Network and Server Infrastructure
deployment
Data Center Network
Redundant Campus Network
Rack layout Port maps
Stress Test and
Throughput RFC 2544

• Network analyzer Optiview

• Test TCP ( TTCP )
•Uplink Test ( PC to Router )
•Downlink Test
(Router to PC )
• Throughput Result
( Frankfurt POP )
• Latency
• Different Frame Size
( 64 to 1518 )

• MetroScope
Sample Result – Stress Tes
100% Physical link passed
Electrical Panel – Blueprints
Structured Cabling – 1
Structured Cabling – 2
Structured Cabling – 3
Sample of Progress Report – EVA