Delivering
on Growth
November 2009



                www.newgold.com   TSX/NYSE AMEX US: NGD
Cautionary Statement

All monetary amounts in U.S. dollars unless otherwise stated

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within
the meaning of applicable Canadian securities legislation. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to,
statements with respect to the future price of gold, silver and copper the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates, the timing and
amount of estimated future production, costs of production, capital expenditures, financing requirements, costs and timing of the development of new and existing deposits,
implementation, timing and success of drilling and other exploration activities, permitting time lines, the completion and success of acquisitions, currency exchange rate fluctuations,
requirements for additional capital, government disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of
forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or
“believes”, or variations of such words (including negative variations) and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or
“be achieved”. All forward-looking statements and forward-looking information is based on reasonable assumptions that have been made by New Gold as at the date such statements are
made. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or
achievements of New Gold to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: the impact of general business and
economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, that New Gold and
Western Goldfields Inc. (“Western”) will be able to realize the synergies from the business combination completed June 1, 2009; there may be difficulties in integrating the operations and
personnel of the New Gold and Western; New Gold is subject to significant capital requirements; fluctuations in the international currency markets and in the rates of exchange of the
currencies of Brazil, Canada, the United States, Australia, Mexico and Chile; price volatility in the spot and forward markets for commodities; impact of any hedging activities, including
margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves and resources and between actual estimated metallurgical
reserves; changes in national and local government legislation in Brazil, Canada, the United States, Australia, Mexico and Chile; or any other country in which New Gold currently or may
in the future carry on business; taxation, controls, regulations and political or economic developments in the countries in which New Gold does or may carry on business; the speculative
nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; competition; loss of key
employees; additional funding requirements; actual results of current exploration or reclamation activities; changes in project parameters as plans continue to be refined; accidents; labour
disputes; and defective title to mineral claims or property or contests over claims to mineral properties. In addition, there are risks and hazards associated with the business of mineral
exploration, development, and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and
risk of inadequate insurance or inability to obtain insurance, to cover these risks) as well as those factors discussed in the section entitled “Risk Factors” in New Gold’s annual information
form and short form prospectus filed on SEDAR. Although New Gold has attempted to identify important factors that could cause actual results to differ materially from those contained in
forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will
prove to be accurate and you should not place undue reliance on forward-looking statements. New Gold does not undertake to update any forward-looking statements that are included
herein, except in accordance with applicable securities laws.




                                                                                                                            www.newgold.com            TSX/NYSE AMEX US: NGD                    2
Cautionary Statement cont’d


CAUTIONARY NOTE TO U.S. READERS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES
Information concerning the properties and operations of New Gold has been prepared in accordance with Canadian standards under applicable Canadian securities laws, and may not be
comparable to similar information for United States companies. The terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral
Resource” used in this presentation are Canadian mining terms as defined in accordance with NI 43-101 under guidelines set out in the Canadian Institute of Mining, Metallurgy and
Petroleum (“CIM”) Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council on December 11, 2005. While the terms “Mineral Resource”, “Measured Mineral
Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are recognized and required by Canadian regulations, they are not defined terms under standards of the United
States Securities and Exchange Commission. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the
mineralization could be economically and legally produced or extracted at the time the reserve calculation is made. As such, certain information contained in this presentation concerning
descriptions of mineralization and resources under Canadian standards is not comparable to similar information made public by United States companies subject to the reporting and
disclosure requirements of the United States Securities and Exchange Commission. An “Inferred Mineral Resource” has a great amount of uncertainty as to its existence and as to its
economic and legal feasibility. It cannot be assumed that all or any part of an “Inferred Mineral Resource” will ever be upgraded to a higher category. Under Canadian rules, estimates of
Inferred Mineral Resources may not form the basis of feasibility or other economic studies. Readers are cautioned not to assume that all or any part of Measured or Indicated Resources
will ever be converted into Mineral Reserves. Readers are also cautioned not to assume that all or any part of an “Inferred Mineral Resource” exists, or is economically or legally mineable.
In addition, the definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” under CIM standards differ in certain respects from the standards of the United States Securities
and Exchange Commission.



TOTAL CASH COST
“Total cash cost” figures are calculated in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and
included leading North American gold producers. The Gold Institute ceased operations in 2002, but the standard is the accepted standard of reporting cash cost of production in North
America. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. New Gold reports total
cash cost on a sales basis. Total cash cost includes mine site operating costs such as mining, processing, administration, royalties and production taxes, but is exclusive of amortization,
reclamation, capital and exploration costs. Total cash cost is reduced by any by-product revenue and is then divided by ounces sold to arrive at the total by-product cash cost of sales.
The measure, along with sales, is considered to be a key indicator of a company’s ability to generate operating earnings and cash flow from its mining operations. This data is furnished to
provide additional information and is a non-GAAP measure and does not have any standardized meaning prescribed by Canadian GAAP. It should not be considered in isolation as a
substitute for measures of performance prepared in accordance with Canadian GAAP and is not necessarily indicative of operating costs presented under Canadian GAAP. The
calculation of “Cash Cost” is consistent with Western’s prior disclosures of “Cost of Sales” ; Western does not have by-product credits.




                                                                                                                        www.newgold.com           TSX/NYSE AMEX US: NGD                   3
Executing on our Strategy


                                    Disciplined Growth
                                    • Completed 3-way business
                                      combination June 2008
                                    • Completed combination with
                                      Western Goldfields June 2009
                                    • Pursue additional growth
                                      opportunities



Enhancing Value                                                                  Operational Execution
• El Morro – strategic asset                                                     • 16% increase in production Q3/09
• Asset Backed Notes                                                               versus Q3/08
• Amapari strategic review                                                       • 17% decrease in cash cost
• New Afton development on                                                         Q3/09 versus Q3/08
  schedule for production in 2012



                                    Maintaining a Strong Financial
                                    Position
                                    • $243 million in cash at Sept. 30/09
                                    • $23 million in earnings from mine
                                      operations in Q3/09
                                    • Strongest cash flow from
                                      operations expected in Q4/09



                                                                            www.newgold.com   TSX/NYSE AMEX US: NGD   4
Management & Board of Directors

EXECUTIVE MANAGEMENT TEAM

     Randall Oliphant, Executive Chairman

     Robert Gallagher, President and Chief Executive Officer

     Brian Penny, Executive VP and Chief Financial Officer

     James Currie, Executive VP and Chief Operating Officer

BOARD OF DIRECTORS

     James Estey, Director

     Robert Gallagher, CEO & Director

     Vahan Kololian, Director

     Martyn Konig, Director

     Pierre Lassonde, Director

     Craig Nelsen, Director

     Randall Oliphant, Executive Chairman

     Ian Telfer, Director

     Raymond Threlkeld, Director


                                                               www.newgold.com   TSX/NYSE AMEX US: NGD   5
Capitalization and Liquidity



Basic Shares Outstanding (millions)                                                                                                                                                    387


FDITM Shares Outstanding (millions)                                                                                                                                                    405


TSX Share Price – November 16, 2009                                                                                                                                                $4.47


Market Capitalization (C$ millions)                                                                                                                                              $1,730


Cash (US$ millions)1                                                                                                                                                                $243


Long-term Investments (Asset Backed Notes US$ millions)2                                                                                                                               $88


Debt (US$ millions)3                                                                                                                                                                $250


Insider Ownership (million shares)                                                                                                                                                       16

1. Cash position as of September 30, 2009.
2. Represents Fair Value of Asset Backed Notes investment at September 30, 2009. Face value of Asset Backed Notes investment is $149 million.
3. Debt position as of September 30, 2009, adjusted for October 2009 term loan repayment which includes $164.7 million in senior secured notes, $36.0 million in convertible debentures,
   $45.8 million in project financing for the Mesquite mine, and $3.6 million in the El Morro project funding loan. See “Debt and Financing Notes” for details in the appendix on page 32.




                                                                                                                               www.newgold.com              TSX/NYSE AMEX US: NGD             6
Q3 2009 Highlights


 EARNINGS FROM MINE OPERATIONS (MILLIONS)                                                      NET EARNINGS(MILLIONS)

  $25                                                                                          $50
  $20                                                                                                                          $4.1
                                                      67%                                        $0
  $15
                                                                                               ($50)          ($148.9)
  $10
                                                                                              ($100)
   $5
   $0                                                                                         ($150)
                                                                                              ($200)
                            Q3 2008             Q3 2009                                                    Q3 2008         Q3 2009

 GOLD SALES (000s OUNCES)                                                                      TOTAL CASH COST PER OUNCE (1)

  80                                                                                          $600
  75                                                 16%                                      $400                            17%
                                                                                                                               17%
  70
  65                                                                                          $200
  60                                                                                             $0

                            Q3 2008             Q3 2009                                                     Q3 2008        Q3 2009

1. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.




                                                                                                         www.newgold.com    TSX/NYSE AMEX US: NGD   7
Q3 and Year-to-Date Production Highlights

Q3 2009 vs. Q3 2008                               YTD 2009 vs. YTD 2009
GOLD PRODUCTION (000s OUNCES)                     GOLD PRODUCTION (000s OUNCES)
  85                                                200
  80                                                150
  75             16%            Q3 2008                                23%              YTD 2008
                                                    100
  70
  65                            Q3 2009              50                                 YTD 2009
  60                                                  0


SILVER PRODUCTION (000s OUNCES)                    SILVER PRODUCTION (000s OUNCES)
  400                                               1,500
  300                                               1,000
                 21%            Q3 2008                                320%             YTD 2008
  200
  100                                                500
                                Q3 2009                                                 YTD 2009
    0                                                     0



 COPPER PRODUCTION (MILLION POUNDS)                 COPPER PRODUCTION (MILLION POUNDS)
  4                                                 15
  3                                                 10
                 50%            Q3 2008                               102%              YTD 2008
  2
  1                                                  5
                                Q3 2009                                                 YTD 2009
  0                                                  0



                                                              www.newgold.com   TSX/NYSE AMEX US: NGD   8
Asset Overview

    GLOBALLY DIVERSIFIED IN MINING-FRIENDLY JURISDICTIONS




    •   12.1 million ounce M&I(1) gold resource
                                                                                                      New Afton
                                                                                                      Canada
                                                                                                               (000s oz Au)
                                                                                                                                                   Mesquite(2)
                                                                                                      2P            1,028

    •
                                                                                                                                                   United States
                                                                                                      M&I(1)        1,630
        7.4 million ounce gold reserve(4)                                                             Inferred       225                           2P
                                                                                                                                                             (000s oz Au)
                                                                                                                                                                  2,574
                                                                                                                                                   M&I(1)         4,101

    •   Diversified gold production base
                                                                                                                         Cerro San Pedro
                                                                                                                                                   Inferred        64


