SlideShare a Scribd company logo
IAEA iNFCIS – NFCIS: Nuclear Fuel Cycle Information System Harikrishnan Tulsidas Nuclear Fuel Cycle and Materials Section
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Integrated Nuclear Fuel Cycle Information System ,[object Object],[object Object],[object Object],[object Object],[object Object],Internet NFCIS :  Nuclear Fuel Cycle Information System UDEPO :  World Distribution of Uranium Deposits PIE :  Post Irradiation Examination Facilities NFCSS :  Nuclear Fuel Cycle Simulation System MADB :  Minor Actinide Property Database   http://www-nfcis.iaea.org ,[object Object],[object Object],[object Object],[object Object],Information  ,[object Object],[object Object],[object Object],Inputs
Integrated Nuclear Fuel Cycle Information System One stop data access for nuclear fuel cycle related databases  http://www-nfcis.iaea.org
iNFCIS & NFCIS Usage Statistics ~40% increase in iNFCIS usage in 2009 (over 2008)
iNFCIS users 10, 042 registered users
Nuclear Fuel Cycle Information System (NFCIS) ,[object Object],[object Object],[object Object],[object Object],[object Object],677 facilities from 55 countries
World distribution of uranium resources   IAEA   / OECD NEA  Uranium 2007: Resources, Production and Demand Others   941,000  17% Total  5,469,000  100% iNFCIS - UDEPO Data of 1234 uranium deposits  from 72 countries http://www-nfcis.iaea.org Total 19,740,600 tU tU Red Book Undiscovered Resources:  7,771,100 tU 5.0% 274,000       Niger 5.0% 275,000       Namibia 5.1% 278,000       Brazil 6.3% 342,000       United States 7.7% 423,000       Canada 8.0% 435,000       South Africa 10.0% 546,000       Russia 14.9% 817,000       Kazakhstan 22.7% 1,243,000       Australia
UDEPO ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],World Distribution of Uranium Deposits
Post Irradiation Examination Facilities Database (PIE) ,[object Object],[object Object],[object Object],[object Object],[object Object],39 facilities from 20 countries and 19 casks
Minor Actinide Database (MADB) ,[object Object],[object Object],[object Object],982 data sets
Nuclear Fuel Cycle Simulation System ,[object Object],[object Object],[object Object],[object Object]
Nuclear Fuel Cycle Simulation System
Nuclear Fuel Cycle Information System (NFCIS) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Background
Nuclear Fuel Cycle Information System (NFCIS) ,[object Object],[object Object],[object Object],[object Object],[object Object],Current Status
Database Structure Main Table
Facility Types * New facility types 9 fuel cycle steps – 29 facility types Uranium Enrichment Enrichment Conversion to U Metal Re-Conversion to U3O8 (Dep. U) Conversion to UF6 Conversion to UF4 Conversion to UO3 Conversion to UO2 Conversion Uranium Mine* U recovery from phosphates Uranium ore processing Mining & Milling Facility Type Fuel Cycle Step Zirconium alloy tubing Spent fuel reprocessing Spent Fuel Reprocessing and Recycling Facility Type Fuel Cycle Step Fuel Assembly Component* Zirconium alloy production Heavy water production Related Industrial Activities Spent Fuel Disposal* Spent Fuel Disposal Spent Fuel Conditioning* Spent Fuel Conditioning AFR Wet spent fuel storage AFR Dry spent fuel storage AR spent fuel storage* Spent Fuel Storage Fuel fabrication (MOX Assembly) Fuel fabrication (MOX Pellet-Pin) Co-conversion to MOX Powder Re-conversion to U3O8 (Rep. U) Fuel fabrication (Pebble)* Fuel Fabrication (MTR) Fuel fabrication (U Assembly) Fuel fabrication (U Pellet-Pin) Re-conversion to UO2 Powder Uranium Fuel Fabrication
Facility Statuses The project has been postponed indefinitely. Deferred A formal commitment has been made to build the facility or process line. Planned Site and/or design have been licensed. Siting-Design The facility or process line is currently being built. Under Construction The construction of the facility or process line has been completed and is under commissioning. Commissioning The facility or process line is currently operational. In Operation The facility or process line is not currently in operation but can be restarted in a relatively short time. Stand by A major modification is underway in the facility or process line. Refurbishment The facility or process line is not currently in operation and there are no plans to restart it. Shutdown The facility or process line is currently under decommissioning. Dismantling and remediation work is included. Decommissioning The facility or process line is decommissioned and dismantled. The facility is not under regulatory control. Decommissioned The project has been cancelled completely during any stage before operation. Cancelled Formal feasibility or pre-feasibility studies or assessments are underway. Under study-Assessment The status of the facility or process line is unknown or not reported. Not reported Description Facility Status
Scale of Operation The facility or process line is being operated as a precursor of a commercial or industrial facility or process line Pilot Plant The facility or process line is being operated in laboratory to examine the applicability of a process Laboratory The facility or process line is being operated in commercial or industrial scale Commercial Description Facility Scale of Operation
Facility Definition ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Facility List Page ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Facility Details Page ,[object Object],[object Object],[object Object],[object Object],[object Object]
Statistics ,[object Object],[object Object],[object Object],[object Object]
Country Reports ,[object Object]
Publications 1988 1996 2009 IAEA TECDOC Series No.  408, 1987  :  The Nuclear Fuel Cycle Information System (An International Directory of Nuclear Fuel Cycle Facilities)
Future Directions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Future Directions ,[object Object],[object Object],[object Object],[object Object]
You can reach me at … Thank you Harikrishnan Tulsidas Nuclear Technology Specialist Nuclear Fuel Cycle and Materials Section International Atomic Energy Agency Tel: (+431)  2600  22758  Fax: (+431)  26007 22758 Room  A26 19  Email:   [email_address]

