Gaelectric History

•

Established in 2004 - privately owned, 60% by senior management, 40% by
high net worth individuals.

•

Engaged in the development of renewable energy & energy storage
projects in Irish/UK, EU and US markets.

•

50 employees across offices in Ireland, Chicago and Montana.

•

Developing onshore wind projects across the island of Ireland.

•

Leading independent developer of onshore wind.

•

Applying proven technologies to develop energy storage projects which
assist system operators regulate the grid and limit curtailment of wind
generation

•

Multidisciplinary teams across, corporate finance, technology, geology,
planning, energy markets and power systems.

•

Strong relationships with relevant stakeholders, governments and
technology providers
Gaelectric – The Wider Group
Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a
different stage in their development lifecycle

Gaelectric Holdings PLC
Group Holding Company

Onshore Ireland

Offshore Ireland

Energy Storage

Onshore USA

Development of wind
projects in Northern
Ireland and the
Republic of Ireland

Development of
offshore wind in Irish
coastal waters

Development of energy
storage solutions

Development of wind
projects in the United
States

 License application
made for
750 – 1000 MW
project off Irish
coast

 Compressed Air Energy
Storage

 Largest owner of wind
resource in Montana

 Flywheel

 Pipeline of 2600MW +
510 MW transmission
capacity

 200 MW in NI
 140 MW in RoI

 Wind speeds 8m/s+
Gaelectric – The Wider Group
Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a
different stage in their development lifecycle

Gaelectric Holdings PLC
Group Holding Company

Onshore Ireland

Offshore Ireland

Energy Storage

Onshore USA

Development of wind
projects in Northern
Ireland and the
Republic of Ireland

Development of
offshore wind in Irish
coastal waters

Development of energy
storage solutions

Development of wind
projects in the United
States

 License application
made for
750 – 1000 MW
project off Irish
coast

 Compressed Air Energy
Storage

 Largest owner of wind
resource in Montana

 Flywheel

 Pipeline of 2600MW +
510 MW transmission
capacity

•

200 MW in NI

123.3MW planning
permission received

•
•

13.8MW in planning

•

63MW pre-planning

•

140 MW in RoI

 Wind speeds 8m/s+
Gaelectric Business Model
Gaelectric’s business model is to create shareholder value through early stage ownership of onshore wind and
energy storage projects, bringing each development through planning, grid connection, financing and
construction through to commissioning and beyond, while adding value at each stage. O&M will become a
significant part of Gaelectric’s business in the forthcoming years.
Own & Operate

Construct &
Commission
Financial Close
Project Value

Grid

Planning / Permitting

Resource Assessment
Project
Acquisition
Time

6
Section I
Gaelectric’s Northern Ireland Wind Farm
Portfolio Overview
Northern Ireland Portfolio
Gaelectric’s NI assets include a development portfolio of 137.1MW
Dunbeg
This excludes expansion of existing sites and acquisition of projects in pre-planning,
42.0 MW
planning or in operation.
Monnaboy
9.2 MW

Cloonty
9.2 MW
Smulgedon
16.1 MW

Corby Knowe
5.4 MW
Cregganconroe
13.8 MW

Carn Hill
13.8 MW

Inishative
13.8 MW
Tullyneil
13.8 MW

Gaelectric's NI Developments Portfolio

Project Name

Planning Status

Commissioning
Date

Potential Construction
jobs (9-12 months)

Nameplate
capacity (MW)

Carn Hill

Received

May-13

Dunbeg

Received

Jun-14

40

13.8
42.0

Cregganconroe

Received

Mar-15

30

13.8

Inishative

Received

Sep-15

30

Projects in
Planning

13.8
5.4

Corby Knowe

Received

Jul-15

20

Monnaboy

Received

Mar-15

20

9.2

Smulgedon

Received

Mar-15

30

16.1

Cloonty

Received

Jun-15

20

9.2

Tullyneil

Submitted

Jun-17

30

Projects Under
Construction/Consented

13.8

Total

137.1

8
Northern Ireland Portfolio – Expansion into O&M

•

We need to grow out O&M capabilities significantly in the next 2-3 years.
The following areas have been identified as those with supply chain
opportunities:

