
Travel time between UB
campuses (UB South,
University Station- UB
North, Greiner Hall)
minimum
Travel time between UB
campuses (Downtown, Allen
Station - UB North, Greiner
Hall) minimum
2035 projected park & ride
patrons
2035 total boardings by
zero car households
(avg. weekday)
Commercial/retail area
served (sf)
1/2 mi station radius
Typical Cross-Sections: Side Platform LRT Station Options
Draft Works in Progress - For Discussion Purposes Only
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
StaggeredSide
PlatformStation
StaggeredSide
PlatformStation
StaggeredSide
PlatformStation
StaggeredSide
PlatformStation
Section 1 Section 2
Section 3 Section 4
Typical Cross-Sections: Center & Tunnel LRT Station Options
Draft Works in Progress - For Discussion Purposes Only
TunnelNo
Station
Section 5 Section 6
Section 7 Section 8
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
CenterPlatform
Station
CenterPlatform
Station
TunnelSide
PlatformStation
Typical Cross-Sections: BRT Options
Draft Works in Progress - For Discussion Purposes Only
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
ExistingStreet
Section
MixedTraffic
Operation
Dedicated
Outside
Lane
Dedicated
InsideLane
Dedicated
Outside
Lane
Section 1 Section 2
Section 3 Section 4
Tier 2 Screening Results Matrix
Flood-
plains
(acres)
Wet-lands
(acres)
Streams
(feet)
Niagara Falls Blvd LRT 1 (via Bailey, Eggert,
Niagara Falls Blvd, Maple and I-990) 10.2 11.0 0% 44% 24,000 14,700 16 26 343 821 6 16 6 12 13.8 1.3 419.0 0.0 211
Nia ga ra Fa ll s Blvd LRT 2 (via Ba il e y,
Egge rt, Nia ga ra Fa ll s Blvd, Ma ple , John
Ja me s Audubon Pa rkwa y a nd Mille rs port) 9.6 11.2 0% 39% 23,200 14,700 16 26 178 786 5 14 6 10 21.1 1.4 495.9 0.0 254
Nia ga ra Fa ll s Blvd LRT 7 (via Ba il e y,
Egge rt, Nia ga ra Fa ll s Blvd, Me ye r Rd,
unde r I-290, I-990) 10.2 10.7 0% 39% 24,100 14,700 15 25 357 860 5 17 6 12 11.7 0.8 398.8 0.1 244
Ba il e y Ave LRT 1 (via Ba il e y, Ma ple , I-990) 9.3 7.0 0% 43% 23,500 14,600 15 25 556 825 6 16 6 12 11.0 0.7 385.8 0.0 189
Ba il e y Ave LRT 2 (via Ba il e y, Ma ple , John
Ja me s Audubon Pa rkwa y a nd Mille rs port) 8.7 8.3 0% 36% 22,800 14,100 15 25 407 790 5 13 6 10 20.4 1.4 462.8 0.0 232
Mille rs port Hwy LRT 1 (via Ba il e y, Grove r
Cle ve la nd, Mille rs port, Flint, John Ja me s
Audubon Pa rkwa y, Mille rs port) 8.2 4.7 0% 28% 22,900 13,500 13 23 976 398 7 8 5 7 21.2 1.5 629.4 0.0 194
Niagara Falls Blvd BRT 1 (via Niagara Falls
Blvd, Maple, I-990) 11.5 25.7 17% 35% 21,100 13,800 30 40 132 961 5 17 4 17 15.3 2.2 782.1 0.4 305
Nia ga ra Fa ll s Blvd BRT 2 (via Nia ga ra
Fa ll s Blvd, Ma ple , John Ja me s Audubon
Pa rkwa y, Mille rs port) 10.9 25.8 19% 33% 20,800 13,600 34 44 167 958 5 17 6 16 21.3 1.9 854.3 0.4 366
Bailey Ave BRT 1 (via Bailey, Maple, I-990) 9.8 7.4 27% 39% 20,400 13,300 23 33 135 846 5 23 4 14 15.6 1.9 559.8 0.0 207