More Related Content

What's hot

Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLCEvolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Energy Network marcus evans
 
SmartMet Server OSGeo
SmartMet Server OSGeoSmartMet Server OSGeo
SmartMet Server OSGeo
Roope Tervo
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way Forward
IEA-ETSAP
 
Enhanced Historical Installation Assessment
Enhanced Historical Installation AssessmentEnhanced Historical Installation Assessment
Enhanced Historical Installation Assessment
Andy Carroll
 
Generating Cash From Your Backup Generator
Generating Cash From Your Backup GeneratorGenerating Cash From Your Backup Generator
Generating Cash From Your Backup Generator
Sergio A. Guerra
 
Compact Linear Collider (CLIC)
Compact Linear Collider (CLIC)Compact Linear Collider (CLIC)
Compact Linear Collider (CLIC)
asafrona
 
Status of ETSAP-TIAM
Status of ETSAP-TIAMStatus of ETSAP-TIAM
Status of ETSAP-TIAM
IEA-ETSAP
 
The future of CTF3
The future of CTF3The future of CTF3
The future of CTF3
asafrona
 
CLIC accelerator overview
CLIC accelerator overviewCLIC accelerator overview
CLIC accelerator overview
asafrona
 
NPOESS Program Overview
NPOESS Program OverviewNPOESS Program Overview
The CLIC project accelerator overview
The CLIC project accelerator overviewThe CLIC project accelerator overview
The CLIC project accelerator overview
asafrona
 
Towards a concept for the integration of European TCCON sites into the Resea...
Towards a concept for the integration of European TCCON sites  into the Resea...Towards a concept for the integration of European TCCON sites  into the Resea...
Towards a concept for the integration of European TCCON sites into the Resea...
Integrated Carbon Observation System (ICOS)
 
FGSA_RHS_Workshop
FGSA_RHS_WorkshopFGSA_RHS_Workshop
FGSA_RHS_Workshop
Bogdan Besfamylnyy
 
NICE_DRS_presentation_060710 (1)
NICE_DRS_presentation_060710 (1)NICE_DRS_presentation_060710 (1)
NICE_DRS_presentation_060710 (1)
Stefano Coltellacci
 
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UK Carbon Capture and Storage Research Centre
 

What's hot (15)

Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLCEvolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
 
SmartMet Server OSGeo
SmartMet Server OSGeoSmartMet Server OSGeo
SmartMet Server OSGeo
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way Forward
 
Enhanced Historical Installation Assessment
Enhanced Historical Installation AssessmentEnhanced Historical Installation Assessment
Enhanced Historical Installation Assessment
 
Generating Cash From Your Backup Generator
Generating Cash From Your Backup GeneratorGenerating Cash From Your Backup Generator
Generating Cash From Your Backup Generator
 
Compact Linear Collider (CLIC)
Compact Linear Collider (CLIC)Compact Linear Collider (CLIC)
Compact Linear Collider (CLIC)
 
Status of ETSAP-TIAM
Status of ETSAP-TIAMStatus of ETSAP-TIAM
Status of ETSAP-TIAM
 
The future of CTF3
The future of CTF3The future of CTF3
The future of CTF3
 
CLIC accelerator overview
CLIC accelerator overviewCLIC accelerator overview
CLIC accelerator overview
 
NPOESS Program Overview
NPOESS Program OverviewNPOESS Program Overview
NPOESS Program Overview
 
The CLIC project accelerator overview
The CLIC project accelerator overviewThe CLIC project accelerator overview
The CLIC project accelerator overview
 
Towards a concept for the integration of European TCCON sites into the Resea...
Towards a concept for the integration of European TCCON sites  into the Resea...Towards a concept for the integration of European TCCON sites  into the Resea...
Towards a concept for the integration of European TCCON sites into the Resea...
 
