SlideShare a Scribd company logo
1 of 21
“cloud based project management solution for construction industry – a Make-in-India product”
www.myepcteam.com
Sunil Vaishnav :+91-9811115163
Nitin Gupta :+91-9987671199
MyEpcTeam.com
Commonly adopted strategies to control project schedule
©2016 MyEpcTeam ALL RIGHT RESERVED
21%
57%
75%
79%
93%
18%
25%
11%
11%
7%
25%
15%
7%
10%
25%
3%
11%
7%
Risk and Reward for Project Team
Standardization of Processes
Automated Tools and Software (MS Project, Primavera, etc)
Independent Monitoring of Projects by Experienced
Managers
Periodic/Secondary Reviews
Frequently Less Frequently Sometimes Seldom Never
Source: PMI-India chapter.
Reasons for Cost Overruns
Source: KPMG in India- PMI survey on cost and schedule overruns, 2012
©2016 MyEpcTeam ALL RIGHT RESERVED
20%
30%
50%
56%
60%
60%
70%
90%
90%
100%
71%
35%
53%
88%
53%
82%
71%
94%
71%
88%
Weak procurement planning
Poor selection of technology/equipments
Contractual disputes due to poor framing of contract document
Incremental financial costs (foreign exchange volatility, borrowing cost, etc.)
Weak contract administration and claim management
Location and connectivity of project site
Inadequate availability of skilled resources
Escalation in labour costs/ineffective utilization of labour
Design changes/iterations
Material price escalations beyond projections
Non-PSU PSU
Reasons for Schedule Overruns
Source: KPMG in India- PMI survey on cost and schedule overruns, 2012 ©2016 MyEpcTeam ALL RIGHT RESERVED
50%
10%
20%
20%
22%
30%
30%
44%
44%
50%
50%
60%
78%
37%
37%
58%
68%
37%
61%
37%
5%
63%
58%
58%
47%
79%
Delay in regulatory approvals (for commissioning)
Lack of awareness of modern technology
Geographical challenges and cultural diffrences
Geological surprises
Ineffective project monitoring
Coordination issue with project team/Vendors
Ineffective programme management
Unavailability of funds
Inadequate availability of skilled resources
Industrial relations and law problems
Contractual disputes
Pre-commissioning teething troubles
Design/scope changes
Non-PSU
PSU
Challenge 1:
Owner/Contractor/Consultant maintains
individual dataset and information to
manage project.
Cloud Based Platform creates centralized
database for all and sets data modification
rules as per users responsibility and
discipline.
Challenge 2:
Unrealistic planning due to Top-Down
approach ignoring inputs of Bottom-Line
participants.
Integrates Management level schedule and
set realistic milestones with inputs from Site
Executives and Planning team.
©2016 MyEpcTeam ALL RIGHT RESERVED
Challenges of Projects Management Solutions by MyEpcTeam.com
Challenge 3:
Information chasing before meetings and
claims and counter-claims on facts during
review meetings consumes substantial time
and efforts thus impacting project
performance.
All the information like project progress status
reports including approvals, documents,
transmittal records, real-time S-curves, site
photos are available on Mouse click.
Challenge 4:
Different software(s) required for Scheduling,
Procurement and Document Management.
Everything is available on one common
platform that reduces time and cost of the
project.
Challenge 5:
Key departments such as Engineering,
Procurement and Construction works in silos.
Engineering, Procurement and Construction
activities are totally integrated with successor
and predecessor linkages and visible to all
stake holders.
©2016 MyEpcTeam ALL RIGHT RESERVED
Challenges of Projects Management Solutions by MyEpcTeam.com
Challenge 6:
Lack of scope/specifications clarity leads to
frequent revisions/changes in engineering
drawings which impacts project cost/time
and leads to disputes.
Transmittal Record System in Engineering
Module keeps updates of latest revisions of
drawings with their pendency, delivery dates
and reason for changes including historical
data.
Challenge 7:
Costly software and thus limited number of
license(s).
Low subscription cost make it affordable to
almost all stake holders.
©2016 MyEpcTeam ALL RIGHT RESERVED
Challenges of Projects Management Solutions by MyEpcTeam.com
Salient Features of MyEpcTeam.com
• Construction Driven Scheduling – which sets drawing and material
requirements based on construction activities. Improves cash flow and also
provides reasonable time for construction.
• Online Engineering workflow – online submission & approval of
engineering drawings between project Owner, engineering consultant and
contractors along with status reports.
• Procurement Tracking System – tracks status of procurement activities
such as order placement, vendor drawing approval, inspection, MDCC and
receipt at site. This is well integrated with engineering and construction
module.
©2016 MyEpcTeam ALL RIGHT RESERVED
• Scope based Progress Measurement System – evaluates project
progress based on actual executed quantity instead of conventional
% progress update and/or duration based updates.
• Issue Management System – easy tracking and resolution of various
issues between stake holders along with reports.
• Punch List Management System – records list of quality defects and
incomplete work in a project with assigned responsibilities.
©2016 MyEpcTeam ALL RIGHT RESERVED
Salient Features of MyEpcTeam.com
How It looks Like - Portfolio
How It looks Like – Schedule (Work Breakdown Structure)
How It looks Like – Schedule (Activities)
How It looks Like – Engineering Module (Engineering Breakdown Structure)
How It looks Like – Engineering Module (Drawing List)
How It looks Like – Engineering Module (Transmittals)
How It looks Like – Procurement Module (Procurement Breakdown Structure)
How It looks Like – Procurement Module (Material List)
How It looks Like – Issue Management Module
How It looks Like – Punch Point Module
Subscription Pricing Details for MyEpcTeam.com
No. of Users
Rate Per User Per
Quarter
Rate Per User Per Year
1 - 5 USD 60 USD 180
6 - 20 USD 55 USD 140
21 - 100 USD 50 USD 110
100+ USD 40 USD 90
No. of Users
Rate Per User Per
Quarter
Rate Per User Per Year
1 - 5 INR 4000 INR 12000
6 - 20 INR 3500 INR 9000
21 - 100 INR 3000 INR 7000
100+ INR 2500 INR 6000
* for Indian customers Tax at the rate of 20% (15 % service tax + 5% VAT) is applicable.
** for International customers Tax is not applicable.
USD INR
Get your Free Subscription today

