The document is a preview for the Trenchless Middle East 2011 International Exhibition and Conference taking place on October 10-11, 2011 in Dubai, UAE. It provides information on the conference program, exhibitor and registration details. Trenchless technology involves minimally invasive installation and rehabilitation of underground utilities to avoid disruptive excavation. The exhibition will feature the latest trenchless equipment and techniques, while the conference will include presentations from local and international speakers.
Service solahart pondok labu 081261101170 | SlideshareService Solahart
Jasa Service Pemanas Air Center Solar Water Heater Solahart Tenaga Matahari Tanyakan Segera! CS Ramah & Cakep Jujur & Profesional Kompeten & Berpengalaman Spare Part Original Harga Murah Ekonomis didukung team teknisi ahli handal berpengalaman selama puluhan tahun di bawah naungan Cv Fikri Mandiri Jaya
KAMI MELAYANI :
A Mesin Pemanas Air Tidak Panas, Tekanan Air Kurang Kencang
B. Tanky Bocor
C. Jasa Penurunan Unit/ Bongkar Pasang
D. Penggantian Sparepart,Element,Termorstat,1/2 Valve, Cek Valve Dll.
F. Pemasangan Titik Air Panas/ Instalasi Pipa Air Panas
NIBE is among top mba colleges in bangalore , india . College offers different courses like mba , bca, bbm and bcom . Its vision is to give efficient professionals to the management sector
Service solahart pondok labu 081261101170 | SlideshareService Solahart
Jasa Service Pemanas Air Center Solar Water Heater Solahart Tenaga Matahari Tanyakan Segera! CS Ramah & Cakep Jujur & Profesional Kompeten & Berpengalaman Spare Part Original Harga Murah Ekonomis didukung team teknisi ahli handal berpengalaman selama puluhan tahun di bawah naungan Cv Fikri Mandiri Jaya
KAMI MELAYANI :
A Mesin Pemanas Air Tidak Panas, Tekanan Air Kurang Kencang
B. Tanky Bocor
C. Jasa Penurunan Unit/ Bongkar Pasang
D. Penggantian Sparepart,Element,Termorstat,1/2 Valve, Cek Valve Dll.
F. Pemasangan Titik Air Panas/ Instalasi Pipa Air Panas
NIBE is among top mba colleges in bangalore , india . College offers different courses like mba , bca, bbm and bcom . Its vision is to give efficient professionals to the management sector
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...Frederik Smit
‘Building bridges between home and school'
In this book you will find case studies, programmes, overviews and reviews of various kinds of involvement in a number of countries over the world. The main body is made up of the business of "building bridges" between home and school. The forms of involvement run from orientation to partnerships in specific subjects to systems, models and strategies for partnerships.
Contributors:
Ana Isabel Alvarez, Emma Beresford, Elzbieta Bielecka, Sue Botcherby, Victoria Casielles, Norberto Corral, Begoña Dona ire, Stelios Georgiou, Raquel-Amaya M artínez González, Jennifer Hartman, Gary Heywood-Everett, Pauline Huizenga, Ingebjörg Johanessen, Lesley Jones, Ann Kinkor, Leonidas Kyriakides, Cees Klaassen , Sue Lasky, Han Leeferink, Ronald Lippens, Donald Lueder, Olwen McNamara, Maria Mendel, Hans Moerel, Oliver Moles, Ton Mooij, Shawn Moore, Pirjo Nuutinen, Rhonda Payne, Marisa Pereira, Helen Phtiaka, Daniel Safran, Peter Sleegers, Ed Smeets, Frederik Smit, Martha Allexsaht-Snider, Annemiek Veen, Adelina Villas-Boas, Babara Wilson, Kees van der Wolf.
Editors: Frederik Smit, Hans Moerel, Kees van der Wolf en Peter Sleegers.
Download: Book
Catálogo de nuestros servicios en marketing digital y diseño gráfico.
Contacta con nosotros (+34 954 922 772) sin ningún tipo de compromiso. Le haremos un presupuesto hecho a medida, con precios justos y equilibrados.
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...Communardo GmbH
Vortrag von Dirk Röhrborn auf dem Forum eLearning & Knowledge Management auf der Cebit 2009 über Microsharing und wie dieser Ansatz die Kommunikation im Unternehmen verändert.
Nowadays, the increasing complexity in government-related processes presents considerable challenges to achieve satisfactory services. In this study we will discuss the first results obtained in an ongoing project named “e-Government Innovation Center”. We first identify typical semantic problems in e-Government, then introduce an e-Government semantic business process management framework and illustrate the building permit application as an example to strengthen how semantic web technologies could be used to design a new approach for exchanging and performing the processes and information in e-Government.
The Oil & Gas Technology Forum Drilling Day event, located in London, will provide a platform for you to hear brand new caste studies on how the oil industry can work together to enhance profits, learn valuable strategies from top-level speakers on maximising resources as well as unlimited access to network with peers and leading experts.
Network and listen to leading experts such as Tue Hassenkam, Associate Professor, NanoGeoScience, UNIVERSITY OF COPHENHAGEN, John Corben, Senior Technical Advisor, IEA, Giovanni Botto, R&D Manager Drilling, ENI SPA and more!
Make sure you register now – the first 5 registrations get automatic places at the invite-only Oil & Gas Technology Forum on 26th & 27th March
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...Frederik Smit
‘Building bridges between home and school'
In this book you will find case studies, programmes, overviews and reviews of various kinds of involvement in a number of countries over the world. The main body is made up of the business of "building bridges" between home and school. The forms of involvement run from orientation to partnerships in specific subjects to systems, models and strategies for partnerships.
Contributors:
Ana Isabel Alvarez, Emma Beresford, Elzbieta Bielecka, Sue Botcherby, Victoria Casielles, Norberto Corral, Begoña Dona ire, Stelios Georgiou, Raquel-Amaya M artínez González, Jennifer Hartman, Gary Heywood-Everett, Pauline Huizenga, Ingebjörg Johanessen, Lesley Jones, Ann Kinkor, Leonidas Kyriakides, Cees Klaassen , Sue Lasky, Han Leeferink, Ronald Lippens, Donald Lueder, Olwen McNamara, Maria Mendel, Hans Moerel, Oliver Moles, Ton Mooij, Shawn Moore, Pirjo Nuutinen, Rhonda Payne, Marisa Pereira, Helen Phtiaka, Daniel Safran, Peter Sleegers, Ed Smeets, Frederik Smit, Martha Allexsaht-Snider, Annemiek Veen, Adelina Villas-Boas, Babara Wilson, Kees van der Wolf.
