This document summarizes the development of a web-based application to automate site survey reporting. The goals are to make data recording and reporting easier, faster, and more clear. Currently, surveyors write data on paper which is difficult to read, input into Excel, and report to customers. The proposed application would allow direct input into forms and generate clear reports. Key metrics are effectively surveying within 5 days and accelerating proposal offering. Suggestions from audiences include kickoff meetings and improving the recording method. Analysis identifies writing on paper as unclear and complicated. The document outlines plans for a web-based software using PHP and MySQL to host standard forms, share projects, and login users. It demonstrates a trial website and notes
An update on new developments in the Executive Briefing Service for ConnectWise, and onsite reporting service which include free custom report development as part of the monthly subscription.
New software to manage Engineering and Architectural firms
This software helps managers to manage their offices online and offline easily
It designed by Arch. Naglaa Mahmoud as PhD product.
http://www.pro.egyptarch.com/Login.aspx
SOLHANA - short for „Solutions for HANA“- is a single point of contact for organizations searching a service provider to plan, implement and operate SAP S/4HANA® in their organization. Through a unique assessment, SOLHANA qualifies the status of your current SAP® landscape, understands your infrastructure, requirements and determines your unique conversion path to SAP S/4HANA®.
https://www.solhana.com/en/
An update on new developments in the Executive Briefing Service for ConnectWise, and onsite reporting service which include free custom report development as part of the monthly subscription.
New software to manage Engineering and Architectural firms
This software helps managers to manage their offices online and offline easily
It designed by Arch. Naglaa Mahmoud as PhD product.
http://www.pro.egyptarch.com/Login.aspx
SOLHANA - short for „Solutions for HANA“- is a single point of contact for organizations searching a service provider to plan, implement and operate SAP S/4HANA® in their organization. Through a unique assessment, SOLHANA qualifies the status of your current SAP® landscape, understands your infrastructure, requirements and determines your unique conversion path to SAP S/4HANA®.
https://www.solhana.com/en/
This is my first idea for a new application for the QA/QC team to use in part of making the inspections or reporting non conformance against the process or the installation on site and also can identify the damages happened on site by others or internally and recorded in this soft ware or share it to other parties.
I'm actually looking to share the same with a distributors and supponcers to assist me for sharing this application to everyone in the world.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...SATN
Mr Alphons Du Toit’s (Director, Technimark, South Africa) presentation at the SATN Annual Conference 2009.
Theme: “Technological innovation at Universities in South Africa: towards industrial and socio-economic development”
16 - 17 July 2009
Cape Peninsula University of Technology
Bellville Campus.
Project of IT243Customer Service For Electroni.docxwoodruffeloisa
Project of IT243
Customer Service
For
Electronic Store
Part 1: Planning Phase
Project Identification
In our group we decide to focus on an E-Store Customer Service. Customer Service is an important part of an organization because it is provide services to customers before, during and after a purchase. Which is affect positively or negatively on the organization.
Problems:
1-Marketing current product.
2-Writing daily report of customer service actions.
3-Follow-up customer complains.
4-After-sales services.
5-Responding to inquiries.
Goals:
1-Gain customer satisfaction.
2-Achieve the highest sales rates.
3-Collect large database of customers.
Feasibility Study
1) Technical Feasibility:
· Users’ and analysts’ should be familiar with the application Yes
· Project will be familiar with the new technology Yes
· Project size is good.
2) Economic Feasibility:
Economic feasibility is also called a cost-benefit analysis that identifies the financial risk associated with the project.
A) Development Costs:
Salaries: 12K per month
Hardware and software expenses: 60K one time.
B) Operational Costs:
Salaries for operation staff: 10K.
Software licensing fees: 50K.
C) Tangible benefits: This includes revenue that the system enables the organization to collect, such as increased sales. 30% Increased Sales.
D) Intangible benefits: Hard numbers to determine right now.
ROI = Total benefits – total costs.
3) Organization Feasibility:
Does the system ultimately will be accepted by its users and incorporated into the ongoing operations of the organization? Yes
SDLC Methodology
The plans created during this phase will help us to choose the project Methodology, manage time, cost, quality, change, risk and issues to ensure that you deliver the project on time
I have used waterfall model for many reasons
· It is simple and easy to understand it_
· It is easy to follow it; each phase has specific outputs.
· Each phase is processed and completed, and then the next phase is begun
· Verification at each stage ensures early detection of errors.
Gantt chart
Task
Assigned to
Start
End
Duration
Cost Analysis Preparation
Mohamed
4/11/2018
30/11/2018
26 days
Meetings
Ahmed
6/11/2018
6/12/2018
30 days
Gathering Requirements
Karim
20/11/2018
21/5/2019
180 days
Stakeholders Meeting
Mostafa
1/1/2019
2/2/2019
31 days
Meeting Minutes
Mahmoud
1/1/2019
20/1/2019
19 days
Displaying a simple model
Omar
2/2/2019
2/5/2019
90 days
Printing Documentation and Reports
Amr
1/6/2019
1/7/2019
30 days
Part 2: Analysis Phase
A) Functional requirements:
1-Marketing current product.