FGSA_RHS_Workshop
FGSA_RHS_WorkshopFGSA_RHS_Workshop
FGSA_RHS_Workshop
 
NICE_DRS_presentation_060710 (1)
NICE_DRS_presentation_060710 (1)NICE_DRS_presentation_060710 (1)
NICE_DRS_presentation_060710 (1)
 
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
 

Similar to Nfcis2009

A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
DataWorks Summit/Hadoop Summit
 
Webinar on Environmental Footprint Data requirements in PEFCR
Webinar on Environmental Footprint Data requirements in PEFCRWebinar on Environmental Footprint Data requirements in PEFCR
Webinar on Environmental Footprint Data requirements in PEFCR
Marisa Vieira
 
Tudor Dragea ICONE 23 Final Paper
Tudor Dragea ICONE 23 Final Paper Tudor Dragea ICONE 23 Final Paper
Tudor Dragea ICONE 23 Final Paper
Tudor Dragea
 
power Reliability pollard
power Reliability pollardpower Reliability pollard
power Reliability pollard
Musa Tufekci
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
ydmisra
 
Ndevr/WesCEF InSync slides
Ndevr/WesCEF InSync slidesNdevr/WesCEF InSync slides
Ndevr/WesCEF InSync slides
InSync Conference
 
Accelerators at ORNL - Application Readiness, Early Science, and Industry Impact
Accelerators at ORNL - Application Readiness, Early Science, and Industry ImpactAccelerators at ORNL - Application Readiness, Early Science, and Industry Impact
Accelerators at ORNL - Application Readiness, Early Science, and Industry Impact
inside-BigData.com
 
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopJon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Sandia National Laboratories: Energy & Climate: Renewables
 
Standard design bop_sep10
Standard design bop_sep10Standard design bop_sep10
Standard design bop_sep10
PRABIR DATTA
 
Nucleir power plant and characterization
Nucleir power plant and characterizationNucleir power plant and characterization
Nucleir power plant and characterization
Haris Setiawan
 
Activities of Smart Ship Application Platform 2 Project (SSAP2)
Activities of Smart Ship Application Platform 2 Project (SSAP2)Activities of Smart Ship Application Platform 2 Project (SSAP2)
Activities of Smart Ship Application Platform 2 Project (SSAP2)
MTI Co., Ltd.
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
Maghrenov
 
SplunkLive! Customer Presentation – Harris
SplunkLive! Customer Presentation – HarrisSplunkLive! Customer Presentation – Harris
SplunkLive! Customer Presentation – Harris
Splunk
 
resume
resumeresume
efdb.ppt
efdb.pptefdb.ppt
efdb.ppt
KartikPrasad12
 
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sentElectricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
Louis Oelofsen
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015
BobSpeirs
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
Elliott Molnar
 
David Chase, Reducing Energy Consumption
David Chase, Reducing Energy ConsumptionDavid Chase, Reducing Energy Consumption
David Chase, Reducing Energy Consumption
David Chase
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
Leonardo ENERGY
 

Similar to Nfcis2009 (20)

A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
A Data Lake and a Data Lab to Optimize Operations and Safety within a nuclear...
 
Webinar on Environmental Footprint Data requirements in PEFCR
Webinar on Environmental Footprint Data requirements in PEFCRWebinar on Environmental Footprint Data requirements in PEFCR
Webinar on Environmental Footprint Data requirements in PEFCR
 
Tudor Dragea ICONE 23 Final Paper
Tudor Dragea ICONE 23 Final Paper Tudor Dragea ICONE 23 Final Paper
Tudor Dragea ICONE 23 Final Paper
 
power Reliability pollard
power Reliability pollardpower Reliability pollard
power Reliability pollard
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
Ndevr/WesCEF InSync slides
Ndevr/WesCEF InSync slidesNdevr/WesCEF InSync slides
Ndevr/WesCEF InSync slides
 
Accelerators at ORNL - Application Readiness, Early Science, and Industry Impact
Accelerators at ORNL - Application Readiness, Early Science, and Industry ImpactAccelerators at ORNL - Application Readiness, Early Science, and Industry Impact
Accelerators at ORNL - Application Readiness, Early Science, and Industry Impact
 
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopJon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jon White: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
Standard design bop_sep10
Standard design bop_sep10Standard design bop_sep10
Standard design bop_sep10
 
Nucleir power plant and characterization
Nucleir power plant and characterizationNucleir power plant and characterization
Nucleir power plant and characterization
 
Activities of Smart Ship Application Platform 2 Project (SSAP2)
Activities of Smart Ship Application Platform 2 Project (SSAP2)Activities of Smart Ship Application Platform 2 Project (SSAP2)
Activities of Smart Ship Application Platform 2 Project (SSAP2)
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
 