•

Civils contractor – Both during construction phases and ongoing during
operational phase of the projects

•

Health & Safety consultants to advise on best practice

•

IT/Software – to assist in developing a suite of programs to analyse realtime turbine performance data

•

Remote sensoring technologies (LiDAR) to allow for performance
measurement of spinning assets

•

Technical consultancy services to assist in assessing site
validation/performance verification

•

Communications providers to ensure robust communications with the wind
farms.
Gaelectric – The Wider Group
Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a
different stage in their development lifecycle

Gaelectric Holdings PLC
Group Holding Company

Onshore Ireland

Offshore Ireland

Energy Storage

Onshore USA

Development of wind
projects in Northern
Ireland and the
Republic of Ireland

Development of
offshore wind in Irish
coastal waters

Development of energy
storage solutions

Development of wind
projects in the United
States

 License application
made for
750 – 1000 MW
project off Irish
coast

 Compressed Air Energy
Storage

 Largest owner of wind
resource in Montana

 Flywheel

 Pipeline of 2600MW +
510 MW transmission
capacity

 200 MW in NI
 140 MW in RoI

 Wind speeds 8m/s+
Gaelectric – The Wider Group
Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a
different stage in their development lifecycle

Gaelectric Holdings PLC
Group Holding Company

Onshore Ireland

Offshore Ireland

Energy Storage

Onshore USA

Development of wind
projects in Northern
Ireland and the
Republic of Ireland

Development of
offshore wind in Irish
coastal waters

Development of energy
storage solutions

Development of wind
projects in the United
States

•

200 MW in NI

123.3MW planning
permission received

•
•

13.8MW in planning

•

63MW pre-planning

•

140 MW in RoI

 License application
made for
750 – 1000 MW
project off Irish
coast

•

Compressed Air
Energy Storage

 Largest owner of wind
resource in Montana
 Pipeline of 2600MW +
510 MW transmission
capacity
 Wind speeds 8m/s+
Section II
Gaelectric Energy Storage
Gaelectric Energy Storage – CAES Larne Project

•

Energy storage concept using compressed air as the storage medium, safely stored circ.
600m below ground in excavated salt caverns (formed by solution mining), project is
located 2.5km south of Larne, co. Antrim

•

200MW Compression/268MW generation. Designed to allow a greater penetration of
renewable energy technologies onto the all-Ireland electricity grid.

•

Planning to be submitted in Q2 2014

•

Construction commence in Q4 2015

•

Commissioning in 2017

•

Total investment of £300m over 5 years

•

300 full and part time jobs during construction, 30-50 permanent jobs in the operational
phase.

•

Infrastructure will include:

•

110kV substation

•

CAES plant main building (plant equipment supplier identified)

•

Balance of plant including cooling/noise abatement, fuel delivery & storage

•

Routing and burying of 2 x 500mm diameter pipes from the plant site to the sea. These
pipes will remain a permanent fixture and will be in periodic use throughout the project
lifetime.
Gaelectric Energy Storage – CAES Larne Solution
Mining Schematic
Gaelectric Energy Storage – CAES Larne Conceptual
Drawings
Gaelectric Energy Storage – CAES Larne Project

• Supply chain opportunities exist in the in the following fields:
• General engineering advisory services both through the
construction phase and into operations
• General construction
• Solution mining & disposal of saturated brine
• Directional drilling/trench excavation for the 2 x 500mm brine
pipes
• Supply and maintenance of pipework through construction and
throughout the life of the project, including:
• Pipework
• Pumping station
• Noise abatement technologies
• HV infrastructure
Gaelectric Developments Limited – Contact Details

• If you require further information on any of the points raised in this
presentation, please contact me using the following details:

Nick Cullen
Technical Manager

12B Clarendon Quay, Clarendon Dock, Belfast BT1 3BG
Tel: +44 (0)2890240099
Email: ncullen@gaelectric.ie
Mob: +44 (0)7780 110679
Web: www.gaelectric.ie
Skype: ncullen74
Thank you for your time.

