This document provides guidance for responding to an invitation to tender for a framework agreement for goods or services. It includes background on the awarding authority and other contracting bodies, an overview of a single or multiple provider framework agreement, instructions to tenderers, and requirements for technical specifications, responses, and commercial considerations. Tenderers are instructed to submit responses electronically by a specified deadline and in a prescribed format for evaluation according to detailed criteria.
World bank ncb works w2 new f&c clause may 2010Safe Rise
This document provides instructions to bidders for a national competitive bidding process for a construction project. It outlines eligibility requirements, qualification criteria, bid preparation and submission instructions, and procedures for bid opening and evaluation. Key requirements include that bidders must be from eligible source countries, have satisfactory past experience and capabilities in similar projects, demonstrate adequate financial resources, and submit bids with the required supporting documents by the specified deadline. The lowest evaluated, substantially responsive bid will be awarded the contract.
This document discusses types of contracts used in highway projects and standard bidding documents.
It outlines various types of civil works and services contracts such as EPC, item rate, lump sum, and BOT contracts. It also discusses FIDIC conditions of contract which are widely used standard bidding documents around the world.
Standard bidding documents promote uniform understanding of responsibilities and risks for all parties. They also help with training. FIDIC conditions are prevalent in India for major infrastructure projects funded by international financing institutions.
1. The document provides guidance on international competitive bidding procedures for procurement under ADB financing projects. It discusses key steps like advertising bids, evaluating bids, and awarding contracts.
2. Contract packaging aims to divide project requirements into a manageable number of contracts large enough for international competition. Factors like nature, value, and market conditions are considered to determine appropriate contract groupings.
3. The document outlines different types of contracts like turnkey contracts where a single contractor is responsible for design, construction and operation of a facility, and alternatives like design-build that involve less employer control but may have cost advantages. Proper contract selection depends on project complexity and capacity of executing agencies.
World bank consultants wb srfp _oct_2011_-v1Safe Rise
This document is a Standard Request for Proposals (SRFP) issued by the World Bank for the selection of consultants.
It provides templates and guidance for the client in preparing a specific Request for Proposals (RFP) for a consulting services assignment. The SRFP follows the structure and provisions of the Master Procurement Document for Selection of Consultants prepared by participating Multilateral Development Banks, with some World Bank specific considerations.
The SRFP contains eight sections. Section 1 provides a template Letter of Invitation. Section 2 provides Instructions to Consultants and a Data Sheet for project specific information. Section 3 contains templates for Technical Proposals. Section 4 contains templates for Financial Proposals. Section 5 lists eligible countries. Section
This document summarizes the key clauses in the ICTAD/SBD/02 form of contract related to claims and determinations by the engineer. It discusses Sub Clause 3.4 which allows the engineer to agree or determine matters in dispute between the employer and contractor. It also discusses related clauses including Sub Clause 2.4 on employer's claims, and Sub Clause 19.1 on contractor's claims. The engineer is empowered to make determinations on issues and claims raised under these clauses as well as other clauses in the conditions of contract related to unforeseen site conditions, rejection of work, liquidated damages, and more. The document provides details on the process, relevant circumstances, and potential outcomes under these various clauses.
Pamela Varley, 'Sustainable Digital Neighbourhoods' presented at 'Communities...Agnes Gulyas
Pamela Varley, Plymouth University, UK, 'Sustainable Digital Neighbourhoods' presented at 'Communities in the Digital Age' International Symposium, Canterbury Christ Church University, UK, 12 June 2013
Congressman Bill Owens of NY State Veterans Experiencing DiscriminationAdirondakdeb
This letter was emailed to Congressman Owens Aide, Scott Matthews, to request assistance in reaching an amicable, quick resolution to the inaccessibility of the DAV National Transportation Program for Veterans in Wheelchairs. The DAV National Transportation Program is run jointly with the Veterans Administration.
Cramlington Learning Village Presentation 2FrogEducation
Here is Phil Spoors and Graham Quince’s presentation from the National Learning Platforms Conference.
Phil and Graham spoke in the Transform session 'Maximising teaching time by making the most of technology’.
World bank ncb works w2 new f&c clause may 2010Safe Rise
This document provides instructions to bidders for a national competitive bidding process for a construction project. It outlines eligibility requirements, qualification criteria, bid preparation and submission instructions, and procedures for bid opening and evaluation. Key requirements include that bidders must be from eligible source countries, have satisfactory past experience and capabilities in similar projects, demonstrate adequate financial resources, and submit bids with the required supporting documents by the specified deadline. The lowest evaluated, substantially responsive bid will be awarded the contract.
This document discusses types of contracts used in highway projects and standard bidding documents.
It outlines various types of civil works and services contracts such as EPC, item rate, lump sum, and BOT contracts. It also discusses FIDIC conditions of contract which are widely used standard bidding documents around the world.
Standard bidding documents promote uniform understanding of responsibilities and risks for all parties. They also help with training. FIDIC conditions are prevalent in India for major infrastructure projects funded by international financing institutions.
1. The document provides guidance on international competitive bidding procedures for procurement under ADB financing projects. It discusses key steps like advertising bids, evaluating bids, and awarding contracts.
2. Contract packaging aims to divide project requirements into a manageable number of contracts large enough for international competition. Factors like nature, value, and market conditions are considered to determine appropriate contract groupings.
3. The document outlines different types of contracts like turnkey contracts where a single contractor is responsible for design, construction and operation of a facility, and alternatives like design-build that involve less employer control but may have cost advantages. Proper contract selection depends on project complexity and capacity of executing agencies.
World bank consultants wb srfp _oct_2011_-v1Safe Rise
This document is a Standard Request for Proposals (SRFP) issued by the World Bank for the selection of consultants.
It provides templates and guidance for the client in preparing a specific Request for Proposals (RFP) for a consulting services assignment. The SRFP follows the structure and provisions of the Master Procurement Document for Selection of Consultants prepared by participating Multilateral Development Banks, with some World Bank specific considerations.
The SRFP contains eight sections. Section 1 provides a template Letter of Invitation. Section 2 provides Instructions to Consultants and a Data Sheet for project specific information. Section 3 contains templates for Technical Proposals. Section 4 contains templates for Financial Proposals. Section 5 lists eligible countries. Section
This document summarizes the key clauses in the ICTAD/SBD/02 form of contract related to claims and determinations by the engineer. It discusses Sub Clause 3.4 which allows the engineer to agree or determine matters in dispute between the employer and contractor. It also discusses related clauses including Sub Clause 2.4 on employer's claims, and Sub Clause 19.1 on contractor's claims. The engineer is empowered to make determinations on issues and claims raised under these clauses as well as other clauses in the conditions of contract related to unforeseen site conditions, rejection of work, liquidated damages, and more. The document provides details on the process, relevant circumstances, and potential outcomes under these various clauses.
Pamela Varley, 'Sustainable Digital Neighbourhoods' presented at 'Communities...Agnes Gulyas
Pamela Varley, Plymouth University, UK, 'Sustainable Digital Neighbourhoods' presented at 'Communities in the Digital Age' International Symposium, Canterbury Christ Church University, UK, 12 June 2013
Congressman Bill Owens of NY State Veterans Experiencing DiscriminationAdirondakdeb
This letter was emailed to Congressman Owens Aide, Scott Matthews, to request assistance in reaching an amicable, quick resolution to the inaccessibility of the DAV National Transportation Program for Veterans in Wheelchairs. The DAV National Transportation Program is run jointly with the Veterans Administration.
Cramlington Learning Village Presentation 2FrogEducation
Here is Phil Spoors and Graham Quince’s presentation from the National Learning Platforms Conference.
Phil and Graham spoke in the Transform session 'Maximising teaching time by making the most of technology’.
This document provides guidance for using Standard Tender Documents to procure works through open tendering for projects financed by the European Bank for Reconstruction and Development (EBRD). It outlines the tendering process and contents of the Standard Tender Documents, including instructions to tenderers, evaluation criteria, tender forms, and conditions of contract. The guidance emphasizes transparency and best practices in procurement.
This document provides information about tenders, including defining what a tender is, the types of tenders (open, limited, single), and an overview of the tender process from preparing tender documents to inviting tenders to scrutinizing submitted tenders. Key points covered include that a tender is a supplier's submission in response to an invitation to tender, tender documents include details like contracts and specifications, and the different types of tenders depend on factors like estimated cost and number of potential suppliers.
The document discusses the contents and purpose of bidding documents provided to prospective bidders. Key points include:
- Bidding documents provide all necessary information for bidders to prepare bids, including objectives, contract details, and eligibility requirements.
- Contents include invitation to bid, eligibility documents, instructions to bidders, general and special conditions of contract, specifications, drawings, and bill of quantities.
- The documents aim to provide equal information to all bidders and clearly define evaluation criteria and contract conditions.
1. The document discusses legal aspects of offset obligations in Brazil. It outlines the key authorities and laws governing offsets, requirements and selection criteria.
2. It describes the offset agreement process, including concepts like compensation credits and multipliers. Main clauses of an offset agreement are also outlined.
3. Financial support options from public funding sources for offsets are provided, as well as details on credit insurance and preferential tax regimes for certain sectors.
4. Examples of direct offset contracts involving foreign direct investment and subcontracting or technology transfer are presented.
This document provides instructions to tenderers for a tender process. It outlines procedures for completing and submitting tenders, including requirements to familiarize with Qatari laws, acknowledge receipt of tender documents, adhere to ethics and secrecy standards, attend site visits if requested, submit queries in writing, be fully informed of work requirements, and use tender bulletins issued by Qatar Petroleum. It also specifies requirements for the tender submission, including valid tender prices in Qatari Riyals, completing the form of tender, and submitting a tender bond valued at 360,000 Qatari Riyals with 150 day validity.
- The document is the model grant agreement for Horizon 2020 multi-beneficiary projects. It outlines the terms and conditions for beneficiaries receiving EU funding under Horizon 2020.
- The main updates from the previous version include allowing beneficiaries to convert costs incurred in other currencies to Euros, giving beneficiaries the option to receive pre-financing payments earlier, and ensuring visibility of EU funding for communication activities.
- The agreement is composed of terms and conditions, annexes describing the action, budget, accession forms for additional beneficiaries, and models for financial reporting. It establishes the rights and obligations of the European Commission and beneficiaries in implementing the funded action.
A BIDDING DOCUMENT SUBMITTED TO GOVERNMENT THEOUGH PUBLIC BIDDING WHERE LOTS OF PROSPECTIVE JOINERS OR BIDDERS WILL JOIN TO THE SAID BIDDING WITH THE GOVERNMENT IMPLEMENTING AGENCY CONDUCTED THE BIDDING PROCESS
This document contains the first 4 sections of the 2016 Revised Implementing Rules and Regulations of Republic Act No. 9184, otherwise known as the Government Procurement Reform Act. Section 1 discusses the short title and purpose of promoting good governance and adherence to transparency, accountability, equity, efficiency and economy in procurement. Section 2 declares the policy that procurement shall be competitive and transparent through competitive bidding. Section 3 lists the governing principles of transparency, competitiveness, streamlined processes, accountability and public monitoring. Section 4 discusses the scope and application of the rules and regulations.
This document provides a model document base for contracting (DBC) to be used for the acquisition of goods through a national support for production and employment (ANPE) modality in Bolivia. It outlines the general information for bidders, including applicable regulations, eligible bidders, required guarantees, bid evaluation and selection criteria, and contract formalization. The DBC establishes both mandatory and referential aspects. It contains three parts: general bidder information, technical specifications of the procurement, and annexes with forms and a sample contract.
Procurement process in detial to understan the process in real essence of procurement. Besides, it will help the procofessional to learn from it and have idea what the process of procurment is actually.
The document is a bidding document from the Federal Democratic Republic of Ethiopia for the procurement of construction works for a residential building. It contains instructions to bidders, general bidding procedures and requirements, evaluation criteria, standard contract forms, and details of the scope of work. The project involves the construction of a G+1 residential building, with a procurement reference number of G/03/10/2014. The bidding document was issued on June 11, 2022 in Addis Ababa.
This document discusses time-bar clauses in standard construction contracts. It begins with an introduction that defines time-bar clauses and notes their increasing use. It then outlines the purposes of time-bar clauses such as alerting employers to claims and allowing for timely evaluation. The document reviews general legal principles around time-bar clauses from relevant case law. It examines the effectiveness of time-bar clauses in contracts like FIDIC and discusses requirements for notices of claims and record keeping. The role of the quantity surveyor is also mentioned.
The document discusses different types of construction contracts and tendering processes. It provides definitions for key terms like tender, quotation, earnest money deposit, liquidated damages, unliquidated damages, firm price and period. It also summarizes the important components of a contract document and classifications of contracts such as lump-sum, cost plus percentage, cost plus fixed fee, target, percentage rate and item rate contracts.
This document is a template for a pre-qualification questionnaire (PQQ) for a collaborative procurement project. It provides instructions for potential providers on completing and submitting the PQQ. The PQQ will be used to evaluate potential providers' technical expertise, capacity, financial standing, and ability to meet the project requirements to create a shortlist of between [X] and [Y] providers that will be invited to tender. The template includes sections for general company information, financial details, contractual matters, technical ability, project-specific questions, and a checklist of required attachments. It notes that no business is guaranteed through any resulting framework agreement.