SplunkLive! Customer Presentation – Harris
SplunkLive! Customer Presentation – HarrisSplunkLive! Customer Presentation – Harris
SplunkLive! Customer Presentation – Harris
 
resume
resumeresume
resume
 
efdb.ppt
efdb.pptefdb.ppt
efdb.ppt
 
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sentElectricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
Electricity scenarios-for-rsa-csir-pc energy-21_feb2017_sent
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
David Chase, Reducing Energy Consumption
David Chase, Reducing Energy ConsumptionDavid Chase, Reducing Energy Consumption
David Chase, Reducing Energy Consumption
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 

Nfcis2009

  • 1. IAEA iNFCIS – NFCIS: Nuclear Fuel Cycle Information System Harikrishnan Tulsidas Nuclear Fuel Cycle and Materials Section
  • 2.
  • 3.
  • 4. Integrated Nuclear Fuel Cycle Information System One stop data access for nuclear fuel cycle related databases http://www-nfcis.iaea.org
  • 5. iNFCIS & NFCIS Usage Statistics ~40% increase in iNFCIS usage in 2009 (over 2008)
  • 6. iNFCIS users 10, 042 registered users
  • 7.
  • 8. World distribution of uranium resources IAEA / OECD NEA Uranium 2007: Resources, Production and Demand Others 941,000 17% Total 5,469,000 100% iNFCIS - UDEPO Data of 1234 uranium deposits from 72 countries http://www-nfcis.iaea.org Total 19,740,600 tU tU Red Book Undiscovered Resources: 7,771,100 tU 5.0% 274,000       Niger 5.0% 275,000       Namibia 5.1% 278,000       Brazil 6.3% 342,000       United States 7.7% 423,000       Canada 8.0% 435,000       South Africa 10.0% 546,000       Russia 14.9% 817,000       Kazakhstan 22.7% 1,243,000       Australia
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Nuclear Fuel Cycle Simulation System
  • 14.
  • 15.
  • 17. Facility Types * New facility types 9 fuel cycle steps – 29 facility types Uranium Enrichment Enrichment Conversion to U Metal Re-Conversion to U3O8 (Dep. U) Conversion to UF6 Conversion to UF4 Conversion to UO3 Conversion to UO2 Conversion Uranium Mine* U recovery from phosphates Uranium ore processing Mining & Milling Facility Type Fuel Cycle Step Zirconium alloy tubing Spent fuel reprocessing Spent Fuel Reprocessing and Recycling Facility Type Fuel Cycle Step Fuel Assembly Component* Zirconium alloy production Heavy water production Related Industrial Activities Spent Fuel Disposal* Spent Fuel Disposal Spent Fuel Conditioning* Spent Fuel Conditioning AFR Wet spent fuel storage AFR Dry spent fuel storage AR spent fuel storage* Spent Fuel Storage Fuel fabrication (MOX Assembly) Fuel fabrication (MOX Pellet-Pin) Co-conversion to MOX Powder Re-conversion to U3O8 (Rep. U) Fuel fabrication (Pebble)* Fuel Fabrication (MTR) Fuel fabrication (U Assembly) Fuel fabrication (U Pellet-Pin) Re-conversion to UO2 Powder Uranium Fuel Fabrication
  • 18. Facility Statuses The project has been postponed indefinitely. Deferred A formal commitment has been made to build the facility or process line. Planned Site and/or design have been licensed. Siting-Design The facility or process line is currently being built. Under Construction The construction of the facility or process line has been completed and is under commissioning. Commissioning The facility or process line is currently operational. In Operation The facility or process line is not currently in operation but can be restarted in a relatively short time. Stand by A major modification is underway in the facility or process line. Refurbishment The facility or process line is not currently in operation and there are no plans to restart it. Shutdown The facility or process line is currently under decommissioning. Dismantling and remediation work is included. Decommissioning The facility or process line is decommissioned and dismantled. The facility is not under regulatory control. Decommissioned The project has been cancelled completely during any stage before operation. Cancelled Formal feasibility or pre-feasibility studies or assessments are underway. Under study-Assessment The status of the facility or process line is unknown or not reported. Not reported Description Facility Status
  • 19. Scale of Operation The facility or process line is being operated as a precursor of a commercial or industrial facility or process line Pilot Plant The facility or process line is being operated in laboratory to examine the applicability of a process Laboratory The facility or process line is being operated in commercial or industrial scale Commercial Description Facility Scale of Operation
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Publications 1988 1996 2009 IAEA TECDOC Series No.  408, 1987 : The Nuclear Fuel Cycle Information System (An International Directory of Nuclear Fuel Cycle Facilities)
  • 26.
  • 27.
  • 28. You can reach me at … Thank you Harikrishnan Tulsidas Nuclear Technology Specialist Nuclear Fuel Cycle and Materials Section International Atomic Energy Agency Tel: (+431) 2600 22758 Fax: (+431) 26007 22758 Room A26 19 Email: [email_address]