Editors: Frederik Smit, Hans Moerel, Kees van der Wolf en Peter Sleegers.
Download: Book
Catálogo de nuestros servicios en marketing digital y diseño gráfico.
Contacta con nosotros (+34 954 922 772) sin ningún tipo de compromiso. Le haremos un presupuesto hecho a medida, con precios justos y equilibrados.
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...Communardo GmbH
Vortrag von Dirk Röhrborn auf dem Forum eLearning & Knowledge Management auf der Cebit 2009 über Microsharing und wie dieser Ansatz die Kommunikation im Unternehmen verändert.
Nowadays, the increasing complexity in government-related processes presents considerable challenges to achieve satisfactory services. In this study we will discuss the first results obtained in an ongoing project named “e-Government Innovation Center”. We first identify typical semantic problems in e-Government, then introduce an e-Government semantic business process management framework and illustrate the building permit application as an example to strengthen how semantic web technologies could be used to design a new approach for exchanging and performing the processes and information in e-Government.
The Oil & Gas Technology Forum Drilling Day event, located in London, will provide a platform for you to hear brand new caste studies on how the oil industry can work together to enhance profits, learn valuable strategies from top-level speakers on maximising resources as well as unlimited access to network with peers and leading experts.
Network and listen to leading experts such as Tue Hassenkam, Associate Professor, NanoGeoScience, UNIVERSITY OF COPHENHAGEN, John Corben, Senior Technical Advisor, IEA, Giovanni Botto, R&D Manager Drilling, ENI SPA and more!
Make sure you register now – the first 5 registrations get automatic places at the invite-only Oil & Gas Technology Forum on 26th & 27th March
The Trading Show is a unique platform that links strategies with the latest solutions. It is a place where innovation is showcased, solutions are found and learning is done.
The conference features senior decision makers from the largest organisations in the trading sector . The conference is split into four distinct focus areas:
Day 1 – High Frequency Trading Strategy and Derivative Trading
Day 2 – High Frequency Trading Technology and Commodities Trading
A Guide to delighting EXPO 2020 visitors & capturing their attentionGemma Fabian
October 2020 will be the date when all eyes turn to Dubai expecting to see some incredible creative visions brought to life.
These factors will drive up visitor numbers, but given the extraordinary architecture and entertainment already seen in the region, it will take something highly creative and unique to grab their attention. Having been involved with audio-visual design and installation in more than 80 EXPO pavilions, we share our knowledge of the 10 factors that designers need to consider, to ensure audiences leave with lasting memories.
Innovations Magazine for the first quarter of 2014 brings you stories including the following:
“Tapping into Tomorrow” - Increasing process and jobsite safety through advanced remote hot tapping technology, with digital enhancements for greater operational control and extreme precision.
“Cracking the Code on Cracks” - Providing comprehensive detection and advanced characterization of integrity threats through Multiple Dataset Platform with SpirALL® EMAT crack detection.
“Technology for an Aging World” - Extending asset life through automated pigging technologies, advanced integrity imaging techniques, custom composite repair, and minimally invasive isolation and repair.
“Wingging with NGLs” - Reducing operation cost, man-hours and carbon emissions through pigging with the SmartTrap® Automated Sphere System, and helping operators make money by capturing NGLs.
“Changing Directions” - Helping operators navigate the risks of pipeline repurposing through a better understanding of integrity and operational challenges.
“Four Steps of Pipeline Integrity” - Achieving optimal pipeline throughput and operational safety through cleaning, inline inspection, non-destructive evaluation and isolation and repair.
Tecnova is a reference center agribusiness through Research Through developing a strategic line of R & D in Technology for grower and Postharvest and Packaging Technology.
The following report shows the actions taken in 2014
2008 Design Management Europe DME Award book of winnersDUCO
Report developed on partnership with Darragh Murphy.
Suggested citation:
Murphy, D. (2008). 2008 Design Management Europe DME Award Book of Winners. ADMIRE project, European Commission – Pro Inno Europe.
Originally uploaded at
https://issuu.com/hirse82/docs/dme_book3_final https://issuu.com/hirse82/docs/dme_book1_final/20 https://issuu.com/hirse82/docs/dme_book2_final
Журнал РОБТ №3 (апрель 2011)
"Шнековое бурение: возможности и перспективы".
Интервью главного редактора журнала «РОБТ» с коммерческим
директором ООО «Капстройтраст» Л.Г. Прокубовским
1. Bringing you the latest in trenchless technology
& land–based utility pipeline engineering
Trenchless Middle East Edition. October 2011
TRENCHLESS MIDDLE EAST 2011
INTERNATIONAL EXHIBITION AND CONFERENCE
Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE
10 -11 October 2011
Exhibition and Conference Preview
KEEPING the
middle east moving
2011
CONFERENCE PROGRAMME
REGISTRATION DETAILS
EXHIBITOR INFORMATION
ENTRANCE TO THE EXHIBITION IS FREE OF CHARGE
REGISTER ONLINE: WWW.TRENCHLESSMIDDLEEAST.COM
AND RECEIVE YOUR FREE GIFT ON ARRIVAL AT THE SHOW
2.
3. Welcome.....
I am very pleased to welcome you to the fourth issue of NO-DIG WORLD, a
publication that doubles as the Show Guide to the upcoming TRENCHLESS
MIDDLE EAST 2011 event being held at the Jumeirah Beach Conference &
Publisher
Paul Harwood Exhibition Centre, Dubai, UAE on 10 - 11 October 2011, supported by The
T + 44 (0) 845 094 8066 International Society for Trenchless Technology (ISTT) and the Institution of
E pharwood@westrade.co.uk Civil Engineers (ICE).
Known also as No-Dig technology and as NDRC (Non Disruptive Road
Advertising
Stuart Hillyard Crossing) in the Gulf region, Trenchless Technology embraces techniques
Gary King from micro tunnelling and directional drilling to pipe bursting, lining and inspection systems,
T + 44 (0) 845 094 8066 aimed at minimising or eliminating the need for disruptive excavations whilst providing a quick,
E shillyard@westrade.co.uk
efficient and economical solution to the construction and renovation of sewers, water mains,
Design & Production electricity cables and telecommunications networks.
