Report No. 6.56/322
November 2001
Offshore helideck review
checklist
Publications
Global experience
The International Association of Oil & Gas Producers (formerly the E&P Forum) has
access to a wealth of technical knowledge and experience with its members operating
around the world in many different terrains. We collate and distil this valuable knowl-
edge for the industry to use as guidelines for good practice by individual members.
Consistent high quality database and guidelines
Our overall aim is to ensure a consistent approach to training, management and best
practice throughout the world.
The oil and gas exploration and production industry recognises the need to develop con-
sistent databases and records in certain fields. The OGP’s members are encouraged to
use the guidelines as a starting point for their operations or to supplement their own
policies and regulations which may apply locally.
Internationally recognised source of industry information
Many of our guidelines have been recognised and used by international authorities and
safety and environmental bodies. Requests come from governments and non-govern-
ment organisations around the world as well as from non-member companies.
Disclaimer
Whilst every effort has been made to ensure the accuracy of the information contained in this publica-
tion, neither the OGP nor any of its members past present or future warrants its accuracy or will,
regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made
thereof, which liability is hereby excluded. Consequently, such use is at the recipient’s own risk on the
basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is
obliged to inform any subsequent recipient of such terms.
Copyright OGP
All rights are reserved. Material may not be copied, reproduced, republished, downloaded, stored in
any retrieval system, posted, broadcast or transmitted in any form in any way or by any means except
for your own personal non-commercial home use. Any other use requires the prior written permission
of the OGP.
These Terms and Conditions shall be governed by and construed in accordance with the laws of
England and Wales. Disputes arising here from shall be exclusively subject to the jurisdiction of the
courts of England and Wales.
Offshore helideck review checklist
Report No: 6.56/322
November 2001
This report has been prepared for OGP by a team drawn from the Aviation Subcommittee of the Safety, Health and Person-
nel Competence Committee (SHAPCC).
i
Offshore helideck review checklist
© 2001 OGP
General instructions ii
Inspection signatures 1
Inspection checklist 1
General helideck information.....................................................................................................................1
Helideck surface.........................................................................................................................................2
Helideck dimensions ..................................................................................................................................2
Helideck markings .....................................................................................................................................3
Surface net .................................................................................................................................................4
Perimeter safety net....................................................................................................................................4
Perimeter lighting.......................................................................................................................................5
Floodlighting .............................................................................................................................................5
General lighting .........................................................................................................................................6
Obstruction marking and lighting .............................................................................................................6
Status lights................................................................................................................................................6
Obstruction environment...........................................................................................................................7
Turbulence .................................................................................................................................................7
Refuelling package .....................................................................................................................................7
Access points..............................................................................................................................................8
Fire protection............................................................................................................................................8
Rescue equipment ......................................................................................................................................9
Protective clothing (RFF)......................................................................................................................... 10
Additional equipment............................................................................................................................... 11
Radio equipment...................................................................................................................................... 11
Weather equipment .................................................................................................................................. 12
Emergency response ................................................................................................................................. 12
Helideck crew........................................................................................................................................... 13
General (exercises & drills)....................................................................................................................... 14
Summary of non compliance’s.................................................................................................................. 14
Annex A: Helideck construction plan detail 15
Table of contents
ii
International Association of Oil & Gas Producers
© 2001 OGP
References
In some countries, specific regulatory guidance has been issued and should be used to amend this checklist as neces-
sary.
1. UK Civil Aviation Authority (CAA) Civil Air Publication (CAP) 437 is the primary reference used for this
Checklist.
2. UK Offshore Petroleum Industry Training Organization (OPITO) refueling and HLO procedures publica-
tions are the primary training references.
3. Recognition is also given to the work of the BHAB and their Offshore Helideck Inspection Checklist which
serves as a key reference for this checklist.
Non-compliances
Record each non-compliance with a note number and summarize at the end of the checklist in the Summary of
Non-Compliances.
Inspection Requirements
Daily, Weekly, Monthly, Quarterly, Semi-Annual, and Annual Checks should be recorded on the form and
retained. In some regions more frequent intervals may be used as necessary, and the form may be amended accord-
ingly. Annually all items are inspected.
General instructions
1
Offshore helideck review checklist
© 2001 OGP
1 Name of installation/vessel
2 Type
3 Owner
4 Helideck Approval or Fitness
Certificate available?
Are any limitations noted?
5 Previous report (if available)
6 Helideck height (in feet)
(For mobiles give variable range
and normal operating height)
7 Installation/vessel
identification
(locations of name, full name
displayed, size of letters,
background, illumination, clearly
visible from air from all 4 sides)
8 Helideck plans (see Annex A)
(Drawing No, date & revision,
strength test. Do the plans
accurately show the detail in
Annex A. If not, state omissions)
9 Helideck Procedures Manual
(HLO, fire, passenger handling,
blocked helideck, unattended
installation, fuel, emergency
response, weather, adverse
weather, etc.?)
Platform / FPSO / FSU / SPM / Semi
Sub / DSV / Seismic / Lay Barge / Crane
Barge / Support Vessel / Jack Up / other
(circle one & give details)
Date:
Date:
Non compliances rectified?
Height=
Drawing#:
Revision:
Date:
Strength test:
Date:
N/A
N/A
N/A
[ ]
[ ]
[ ]
N/A
[ ]
[ ]
[ ]
3 years
6.1
4.1 1-2
Inspection signatures
Location
Inspector
Inspection interval
Date
Additional remarks [ ] - check here and use back for comments
Inspection checklist
A General helideck information
Remarks ! if OK CAP 437 Ref.
& inspct. int.
2
International Association of Oil & Gas Producers
© 2001 OGP
1 Colour
2 Condition
(both paint & cleanliness)
3 Non-slip characteristics