2- Writing daily report of CS.
3-Follow-up customer complains.
4-After-sales services.
5-Responding to inquiries.
B) Nonfunctional requirements:
1- Secure access of confidential data (customer’s details).
2- 24 hours availability.
3- Easy to maintain.
4- System should be portable for to different platforms.
5- Reliability.
Use cases:
Importance leve ...
Capital Power has implemented Unifier as our Project Control's tool for $500,000 to $2 billion construction projects. What is different about our implementation is that we use Unifier to collect quantity of work (e.g. km of roads) and the hours of labour involved. This information is very important in understanding productivity on a project and in estimating future projects. We are using Unifier on our first project, Genesee 4/5 a gas turbine plant with a construction budget of $1.5 billion. We also leverage the power of Oracle integration across EBS, P6 and Unifier to eliminate rekeying and avoidance of potential errors. Direct input by contractors of progress information also saves time.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Banking Proposal Bidding and response to RFP PresentationHarnoor Singh
This was part of assignment i had in my college. It was very nice experience. We went through all phases of SDLC and developed a prototype and final proposal.
This is my first idea for a new application for the QA/QC team to use in part of making the inspections or reporting non conformance against the process or the installation on site and also can identify the damages happened on site by others or internally and recorded in this soft ware or share it to other parties.
I'm actually looking to share the same with a distributors and supponcers to assist me for sharing this application to everyone in the world.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...SATN
Mr Alphons Du Toit’s (Director, Technimark, South Africa) presentation at the SATN Annual Conference 2009.
Theme: “Technological innovation at Universities in South Africa: towards industrial and socio-economic development”
16 - 17 July 2009
Cape Peninsula University of Technology
Bellville Campus.
Project of IT243Customer Service For Electroni.docxwoodruffeloisa
Project of IT243
Customer Service
For
Electronic Store
Part 1: Planning Phase
Project Identification
In our group we decide to focus on an E-Store Customer Service. Customer Service is an important part of an organization because it is provide services to customers before, during and after a purchase. Which is affect positively or negatively on the organization.
Problems:
1-Marketing current product.
2-Writing daily report of customer service actions.
3-Follow-up customer complains.
4-After-sales services.
5-Responding to inquiries.
Goals:
1-Gain customer satisfaction.
2-Achieve the highest sales rates.
3-Collect large database of customers.
Feasibility Study
1) Technical Feasibility:
· Users’ and analysts’ should be familiar with the application Yes
· Project will be familiar with the new technology Yes
· Project size is good.
2) Economic Feasibility:
Economic feasibility is also called a cost-benefit analysis that identifies the financial risk associated with the project.
A) Development Costs:
Salaries: 12K per month
Hardware and software expenses: 60K one time.
B) Operational Costs:
Salaries for operation staff: 10K.
Software licensing fees: 50K.
C) Tangible benefits: This includes revenue that the system enables the organization to collect, such as increased sales. 30% Increased Sales.
D) Intangible benefits: Hard numbers to determine right now.
ROI = Total benefits – total costs.
3) Organization Feasibility:
Does the system ultimately will be accepted by its users and incorporated into the ongoing operations of the organization? Yes
SDLC Methodology
The plans created during this phase will help us to choose the project Methodology, manage time, cost, quality, change, risk and issues to ensure that you deliver the project on time
I have used waterfall model for many reasons
· It is simple and easy to understand it_
· It is easy to follow it; each phase has specific outputs.
· Each phase is processed and completed, and then the next phase is begun
· Verification at each stage ensures early detection of errors.
Gantt chart
Task
Assigned to
Start
End
Duration
Cost Analysis Preparation
Mohamed
4/11/2018
30/11/2018
26 days
Meetings
Ahmed
6/11/2018
6/12/2018
30 days
Gathering Requirements
Karim
20/11/2018
21/5/2019
180 days
Stakeholders Meeting
Mostafa
1/1/2019
2/2/2019
31 days
Meeting Minutes
Mahmoud
1/1/2019
20/1/2019
19 days
Displaying a simple model
Omar
2/2/2019
2/5/2019
90 days
Printing Documentation and Reports
Amr
1/6/2019
1/7/2019
30 days
Part 2: Analysis Phase
A) Functional requirements:
1-Marketing current product.
2- Writing daily report of CS.
3-Follow-up customer complains.
4-After-sales services.
5-Responding to inquiries.
B) Nonfunctional requirements:
1- Secure access of confidential data (customer’s details).
2- 24 hours availability.
3- Easy to maintain.
4- System should be portable for to different platforms.
5- Reliability.
Use cases:
Importance leve ...