Trevor Dorrell This is a developing global Industry. Products and techniques are reviewed and improved
T + 44 (0) 845 094 8066 on a regular basis. New innovations are proven to enhance performance. Major projects are
E trevor@frontpagepublishing.co.uk
completed every day somewhere around the world, proving that trenchless techniques provide
The publishers accept no responsibility in respect of economic solutions and reduced environmental impact. The social costs are reduced, benefiting
advertisements appearing in the magazine and the
communities, as well as the travelling public.
opinions expressed in editorial material or otherwise do
not necessarily represent the views of the publishers.
The two day exhibition will be complemented by a conference programme, assembled in
The publishers accept no responsibility for actions collaboration with the International Society for Trenchless Technology (ISTT). The conference will
taken on the basis of any information contained include presentations by local and international speakers, thus providing an exciting platform for
within this magazine. The publishers cannot accept
liability for any loss arising from the late appearance
delegates to learn, debate, share knowledge, benchmark, and network with like minded industry
or non-publication of any advertisement for any reason colleagues.
whatsoever. We, here at Westrade, are specialist organisers of shows focused on promoting the latest
ISSN 1479-0815
equipment and techniques used in Trenchless Technology which is now becoming the preferred
option for utility installation and repair, designed to keep traffic on the move.
If you haven’t yet planned your visit to Trenchless Middle East, don’t miss this opportunity to
come and see this unique line-up of products on display from exhibitors worldwide, and talk to the
experts who can provide solutions to the challenges ahead.
2011 For all information on how to get here and where to stay, visit our website
www.trenchlessmiddleeast.com I am sure you will find time invested here will be both profitable
and enjoyable.
The success of Trenchless Middle East is of course dependant on the support of the industry.
We offer our thanks to all exhibitors for their participation and professional displays and of course
to our sponsors. Their commitment and support to the event is greatly appreciated.
International Society Paul Harwood
For Trenchless Technology Sales and Marketing Director
Westrade Group Ltd.
Organised by
Contents
TRENCHLESS MIDDLE EAST is
organised by CONFERENCE programme and timetable Page 24 - 25
EXHIBITION floor plan Page 26
WESTRADE GROUP LTD
Westrade Group Ltd,
112-114 High Street, exhibitor profiles PAge 27
Rickmansworth, Herts,
WD3 1AQ UK
Tel: +44 (0) 845 094 8066
Fax: +44 (0) 870 429 9275
Web: www.westrade.co.uk
product guide page 32
Sponsors
4. exhibitor NEWS
FULL HOUSE AT REHABILITATION PROJECT
TRENchLESS MIDDLE EAST 2011, DUBAI
I am very pleased to welcome you to Products and techniques are reviewed organisers of shows focused on promoting their advice and assistance in compiling
in Kingdom of Saudi Arabia
the fourth issue of NO-DIG WORLD, a and improved on a regular basis. New the latest equipment and techniques used our Conference programme. We also
publication that doubles as the Show innovations are proven to enhance in Trenchless Technology which is rapidly welcome the support of The Institution International Aramoon Corp (IAC), is the first Trenchless Extensive cleaning was made to facilitate the CCTV During the preparation and installation of CIPP-UV
Guide to the upcoming TRENCHLESS performance. Major projects are completed becoming the preferred option for utility of Civil Engineers (ICE) and we welcome Technology specialized local contractor in Saudi Arabia. robotic inspection and as a result, several problems system IAC had given very careful attention for safety
MIDDLE EAST 2011 Exhibition and every day somewhere around the world, installation and repair around the world. their members to the event. Last but by The CEO President of IAC, Faiz Al-Elweet reports that were identified in the pipelines, such as infiltration, wall precautions especially when rehabilitating sewer
Conference being held at the Jumeirah proving that trenchless techniques If you haven’t yet planned your visit to no means least, we acknowledge the huge IAC has recently completed a rehabilitation project in incrustations, partial blockages, severe corrosion. infrastructure in heavy traffic areas.
Beach Conference Exhibition Centre in provide economic solutions and reduced TRENCHLESS MIDDLE EAST 2011, don’t support from our sponsors and exhibitors. KSA for The Water Authority of Eastern Province. The
Dubai, UAE, on 10 -11 October 2011. environmental impact. The social costs are miss this opportunity to come and see client was facing severe problems in their gravity sewers
Known also as No-Dig and also as minimised, benefitting communities, as this unique line-up of products on display See you at the show in Dubai, 10-11 (600mm and 700mm pipelines).
NDRC (Non Disruptive Road Crossing) in well as the travelling public. from exhibitors worldwide, and talk to the October!
the Gulf region, Trenchless Technology The two day exhibition will be experts who can provide solutions to the
embraces techniques from micro complemented by a top quality challenges ahead.
tunnelling and directional drilling, to pipe conference programme, assembled in For all information on how to get here
bursting, lining and inspection systems, collaboration with the International Society and where to stay, visit our website
aimed at minimising or eliminating for Trenchless Technology (ISTT). The www.trenchlessmiddleeast.com I am sure
the need for disruptive excavations conference will include presentations by you will find time invested here will be
2011
whilst providing a quick, efficient and local and international speakers, thus both profitable and enjoyable.
economical solution to the construction providing an exciting platform for delegates The success of Trenchless Middle East
and renovation of sewers, water mains, to learn, debate, share knowledge, is of course dependant on the support of
electricity cables and telecommunications benchmark, and network with like minded the industry.
networks. industry colleagues. We offer our thanks to The International
This is a developing global Industry. We, here at Westrade, are specialist Society (ISTT) for their support, as well as
IAC combined Jet-Vacuum Truck ready for
cleaning works
Liner material installation
CCTV inspection work in progress
After evaluation and condition assessment, IAC
recommended No-Dig pipe rehabilitation using CIPP-UV The CIPP-UV system is designed for fast and efficient
IAC were called upon to discuss the project and system for the gravity sewer pipelines in order to restore onsite installation that minimizes the economic, social
perform inspection condition assessment for the the 100% hydraulic efficiency and structural strength of and environmental impacts. IAC is well prepared to meet
gravity sewers, including providing services for pipeline the pipelines. the demand in the Region and has the full capability to
rehabilitation works. The pipeline material was ductile undertake such No-Dig repair rehabilitation works of
iron with a total length of 2300m. The pipes were wastewater network for the clients. n
located at an average depth of 4m below the ground
surface in Dammam City - KSA.