More Related Content

What's hot

Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope ManagementSerdar Temiz
 
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...Nesma
 
June 2009 Veterans Affairs Program Management Accountability System
June 2009 Veterans Affairs Program Management Accountability SystemJune 2009 Veterans Affairs Program Management Accountability System
June 2009 Veterans Affairs Program Management Accountability SystemChristopher Dorobek
 
Software sizing the cornerstone for iceaa's scebok - Carol Dekkers
Software sizing the cornerstone for iceaa's scebok - Carol DekkersSoftware sizing the cornerstone for iceaa's scebok - Carol Dekkers
Software sizing the cornerstone for iceaa's scebok - Carol DekkersNesma
 
Thoughts on Building Metrics for Good Developers
Thoughts on Building Metrics for Good DevelopersThoughts on Building Metrics for Good Developers
Thoughts on Building Metrics for Good DevelopersHoussam FAKIH
 
Webinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgenWebinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgenStork
 
Introduction KPIs and OEE
Introduction KPIs and OEEIntroduction KPIs and OEE
Introduction KPIs and OEEJvdZ
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health CheckStork
 
Bridging the gap rob de munnik - dutch tax office
Bridging the gap   rob de munnik - dutch tax officeBridging the gap   rob de munnik - dutch tax office
Bridging the gap rob de munnik - dutch tax officeNesma
 
Lean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation SlideLean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation SlideSlideTeam
 
3 Steps to Optimize Project Reporting using SharePoint
3 Steps to Optimize Project Reporting using SharePoint3 Steps to Optimize Project Reporting using SharePoint
3 Steps to Optimize Project Reporting using SharePointBrightWork
 