                                                                                                                         Mexico

    •   Politically stable jurisdictions                                                                                 2P
                                                                                                                                  (000s oz Au)
                                                                                                                                       1,266                                           Amapari
                                                                                                                         M&I(1)        1,691                                           Brazil
                                                                                                                         Inferred       25                                                        (000s oz Au)
                                                                                                                                                                                       M&I             1,136
                                                                  Peak                                                                                                                 Inferred        1,045
                                                                  Australia
                                                                                (000s oz Au)                                                 El Morro(3)
                                                                  2P                  514                                                    Chile
                                                                  M&I(1)              849                                                              (000s oz Au)
                                                                                                                                             2P             2,013
                                                                  Inferred            388                                                        (1)
                                                                                                                                             M&I            2,659
                                                                                                                                             Inferred        110




1   Measured and indicated mineral resources are inclusive of mineral reserves. See technical reports, Annual Information Form, Form 10-K, and other filings made on SEDAR by
    each of New Gold and Western for detailed information with regard to the assumptions, parameters and other information relevant to quantities discussed above. 2P refers to
    proven and probable reserves, M&I refers to measured and indicated resources
                                                                                                                                                                                  Producing Mines
2   Represents Mesquite‟s December 31, 2008 reserves and resources
3   El Morro Project‟s reserves and resources reflect New Gold‟s 30% interest                                                                                                     Development Projects
4   Proven and probable mineral reserves                                                                                                                                          Undergoing Strategic Review




                                                                                                                                       www.newgold.com                TSX/NYSE AMEX US: NGD                  9
Executing with Upside – Mesquite

                                                                                          Location                                             United States

                                                                                          Mine Type                                            Open Pit

                                                                                          Reserves1,4                    Gold (m oz)           2.6

                                                                                          Resources1,2,5                 Gold (m oz)           4.1

                                                                                          Estimate Mine Life3                                  13 years

                                                                                          Gold Production ‟09 Guidance oz6                     140k-150k

                                                                                          Total Cash Cost/oz ‟09 Guidance6,7                   $530-$540


             Proven Execution                                             Current Enhancements                                         Future Upside

    • Completed positive feasibility                               • Production ramped up in                                  • Potential to increase
      study in 2006                                                  September 2009, expected to                                mining rate – add 5k to
                                                                     continue on this trend in Q4/09                            10koz of production per
    • Mine brought into                                              and going forward                                          year
      production on time and on
      budget in 2008                                               • Declining total cash cost over                           • 1M oz sulfide resource below
                                                                     the next two years                                         current pit – exploring
                                                                                                                                processing alternatives



1   Represents December 31, 2008 reserves and resources.
2   Mineral resources are inclusive of mineral reserves.
3   11 years of production and 2 years of residual leaching.
4   Mesquite Mine mineral reserves have been calculated based on a gold price of US $500/oz. Refer to Reserves Notes.
5   Mesquite Mine mineral resources have been estimated based on a gold price of US $650/oz. Refer to Resources Notes.
6   Mesquite production and total cash cost guidance for 2009 are for the full year.
7   Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.




                                                                                                                     www.newgold.com   TSX/NYSE AMEX US: NGD   10
Executing with Upside – Cerro San Pedro

                                                                                        Location                                                          Mexico

                                                                                        Mine Type                                                         Open Pit
                                                                                                                       Gold (m oz)                        1.3
                                                                                        Reserves1,3
                                                                                                                       Silver (m oz)                      51
                                                                                                                       Gold (m oz)                        1.7
                                                                                        Resources2,3,4
                                                                                                                       Silver (m oz)                      63
                                                                                        Estimated Mine Life                                               ~ 9 years

                                                                                        Gold Production „09 Guidance oz                                   90k-100k

                                                                                        Total Cash Cost/oz „09 Guidance5                                  $550-$570

             Proven Execution                                            Current Enhancement                                                 Future Upside

 • Achieved full production in                                    • Both silver grades and                                       • Completed sulfide
   2008                                                             recovery continue to improve                                   exploration program with 30
                                                                                                                                   drill holes; results expected
 • Received award as safest                                       • 68% increase in tonnes of ore
                                                                                                                                   to be released by Q1/10
   mine of its size in Mexico for                                   mined in comparison to
   2007 and 2008                                                    Q3/2008

 • Attained ISO: 14001                                            • Currently tracking below 2009
   environmental certification in                                   cash cost guidance
   2008

1 Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of US$2.64/t. Refer to Reserves Notes.
2 Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2 g/t gold and are constrained within an
  economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as of December 31, 2008. Refer to Resources Notes.
3 Reported as of December 31, 2008
4 Mineral resources are inclusive of mineral reserves
5 Cash costs guidance for 2009 have been calculated based on a silver price of US$14.00/lb. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost



                                                                                                                        www.newgold.com              TSX/NYSE AMEX US: NGD                        11
Executing with Upside – Peak Mines

                                                                                      Location                                                           Australia
                                                                                      Mine Type                                                          Underground
                                                                                                                     Gold (k oz)                         514
                                                                                      Reserves1,3
                                                                                                                     Copper (m lbs)                      51
                                                                                                                     Gold (k oz)                         849
                                                                                      Resources2,3,4
                                                                                                                     Copper (m lbs)                      136
                                                                                      Estimated Mine Life                                                ~ 8 years
                                                                                      Gold Production „09 Guidance oz                                    90k-100k
                                                                                      Total Cash Cost/oz „09 Guidance5                                   $370-$390

          Proven Execution                                           Current Enhancement                                                  Future Upside

 • In operation since 1992                                      • Successfully transitioned to                               • Potential for additional
   – history of success                                           higher gold grade                                            future targets around
                                                                  Perseverance Zone D ore                                      Peak’s currently
 • Proven ability to                                              body                                                         existing underground
   replace reserves –                                                                                                          ore body and in the
   produced two millionth                                       • Benefitting from increased                                   surrounding region
   ounce in 2008 after                                            copper production
   starting with one million
                                                                • Currently tracking below
   ounce in reserves
                                                                  2009 cash cost guidance

1 Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$112/t to AUD$130/t that
  vary between individual mines and their proximity to the Peak operation processing facility.. Refer to Reserves Notes.
2 Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$85/t to AUD$95/t that vary
  between individual mines and their proximity to the Peak operation processing facility.. Refer to Resources Notes.
3 Reported as of December 31, 2008.
4 Mineral resources are inclusive of mineral reserves.
5 Cash costs guidance for 2009 have been calculated based on a copper price of US$2.00/lb. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.



                                                                                                                     www.newgold.com             TSX/NYSE AMEX US: NGD                      12
Executing with Upside – New Afton

                                                                                             Location                                                                    Canada

                                                                                                                                 Gold (m oz)                             1.03
                                                                                             Reserves1,2
                                                                                                                                 Copper (m lbs)                          959
                                                                                                                                 Gold (m oz)                             1.63
                                                                                             Resources2,3
                                                                                                                                 Copper (m lbs)                          1,483
                                                                                             Mine type                                                                   Underground
                                                                                             Estimated mine life                                                         12 years
                                                                                             LOM Production/yr (Au oz/Cu lbs)                                            85k/75m
                                                                                             LOM Cash Cost/oz co-product (Au/Cu)4                                        $305/$1.10

             Proven Execution                                                 Current Enhancement                                                       Future Upside

 • Delivered positive feasibility                                   • Achieved break through of the                                       • Potential to bring some
   study                                                              conveyor decline and main                                             resources into reserves given
                                                                      surface decline in Q3/09                                              current commodity prices
 • Long lead time equipment
   ordered and in place                                             • Increased development rates by                                      • Potential for additional blocks
                                                                      doubling operating crews                                              containing similar
 • Surface infrastructure partially                                                                                                         mineralization below those
   in place with mill building                                      • Completing full capital and                                           currently included in mine plan
   exterior completed                                                 operating cost review – results
                                                                      expected in Q1/10

1 New Afton mineral reserves have been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of ore. Refer to Reserves Notes.
2 Reported as of September 21, 2006.
3 New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a lower NSR cut-off of CAD$10.00/t of
  mineralized material. Mineral resources are inclusive of mineral reserves. Refer to Resources Notes.
4 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.



                                                                                                                              www.newgold.com             TSX/NYSE AMEX US: NGD              13
Executing with Upside – New Afton (cont’d)

PATH FORWARD: TOWARD PRODUCTION                             ADVANCE RATE (METERS)

•   Project remains on time and on budget                    500

•   Total capital expenditure requirements ~$600m            450
    - 37% complete
                                                             400
        • ~ $380 million left to be spent 2010-2012
                                                             350
•   Completed the mill building in early 2009 for
    storage of mill equipment                                300
•   Continuing development of declines to the base           250
    of the ore body
                                                             200
•   Re-commence surface construction and start
    undercut of the ore body in 2011                         150
•   Start stockpiling ore in 2011 to feed the mill in        100
    2012
                                                              50
•   Commence production in the second half of
    2012 with life-of-mine annual production of:               0
        • 75 m lbs copper
        • 85k oz gold                                                  Q1 2009    Q2 2009       Q3 2009




                                                                           www.newgold.com   TSX/NYSE AMEX US: NGD   14
Gold Production Outlook

       EXCEPTIONAL GOLD PRODUCTION GROWTH PROFILE
                                                                   Broker Consensus Production Profile1,2,3
                                                                               (2009E-2013E)
                              600                                                                                                                       $600

                                                                                     74% Increase in
                                                                                       Production




                                                                                                                                                               Total Cash Costs (US$/oz) 4
                              500                                                                                                                       $500
        Au Production (koz)




                              400                                                                                                                       $400


                              300                                                                                                                       $300
                                                                                                                                     62% Decrease in
                                                                                                                                     Total Cash Costs
                              200                                                                                                                       $200


                              100                                                                                                                       $100


                               0                                                                                                                        $0
                                                                                                                                                    5
                                    2009E                          2010E                          2011E                 2012E               2013E
                                                            Gold Production                                       Total Cash Costs
1 Source: Available consensus research estimates.
2 Based on 2009-2013 avg. broker consensus commodity prices of US$948/oz Au, US$2.74/lb Cu, US$14.64/oz Ag.
3 2009 production shown for the period of ownership of Western Goldfields.
4 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.
5 2013 production based on 2 equity research analyst estimates, none of which include production from El Morro.



                                                                                                                          www.newgold.com   TSX/NYSE AMEX US: NGD                            15
Operating Margin

            EXCEPTIONAL CASH FLOW GENERATION AND GROWTH

                                                                                                                                         1,2,3
                                                                                                       Operating Margin
                                        $400


                                        $350
                                                                                           ~ 183% Increase in
                                        $300                                                Operating Margin
             Operating Margin (US$mm)




                                        $250


                                        $200


                                        $150


                                        $100


                                        $50


                                         $0
                                                                                                                                                                                 4
                                               2009E                              2010E                                 2011E                        2012E               2013E

1 Source: Available consensus research estimates
2 Based on 2009-2013 avg. broker consensus commodity prices of US$948/oz Au, US$2.74/lb Cu, US$14.64/oz Ag
3 Operating Margin is a non-GAAP measure calculated as production multiplied by the assumed gold price less cash costs net of by-product credits
4 2013 production based on 2 equity research analyst estimates, none of which include production from El Morro
Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost




                                                                                                                                                   www.newgold.com   TSX/NYSE AMEX US: NGD   16
Copper Leverage

            IMPACT OF COPPER ON OPERATING MARGIN AND CASH COST
                                                                        Assumes average of 90 million lbs of copper per year from 2013-20171,2,3
              Incremental Increase in Operating Margin (US$ mm)


                                                                  200                                                                                                                     $300




                                                                                                                                                                                                         Total Cash Costs (US$/oz)
                                                                  150                                                                                                                     $150




                                                                  100                                                                                                                     $0




                                                                  50                                                                                                                      ($150)




                                                                   0                                                                                                                      ($300)
                                                                        $2.00            $2.50             $3.00                     $3.50                          $4.00
                                                                                        Operating Margin                     Total Cash Costs

                                                                        Cash costs (net of by-products) approach zero at current copper prices.
1. Assumptions: Silver price $12.00/oz.
2. Assumes an average of 75 million pounds of copper sales per year from New Afton and 15 million pounds of copper sales per year from Peak Mines. It does not include any copper sales from El Morro.
3. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.