IAC employee prepares for working in confined
space (Manhole)
Site engineer operates controls the UV
BKP Berolina-Liner System, the CIPP-UV system curing system
supplier of equipment, liners and training, had made
CCTV inspection during cleaning process the structural calculation and liner design based on the www.aramoon.com
information provided by IAC. general@aramoon.com
4 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 5
5. exhibitor NEWS exhibitor NEWS
Vermeer new technology IAC specialized Stop
topography in the area, which included the gun barrel straight hole, a 490mm hole local Press
contractor
very hilly terrain, a stream, and existing opener was selected, which allowed for a
wet well elevations raised many concerns. 20mm annulus. The cutter was built with
The greatest challenge, however, wasn’t standard roller cone cutters, and the pipe At the time of going to press we have
the topography. The line would be bored was installed successfully, averaging around learned that the ISTT (International
through layered shale and limestone rock. 3m per hour. International Aramoon Corp. (IAC) is the Leak Detection and Repair for about 15,000Km successfully executed and ongoing projects Society for Trenchless Technology)
A 343mm cutter was used for the pilot As the hole opener approached the softer pioneer and the first specialized local contractor of pipelines for various diameters and 550,000 for Sewer Networks are about (40,000m) are in the process of finalising the
bore, and the AXIS system achieved an average rock, production increased and the last 85m in the Kingdom of Saudi Arabia with core House Connections in the various cities in including flow control diversion (i.e. By-Pass, affiliated agreement for a UAE Society
production rate of 4.3m per hour. Though section was completed in under 8 hours. specialty in the field of No-Dig Pipe Inspection, Saudi Arabia. dewatering…etc), Hydro-Jet Cleaning, CCTV for Trenchless Technology. An official
the pilot alone could have been considered Condition Assessment and Rehabilitation. IAC had developed locally “WATCH LEAK” Robotic Inspection, Pipelines Condition signing of the agreement will take place
a challenge, the real test was yet to come. The CEO President of IAC, Eng. Faiz software, which is a Water Management Assessment, Pipelines Rehabilitation (MH-MH at Trenchless Middle East 2011. Further
Rock bores had been completed for smaller Al-Elweet says (IAC) is an engineering contractor System to monitor and quantify leaks in Water Internal Lining). information about the Society will also
pipe installations, but prior to this project, the which has been founded in Riyadh since 1990. Supply Networks. IAC introduces several Trenchless be available.
A new technology is entering the guided pipe sizes and materials. system had not been used to upsize in rock. IAC is specialized in Water Leak Detection, The traditional water audit collects the Techniques and cost effective solutions for No-
boring industry, primarily focused on gravity A recent project was the successful In order to install the HDPE with an OD of Test and Repair for Water and Sewer Networks data manually during a single historic time, Dig Pipes Rehabilitation such as Cured In Place
sewer installations. The AXIS™ Guided installation of a 153m section of 450mm 470mm, a larger hole would need to be cut, without Excavation, by using Trenchless but “WATCHLEAK” collect real-time network Pipe System using Ultra Violet Rays (CIPP-UV)
Boring System is capable of achieving HDPE pipe. The goal was to eliminate a while still maintaining the perfect line and Technology. information. This software is a GIS based web and Spiral Wounding System as well as Spot
pinpoint line and grade accuracy in a variety pump station and convert the existing sewer grade achieved on the pilot shot. Head Office of IAC is in Riyadh and it has interface tool in order to help the Water Network Lining Technique for sectional repair of all types
of ground conditions, and for many different from a forced main to gravity flow. The Requiring a minimum over-cut due to branch offices in Dammam/ Al-Khobar, Ahsa, Operation Maintenance staff to identify of host pipes.
Tabuk, Madinah and Abha in KSA. District Meter Area (DMA) with higher water
We have undertaken projects throughout usage and to react before developing a visible International Society
Bursting with rope Saudi Arabia and since last five years we have
executed ( progressing) projects for Water
and costly failure.
During the last five years, IAC has
For Trenchless Technology
ABS Trenchless has introduced tonnes, the 420 m section was reached in
the rope bursting system – the only one drill string. Project Manager Marco
world’s first large pipe bursting Wulff said “This is the first time that a 420
system with a rope as the pulling m section was burst in only one string.”
mechanism and a pulling force of Trenchless techniques were chosen for
more than 1,000 kN. this job as the site was close to a nature
reserve and for the preservation of trees.
In addition to this, due to the amount of
water that was involved, it would have been
impossible to do use the traditional open-cut
method. Special tools were needed as the
concrete pipes had curves and bends that
are quite difficult to crack.
The advantage to using a rope is that
it can be redirected with a pulley and can
burst more of the diameter. Only taking
The rope bursting system (RBS), pipes. The single operator is able to control Roping in France two days to complete the bursting, the full
from the ABS Trenchless GmbH company everything from a safe distance above the ABS Trenchless, with Entreprise de Travaux project was done in just one week.
in Germany, uses an innovative clamping pulling unit, as the Burster is operated by Publics GIROUD GARANPON, Isére, France,
technology in order to complete relining radio remote control – an important safety recently completed a project in Vorion, near
jobs with long pulling distances exceeding feature to the machine. Grenoble, France with the RBS helping to
1,000 m. This is done in one run, using In addition to the safe handling, the new supply cleaner drinking water to the town.
only one machine pit in certain soil rope pull technology makes the work much For this project the team used a RBS
conditions. The RBS-Burster line is available easier for the operator as there is no need 1,200 machine to burst through two
with pulling capacities between 40 and for rods to be removed. sections of water pipelines. The old pipes,
190 tonnes. Along with pipe bursting, the pulling which had an OD 250 mm for a 420 m
With the use of return pulleys, this system can also be adapted for slip lining, section and an OD 200 mm for a 210 m
technology also makes it possible to relining and swagelining jobs, making the section were replaced with new HDPE OD
overdrive larger doglegs and bent old machine very versatile. 250 mm pipes. With a pulling force of 40
6 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 7
6. exhibitor NEWS exhibitor NEWS
ConShield Solutions Launch of the Goodeng HDD machine - GD 8000-LL
China-Burma oil gas pipeline it was off the assembly line on 22nd channel has taken shape, which are the finished successfully. It was designed by
For thirty years, ConShield has engineered PERMACAST® is our engineered mortar highly resistant to abrasion. This process also studs. All inlet and outlet pipe connections are Project, contracted by PetroChina of January and immediately loaded for northeast of China (China-Russia crude Zhongyuan Petroleum Explore Bureau
solutions to reinforce, seal and protect existing liner system for manholes. Specially provides waterproofing, sealing, structural sealed directly to the inlet/outlet pipes so they Daqing Oilfield Construction Group. shipment to be sent to “China-Burma oil oil pipeline), Northwest (Central Asia Gas Projects Construction Main Company and
underground structures for both storm water formulated ultra-high strength mortar is reinforcement and corrosion protection, www. cannot leak. gas pipeline project” worksite in Burma on Pipeline), Southwest Land (China-Burma oil constructed by Jiangsu Keyi Company using
and sanitary environments; from manholes centrifugally cast from our patented robotic centripipe.com For severe corrosion, our COR+GARD® The launch ceremony of GD8000-LL HDD behalf of China Petroleum. and gas pipelines) and marine (sea lanes Goodeng Machine Model GD8000-LL.