(estimate)
4 Last friction test
5 Gutter or raised curb
(give detail: around all of the
perimeter?)
6 Drainage
(sufficient number of downpipes,
slope, debris, filter fitted)
7 Deck sealed
8 Aircraft tie down points
(Location, quantity, flush, bar
diameter - 20mm, condition)
C Helideck dimensions
Remarks ! if OK CAP 437 Ref.
& inspct. int.
1 Overall helideck
(dimensions in meters)
2 Safe landing area
(dimensions. Contains D circle)
Dark grey / dark green / aluminium / other:
Last repaint:
High / medium / low / nil
Date:
Result:
Yes / No
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
4.2.1
3.8.1
3.8.5
3.13.3
3.8.2
3.8.2
3.8.2
3.9
3.7.1
3.7.2
B Helideck surface
Remarks ! if OK CAP 437 Ref.
& inspct. int.
3
Offshore helideck review checklist
© 2001 OGP
1 Installation/rig
(State name painted on deck)
(Height 1.2m, colour-white,
position, outlined
[alum.decks only])
(Are other names on deck
e.g. Block No. Oil Company,
Logo? If so give details)
Are there side identification
panels? (visible all angles
and directions of approach)
2 Perimeter line
(Colour white, width 0.3m,
location)
3 Aiming circle
(Colour-yellow, width 1m, inner
diameter 0.5D, location 0.1’D’
outboard)
4 Chevron (For obstacle
clearances)
Length/width 0.79m/0.01m,
colour-black, angle 210º, location -
edge of D circle)
5 Actual D value
(Height 0.1m, Colour black,
location, inboard of
Chevron)(does it match physical
measurements?)
6 Perimeter ‘D’ value
(Value, quantity 3, colour white,
height 0.6m, location, orientation)
7 ‘H’ (size 4m x 3m x 0.75m)
location, orientation (concentric
with bisector), swung ± 15º max)
8 Max allowable mass
(Value, size 0.9m, colour white,
location. Design load calcs confirm
value?)
9 Prohibited Landing Sector
(If used, provide laction, angle,
colours red/white hatching,
reason)
D Helideck markings
Remarks ! if OK CAP 437 Ref.
& inspct. int
D=
D=
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
4.1.1
4.1.3
4.2.1
4.2.1
4.1.4
4.2.4
4.2.2
4.2.2
4.2.2
4.2.4
3.4-6
4.2.3
4.2.5
4
International Association of Oil & Gas Producers
© 2001 OGP
1 Material
[recommend sisal (no
polypropylene)]
2 Type
3 Coverage
(Covers aiming circle, clear of
name and t value)
4 Age/condition
5 Rope diameter
6 Mesh size
7 Net size
8 Tension
(2225N)
9 Tie down points
10Method of securing
Knotted/threaded
1 / 2 / 3 / 4 / 5 years
20mm
200mm
6x6m / 121x12m / 15x15m / other
Max lift 0.25m at center
Every 1.5m
Rope / webbing / ratchet tensioners
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
3.8.4
3.8.3
3.8.3
3.8.3
3.8.3
3.8.3
3.8.4
3.8.3
3.8.3
F Perimeter safety net
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Material
2 Width from deck edge
3 Condition/securely attached
4 Last drop load test
(75 kgs)
5 Hammock effect
(Nil bounce effect)
6 Drop down area protected
7 Slope
(slope at least 10 degrees. Highest
point above deck level: 250mm)
8 Covers drop down areas
(unless adequate structural
protection exists)
Wire mesh / polypropylene / sisal / corrugated steel
1.5m
Date
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
3.10.2
3.10.1
3.10.2
3.10.1
(annual)
3.10.1
3.10.1
3.10.1
3.10.1
E Surface net (not required in all areas, if surface friction is adequate)
Remarks ! if OK CAP 437 Ref.
& inspct. int
5
Offshore helideck review checklist
© 2001 OGP
1 Colour
2 Serviceability
(All working, brightness, condition
of lens)
3 Height & distance apart
(<250mm, <3m)
4 Power rating
Candelas 25
Connected to uninterrupted
(second generator)
emergency power supply?
5 Location
6 Limit of safe landing area
(Have red lights been temporarily
employed to deliniate unsafe
sectors? If so, state how the
situation is going to be rectified.)
7 Switching
(Controlled from Radio Room/
Bridge or HLO)
Yellow
Yes / No
Co-incident with perimeter line
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
4.3.1
4.3.1
4.3.1
4.3.8
4.3.8
4.3.2
4.3.4
G Perimeter lighting
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Position, height & quality
(Position, quantity, height,
adequate illumination, brightness
meets 10 lux & 8:1 ratio)
2 Serviceability
(All working)
3 Dazzle protection
(What method is employed to
avoid dazzle & type of unit)
4 Switching
(Controlled from Radio Room by
HLO)
5 Emergency power supply
(In addition to the perimeter
lights, are the floods connected to
the uninterrupted (second
generator)/emergency power
supply?)
Yes / No
Shuttering / Directional beam
Yes / No
Yes / No
[ ]
[ ]
[ ]
[ ]
[ ]
4.3 3-5
4.3.3
4.3.4
4.3.8
4.3.8
H Flood lighting
Remarks ! if OK CAP 437 Ref.
& inspct. int
6
International Association of Oil & Gas Producers
© 2001 OGP
1 Installation floodlighting
(All floodlighting angled so as to
not dazzle pilots)
2 Structures>15m above deck
level
(Omni-directional red lights every
10m above deck level. To include
all crane booms)
3 Highest point
(Omni-directional, colour,
intensity)
4 Light pollution
J Obstruction marking & lighting
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Obstructions
(List and give colour scheme)
2 Crane colours
(Colour [if close to helideck or
150° sector boundary])
3 Lighting
(Give detail)
K Status lights
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Visible from all approach
directions
2 Connected to emergency
supply/UPS
3 Switching
(Automatic and manual activation
with connection to Emergency
Power Supply)
Yes / No
Contrasting
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
4.3.3
4.4.3
4.4.4
4.3.4
4.4.1-2
4.4.1-2
4.4
4.3.6
4.4.8
4.4.6
I General lighting
Remarks ! if OK CAP 437 Ref.
& inspct. int
7
Offshore helideck review checklist
© 2001 OGP
1 210° Sector Obstructions
(State items, location & height,
max 0.25m within 1000m above
deck level)
2 150° Sector Obstructions
(State items, location & height
above deck level) a) up to 0.62 ‘D’
(or 0.12 from edge of safe landing
area)=0.05’D’ 0.62-0.83 ‘D’ (or
0.33 from edge of safe landing
area)=gradient of 1:2
3 180° 5:1 falling gradient
(11.4°) for obstructions
below the helideck level
(State items, location, distance
from the edge of netting and
height below deck level)
M Turbulence
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Structure
(State items likely to cause
turbulence)
2 Hot emissions
(State emissions, e.g. flares,
turbine exhausts)
3 Cold emissions
(State emissions, e.g. vents, blow
down)
4 Air gap beneath helideck
(State height & obstruction
environment)
5 Prevailing wind
(State any restrictions in
landing/to weight/approach-
departure direction)
N Refuelling systems
General comments only
(Use Refuelling System
Inspection Form)
Items allowed up to 0.25m -
guttering / lighting / outboard safety
net / foam monitors / handrails
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
3.7.2
3.7.4
3.7.5
3.3
3.3
3.3
3.3
3.3
L Obstruction environment
Remarks ! if OK CAP 437 Ref.
& inspct. int
8
International Association of Oil & Gas Producers
© 2001 OGP
1 Locations
(Primary and secondary)
2 Handrails
(Foldable if obstacle height?,
height)
3 Safety notices
(Recommended tail rotor, clear
deck, hearing protection, in dual
language if necessary)
4 Control of pax
(System employed to prevent
inadvertent access to helideck,
frangible chainsat secondary
access points)
P Fire protection
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Foam monitors
(Quantity, type)
If non-aspirated, state what
aspirated back up available
2 Delivery rate
(Liters/min of applied foam)
3 Concentrate
(Capacity of tank, quantity in tank,
type, percentage [marked
container])
4 Certificate of conformity
(Cert. of conformity, test report on
concentrate, water & produced
foam [if applicable])
5 Back-up concentrate
(Quantity)
6 Hydrant points
(Quantity, location)
7 Hand lines
(Quantity, location, hand
controlled spray/jet nozzles)
8 Foam hand branch
(Quantity, location, delivery rate)
Aspirated / Non aspirated
Manual / oscillating / oscillating with manual
override / remote
________liters/minute
Capacity:
Type:
Quantity available:
Percentage:
Date of last test:
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
3.11.2
3.11.5
3.11.5
3.11.5
5.2.7
5.2.5
5.2.4
5.2.6
5.3.3
(Annual)
5.2.6
5.2 8-9
5.2.8
5.2 8-9
O Access points
Remarks ! if OK CAP 437 Ref.
& inspct. int
9
Offshore helideck review checklist
© 2001 OGP
9 Foam inductors
(Quantity, location, concentrate-
quantity, percentage setting,
connection,
10Dry powder (DP)
(No. & capacity of each unit,
location, access to helideck, last
test date,)
11 CO2
(No. & capacity of each unit,
location, access to helideck, lance,
last test date)
12Back-up DP & CO2
(Back up determined by duty
holder but should be determined
by circumstances. No & capacity,
locations)
Q Rescue equipment
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Rescue equipment box(es)
(Location, quantity, condition,
lighting)
Layout of the equipment
Accessibility from all
helideck access points
2 Checklist
3 Adjustable wrench
(Quantity, location)
4 Large rescue axe
(Non wedge or aircraft type)
5 Bolt cutters
(Quantity, location)