                                                                                                                                       www.newgold.com              TSX/NYSE AMEX US: NGD                                            17
Peer Comparison


                                                                                Change in 2009E-2013E Broker Consensus Cash Cost 1,2
                                                                         5%


                                                                                        (5%)        (7%)        (8%) 3       (9%)
                                                                                                                                        (13%)        (15%)
                                                                                                                                                                  (19%)




                                                                                                                                                                               (62%)




                                                                                                                                                  le
                                                                                                              a




                                                                                                                                                                  d
                                                                                   ra




                                                                                                                          do


                                                                                                                                      LD
                                                                       on




                                                                                                                                                                              d
                                                                                                ck


                                                                                                            ur




                                                                                                                                                              ol


                                                                                                                                                                            ol
                                                                                                                                                 ag
                                                                                    r

                                                                                               Ba
                                                                   m




                                                                                                                        ra
                                                                                 te




                                                                                                                                    O




                                                                                                                                                             dg


                                                                                                                                                                          G
                                                                                                            t
                                                                                                         en




                                                                                                                                             -E
                                                                 am




                                                                                                                     do


                                                                                                                                  G
                                                                             en




                                                                                                                                                                       ew
                                                                                                                                                        an
                                                                                          ed


                                                                                                     av




                                                                                                                               M


                                                                                                                                            co
                                                                                                                   El
                                                                            C
                                                            G




                                                                                                                                                       R
                                                                                        R




                                                                                                                             IA




                                                                                                                                                                      N
                                                                                                    en




                                                                                                                                         ni
                                                                                                                                      Ag
                                                                                                Bu
                                                           1. Note: Gammon Gold calculated based on gold equivalent cash costs
                                                           2. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost
                                                           3. Based on 2009-2011 data due to unavailability of broker estimates

                                                                                                                                                  28.7x                                             Price/2010E CF
                                                  Price/Consensus NAV
                                                                                                                                                              24.7x           24.1x
            2.0x           2.0x
                                       1.9x       1.8x
                                                                1.7x        1.6x                                                                                                          18.6x
                                                                                         1.6x                                                                                                          17.4x
                                                                                                     1.3x
                                                                                                                   1.2x
                                                                                                                                                                                                                   11.9x        11.8x
                                                                                                                                                                                                                                            8.8x          8.6x

                                                                                                                                                 d




                                                                                                                                                                                       LD
                                                                                                                                                              o




                                                                                                                                                                                                    le




                                                                                                                                                                                                                                        on


                                                                                                                                                                                                                                                     ra
                                                                                                                                                                            a




                                                                                                                                                                                                                 d


                                                                                                                                                                                                                            ck
                      ld




                                              LD
           e




                                    o




                                                                                    on




                                                                                                                ra
                                                                        a




                                                                                                    d
                                                           k




                                                                                                                                                ol


                                                                                                                                                             ad


                                                                                                                                                                          ur




                                                                                                                                                                                                               ol
                                                                                                                                                                                                  ag
                                                            c




                                                                                                                                                                                                                                                      r
            l




                                  ad




                                                                       ur




                                                                                                ol




                                                                                                                                                                                                                           Ba


                                                                                                                                                                                                                                        m
                       o
         ag




                                                                                                                                                                                                                                                   te
                                                                                                               r




                                                                                                                                                                                      O
                                                                                                                                            dg




                                                                                                                                                                                                               G
                                                         Ba




                                                                                                                                                                          t
                                                                                m




                                                                                                            te
                                              O




                                                                                                                                                        or
                    dg




                                                                                                G




                                                                                                                                                                       en
                                                                    nt




                                                                                                                                                                                                -E




                                                                                                                                                                                                                                   am
                                r




                                                                                                                                                                                  G




                                                                                                                                                                                                                                               en
      -E




                                                                              am
                             do




                                                                                                                                                                                                         ew
                                         G




                                                                                                         en




                                                                                                                                           an




                                                                                                                                                                                                                     ed
                                                                                                                                                         d
                                                                  ve




                                                                                          ew
                an




                                                                                                                                                                                 M
                                                                                                                                                                   av
                                                   ed




                                                                                                                                                                                               co
                                                                                                                                                      El




                                                                                                                                                                                                                                             C
                                        M
    co




                                                                                                                                                                                                                                 G
                            El




                                                                                                        C




                                                                                                                                        R




                                                                                                                                                                                                                     R
                                                                                                                                                                               IA




                                                                                                                                                                                                         N
                                                                             G
                                                                na




                                                                                                                                                                  en
                R




                                                                                                                                                                                           ni
                                                   R
                                       IA




                                                                                         N
  ni




                                                                                                                                                                                          Ag
                                                             e




                                                                                                                                                             Bu
Ag




                                                          Bu




Note: As at November 16, 2009                                                                                                           Note: As at November 16, 2009


                                                                                                                                                                          www.newgold.com                    TSX/NYSE AMEX US: NGD                               18
Performance Since Merger




            94% share price appreciation since announcement of merger with Western Goldfields in March 2009



            NAV multiple increased from 0.7x to 1.3x over the same time period



            Increased exposure with 12 analysts now covering NGD


            Trading liquidity has tripled




Source: Bloomberg
Note: Share price performance based on local currency adjusted for dividends and distributions
Intermediates Index includes: Buenaventura, Lihir Gold, Centerra, IAMGOLD, Gammon, Eldorado, New Gold, Red Back
Seniors Index includes: Newmont, Barrick, Goldcorp, Newcrest, Kinross, Yamana Gold and Agnico-Eagle




                                                                                                                   www.newgold.com   TSX/NYSE AMEX US: NGD   19
Value Generation



FUTURE UPSIDE


  El Morro unlocking incremental value



  Amapari strategic review



  Asset Backed Notes now trading at approximately C$0.50 on the dollar



  New Afton development on schedule, expect to commence production second half of 2012




                                                                     www.newgold.com   TSX/NYSE AMEX US: NGD   20
Enhancing Value – El Morro (30%)

                                                                                                                  Location                                                                   Chile

                                                                                                                                                   Gold (m oz)                               2.01
                                                                                                                  Reserves1,2
                                                                                                                                                   Copper (m lbs)                            1,715
                                                                                                                                                   Gold (m oz)                               2.66
                                                                                                                  Resources1,3
                                                                                                                                                   Copper (m lbs)                            2,018
                                                                                                                  Mine type                                                                  Open Pit
                                                                                                                  Estimated mine life                                                        15 years
                                                                                                                  LOM Production/yr (Au oz/Cu lbs)4                                          95k/105m
                                                                                                                  LOM Cash Cost/oz co-product (Au/Cu)5                                       $370/$0.95

                                                                                                          Future Upside

                         •     On October 12, 2009, Barrick Gold Corporation announced an agreement with Xstrata to acquire its 70%
                               interest in the project for $465 million cash
                         •     New Gold owns remaining 30% interest and has right of first refusal to purchase Xstrata’s 70% interest
                         •     Research analysts and market beginning to increase inherent value – approximately $200 million based in
                               Barrick/Xstrata agreement
                         •     Various opportunities are available: swap New Gold’s stake for a gold producing asset, develop the asset
                               with experienced, gold-focused partner, or monetize 30% interest
1 El Morro‟s mineral reserves and resources are reported as of March 31, 2008 and reflect New Gold‟s 30% interest.
2 Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent
  copper, Au(g/t) = grams per tonne gold. Qualified person as defined under NI43-101 is Mr. Richard J. Lambert, P.E and formerly Principal Mining Engineer for Pincock, Allen & Holt Inc., currently Executive VP with Scott Wilson
  Roscoe Postle Associates.
3 Mineral resources have been est. based on US$500/oz gold, US$1.25/lb copper and a lower grade cut-off of 0.3% copper-equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper Au(g/t)
  = grams per tonne gold. Mineral resources are based on an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as described in the May 2008 NI
  43-101 technical report for the project. Mineral resources are inclusive of mineral reserves. Qualified person as defined under NI43-101 is Mr. Barton G. Stone, P. Geo and Chief Geologist for Pincock, Allen & Holt Inc.
4 El Morro‟s life of mine gold and copper production represents New Gold‟s 30% interest.
5 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost.



                                                                                                                                               www.newgold.com              TSX/NYSE AMEX US: NGD                       21
Value Generation



FUTURE UPSIDE

  1. Amapari strategic review


      •   Measured and Indicated Mineral Resources1 – gold 1.44 m oz (63% sulfide)
      •   Inferred Resources2 – gold 1.04 m oz (93% sulfide)
      •   Asset under strategic review
      •   Several parties have approached New Gold and are interested in purchasing the asset



  2. Asset Backed Notes now trading at approximately $0.50 on the dollar


      • Face value of $149 million
      • Improvement in global credit market conditions have positively impacted the value of the notes


  3. New Afton development on schedule, expect to commence production in second half of 2012

  1   Amapari mineral resources have been estimated based on a gold price of US$750/oz and a variable lower grade cut-offs ranging from 0.6 g/t to 0.8 g/t gold for open pit oxide and sulphide
      resources and 1.7 g/t gold for underground sulphide resources that vary between individual mineral resources and their proximity to the Amapari operation processing facility. Reported as
      of December 21, 2008. The qualified person as Defined under NI 43-101 is Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc.
  2   Inferred Mineral Resources are not known with the same degree of certainty as Mineral Reserves, do not have demonstrated economic viability and are exclusive of mineral reserves.