to catch basins, wet wells and lift stations as applicator. It guarantees a consistently dense PERMAFORM® is the system for complete 100% solids epoxy is spun on to form a Machine for China-Burma oil gas pipeline Except for the structural parts, the power, through the Malacca Strait). It diversifies The horizontal length of the project is
well as CMP to RCP, because just one product and uniform liner at whatever thickness (1/2” replacement of old manholes without digging protective, composite barrier. In all cases, project was held in Goodeng machine’s hydraulic, electrical, the appliance control the oil transport channels and protects the 1887.52 meters and the real working length
cannot effectively overcome every problem in to 2”) is best suited for the condition, depth, or disrupting flows. This process pours a each material is applied safely and uniformly production base – Jiangsu Goodeng are all imported from abroad. It uses split energy supply security in China. It is the is 1890.34 meters (The width of the Gan
every system. diameter, traffic loading, and ground water seamless and structurally independent from above without entry into the manhole. Engineering Machinery Assembling Co., Ltd and double caterpillar. The maximum pull fourth energy import channel after the Sino- river is 1363.82 m, the width of sand and
ConmicShield®, the liquid additive that pressure. The highest quality is guaranteed “manhole within a manhole” for the best long- The II Barrier® is the best solution we on Jan. 23rd , 2011. On this day, a colourful push force is 8100KN, the maximum torque Kazakhstan oil pipeline, the Central Asian riverbank is 526.52 m). The project pipe is
prevents Microbiologically Induced Corrosion each and every time since application does term solution to serious manhole problems. have found for sealing the chimney when ball swayed to welcome every guest, and is 165000N.M, which was independently natural gas pipeline, oil pipeline between 508×10L415 diameter arc welding steel pipe.
(MIC) in concrete sewer pipe and structures. It not depend upon a person working inside When biogenic or chemical corrosion is resetting frames and covers. COR+FLEX® gun salutes declared the beginning of the researched, developed, and manufactured China and Russia; it relieves China’s Which adopts strengthen three-coat PE
is dosed directly into the concrete mix that can cramped and hazardous conditions. Our the problem, a plastic liner is embedded into works best when doing an internal chimney ceremony. by Goodeng machine. With advanced dependence on the Malacca Strait and anti-rotten.
be used in shotcrete, precast and ready mix, formulations are high-strength, quick-setting the structurally independent concrete wall and seal without digging. Guests included the general manager of senses, excellent performance, top quality reduces the risk of importing crude oil at sea. The entry angle is 9°and out is 6°.
for both new structures and can be used to and corrosion-resistant. www.permaform.net anchored securely with its interlocking tees or Daqing Oilfield Construction Group Pipeline service, the large-scale machine produced by The curvature radius is 762m (150 OD).
rehab existing structures. ConmicShield®, has CentriPipeTM Centrifugally Cast Concrete Crossing Company, Mr. Guan Lizhi, Dafeng Goodeng machine has become the preferred Goodeng Machine Model GD8000- The project crosses the Jiangxi Gan river.
proven performance since 1996 with several Pipe. is a cost-effective, NO DIG solution for people’s government mayor, Mr. Wang Hai, product for China National Petroleum LL Finishes the following project The geology of the river bed is very
case studies from all over the country. structural lining of culverts using a spin caster Jiangsu Goodeng Engineering Machinery Corporation, China Petroleum Chemical successfully: Jiangxi Province Main complex because it contains a fault area,
ConmicShield®, has a 100 year design and our specialty mortar, PL-8000. Assembling Co., Ltd general manager, Chen Corporation, and many other construction project.The first step of Jiangxi pebble stone area, gravel sand area and
life and offers full thickness protection for The precisely placed and compacted Fenggang, and other management leaders. units. Province gas pipeline—Gan river HDD rough soft clay (including many stones). It is
a fraction of the cost of plastic liners or concrete liner is applied at the best design GD8000-LL HDD Machine was appointed The strategic meaning of China-Burma Project obvious that the project is complicated as it is
polymer coatings. For case studies technical thickness for the diameter and conditions. by China National Petroleum Corporation oil gas pipeline project : with the China- also difficult to control the angle and azimuth.
information and specifications go to It contains rust inhibitors to prevent Daqing oilfield Construction Group. After the Burma oil gas pipeline project started, the On May 13th, 2011, the project in The HDD project is the biggest in scale,
www.conshield.com corrosion of the old metal culvert and it is successful completion of commissioning, strategic pattern of four oil and gas import Fengcheng City Jiangxi province was longest in length, most complex.
impreg, cured in place
pipelining
then 150 miles each year and distributing
their products all over the world.
Cured by Steam or latest UV – Technology
the iMPREG Liners are the benchmark for
being the strongest, most cost effective and
most environmentally friendly products in
the market.
Made in Germany, the iMPREG Liner
is manufactured fully quality controlled
according DIN EN ISO 9001. Additionally
the iMPREG Liner is certified by the DIBT
(German Institute for construction techniques)
and meets several industry standards.
Compared to conventional felt liners the
iMPREG GRP Liners show five times more
strength, 100% water tightness and provide A pipe section can be rehabilitated in manufacture liners up to DIA 1600!
minimum 50 years of Service. less then a day. An installation range of DIA Additionally to the liner manufacture
Over the years ‘cured in place pipelining’ The iMPREG Liners come already pre- 150mm – DIA 1300mm and even more iMPREG provides training on side as well
methods for sewer and drainage pipes impregnated with special resins and ready can be installed in maximum lengths up as on their own training course. With two
becomes more and more a key role in the to use on the job side. Shelf lives up to six to 300 meters each. In middle of 2012 own lining equipments and a team of
no-dig business. months and easy container shipment keeps iMPREG is planing to open the new part professionals iMPREG provides a world wide
iMPREG is currently manufacturing more your construction flexible abroad. of the production plant and is than able to support.