Ba il e y Ave BRT 2 (via Ba il e y, Ma ple , John
Ja me s Audubon Pa rkwa y, Mille rs port) 9.0 6.8 30% 36% 20,400 12,900 23 33 266 844 5 23 6 13 21.3 1.5 632.1 0.0 262
Millersport Hwy BRT 1 (via Bailey, Grover
Cleveland, Millersport, Flint, John James
Audubon Parkway, Millersport) 8.5 4.1 35% 35% 17,800 11,500 18 28 251 432 7 21 5 8 21.2 1.5 564.0 0.0 201
# OF PROPERTIES
AFFECTED
Projected Park-
and-Ride
Patrons, 2035
LENGTH OF
ALT (miles)
Percent Mixed
Traffic
Operations
ENGINEERING / RIGHT OF W AY NEEDS
ALTERNATIVE
PRIVATE LAND
AREA AFFECTED
BY GUIDEWAY
(acres)
2035 Total
Project Boardings
(Average
Weekday)
# OF STATIONS WITH
TRANSIT SUPPORTIVE
ZONING - 1/2 mile
station radius - total
of high and medium
stations
Percent Signalized
Intersections of
Total Intersections
Travel Time
between UB
Campuses (UB
South,
University
Station- UB
Car HH (Average North, Greiner
Weekday) Hall), min.
IMPACTS TO PARKS
/ RECREATION /
OPEN SPACE (acres)
BUSRAPID
TRANSIT
Travel Time
between UB
Campuses
(Downtown,
Allen Station -
UB North,
Greiner Hall),
min.
LIGHT
RAIL
2035 Total
Boardings by 0
COMMERCIAL /
RETAIL AREA # OF PARK AND
SERVED (acres) - 1/2 RECREATION AREAS CONNECTING NFTA
mile station radius SERVED BUS ROUTES
Consistency with
local and regional
plans and
strategies
SUPPORT FOR TOD ENVIRONMENTAL / COMMUNITY IMPACTS
IMPACTS TO WATER RESOURCES
RIDERSHIP / MARKET SYSTEM CONNECTIVITYDESCRIPTIVE
Niagara Falls Blvd. LRT Alternatives 1 & 2
Niagara Falls Blvd. LRT Alternative 7
Bailey Avenue LRT Alternatives 1 & 2
and Millersport Highway LRT Alternative 1
Niagara Falls Blvd. BRT Alternatives 1 & 2
Bailey Avenue BRT Alternatives 1 & 2
and Millersport Highway BRT Alternative 1
University at Buffalo North Campus
LRT BRT
Millersport Alternatives for
UB North Campus
Next Steps
• Reach Consensus on Alternatives Advancing
to Tier 3
• Refine Alternatives (cross-section/ROW need,
possible truncation/MOS, station locations, etc.)
• Develop Analysis for Tier 3 Alternatives
• Identify Locally Preferred Alternative (LPA)
• Hold Committee and Public Open House
Meeting on LPA
» Tentatively October 2015
• LPA moves to the next project phase
» Federal and State environmental review
» Preliminary and final engineering
» Construction
What do you like? What would you change?
Remaining Study Schedule
June 2015 Jul 2015 Aug 2015 Sep 2015 Oct 2015 Nov 2015 Dec 2015 Jan 2015
Tier 2 Decisions
Tier 3 Process
Refine Evaluation
Criteria
Define
Alternatives
Conduct
Evaluation
Develop Life Cycle
Costs/Financial Info
LPA Selection Process
Project Steering
Committee Meeting
Project Advisory
Committee Meeting
Public Open House
Meeting
Proposed Alternatives Advancing to Tier 3
• LRT
» Niagara Falls Boulevard 1
• BRT
» Niagara Falls Boulevard 1
» Bailey Avenue 1
» Millersport Highway 1