Gaelectric Developments Limited, David Arnold

  • 1.
    Gaelectric Developments Limited InvestNI Presentation Opportunities in Onshore & Offshore O&M supply chain Wednesday, November 27, 2013 1
  • 2.
  • 3.
    Gaelectric History • Established in2004 - privately owned, 60% by senior management, 40% by high net worth individuals. • Engaged in the development of renewable energy & energy storage projects in Irish/UK, EU and US markets. • 50 employees across offices in Ireland, Chicago and Montana. • Developing onshore wind projects across the island of Ireland. • Leading independent developer of onshore wind. • Applying proven technologies to develop energy storage projects which assist system operators regulate the grid and limit curtailment of wind generation • Multidisciplinary teams across, corporate finance, technology, geology, planning, energy markets and power systems. • Strong relationships with relevant stakeholders, governments and technology providers
  • 4.
    Gaelectric – TheWider Group Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a different stage in their development lifecycle Gaelectric Holdings PLC Group Holding Company Onshore Ireland Offshore Ireland Energy Storage Onshore USA Development of wind projects in Northern Ireland and the Republic of Ireland Development of offshore wind in Irish coastal waters Development of energy storage solutions Development of wind projects in the United States  License application made for 750 – 1000 MW project off Irish coast  Compressed Air Energy Storage  Largest owner of wind resource in Montana  Flywheel  Pipeline of 2600MW + 510 MW transmission capacity  200 MW in NI  140 MW in RoI  Wind speeds 8m/s+
  • 5.
    Gaelectric – TheWider Group Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a different stage in their development lifecycle Gaelectric Holdings PLC Group Holding Company Onshore Ireland Offshore Ireland Energy Storage Onshore USA Development of wind projects in Northern Ireland and the Republic of Ireland Development of offshore wind in Irish coastal waters Development of energy storage solutions Development of wind projects in the United States  License application made for 750 – 1000 MW project off Irish coast  Compressed Air Energy Storage  Largest owner of wind resource in Montana  Flywheel  Pipeline of 2600MW + 510 MW transmission capacity • 200 MW in NI 123.3MW planning permission received • • 13.8MW in planning • 63MW pre-planning • 140 MW in RoI  Wind speeds 8m/s+
  • 6.
    Gaelectric Business Model Gaelectric’sbusiness model is to create shareholder value through early stage ownership of onshore wind and energy storage projects, bringing each development through planning, grid connection, financing and construction through to commissioning and beyond, while adding value at each stage. O&M will become a significant part of Gaelectric’s business in the forthcoming years. Own & Operate Construct & Commission Financial Close Project Value Grid Planning / Permitting Resource Assessment Project Acquisition Time 6
  • 7.
    Section I Gaelectric’s NorthernIreland Wind Farm Portfolio Overview
  • 8.
    Northern Ireland Portfolio Gaelectric’sNI assets include a development portfolio of 137.1MW Dunbeg This excludes expansion of existing sites and acquisition of projects in pre-planning, 42.0 MW planning or in operation. Monnaboy 9.2 MW Cloonty 9.2 MW Smulgedon 16.1 MW Corby Knowe 5.4 MW Cregganconroe 13.8 MW Carn Hill 13.8 MW Inishative 13.8 MW Tullyneil 13.8 MW Gaelectric's NI Developments Portfolio Project Name Planning Status Commissioning Date Potential Construction jobs (9-12 months) Nameplate capacity (MW) Carn Hill Received May-13 Dunbeg Received Jun-14 40 13.8 42.0 Cregganconroe Received Mar-15 30 13.8 Inishative Received Sep-15 30 Projects in Planning 13.8 5.4 Corby Knowe Received Jul-15 20 Monnaboy Received Mar-15 20 9.2 Smulgedon Received Mar-15 30 16.1 Cloonty Received Jun-15 20 9.2 Tullyneil Submitted Jun-17 30 Projects Under Construction/Consented 13.8 Total 137.1 8
  • 9.