The document discusses a presentation on contract management under the FIDIC Red Book 1999. The presentation will cover topics such as the role of the engineer, variations, claims, notices and time bars, managing claims, delay and disruption, acceleration, effective presentation of claims, negotiation and settlement of claims, and dispute resolution. It will take place on March 26, 2019 and be given by Stephen Osuhor of Driver Trett, a global construction consultancy firm.
11. A concrete dam can be assumed to be trapezoidal in section having a top width of 2 m and bottom width of 10 m. Its height is 12 m and the upstream face has a batter of 1: 10. Give an analysis of the stability of the dam for the base section for overturning and sliding in the full reservoir condition assuming no free-board allowance but allowing for uplift pressures. Assume uplift intensity factor ast 100%. Also determine the compressive stresses at the toe and the heel, and major principal and shear stress developed at the toe. Assume weight of concrete to be 24 kN/m³, unit shear strength of concrete
to be 1400 KN/m³, and the coefficient of friction between concrete and foundation soil to be 0.7.
12. The following data refer to the non-overflow section of a gravity dam:
R.L. of top of the dam
315 m.
R.L. of bottom of the dam
260 m
Full reservoir level
= 312 m
Top width of the dam
= 12 m.
Unstream face is vertical. Downstream face is vertical upto R.L. 304 m; and thereafter, the
This document is a bidding document for the procurement of construction works for a building project in Ethiopia. It provides instructions to bidders on the bidding process, including eligibility requirements, submission of bids, bid evaluation and contract award. The works involve the construction of the AGORA building one project. Bidders are required to submit their bids by the deadline of June 2014 and the bidding process will be conducted according to the procurement laws and regulations of Ethiopia.
This document discusses how small and medium enterprises (SMEs) can offer better value for money than larger suppliers to the public sector. It outlines some of the key challenges SMEs face in competing for public sector contracts, such as difficulty finding opportunities, perceiving the procurement process as too complex, and contracts being too large. The document then provides recommendations for how public sector organizations can help address these challenges, such as advertising opportunities more widely, simplifying procurement processes, and setting realistic timelines. The goal is to encourage more SME participation to increase competition and allow the public sector to benefit from the innovative solutions and responsiveness that SMEs can provide.
This document provides guidance to help determine the appropriate project strategy and procurement approach.
[1] It explains the key factors to consider such as the stability of the organization's goals and business needs, internal readiness for change, and external market conditions.
[2] Decision makers are advised to determine if contracting for outcomes, outputs, or inputs is best by considering which party is best placed to manage associated risks.
[3] The guidance provides tools to help assess internal change readiness and analyze strategic preferences based on both internal capabilities and external market conditions.
This document provides guidance for using Standard Tender Documents to procure works through open tendering for projects financed by the European Bank for Reconstruction and Development (EBRD). It outlines the tendering process and contents of the Standard Tender Documents, including instructions to tenderers, evaluation criteria, tender forms, and conditions of contract. The guidance emphasizes transparency and best practices in procurement.
This document provides information about tenders, including defining what a tender is, the types of tenders (open, limited, single), and an overview of the tender process from preparing tender documents to inviting tenders to scrutinizing submitted tenders. Key points covered include that a tender is a supplier's submission in response to an invitation to tender, tender documents include details like contracts and specifications, and the different types of tenders depend on factors like estimated cost and number of potential suppliers.
The document discusses the contents and purpose of bidding documents provided to prospective bidders. Key points include:
- Bidding documents provide all necessary information for bidders to prepare bids, including objectives, contract details, and eligibility requirements.
- Contents include invitation to bid, eligibility documents, instructions to bidders, general and special conditions of contract, specifications, drawings, and bill of quantities.
- The documents aim to provide equal information to all bidders and clearly define evaluation criteria and contract conditions.
1. The document discusses legal aspects of offset obligations in Brazil. It outlines the key authorities and laws governing offsets, requirements and selection criteria.
2. It describes the offset agreement process, including concepts like compensation credits and multipliers. Main clauses of an offset agreement are also outlined.
3. Financial support options from public funding sources for offsets are provided, as well as details on credit insurance and preferential tax regimes for certain sectors.
4. Examples of direct offset contracts involving foreign direct investment and subcontracting or technology transfer are presented.
This document provides instructions to tenderers for a tender process. It outlines procedures for completing and submitting tenders, including requirements to familiarize with Qatari laws, acknowledge receipt of tender documents, adhere to ethics and secrecy standards, attend site visits if requested, submit queries in writing, be fully informed of work requirements, and use tender bulletins issued by Qatar Petroleum. It also specifies requirements for the tender submission, including valid tender prices in Qatari Riyals, completing the form of tender, and submitting a tender bond valued at 360,000 Qatari Riyals with 150 day validity.
- The document is the model grant agreement for Horizon 2020 multi-beneficiary projects. It outlines the terms and conditions for beneficiaries receiving EU funding under Horizon 2020.
- The main updates from the previous version include allowing beneficiaries to convert costs incurred in other currencies to Euros, giving beneficiaries the option to receive pre-financing payments earlier, and ensuring visibility of EU funding for communication activities.
- The agreement is composed of terms and conditions, annexes describing the action, budget, accession forms for additional beneficiaries, and models for financial reporting. It establishes the rights and obligations of the European Commission and beneficiaries in implementing the funded action.
A BIDDING DOCUMENT SUBMITTED TO GOVERNMENT THEOUGH PUBLIC BIDDING WHERE LOTS OF PROSPECTIVE JOINERS OR BIDDERS WILL JOIN TO THE SAID BIDDING WITH THE GOVERNMENT IMPLEMENTING AGENCY CONDUCTED THE BIDDING PROCESS
This document contains the first 4 sections of the 2016 Revised Implementing Rules and Regulations of Republic Act No. 9184, otherwise known as the Government Procurement Reform Act. Section 1 discusses the short title and purpose of promoting good governance and adherence to transparency, accountability, equity, efficiency and economy in procurement. Section 2 declares the policy that procurement shall be competitive and transparent through competitive bidding. Section 3 lists the governing principles of transparency, competitiveness, streamlined processes, accountability and public monitoring. Section 4 discusses the scope and application of the rules and regulations.
This document provides a model document base for contracting (DBC) to be used for the acquisition of goods through a national support for production and employment (ANPE) modality in Bolivia. It outlines the general information for bidders, including applicable regulations, eligible bidders, required guarantees, bid evaluation and selection criteria, and contract formalization. The DBC establishes both mandatory and referential aspects. It contains three parts: general bidder information, technical specifications of the procurement, and annexes with forms and a sample contract.
Procurement process in detial to understan the process in real essence of procurement. Besides, it will help the procofessional to learn from it and have idea what the process of procurment is actually.
The document is a bidding document from the Federal Democratic Republic of Ethiopia for the procurement of construction works for a residential building. It contains instructions to bidders, general bidding procedures and requirements, evaluation criteria, standard contract forms, and details of the scope of work. The project involves the construction of a G+1 residential building, with a procurement reference number of G/03/10/2014. The bidding document was issued on June 11, 2022 in Addis Ababa.
This document discusses time-bar clauses in standard construction contracts. It begins with an introduction that defines time-bar clauses and notes their increasing use. It then outlines the purposes of time-bar clauses such as alerting employers to claims and allowing for timely evaluation. The document reviews general legal principles around time-bar clauses from relevant case law. It examines the effectiveness of time-bar clauses in contracts like FIDIC and discusses requirements for notices of claims and record keeping. The role of the quantity surveyor is also mentioned.
The document discusses different types of construction contracts and tendering processes. It provides definitions for key terms like tender, quotation, earnest money deposit, liquidated damages, unliquidated damages, firm price and period. It also summarizes the important components of a contract document and classifications of contracts such as lump-sum, cost plus percentage, cost plus fixed fee, target, percentage rate and item rate contracts.
This document is a template for a pre-qualification questionnaire (PQQ) for a collaborative procurement project. It provides instructions for potential providers on completing and submitting the PQQ. The PQQ will be used to evaluate potential providers' technical expertise, capacity, financial standing, and ability to meet the project requirements to create a shortlist of between [X] and [Y] providers that will be invited to tender. The template includes sections for general company information, financial details, contractual matters, technical ability, project-specific questions, and a checklist of required attachments. It notes that no business is guaranteed through any resulting framework agreement.
The document discusses a presentation on contract management under the FIDIC Red Book 1999. The presentation will cover topics such as the role of the engineer, variations, claims, notices and time bars, managing claims, delay and disruption, acceleration, effective presentation of claims, negotiation and settlement of claims, and dispute resolution. It will take place on March 26, 2019 and be given by Stephen Osuhor of Driver Trett, a global construction consultancy firm.
11. A concrete dam can be assumed to be trapezoidal in section having a top width of 2 m and bottom width of 10 m. Its height is 12 m and the upstream face has a batter of 1: 10. Give an analysis of the stability of the dam for the base section for overturning and sliding in the full reservoir condition assuming no free-board allowance but allowing for uplift pressures. Assume uplift intensity factor ast 100%. Also determine the compressive stresses at the toe and the heel, and major principal and shear stress developed at the toe. Assume weight of concrete to be 24 kN/m³, unit shear strength of concrete
to be 1400 KN/m³, and the coefficient of friction between concrete and foundation soil to be 0.7.
12. The following data refer to the non-overflow section of a gravity dam:
R.L. of top of the dam
315 m.
R.L. of bottom of the dam
260 m
Full reservoir level
= 312 m
Top width of the dam
= 12 m.
Unstream face is vertical. Downstream face is vertical upto R.L. 304 m; and thereafter, the
This document is a bidding document for the procurement of construction works for a building project in Ethiopia. It provides instructions to bidders on the bidding process, including eligibility requirements, submission of bids, bid evaluation and contract award. The works involve the construction of the AGORA building one project. Bidders are required to submit their bids by the deadline of June 2014 and the bidding process will be conducted according to the procurement laws and regulations of Ethiopia.
This document discusses how small and medium enterprises (SMEs) can offer better value for money than larger suppliers to the public sector. It outlines some of the key challenges SMEs face in competing for public sector contracts, such as difficulty finding opportunities, perceiving the procurement process as too complex, and contracts being too large. The document then provides recommendations for how public sector organizations can help address these challenges, such as advertising opportunities more widely, simplifying procurement processes, and setting realistic timelines. The goal is to encourage more SME participation to increase competition and allow the public sector to benefit from the innovative solutions and responsiveness that SMEs can provide.
This document provides guidance to help determine the appropriate project strategy and procurement approach.
[1] It explains the key factors to consider such as the stability of the organization's goals and business needs, internal readiness for change, and external market conditions.
[2] Decision makers are advised to determine if contracting for outcomes, outputs, or inputs is best by considering which party is best placed to manage associated risks.
[3] The guidance provides tools to help assess internal change readiness and analyze strategic preferences based on both internal capabilities and external market conditions.
This document provides guidance on framework agreements under the 2006 Public Contracts and Utilities Contracts Regulations. It defines a framework agreement as an agreement between contracting authorities and economic operators that establishes terms for entering contracts during the framework period. It discusses setting up framework agreements, including considering early if it is appropriate, advertising in OJEU, and awarding the agreement. It also covers calling off individual contracts under existing frameworks in compliance with EU principles.
This document summarizes situations where the threat of a contract being declared ineffective should be considered in procurement decision making. Some key areas discussed include:
1) Decisions made in good faith around whether a contract requires an OJEU advert could potentially result in a contract being declared ineffective if the decision is later deemed incorrect.
2) Scope changes to a procurement may treat it as a direct award if it evolves outwith the original advert scope.
3) The classification of services and whether contracts meet value thresholds can be difficult judgements, with ineffectiveness risk increasing for decisions near the margins.
4) Significant changes to contractors or subcontractors after award may require a new competition to avoid
The document summarizes changes to standstill procedures between contract decision and award for procurements commencing after December 20, 2009. Key changes include: [1] unsuccessful bidders from earlier stages no longer need notification; [2] standstill notices must contain more detailed information; [3] the minimum standstill period is 10 days for electronic communication and 15 days for postal communication. The document also provides guidance on counting standstill period days and the required contents of standstill notices.
Procurement law remedies before and afterMartin Ellis
Procurement law remedies have changed for procurements commencing after 20 December 2009. The changes include a minimum standstill period of 10 days for electronic communication and 15 days for postal communication. Contracts can no longer be awarded if court proceedings have been served. New remedies include contract ineffectiveness and curtailment for some breaches, and courts may impose fines. Time limits for legal action are 30 days or 6 months depending on contract publication.
This document provides a summary of contracts held by Plymouth City Council. It lists over 70 contracts across various directorates, sections, and teams. The contracts range from 3 months to 25 years in length and cover services such as care services, construction projects, IT systems, and more. Contact details are provided for any questions about the listed contracts.