More Related Content

What's hot

Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
Toronto Public Consultation Unit
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
Toronto Public Consultation Unit
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
Toronto Public Consultation Unit
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment Study
StittsvilleCentral.ca
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
Toronto Public Consultation Unit
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
Toronto Public Consultation Unit
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
Toronto Public Consultation Unit
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
Toronto Public Consultation Unit
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
Toronto Public Consultation Unit
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
Toronto Public Consultation Unit
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
Toronto Public Consultation Unit
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
Toronto Public Consultation Unit
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
StittsvilleCentral.ca
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Toronto Public Consultation Unit
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
City of Toronto - Relief Line Project Assessment
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Toronto Public Consultation Unit
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
Miami-Dade Transportation Planning Organization
 

What's hot (20)

Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment Study
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Scarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation PlanScarborough Subway Extension - Draft Public Consultation Plan
Scarborough Subway Extension - Draft Public Consultation Plan
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 

Viewers also liked

Employer Presentation
Employer Presentation Employer Presentation
Employer Presentation
skampic
 
Template Hack&Fly Amsterdam
Template Hack&Fly AmsterdamTemplate Hack&Fly Amsterdam
Template Hack&Fly Amsterdam
Miguel van Bodegom
 
VIRAL MARKETING
VIRAL MARKETINGVIRAL MARKETING
VIRAL MARKETING
asenju
 
Night Dress For Women Sex
Night Dress For Women SexNight Dress For Women Sex
Night Dress For Women Sex
Lavanya's Trendzs
 
2016 SWFL Highschool fFootball Game of the Week
2016 SWFL Highschool fFootball Game of the Week2016 SWFL Highschool fFootball Game of the Week
2016 SWFL Highschool fFootball Game of the Week
Joe Skladany
 
Governor’s ball project FINAL
Governor’s ball project FINALGovernor’s ball project FINAL
Governor’s ball project FINAL
Kyle Robinson
 
Redvolucion
RedvolucionRedvolucion
Shilpa_Ranganathan_-_Resume
Shilpa_Ranganathan_-_ResumeShilpa_Ranganathan_-_Resume
Shilpa_Ranganathan_-_Resume
Shilpa R
 
CV - Marcio_ingles detalhado- v9s
CV - Marcio_ingles detalhado- v9sCV - Marcio_ingles detalhado- v9s
CV - Marcio_ingles detalhado- v9s
Marcio Barbosa
 
Artese - Social network e sanzioni disciplinari
Artese - Social network e sanzioni disciplinariArtese - Social network e sanzioni disciplinari
Artese - Social network e sanzioni disciplinari
Edoardo E. Artese
 
CVธนภัทร 1Thanaphat -CHEVRON
CVธนภัทร 1Thanaphat -CHEVRONCVธนภัทร 1Thanaphat -CHEVRON
CVธนภัทร 1Thanaphat -CHEVRON
Thanaphat Sathaworn sathaworn
 
researchpaper-complete
researchpaper-completeresearchpaper-complete
researchpaper-complete
Anna Bennett
 
Employment Schedule Changes to salary
Employment Schedule Changes to salaryEmployment Schedule Changes to salary
Employment Schedule Changes to salaryMark Jones
 
Xenon Lights Manufacturer in India
Xenon Lights Manufacturer in IndiaXenon Lights Manufacturer in India
Xenon Lights Manufacturer in India
Wiptech Peripherals
 

Viewers also liked (14)

Employer Presentation
Employer Presentation Employer Presentation
Employer Presentation
 
Template Hack&Fly Amsterdam
Template Hack&Fly AmsterdamTemplate Hack&Fly Amsterdam
Template Hack&Fly Amsterdam
 
VIRAL MARKETING
VIRAL MARKETINGVIRAL MARKETING
VIRAL MARKETING
 
Night Dress For Women Sex
Night Dress For Women SexNight Dress For Women Sex
Night Dress For Women Sex
 