8 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 9
7. Company News Company News
of traffic. Hydraulic intermediate jacking stations serve Project data
to reduce the friction forces prevailing in such long-
distance tunnelling projects. Herrenknecht had already Wastewater tunnel in Warsaw, Poland
adapted these interjack stations exactly to the thin walls Geology: 70% coarse and fine sand, 30% clay and loam,
of the Hobas GRP pipes installed in Warsaw. The longest gravel, boulders
section revealed yet another particular feature: two Tunnel lengths: total of 5,860 m, 16 drives of 80 to 930
underground curves with a radius of 450m and 900m meters
had to be realized. Thanks to the Herrenknecht SLS Particular features: high groundwater level, long-distance
RV navigation system the cutterhead is guided exactly driving, curve drives
with millimeter precision, the machine operators also
mastered this task in a precise and safe manner. Machine data
December 14, 2010 saw completion of the last section
representing a significant milestone for this wastewater Herrenknecht M-1083M, AVND2000AB with Extension
project in Warsaw. During the construction project, the Kit, excavation diameter 3,025mm Herrenknecht
Herrenknecht equipment achieved impressive advance M-1363M, AVND2400AB, excavation diameter 3,025mm
rates of up to 36 meters a day (double shift) and an
average of 20 meters per day. Cutterhead: mixed-soil cutterheads fitted with disc
To complete the entire sewer system and connect it cutters and cutting knives
with “Czajka” wastewater treatment plant (WWTP), PRG Max. torque: 780kNm, 1,200kNm
Metro Sp.z.o.o. and Hydrobudowa 9 S.A. are additionally
realizing the 1,300m long Vistula River Crossing tunnel with Tunnel lining: Pipe Jacking
a Herrenknecht large diameter tunnel boring machine. The
Mixshield S-642 with a diameter of 5.35m was successfully
accepted in February 2011 in the Schwanau/Germany
plant of Herrenknecht. Once this tunnel is completed the
Czajka WWTP could go into operation. n
Warsaw: Major pipe jacking
process successfully completed
Clean water for the Vistula river
The underground connection to the new “Czajka” banks of the Vistula over the long term. Hydrobudowa dewater and seal the requisite construction shafts prior
wastewater treatment plant in Warsaw has been 9 S.A., PRG Metro Sp.z.o.o. and KWG (PBG Group) to tunnelling. The Herrenknecht AVND pipe jacking
completed successfully and on time. Two Herrenknecht have been commissioned to connect the plant with the machines proved its worth during this tunnelling
AVND micromachines handled the difficult drives with underground wastewater network. process. Where required, these machines secure the
a total of 5,860 meters with bravura. Apart from pipe The Polish contractors selected the pipe jacking tunnel face using a support fluid (bentonite and water
jacking with extraordinarily large diameters of 3 meters, method for their tunnel project and relied on the mixture) and an additional compressed air cushion in
the extreme winter conditions and a high groundwater two AVND2000AB (with Extension Kit, Ø 3,025mm) the split excavation chamber, allowing safe tunnelling
level demanded top performance by everyone involved. and AVND2400AB (Ø 3,025mm) hydroshields from under water pressure. The separation of solids of the
With performances of up to 36 meters a day, the Herrenknecht. This type of machine is worldwide in excavated material from fluids was realized with the
Herrenknecht machines blazed the trail for an efficient use in the construction of supply and disposal tunnels; Herrenknecht Separation Plant HSP500, providing a
new wastewater system in the Polish capital fast and they master tunnelling through groundwater and can capacity of 400 to 500 m3/h depending on the particle
efficiently. penetrate a wide range of heterogeneous soils. In size distribution.
Warsaw, Poland / Schwanau, Germany, 6. April Warsaw, the machines tunnelled at depths of 10 to 14 During the particularly cold winter months of 2010,
2011. Wastewater systems in many large cities have meters reaching their final targets after boring through the site team continued tunnelling work despite some
already reached their limits requiring modernization 5,860 meters of soil comprising coarse and fine sand, extremely low temperatures and a lengthy period of frost.
or expansion in order to avoid overflowing into nearby clay, loam, gravel and boulders. The Herrenknecht micromachines completed a total
rivers. For this reason, the city of Warsaw is investing Apart from the unusually large diameter of 3 meters of 16 drives, some with short distances starting at 80
in the construction of a state-of-the-art wastewater for the pipe jacking method, another challenge was meters, but also including long-distance sections of 800
treatment system. This will treat the wastewater represented by a high groundwater level which in meters and more. The longest individual drive was 930
produced by 80 percent of Warsaw’s inhabitants, some places reached up to 8 meters above the top meters. The hydroshields safely underpassed a six-lane
thereby improving the quality of water and life along the of the pipes. The site teams were therefore obliged to highway without having any negative impact on the flow
10
10 No-Dig World 2011 Global Focus Middle East 2009
www.trenchlessmiddleeast.com
8. Company News
beton rohrbau
highly customer-orientated
beton rohrbau is one of the leading companies in civil of beton rohrbau have many years of experience in treatment plants and pumping stations, micro-tunnelling
and construction engineering for the public sector. providing water and sewage services for the public sector and pipe jacking, the laying and sinking of pipes, caissons
Throughout Germany and abroad, clients in the public and have been recruited from the regions where the and storm water clarification plants and as well as turnkey
water and sewage sector provide beton rohrbau with a projects take place. With the most up-to-date and innovative civil engineering projects is one of the main reasons why it
high level of confidence. With nationwide branches beton technology, the equipment and machinery of beton enjoys the confidence of its clients in the public sector.
rohrbau is well equipped and highly customer-orientated. rohrbau satisfy all current requirements. The technical With a workforce of some 500 members of staff the
Besides Germany projects are also executed through and commercial capabilities have made it a consistent beton rohrbau group meanwhile achieves an annual
subsidiaries and holding companies in Bahrain, Bulgaria, partner for the public water and sewage sector in Germany turnover of around 100 mi. Euros. At its various regional
Georgia, Kazakhstan, Mauritius, Nigeria, Romania, Russian and Abroad. The scope of beton rohrbau encompasses locations, beton rohrbau is one of the most efficient
Federation, Turkey and the United Kingdom. The employees sewer pipes, portable water, pressurized pipes, sewage and productive companies. n
12 No-Dig World 2011 www.trenchlessmiddleeast.com
9. Company News
TT-Middle East/TT-UK, successes
in Oman, Saudi Arabia and the UAE
TT-Middle East/TT-UK have been offering their range of
Trenchless Technology (NDRC) products throughout the
Middle East for many years with notable successes in
Oman, Saudi Arabia and the UAE.