The document discusses top barriers to tendering for public sector contracts for small and medium enterprises. It outlines difficulties in finding opportunities, understanding complex tender processes, and meeting resource-intensive requirements. It then provides advice on how to increase chances of winning contracts, including researching the market, understanding buyer processes, and ensuring all requested information and documentation is fully provided in a clear bid.
The document provides information about Business Link for Cornwall and the Isles of Scilly, Devon and Somerset. It outlines the services provided by Business Link to help businesses start, run, and grow through information, advice, and support. It also discusses selling to the public sector, including who the public sector includes, barriers to public sector tendering, advantages of working with the public sector, and how to find public sector contracting opportunities.
Temple of Asclepius in Thrace. Excavation resultsKrassimira Luka
The temple and the sanctuary around were dedicated to Asklepios Zmidrenus. This name has been known since 1875 when an inscription dedicated to him was discovered in Rome. The inscription is dated in 227 AD and was left by soldiers originating from the city of Philippopolis (modern Plovdiv).
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPRAHUL
This Dissertation explores the particular circumstances of Mirzapur, a region located in the
core of India. Mirzapur, with its varied terrains and abundant biodiversity, offers an optimal
environment for investigating the changes in vegetation cover dynamics. Our study utilizes
advanced technologies such as GIS (Geographic Information Systems) and Remote sensing to
analyze the transformations that have taken place over the course of a decade.
The complex relationship between human activities and the environment has been the focus
of extensive research and worry. As the global community grapples with swift urbanization,
population expansion, and economic progress, the effects on natural ecosystems are becoming
more evident. A crucial element of this impact is the alteration of vegetation cover, which plays a
significant role in maintaining the ecological equilibrium of our planet.Land serves as the foundation for all human activities and provides the necessary materials for
these activities. As the most crucial natural resource, its utilization by humans results in different
'Land uses,' which are determined by both human activities and the physical characteristics of the
land.
The utilization of land is impacted by human needs and environmental factors. In countries
like India, rapid population growth and the emphasis on extensive resource exploitation can lead
to significant land degradation, adversely affecting the region's land cover.
Therefore, human intervention has significantly influenced land use patterns over many
centuries, evolving its structure over time and space. In the present era, these changes have
accelerated due to factors such as agriculture and urbanization. Information regarding land use and
cover is essential for various planning and management tasks related to the Earth's surface,
providing crucial environmental data for scientific, resource management, policy purposes, and
diverse human activities.
Accurate understanding of land use and cover is imperative for the development planning
of any area. Consequently, a wide range of professionals, including earth system scientists, land
and water managers, and urban planners, are interested in obtaining data on land use and cover
changes, conversion trends, and other related patterns. The spatial dimensions of land use and
cover support policymakers and scientists in making well-informed decisions, as alterations in
these patterns indicate shifts in economic and social conditions. Monitoring such changes with the
help of Advanced technologies like Remote Sensing and Geographic Information Systems is
crucial for coordinated efforts across different administrative levels. Advanced technologies like
Remote Sensing and Geographic Information Systems
9
Changes in vegetation cover refer to variations in the distribution, composition, and overall
structure of plant communities across different temporal and spatial scales. These changes can
occur natural.
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
Communicating effectively and consistently with students can help them feel at ease during their learning experience and provide the instructor with a communication trail to track the course's progress. This workshop will take you through constructing an engaging course container to facilitate effective communication.
Leveraging Generative AI to Drive Nonprofit InnovationTechSoup
In this webinar, participants learned how to utilize Generative AI to streamline operations and elevate member engagement. Amazon Web Service experts provided a customer specific use cases and dived into low/no-code tools that are quick and easy to deploy through Amazon Web Service (AWS.)
This document provides an overview of wound healing, its functions, stages, mechanisms, factors affecting it, and complications.
A wound is a break in the integrity of the skin or tissues, which may be associated with disruption of the structure and function.
Healing is the body’s response to injury in an attempt to restore normal structure and functions.
Healing can occur in two ways: Regeneration and Repair
There are 4 phases of wound healing: hemostasis, inflammation, proliferation, and remodeling. This document also describes the mechanism of wound healing. Factors that affect healing include infection, uncontrolled diabetes, poor nutrition, age, anemia, the presence of foreign bodies, etc.
Complications of wound healing like infection, hyperpigmentation of scar, contractures, and keloid formation.
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxEduSkills OECD
Iván Bornacelly, Policy Analyst at the OECD Centre for Skills, OECD, presents at the webinar 'Tackling job market gaps with a skills-first approach' on 12 June 2024
2. [INSERT NAME OF AWARDING AUTHORITY AS PUBLISHED IN THE RELEVANT OJEU
CONTRACT NOTICE]
INVITATION TO TENDER FOR
[INSERT TITLE OF REQUIREMENT AS PUBLISHED IN THE RELEVANT OJEU CONTRACT
NOTICE]
REFERENCE NUMBER
[INSERT REFERENCE NUMBER AS PUBLISHED IN THE RELEVANT OJEU CONTRACT
NOTICE e.g. 2007/s – xx/xxxxx]
PAGE 2 OF 79
3. TABLE OF CONTENTS
Section 0 - Preface 4
Section 1 - Background 9
Part A - Background 11
Part B - Overview of the Invitation to Tender and the Procurement Process 14
Section 2 – Tendering Process 24
Part A – Instructions to Tenderers 26
Part B – Tender Evaluation 39
Schedule 1-5 45
Section 3 - Specification 57
Section 4 – Technical Requirements (including Mandatory Information Requirements) 59
Section 5 – Response Requirements 64
Section 6 – Commercial Response Requirements 70
PAGE 3 OF 79
5. TABLE OF CONTENTS – SECTION 0
1 Glossary 5
2 Table of Abbreviations 7
3 Structure of the ITT Document 8
PAGE 5 OF 79
6. 1 Glossary
USE A TABLE OF DEFINITIONS PRECEDED WITH THE FOLLOWING WORDING:
“Unless the context otherwise requires, the following words and expressions used within this
Invitation to Tender shall have the following meanings:”
TERM MEANING
“Authority” means [insert the name of the Awarding Authority e.g.
Department for Transport]
Guidance note - You should note that that the Authority may be
different from the legal person in whose name the framework is
entered into. For example, framework agreements for the
Home Office will normally be entered into by the Secretary of
State for the Home Department.
“Call Off Contract” means the document set out in Schedule [XX] of the draft
Framework Agreement contained in Section 6, Schedule 6 of
this ITT
“Competed means the competed [goods] [services] which will be Ordered
[Goods][Services] from the Framework Agreement following a Mini-Competition
and are set out at Schedule 1 of the Framework Agreement
“Conditions of means the terms and conditions set out in this ITT relating to
Tender” the submission of a Tender
“Contracting Bodies” Means the Authority and any other contracting authorities
described in the OJEU Contract Notice
“Direct Award” means the award of a Call Off Contract by application of the
terms laid down in the Framework Agreement without re-
opening competiton
“Due Diligence means the background and supporting documents and
Information” information provided by the Authority for the purpose of better
informing the Tenderers‟ responses to this Invitation to Tender
"EIR" mean the Environmental Information Regulations 2004 together
with any guidance and/or codes of practice issued by the
Information Commissioner or relevant Government department
in relation to such regulations
FoIA means the Freedom of Information Act 2000 and any
subordinate legislation made under such Act from time to time
together with any guidance and/or codes of practice issued by
the Information Commissioner or relevant Government
department in relation to such legislation
“Framework means the agreement (as set out in Section 6, Schedule 6 of
Agreement” this ITT) to be entered by the Authority and the Provider(s)
following any award under the procurement exercise
“Invitation to Tender” means this invitation to tender documentation and all related
or “ITT” documents published by the Authority and made available to
Tenderers and includes the Due Diligence Information.
“Lot” means a discrete sub-division of the requirements
“Mini-competition” means the award of a Call Off Contract by re-opening
competiton between the Providers appointed to the Framework
Agreement and which are capable of performing the proposed
contract
“OJEU Contract means the advertisement [insert reference number and date]
Notice” issued in the Official Journal of the European Union
“Order” means an order for [goods/services or goods and services]
served by any Contracting Body on the Provider
“Other Contracting means all Contracting Bodies except the Authority
Bodies”
“Provider” means the organisation(s) admitted to the Framework
Agreement
“Public Buying means a duly constituted public sector organisation which
PAGE 6 OF 79
7. Organisation” procures goods/services for and on behalf of contracting
authorities
“Standard means the [goods][services] set out at Schedule 1 of the
[Goods]/[Services]” Framework Agreement
“Tender”, “Response”, means the Tenderers formal offer in response to this Invitation
“Tender Response”, to Tender
“Tendered Response”
or “ITT Response”
“Tenderers” means the organisations being invited to respond to this
Invitation to Tender
Where applicable Guidance Notes will appear throughout this document and will
always be in BLUE text. They are solely to assist/advise the person drafting an ITT and
as such MUST be removed from the ITT document PRIOR to issue to Tenderers.
Guidance Note for drafters any Guidance Notes, Drafter‟s Notes (DNs) Drafters Questions
(DQs) and/or text in italics must be removed (and where appropriate replacement drafting
inserted) prior to the ITT document being issued to Tenderers
Guidance Note - other definitions may be added as applicable. Defined terms must always
start with an upper case letter eg Tenderers or Invitation to Tender as indicated in the table
above.
THE GLOSSARY CAN BE SUPPLEMENTED WITH THE CONVENTION THAT A WORD
OR PHRASE IS SPECIFIED IN THE DOCUMENT THE FIRST TIME IT IS USED AND THEN
NOTED AS SUCH IN INVERTED COMMAS AND BOLD AS FOR EXAMPLE –
Persons responding to this document (“Tenderers”) or
The Department for Work and Pensions (“the Authority”)
Guidance Note - throughout the ensuing document all defined terms must start with an upper
case letter eg Tenderers or the Authority.
ABBREVATIONS MAY ALSO BE USED THUS-
Department for Work and Pensions (“DWP”)
Guidance Note – it may be helpful to Tenderers if a glossary of abbreviations is provided (see
below).
2 Table of Abbreviations
In this Invitation to Tender the following abbreviations are ascribed the meanings detailed in
the table below
ABBREVIATION MEANS
ITT Invitation to Tender
KPI Key Performance Indicator
MI Management Information
OCB Other Contracting Body
OGC Office of Government Commerce
OJEU Official Journal of the European Union
PBO Public Buying Organisation
PAGE 7 OF 79
8. 3 Structure of the ITT Document
Covering Letter for Invitation to Tender
Acknowledgement Letter
Section 0 Preface
(A) Background
Section 1
Background
(B) Overview of the ITT and the
Procurement Process
(A) Instructions To Tenderers
Section 2 (B) Tender Evaluation:
Tendering Process
Schedules 1 to 5
Section 3 Specification
Section 4 Technical Requirements
Section 5 Response Requirements
Section 6 Commercial Response
Requirements
PAGE 8 OF 79
10. TABLE OF CONTENTS – SECTION 1
Part A - Background 11
1 Introduction 12
2 The Authority 12
3 OGC 13
4 Other Contracting Bodies 13
5 Use of Electronic Tendering Tool 14
6 Marketing of the Framework 14
Appendix 1 14
Part B- Overview of the Invitation to Tender and the Procurement Process 14
1 Introduction 16
2 Proposed Framework Agreement – Single Provider 17
2 Proposed Framework Agreement – Multiple Providers 17
3 Lots 19
4 Orders Under Multiple Provider Frameworks 22
PAGE 10 OF 79
11. Section 1 – Part A
Background
Version 1.0
PAGE 11 OF 79
12. 1 Introduction
1.1 [AUTHORITY TO INSERT DETAILS OF WHY THE PROCUREMENT IS TAKING PLACE
AND PROVIDE DETAILS OF OJEU NOTICE] for example
HM Revenue and Customs (HMRC) working with the Office of Government Commerce
(OGC) and the Other Contracting Bodies named in OJEU Notice 2007/s xx-xxxxx dated xx
February 20xx are looking for a Provider(s) [OR x NUMBER OF PROVIDERS – AS
SPECIFIED IN THE OJEU NOTICE REFERRED TO ABOVE] to be appointed onto a Pan
Government Framework Agreement for the supply of [THE GOODS OR SERVICES OR
GOODS AND SERVICES AS SPECIFIED IN THE OJEU NOTICE REFERRED TO ABOVE].
The UK Government currently procures XXX of XXX OR SPENDS AN ESTIMATED £XXX
MILLION ON THE SUPPLY OF XXX OR PROVISION OF XXX SERVICES.
2 The Authority
2.1 [AUTHORITY TO INSERT BACKGROUND DETAILS OF ITS ORGANISATION] for example
HMRC is a Government Department that was created in April 2005 it brought together the
functions of HM Customs and Excise and the Inland Revenue.