2016 SWFL Highschool fFootball Game of the Week
2016 SWFL Highschool fFootball Game of the Week2016 SWFL Highschool fFootball Game of the Week
2016 SWFL Highschool fFootball Game of the Week
 
Governor’s ball project FINAL
Governor’s ball project FINALGovernor’s ball project FINAL
Governor’s ball project FINAL
 
Redvolucion
RedvolucionRedvolucion
Redvolucion
 
Shilpa_Ranganathan_-_Resume
Shilpa_Ranganathan_-_ResumeShilpa_Ranganathan_-_Resume
Shilpa_Ranganathan_-_Resume
 
CV - Marcio_ingles detalhado- v9s
CV - Marcio_ingles detalhado- v9sCV - Marcio_ingles detalhado- v9s
CV - Marcio_ingles detalhado- v9s
 
Artese - Social network e sanzioni disciplinari
Artese - Social network e sanzioni disciplinariArtese - Social network e sanzioni disciplinari
Artese - Social network e sanzioni disciplinari
 
CVธนภัทร 1Thanaphat -CHEVRON
CVธนภัทร 1Thanaphat -CHEVRONCVธนภัทร 1Thanaphat -CHEVRON
CVธนภัทร 1Thanaphat -CHEVRON
 
researchpaper-complete
researchpaper-completeresearchpaper-complete
researchpaper-complete
 
Employment Schedule Changes to salary
Employment Schedule Changes to salaryEmployment Schedule Changes to salary
Employment Schedule Changes to salary
 
Xenon Lights Manufacturer in India
Xenon Lights Manufacturer in IndiaXenon Lights Manufacturer in India
Xenon Lights Manufacturer in India
 

Similar to Open houseboards

Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
peggydrouet
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobility
guest7106fd
 
Sustainable Tulsa 8-1-2013
Sustainable Tulsa 8-1-2013Sustainable Tulsa 8-1-2013
Sustainable Tulsa 8-1-2013
rtspincog
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
Toronto Public Consultation Unit
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
South Fraser Blog
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Fairfax County
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Toronto Public Consultation Unit
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Nathan Baker
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
absnakcac
 
GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15
Greater Bridgeport Transit
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
SCVTA
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
jgabateman
 
LO5: Simulation of transit signal priority strategies for brt operations
LO5: Simulation of transit signal priority strategies for brt operationsLO5: Simulation of transit signal priority strategies for brt operations
LO5: Simulation of transit signal priority strategies for brt operations
BRTCoE
 
BPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual MeetingBPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual Meeting
Miami-Dade Transportation Planning Organization
 
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two ImplementationTraffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
JumpingJaq
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019
Steven Simms
 
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Fairfax County
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
Miami-Dade Transportation Planning Organization
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
Barry Scott
 
Review network modeling
Review network modelingReview network modeling
Review network modeling
Harun Al-Rasyid Lubis
 

Similar to Open houseboards (20)

Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobility
 
Sustainable Tulsa 8-1-2013
Sustainable Tulsa 8-1-2013Sustainable Tulsa 8-1-2013
Sustainable Tulsa 8-1-2013
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
 
GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
 
LO5: Simulation of transit signal priority strategies for brt operations
LO5: Simulation of transit signal priority strategies for brt operationsLO5: Simulation of transit signal priority strategies for brt operations
LO5: Simulation of transit signal priority strategies for brt operations
 
BPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual MeetingBPAC April 21, 2020 Virtual Meeting
BPAC April 21, 2020 Virtual Meeting
 
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two ImplementationTraffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019
 
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
Reston Network Analysis - Existing Conditions - Stakeholders Meeting: Nov. 20...
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
Review network modeling
Review network modelingReview network modeling
Review network modeling
 