6 Large crowbar
(Quantity, location)
7 Grab or salving hook
(Quantity, location)
8 Heavy duty hacksaw
(Quantity, location)
9 Heavy duty blades
(Quantity, location)
Branch / Hydrant
_____x_____ kg (45kg min)
_____x_____ kg (22kg min)
DP _____x_____ kg
CO2 _____x_____ kg
Attached to container
1
1
1
1
1
1
6
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
5.2.8
5.3.2
5.4
5.4
5.4
5.6.1
5.6.1
5.6.1
5.6.2
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
P Fire protection (continued)
Remarks ! if OK CAP 437 Ref.
& inspct. int
10
International Association of Oil & Gas Producers
© 2001 OGP
10 Fire resistant blanket
(Quantity, location)
11 Ladder
(Quantity, location)
12Life-line/rescue harness
(Quantity, location)
13Side cutting pliers
(Quantity, location)
14Set of assorted screwdrivers
(Quantity, location)
15Harness knife c/w sheath
(1 per deck crew)
16Self-contained breathing
apparatus
(Quantity, location, storage, spare
bottles)
17Portable safety lamp
(Quantity, location, operating life)
R Protective clothing (RFF)
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Stowage type
(Location, condition)
2 Helmet with visor
(Quantity, , type, BS/EN code,
condition)
3 Gloves
(Quantity, type, PREN code,
condition)
4 Boots
(Quantity, type, PREN code,
condition)
5 Fire tunic & trouser or one
piece
(Quantity, type, PREN code,
condition)
1
1
1
1
1
2
2
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.6.1
5.8
5.8
5.8
5.8
5.8
Q Rescue equipment (continued)
Remarks ! if OK CAP 437 Ref.
& inspct. int
11
Offshore helideck review checklist
© 2001 OGP
1 Chocks
([Sandbag type best on decks with
a deck net])quantity)
2 Tie down strops/ropes
(Type, quantity - 6 minimum,
break strenght min of wt of helo)
3 Scales for baggaage,
freight, passengers
(Type, max wt., cllibration date)
4 Helicopter start unit
(Type, location, voltage. Can lead
reach to a/c in any position, incl.
in maint. programme?)
5 Snow/ice clearing
equipment
(If needed)
6 Equipment for showing
passenger brief
(Type, location, dual language or
subtitles?)
7 Prohibited Landing Marker
8 Windsock
(Location, condition, illumination,
in clear air?)
T Radio equipment
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 VHF Main
(Call sign, location, quantity [min
req. varies, eg 2 in N.Sea], ATSSD
approved, details, connected to
emergency supply/UPS)
2 VHF portable
(Quantity 1 min, with headset)
3 NDB
(ATSSD approved, details, ident,
frequency)
4 AIP ENR 1-15 available
5 Radio log
(written or electromagnetic, kept
for 28 days, detailing: no of pax,
pax wt, baggage/freight wt.)
Sandbag / rubber / metal frame
Quantity:
Webbing / rope / webbing with tensioners
Calibration date:
Rectifier, battery trolley, 28V DC
Laser / brief
4x4m red flag with diagonal yellow cross
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
6.9.1a-2
6.9.3
6.9.1b
(Annual)
6.9.1c
6.9.1d
ANO
Art 39
4.2.6
4.1.5
6.4.2
6.9.4
6.9.4
S Additional equipment
Remarks ! if OK CAP 437 Ref.
& inspct. int
12
International Association of Oil & Gas Producers
© 2001 OGP
1 Anemometer
(Location, calibration date, in clear
air)
2 Air temp
(Calibration)
3 Precision barometer
(Location of a sensor relative to
h/deck level, calibration date?)
4 Visibility, cloud base & cover
(Give details of equipment if
available)
5 Pitch/roll/heave & sea state
(Give details of equipment if
available)
Can the equipment record
the max. figure over the
preceding 10 mins?
6 Location of the readouts
(Can the radio op access to all
weather info?)
7 Are personnel trained in
weather observation?
8 Are helideck/bridge
personnel knowledgeable
on operator weather
limitations and also on
adverse weather policy?
9 AWOS?
(Provide telephone or comms link
available)
V Emergency response
Remarks ! if OK CAP 437 Ref.
& inspct. int
1 Helicopter emergency
diagrams
(Location, which types are
covered?)
2 Emergency procedures
(Is there an Emergency Procedures
Manual detailing helicopter
emergencies?)
Date calibrated:
Date calibrated:
Date calibrated:
B212 / 365N / 365N2 / S76A /
S76B / S76C / B214 / AS332LI /
AS332L2 / S61N / Others
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
6.4
6.4
6.4
6.4
6.4
6.4
5.10
U Weather equipment
Remarks ! if OK CAP 437 Ref.
& inspct. int
13
Offshore helideck review checklist
© 2001 OGP
1 Helideck Landing Officer
(HLO)
Total number,number per shift
Completed:
Basic offshore Safety Induction
& Emergency Training Prog.
Further Offshore Emergency
Training programme
Previously server as HLA or
have previous suitable
experience
Have a Helicopter Refuelling
Certificate meeting industry
standard
Have an RT license
Possess current Emergency
Helideck Team Member
Certificate
Have completed an initial
HLO training programme
2 Helideck Assistant (HLA)
(Total number, number per shift)
Completed:
Basic Offshore Safety Induction
& Emergency Training prog.
Further Offshore Emergency
Training programme
Have previous experience
of handling helicopters
HDA: have completed and
initial training programme
covering routine operations
(including refuelling)
Have a Helicopter Refuelling
Certificate meeting industry
standard, where required
Have completed an
approved Emergency
Helideck Team Members
Course
HLO & HDAs: Training
records available?
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
W Helideck crew (note: OPITO or equivalent standard)
Remarks ! if OK CAP 437 Ref.
& inspct. int
14
International Association of Oil & Gas Producers
© 2001 OGP
1 Date of last practice in use
of foam agents on
simulated fuel spill
2 Date of last practice in use
of portable equipment
(including DP & CO2) on
simulated engine fires
3 Date of last test of fire
fighting systems
4 Aircraft evacuation drills,
including removal of
casualties, with and without
smoke and breathing
apparatus
5 Crash drills/briefings, to
include high and low
impact. On/off helideck
incidents (preplanning,
priorities, actions,
techniques & problems
likely to be encountered).
Y Summary of non-compliances
List of non-compliances
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Additional remarks [ ] - check here and attach sheets
[ ]
[ ]
[ ]
[ ]
[ ]
X General (excercises and drills)
Remarks ! if OK CAP 437 Ref.
& inspct. int
15
Offshore helideck review checklist
© 2001 OGP
Annex A
Plans required - to scale
• GA of the entire Platform/Rig
• Elevation - clearly showing the 180° 5:1 sector
• Plan view of helideck and the obstacle environment
Detail to be shown
• All helideck markings, giving dimensions and color
• Deck net location
• Tie down points
• Perimeter net
• Lighting - both perimeter and floodlighting
• Location of RFFF
• Refueling system
• Guttering & downpipes
• Access points
• Windsock(s)
• 210°, 150° & 180° sectors to be clearly shown
• All obstruction non compliance’s to be detailed, stating height above/below deck level
• Color scheme of above
• Structures that might cause turbulence over the helideck
• Hot emission sources e.g. flares, turbine exhausts
16
International Association of Oil & Gas Producers
© 2001 OGP
What is OGP?
e International Association of Oil & Gas Producers encompasses the world’s leading
private and state-owned oil & gas companies, their national and regional associations, and
major upstream contractors and suppliers.
Vision
• To work on behalf of all the world’s upstream companies to promote responsible and
profitable operations.
Mission
• To represent the interests of the upstream industry to international regulatory and
legislative bodies.
• To achieve continuous improvement in safety, health and environmental performance
and in the engineering and operation of upstream ventures.
• To promote awareness of Corporate Social Responsibility issues within the industry
and among stakeholders.
Objectives
• To improve understanding of the upstream oil and gas industry, its achievements and
challenges and its views on pertinent issues.
• To encourage international regulators and other parties to take account of the
industry’s views in developing proposals that are effective and workable.
• To become a more visible, accessible and effective source of information about the
global industry, both externally and within member organisations.
• To develop and disseminate best practices in safety, health and environmental
performance and the engineering and operation of upstream ventures.
• To improve the collection, analysis and dissemination of safety, health and
environmental performance data.
• To provide a forum for sharing experience and debating emerging issues.
• To enhance the industry’s ability to influence by increasing the size and diversity of
the membership.
• To liaise with other industry associations to ensure consistent and effective approaches
to common issues.
209-215 Blackfriars Road
London SE1 8NL
United Kingdom
Telephone: +44 (0)20 7633 0272
Fax: +44 (0)20 7633 2350
165 Bd du Souverain
4th Floor
B-1160 Brussels, Belgium
Telephone: +32 (0)2 566 9150
Fax: +32 (0)2 566 9159
Internet site: www.ogp.org.uk
e-mail: reception@ogp.org.uk