HMRC employs approximately 100,000 people, about a fifth of the entire Civil Service, across
more than 300 locations and some 900 offices. Its responsibilities include:
Income, Corporation, Capital Gains, Inheritance, Insurance Premium, Stamp, Land and
Petroleum Revenue Taxes
VAT, Excise Duties, Customs Duties and frontier protection
Environmental taxes: climate change and aggregates levy and landfill tax
National Insurance
Tax Credits
Child Benefit and the Child Trust Fund
Enforcement of the National Minimum Wage
Recovery of Student Loan repayments
Additional general information about HMRC can be found on www.hmrc.gov.uk
2.2 The Authority, shall actively manage the resulting Framework Agreements, key activities
including: contract review meetings; KPI management and analysis of management
information provided [OTHER FUNCTIONS TO BE ADDED AS APPLICABLE].
[OR IF ANY OTHER AUTHORITY OR PUBLIC BUYING ORGANISATION ARE GOING TO
MANAGE THE RESULTING FRAMEWORK SUBSTITUTE THEIR NAME FOR THE
AUTHORITY. A STATEMENT OF RELATIONSHIP BETWEEN THE PBO, THE
AUTHORITY, OTHER CONTRACTING BODIES AND PROVIDERS IN THE OPERATION OF
THE FRAMEWORK INCLUDING CUSTOMER ACCESS PROCEDURES (IF ANY) AND
CONTRACT MANAGEMENT RESPONSIBILITIES (E.G. SANCTIONS, MANAGEMENT
INFORMATION ANALYSIS, CO-ORDINATING PROVIDER AND CUSTOMER ISSUES)]
WILL NEED TO BE INCLUDED HEREOR
PAGE 12 OF 79
13. [IF IT IS TO BE A JOINT APPROACH TO CONTRACT/PROVIDER RELATIONSHIP
MANAGEMENT SET OUT DETAILS OF THE ORGANISATIONS INVOLVED AND AS
ABOVE AND THEIR RESPECTIVE ROLES]
3 OGC
3.1 [OGC TO PROVIDE UP TO DATE NARRATIVE FOR THIS SECTION]
4 Other Contracting Bodies (OCBs)
4.1 The Framework Agreement will be available for use by OCBs throughout the whole of the UK,
including Northern Ireland, Scotland and Wales [AMEND GEOGRAPHICAL COVERAGE
WHERE APPROPRIATE] as described in the OJEU Contract Notice. Any OCB described in
the OJEU Contract Notice may utilise the resulting Framework Agreement from the
commencement date.
Guidance note – the lead Authority should validate potential usage of the Framework
Agreement by the different sectors of the public arena. Whilst the OJEU may have been
widely drafted to enable Framework Agreement to be used by wide range of other Other
Contracting Bodies it may be appropriate to be more specific in the ITT. If further analysis
work has been undertaken and it is evident that some sectors of the public arena are highly
unlikely to use the Framework the drafting above should be amended to bring such
exclusions to the attention of Providers. However under no circumstances can the original
scope of the OJEU Contract Notice be widened encompass areas of the public sector
previously omitted.
4.2 A list of OCBs [WHO HAVE EXPRESSED AN INTEREST/COMMITTED TO USING THE
FRAMEWORK] can be found at Appendix One of this document. Once established the
Framework will be actively marketed to attract take up by additional Contracting Bodies
beyond those specified in Appendix One.
PAGE 13 OF 79
14. 5 Use of Electronic Tendering Tool [IF APPLICABLE]
5.1 The Authority is utilising an electronic tendering tool to manage this procurement and
communicate with Tenderers. Accordingly, there will be no hard copy documents issued to
Tenderers and all communications with the Authority including the submission of Tenderers
responses will be conducted via [insert name of proprietary electronic tool being used and link
to URL address.]
6 Marketing of the Framework
[AUTHORITY TO INSERT DETAILS OF HOW THE FRAMEWORK WILL BE MARKETED –
WHEREVER POSSIBLE INCLUDE A HIGH LEVEL MARKETING PLAN. THIS SHOULD
INCLUDE ANY DETAILS OF MARKETING THAT THE AUTHORITY EXPECTS THE
SUCCESSFUL TENDERER(S) TO PARTICIPATE IN OR UNDERTAKE.]
Guidance Note: Any marketing by the Authority must take into account the estimated value of
services/goods to be procured under the Framework Agreement, as advertised in the OJEU
Contract Notice.
Appendix 1
[INSERT LIST OF ANTICIPATED/COMMITTED OTHER CONTRACTING BODIES – WHERE
APPROPRIATE INCLUDE ANY SPEND, VOLUMES AND THE POTENTIAL ACCESS
DATES IF THE THE OCB IS ALREADY IN A CONTRACTUAL ARRANGEMENT WHICH
EXPIRES BEYOND THE ANTICIPATED START DATE OF THE FRAMEWORK
AGREEMENT]
Tenderers should note that the details of spend, volumes and potential access dates set out
in this Appendix are estimates only. They are not intended to provide any commitment as to
the number or value of contracts that the Authority and OCBs may purchase using this
Framework Agreement. OCBs are under no obligation to join the framework and may decide
not to do so. The Framework Agreement is non-exclusive: the Authority and OCBs give no
undertaking that they will purchase the whole or any of their requirement for [goods/services
or goods and services] through this arrangement.
PAGE 14 OF 79
15. Section 1 – Part B
Overview of the Invitation to Tender
and the Procurement Process
Version 1.0
PAGE 15 OF 79
16. 1 Introduction
1.1 The Authority wishes to establish a [insert either single Provider or multi-Provider] Framework
Agreement for the provision of [insert a short description of the goods or services or goods
and services]. The Authority is managing this procurement process in accordance with the
Public Contracts Regulations 2006 (the “Regulations”). This is a [goods/services/goods and
services] Framework Agreement being procured under the restricted procedure.
1.2 The Authority is procuring the Framework Agreement as a central purchasing body for itself
and Other Contracting Bodies. This means that OCBs referred to in the OJEU Notice may
also participate in the Framework Agreement.
1.3 The Authority received completed Pre-Qualification Questionnaires from potential providers
and has evaluated minimum standards of technical or professional ability and economic and
financial standing. All those potential providers who were shortlisted following the evaluation
of the PQQ have been issued with the ITT.
Guidance note – if the lead authority considers there to be commercial advantage in
disclosing details of which other organisations have also been sent the ITT the above
paragraph should be amended and a list of organisations invited to tender inserted.
1.4 Section 2 contains the Instructions to Tenderers and the conditions of this ITT.
1.4.1 There are also a number of certificates contained in the Schedules at Section 2 for you
to confirm the basis on which your Tender is submitted.
1.4.2 In addition, Section 2 contains a checklist for you to use to check that you have
included the correct information that you should complete and return with the Tender
Response.
1.5 Section 3 contains the Specification.
1.6 Section 4 contains the Technical Requirements.
1.7 Section 5 contains the Response Requirements. This sets out how the Tenderer must
respond to the Specification and the Technical Requirements.
1.8 Section 6 contains the Commercial Response Requirements including a copy of the proposed
Framework Agreement.
1.9 Prior to commencing formal evaluation, Tender Responses will be checked to ensure they are
fully compliant with the conditions of Tender. Non-compliant Tender Responses may be
rejected by the Authority. Tender Responses which are deemed by the Authority to be fully
compliant will proceed to evaluation. These will be evaluated using the selection criteria and
weightings detailed in the matrix set out at paragraph 2 of Section 2 (B).
Guidance note - where the Authority reserves to itself a discretion under this ITT, it should
exercise that discretion properly, fairly and not unreasonably. It should endeavour to treat
Tenderers equally throughout the process.
PAGE 16 OF 79
17. 1.10 Following evaluation of the compliant Tenders and approval of the outcome the Authority
intends to appoint [insert as applicable, and depending on whether the Framework is to be
either single or multi Provider, one or [insert number] successful Providers] to enter into a
Framework Agreement.
1.11 Whilst it is the Authority‟s [and any relevant Other Contracting Bodies] intention to purchase
the majority of its [goods/services/goods and services] under this Framework Arrangement
from the Providers appointed this does not confer any exclusivity on the appointed Providers.
The Authority and any relevant Other Contracting Bodies reserve the right to purchase any
[goods/services/goods and services] (including those similar to the [goods/services/goods and
services] covered by this procurement) from any provider outside of these Framework
Agreements.
Guidance note – the Authority needs to consider whether the above statement is applicable to
the procurement exercise they are engaged on and whether it can make this statement on
behalf of OCBs. If the Procurement Strategy or Sourcing Strategy has concluded that the
Framework will meet all potential requirements across the public sector and there will be no
opportunity for Contracting Bodies to procure their requirements outside of the proposed
Framework Agreement the above paragraph should be amended to make it clear this will be
the case.
2 Proposed Framework Agreement – Single Provider [if
applicable]
Guidance note – The Procurement Strategy or Sourcing Strategy should specify whether the
aim of the procurement is to appoint a single Provider or multiple Providers to fulfill all the
requirements. In this context it is crucial to check what was specified in the OJEU Contract
Notice - Section II.1.4 which will have been either “several operators” or “a single operator”
insert the relevant paragraph from those detailed below.
2.1 It is the Authority‟s intention to enter into a Framework Agreement with a single Provider.
Guidance note - Where a Framework Agreement is concluded with just one Provider, Call Off
Contracts under the Framework Agreement should be awarded within the terms laid down in
the agreement. It is the same principle as that applying to a normal contract, except that, with
a Framework Agreement, there will be an interval between the awarding of the framework
itself and the calling-off of the goods/services/goods and services under it. The Framework
Agreement has been drafted on the basis that the Authority will appoint multi suppliers to the
framework and it will need to be amended prior to dispatch of the ITT if the Authority intends
to award a single supplier framework.
2.2 The Authority reserves the right not to conclude a Framework Agreement as a result of the
current procurement process.
OR
2 Proposed Framework Agreement – Multiple Providers [if
applicable]
2.1 It is the Authority‟s intention to enter into a Framework Agreement with more than one
Provider.
2.2 For the purposes of this Framework Agreement the Authority has classified the
[goods/services/or goods and services] as Standard [Goods]/[Services] and Competed
[Goods]/[Services].
PAGE 17 OF 79
18. The Standard [Goods]/ [Services] are described in Lot numbers [insert lot numbers].
The Competed [Goods]/[Services] are described in Lot numbers [insert lot numbers].
2.3 Call Off Contracts for Standard [Goods]/[Services] will be awarded by Direct Award i.e without
re-opening competition and Call Off Contracts for Competed [Goods] / [Services] will be
awarded following a Mini-Competition. These processes are explained in more detail below.
2.4 Call Off Contracts, whether as a result of Direct Award or following Mini-Competition will be
formed by the issue of an Order by the Authority or relevant OCB, to the Provider and
acceptance by the Provider of such an Order. The Call Off Contract will be on the terms
specified in the Framework Agreement - Schedule 6, supplemented as appropriate by such
details as price and quantity which will be specified in the Order.
Guidance Note
The Authority will need to consider which goods/services will be capable of being awarded on
the terms laid down in the framework agreement (Standard Goods/Services) by way of Direct
Award and those goods /services where the terms are not precise enough and will be subject
to a Mini-Competition (Competed Goods/Services).
Direct Award
The Direct Award of a Call Off Contract is permitted where the terms laid down in the
Framework Agreement are sufficiently precise to cover the particular Call Off Contract. Where
the Authority plans to award contracts without re-opening competition, then the Framework
Agreement must include a mechanism, which should be followed by the Authority and OCBs.
The mechanism for Direct Award of a Call-Off Contract contained in the Framework
Agreement requires the Authority/OCB to apply the criteria, which were originally applied by
the Authority when awarding the Framework Agreement. These will be set out at Schedule 2
of the Framework Agreement. It is permissible not to apply an award criterion if it is not
relevant to the Call–Off Contract (for example, where the original criteria requires the Provider
to show that it can supply the [goods/services/goods and services] nationwide, but the OCB is
only concerned with supply on a local level). Therefore, the Authority must give careful
consideration to the Framework award criteria to ensure that not only are they suitable for use
when appointing Providers to the Framework, but that the criteria will also allow the
Authority/OCB to call-off contracts.
In order for an OCB to be able to apply the original criteria, the lead Authority will have to
ensure that they are able to supply OCBs with all necessary information to ensure that it can
apply the criteria correctly. Such information could include the applicable quality standards,
price and the statement of requirements or specification.
The Authority will need to consider whether there is any justification for allowing limited
flexibility in the award criteria weightings used for the Direct Award. A potential approach
would be to allow a 10% range between the minimum and maximum weighting for each
award criterion. This would then allow OCBs some discretion when applying the award criteria
at Direct Award.
The Regulations do not specify how Call Off Contracts should be awarded without re-opening
competition and the approach set out above is one suggested option. Another method for
Direct Awards is to use a “cascade” approach. This means that all Providers are ranked at
Framework award stage (by application of the award criteria) and Call-Off Contracts are then
awarded to the highest-ranking Provider available in the relevant lot. If that Provider is not
able to undertake the Call-Off Contract then it will be awarded to the Provider ranked second
and so on. If the Authority wishes to use the “cascade” approach for awarding Call-Off
Contracts, it will be necessary to amend the model Framework Agreement.
PAGE 18 OF 79
19. Please note that a “catalogue shopping” approach i.e. free choice of a supplier under a
framework is not permissible. The Authority/OCB must use the mechanism laid down in the
Framework Agreement before choosing a Provider under Direct Award.