Open houseboards

  • 1. WELCOME Amherst - Buffalo Transit Options Public Open House Meeting Sponsored by Niagara Frontier Transportation Authority Greater Buffalo Niagara Regional Transportation Council
  • 2. Where do you work? Where do you live? Indicate with green dot Indicate with red dot
  • 3. Study Process Flow Chart Tier 3 Detailed Evaluation of Alternatives Define No-Build Alternatives (current year & horizon year) Detailed Alternatives Screening Methodology & Evaluation Criteria Public Involvement and Agency Coordination Goals and Objectives Detailed Evaluation Methodology (FTA rating criteria) Needs Define Detailed Build Alternatives Identify Long List of Multi-Modal Alternatives Conceptual Alternatives Tier 1 & Tier 2 Screening Steps Locally Preferred Alternative
  • 4. Alternatives Analysis Study Process Fatal Flaw Analysis – Tier 1 Screening Establish Universe (Long List) of Alternatives Apply Purpose and Need Test and Market Assessment (transit mode) Reasonable Test #1 and Test #2 Fatal Flaw Results (Tier 1 Results) Public Open House Meeting – November 2014 Conceptual Analysis – Tier 2 Screening Identify Alternatives that Advance to Tier 2 Provide High Level Conceptual Engineering and Apply Evaluation Criteria to Screen Alternatives Conceptual Analysis (Tier 2) Results Public Open House Meeting Detailed Analysis – Tier 3 Screening Identify Reasonable Range of Alternatives that Advance to Detailed Level Analysis Conduct Detailed Definition of Alternatives Apply Evaluation Criteria to Alternatives Alternatives Analysis Results (Tier 3 Results) Public Open House Meeting – Fall 2015 Recommendation of a Locally Preferred Alternative Step 1 Step 2 Step 3 Step 4 Step 5 Fall2014Winter2014–Spring 2015 Summer2015–Winter 2015 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 1 Step 2 Step 3 Step 4 We Are Here
  • 5. Draft Purpose and Need Purpose • Provide a fast, reliable, safe, and convenient transit ride in the Amherst-Buffalo corridor • Link activity centers • Support planned regional economic development Need • Expanded transit service is needed to serve: » Ongoing development and redevelopment » Existing and new activity centers » Transit-dependent populations in the study area
  • 7. • Conventional buses or special BRT vehicles • Interior (seats, doors) for: » Efficient boarding, alighting » Easy internal circulation • Permanent, weather protected • Passenger information, amenities • Secure, well-lit • Convey system identity with branding Stations & Terminals • Variety of sizes, floor heights Priority Bus Lanes • Operate in a broad variety of physical and operating environments • Vehicles receive priority to move faster than general traffic • Critical design parameters: » Safely supports rapid, reliable service, enforcement » System identity Systems • Passenger information • Off-board, advanced fare collection • Traffic signal prioritization • Automatic Vehicle Location Vehicles What is Bus Rapid Transit (BRT)?
  • 8. What is Light Rail Transit? (LRT) • Buffalo’s Metro Rail is an example of LRT • Can operate on streets or dedicated Right-of-Way • Can have raised platforms or street-level boarding of passengers • High passenger capacity • Increased reliability Buffalo, NY NFTA Metro LRT
  • 9. Long List of LRT Alternatives
  • 10. Proposed LRT Alternatives Advancing to Tier 2 Niagara Falls Blvd. Bailey Avenue Millersport Highway