More Related Content

What's hot

Aircraft performance 2
Aircraft performance 2Aircraft performance 2
Aircraft performance 2Nazmul Alam
 
2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West EquipmentEagle West Cranes JB
 
Engine room resource management
Engine room resource managementEngine room resource management
Engine room resource managementYasser B. A. Farag
 
Final report Ship Handling and Manuevering 05-13-22.pptx
Final report Ship Handling and Manuevering 05-13-22.pptxFinal report Ship Handling and Manuevering 05-13-22.pptx
Final report Ship Handling and Manuevering 05-13-22.pptxNieLReSpiCiO
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt chengAiDY
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
Primary Flight Instruments | Flight Mechanics | GATE Aerospace
Primary Flight Instruments | Flight Mechanics | GATE AerospacePrimary Flight Instruments | Flight Mechanics | GATE Aerospace
Primary Flight Instruments | Flight Mechanics | GATE AerospaceAge of Aerospace
 
Instrument landing system
Instrument landing system Instrument landing system
Instrument landing system Itchan Urbano
 
LEEA Appointed Person in lifting Operations accreditation training
LEEA Appointed Person in lifting Operations accreditation trainingLEEA Appointed Person in lifting Operations accreditation training
LEEA Appointed Person in lifting Operations accreditation trainingDaryl Wake
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
 
Human factors - Maintenance and inspection
Human factors - Maintenance and inspectionHuman factors - Maintenance and inspection
Human factors - Maintenance and inspectionLahiru Dilshan
 
Offshore Safety Officer and Trainer - G.V.Rama Murthy
Offshore Safety Officer and Trainer - G.V.Rama MurthyOffshore Safety Officer and Trainer - G.V.Rama Murthy
Offshore Safety Officer and Trainer - G.V.Rama MurthyGuthi V. Rama murthy
 
Aerial Lifts Training by University of Wisconsin
Aerial Lifts Training by University of WisconsinAerial Lifts Training by University of Wisconsin
Aerial Lifts Training by University of WisconsinAtlantic Training, LLC.
 
Angle of attack | Flight Mechanics | GATE Aerospace
Angle of attack | Flight Mechanics | GATE AerospaceAngle of attack | Flight Mechanics | GATE Aerospace
Angle of attack | Flight Mechanics | GATE AerospaceAge of Aerospace
 
Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)diegocely700615
 
Weight and balance
Weight and balanceWeight and balance
Weight and balanceabarget
 

What's hot (20)

Aircraft performance 2
Aircraft performance 2Aircraft performance 2
Aircraft performance 2
 
2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment
 
Engine room resource management
Engine room resource managementEngine room resource management
Engine room resource management
 
Final report Ship Handling and Manuevering 05-13-22.pptx
Final report Ship Handling and Manuevering 05-13-22.pptxFinal report Ship Handling and Manuevering 05-13-22.pptx
Final report Ship Handling and Manuevering 05-13-22.pptx
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt cheng
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Airplane Upset Recovery: High Altitude Operations
Airplane Upset Recovery:  High Altitude OperationsAirplane Upset Recovery:  High Altitude Operations
Airplane Upset Recovery: High Altitude Operations
 
Primary Flight Instruments | Flight Mechanics | GATE Aerospace
Primary Flight Instruments | Flight Mechanics | GATE AerospacePrimary Flight Instruments | Flight Mechanics | GATE Aerospace
Primary Flight Instruments | Flight Mechanics | GATE Aerospace
 
Instrument landing system
Instrument landing system Instrument landing system
Instrument landing system
 
LEEA Appointed Person in lifting Operations accreditation training
LEEA Appointed Person in lifting Operations accreditation trainingLEEA Appointed Person in lifting Operations accreditation training
LEEA Appointed Person in lifting Operations accreditation training
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
Human factors - Maintenance and inspection
Human factors - Maintenance and inspectionHuman factors - Maintenance and inspection
Human factors - Maintenance and inspection
 
Offshore Safety Officer and Trainer - G.V.Rama Murthy
Offshore Safety Officer and Trainer - G.V.Rama MurthyOffshore Safety Officer and Trainer - G.V.Rama Murthy
Offshore Safety Officer and Trainer - G.V.Rama Murthy
 