Capital Power has implemented Unifier as our Project Control's tool for $500,000 to $2 billion construction projects. What is different about our implementation is that we use Unifier to collect quantity of work (e.g. km of roads) and the hours of labour involved. This information is very important in understanding productivity on a project and in estimating future projects. We are using Unifier on our first project, Genesee 4/5 a gas turbine plant with a construction budget of $1.5 billion. We also leverage the power of Oracle integration across EBS, P6 and Unifier to eliminate rekeying and avoidance of potential errors. Direct input by contractors of progress information also saves time.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Banking Proposal Bidding and response to RFP PresentationHarnoor Singh
This was part of assignment i had in my college. It was very nice experience. We went through all phases of SDLC and developed a prototype and final proposal.
2. REMIND OPA PART 1
Done survey outside
city / island
effectively in 5
working days
GOAL
STATEMENT
Review Data and
Drawing
Schedule
Confirmation
Execute Site Survey
Reporting
Customer
Acceptance &
Approval
Hand over to
proposal team
PROJECT
SCOPE
Commonly Site
Survey Activities
Not On Schedule,
especially when
execute survey out
of city or Island
PROBLEM
STATEMENT
in line with the
development of PLS,
many project
opportunities
waiting for done to
survey, so the site
survey activities has
to be done
effectively
PROJECT
BACKGROUND
PRIMARY
METRIC
•EFECTIVELY SURVEY DURATION IN 5
WORKING DAYS
SECONDARY
METRIC
•ACCELERATE OFFERING PROPOSAL TO
CUSTOMER
•READY TO DO MORE SITE SURVEY PROJECT
3. The Most Important SUGGESTIONS FROM AUDIENCES :
1. Mr. Yustinus Sigit :
held a Kick of Meeting with customer before do survey , The kick of meeting
involving KAM/Sales, Surveyor, and PIC of Customer
2. Mr. Aris Dwi Nugroho :
Recording method not effectively, because after writing on papers, surveyor still
has to input to excel form, so if possible make it easy reporting
3. Mrs. Riana Nurtriyono
supposed improvements have been made and applied to several projects before
OPA
5. ANALYZE OPA PART 1 :
Reporting at night every day
ANALYZE OPA PART 1
6. Easily recording
data
Easily reporting
Report can be
read clearly and
be submitted to
customer
directly after site
survey at the
time
GOAL
STATEMENT
Make the easy
recording
aplication by
web base
PROJECT
SCOPE
writing data on
paper usually the
result was not
clear, hard to
read,
complicated to
reporting.
PROBLEM
STATEMENT
in line with the
development of
PLS, many
project
opportunities
waiting for done
to survey, so the
site survey
activities has to
be done
effectively and
clearly
PROJECT
BACKGROUND
PROJECT CHAPTER
Define
13. FLOW CHART DESIGN (1)
SOFTWARE
APLIKASI /
PROGRAM
FORM A &
FORM B
(Excel Form)
FORM C
(Excel Form)
PRINT OUT
report
Link
sofware - excel
Link
Excel - Excel
14. PLANING SOFTWARE 1
SOFTWARE 1
Digunakan untuk
Mengisi form A
Diharapkan bisa
Di input langsung
Ke Form Excel A
DAFTAR JENIS LAMPU
1. KODE LAMPU TL318TL318
2. NAMA & TIPE LAMPU TBS 3x18 WTBS 3x18 W
3. KATEGORI LAMPU TLTL
4. FITTING LAMPU T8T8
5. WARNA CAHAYA LAMPU 40004000
6. DAYA LAMPU 1818
7. JENIS BALLAST MM
8. JUMLAH LAMPU / RUMAH LAMPU 33
9. LUX LEVEL 179179
10. APLIKASI PEMASANGAN INDOORINDOOR
11. LOKASI LAMPU TERPASANG RECESSEDRECESSED
12. DIAMETER DOWNLIGHT 2626
13. PHOTO LAMPU
15. PLANING SOFTWARE 2
SOFTWARE 2
Digunakan untuk
Mengisi form B
Software ini digunakan
saat pendataan
Lampu, sehingga akan
Lebih sering dipakai
DATA LAMPU EXISTING
1. LOCATION / FLOOR
2. AREA / ROOM
3. KODE LAMPU
4. JUMLAH TITIK LAMPU
5. BATTERY EMERGENCY
6. APLIKASI BATTERY
7. LUX LEVEL AVERAGE
8. JENIS CEILING
9. DIMMER
16. PERFORM WEB BASE (1)
First Planning , with HTML and Delphi program
language
Status = Not to be continued > its too difficult and
bad performance
17. Obtain good idea :
- Use web base
- Use PHP & MySQL program
- Get the book reference
25. the application still need continues improvement to solve some
function until this tools accordant with Philips PLS business
process for survey
Some problems till now cannot be solved, are :
“Forgot Password’ function
Multi User capability
Convert to PLS standard form (excel form)
User level function capability