                                                                                                                         www.newgold.com              TSX/NYSE AMEX US: NGD                        22
The New Gold Advantage



   On track to achieve 2009 guidance of 270,000 to 300,00 oz of gold production at cash cost of
    $470 to $490 per oz, net of by-product sales for the period of ownership

   Production growth over the next four years with current portfolio of assets

   Decreasing cash cost over the next four years

   Strong balance sheet

   All assets located in mining-friendly jurisdictions

   Enhanced market presence with increased analyst coverage and trading liquidity

   Proven Board of Directors and management team




                                                                          www.newgold.com   TSX/NYSE AMEX US: NGD   23
Contact Information




Investor Relations
Melanie Hennessey
Vice President Investor Relations
New Gold Inc.
1-888-315-9715
melanie.hennessey@newgold.com

Media and Communications
Christine Marks
Investor Relations and External Communications Coordinator
New Gold Inc.
(604)639-0023
christine.marks@newgold.com




                                                             www.newgold.com   TSX/NYSE AMEX US: NGD   24
Asset Overview Notes

PRODUCING                     MESQUITE                                         CERRO SAN PEDRO                                         PEAK
ASSETS

Location                      United States                                    Mexico                                                  Australia

Ownership                     100%                                             100%                                                    100%

Metal                         Gold (m oz @ g/t)                                Gold (m oz @ g/t)               Silver (m oz @ g/t)     Gold (m oz @ g/t)             Copper (m lb @ %)

     Reserves1,5,8            2.6 @ 0.58                                       1.3 @ 0.555                     51 @ 22.3               514 @ 4.41                    849 @ 0.96

     Resources1,2,6,9         4.1 @ 0.56                                       1.7 @ 0.47                      63 @ 15.6               76 @ 3.38                     136 @ 1.08

Mine type                     Open Pit - ROM Heap Leach                        Open Pit - ROM Heap Leach                               Underground - Mill

Production Start-up           2008                                             2007                                                    1992

Estimated Mine Life3          13                                               ~9 years                                                ~8 years

Production                    YTD 30/09/09        2009 Guidance   LOM Annual   YTD 30/09/09        2009 Guidance        LOM Annual     YTD 30/06/09         2009 Guidance     LOM Annual
                                                                  Avg                                                   Avg                                                   Avg

     Gold (k oz)              88.7                140-150         150-160      69.7                90-100               95-105         68.6                 90-100            90-100

     Silver (m oz)                                                             1.2                 1.1 – 1.3            2.1 – 2.3

     Copper (m lbs)                                                                                                                    11.7                 13-15             14-16

Total Cash Cost/oz4,10        $624                $530-540        $420-430     $394                $550 - 570           $390 – 410     $332                 $370-390          $390 - 410


Strip Ratio                                       ~3.0            ~3.0                             ~2.0                 ~1.0

Grade


     Gold g/t                 0.44                0.54            0.58         0.46                0.55                 .0.52          3.99                 4.1               4.2

     Silver g/t                                                                31.47               23.8                 21.4

     Copper                                                                                                                            1.0%                 1.0%              1.1%

Sustaining Capital   7                            ~$1.5 m         ~$0.5 m/yr                       ~2.8 m               ~$3 m/yr                            ~$24 m            ~$12 m/yr

*For footnotes reference page 31 .



                                                                                                                           www.newgold.com         TSX/NYSE AMEX US: NGD              25
Asset Overview Notes cont’d

 DEVELOPMENT PROJECTS                NEW AFTON                                     EL MORRO

 Location                            Canada                                        Chile

 Ownership                           100%                                          30 % New Gold / 70% Xstrata Plc

                                     Gold (m oz @ g/t)    Copper (m lb @ %)        Gold (m oz @ g/t)                 Copper (m lb @ %)

 Reserves 11,13,14, 15, 16           1.03 @ 0.72          959 @ 0.98               2.01 @ 0.46                       1,715 @ 0.58

 Resources2, 12, 13, 14, 15, 17      1,63 @ 0.77          1,483 @ 1.02             2.66 @ 0.49                       2,018 @ 0.55


 Mine type                           Underground - Mill                            Open Pit - Mill

  Status                             In Development                                Permitting Stage (6 – 12 months)

 Production Start-up                 Middle of 2012                                Construction Timeline 3.5 years

 Grade (LOM Average)

       Gold g/t                      0.72                                          0.46

       Copper                        0.98%                                         0.58%

 Capital Expenditures Remaining      $380 m                                        n/a

 Development Funding Requirements    ~$600 m                                       $225 m18

 Sustaining Capital (LOM Average)    $11 m/year                                    $7 m/year

 Estimated Mine Life                 12 Years                                      15 Years

 Production (Annual LOM Averages)

       Gold (k oz/yr)                85                                            95

       Copper (m lb/yr)              75                                            105

 Total Cash Cost/oz co-product Au4   $305                                          $370

 Total Cash Cost/oz co-product Cu4   $1.10                                         $0.95

*For footnotes reference page 31.


                                                                              www.newgold.com        TSX/NYSE AMEX US: NGD               26
Asset Overview Notes cont’d

                                                                                             NEW AFTON
•   Block caving will involve:
     •     Undercutting the ore body allowing the ore to collapse
           and fragment into underlying draw points
     •     Ore extraction from draw points by 3 m3 scoops, transfer
           to the u/g crusher by 10 m3 scoops, then transferred to
           surface via conveyor system
•   New Afton has three blocks
     •     B1 & B2 bottom at approx. 600m below surface
     •     B3 bottom at approx. 730m below surface
•   New Afton ore is very amenable to block caving
•   Capital intensive up-front but low operating costs
•   Lowest hard rock underground mining method




                                                                        www.newgold.com   TSX/NYSE AMEX US: NGD   27
Asset Overview Notes cont’d

                                                 Global Block Caving Mines

     Pebble

         Cassiar
                         Ekati

    New Afton


  Resolution                           Jeffrey
                   Bingham Canyon
San Manuel          Henderson                                                                      Oyu Tolgoi                                 LEGEND
                   Questa             Bell
                                                                                                                                          Past Producers
                                                                                      Several Projects And
                                                                                           Mines In China                                 Producers

                                                                                                                                          Development Projects

                                                                                                                      Didipio
                                                                                                   Santo Thomas II




                                                                                                                 Grasberg       Ok Tedi

                                                                                                                 Argyle          Wafi
                                                                    King    Shabani
                                                   Debswana Mines          Palabora
                                                                                                              Olympic Dam       Northparkes E26
                                                  Kimberley Mines      Cullihan                                                 And E48
                   Chuquicamata                                                                       Mt Keith
                                                                       Finsch
                       Salvador                        Koffiefontain                                                                 Ridgeway Deeps
                                    Andina                                                                                           And Cadia East
                El Teniente Mines
                                                                                                                          Mt Lyall




                                                                                             www.newgold.com         TSX/NYSE AMEX US: NGD                 28
Asset Overview Notes cont’d

                                                                                                    NEW AFTON
CAPITAL AND DEVELOPMENT TO DATE
•   US$51.4 million YTD project spend (Sept. 30, 2009)
•   Detailed design and engineering 92% complete
•   Underground Development
        •   Achieved break through in Q3/09, connecting the conveyor with
            the main surface declines, providing a secondary access to all
            development areas
        •   Recently increased development rates by doubling number of
            operating crews to four, enabling continuous 7 day per week
            operation
        •   Over 5,000m of development completed
•   Surface Development
    •       Mill building closed in as of May 2009, provides secure
            equipment storage
    •       Surface infrastructure partially in place with SAG, Ball and
            Vertical mills assembled and placed above their foundations
    •       Surface development will resume in Q1/11




                                                                               www.newgold.com   TSX/NYSE AMEX US: NGD   29
Asset Overview Notes cont’d

PATH FORWARD: TOWARD PRODUCTION                                                               NEW AFTON



2009                        2010                         2011                      2012

Underground                 Underground                  Underground               Completion/Production
Development                 Development       BASE       Development/Surface
                                                         Construction

- Continued                 - Continued development      - Re-commence surface     - Create draw bells for
  development of              of drifts to base of the     construction              extraction of caved ore
  declines to the base of     ore body
  the ore body                                           - Undercut the ore body   - Production expected in
                                                                                     the second half of 2012
- Conveyor pass
  development for
  ultimate haulage to
  surface

- Completed the mill
  building in early 2009
  for storage of mill
  equipment




                                                                         www.newgold.com   TSX/NYSE AMEX US: NGD   30
Asset Overview Notes cont’d

Notes to Asset Overview

1.    Reported as of December 31, 2008
2.    Mineral resources are inclusive of mineral reserves
3.    11 years of production and 2 years of residual leaching
4.    Refer to note regarding Total Cash Costs in Cautionary Statements
5.    Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of
      US$2.64/t
6.    Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2
      g/t gold and are constrained within an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to
      define mineral reserves as of December 31, 2008
7.    Includes both development and sustaining capex
8.    Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs
      ranging from AUD$112/t to AUD$130/t that vary between individual mines and their proximity to the Peak operation processing facility.
9.    Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs
      ranging from AUD$85/t to AUD$95/t that vary between individual mines and their proximity to the Peak operation processing facility.
10.   Cash costs have been calculated based on a copper price of US$2.00/lb for 2009 and $1.70/lb for the LOM
11.   New Afton mineral reserves been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of
      ore
12.   New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a
      lower NSR cut-off of CAD$10.00/t of mineralized material
13.   Reported as of September 21, 2006
14.   Updated reserves and resources expected to be release in Q4 2009
15.   El Morro’s mineral reserves and resources are reported as of March 31, 2008 and reflect New Gold’s 30% interest
16.   Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent
      (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold
17.   Mineral resources have been estimated based on a gold price of US$500/oz, a copper price of US$1.25/lb and a lower grade cut-off of 0.3% copper-
      equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold. Mineral resources are
      based on an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves
      as described in the May 2008 NI 43-101 technical report for the project
18.   New Gold has an agreement with Xstrata whereby Xstrata will finance 70 percent of New Gold's 30 percent share of El Morro's project development
      costs. New Gold will repay the funds advanced by Xstrata through 80 percent of its share of cash flow from the project. New Gold’s share of the
      estimated $2.5 billion development cost is $750 million of which cash contribution is $225 million.




                                                                                                www.newgold.com        TSX/NYSE AMEX US: NGD              31
Debt and Financing Notes



                                          Senior Secured Notes                        Convertible Debentures                      Term Loan*

Face Value                                C$187 million                               C$55 million                                US$45.8 million

Maturity                                  2017                                        2014                                        2012

Interest Rate                             10%                                         5%                                          LIBOR + 4.25%

Payable                                   Semi-annually                               Semi-annually                               Semi-annually

Conversion price                          n/a                                         C$9.35                                      n/a

*New Gold amended the term loan facility on October 7, 2009 and made a prepayment of $15 million. The prepayment reduces the outstanding principal of the loan to $45.8
million. The lending syndicate, lead by Investec, now considers the development of Mesquite complete and has released the guarantee provided by Western Goldfields
Inc. In addition, the remaining available commitment of $18.6 million, which New Gold no longer requires, has been cancelled along with all related costs to the company.
The revised interest rate is US dollar LIBOR plus 4.25%. The term loan facility is now repayable by June 30, 2012 unless the company chooses to repay the loan early or
the sweep mechanism comes into effect. New Gold has increased flexibility in considering its options with respect to the gold hedge program, a required condition
precedent to the loan facility, that now extends two and half years beyond the revised term to December 31, 2014, the original term prior to prepayment. Approximately
165,000 ounces of gold, or approximately half of the program, are hedged beyond June 30, 2012 and may be terminated by New Gold.