Software Rollout
Software RolloutSoftware Rollout
Software Rolloutcolmbennett
 
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...Nesma
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment ManagementMaveric Systems
 
Velocity enhanced support- SAP
Velocity enhanced support- SAPVelocity enhanced support- SAP
Velocity enhanced support- SAPDeepa Nair
 
The challenge of IT Outsourcing
The challenge of IT OutsourcingThe challenge of IT Outsourcing
The challenge of IT OutsourcingNesma
 
Design process optimisation conceptual design stage - may 2015
Design process optimisation   conceptual design stage - may 2015Design process optimisation   conceptual design stage - may 2015
Design process optimisation conceptual design stage - may 2015Ralf Fickert
 

What's hot (19)

T24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning PresentationT24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning Presentation
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...
Nesma autumn conference 2015 - A QFD based tool for managing agile requiremen...
 
June 2009 Veterans Affairs Program Management Accountability System
June 2009 Veterans Affairs Program Management Accountability SystemJune 2009 Veterans Affairs Program Management Accountability System
June 2009 Veterans Affairs Program Management Accountability System
 
Software sizing the cornerstone for iceaa's scebok - Carol Dekkers
Software sizing the cornerstone for iceaa's scebok - Carol DekkersSoftware sizing the cornerstone for iceaa's scebok - Carol Dekkers
Software sizing the cornerstone for iceaa's scebok - Carol Dekkers
 
Thoughts on Building Metrics for Good Developers
Thoughts on Building Metrics for Good DevelopersThoughts on Building Metrics for Good Developers
Thoughts on Building Metrics for Good Developers
 
Webinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgenWebinar | OEE-implementaties zonder zorgen
Webinar | OEE-implementaties zonder zorgen
 
Patching at Scale
Patching at ScalePatching at Scale
Patching at Scale
 
Introduction KPIs and OEE
Introduction KPIs and OEEIntroduction KPIs and OEE
Introduction KPIs and OEE
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health Check
 
Bridging the gap rob de munnik - dutch tax office
Bridging the gap   rob de munnik - dutch tax officeBridging the gap   rob de munnik - dutch tax office
Bridging the gap rob de munnik - dutch tax office
 
Lean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation SlideLean Project Management Powerpoint Presentation Slide
Lean Project Management Powerpoint Presentation Slide
 
3 Steps to Optimize Project Reporting using SharePoint
3 Steps to Optimize Project Reporting using SharePoint3 Steps to Optimize Project Reporting using SharePoint
3 Steps to Optimize Project Reporting using SharePoint
 
Software Rollout
Software RolloutSoftware Rollout
Software Rollout
 
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment Management
 
Velocity enhanced support- SAP
Velocity enhanced support- SAPVelocity enhanced support- SAP
Velocity enhanced support- SAP
 
The challenge of IT Outsourcing
The challenge of IT OutsourcingThe challenge of IT Outsourcing
The challenge of IT Outsourcing
 
Design process optimisation conceptual design stage - may 2015
Design process optimisation   conceptual design stage - may 2015Design process optimisation   conceptual design stage - may 2015
Design process optimisation conceptual design stage - may 2015
 

Viewers also liked

Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...
Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...
Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...Kouluterveyskysely
 
10 planete infricosatoare
10 planete infricosatoare10 planete infricosatoare
10 planete infricosatoarebalada65
 
Fair use presentation la francis
Fair use presentation la francisFair use presentation la francis
Fair use presentation la francisMedia Goddess
 
Power Notes Measurements and Dealing with Data
Power Notes   Measurements and Dealing with DataPower Notes   Measurements and Dealing with Data
Power Notes Measurements and Dealing with Datajmori1
 
EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS- MODELAGEM P...
 EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS-  MODELAGEM  P... EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS-  MODELAGEM  P...
EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS- MODELAGEM P...PLANORS
 
Pangaruh Pola Makan Terhadap Postur Tubuh Manusia
Pangaruh Pola Makan Terhadap Postur Tubuh ManusiaPangaruh Pola Makan Terhadap Postur Tubuh Manusia
Pangaruh Pola Makan Terhadap Postur Tubuh ManusiaSariana Csg
 