Re-opening Competition
Where not all of the terms are laid down in the Framework Agreement, a Call-Off Contract
can be awarded using a Mini-Competition. When re-opening competition in this way, it is
important to understand this does not mean that basic terms can be renegotiated, or that the
specification or statement of requirements used in setting up the Framework Agreement can
be changed. It is more a matter of supplementing or refining the basic terms to reflect
particular circumstances.
The terms which may be refined include the following:
particular delivery timescales;
particular invoicing arrangements and payment profiles;
additional security needs;
incidental charges;
particular associated services, eg installation, maintenance and training;
particular mixes of quality systems and rates;
particular mixes of rates and quality;
where the terms include a price mechanism;
individual special terms (e.g. specific to the particular goods/services/goods and services
that will be provided to meet a particular requirement under the Framework Agreement).
When awarding a Call-Off Contract using a Mini-Competition, the Authority/OCB should
generally use the criteria laid down by the Authority for the award of the Framework
Agreement. If necessary, the award criteria used for the Mini-Competition can be different to
the original award criteria but they should be related. For Mini-Competitions it is possible for
the Authority/OCB to vary the weightings given to each of the criteria provided this is set out
clearly in the invitation to tender for the Mini-Competition.
The Mini-Competition must include all Providers who have been admitted to the Framework
Agreement who are capable of performing the particular Call-Off Contract. Often, this will
mean that all Providers admitted to the Framework Agreement, or, where the requirement has
been divided into Lots, all Providers appointed to a particular Lot.
2.5 The Authority reserves the right not to conclude any Framework Agreement(s) as a result of
the current procurement process.
3 Lots [if applicable]
Guidance note - number of Providers - check for consistency with the OJEU Contract Notice
- section II.1.4 that “several operators” was specified and if so the number specified or the
maximum number of providers envisaged in each Lot.
Guidance note – cross-check with the OJEU Contract Notice - section II.1.8 whether it was
specified that the [goods/services/goods and services] were to be divided into Lots, or that the
right was reserved to divide the requirement into Lots under section II.2.1.
PAGE 19 OF 79
20. Guidance note – If the Procurement Strategy or Sourcing Strategy concluded that the
framework would involve multiple Providers, then subject to the wording of the OJEU Contract
Notice consideration should be given to whether the requirement should be divided into
separate Lots with one or more Lot(s) containing standard [goods/services/goods and
services] with Direct Award of Call Off Contracts and a separate Lot(s) for non standard
(competed) requirements i.e. where there is variability of the standard offering or where the
terms laid down in the Framework Agreement are not precise enough for the particular Call
Off Contract . These should then be listed by the Authority as the Standard Goods/Services
and Competed Goods/Services in Schedule 1 of the Framework Agreement.
Guidance note - In running Mini-Competitions Contracting Bodies should take note of the
extent to which changes to requirements and/or the terms of the Framework Agreement can
be modified under the Regulations.
PAGE 20 OF 79
21. 3.1 The [goods/services/goods and services] covered by this procurement exercise have been
sub-divided into [insert number] categories (referred to in the OJEU Contract Notice as
“Lots”), namely:
LOT DESCRIPTION METHOD OF AWARD OF CALL OFF
CONTRACTS
LOT 1 [insert description of the Lot] [insert method by which Call Off
Contracts will be awarded – either Direct
Award or by Mini-Competition”]
LOT 2 -ditto- -ditto-
LOT 3 -ditto- -ditto-
LOT 4 -ditto- -ditto-
LOT 5 -ditto- -ditto-
LOT 6 -ditto- -ditto-
3.2 The Authority anticipates that it will enter into a Framework Agreement with between [[insert
number] of Providers] or [a maximum of [insert number] of Providers] for each of the Lots.
Guidance note – the above paragraph may need to be amended to reflect the number of
Providers which the Authority intends to enter into the Framework Agreement with in respect
of each of the Lots.
3.3 Following the outcome of the evaluation of PQQ responses Tenderers have previously been
notified which of the Lots they will be invited to Tender for.
3.4 [The Call-Off Contracts may contain different provisions for each Lot].
Guidance note – if this is indeed the case the Call Off Contract terms and conditions must be
duly amended prior to the dispatch of the ITT and the Tenderer‟s attention drawn the relevant
changes and details provided which Lot(s) the changes are applicable to.
3.5 It is intended that each time the Authority (and/or any Other Contracting Body) re-opens
competition and runs a mini competition for the award of a Call Off Contract under the multi
Provider Framework then the award decision will be based on the following criteria:
Guidance note - the competed goods/services award criteria to be applied to tenders
evaluated under any mini competition must be related to the original criteria used to award the
Framework Agreements and will be set out at Schedule 2 of the Framework Agreement.
PAGE 21 OF 79
22. TABLE 3.6 – COMPETED GOODS/SERVICES AWARD CRITERIA AND WEIGHTINGS
LOT CRITERIA FOR MINI WEIGHTINGS
COMPETITIONS UNDER THE
MULTI-PROVIDER FRAMEWORK
LOT 1 [insert proposed mini competition To be set by Authority/OCB conducting
evaluation criteria as specified in the mini-competiton
original OJEU Notice or as otherwise
modified for this ITT]
[insert proposed mini competition To be by Authority/OCB conducting mini-
LOT 2
evaluation criteria as specified in the competition
original OJEU Notice or as otherwise
modified for this ITT]
[insert proposed mini competition To be set by Authority/OCB conducting
LOT 3
evaluation criteria as specified in the mini-competition
original OJEU Notice or as otherwise
modified for this ITT]
[insert proposed mini competition To be by Authority/OCB conducting mini-
LOT 4
evaluation criteria as specified in the competition
original OJEU Notice or as otherwise
modified for this ITT]
[insert proposed mini competition To be set by Authority/OCB conducting
LOT 5
evaluation criteria as specified in the mini-competition
original OJEU Notice or as otherwise
modified for this ITT]
3.7 The Authority and the relevant Other Contracting Bodies reserve the right to use reverse
electronic auctions in order when conducting mini competitions between Providers under the
Framework.
4 Orders Under Multiple Provider Frameworks
4.1 In the event that the Authority (and/or any OCB) decides to use this multi Provider Framework
to source [goods/services/goods and services] it is expected that the following process will be
applied:
4.1.1 Prior to any OCB conducting any Mini-competitions or making any Direct Awards under
the Framework Agreement they will complete and submit a participation agreement to
the Authority, or as applicable, the body managing the Framework Agreement notifying
them that the Framework Agreement meets their requirements and that they intend to
award Call Off Contracts under the Framework Agreement. Following submission of
the participation agreement the relevant OCB will send a letter to the Provider(s)
putting them on notice that they intend to award Call Off Contracts under the
Framework Agreement.
4.1.2 For Standard [Goods]/[Services] which are subject to Direct Award the Authority or
relevant OCB will award a Call Off Contract to the appropriate provider by application of
the direct award mechanism contained in the Framework Agreement.
4.1.3 This means that the Authority/OCB will apply the award criteria set out in Section 2,
Table 2.2 on page [50] of this ITT to select the Provider which it will then place an
Order with.
PAGE 22 OF 79
23. 4.1.4 For Competed [Goods]/[Services] the Authority or any relevant OCB will run a Mini-
Competition. This will involve inviting tenders from those Provider‟s capable of
performing the proposed Call Off Contract and requesting “sealed bids” from Providers
included on the relevant Lots who have been qualified to deliver those particular
[goods/services/goods and services] requesting, for example,
particular delivery timescales;
particular invoicing arrangements and payment profiles;
additional security needs;
incidental charges;
particular associated services, eg installation, maintenance and training;
particular mixes of quality systems and rates;
particular mixes of rates and quality;
where the terms include a price mechanism;
individual special terms (e.g. specific to the particular goods/services/goods and
services that will be provided to meet a particular requirement under the Framework
Agreement).
4.1.5 The Provider submitting the most economically advantageous “sealed bid” in
accordance with the criteria set out in Table 3.6 above will be awarded the Call Off
Contract.
PAGE 23 OF 79
24. Section 2
Tendering Process
Version 1.0
PAGE 24 OF 79
25. TABLE OF CONTENTS – SECTION 2
Part A – Instructions to Tenderers 26
1 General 28
2 Bidders Conference 29
3 Confidentiality 29
4 Freedom of Information 30
5 Tender Validity 30
6 Timescales 30
7 Authority’s Contact Details 31
8 Intention to Submit a Tender 31
9 Preparation of Tender 32
10 Submission of Tenders 32
11 Canvassing 35
12 Disclaimers 35
13 Collusive Behaviour 35
14 No Inducement or Incentive 36
15 Acceptance and Admission to the Framework Agreement 36
16 Queries Relating to Tender 36
17 Amendments to Tender Documents 37
18 Late Tenders 37
19 Proposed Amendments to the Framework Agreement and/or Call Off Order
Documents by the Tenderer 37
20 Modification and Withdrawal 37
21 Right to Reject/Disqualify 38
22 Right to Cancel, Clarify or Vary the Process 38
23 Customer References 38
24 Notification of Award 38
25 Debriefing 38
26 Statement of Compliance 39
PAGE 25 OF 79
26. Part B – Tender Evaluation 39
1 Introduction 41
2 Evaluation of Tenders 41
3 Evaluation Process 42
4 Award of Framework Agreement 43
Schedule 1: Form of Tender 45
Schedule 2: Collusive Tendering 48
Schedule 3: Canvassing 49
Schedule 4: Confirmation of PQQ Submission 50
Schedule 5: Tender Response and Statement of Compliance 51
PAGE 26 OF 79
27. Section 2 – Part A
Instructions to Tenderers
Version 1.0
PAGE 27 OF 79
28. 1 General
1.1 These instructions are designed to ensure that all Tenderers are given equal and fair
consideration. It is important therefore that you provide all the information asked for in the format
and order specified. Please contact [insert the name, address and e-mail address of the
designated Authority contact or in their absence [insert the name address and e-mail address of
the designated alternative Authority contact] if you have any doubt as to what is required or will
have difficulty in providing the information requested.
Guidance note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to reflect how the tool will deal with communications between
the Authority and the Tenderers.
1.2 Tenderers should read these instructions carefully before completing the Tender
documentation. Failure to comply with these requirements for completion and submission of
the Tender Response may result in the rejection of the Tender. Tenderers are advised
therefore to acquaint themselves fully with the extent and nature of the [goods/services/goods
and services] and contractual obligations. These instructions constitute the Conditions of
Tender. Participation in the tender process automatically signals that the Tenderer accepts
these Conditions of Participation.
1.3 All material issued in connection with this ITT shall remain the property of the Authority and/or
as applicable relevant OCB and shall be used only for the purpose of this procurement
exercise. All Due Diligence Information shall be either returned to the Authority or securely
destroyed by the Tenderer (at the Authority‟s option) at the conclusion of the procurement
exercise.
1.4 The Tenderer shall ensure that each and every sub-contractor, consortium member and
adviser abides by the terms of these instructions and the Conditions of Tender.
1.5 The Tenderer shall not make contact with any other employee, agent or consultant of the
Authority or any relevant OCB who are in any way connected with this procurement exercise
during the period of this procurement exercise, unless instructed otherwise by the Authority.
1.6 The Authority shall not be committed to any course of action as a result of:
issuing this ITT or any invitation to participate in this procurement exercise;
an invitation to submit any Response in respect of this procurement exercise;
communicating with a Tenderer or a Tenderer‟s representatives or agents in respect of
this procurement exercise; or
any other communication between the Authority and/or any relevant OCB (whether
directly or by its agents or representatives) and any other party.
1.7 Tenderers shall accept and acknowledge that by issuing this ITT the Authority shall not be
bound to accept any Tender and reserves the right not to conclude a Framework Agreement
for some or all of the [goods/services/goods and services] for which Tenders are invited.
1.8 The Authority reserves the right to amend, add to or withdraw all, or any part of this ITT at any
time during the procurement exercise.
PAGE 28 OF 79
29. 2 Bidders Conference [if applicable]
2.1 A Bidders‟ Conference will be held on [Insert date and location]. The conference will provide
Tenderers with an opportunity to seek clarification on any matters relating to the ITT and the
requirements in an open forum. Further details are included in the letter accompanying this
ITT.
As space is at a premium, please nominate a maximum of [insert number] key personnel to
attend. Details of those attending must be provided to the Authority [insert name of
designated Authority contact, telephone number and e-mail address as in paragraph 1.1] by
no later than [insert time and date].