                                                                                                           www.newgold.com        TSX/NYSE AMEX US: NGD              32
Reserves Notes

Additional Notes on all Mineral Reserves:
•      All mineral reserves have been calculated in accordance with the CIM Standards or the JORC Code. The JORC Code has been accepted for current disclosure rules in
       Canada under NI 43-101. The mineral reserve & resource Statements are reported as of the following dates:
          –     Peak Mines – December 31, 2008
          –     New Afton Project – September 21, 2006
          –     Cerro San Pedro Mine – December 31, 2008
          –     El Morro – March 31, 2008
          –     Mesquite Mine - December 31, 2007
•      The Qualified Person(s) (as defined under NI 43-101) or Competent Person(s) (as defined under the JORC Code for the Mineral Reserve & Resource Statements) are as
       follows:
          –     Peak Mines – Mr. Eric Strom, P.Eng. and Technical Services Superintendent for Peak Mines Pty Ltd.
          –     New Afton Project – Mr. Mike Thomas, Member AusIMM and Principal Mining Consultant for AMC Consultants Pty Ltd.
          –     Cerro San Pedro Mine – Mr. William L. Rose, P.E. and Principal Mining Engineer for WLR Consulting, Inc.
          –     El Morro Project – Mr. Richard J. Lambert, P. E. and formerly Principal Mining Engineer for Pincock, Allen & Holt Inc., currently Executive Vice President with
                Scott Wilson Roscoe Postle Associates
          –     Mesquite Mine – Mr. Wes Hanson, P. Geo., VP. Mine Development, Western Goldfields Inc.
•      Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from
       AUD$112/t to AUD$130/t that vary between individual mines and their proximity to the Peak operation processing facility.
•      New Afton mineral reserves been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of ore.
•      Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of US$2.64/t.
•      El Morro mineral reserve tonnes and grade are reported on a 100% basis; contained metals are reported on a 30% basis to reflect New Gold’s 30% ownership interest
       in the project. Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent
       (“EqCu”) where EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold
•      Mesquite mineral reserves are calculated based on a gold price of US$500/oz
•      Inferred mineral resources are not known with the same degree of certainty as mineral reserves, do not have demonstrated economic viability and are exclusive of
       mineral reserves
•      Numbers may not add due to rounding.
•      See technical reports, Annual Information Form, Form 10-K and other filings made on SEDAR by each of New Gold and Western Goldfields for detailed information
       with regard to the assumptions, parameters and other relevant information.




                                                                                                               www.newgold.com         TSX/NYSE AMEX US: NGD              33
Resources Notes

Additional Notes on all Mineral Resources:
•      All mineral resources have been calculated in accordance with the CIM Standards or the JORC Code. The JORC Code has been accepted for current disclosure rules in
       Canada under NI 43-101. The Mineral Resources have been reported as of the following dates:
          –     Amapari Mine – December 31, 2008
          –     Peak Mines – December 31, 2008
          –     New Afton Project – September 21, 2006
          –     Cerro San Pedro Mine – December 31, 2008
          –     El Morro – March 31, 2008
          –     Mesquite Mine – December 31, 2008
•      The qualified person(s) (as defined under NI 43-101) or competent person(s) (as defined under the JORC Code) for the mineral resource estimates are as follows:
          –     Amapari Mine – Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc.
          –     Peak Mines – Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc.
          –     New Afton Project – Mr. David Rennie, P. Eng. and Consulting Geological Engineer for Scott Wilson Roscoe Postle Assoc.
          –     Cerro San Pedro Mine – Mr. William L. Rose, P.E. and Principal Mining Engineer for WLR Consulting, Inc.
          –     El Morro Project – Mr. Barton G. Stone, P. Geo. and Chief Geologist for Pincock, Allen & Holt Inc.
          –     Mesquite Mine – Mr. Wes Hanson, P. Geo., VP. Mine Development, Western Goldfields Inc.
•      Amapari mineral resources have been estimated based on a gold price of US$750/oz and a variable lower grade cut-offs ranging from 0.6 g/t to 0.8 g/t gold for open pit
       oxide and sulphide resources and 1.7 g/t gold for underground sulphide resources that vary between individual mineral resources and their proximity to the Amapari
       operation processing facility.
•      Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from
       AUD$85/t to AUD$95/t that vary between individual mines and their proximity to the Peak operation processing facility.
•      New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a lower NSR cut-off
       of CAD$10.00/t of mineralized material.
•      Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2 g/t gold and are
       constrained within an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as of
       December 31, 2008. The Cerro San Pedro minderal resoucre estimates account for mining extraction from January 1, 2007 through thte end of 2008.
•      El Morro mineral resource tonnes and grade are reported on a 100% basis; contained metals are reported on a 30% basis to reflect New Gold’s 30% ownership interest in
       the project. El Morro mineral resources have been estimated based on a gold price of US$500/oz, a copper price of US$1.25/lb and a lower grade cut-off of 0.3% copper-
       equivalent (“EqCu”) where EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold. Mineral resources are based on an economically
       constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as described in the May 2008 NI 43-101
       technical report for the project.
•      Mesquite Mine mineral resources have been calculated based on a gold price of US$650/oz
•      Inferred mineral resources are not known with the same degree of certainty as mineral reserves, do not have demonstrated economic viability and are exclusive of mineral
       reserves
•      Numbers may not add due to rounding.
•      See technical reports, Annual Information Form, Form 10-K, and other filings made on SEDAR by each of New Gold and Western Goldfields for detailed information with
       regard to the assumptions, parameters and other relevant information.