Aerial Lifts Training by University of Wisconsin
Aerial Lifts Training by University of WisconsinAerial Lifts Training by University of Wisconsin
Aerial Lifts Training by University of Wisconsin
 
Airfield ground lighting (AGL)
Airfield ground lighting (AGL)Airfield ground lighting (AGL)
Airfield ground lighting (AGL)
 
Angle of attack | Flight Mechanics | GATE Aerospace
Angle of attack | Flight Mechanics | GATE AerospaceAngle of attack | Flight Mechanics | GATE Aerospace
Angle of attack | Flight Mechanics | GATE Aerospace
 
Operating practices
Operating practicesOperating practices
Operating practices
 
Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)
 
Weight and balance
Weight and balanceWeight and balance
Weight and balance
 
Ship Construction - Rudder Theory
Ship Construction - Rudder TheoryShip Construction - Rudder Theory
Ship Construction - Rudder Theory
 

Similar to Offshore helideck review checklist

OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master OCIMF OVID
 
Widespread Fatigue Damage
Widespread Fatigue DamageWidespread Fatigue Damage
Widespread Fatigue Damagesyedrooh
 
Transocean offshore operation 3
Transocean   offshore operation 3Transocean   offshore operation 3
Transocean offshore operation 3Steffones K
 
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.pptssuser856cc8
 
Stcw guide english
Stcw guide englishStcw guide english
Stcw guide englishBrian Dsilva
 
Aircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance RecordsAircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance RecordsFernando Araujo
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...minte3
 
Cap641 report of the review of helicopter offshore safety and survival
Cap641   report of the review of helicopter offshore safety and survivalCap641   report of the review of helicopter offshore safety and survival
Cap641 report of the review of helicopter offshore safety and survivalRonachai Fuangfoong
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentationOladokun Sulaiman Olanrewaju
 
Aea Training Man Ed6
Aea Training Man Ed6Aea Training Man Ed6
Aea Training Man Ed6guest78ed2f4
 
E icao ramp inspection guidance part i 2009-07 r3
E   icao ramp inspection guidance part i 2009-07 r3E   icao ramp inspection guidance part i 2009-07 r3
E icao ramp inspection guidance part i 2009-07 r3Ahmed Mogy
 
Marpol regs4ships
Marpol regs4shipsMarpol regs4ships
Marpol regs4shipsravi6543
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]George Teriakidis
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringGeorge Teriakidis
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...Mohammud Hanif Dewan M.Phil.
 
UAV Certification - extract for AUVSI 2015
UAV Certification - extract for AUVSI 2015 UAV Certification - extract for AUVSI 2015
UAV Certification - extract for AUVSI 2015 Mike Roberts
 

Similar to Offshore helideck review checklist (20)

OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master
 
Widespread Fatigue Damage
Widespread Fatigue DamageWidespread Fatigue Damage
Widespread Fatigue Damage
 
Transocean offshore operation 3
Transocean   offshore operation 3Transocean   offshore operation 3
Transocean offshore operation 3
 
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
 
Stcw guide english
Stcw guide englishStcw guide english
Stcw guide english
 
Aircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance RecordsAircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance Records
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
 
Csms 1999
Csms 1999Csms 1999
Csms 1999
 
Cap641 report of the review of helicopter offshore safety and survival
Cap641   report of the review of helicopter offshore safety and survivalCap641   report of the review of helicopter offshore safety and survival
Cap641 report of the review of helicopter offshore safety and survival
 
Session 02.pptx
Session 02.pptxSession 02.pptx
Session 02.pptx
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
 
Aea Training Man Ed6
Aea Training Man Ed6Aea Training Man Ed6
Aea Training Man Ed6
 
Aea Training Man Ed6
Aea Training Man Ed6Aea Training Man Ed6
Aea Training Man Ed6
 
E icao ramp inspection guidance part i 2009-07 r3
E   icao ramp inspection guidance part i 2009-07 r3E   icao ramp inspection guidance part i 2009-07 r3
E icao ramp inspection guidance part i 2009-07 r3
 
Marpol regs4ships
Marpol regs4shipsMarpol regs4ships
Marpol regs4ships
 
Imcam149 -issue_8
Imcam149  -issue_8Imcam149  -issue_8
Imcam149 -issue_8
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkering
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
 
UAV Certification - extract for AUVSI 2015
UAV Certification - extract for AUVSI 2015 UAV Certification - extract for AUVSI 2015
UAV Certification - extract for AUVSI 2015
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Offshore helideck review checklist