Guidance note: this should be included in the letter accompanying the ITT and cross-
referenced here
Guidance note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to be consistent with the information set out in paragraph 1.1
3 Confidentiality
3.1 Subject to the exceptions referred to in paragraph 3.2, the contents of this ITT are being
made available by the Authority on condition that:
3.1.1 Tenderers shall at all times treat the contents of the ITT and any related documents
(together called the „Information‟) as confidential, save in so far as they are already in
the public domain;
3.1.2 Tenderers shall not disclose, copy, reproduce, distribute or pass any of the
Information to any other person at any time or allow any of these things to happen;
3.1.3 Tenderers shall not use any of the Information for any purpose other than for the
purposes of submitting (or deciding whether to submit) a Tender; and
3.1.4 Tenderers shall not undertake any publicity activity within any section of the media.
3.2 Tenderers may disclose, distribute or pass any of the Information to the Tenderer‟s advisers,
sub-contractors or to another person provided that either:
3.2.1 This is done for the sole purpose of enabling a Tender to be submitted and the
person receiving the Information undertakes in writing to keep the Information
confidential on the same terms as if that person were the Tenderer; or
3.2.2 The Tenderer obtains the prior written consent of the Authority in relation to such
disclosure, distribution or passing of Information; or
3.2.3 The disclosure is made for the sole purpose of obtaining legal advice from external
lawyers in relation to the procurement or to any Framework Agreement arising from it;
or
3.2.4 The Tenderer is legally required to make such a disclosure.
PAGE 29 OF 79
30. 3.3 In paragraphs 3.1 and 3.2 above the definition of „person‟ includes but is not limited to any
person, firm, body or association, corporate or incorporate.
3.4 The Authority may disclose detailed information relating to Tenders to its officers, employees,
agents or advisers and the Authority may make any of the Framework Agreement documents
available for private inspection by its officers, employees, agents or advisers. The Authority
also reserves the right to disseminate information that is materially relevant to the
procurement to all Tenderers, even if the information has only been requested by one
Tenderer, subject to the duty to protect each Tenderer's commercial confidentiality in relation
to its Tender (unless there is a requirement for disclosure under the Freedom of Information
Act, as explained in paragraphs 4.1 to 4.3 below).
4 Freedom of Information
4.1 In accordance with the obligations and duties placed upon public authorities by the Freedom
of Information Act 2000 (the „FoIA‟), the Authority may, acting in accordance with the
Secretary of State‟s Code of Practice on the Discharge of the Functions of Public Authorities
under Part 1 of the said Act, or the EIR be required to disclose information submitted by the
Tenderer to the to the Authority.
4.2 In respect of any information submitted by a Tenderer that it considers to be commercially
sensitive the Tenderer should:
4.2.1 Clearly identify such information as commercially sensitive;
4.2.2 Explain the potential implications of disclosure of such information; and
4.2.3 provide an estimate of the period of time during which the Tenderer believes that
such information will remain commercially sensitive.
4.3 Where a Tenderer identifies information as commercially sensitive, the Authority will
endeavour to maintain confidentiality. Tenderers should note, however, that, even where
information is identified as commercially sensitive, the Authority may be required to disclose
such information in accordance with the FoIA or the Environmental Information Regulations.
In particular, the Authority is required to form an independent judgment concerning whether
the information is exempt from disclosure under the FoIA or the EIR and whether the public
interest favours disclosure or not. Accordingly, the Authority cannot guarantee that any
information marked „confidential‟ or “commercially sensitive” will not be disclosed.
4.4 Where a Tenderer receives a request for information under the FoIA or the EIR during the
procurement process, this should be immediately passed on to the Authority and the
Tenderer should not attempt to answer the request without first consulting with the Authority.
5 Tender Validity
5.1 Your Tender should remain open for acceptance for a period of [insert number] days. A
Tender valid for a shorter period may be rejected.
Guidance note – a minimum of 60 days is suggested but this should be reviewed and
amended to comply with the Authority‟s policy and/or the complexity of the procurement.
6 Timescales
6.1 Set out below is the proposed procurement timetable. This is intended as a guide and whilst
the Authority does not intend to depart from the timetable it reserves the right to do so
at any stage.
DATE STAGE
[insert date] ITT to be issued to short-listed Tenderers by the Authority
[insert date] Tenderers confirm receipt of ITT pack
PAGE 30 OF 79
31. [insert date] Bidders conference
[insert date] Deadline for Tenderers to confirm intention to submit ITT Response
[insert date] Clarification period opens
[insert date] Clarification period closes
[1100] GMT Closing date and time for receipt by the Authority of Tenderer Responses to
[insert date] the ITT
[insert date] Evaluation of ITT Responses commences
[insert date] If not undetaken at an earlier stage in the procurement process, Reference
Site visits
[insert date] Notification of proposed appointment(s) to Framework
[insert date] Expiry of standstill period required under Regulation 32 of the Public
Contracts Regulations 2006
[insert date] Appointment of Provider(s) to Frameworks(s)
[insert date] Commencement Date of Framework Agreement
[insert date] Implementation
Guidance note – the above timetable is based on the assumption that the Restricted
Procedure is being used, if this is not the case and either the Open or the Competitive
Dialogue Procedure is being used the timetable should be amended to match the procedural
steps under the particular procedure being followed.
Guidance note – if it is intended that implementation commences prior to provision of the
[goods/services/goods and services] reverse the order of the last two rows in the table above.
7 Authority’s Contact Details
7.1 Unless stated otherwise in these Instructions or in writing from the Authority, all
communications from Tenderers (including their sub-contractors, consortium members,
consultants and advisers) during the period of this procurement exercise must be directed to
the designated Authority contact named in paragraph 1.1 above.
Guidance Note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to be consistent with, and cross-referenced to paragraph 1.1
to reflect how the tool will deal with communications between the Authority and the Tenderers.
7.2 All communications should be clearly headed Invitation to Tender for [insert details of Tender
and reference number as per front sheet of ITT] and include the name, contact details and
position of the person making the communication.
Requests for Tender clarifications must be submitted in accordance with the procedure set
out in paragraph 16 – Queries Relating to Tender.
8 Intention to Submit a Tender
8.1 Tenderers must complete the Invitation To Tender Acknowledgement pro-forma appended to
the ITT covering letter indicating that they intend to submit a Tender and be bound by the
Conditions of Tender and return it to [insert name of designated Authority contact] at the
address provided at paragraph 1.1 above no later than [insert date - xx month 20xx].
PAGE 31 OF 79
32. Guidance Note – Ensure consistency with the ITT covering letter
Guidance Note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to be consistent with, and cross-referenced to the ITT
covering letter and paragraph 1.1 to reflect how the tool will deal with communications between
the Authority and the Tenderers.
8.2 In the event that a Tenderer does not wish to participate further in this procurement exercise,
the Tenderer should indicate such on the Tender Acknowledgement pro-forma and return it
with the complete ITT document set to [insert name of designated Authority contact] at the
address provided at paragraph 1.1 above.
Guidance Note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to be consistent with, and cross-referenced to paragraph 1.1
to reflect how the tool will deal with communications between the Authority and the Tenderers.
9 Preparation of Tender
9.1 Tenderers must obtain for themselves at their own responsibility and expense all information
necessary for the preparation of Tenders. Tenderers are solely responsible for the costs and
expenses incurred in connection with the preparation and submission of their Tender and all
other stages of the selection and evaluation process. Under no circumstances will the
Authority, or any of their advisers, be liable for any costs or expenses borne by Tenderers,
sub-contractors, suppliers or advisers in this process.
9.2 Tenderers are required to complete and provide all information required by the Authority in
accordance with the Conditions of Tender and the Invitation to Tender. Failure to comply with
the Conditions and the Invitation to Tender may lead the Authority to reject a Tender
Response.
9.3 The Authority relies on Tenderers' own analysis and review of information provided.
Consequently, Tenderers are solely responsible for obtaining the information which they
consider is necessary in order to make decisions regarding the content of their Tenders and
to undertake any investigations they consider necessary in order to verify any information
provided to them during the procurement process.
9.4 Tenderers must form their own opinions, making such investigations and taking such advice
(including professional advice) as is appropriate, regarding the [suppliers/services goods and
services] and their Tenders, without reliance upon any opinion or other information provided
by the Authority or their advisers and representatives. Tenderers should notify the Authority
promptly of any perceived ambiguity, inconsistency or omission in this ITT, any of its
associated documents and/or any other information issued to them during the procurement
process.
10 Submission of Tenders
10.1 The Tender must be submitted in the form specified in the Form of Tender instructions in
Section Two: Schedule One. Failure to do so may render the Response non-compliant and it
may be rejected.
10.2 The Authority may at its own absolute discretion extend the closing date and the time for
receipt of Tenders specified in paragraph [insert “10.10” (paper based Tenders) or “10.4”
(electronic Tenders)].
10.3 Any extension granted under paragraph 10.2 will apply to all Tenderers.
Insert the following clauses for a paper based tendering exercise:
10.4 Tenderers must submit:
PAGE 32 OF 79
33. 10.4.1 one original bound priced hard copy of their Tender (clearly marked Master Copy);
10.4.2 [insert number] priced hard copies of their Tender; and
10.4.3 [insert number] unpriced hard copies of their Tender.
All in the form specified in the Form of Tender, The original and the copies must be provided
on single-side A4 paper, double spaced, in Arial with a minimum size 11 font and securely
bound and signed by the Tenderer‟s authorised representative.
10.5 In line with Government objectives to achieve ISO14001:2004 (Environmental Management
Systems), the Authority asks that you do not include any of the following with your Tender:
10.6 Any lever arch folder or ring binder; or any extraneous information that has not been
specifically requested in the ITT including, for example, sales literature, Tenderers‟ standard
terms and conditions etc.
10.7 In addition to the hard copies, Tenderers are requested to submit [xx] copies of their
Response on a CD-Rom with the narrative in Microsoft Word [insert required version] and the
financial data in Microsoft Excel [insert required version] or in backwardly compatible
equivalents.
10.8 The Tender and any documents accompanying it must be in the English language.
10.9 Price and any financial data provided must be submitted in or converted into pounds sterling.
Where official documents include financial data in a foreign currency, a sterling equivalent
must be provided.
PAGE 33 OF 79
34. 10.10 An address label that must be used when submitting the Tender Response is enclosed with
this ITT. Envelopes and packages must bear no reference to the Tenderer by name.
Tenders are to be returned and received by the Authority at [repeat full name and address as
set out on the return label referred to in para 10.10] by no later than [insert closing date and
time for receipt of Tenders].
10.11 Tenders must be received at the reception or if no reception is available in the post room at
the address above by [insert closing date and time for receipt of Tenders] (“the Deadline”).
Envelopes and packages should not bear any reference to the Tenderer by name.
Guidance note – the Authority should provide guidance to Tenderers regarding submission of
bids personally by hand at the Authority‟s premises. Any internal receipting procedures
should be clearly set out and clarity of such procedures understood by all persons (including
Authority staff) likely to be involved in the receipt of Responses. The Authority should also be
aware of the need to understand the issues associated with receiving large volumes of
Responses in a busy public area and if possible should test out the receipting procedures
prior to receipt of Responses.
10.12 Tenders will be received any time up to the deadline stated above. Tenders received before
this deadline will be retained in a secure environment, unopened until the opening date.
10.13 The Authority does not accept responsibility for the premature opening or mishandling of
Tenders that are not submitted in accordance with these instructions.
Insert the following clauses for an eTendering Exercise:
10.4 You must submit your Tender via the Authority‟s e-tendering tool at [insert URL address and
link] no later than [insert closing date and time for receipt of Tenders] (“the Deadline”).
Tenders may be submitted at any time before the closing date. Tenders received before this
deadline will be retained unopened until the opening date.
10.5 The Tender and any documents accompanying it must formatted in ADOBE read only format
and be in the English language.
10.6 Price and any financial data provided must be submitted in or converted into pounds sterling.
Where official documents include financial data in a foreign currency, a sterling equivalent
must be provided.
10.7 The Authority does not accept responsibility for the premature opening or mishandling of
Tenders that are not submitted in accordance with these instructions.
10.8 Tenderers should not include in the Tender any extraneous information which has not been
specifically requested in the ITT including, for example, any sales literature, standard terms of
trading etc.
PAGE 34 OF 79
35. 11 Canvassing
11.1 Any Tenderer who directly or indirectly canvasses any officer, member, employee, or agent of
the Authority or its members or any relevant OCB or any of its officers or members
concerning the establishment of the Framework Agreement or who directly or indirectly
obtains or attempts to obtain information from any such officer, member, employee or agent
or concerning any other Tenderer, Tender or proposed Tender will be disqualified.
12 Disclaimers
12.1 Whilst the information in this ITT, Due Diligence Information and supporting documents has
been prepared in good faith, it does not purport to be comprehensive nor has it been
independently verified.
12.2 Neither the Authority, nor any relevant OCBs nor their advisors, nor their respective directors,
officers, members, partners, employees, other staff or agents:
(a) makes any representation or warranty (express or implied) as to the accuracy,
reasonableness or completeness of the ITT; or
(b) accepts any responsibility for the information contained in the ITT or for their fairness,
accuracy or completeness of that information nor shall any of them be liable for any loss
or damage (other than in respect of fraudulent misrepresentation) arising as a result of
reliance on such information or any subsequent communication.