  • 11. Long List of BRT Alternatives
  • 12. Proposed BRT Alternatives Advancing to Tier 2 Niagara Falls Blvd. Bailey Avenue Millersport Highway
  • 13. Preferential and Enhanced Bus Alternatives to be Evaluated in Tier 3 Preferential Bus Alternative Enhanced Bus Alternative
  • 14. Tier 2 Screening Criteria SUPPORT FOR TOD Consistency with local and regional plans and strategies Number of stations with transit supportive zoning - total of high and medium stations SYSTEM CONNECTIVITY Connecting NFTA bus routes Number of park and recreation areas served ENGINEERING/ RIGHT-OF-WAY NEEDS Percent mixed traffic operations Percent signalized intersec- tions of total intersections Private land area affected by guideway (acres) ENVIRONMENTAL/ COMMUNITY IMPACTS Impacts to parks, recreation, open space (acres) Impacts to water resources Floodplains (acres) Wetlands (acres) Streams (feet) Number of properties affected RIDERSHIP/ MARKET 2035 total project boardings (avg. weekday) Travel time between UB campuses (UB South, University Station- UB North, Greiner Hall) minimum Travel time between UB campuses (Downtown, Allen Station - UB North, Greiner Hall) minimum 2035 projected park & ride patrons 2035 total boardings by zero car households (avg. weekday) Commercial/retail area served (sf) 1/2 mi station radius
  • 15. Typical Cross-Sections: Side Platform LRT Station Options Draft Works in Progress - For Discussion Purposes Only ExistingStreet Section ExistingStreet Section ExistingStreet Section ExistingStreet Section StaggeredSide PlatformStation StaggeredSide PlatformStation StaggeredSide PlatformStation StaggeredSide PlatformStation Section 1 Section 2 Section 3 Section 4
  • 16. Typical Cross-Sections: Center & Tunnel LRT Station Options Draft Works in Progress - For Discussion Purposes Only TunnelNo Station Section 5 Section 6 Section 7 Section 8 ExistingStreet Section ExistingStreet Section ExistingStreet Section ExistingStreet Section CenterPlatform Station CenterPlatform Station TunnelSide PlatformStation
  • 17. Typical Cross-Sections: BRT Options Draft Works in Progress - For Discussion Purposes Only ExistingStreet Section ExistingStreet Section ExistingStreet Section ExistingStreet Section MixedTraffic Operation Dedicated Outside Lane Dedicated InsideLane Dedicated Outside Lane Section 1 Section 2 Section 3 Section 4
  • 18. Tier 2 Screening Results Matrix Flood- plains (acres) Wet-lands (acres) Streams (feet) Niagara Falls Blvd LRT 1 (via Bailey, Eggert, Niagara Falls Blvd, Maple and I-990) 10.2 11.0 0% 44% 24,000 14,700 16 26 343 821 6 16 6 12 13.8 1.3 419.0 0.0 211 Nia ga ra Fa ll s Blvd LRT 2 (via Ba il e y, Egge rt, Nia ga ra Fa ll s Blvd, Ma ple , John Ja me s Audubon Pa rkwa y a nd Mille rs port) 9.6 11.2 0% 39% 23,200 14,700 16 26 178 786 5 14 6 10 21.1 1.4 495.9 0.0 254 Nia ga ra Fa ll s Blvd LRT 7 (via Ba il e y, Egge rt, Nia ga ra Fa ll s Blvd, Me ye r Rd, unde r I-290, I-990) 10.2 10.7 0% 39% 24,100 14,700 15 25 357 860 5 17 6 12 11.7 0.8 398.8 0.1 244 Ba il e y Ave LRT 1 (via Ba il e y, Ma ple , I-990) 9.3 7.0 0% 43% 23,500 14,600 15 25 556 825 6 16 6 12 11.0 0.7 385.8 0.0 189 Ba il e y Ave LRT 2 (via Ba il e y, Ma ple , John Ja me s Audubon Pa rkwa y a nd Mille rs port) 8.7 8.3 0% 36% 22,800 14,100 15 25 407 790 5 13 6 10 20.4 1.4 462.8 0.0 232 Mille