    Northern Ireland Portfolio– Expansion into O&M • We need to grow out O&M capabilities significantly in the next 2-3 years. The following areas have been identified as those with supply chain opportunities: • Civils contractor – Both during construction phases and ongoing during operational phase of the projects • Health & Safety consultants to advise on best practice • IT/Software – to assist in developing a suite of programs to analyse realtime turbine performance data • Remote sensoring technologies (LiDAR) to allow for performance measurement of spinning assets • Technical consultancy services to assist in assessing site validation/performance verification • Communications providers to ensure robust communications with the wind farms.
  • 10.
    Gaelectric – TheWider Group Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a different stage in their development lifecycle Gaelectric Holdings PLC Group Holding Company Onshore Ireland Offshore Ireland Energy Storage Onshore USA Development of wind projects in Northern Ireland and the Republic of Ireland Development of offshore wind in Irish coastal waters Development of energy storage solutions Development of wind projects in the United States  License application made for 750 – 1000 MW project off Irish coast  Compressed Air Energy Storage  Largest owner of wind resource in Montana  Flywheel  Pipeline of 2600MW + 510 MW transmission capacity  200 MW in NI  140 MW in RoI  Wind speeds 8m/s+
  • 11.
    Gaelectric – TheWider Group Gaelectric Holdings plc is a renewable energy company with four separately managed business units, each at a different stage in their development lifecycle Gaelectric Holdings PLC Group Holding Company Onshore Ireland Offshore Ireland Energy Storage Onshore USA Development of wind projects in Northern Ireland and the Republic of Ireland Development of offshore wind in Irish coastal waters Development of energy storage solutions Development of wind projects in the United States • 200 MW in NI 123.3MW planning permission received • • 13.8MW in planning • 63MW pre-planning • 140 MW in RoI  License application made for 750 – 1000 MW project off Irish coast • Compressed Air Energy Storage  Largest owner of wind resource in Montana  Pipeline of 2600MW + 510 MW transmission capacity  Wind speeds 8m/s+
  • 12.
  • 13.
    Gaelectric Energy Storage– CAES Larne Project • Energy storage concept using compressed air as the storage medium, safely stored circ. 600m below ground in excavated salt caverns (formed by solution mining), project is located 2.5km south of Larne, co. Antrim • 200MW Compression/268MW generation. Designed to allow a greater penetration of renewable energy technologies onto the all-Ireland electricity grid. • Planning to be submitted in Q2 2014 • Construction commence in Q4 2015 • Commissioning in 2017 • Total investment of £300m over 5 years • 300 full and part time jobs during construction, 30-50 permanent jobs in the operational phase. • Infrastructure will include: • 110kV substation • CAES plant main building (plant equipment supplier identified) • Balance of plant including cooling/noise abatement, fuel delivery & storage • Routing and burying of 2 x 500mm diameter pipes from the plant site to the sea. These pipes will remain a permanent fixture and will be in periodic use throughout the project lifetime.
  • 14.
    Gaelectric Energy Storage– CAES Larne Solution Mining Schematic
  • 15.
    Gaelectric Energy Storage– CAES Larne Conceptual Drawings
  • 16.
    Gaelectric Energy Storage– CAES Larne Project • Supply chain opportunities exist in the in the following fields: • General engineering advisory services both through the construction phase and into operations • General construction • Solution mining & disposal of saturated brine • Directional drilling/trench excavation for the 2 x 500mm brine pipes • Supply and maintenance of pipework through construction and throughout the life of the project, including: • Pipework • Pumping station • Noise abatement technologies • HV infrastructure
  • 17.
    Gaelectric Developments Limited– Contact Details • If you require further information on any of the points raised in this presentation, please contact me using the following details: Nick Cullen Technical Manager 12B Clarendon Quay, Clarendon Dock, Belfast BT1 3BG Tel: +44 (0)2890240099 Email: ncullen@gaelectric.ie Mob: +44 (0)7780 110679 Web: www.gaelectric.ie Skype: ncullen74
  • 18.
    Thank you foryour time.