12.3 Any persons considering making a decision to enter into contractual relationships with the
Authority and/or, as applicable, relevant OCB following receipt of the ITT should make their
own investigations and their own independent assessment of the Authority and/or, as
applicable, relevant OCB and its requirements for the [goods/services/goods and services]
and should seek their own professional financial and legal advice. For the avoidance of doubt
the provision of clarification or further information in relation to the ITT or any other associated
documents (including the Schedules) is only authorised to be provided following a query
made in accordance with paragraph 16 of this Invitation to Tender.
12.4 Any Framework Agreement concluded as a result of this ITT shall be governed by English
law.
13 Collusive Behaviour
13.1 Any Tenderer who:
(a) fixes or adjusts the amount of its Tender by or in accordance with any agreement or
arrangement with any other party; or
(b) communicates to any party other than the Authority or, as applicable, relevant OCB the
amount or approximate amount of its proposed Tender or information which would
enable the amount or approximate amount to be calculated (except where such
disclosure is made in confidence in order to obtain quotations necessary for the
preparation of the Tender or insurance or any necessary security); or
(c) enters into any agreement or arrangement with any other party that such other party
shall refrain from submitting a Tender; or
(d) enters into any agreement or arrangement with any other party as to the amount of any
Tender submitted; or
(e) offers or agrees to pay or give or does pay or give any sum or sums of money,
inducement or valuable consideration directly or indirectly to any party for doing or
having done or causing or having caused to be done in relation to any other Tender or
proposed Tender, any act or omission, shall (without prejudice to any other civil
remedies available to the Authority and without prejudice to any criminal liability which
such conduct by a Tenderer may attract) be disqualified.
PAGE 35 OF 79
36. 14 No Inducement or Incentive
14.2 The ITT is issued on the basis that nothing contained in it shall constitute an inducement or
incentive nor shall have in any other way persuaded a Tenderer to submit a Tender or enter
into the Framework Agreement or any other contractual agreement.
15 Acceptance and Admission to the Framework Agreement
15.1 The Tenderer in submitting the Tender undertakes that in the event of the Tender being
accepted by the Authority and the Authority confirming in writing such acceptance to the
Tenderer, the Tenderer will within 30 days of being called upon to do so by the Authority
execute the Framework Agreements in the form set out in Schedule 6 or in such amended
form as may subsequently be agreed.
15.2 The Authority shall be under no obligation to accept the lowest or any Tender.
16 Queries Relating to Tender
16.1 All requests for clarification about the requirements or the process of this procurement
exercise shall be made in accordance with 16.3 of these Instructions.
16.2 The Authority will endeavour to answer all questions as quickly as possible, but cannot
guarantee a minimum response time. The Public Contracts Regulation 2006 require that
Contracting Authorities respond to any request for clarification at least 4 days‟ before the
deadline for receipt of Tenders. In order to satisfy this requirement, the Authority has
designated a specific window of time to deal with clarification requests from Tenderers
16.3 Clarification requests can be submitted [via e-mail only] to [for paper based tenders only
insert name and e-mail address of the Authority‟s designated contact point as detailed in para
1.1] from [insert date]. [for e-tendering based tenders insert nominated “system” contact point]
from [insert date].
16.4 No further requests for clarifications will be accepted after [insert date approximately two
weeks prior to the Deadline for the receipt of Tenders]
16.5 In order to ensure equality of treatment of Tenderers, the Authority intends to publish the
questions and clarifications raised by Tenderers together with the Authority‟s responses (but
not the source of the questions) to all participants on a regular basis.
PAGE 36 OF 79
37. 16.6 Tenderers should indicate if a query is of a commercially sensitive nature – where disclosure
of such query and the answer would or would be likely to prejudice its commercial interests.
However, if the Authority at its sole discretion does not either; consider the query to be of a
commercially confidential nature or one which all Tenderers would potentially benefit from
seeing both the query and Authority‟s response, the Authority will:
16.6.1 invite the Tenderer submitting the query to either declassify the query and allow the
query along with the Authority‟s response to be circulated to all Tenderers; or
16.6.2 request the Tenderer, if it still considers the query to be of a commercially confidential
nature, to withdraw the query.
16.7 The Authority reserves the right not to respond to a request for clarification or to circulate
such a request where it considers that the answer to that request would or would be likely to
prejudice its commercial interests.
17 Amendments to Tender Documents
17.1 At any time prior to the deadline for the receipt of Tenders, the Authority may modify the ITT
by amendment. Any such amendment will be numbered and dated and issued by the
Authority to all prospective Tenderers by [insert date which at least two weeks prior to the
Deadline for the submission of Tenders]. In order to give prospective Tenderers reasonable
time in which to take the amendment into account in preparing their Tenders, the Authority
may, at its discretion, extend the Deadline for receipt of Tenders.
18 Late Tenders
18.1 Any Tender received at the designated point after [insert the Deadline for receipt of Tenders
as per para 10.10 (paper based Tenders) or 10.4 (electronic Tenders)] may be rejected
unless the Tenderer can provide irrefutable evidence that the Tender was capable of being
received by the due date and time.
19 Proposed Amendments to the Framework Agreement by the
Tenderer
19.1 As the Authority is using the restricted procedure as detailed in the Public Contracts
Regulations 2006 it is prevented from undertaking negotiation of the Framework Agreement.
However, amendments by Tenderers and/or the Authority to clarify its terms are permitted.
19.2 The Authority will consider proposed amendments strictly on their merits and within the limits
imposed by the Regulations.
19.3 Any proposed amendments to the Framework Agreement must be detailed separately on the
Proposed Amendments form included at Schedule 10, and returned with the Tenderer‟s ITT
Response.
19.4 Where the Authority makes changes to the Framework Agreement as a result of the
proposals received it will circulate the amended Framework Agreement to all Tenderers.
20 Modification and Withdrawal
20.1 Tenderers may modify their Tender prior to the Deadline by giving notice to the Authority in
writing or via electronic submission to [insert details of designated Authority contact as per
para 1.1]. No Tender may be modified subsequent to the Deadline for receipt.
Guidance note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to reflect how the tool will deal with communications between
the Authority and the Tenderers.
PAGE 37 OF 79
38. 20.2 The modification notice must state clearly how the Authority should implement the
modification and must be submitted in accordance with the provisions of [paragraph 10.10 (for
paper based tenders) or 10.4 (for electronic tenders)].
20.3 Tenderers may withdraw their Tender at any time prior to the Deadline or any other time prior
to accepting the offer of a Framework Agreement. The notice to withdraw the Tender must be
in writing and sent to the Authority by recorded delivery or equivalent service and delivered to
the Authority at the address set out in paragraph 1.1 -.General of this Section 2.
Guidance note: if the tendering exercise is to be conducted via an e-tendering tool the above
paragraph will need to be amended to reflect how the tool will deal with communications between
the Authority and the Tenderers.
21 Right to Reject/Disqualify
21.1 The Authority reserves the right to reject or disqualify a Tenderer where:
(a) the Tenderer fails to comply fully with the requirements of this Invitation to Tender or is
guilty of a serious misrepresentation in supplying any information required in this
document; or expression of interest; or PQQ; and/or
(b) the Tenderer is guilty of serious misrepresentation in relation to its Tender; expression of
interest; the PQQ and/or the Tender process; and/or
(c) there is a change in identity, control, financial standing or other factor impacting on the
selection and/or evaluation process affecting the Tenderer.
22 Right to Cancel, Clarify or Vary the Process
22.1 The Authority reserves the right to:
(a) amend the terms and conditions of the Invitation to Tender process,
(b) cancel the evaluation process at any stage; and/or
(c) require the Tenderer to clarify its Tender in writing and/or provide additional information.
(Failure to respond adequately may result in the Tenderer not being selected),
23 Customer References [if appropriate]
23.1 Unless already taken up at an earlier stage in the procurement process and after the receipt
of Tenders, the Authority may visit at least one customer reference site of the Tenderer and
may seek written references from any other designated customers which are not visited.
24 Notification of Award
24.1 The Authority will notify the successful Tenderer(s) of their admission to the Framework
Agreement in writing and will publish an Award Notice in the Official Journal of the European
Union in accordance with the Public Contracts Regulations 2006 within 48 days of the award
of the contract.
25 Debriefing
25.1 Following the conclusion of the Framework Agreement, all unsuccessful Tenderers will be
afforded the opportunity of a debriefing. Unsuccessful Tenderers should notify the Authority in
writing that they wish to be debriefed. The Authority will formally debrief the unsuccessful
Tenderer within 15 days of receiving such a request.
25.2 Where an unsuccessful Tenderer requests, in writing and no later than midnight on the
second working day after being informed of the conclusion of the Framework Agreement, the
reasons why that Tenderer was unsuccessful, the Authority will provide details of the
characteristics and relative advantages of the successful Tender(s).
PAGE 38 OF 79
39. 26 Statement of Compliance
A Statement of Compliance can be found at Section 2, Schedule Five. This will be used by
the Authority for checking the completeness of all returned Tenders in accordance with the
said Schedule Five. Tenderers shall ensure a response is provided for each item listed on
the Statement of Compliance. Failure to do so may result in the Tenderer being disqualified
from the award process.
PAGE 39 OF 79
40. Section 2 – Part B
Tender Evaluation
Version 1.0
PAGE 40 OF 79
41. 27 Introduction
27.1 The Tender process will be conducted to ensure that Tenders are evaluated fairly to ascertain
the most economically advantageous tender.
Guidance note – government policy is to award on the basis of value for money, which is the
optimum combination of quality and whole-life costs to meet the user requirements which,
when commonly translated, means the most economically advantageous tender or MEAT.
Guidance note: The OJEU Contract Notice is required to stipulate in section IV.2.1 the
relevant award criteria Please ensure that the award criteria specified in this ITT is consistent
with the award criteria published in the relevant OJEU Contract Notice.
Account will also be taken of any factors which may impact on the Tenderers suitability that
emerge from the tendering process and relate to information previously provided by the
Tenderer as part of the pre-qualification process. If the Tenderers circumstances have
changed significantly from the position stated in the PQQ this may lead to the Tenderer no
longer being able to participate further in the Tender process.
28 Evaluation of Tenders for selection onto the Framework
28.1 Tenderers Response to the questions contained in the Response Requirement and their
Response to the Specification along with pricing information and any other information,
specifically related to the evaluation of Tenders and requested by the Authority in this ITT will
be evaluated against [insert the number] of high level criteria, details of which can be found in
Table 2.2 below:
TABLE 2.2: HIGH LEVEL EVALUATION CRITERIA FOR SELECTION OF PROVIDERS
ONTO THE FRAMEWORK
CRITERION [PERCENTAGE WEIGHTINGS]
[PERCENTAGE RANGES]
[RANKINGS]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
[insert criterion] [insert number]% [range of %s] or [ranking of the criterion]
Guidance note - The Evaluation Criteria must be linked to the subject matter of this
procurement and could include, in no particular order and, as applicable, a mixture of the
following criteria:
Quality, price, technical merit, aesthetic and functional characteristics, sustainability
characteristics, running costs, cost effectiveness, after sales service, technical assistance,
delivery date and delivery period and period of completion.
Exact weightings, a range of weightings (maximum and minimum); or where the Authority is
of the opinion that it is not possible to provide weightings on objective grounds, an indication
of the priority of importance in descending order must also be provided in the table above.
PAGE 41 OF 79
42. The high level criteria should also be linked to the criteria detailed in Table 3.6 – Mini
Competition Award Criteria and Weightings.
28.2 Tenderers will be admitted to a Framework Agreement who, in the opinion of the Authority at
the conclusion of the evaluation, offers the most economically advantageous Tender(s) to the
Authority having regard to the award criteria set out in table 2.2 above.
Guidance note – ensure consistency with paragraph 28.1 above
29 Evaluation Process
Guidance note – the process set out below up to and including Phase 3 can be carried out in
the traditional manner whereby evaluators read written responses submitted in hard copy.
They are scored individually and consensus is reached, scores recorded manually etc. The
same evaluation process can also be applied to responses that are submitted electronically
via an e-procurement tool. The key differences are in how the process is developed to
facilitate at desk online viewing of tender documents, how scores are recorded on the online
evaluation tool, how moderation takes place etc. Persons drafting ITTs need to be aware that
the “traditional suite” paper response templates and instructions regarding completion of the
same, compliance checking templates etc and traditional paper evaluation documentation and
forms will likely need to be developed on specialist templates online in the relevant e-
tendering tool.
29.1 The evaluation process will feature some, if not all, the following phases:
29.1.1 Phase 1 – Compliance Checks
(a) Receipt and Opening
ITT Responses will be formally logged upon receipt in accordance with the Authority‟s
procurement procedures. Any ITT Response that is received at the designated point
after the deadline may be rejected and not considered for evaluation.
PAGE 42 OF 79
43. (b) Compliance Check
A small team from the Authority‟s Procurement/Commercial [Directorate/Division/
Branch/Team] will then check the Statement of Compliance; completion of which is
mandatory. Tenderers are required to confirm in the Statement of Compliance that
they have provided a Response including, where applicable, any evidence requested
against each of the requirements, as directed, in the Specification, the Technical
Requirements, the Response Requirements and the Commercial Response
Requirements. In the event that a Tenderer is unable to provide a positive response
for any of the requirements, or a detailed reason as to why a positive response
cannot be given, the Authority may either exclude the Tenderer from further
participation in the evaluation process or, at its discretion, may seek clarification. In
the case of the latter, a failure by the Tenderer to provide a satisfactory response
within the deadline specified in the request for clarification may result in its
disqualification from the evaluation process.