  • 1. Report No. 6.56/322 November 2001 Offshore helideck review checklist
  • 2. Publications Global experience The International Association of Oil & Gas Producers (formerly the E&P Forum) has access to a wealth of technical knowledge and experience with its members operating around the world in many different terrains. We collate and distil this valuable knowl- edge for the industry to use as guidelines for good practice by individual members. Consistent high quality database and guidelines Our overall aim is to ensure a consistent approach to training, management and best practice throughout the world. The oil and gas exploration and production industry recognises the need to develop con- sistent databases and records in certain fields. The OGP’s members are encouraged to use the guidelines as a starting point for their operations or to supplement their own policies and regulations which may apply locally. Internationally recognised source of industry information Many of our guidelines have been recognised and used by international authorities and safety and environmental bodies. Requests come from governments and non-govern- ment organisations around the world as well as from non-member companies. Disclaimer Whilst every effort has been made to ensure the accuracy of the information contained in this publica- tion, neither the OGP nor any of its members past present or future warrants its accuracy or will, regardless of its or their negligence, assume liability for any foreseeable or unforeseeable use made thereof, which liability is hereby excluded. Consequently, such use is at the recipient’s own risk on the basis that any use by the recipient constitutes agreement to the terms of this disclaimer. The recipient is obliged to inform any subsequent recipient of such terms. Copyright OGP All rights are reserved. Material may not be copied, reproduced, republished, downloaded, stored in any retrieval system, posted, broadcast or transmitted in any form in any way or by any means except for your own personal non-commercial home use. Any other use requires the prior written permission of the OGP. These Terms and Conditions shall be governed by and construed in accordance with the laws of England and Wales. Disputes arising here from shall be exclusively subject to the jurisdiction of the courts of England and Wales.
  • 3. Offshore helideck review checklist Report No: 6.56/322 November 2001
  • 4. This report has been prepared for OGP by a team drawn from the Aviation Subcommittee of the Safety, Health and Person- nel Competence Committee (SHAPCC).
  • 5. i Offshore helideck review checklist © 2001 OGP General instructions ii Inspection signatures 1 Inspection checklist 1 General helideck information.....................................................................................................................1 Helideck surface.........................................................................................................................................2 Helideck dimensions ..................................................................................................................................2 Helideck markings .....................................................................................................................................3 Surface net .................................................................................................................................................4 Perimeter safety net....................................................................................................................................4 Perimeter lighting.......................................................................................................................................5 Floodlighting .............................................................................................................................................5 General lighting .........................................................................................................................................6 Obstruction marking and lighting .............................................................................................................6 Status lights................................................................................................................................................6 Obstruction environment...........................................................................................................................7 Turbulence .................................................................................................................................................7 Refuelling package .....................................................................................................................................7 Access points..............................................................................................................................................8 Fire protection............................................................................................................................................8 Rescue equipment ......................................................................................................................................9 Protective clothing (RFF)......................................................................................................................... 10 Additional equipment............................................................................................................................... 11 Radio equipment...................................................................................................................................... 11 Weather equipment .................................................................................................................................. 12 Emergency response ................................................................................................................................. 12 Helideck crew........................................................................................................................................... 13 General (exercises & drills)....................................................................................................................... 14 Summary of non compliance’s.................................................................................................................. 14 Annex A: Helideck construction plan detail 15 Table of contents
  • 6. ii International Association of Oil & Gas Producers © 2001 OGP References In some countries, specific regulatory guidance has been issued and should be used to amend this checklist as neces- sary. 1. UK Civil Aviation Authority (CAA) Civil Air Publication (CAP) 437 is the primary reference used for this Checklist. 2. UK Offshore Petroleum Industry Training Organization (OPITO) refueling and HLO procedures publica- tions are the primary training references. 3. Recognition is also given to the work of the BHAB and their Offshore Helideck Inspection Checklist which serves as a key reference for this checklist. Non-compliances Record each non-compliance with a note number and summarize at the end of the checklist in the Summary of Non-Compliances. Inspection Requirements Daily, Weekly, Monthly, Quarterly, Semi-Annual, and Annual Checks should be recorded on the form and retained. In some regions more frequent intervals may be used as necessary, and the form may be amended accord- ingly. Annually all items are inspected. General instructions
  • 7. 1 Offshore helideck review checklist © 2001 OGP 1 Name of installation/vessel 2 Type 3 Owner 4 Helideck Approval or Fitness Certificate available? Are any limitations noted? 5 Previous report (if available) 6 Helideck height (in feet) (For mobiles give variable range and normal operating height) 7 Installation/vessel identification (locations of name, full name displayed, size of letters, background, illumination, clearly visible from air from all 4 sides) 8 Helideck plans (see Annex A) (Drawing No, date & revision, strength test. Do the plans accurately show the detail in Annex A. If not, state omissions) 9 Helideck Procedures Manual (HLO, fire, passenger handling, blocked helideck, unattended installation, fuel, emergency response, weather, adverse weather, etc.?) Platform / FPSO / FSU / SPM / Semi Sub / DSV / Seismic / Lay Barge / Crane Barge / Support Vessel / Jack Up / other (circle one & give details) Date: Date: Non compliances rectified? Height= Drawing#: Revision: Date: Strength test: Date: N/A N/A N/A [ ] [ ] [ ] N/A [ ] [ ] [ ] 3 years 6.1 4.1 1-2 Inspection signatures Location Inspector Inspection interval Date Additional remarks [ ] - check here and use back for comments Inspection checklist A General helideck information Remarks ! if OK CAP 437 Ref. & inspct. int.