rs port Hwy LRT 1 (via Ba il e y, Grove r Cle ve la nd, Mille rs port, Flint, John Ja me s Audubon Pa rkwa y, Mille rs port) 8.2 4.7 0% 28% 22,900 13,500 13 23 976 398 7 8 5 7 21.2 1.5 629.4 0.0 194 Niagara Falls Blvd BRT 1 (via Niagara Falls Blvd, Maple, I-990) 11.5 25.7 17% 35% 21,100 13,800 30 40 132 961 5 17 4 17 15.3 2.2 782.1 0.4 305 Nia ga ra Fa ll s Blvd BRT 2 (via Nia ga ra Fa ll s Blvd, Ma ple , John Ja me s Audubon Pa rkwa y, Mille rs port) 10.9 25.8 19% 33% 20,800 13,600 34 44 167 958 5 17 6 16 21.3 1.9 854.3 0.4 366 Bailey Ave BRT 1 (via Bailey, Maple, I-990) 9.8 7.4 27% 39% 20,400 13,300 23 33 135 846 5 23 4 14 15.6 1.9 559.8 0.0 207 Ba il e y Ave BRT 2 (via Ba il e y, Ma ple , John Ja me s Audubon Pa rkwa y, Mille rs port) 9.0 6.8 30% 36% 20,400 12,900 23 33 266 844 5 23 6 13 21.3 1.5 632.1 0.0 262 Millersport Hwy BRT 1 (via Bailey, Grover Cleveland, Millersport, Flint, John James Audubon Parkway, Millersport) 8.5 4.1 35% 35% 17,800 11,500 18 28 251 432 7 21 5 8 21.2 1.5 564.0 0.0 201 # OF PROPERTIES AFFECTED Projected Park- and-Ride Patrons, 2035 LENGTH OF ALT (miles) Percent Mixed Traffic Operations ENGINEERING / RIGHT OF W AY NEEDS ALTERNATIVE PRIVATE LAND AREA AFFECTED BY GUIDEWAY (acres) 2035 Total Project Boardings (Average Weekday) # OF STATIONS WITH TRANSIT SUPPORTIVE ZONING - 1/2 mile station radius - total of high and medium stations Percent Signalized Intersections of Total Intersections Travel Time between UB Campuses (UB South, University Station- UB Car HH (Average North, Greiner Weekday) Hall), min. IMPACTS TO PARKS / RECREATION / OPEN SPACE (acres) BUSRAPID TRANSIT Travel Time between UB Campuses (Downtown, Allen Station - UB North, Greiner Hall), min. LIGHT RAIL 2035 Total Boardings by 0 COMMERCIAL / RETAIL AREA # OF PARK AND SERVED (acres) - 1/2 RECREATION AREAS CONNECTING NFTA mile station radius SERVED BUS ROUTES Consistency with local and regional plans and strategies SUPPORT FOR TOD ENVIRONMENTAL / COMMUNITY IMPACTS IMPACTS TO WATER RESOURCES RIDERSHIP / MARKET SYSTEM CONNECTIVITYDESCRIPTIVE
  • 19. Niagara Falls Blvd. LRT Alternatives 1 & 2
  • 20. Niagara Falls Blvd. LRT Alternative 7
  • 21. Bailey Avenue LRT Alternatives 1 & 2 and Millersport Highway LRT Alternative 1
  • 22. Niagara Falls Blvd. BRT Alternatives 1 & 2
  • 23. Bailey Avenue BRT Alternatives 1 & 2 and Millersport Highway BRT Alternative 1
  • 24. University at Buffalo North Campus LRT BRT Millersport Alternatives for UB North Campus
  • 25. Next Steps • Reach Consensus on Alternatives Advancing to Tier 3 • Refine Alternatives (cross-section/ROW need, possible truncation/MOS, station locations, etc.) • Develop Analysis for Tier 3 Alternatives • Identify Locally Preferred Alternative (LPA) • Hold Committee and Public Open House Meeting on LPA » Tentatively October 2015 • LPA moves to the next project phase » Federal and State environmental review » Preliminary and final engineering » Construction
  • 26. What do you like? What would you change?
  • 27. Remaining Study Schedule June 2015 Jul 2015 Aug 2015 Sep 2015 Oct 2015 Nov 2015 Dec 2015 Jan 2015 Tier 2 Decisions Tier 3 Process Refine Evaluation Criteria Define Alternatives Conduct Evaluation Develop Life Cycle Costs/Financial Info LPA Selection Process Project Steering Committee Meeting Project Advisory Committee Meeting Public Open House Meeting