The evaluation of Tenders will, as applicable, proceed through some, or all of the
following phases of evaluation:
29.1.2 Phase 2 – Independent Evaluation of Tender Responses
(a) Qualitative/Technical Evaluation
(b) Quantitative/Commercial Evaluation
29.1.3 Phase 3 - Moderation of Scores
Moderation and merging of qualitative and quantitative evaluation scores/rankings to
produce preliminary ranking
29.1.4 Phase 4 - Bidder Presentations/Clarification Meetings
29.1.5 Phase 5 – Customer References [if not taken up as part of the PQQ process]
(a) Customer Reference Site Visits
(b) Taking up of written customer references
29.1.6 Final moderation meeting to moderate and merge scores gathered from Customer
Reference Site Visits and/or written reference to produce final ranking.
29.1.7 Evaluation Report and Recommendation
29.1.8 Approvals
30 Award of Framework Agreement
30.1 The Authority will inform all Tenderers [in writing or via the e-procurement messaging tool] of
any intention to award a Framework Agreement. Following a minimum standstill period of 10
calendar days, subject to there being no substantive challenge to that intention, a Framework
Agreement will be formally awarded to the successful Tenderer(s).
PAGE 43 OF 79
44. 30.2 All unsuccessful Tenderers will be provided with an “unsuccessful letter “[in writing via email
or via the e-procurement messaging tool] at the start of the standstill period notifying them of
the outcome of the evaluation exercise. This will include details of:
the award criteria;
the score of the Tenderer;
the name of the successful Tenderer/s and why that Tenderer was successful;
the score for the successful Tenderer/s.
30.3 Unsuccessful Tenderers will be able to seek a debrief in accordance with paragraph 25.
PAGE 44 OF 79
45. Schedule 1: Form of Tender
TO BE COMPLETED BY THE TENDERER
To: [Tenderer to insert name and address of Authority]
Date: [Tenderer to insert date]
PROVISION OF: [Tenderer to insert title of requirements from front sheet of ITT]
REFERENCE NUMBER: Tenderer to insert OJEU Contract Notice reference from front
sheet of ITT]
To: The Authority
From: [Tenderer to insert name of organisation submitting Tender ]
Having examined the Invitation to Tender and all other Schedules, and being fully satisfied in
all respects with the requirements of the ITT (including the Conditions of Tender). I/We hereby
offer to provide [insert details of supply/services/goods and services as per front sheet of ITT]
as specified in Section 3 – Specification and/or Section 4 - Technical Requirements at the
prices shown in the Section 6: Schedule 7 - Charges for the term of [insert number of years
the Framework Agreement is to run for] Guidance note - ensure this accords with the original
OJEU Contract Notice and is not more than 4 years and in accordance with the provisions of
the Framework Agreement. If this offer is accepted I/we will execute documents in the form of
the Framework Agreement within 30 days of being called upon to do so.
** [Paragraph to be inserted if amendments to the ITT or Information Releases have
been issued] - and have taken account of subsequent amendments numbered [insert
number of first amendment] to [insert number of last amendment] inclusive [and/or]]
Information Release [insert number of first Information Release] to [insert number of
last Information Release].
I/We confirm that I/we agree with the Authority in legally binding terms to comply with
the provisions relating to confidentiality set out in paragraphs 3.1 to 3.4 of the
Invitation to Tender.
PAGE 45 OF 79
46. In compliance with your requirements as set out in your ITT I have completed and
enclose the following documents:
SECTION TWO: SCHEDULE ONE:
FORM OF TENDER
SECTION SIX: SCHEDULE SEVEN:
CHARGES
SECTION SIX: SCHEDULE EIGHT:
COMPANY DETAILS
SECTION SIX: SCHEDULE NINE:
REFERENCES
SECTION SIX: SCHEDULE TEN:
PROPOSED AMENDMENTS TO THE FRAMEWORK AGREEMENT DOCUMENTS
In compliance with the requirements set out in your Invitation to Tender, which I
confirm I have read and fully understand. I also confirm that I have complied with the
specific requirements set out in the documents detailed in the table below:
SECTION 2: SCHEDULE TWO:
COLLUSIVE TENDERING
SECTION 2: SCHEDULE THREE:
CANVASSING
SECTION 2: SCHEDULE FOUR:
CONFIRMATION OF PQQ SUBMISSION
SECTION TWO: SCHEDULE FIVE:
TENDER RESPONSE AND STATEMENT OF COMPLIANCE
PAGE 46 OF 79
47. This Tender shall remain open for acceptance by the Authority for a period of [insert
number] days as Section 2: Paragraph 5.1 after the due date for return of tenders
specified in the Invitation to Tender.
I warrant that I have all the requisite corporate authority to sign this Tender and confirm
that I have complied with all the requirements set out in Section 2; Schedules 2 to 5
inclusive.
Signed for and on behalf of the above named Tenderer:
Signature:
......................................................................................................…............
Position:
......................................................................................................….............
Signature:
......................................................................................................….............
Position:
......................................................................................................…..............
Date:
......................................................................................................…...............
PAGE 47 OF 79
48. Schedule 2: Collusive Tendering
TENDER FOR SUPPLY OF [insert details of supply/services/goods and services as per front
sheet of ITT]
The essence of the public procurement process is that the Authority shall receive bona fide
competitive Tenders from all Tenderers. In recognition of this principle and in signing Schedule 1:
Form of Tender I/we warrant this is a bona fide Tender, intended to be competitive and that I/we
have not fixed or adjusted the amount of the Tender or the rates and prices quoted by or under or
in accordance with any agreement or arrangement with any other party.
I/We also confirm that I/we have not done and undertake that I/we will not do at any time any of
the following acts:
Communicate to a party other than the Authority the amount or approximate amount of my/our
proposed Tender (other than in confidence in order to obtain quotations necessary for the
preparation of the Tender and/or insurance), enter into any agreement or arrangement with any
other party that he shall refrain from tendering or as to the amount of any Tender to be submitted,
or offer or agree to pay or give or pay or give any sum of money inducement or valuable
consideration directly or indirectly to any person for doing or having done or causing or having
caused any act or omission to be done in relation to any other tender or the proposed Tender.
In this Schedule:
the word “person” includes any person, body or association, corporate or incorporate
the phrase “any agreement or arrangement” includes any transaction, formal or informal whether
legally binding or not.
PAGE 48 OF 79
49. Schedule 3: Canvassing
TENDER FOR SUPPLY OF [insert details of supply/services/goods and services as per front
sheet of ITT]
I/We hereby confirm that I/we have not canvassed any member, officer, employee, or agent of
the Authority or Other Contracting Body in connection with the award of the Frameworks
Agreement for the [goods/services/goods and services] and that no person employed by
me/us or acting on my/our behalf has done any such act.
I/We further hereby undertake that I/we will not prior to the conclusion of the Provider
selection process canvass or solicit any member, employee, agent or provider of the Authority
or Other Contracting Body in connection with the award of the Framework Agreement for the
[goods/services/goods and services] or any proposed Call Off Contract for the provision of the
[goods/services/goods and services] and that no person employed by me/us or acting on
my/our behalf will do any such act.
I/We further acknowledge that, should I/we be appointed as a Provider to the Framework
following the conclusion of the Provider selection process, the Authority will permit me/us to
approach the Authority and/or Other Contracting Body directly in order the promote the
Framework Agreement.
PAGE 49 OF 79
50. Schedule 4: Confirmation of PQQ Submission
TENDER FOR SUPPLY OF [insert details of supply/services/goods and services as per front
sheet of ITT]
I/ We hereby certify that any statement made in our PQQ submission remains true and
accurate in all material aspects save as specified below: -
PAGE 50 OF 79
51. Schedule 5: Tender Response and Statement of Compliance
Tenderers to Note:
The Tenderers‟ Response to the Specification (Section 3); the Technical Requirements (Section 4); the Commercial Requirements and Schedules 7, 8, 9 & 10 and
the Statement of Compliance forms the basis against which the Tenderers‟ Response to the ITT will be compliance checked and evaluated. The following
Statement of Compliance provides Tenderers with a list of the key areas within their response that must be addressed. Tenderers shall ensure that their overall
Response includes evidence of providing/addressing all of these areas. Tenderers must ensure that a yes response is given against each area and the table of
Schedules. In the event that a Tenderer is unable to provide a yes response, the Tenderer shall provide a detailed reason as to why a response cannot be given.
The Authority may seek to clarify Responses given by a Tenderer but reserves the right to reject any Tender Response, which fails to meet this initial compliance
check.
The Tenderers‟ response to the ITT should be divided into five sections:
The five sections are:
1. Executive Summary
2. Response to the Specification
3. Response to the Technical Requirements
4. Response to the Commercial Requirements and completion of Schedules 7, 8, 9 and 10
5. Completion of the Statement of Compliance
PAGE 51 OF 79
52. TABLE 1: EXECUTIVE SUMMARY
The executive summary should focus on the key features of the Tenderer‟s Response including all key assumptions made by the T enderer (but excluding all
pricing/financial information)
The objective of the executive summary is to provide the Authority with a clear, concise and complete summary of the Tenderer‟s Response together with an
insight into the reasoning and rationale behind the Response.
The executive summary should be no more than 10 pages of A4 text highlighting the key strengths of the Response to demonstrate how the Tender represents
value for money to the Authority.
It is intended that the executive summary should provide a useful introduction to the Response for evaluators, as well as senior stakeholders who may not be
involved in the detailed evaluation.
Whilst the executive summary will not be formally evaluated, it will be scrutinised for consistency with your Response and clarification will be sought if required.
The executive summary must only contain information drawn from other areas of your Response and must not contain any new material. Whilst diagrams and
photographs may be used, they should be high level and should not be used to support other parts of the Response where more detailed information is required.
PAGE 52 OF 79
53. TABLE 2: RESPONSE TO THE SPECIFICATION (SECTION 3)
The following table needs to reflect all the elements of the Specification - Evidence included Tenderer to cross reference to page number(s) in
Section 3 which require a Response as detailed in Section 5 (2) -Response in response (yes/no) Section 5 (2) (including paragraph number where
Requirements appropriate).
Specification Details of Requirements
Reference
[insert a brief summary of Requirement one from
the Specification]
[insert a brief summary of Requirement two from
the Specification]
[insert a brief summary of Requirement three from
the Specification] and so on
Guidance note – the table above will populated by the Tenderer cross referencing his responses contained in Section 5 (2)
PAGE 53 OF 79
54. TABLE 3: RESPONSE TO THE TECHNICAL REQUIREMENTS (SECTION 4)
The following table needs to reflect all the elements of the Technical Evidence included in Tenderer to cross reference to page number(s) in
Requirements - Section 4 which requires a Response as detailed in response (yes/no) Section 5 (3) (including paragraph number where
Section 5 (3) -Response Requirements appropriate).
TR Reference Details of Requirements
[insert a brief summary of Technical Requirement
one]
[insert a brief summary of Technical Requirement
one]
[insert a brief summary of Technical Requirement
one]
Guidance note – the table above will populated by the Tenderer cross referencing his responses contained in Section 5 (3)
PAGE 54 OF 79
55. TABLE 4: RESPONSE TO THE COMMERCIAL REQUIREMENTS AND COMPLETION OF SCHEDULES 7, 8, 9 AND 10
Included (Yes/No) Comments
SECTION FIVE: SCHEDULE SEVEN:
CHARGES
SECTION FIVE: SCHEDULE EIGHT:
COMPANY DETAILS
SECTION FIVE: SCHEDULE NINE:
REFERENCES
SECTION FIVE: SCHEDULE TEN:
PROPOSED AMENDMENTS TO THE
FRAMEWORK DOCUMENTS (please
respond with “Yes” even if you have no
proposed changes to the draft Framework
Agreement
PAGE 55 OF 79
56. TABLE 5(a): STATEMENT OF COMPLIANCE
Included (Yes/No) Comments
SECTION TWO: SCHEDULE ONE:
FORM OF TENDER
TABLE 5(b): CONFIRMATION OF COMPLIANCE WITH:
Compliant (Yes/No) Comments
SECTION TWO: SCHEDULE TWO:
COLLUSIVE TENDERING
SECTION TWO: SCHEDULE THREE:
CANVASSING
SECTION TWO: SCHEDULE FOUR:
CONFIRMATION OF PQQ SUBMISSION
PAGE 56 OF 79
57. Section 3
Specification
Version 1.0
PAGE 57 OF 79
58. The specification for the [goods/services/goods and services] should be inserted here.
VPMO Specification guidance and template documentation
PAGE 58 OF 79
59. Section 4
Technical Requirements
(including Mandatory Information
Requirements)
Version 1.0
PAGE 59 OF 79
60. TABLE OF CONTENTS – SECTION 4
1 Introduction 61
2 Mandatory and Desireable Requirements 61
3 Mandatory Information Requirements 63