  • 8. 2 International Association of Oil & Gas Producers © 2001 OGP 1 Colour 2 Condition (both paint & cleanliness) 3 Non-slip characteristics (estimate) 4 Last friction test 5 Gutter or raised curb (give detail: around all of the perimeter?) 6 Drainage (sufficient number of downpipes, slope, debris, filter fitted) 7 Deck sealed 8 Aircraft tie down points (Location, quantity, flush, bar diameter - 20mm, condition) C Helideck dimensions Remarks ! if OK CAP 437 Ref. & inspct. int. 1 Overall helideck (dimensions in meters) 2 Safe landing area (dimensions. Contains D circle) Dark grey / dark green / aluminium / other: Last repaint: High / medium / low / nil Date: Result: Yes / No [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 4.2.1 3.8.1 3.8.5 3.13.3 3.8.2 3.8.2 3.8.2 3.9 3.7.1 3.7.2 B Helideck surface Remarks ! if OK CAP 437 Ref. & inspct. int.
  • 9. 3 Offshore helideck review checklist © 2001 OGP 1 Installation/rig (State name painted on deck) (Height 1.2m, colour-white, position, outlined [alum.decks only]) (Are other names on deck e.g. Block No. Oil Company, Logo? If so give details) Are there side identification panels? (visible all angles and directions of approach) 2 Perimeter line (Colour white, width 0.3m, location) 3 Aiming circle (Colour-yellow, width 1m, inner diameter 0.5D, location 0.1’D’ outboard) 4 Chevron (For obstacle clearances) Length/width 0.79m/0.01m, colour-black, angle 210º, location - edge of D circle) 5 Actual D value (Height 0.1m, Colour black, location, inboard of Chevron)(does it match physical measurements?) 6 Perimeter ‘D’ value (Value, quantity 3, colour white, height 0.6m, location, orientation) 7 ‘H’ (size 4m x 3m x 0.75m) location, orientation (concentric with bisector), swung ± 15º max) 8 Max allowable mass (Value, size 0.9m, colour white, location. Design load calcs confirm value?) 9 Prohibited Landing Sector (If used, provide laction, angle, colours red/white hatching, reason) D Helideck markings Remarks ! if OK CAP 437 Ref. & inspct. int D= D= [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 4.1.1 4.1.3 4.2.1 4.2.1 4.1.4 4.2.4 4.2.2 4.2.2 4.2.2 4.2.4 3.4-6 4.2.3 4.2.5
  • 10. 4 International Association of Oil & Gas Producers © 2001 OGP 1 Material [recommend sisal (no polypropylene)] 2 Type 3 Coverage (Covers aiming circle, clear of name and t value) 4 Age/condition 5 Rope diameter 6 Mesh size 7 Net size 8 Tension (2225N) 9 Tie down points 10Method of securing Knotted/threaded 1 / 2 / 3 / 4 / 5 years 20mm 200mm 6x6m / 121x12m / 15x15m / other Max lift 0.25m at center Every 1.5m Rope / webbing / ratchet tensioners [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 3.8.4 3.8.3 3.8.3 3.8.3 3.8.3 3.8.3 3.8.4 3.8.3 3.8.3 F Perimeter safety net Remarks ! if OK CAP 437 Ref. & inspct. int 1 Material 2 Width from deck edge 3 Condition/securely attached 4 Last drop load test (75 kgs) 5 Hammock effect (Nil bounce effect) 6 Drop down area protected 7 Slope (slope at least 10 degrees. Highest point above deck level: 250mm) 8 Covers drop down areas (unless adequate structural protection exists) Wire mesh / polypropylene / sisal / corrugated steel 1.5m Date [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 3.10.2 3.10.1 3.10.2 3.10.1 (annual) 3.10.1 3.10.1 3.10.1 3.10.1 E Surface net (not required in all areas, if surface friction is adequate) Remarks ! if OK CAP 437 Ref. & inspct. int
  • 11. 5 Offshore helideck review checklist © 2001 OGP 1 Colour 2 Serviceability (All working, brightness, condition of lens) 3 Height & distance apart (<250mm, <3m) 4 Power rating Candelas 25 Connected to uninterrupted (second generator) emergency power supply? 5 Location 6 Limit of safe landing area (Have red lights been temporarily employed to deliniate unsafe sectors? If so, state how the situation is going to be rectified.) 7 Switching (Controlled from Radio Room/ Bridge or HLO) Yellow Yes / No Co-incident with perimeter line [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 4.3.1 4.3.1 4.3.1 4.3.8 4.3.8 4.3.2 4.3.4 G Perimeter lighting Remarks ! if OK CAP 437 Ref. & inspct. int 1 Position, height & quality (Position, quantity, height, adequate illumination, brightness meets 10 lux & 8:1 ratio) 2 Serviceability (All working) 3 Dazzle protection (What method is employed to avoid dazzle & type of unit) 4 Switching (Controlled from Radio Room by HLO) 5 Emergency power supply (In addition to the perimeter lights, are the floods connected to the uninterrupted (second generator)/emergency power supply?) Yes / No Shuttering / Directional beam Yes / No Yes / No [ ] [ ] [ ] [ ] [ ] 4.3 3-5 4.3.3 4.3.4 4.3.8 4.3.8 H Flood lighting Remarks ! if OK CAP 437 Ref. & inspct. int
  • 12. 6 International Association of Oil & Gas Producers © 2001 OGP 1 Installation floodlighting (All floodlighting angled so as to not dazzle pilots) 2 Structures>15m above deck level (Omni-directional red lights every 10m above deck level. To include all crane booms) 3 Highest point (Omni-directional, colour, intensity) 4 Light pollution J Obstruction marking & lighting Remarks ! if OK CAP 437 Ref. & inspct. int 1 Obstructions (List and give colour scheme) 2 Crane colours (Colour [if close to helideck or 150° sector boundary]) 3 Lighting (Give detail) K Status lights Remarks ! if OK CAP 437 Ref. & inspct. int 1 Visible from all approach directions 2 Connected to emergency supply/UPS 3 Switching (Automatic and manual activation with connection to Emergency Power Supply) Yes / No Contrasting [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 4.3.3 4.4.3 4.4.4 4.3.4 4.4.1-2 4.4.1-2 4.4 4.3.6 4.4.8 4.4.6 I General lighting Remarks ! if OK CAP 437 Ref. & inspct. int
  • 13. 7 Offshore helideck review checklist © 2001 OGP 1 210° Sector Obstructions (State items, location & height, max 0.25m within 1000m above deck level) 2 150° Sector Obstructions (State items, location & height above deck level) a) up to 0.62 ‘D’ (or 0.12 from edge of safe landing area)=0.05’D’ 0.62-0.83 ‘D’ (or 0.33 from edge of safe landing area)=gradient of 1:2 3 180° 5:1 falling gradient (11.4°) for obstructions below the helideck level (State items, location, distance from the edge of netting and height below deck level) M Turbulence Remarks ! if OK CAP 437 Ref. & inspct. int 1 Structure (State items likely to cause turbulence) 2 Hot emissions (State emissions, e.g. flares, turbine exhausts) 3 Cold emissions (State emissions, e.g. vents, blow down) 4 Air gap beneath helideck (State height & obstruction environment) 5 Prevailing wind (State any restrictions in landing/to weight/approach- departure direction) N Refuelling systems General comments only (Use Refuelling System Inspection Form) Items allowed up to 0.25m - guttering / lighting / outboard safety net / foam monitors / handrails [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 3.7.2 3.7.4 3.7.5 3.3 3.3 3.3 3.3 3.3 L Obstruction environment Remarks ! if OK CAP 437 Ref. & inspct. int
  • 14. 8 International Association of Oil & Gas Producers © 2001 OGP 1 Locations (Primary and secondary) 2 Handrails (Foldable if obstacle height?, height) 3 Safety notices (Recommended tail rotor, clear deck, hearing protection, in dual language if necessary) 4 Control of pax (System employed to prevent inadvertent access to helideck, frangible chainsat secondary access points) P Fire protection Remarks ! if OK CAP 437 Ref. & inspct. int 1 Foam monitors (Quantity, type) If non-aspirated, state what aspirated back up available 2 Delivery rate (Liters/min of applied foam) 3 Concentrate (Capacity of tank, quantity in tank, type, percentage [marked container]) 4 Certificate of conformity (Cert. of conformity, test report on concentrate, water & produced foam [if applicable]) 5 Back-up concentrate (Quantity) 6 Hydrant points (Quantity, location) 7 Hand lines (Quantity, location, hand controlled spray/jet nozzles) 8 Foam hand branch (Quantity, location, delivery rate) Aspirated / Non aspirated Manual / oscillating / oscillating with manual override / remote ________liters/minute Capacity: Type: Quantity available: Percentage: Date of last test: [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 3.11.2 3.11.5 3.11.5 3.11.5 5.2.7 5.2.5 5.2.4 5.2.6 5.3.3 (Annual) 5.2.6 5.2 8-9 5.2.8 5.2 8-9 O Access points Remarks ! if OK CAP 437 Ref. & inspct. int
  • 15. 9 Offshore helideck review checklist © 2001 OGP 9 Foam inductors (Quantity, location, concentrate- quantity, percentage setting, connection, 10Dry powder (DP) (No. & capacity of each unit, location, access to helideck, last test date,) 11 CO2 (No. & capacity of each unit, location, access to helideck, lance, last test date) 12Back-up DP & CO2 (Back up determined by duty holder but should be determined by circumstances. No & capacity, locations) Q Rescue equipment Remarks ! if OK CAP 437 Ref. & inspct. int 1 Rescue equipment box(es) (Location, quantity, condition, lighting) Layout of the equipment Accessibility from all helideck access points 2 Checklist 3 Adjustable wrench (Quantity, location) 4 Large rescue axe (Non wedge or aircraft type) 5 Bolt cutters (Quantity, location) 6 Large crowbar (Quantity, location) 7 Grab or salving hook (Quantity, location) 8 Heavy duty hacksaw (Quantity, location) 9 Heavy duty blades (Quantity, location) Branch / Hydrant _____x_____ kg (45kg min) _____x_____ kg (22kg min) DP _____x_____ kg CO2 _____x_____ kg Attached to container 1 1 1 1 1 1 6 [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 5.2.8 5.3.2 5.4 5.4 5.4 5.6.1 5.6.1 5.6.1 5.6.2 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 P Fire protection (continued) Remarks ! if OK CAP 437 Ref. & inspct. int