                                                                                                               www.newgold.com        TSX/NYSE AMEX US: NGD              34

New Gold Inc - A Clear Direction - November 2009

  • 1.
    Delivering on Growth November 2009 www.newgold.com TSX/NYSE AMEX US: NGD
  • 2.
    Cautionary Statement All monetaryamounts in U.S. dollars unless otherwise stated CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to, statements with respect to the future price of gold, silver and copper the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, financing requirements, costs and timing of the development of new and existing deposits, implementation, timing and success of drilling and other exploration activities, permitting time lines, the completion and success of acquisitions, currency exchange rate fluctuations, requirements for additional capital, government disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words (including negative variations) and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. All forward-looking statements and forward-looking information is based on reasonable assumptions that have been made by New Gold as at the date such statements are made. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of New Gold to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, that New Gold and Western Goldfields Inc. (“Western”) will be able to realize the synergies from the business combination completed June 1, 2009; there may be difficulties in integrating the operations and personnel of the New Gold and Western; New Gold is subject to significant capital requirements; fluctuations in the international currency markets and in the rates of exchange of the currencies of Brazil, Canada, the United States, Australia, Mexico and Chile; price volatility in the spot and forward markets for commodities; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves and resources and between actual estimated metallurgical reserves; changes in national and local government legislation in Brazil, Canada, the United States, Australia, Mexico and Chile; or any other country in which New Gold currently or may in the future carry on business; taxation, controls, regulations and political or economic developments in the countries in which New Gold does or may carry on business; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; competition; loss of key employees; additional funding requirements; actual results of current exploration or reclamation activities; changes in project parameters as plans continue to be refined; accidents; labour disputes; and defective title to mineral claims or property or contests over claims to mineral properties. In addition, there are risks and hazards associated with the business of mineral exploration, development, and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and risk of inadequate insurance or inability to obtain insurance, to cover these risks) as well as those factors discussed in the section entitled “Risk Factors” in New Gold’s annual information form and short form prospectus filed on SEDAR. Although New Gold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate and you should not place undue reliance on forward-looking statements. New Gold does not undertake to update any forward-looking statements that are included herein, except in accordance with applicable securities laws. www.newgold.com TSX/NYSE AMEX US: NGD 2
  • 3.
    Cautionary Statement cont’d CAUTIONARYNOTE TO U.S. READERS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES Information concerning the properties and operations of New Gold has been prepared in accordance with Canadian standards under applicable Canadian securities laws, and may not be comparable to similar information for United States companies. The terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” used in this presentation are Canadian mining terms as defined in accordance with NI 43-101 under guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council on December 11, 2005. While the terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are recognized and required by Canadian regulations, they are not defined terms under standards of the United States Securities and Exchange Commission. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve calculation is made. As such, certain information contained in this presentation concerning descriptions of mineralization and resources under Canadian standards is not comparable to similar information made public by United States companies subject to the reporting and disclosure requirements of the United States Securities and Exchange Commission. An “Inferred Mineral Resource” has a great amount of uncertainty as to its existence and as to its economic and legal feasibility. It cannot be assumed that all or any part of an “Inferred Mineral Resource” will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies. Readers are cautioned not to assume that all or any part of Measured or Indicated Resources will ever be converted into Mineral Reserves. Readers are also cautioned not to assume that all or any part of an “Inferred Mineral Resource” exists, or is economically or legally mineable. In addition, the definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” under CIM standards differ in certain respects from the standards of the United States Securities and Exchange Commission. TOTAL CASH COST “Total cash cost” figures are calculated in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and included leading North American gold producers. The Gold Institute ceased operations in 2002, but the standard is the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. New Gold reports total cash cost on a sales basis. Total cash cost includes mine site operating costs such as mining, processing, administration, royalties and production taxes, but is exclusive of amortization, reclamation, capital and exploration costs. Total cash cost is reduced by any by-product revenue and is then divided by ounces sold to arrive at the total by-product cash cost of sales. The measure, along with sales, is considered to be a key indicator of a company’s ability to generate operating earnings and cash flow from its mining operations. This data is furnished to provide additional information and is a non-GAAP measure and does not have any standardized meaning prescribed by Canadian GAAP. It should not be considered in isolation as a substitute for measures of performance prepared in accordance with Canadian GAAP and is not necessarily indicative of operating costs presented under Canadian GAAP. The calculation of “Cash Cost” is consistent with Western’s prior disclosures of “Cost of Sales” ; Western does not have by-product credits. www.newgold.com TSX/NYSE AMEX US: NGD 3
  • 4.
    Executing on ourStrategy Disciplined Growth • Completed 3-way business combination June 2008 • Completed combination with Western Goldfields June 2009 • Pursue additional growth opportunities Enhancing Value Operational Execution • El Morro – strategic asset • 16% increase in production Q3/09 • Asset Backed Notes versus Q3/08 • Amapari strategic review • 17% decrease in cash cost • New Afton development on Q3/09 versus Q3/08 schedule for production in 2012 Maintaining a Strong Financial Position • $243 million in cash at Sept. 30/09 • $23 million in earnings from mine operations in Q3/09 • Strongest cash flow from operations expected in Q4/09 www.newgold.com TSX/NYSE AMEX US: NGD 4
  • 5.
    Management & Boardof Directors EXECUTIVE MANAGEMENT TEAM Randall Oliphant, Executive Chairman Robert Gallagher, President and Chief Executive Officer Brian Penny, Executive VP and Chief Financial Officer James Currie, Executive VP and Chief Operating Officer BOARD OF DIRECTORS James Estey, Director Robert Gallagher, CEO & Director Vahan Kololian, Director Martyn Konig, Director Pierre Lassonde, Director Craig Nelsen, Director Randall Oliphant, Executive Chairman Ian Telfer, Director Raymond Threlkeld, Director www.newgold.com TSX/NYSE AMEX US: NGD 5
  • 6.
    Capitalization and Liquidity BasicShares Outstanding (millions) 387 FDITM Shares Outstanding (millions) 405 TSX Share Price – November 16, 2009 $4.47 Market Capitalization (C$ millions) $1,730 Cash (US$ millions)1 $243 Long-term Investments (Asset Backed Notes US$ millions)2 $88 Debt (US$ millions)3 $250 Insider Ownership (million shares) 16 1. Cash position as of September 30, 2009. 2. Represents Fair Value of Asset Backed Notes investment at September 30, 2009. Face value of Asset Backed Notes investment is $149 million. 3. Debt position as of September 30, 2009, adjusted for October 2009 term loan repayment which includes $164.7 million in senior secured notes, $36.0 million in convertible debentures, $45.8 million in project financing for the Mesquite mine, and $3.6 million in the El Morro project funding loan. See “Debt and Financing Notes” for details in the appendix on page 32. www.newgold.com TSX/NYSE AMEX US: NGD 6
  • 7.
    Q3 2009 Highlights EARNINGS FROM MINE OPERATIONS (MILLIONS) NET EARNINGS(MILLIONS) $25 $50 $20 $4.1 67% $0 $15 ($50) ($148.9) $10 ($100) $5 $0 ($150) ($200) Q3 2008 Q3 2009 Q3 2008 Q3 2009 GOLD SALES (000s OUNCES) TOTAL CASH COST PER OUNCE (1) 80 $600 75 16% $400 17% 17% 70 65 $200 60 $0 Q3 2008 Q3 2009 Q3 2008 Q3 2009 1. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 7
  • 8.
    Q3 and Year-to-DateProduction Highlights Q3 2009 vs. Q3 2008 YTD 2009 vs. YTD 2009 GOLD PRODUCTION (000s OUNCES) GOLD PRODUCTION (000s OUNCES) 85 200 80 150 75 16% Q3 2008 23% YTD 2008 100 70 65 Q3 2009 50 YTD 2009 60 0 SILVER PRODUCTION (000s OUNCES) SILVER PRODUCTION (000s OUNCES) 400 1,500 300 1,000 21% Q3 2008 320% YTD 2008 200 100 500 Q3 2009 YTD 2009 0 0 COPPER PRODUCTION (MILLION POUNDS) COPPER PRODUCTION (MILLION POUNDS) 4 15 3 10 50% Q3 2008 102% YTD 2008 2 1 5 Q3 2009 YTD 2009 0 0 www.newgold.com TSX/NYSE AMEX US: NGD 8
  • 9.
    Asset Overview GLOBALLY DIVERSIFIED IN MINING-FRIENDLY JURISDICTIONS • 12.1 million ounce M&I(1) gold resource New Afton Canada (000s oz Au) Mesquite(2) 2P 1,028 • United States M&I(1) 1,630 7.4 million ounce gold reserve(4) Inferred 225 2P (000s oz Au) 2,574 M&I(1) 4,101 • Diversified gold production base Cerro San Pedro Inferred 64 Mexico • Politically stable jurisdictions 2P (000s oz Au) 1,266 Amapari M&I(1) 1,691 Brazil Inferred 25 (000s oz Au) M&I 1,136 Peak Inferred 1,045 Australia (000s oz Au) El Morro(3) 2P 514 Chile M&I(1) 849 (000s oz Au) 2P 2,013 Inferred 388 (1) M&I 2,659 Inferred 110 1 Measured and indicated mineral resources are inclusive of mineral reserves. See technical reports, Annual Information Form, Form 10-K, and other filings made on SEDAR by each of New Gold and Western for detailed information with regard to the assumptions, parameters and other information relevant to quantities discussed above. 2P refers to proven and probable reserves, M&I refers to measured and indicated resources Producing Mines 2 Represents Mesquite‟s December 31, 2008 reserves and resources 3 El Morro Project‟s reserves and resources reflect New Gold‟s 30% interest Development Projects 4 Proven and probable mineral reserves Undergoing Strategic Review www.newgold.com TSX/NYSE AMEX US: NGD 9
  • 10.
    Executing with Upside– Mesquite Location United States Mine Type Open Pit Reserves1,4 Gold (m oz) 2.6 Resources1,2,5 Gold (m oz) 4.1 Estimate Mine Life3 13 years Gold Production ‟09 Guidance oz6 140k-150k Total Cash Cost/oz ‟09 Guidance6,7 $530-$540 Proven Execution Current Enhancements Future Upside • Completed positive feasibility • Production ramped up in • Potential to increase study in 2006 September 2009, expected to mining rate – add 5k to continue on this trend in Q4/09 10koz of production per • Mine brought into and going forward year production on time and on budget in 2008 • Declining total cash cost over • 1M oz sulfide resource below the next two years current pit – exploring processing alternatives 1 Represents December 31, 2008 reserves and resources. 2 Mineral resources are inclusive of mineral reserves. 3 11 years of production and 2 years of residual leaching. 4 Mesquite Mine mineral reserves have been calculated based on a gold price of US $500/oz. Refer to Reserves Notes. 5 Mesquite Mine mineral resources have been estimated based on a gold price of US $650/oz. Refer to Resources Notes. 6 Mesquite production and total cash cost guidance for 2009 are for the full year. 7 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 10
  • 11.
    Executing with Upside– Cerro San Pedro Location Mexico Mine Type Open Pit Gold (m oz) 1.3 Reserves1,3 Silver (m oz) 51 Gold (m oz) 1.7 Resources2,3,4 Silver (m oz) 63 Estimated Mine Life ~ 9 years Gold Production „09 Guidance oz 90k-100k Total Cash Cost/oz „09 Guidance5 $550-$570 Proven Execution Current Enhancement Future Upside • Achieved full production in • Both silver grades and • Completed sulfide 2008 recovery continue to improve exploration program with 30 drill holes; results expected • Received award as safest • 68% increase in tonnes of ore to be released by Q1/10 mine of its size in Mexico for mined in comparison to 2007 and 2008 Q3/2008 • Attained ISO: 14001 • Currently tracking below 2009 environmental certification in cash cost guidance 2008 1 Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of US$2.64/t. Refer to Reserves Notes. 2 Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2 g/t gold and are constrained within an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as of December 31, 2008. Refer to Resources Notes. 3 Reported as of December 31, 2008 4 Mineral resources are inclusive of mineral reserves 5 Cash costs guidance for 2009 have been calculated based on a silver price of US$14.00/lb. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost www.newgold.com TSX/NYSE AMEX US: NGD 11