A 30” diameter x 110m long steel oil pipeline exchange
project under a major highway between Damman and
Riyadh was completed using a Grundoram Taurus.
Grundodrill HDD working in Oman
HDD drill rod rescue using Grundoram technology saved the company DCL significant financial implications such as
the total cost of a lost drilled bore, contractual penalties, ongoing cost delays in commissioning the final pipelines and
all associated costs involved in planning a new bore and the actual costs of duplicating all the undertakings of a new
bore/installation, etc…
Taurus Grundoram installing a 30” steel
pipe under the Damman-Riyadh Highway
Grundomat Soil Displacement Hammers and
Grundodrill HDD rigs are now in daily use throughout
the region laying fibre optic network systems; notable
success has been achieved by Omani companies with
Grundomats and a Grundodrill 15X.
HDD Drill Rod Rescue using Grundoram
Due to the success of the HDD Drill Rod Rescue above, DCL went on to purchase a Prime Drilling PD 250/90 HDD
System. n
Grundomat road crossing in Oman Prime Drilling PD 250/90 System
14 No-Dig World 2011 www.trenchlessmiddleeast.com
10. Company News
Save Water, Save Money …
Innovative shaft sealing cleaned up before being disposed as waste water.
technologies for tunnelling This means you have to pay for supply, cleaning and
removing the sealing water every day of tunnelling. As
pumps – no additional sealing alternative grease lubricated packing glands are used
water required associated with reduced wear life of the gland and
shaft sleeve.
Though our Earth is made up of 2/3 water, only 1/100 Nevertheless a permanent greasing of the gland using
of that water is drinkable. The rest is salt water or a grease pump is necessary as well as periodic on-site
permanently frozen and we can’t drink it, wash with it, or refilling of the storage tank.
use it to water plants. Water is a limited resource! Our experienced team of engineers and technicians
Therefore, it is important that we use our water designed an innovative shaft sealing solution tailored to
wisely and do not waste it. For future generations we the task. Our experience which we have gained in a large
all must do our part to save water, particularly in industrial number of applications is included in the development
application. and design of our own mechanical seal type HGD which
Most of these efforts can be reached priceless and as is available in single- acting and double-acting designs.
a benefit you can save money by saving water - In double acting design this seal is supplied with sealing
using innovative shaft sealing technologies for your slurry water from an unpressurized storage tank. Continuous
pumps. As a standard for slurry pumps in tunnelling external sealing water distribution is therefore not
packing glands and expeller units combined with packing essential. In single acting design no additional sealing
rings are installed as state of the art shaft sealing water is required while pump operation.
technologies. Shaft seals of pumps which convey sludges For rough conditions in tunnelling we use application-
and slurries containing solid particles require constant optimized materials for the sliding and counter rings.
supply of sealing water in order to cool, lubricate and This ensures reliable operation in a large number of
keep the seal clean. Furthermore a permanent dripping slurry pump applications in direct pipe, utility- and traffic-
of sealing water is essential for a trouble free operation tunnelling today.
of packing glands. While boring the tunnel a constant Save Water using innovative shaft sealing technologies
sealing water supply to discharge and feed pumps must for tunnelling pumps. n
be assured.
After having been charged with particles it has to be See Arthur Habermann Gmbh Co. Kg on stand 53.
16 No-Dig World 2011 www.trenchlessmiddleeast.com
11. Company News Company News
also offer support as a competent partners in all
technical and commercial issues.
The technologies on offer from Fluvius include
full lining systems for pipelines in diameters from 28
mm up to 800 mm using CIPP technology as well
as lateral lining and lateral sealing systems that can
negotiate bends up to 90o and diameter transitions
in a single installation. Liners are also offered
for localised repairs (‘patches’) where full length
rehabilitation is not required in diameters from 100
mm up to 900 mm.
In larger man-entry diameters Fluvius also offers a
range of Kevlar/EPDM manually installed pipe joint
seals. For manhole rehabilitation the company has
cementitious grout lining options offering structural
repair and saltwater resistance, as well as localised
manhole leak sealing systems. Fluvius offers ‘patch’ repair localised lining systems
Commenting on the event Sebastian Schmitz,
Managing Director of Fluvius said:
“Trenchless Middle East 2011 will give us another
springboard into areas of the world that require the
sort of technology we have on offer. Our technical
Full length lining utilising an inversion drum installation technique team will be at the event offering current and any
potential new clientelle guidance through the Fluvius
range of systems.” n
EUROPEAN REHABILITATION
TECHNOLOGY GOES GLOBAL
Fluvius GmbH of Germany, in association with its
Eastern European partner Sanikom in Slovenia,
sells products primarily for the trenchless repair
of wastewater pipe systems with the product focus
being mainly on full-length and localised repair up to
a pipe diameter of 800 mm.
The company’s range includes the full spectrum
of consumables, such as resin systems, liners,
fibreglass complexes, renovation packers and
products for flow control and test technology as
well as accessories, that are required for trenchless
installations in wastewater systems, as well as
specialist technical equipment that is designed
either in-house to the highest quality standards
or as products sourced from other renowned
manufacturers. The various renovation methods
offered carry a range of globally recognised industry
approvals and certificates.