  • 16. 10 International Association of Oil & Gas Producers © 2001 OGP 10 Fire resistant blanket (Quantity, location) 11 Ladder (Quantity, location) 12Life-line/rescue harness (Quantity, location) 13Side cutting pliers (Quantity, location) 14Set of assorted screwdrivers (Quantity, location) 15Harness knife c/w sheath (1 per deck crew) 16Self-contained breathing apparatus (Quantity, location, storage, spare bottles) 17Portable safety lamp (Quantity, location, operating life) R Protective clothing (RFF) Remarks ! if OK CAP 437 Ref. & inspct. int 1 Stowage type (Location, condition) 2 Helmet with visor (Quantity, , type, BS/EN code, condition) 3 Gloves (Quantity, type, PREN code, condition) 4 Boots (Quantity, type, PREN code, condition) 5 Fire tunic & trouser or one piece (Quantity, type, PREN code, condition) 1 1 1 1 1 2 2 [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.6.1 5.8 5.8 5.8 5.8 5.8 Q Rescue equipment (continued) Remarks ! if OK CAP 437 Ref. & inspct. int
  • 17. 11 Offshore helideck review checklist © 2001 OGP 1 Chocks ([Sandbag type best on decks with a deck net])quantity) 2 Tie down strops/ropes (Type, quantity - 6 minimum, break strenght min of wt of helo) 3 Scales for baggaage, freight, passengers (Type, max wt., cllibration date) 4 Helicopter start unit (Type, location, voltage. Can lead reach to a/c in any position, incl. in maint. programme?) 5 Snow/ice clearing equipment (If needed) 6 Equipment for showing passenger brief (Type, location, dual language or subtitles?) 7 Prohibited Landing Marker 8 Windsock (Location, condition, illumination, in clear air?) T Radio equipment Remarks ! if OK CAP 437 Ref. & inspct. int 1 VHF Main (Call sign, location, quantity [min req. varies, eg 2 in N.Sea], ATSSD approved, details, connected to emergency supply/UPS) 2 VHF portable (Quantity 1 min, with headset) 3 NDB (ATSSD approved, details, ident, frequency) 4 AIP ENR 1-15 available 5 Radio log (written or electromagnetic, kept for 28 days, detailing: no of pax, pax wt, baggage/freight wt.) Sandbag / rubber / metal frame Quantity: Webbing / rope / webbing with tensioners Calibration date: Rectifier, battery trolley, 28V DC Laser / brief 4x4m red flag with diagonal yellow cross [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 6.9.1a-2 6.9.3 6.9.1b (Annual) 6.9.1c 6.9.1d ANO Art 39 4.2.6 4.1.5 6.4.2 6.9.4 6.9.4 S Additional equipment Remarks ! if OK CAP 437 Ref. & inspct. int
  • 18. 12 International Association of Oil & Gas Producers © 2001 OGP 1 Anemometer (Location, calibration date, in clear air) 2 Air temp (Calibration) 3 Precision barometer (Location of a sensor relative to h/deck level, calibration date?) 4 Visibility, cloud base & cover (Give details of equipment if available) 5 Pitch/roll/heave & sea state (Give details of equipment if available) Can the equipment record the max. figure over the preceding 10 mins? 6 Location of the readouts (Can the radio op access to all weather info?) 7 Are personnel trained in weather observation? 8 Are helideck/bridge personnel knowledgeable on operator weather limitations and also on adverse weather policy? 9 AWOS? (Provide telephone or comms link available) V Emergency response Remarks ! if OK CAP 437 Ref. & inspct. int 1 Helicopter emergency diagrams (Location, which types are covered?) 2 Emergency procedures (Is there an Emergency Procedures Manual detailing helicopter emergencies?) Date calibrated: Date calibrated: Date calibrated: B212 / 365N / 365N2 / S76A / S76B / S76C / B214 / AS332LI / AS332L2 / S61N / Others [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] 6.4 6.4 6.4 6.4 6.4 6.4 5.10 U Weather equipment Remarks ! if OK CAP 437 Ref. & inspct. int
  • 19. 13 Offshore helideck review checklist © 2001 OGP 1 Helideck Landing Officer (HLO) Total number,number per shift Completed: Basic offshore Safety Induction & Emergency Training Prog. Further Offshore Emergency Training programme Previously server as HLA or have previous suitable experience Have a Helicopter Refuelling Certificate meeting industry standard Have an RT license Possess current Emergency Helideck Team Member Certificate Have completed an initial HLO training programme 2 Helideck Assistant (HLA) (Total number, number per shift) Completed: Basic Offshore Safety Induction & Emergency Training prog. Further Offshore Emergency Training programme Have previous experience of handling helicopters HDA: have completed and initial training programme covering routine operations (including refuelling) Have a Helicopter Refuelling Certificate meeting industry standard, where required Have completed an approved Emergency Helideck Team Members Course HLO & HDAs: Training records available? [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] W Helideck crew (note: OPITO or equivalent standard) Remarks ! if OK CAP 437 Ref. & inspct. int
  • 20. 14 International Association of Oil & Gas Producers © 2001 OGP 1 Date of last practice in use of foam agents on simulated fuel spill 2 Date of last practice in use of portable equipment (including DP & CO2) on simulated engine fires 3 Date of last test of fire fighting systems 4 Aircraft evacuation drills, including removal of casualties, with and without smoke and breathing apparatus 5 Crash drills/briefings, to include high and low impact. On/off helideck incidents (preplanning, priorities, actions, techniques & problems likely to be encountered). Y Summary of non-compliances List of non-compliances 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Additional remarks [ ] - check here and attach sheets [ ] [ ] [ ] [ ] [ ] X General (excercises and drills) Remarks ! if OK CAP 437 Ref. & inspct. int
  • 21. 15 Offshore helideck review checklist © 2001 OGP Annex A Plans required - to scale • GA of the entire Platform/Rig • Elevation - clearly showing the 180° 5:1 sector • Plan view of helideck and the obstacle environment Detail to be shown • All helideck markings, giving dimensions and color • Deck net location • Tie down points • Perimeter net • Lighting - both perimeter and floodlighting • Location of RFFF • Refueling system • Guttering & downpipes • Access points • Windsock(s) • 210°, 150° & 180° sectors to be clearly shown • All obstruction non compliance’s to be detailed, stating height above/below deck level • Color scheme of above • Structures that might cause turbulence over the helideck • Hot emission sources e.g. flares, turbine exhausts
  • 22. 16 International Association of Oil & Gas Producers © 2001 OGP
  • 23. What is OGP? e International Association of Oil & Gas Producers encompasses the world’s leading private and state-owned oil & gas companies, their national and regional associations, and major upstream contractors and suppliers. Vision • To work on behalf of all the world’s upstream companies to promote responsible and profitable operations. Mission • To represent the interests of the upstream industry to international regulatory and legislative bodies. • To achieve continuous improvement in safety, health and environmental performance and in the engineering and operation of upstream ventures. • To promote awareness of Corporate Social Responsibility issues within the industry and among stakeholders. Objectives • To improve understanding of the upstream oil and gas industry, its achievements and challenges and its views on pertinent issues. • To encourage international regulators and other parties to take account of the industry’s views in developing proposals that are effective and workable. • To become a more visible, accessible and effective source of information about the global industry, both externally and within member organisations. • To develop and disseminate best practices in safety, health and environmental performance and the engineering and operation of upstream ventures. • To improve the collection, analysis and dissemination of safety, health and environmental performance data. • To provide a forum for sharing experience and debating emerging issues. • To enhance the industry’s ability to influence by increasing the size and diversity of the membership. • To liaise with other industry associations to ensure consistent and effective approaches to common issues.
  • 24. 209-215 Blackfriars Road London SE1 8NL United Kingdom Telephone: +44 (0)20 7633 0272 Fax: +44 (0)20 7633 2350 165 Bd du Souverain 4th Floor B-1160 Brussels, Belgium Telephone: +32 (0)2 566 9150 Fax: +32 (0)2 566 9159 Internet site: www.ogp.org.uk e-mail: reception@ogp.org.uk