  • 12.
    Executing with Upside– Peak Mines Location Australia Mine Type Underground Gold (k oz) 514 Reserves1,3 Copper (m lbs) 51 Gold (k oz) 849 Resources2,3,4 Copper (m lbs) 136 Estimated Mine Life ~ 8 years Gold Production „09 Guidance oz 90k-100k Total Cash Cost/oz „09 Guidance5 $370-$390 Proven Execution Current Enhancement Future Upside • In operation since 1992 • Successfully transitioned to • Potential for additional – history of success higher gold grade future targets around Perseverance Zone D ore Peak’s currently • Proven ability to body existing underground replace reserves – ore body and in the produced two millionth • Benefitting from increased surrounding region ounce in 2008 after copper production starting with one million • Currently tracking below ounce in reserves 2009 cash cost guidance 1 Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$112/t to AUD$130/t that vary between individual mines and their proximity to the Peak operation processing facility.. Refer to Reserves Notes. 2 Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$85/t to AUD$95/t that vary between individual mines and their proximity to the Peak operation processing facility.. Refer to Resources Notes. 3 Reported as of December 31, 2008. 4 Mineral resources are inclusive of mineral reserves. 5 Cash costs guidance for 2009 have been calculated based on a copper price of US$2.00/lb. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 12
  • 13.
    Executing with Upside– New Afton Location Canada Gold (m oz) 1.03 Reserves1,2 Copper (m lbs) 959 Gold (m oz) 1.63 Resources2,3 Copper (m lbs) 1,483 Mine type Underground Estimated mine life 12 years LOM Production/yr (Au oz/Cu lbs) 85k/75m LOM Cash Cost/oz co-product (Au/Cu)4 $305/$1.10 Proven Execution Current Enhancement Future Upside • Delivered positive feasibility • Achieved break through of the • Potential to bring some study conveyor decline and main resources into reserves given surface decline in Q3/09 current commodity prices • Long lead time equipment ordered and in place • Increased development rates by • Potential for additional blocks doubling operating crews containing similar • Surface infrastructure partially mineralization below those in place with mill building • Completing full capital and currently included in mine plan exterior completed operating cost review – results expected in Q1/10 1 New Afton mineral reserves have been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of ore. Refer to Reserves Notes. 2 Reported as of September 21, 2006. 3 New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a lower NSR cut-off of CAD$10.00/t of mineralized material. Mineral resources are inclusive of mineral reserves. Refer to Resources Notes. 4 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 13
  • 14.
    Executing with Upside– New Afton (cont’d) PATH FORWARD: TOWARD PRODUCTION ADVANCE RATE (METERS) • Project remains on time and on budget 500 • Total capital expenditure requirements ~$600m 450 - 37% complete 400 • ~ $380 million left to be spent 2010-2012 350 • Completed the mill building in early 2009 for storage of mill equipment 300 • Continuing development of declines to the base 250 of the ore body 200 • Re-commence surface construction and start undercut of the ore body in 2011 150 • Start stockpiling ore in 2011 to feed the mill in 100 2012 50 • Commence production in the second half of 2012 with life-of-mine annual production of: 0 • 75 m lbs copper • 85k oz gold Q1 2009 Q2 2009 Q3 2009 www.newgold.com TSX/NYSE AMEX US: NGD 14
  • 15.
    Gold Production Outlook EXCEPTIONAL GOLD PRODUCTION GROWTH PROFILE Broker Consensus Production Profile1,2,3 (2009E-2013E) 600 $600 74% Increase in Production Total Cash Costs (US$/oz) 4 500 $500 Au Production (koz) 400 $400 300 $300 62% Decrease in Total Cash Costs 200 $200 100 $100 0 $0 5 2009E 2010E 2011E 2012E 2013E Gold Production Total Cash Costs 1 Source: Available consensus research estimates. 2 Based on 2009-2013 avg. broker consensus commodity prices of US$948/oz Au, US$2.74/lb Cu, US$14.64/oz Ag. 3 2009 production shown for the period of ownership of Western Goldfields. 4 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. 5 2013 production based on 2 equity research analyst estimates, none of which include production from El Morro. www.newgold.com TSX/NYSE AMEX US: NGD 15
  • 16.
    Operating Margin EXCEPTIONAL CASH FLOW GENERATION AND GROWTH 1,2,3 Operating Margin $400 $350 ~ 183% Increase in $300 Operating Margin Operating Margin (US$mm) $250 $200 $150 $100 $50 $0 4 2009E 2010E 2011E 2012E 2013E 1 Source: Available consensus research estimates 2 Based on 2009-2013 avg. broker consensus commodity prices of US$948/oz Au, US$2.74/lb Cu, US$14.64/oz Ag 3 Operating Margin is a non-GAAP measure calculated as production multiplied by the assumed gold price less cash costs net of by-product credits 4 2013 production based on 2 equity research analyst estimates, none of which include production from El Morro Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost www.newgold.com TSX/NYSE AMEX US: NGD 16
  • 17.
    Copper Leverage IMPACT OF COPPER ON OPERATING MARGIN AND CASH COST Assumes average of 90 million lbs of copper per year from 2013-20171,2,3 Incremental Increase in Operating Margin (US$ mm) 200 $300 Total Cash Costs (US$/oz) 150 $150 100 $0 50 ($150) 0 ($300) $2.00 $2.50 $3.00 $3.50 $4.00 Operating Margin Total Cash Costs Cash costs (net of by-products) approach zero at current copper prices. 1. Assumptions: Silver price $12.00/oz. 2. Assumes an average of 75 million pounds of copper sales per year from New Afton and 15 million pounds of copper sales per year from Peak Mines. It does not include any copper sales from El Morro. 3. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 17
  • 18.
    Peer Comparison Change in 2009E-2013E Broker Consensus Cash Cost 1,2 5% (5%) (7%) (8%) 3 (9%) (13%) (15%) (19%) (62%) le a d ra do LD on d ck ur ol ol ag r Ba m ra te O dg G t en -E am do G en ew an ed av M co El C G R R IA N en ni Ag Bu 1. Note: Gammon Gold calculated based on gold equivalent cash costs 2. Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost 3. Based on 2009-2011 data due to unavailability of broker estimates 28.7x Price/2010E CF Price/Consensus NAV 24.7x 24.1x 2.0x 2.0x 1.9x 1.8x 1.7x 1.6x 18.6x 1.6x 17.4x 1.3x 1.2x 11.9x 11.8x 8.8x 8.6x d LD o le on ra a d ck ld LD e o on ra a d k ol ad ur ol ag c r l ad ur ol Ba m o ag te r O dg G Ba t m te O or dg G en nt -E am r G en -E am do ew G en an ed d ve ew an M av ed co El C M co G El C R R IA N G na en R ni R IA N ni Ag e Bu Ag Bu Note: As at November 16, 2009 Note: As at November 16, 2009 www.newgold.com TSX/NYSE AMEX US: NGD 18
  • 19.
    Performance Since Merger 94% share price appreciation since announcement of merger with Western Goldfields in March 2009 NAV multiple increased from 0.7x to 1.3x over the same time period Increased exposure with 12 analysts now covering NGD Trading liquidity has tripled Source: Bloomberg Note: Share price performance based on local currency adjusted for dividends and distributions Intermediates Index includes: Buenaventura, Lihir Gold, Centerra, IAMGOLD, Gammon, Eldorado, New Gold, Red Back Seniors Index includes: Newmont, Barrick, Goldcorp, Newcrest, Kinross, Yamana Gold and Agnico-Eagle www.newgold.com TSX/NYSE AMEX US: NGD 19
  • 20.
    Value Generation FUTURE UPSIDE El Morro unlocking incremental value Amapari strategic review Asset Backed Notes now trading at approximately C$0.50 on the dollar New Afton development on schedule, expect to commence production second half of 2012 www.newgold.com TSX/NYSE AMEX US: NGD 20
  • 21.
    Enhancing Value –El Morro (30%) Location Chile Gold (m oz) 2.01 Reserves1,2 Copper (m lbs) 1,715 Gold (m oz) 2.66 Resources1,3 Copper (m lbs) 2,018 Mine type Open Pit Estimated mine life 15 years LOM Production/yr (Au oz/Cu lbs)4 95k/105m LOM Cash Cost/oz co-product (Au/Cu)5 $370/$0.95 Future Upside • On October 12, 2009, Barrick Gold Corporation announced an agreement with Xstrata to acquire its 70% interest in the project for $465 million cash • New Gold owns remaining 30% interest and has right of first refusal to purchase Xstrata’s 70% interest • Research analysts and market beginning to increase inherent value – approximately $200 million based in Barrick/Xstrata agreement • Various opportunities are available: swap New Gold’s stake for a gold producing asset, develop the asset with experienced, gold-focused partner, or monetize 30% interest 1 El Morro‟s mineral reserves and resources are reported as of March 31, 2008 and reflect New Gold‟s 30% interest. 2 Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold. Qualified person as defined under NI43-101 is Mr. Richard J. Lambert, P.E and formerly Principal Mining Engineer for Pincock, Allen & Holt Inc., currently Executive VP with Scott Wilson Roscoe Postle Associates. 3 Mineral resources have been est. based on US$500/oz gold, US$1.25/lb copper and a lower grade cut-off of 0.3% copper-equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper Au(g/t) = grams per tonne gold. Mineral resources are based on an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as described in the May 2008 NI 43-101 technical report for the project. Mineral resources are inclusive of mineral reserves. Qualified person as defined under NI43-101 is Mr. Barton G. Stone, P. Geo and Chief Geologist for Pincock, Allen & Holt Inc. 4 El Morro‟s life of mine gold and copper production represents New Gold‟s 30% interest. 5 Refer to Cautionary Statements regarding Forward Looking Statements and Total Cash Cost. www.newgold.com TSX/NYSE AMEX US: NGD 21
  • 22.
    Value Generation FUTURE UPSIDE 1. Amapari strategic review • Measured and Indicated Mineral Resources1 – gold 1.44 m oz (63% sulfide) • Inferred Resources2 – gold 1.04 m oz (93% sulfide) • Asset under strategic review • Several parties have approached New Gold and are interested in purchasing the asset 2. Asset Backed Notes now trading at approximately $0.50 on the dollar • Face value of $149 million • Improvement in global credit market conditions have positively impacted the value of the notes 3. New Afton development on schedule, expect to commence production in second half of 2012 1 Amapari mineral resources have been estimated based on a gold price of US$750/oz and a variable lower grade cut-offs ranging from 0.6 g/t to 0.8 g/t gold for open pit oxide and sulphide resources and 1.7 g/t gold for underground sulphide resources that vary between individual mineral resources and their proximity to the Amapari operation processing facility. Reported as of December 21, 2008. The qualified person as Defined under NI 43-101 is Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc. 2 Inferred Mineral Resources are not known with the same degree of certainty as Mineral Reserves, do not have demonstrated economic viability and are exclusive of mineral reserves. www.newgold.com TSX/NYSE AMEX US: NGD 22
  • 23.
    The New GoldAdvantage  On track to achieve 2009 guidance of 270,000 to 300,00 oz of gold production at cash cost of $470 to $490 per oz, net of by-product sales for the period of ownership  Production growth over the next four years with current portfolio of assets  Decreasing cash cost over the next four years  Strong balance sheet  All assets located in mining-friendly jurisdictions  Enhanced market presence with increased analyst coverage and trading liquidity  Proven Board of Directors and management team www.newgold.com TSX/NYSE AMEX US: NGD 23
  • 24.
    Contact Information Investor Relations MelanieHennessey Vice President Investor Relations New Gold Inc. 1-888-315-9715 melanie.hennessey@newgold.com Media and Communications Christine Marks Investor Relations and External Communications Coordinator New Gold Inc. (604)639-0023 christine.marks@newgold.com www.newgold.com TSX/NYSE AMEX US: NGD 24
  • 25.
    Asset Overview Notes PRODUCING MESQUITE CERRO SAN PEDRO PEAK ASSETS Location United States Mexico Australia Ownership 100% 100% 100% Metal Gold (m oz @ g/t) Gold (m oz @ g/t) Silver (m oz @ g/t) Gold (m oz @ g/t) Copper (m lb @ %) Reserves1,5,8 2.6 @ 0.58 1.3 @ 0.555 51 @ 22.3 514 @ 4.41 849 @ 0.96 Resources1,2,6,9 4.1 @ 0.56 1.7 @ 0.47 63 @ 15.6 76 @ 3.38 136 @ 1.08 Mine type Open Pit - ROM Heap Leach Open Pit - ROM Heap Leach Underground - Mill Production Start-up 2008 2007 1992 Estimated Mine Life3 13 ~9 years ~8 years Production YTD 30/09/09 2009 Guidance LOM Annual YTD 30/09/09 2009 Guidance LOM Annual YTD 30/06/09 2009 Guidance LOM Annual Avg Avg Avg Gold (k oz) 88.7 140-150 150-160 69.7 90-100 95-105 68.6 90-100 90-100 Silver (m oz) 1.2 1.1 – 1.3 2.1 – 2.3 Copper (m lbs) 11.7 13-15 14-16 Total Cash Cost/oz4,10 $624 $530-540 $420-430 $394 $550 - 570 $390 – 410 $332 $370-390 $390 - 410 Strip Ratio ~3.0 ~3.0 ~2.0 ~1.0 Grade Gold g/t 0.44 0.54 0.58 0.46 0.55 .0.52 3.99 4.1 4.2 Silver g/t 31.47 23.8 21.4 Copper 1.0% 1.0% 1.1% Sustaining Capital 7 ~$1.5 m ~$0.5 m/yr ~2.8 m ~$3 m/yr ~$24 m ~$12 m/yr *For footnotes reference page 31 . www.newgold.com TSX/NYSE AMEX US: NGD 25
  • 26.