Fluvius can provide clients with solution
proposals and entire systems for the renovation and
maintenance of defective wastewater pipes. With
experienced employees that have been active in this
Manhole rehabilitation systems are included in the Fluvius range. industry sector for many years, the company can
18 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 19
12. Company News Company News
Horizontal directional drilling
technique for DN 900 pipes
Horizontal directional drilling technique The horizontal directional drilling technique
used for pipe-by-pipe pulling-in of DN 900 using ductile iron pipes
ductile iron pipes in Belgium Pipes having the positive locking BLS®/VRS®-T Fig. 7, left : Opening leading into socket on
push-in joint (Fig. 1), combined with a cement DN 600 to DN 1000 size BLS®/VRS®-T push-in
Introduction mortar coating to EN 15542 [1] as an external joints
Constantly spreading built-up areas, wide multi-lane protection able to withstand high mechanical
Fig. 8, right : Insertion of locking segments
roads or complicated routes are making it loads (Fig. 2), are available for the trenchless
increasingly difficult and expensive to replace installation of ductile iron pipes by the horizontal
existing pipeline systems, or lay new ones, by directional drilling (HDD) technique. Fig 3. Construction of the DN 900 BLS®/VRS®-T
the open trench technique. This is why trenchless The BLS®/VRS®-T push-in joint is a restrained push-in joint with fixing clip for trenchless
installation techniques have been under socket joint in which a welding bead is applied to pipeline installation
development and in use for some 30 years now. the spigot end in the factory. A locking chamber Ductile iron pipes can be trenchlessly installed
The continuing development of the machinery cast into the socket receives the locks or locking by the HDD technique both as a fully assembled
used is going hand in hand with the modification segments which, once the spigot end has been pipe string and by pipe-by-pipe connection. The Fig 4. 1000 kN drilling rig
of a pipe material with a great tradition, pushed into the socket, are inserted through possible length of pipeline which can be pulled in is
namely ductile iron, and with changes in the openings in the end-face of the socket which determined by the permitted tractive force
technology of making restrained joints between lead into the locking chamber. If axial tractive on the restrained push-in joint. Details can be Installation of a drinking water pipeline
pipes of this material. A successful example of forces are exerted on the joint, either by the found in DVGW-Arbeitsblatt GW 321 [2] and using DN 900 ductile iron pipes
such new joints is the positive locking BLS®/ internal pressure or by the use of the pipes for in the manual entitled “Trenchless Installation Pidpa is one of the largest Flemish water suppliers and Fig. 9: Pulling-in of the pipes; the push-in joint
VRS®-T push-in joint. This joint is flexible and a trenchless pulling-in technique, the welding of Ductile Cast Iron Pipes” [3]. Because of supplies fresh drinking water to more than a million people. is protected by shrink-on material and a sheet-
enables pipes to be laid to tight radiuses by an bead is supported against these locks or locking the results of externally monitored type tests The company distributes its drinking water by means metal cone slid over the top
angular deflection at the sockets. The welding segments and in this way transmits a very high (internal pressure tests under product standard of a 12,581 km long pipeline network. The municipality
bead, which is applied to the spigot end in the force (Fig. 3). EN 545 [4]), the values of permitted tractive of Grobbendonk (a small town with just over 10,000 damage from being done to the shrink-on sleeve in the bore
factory, and the metallic locking segments, which force specified in the latter are in some cases inhabitants), is situated right next to the Albert Canal, an Fig. 5: Upsizing heads as the pipeline is subsequently being pulled in.
are supported in the locking chamber cast into higher than those specified in DVGW-Arbeitsblatt artificial waterway 129.5 km long which connects the two
the socket, enable very high longitudinal forces GW 321 [2] (Table 1). Belgian towns of Liège and Antwerp. The existing pipeline To sum up
to be transmitted. needed to be relaid due to the construction of a new bridge. Ductile iron pipes with restrained BLS®/VRS®-T
In part of the area, the new pipeline runs directly along push-in joints are very well suited to trenchless
the Albert Canal. If open trenches had been used, the water installation and have already shown this to be the case on a
would have had to be predrained from them, an expensive large number of completed projects.
undertaking. This was avoided by the trenchless installation The possibility of particularly high forces being
of ductile iron pipes by the horizontal directional drilling Fig. 6: Pipes being connected on a connecting transmitted from pipe to pipe allows economical and cost-
technique with the pipes pulled in pipe-by-pipe. ramp saving installation and enables very long runs of pipe to be
It was possible to make use in this case of the experience pulled in when using trenchless installation techniques. n
gained on a project involving DN 600 nominal size pipes DN 900 BLS®/VRS®-T push-in joint are inserted, once the
Fig 1. The BLS®/VRS®-T push-in joint which was completed in 2008 in the town of Ghent [5], also spigot end of the pipe has been inserted in the next socket, Project data
in Belgium. in the locking chamber (Fig. 8) through the opening leading • HDD installation of individually connected
A 1000 kN drilling rig (Fig. 4) was used for the drilling into the socket (Fig. 7) and are distributed around the • DN 900 BLS® pipes
and the subsequent pulling-in of the ductile iron pipes. The circumference of the pipe alternately to the left and the right. • Pipe external protection: cement mortar
pilot bore having been made, it was widened step by step by In a trenchless installation technique, the segments are • coating to EN 15542 [1]
special upsizing heads (Fig. 5). The pipes were connected then secured with a steel fixing clip. • Length of pipeline: 342 m
on one by one on a special connecting ramp. The first pipe This ensures that the locking segments are at all • Drilling rig: 1,000 kN
was connected (Fig. 6) to the traction string and the barrel times firmly in abutment as the pipe is pulled in. • Permitted tractive force for DN 900 BLS®
reamer by means of a BLS®/VRS®-T traction head with Once the locking segments have been inserted, the • pipes: 1,845 kN
built-in force-measuring equipment. socket joints are protected by a shrink-on sleeve. The sheet- • Max. tractive force which occurred: 500 kN
To make the connection, the segments for locking the metal cone (Fig. 9) which is slid on prevents any possible
See Duktus Pipe Systems Fzco on stand 13.
References
Fig 2. The cement mortar coating to EN 15542 [1] EN 15542, Ductile iron pipes, fittings and accessories - External cement mortar coating for pipes – requirements and test methods 2008
[2] DVGW-Arbeitsblatt GW 321, Horizontal directional drilling for gas and water pipelines – requirements, quality assurance and testing 2003-10
[3] Buderus Manual - Trenchless Installation of Ductile Cast Iron Pipes 2009-07
[4] EN 545, Ductile iron pipes, fittings, accessories and
their joints for water pipelines - requirements and test methods 2006
[5] Ertelt, S.: Einzelrohreinzug ductiler Gussrohre
beim HDD-Verfahren – Fortsetzung einer Erfolgsgeschichte [Pipe-by-pipe pulling-in of ductile iron pipes by the HDD technique – a continuing success story] GUSSROHR-TECHNIK 43 (2009), p. 72 ff
20 No-Dig World 2011 www.trenchlessmiddleeast.com