    Asset Overview Notescont’d DEVELOPMENT PROJECTS NEW AFTON EL MORRO Location Canada Chile Ownership 100% 30 % New Gold / 70% Xstrata Plc Gold (m oz @ g/t) Copper (m lb @ %) Gold (m oz @ g/t) Copper (m lb @ %) Reserves 11,13,14, 15, 16 1.03 @ 0.72 959 @ 0.98 2.01 @ 0.46 1,715 @ 0.58 Resources2, 12, 13, 14, 15, 17 1,63 @ 0.77 1,483 @ 1.02 2.66 @ 0.49 2,018 @ 0.55 Mine type Underground - Mill Open Pit - Mill Status In Development Permitting Stage (6 – 12 months) Production Start-up Middle of 2012 Construction Timeline 3.5 years Grade (LOM Average) Gold g/t 0.72 0.46 Copper 0.98% 0.58% Capital Expenditures Remaining $380 m n/a Development Funding Requirements ~$600 m $225 m18 Sustaining Capital (LOM Average) $11 m/year $7 m/year Estimated Mine Life 12 Years 15 Years Production (Annual LOM Averages) Gold (k oz/yr) 85 95 Copper (m lb/yr) 75 105 Total Cash Cost/oz co-product Au4 $305 $370 Total Cash Cost/oz co-product Cu4 $1.10 $0.95 *For footnotes reference page 31. www.newgold.com TSX/NYSE AMEX US: NGD 26
  • 27.
    Asset Overview Notescont’d NEW AFTON • Block caving will involve: • Undercutting the ore body allowing the ore to collapse and fragment into underlying draw points • Ore extraction from draw points by 3 m3 scoops, transfer to the u/g crusher by 10 m3 scoops, then transferred to surface via conveyor system • New Afton has three blocks • B1 & B2 bottom at approx. 600m below surface • B3 bottom at approx. 730m below surface • New Afton ore is very amenable to block caving • Capital intensive up-front but low operating costs • Lowest hard rock underground mining method www.newgold.com TSX/NYSE AMEX US: NGD 27
  • 28.
    Asset Overview Notescont’d Global Block Caving Mines Pebble Cassiar Ekati New Afton Resolution Jeffrey Bingham Canyon San Manuel Henderson Oyu Tolgoi LEGEND Questa Bell Past Producers Several Projects And Mines In China Producers Development Projects Didipio Santo Thomas II Grasberg Ok Tedi Argyle Wafi King Shabani Debswana Mines Palabora Olympic Dam Northparkes E26 Kimberley Mines Cullihan And E48 Chuquicamata Mt Keith Finsch Salvador Koffiefontain Ridgeway Deeps Andina And Cadia East El Teniente Mines Mt Lyall www.newgold.com TSX/NYSE AMEX US: NGD 28
  • 29.
    Asset Overview Notescont’d NEW AFTON CAPITAL AND DEVELOPMENT TO DATE • US$51.4 million YTD project spend (Sept. 30, 2009) • Detailed design and engineering 92% complete • Underground Development • Achieved break through in Q3/09, connecting the conveyor with the main surface declines, providing a secondary access to all development areas • Recently increased development rates by doubling number of operating crews to four, enabling continuous 7 day per week operation • Over 5,000m of development completed • Surface Development • Mill building closed in as of May 2009, provides secure equipment storage • Surface infrastructure partially in place with SAG, Ball and Vertical mills assembled and placed above their foundations • Surface development will resume in Q1/11 www.newgold.com TSX/NYSE AMEX US: NGD 29
  • 30.
    Asset Overview Notescont’d PATH FORWARD: TOWARD PRODUCTION NEW AFTON 2009 2010 2011 2012 Underground Underground Underground Completion/Production Development Development BASE Development/Surface Construction - Continued - Continued development - Re-commence surface - Create draw bells for development of of drifts to base of the construction extraction of caved ore declines to the base of ore body the ore body - Undercut the ore body - Production expected in the second half of 2012 - Conveyor pass development for ultimate haulage to surface - Completed the mill building in early 2009 for storage of mill equipment www.newgold.com TSX/NYSE AMEX US: NGD 30
  • 31.
    Asset Overview Notescont’d Notes to Asset Overview 1. Reported as of December 31, 2008 2. Mineral resources are inclusive of mineral reserves 3. 11 years of production and 2 years of residual leaching 4. Refer to note regarding Total Cash Costs in Cautionary Statements 5. Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of US$2.64/t 6. Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2 g/t gold and are constrained within an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as of December 31, 2008 7. Includes both development and sustaining capex 8. Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$112/t to AUD$130/t that vary between individual mines and their proximity to the Peak operation processing facility. 9. Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$85/t to AUD$95/t that vary between individual mines and their proximity to the Peak operation processing facility. 10. Cash costs have been calculated based on a copper price of US$2.00/lb for 2009 and $1.70/lb for the LOM 11. New Afton mineral reserves been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of ore 12. New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a lower NSR cut-off of CAD$10.00/t of mineralized material 13. Reported as of September 21, 2006 14. Updated reserves and resources expected to be release in Q4 2009 15. El Morro’s mineral reserves and resources are reported as of March 31, 2008 and reflect New Gold’s 30% interest 16. Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold 17. Mineral resources have been estimated based on a gold price of US$500/oz, a copper price of US$1.25/lb and a lower grade cut-off of 0.3% copper- equivalent (“EqCu”) where: EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold. Mineral resources are based on an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as described in the May 2008 NI 43-101 technical report for the project 18. New Gold has an agreement with Xstrata whereby Xstrata will finance 70 percent of New Gold's 30 percent share of El Morro's project development costs. New Gold will repay the funds advanced by Xstrata through 80 percent of its share of cash flow from the project. New Gold’s share of the estimated $2.5 billion development cost is $750 million of which cash contribution is $225 million. www.newgold.com TSX/NYSE AMEX US: NGD 31
  • 32.
    Debt and FinancingNotes Senior Secured Notes Convertible Debentures Term Loan* Face Value C$187 million C$55 million US$45.8 million Maturity 2017 2014 2012 Interest Rate 10% 5% LIBOR + 4.25% Payable Semi-annually Semi-annually Semi-annually Conversion price n/a C$9.35 n/a *New Gold amended the term loan facility on October 7, 2009 and made a prepayment of $15 million. The prepayment reduces the outstanding principal of the loan to $45.8 million. The lending syndicate, lead by Investec, now considers the development of Mesquite complete and has released the guarantee provided by Western Goldfields Inc. In addition, the remaining available commitment of $18.6 million, which New Gold no longer requires, has been cancelled along with all related costs to the company. The revised interest rate is US dollar LIBOR plus 4.25%. The term loan facility is now repayable by June 30, 2012 unless the company chooses to repay the loan early or the sweep mechanism comes into effect. New Gold has increased flexibility in considering its options with respect to the gold hedge program, a required condition precedent to the loan facility, that now extends two and half years beyond the revised term to December 31, 2014, the original term prior to prepayment. Approximately 165,000 ounces of gold, or approximately half of the program, are hedged beyond June 30, 2012 and may be terminated by New Gold. www.newgold.com TSX/NYSE AMEX US: NGD 32
  • 33.
    Reserves Notes Additional Noteson all Mineral Reserves: • All mineral reserves have been calculated in accordance with the CIM Standards or the JORC Code. The JORC Code has been accepted for current disclosure rules in Canada under NI 43-101. The mineral reserve & resource Statements are reported as of the following dates: – Peak Mines – December 31, 2008 – New Afton Project – September 21, 2006 – Cerro San Pedro Mine – December 31, 2008 – El Morro – March 31, 2008 – Mesquite Mine - December 31, 2007 • The Qualified Person(s) (as defined under NI 43-101) or Competent Person(s) (as defined under the JORC Code for the Mineral Reserve & Resource Statements) are as follows: – Peak Mines – Mr. Eric Strom, P.Eng. and Technical Services Superintendent for Peak Mines Pty Ltd. – New Afton Project – Mr. Mike Thomas, Member AusIMM and Principal Mining Consultant for AMC Consultants Pty Ltd. – Cerro San Pedro Mine – Mr. William L. Rose, P.E. and Principal Mining Engineer for WLR Consulting, Inc. – El Morro Project – Mr. Richard J. Lambert, P. E. and formerly Principal Mining Engineer for Pincock, Allen & Holt Inc., currently Executive Vice President with Scott Wilson Roscoe Postle Associates – Mesquite Mine – Mr. Wes Hanson, P. Geo., VP. Mine Development, Western Goldfields Inc. • Peak Mines mineral reserves have been calculated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$112/t to AUD$130/t that vary between individual mines and their proximity to the Peak operation processing facility. • New Afton mineral reserves been calculated based on a gold price of US$475/oz, a copper price of US$1.45/lb and a lower NSR cut-off of CAD$15/t of ore. • Cerro San Pedro mineral reserves have been calculated based on a gold price of $750/oz, a silver price of US$10.00/oz and a lower NSR cut-off of US$2.64/t. • El Morro mineral reserve tonnes and grade are reported on a 100% basis; contained metals are reported on a 30% basis to reflect New Gold’s 30% ownership interest in the project. Mineral reserves have been calculated based on a gold price of $500/oz, a copper price of US$1.25/lb and a lower cut-off of 0.30% copper-equivalent (“EqCu”) where EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold • Mesquite mineral reserves are calculated based on a gold price of US$500/oz • Inferred mineral resources are not known with the same degree of certainty as mineral reserves, do not have demonstrated economic viability and are exclusive of mineral reserves • Numbers may not add due to rounding. • See technical reports, Annual Information Form, Form 10-K and other filings made on SEDAR by each of New Gold and Western Goldfields for detailed information with regard to the assumptions, parameters and other relevant information. www.newgold.com TSX/NYSE AMEX US: NGD 33
  • 34.
    Resources Notes Additional Noteson all Mineral Resources: • All mineral resources have been calculated in accordance with the CIM Standards or the JORC Code. The JORC Code has been accepted for current disclosure rules in Canada under NI 43-101. The Mineral Resources have been reported as of the following dates: – Amapari Mine – December 31, 2008 – Peak Mines – December 31, 2008 – New Afton Project – September 21, 2006 – Cerro San Pedro Mine – December 31, 2008 – El Morro – March 31, 2008 – Mesquite Mine – December 31, 2008 • The qualified person(s) (as defined under NI 43-101) or competent person(s) (as defined under the JORC Code) for the mineral resource estimates are as follows: – Amapari Mine – Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc. – Peak Mines – Mr. Rex Berthelsen, Member AusIMM and Principal Geologist for New Gold Inc. – New Afton Project – Mr. David Rennie, P. Eng. and Consulting Geological Engineer for Scott Wilson Roscoe Postle Assoc. – Cerro San Pedro Mine – Mr. William L. Rose, P.E. and Principal Mining Engineer for WLR Consulting, Inc. – El Morro Project – Mr. Barton G. Stone, P. Geo. and Chief Geologist for Pincock, Allen & Holt Inc. – Mesquite Mine – Mr. Wes Hanson, P. Geo., VP. Mine Development, Western Goldfields Inc. • Amapari mineral resources have been estimated based on a gold price of US$750/oz and a variable lower grade cut-offs ranging from 0.6 g/t to 0.8 g/t gold for open pit oxide and sulphide resources and 1.7 g/t gold for underground sulphide resources that vary between individual mineral resources and their proximity to the Amapari operation processing facility. • Peak Mines mineral resources have been estimated based on a gold price of US$750/oz, a copper price of US$2.00/lb and variable lower NSR cut-offs ranging from AUD$85/t to AUD$95/t that vary between individual mines and their proximity to the Peak operation processing facility. • New Afton mineral resources have been estimated based on a gold price of US$450/oz, a silver price of US$5.25/oz, a copper price of US$1.20/lb and a lower NSR cut-off of CAD$10.00/t of mineralized material. • Cerro San Pedro mineral resources have been estimated based on a gold price of US$1000/oz, a silver price of US$21/oz and a lower grade cut-off of 0.2 g/t gold and are constrained within an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as of December 31, 2008. The Cerro San Pedro minderal resoucre estimates account for mining extraction from January 1, 2007 through thte end of 2008. • El Morro mineral resource tonnes and grade are reported on a 100% basis; contained metals are reported on a 30% basis to reflect New Gold’s 30% ownership interest in the project. El Morro mineral resources have been estimated based on a gold price of US$500/oz, a copper price of US$1.25/lb and a lower grade cut-off of 0.3% copper- equivalent (“EqCu”) where EqCu(%) = Cu(%) + 0.592 x Au (g/t) and Cu(%) = percent copper, Au(g/t) = grams per tonne gold. Mineral resources are based on an economically constrained “mineral resource pit” that uses the same cost and metal recovery parameters used to define mineral reserves as described in the May 2008 NI 43-101 technical report for the project. • Mesquite Mine mineral resources have been calculated based on a gold price of US$650/oz • Inferred mineral resources are not known with the same degree of certainty as mineral reserves, do not have demonstrated economic viability and are exclusive of mineral reserves • Numbers may not add due to rounding. • See technical reports, Annual Information Form, Form 10-K, and other filings made on SEDAR by each of New Gold and Western Goldfields for detailed information with regard to the assumptions, parameters and other relevant information. www.newgold.com TSX/NYSE AMEX US: NGD 34