Mff715 w1 1_introto_research_fall11
Mff715 w1 1_introto_research_fall11Mff715 w1 1_introto_research_fall11
Mff715 w1 1_introto_research_fall11Rachel Chung
 
Edtc 6340-66 copyright crash course alberto tudon 2nd ed
Edtc 6340-66 copyright crash course  alberto tudon 2nd edEdtc 6340-66 copyright crash course  alberto tudon 2nd ed
Edtc 6340-66 copyright crash course alberto tudon 2nd edalbertotudon
 
Stopmotion film ptfive - Orange's Party
Stopmotion film ptfive - Orange's PartyStopmotion film ptfive - Orange's Party
Stopmotion film ptfive - Orange's PartySammi Wilde
 
Government Honors Chapter 2
Government Honors Chapter 2Government Honors Chapter 2
Government Honors Chapter 2cyndalea
 
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?Pelkonen: Lainsäädäntö uudistui - mikä muuttui?
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?Kouluterveyskysely
 

Viewers also liked (20)

Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...
Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...
Havanko ja Riihimäki: Hyvinvoivassa opiskelijassa on virtaa - Hyvän olon työk...
 
10 planete infricosatoare
10 planete infricosatoare10 planete infricosatoare
10 planete infricosatoare
 
Fair use presentation la francis
Fair use presentation la francisFair use presentation la francis
Fair use presentation la francis
 
Power Notes Measurements and Dealing with Data
Power Notes   Measurements and Dealing with DataPower Notes   Measurements and Dealing with Data
Power Notes Measurements and Dealing with Data
 
Arcadian
ArcadianArcadian
Arcadian
 
Connecor company presentation
Connecor company presentationConnecor company presentation
Connecor company presentation
 
Irma present 2
Irma present 2Irma present 2
Irma present 2
 
EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS- MODELAGEM P...
 EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS-  MODELAGEM  P... EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS-  MODELAGEM  P...
EGR/PPPs GOVERNO RS; DIRETRIZES DO LITORAL NORTE/RS- RODOVIAS- MODELAGEM P...
 
The Works 1
The Works 1The Works 1
The Works 1
 
Pangaruh Pola Makan Terhadap Postur Tubuh Manusia
Pangaruh Pola Makan Terhadap Postur Tubuh ManusiaPangaruh Pola Makan Terhadap Postur Tubuh Manusia
Pangaruh Pola Makan Terhadap Postur Tubuh Manusia
 
Mff715 w1 1_introto_research_fall11
Mff715 w1 1_introto_research_fall11Mff715 w1 1_introto_research_fall11
Mff715 w1 1_introto_research_fall11
 
C 1
C 1C 1
C 1
 
Ppt ekonomi
Ppt ekonomiPpt ekonomi
Ppt ekonomi
 
Edtc 6340-66 copyright crash course alberto tudon 2nd ed
Edtc 6340-66 copyright crash course  alberto tudon 2nd edEdtc 6340-66 copyright crash course  alberto tudon 2nd ed
Edtc 6340-66 copyright crash course alberto tudon 2nd ed
 
CLASH script
CLASH scriptCLASH script
CLASH script
 
Stopmotion film ptfive - Orange's Party
Stopmotion film ptfive - Orange's PartyStopmotion film ptfive - Orange's Party
Stopmotion film ptfive - Orange's Party
 
Government Honors Chapter 2
Government Honors Chapter 2Government Honors Chapter 2
Government Honors Chapter 2
 
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?Pelkonen: Lainsäädäntö uudistui - mikä muuttui?
Pelkonen: Lainsäädäntö uudistui - mikä muuttui?
 
World 1, Module 2
World 1, Module 2World 1, Module 2
World 1, Module 2
 
Formato planeacion
Formato planeacionFormato planeacion
Formato planeacion
 

Similar to MyEpcTeam v1.1

The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream ArchitectureTasktop
 
ShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6keith inman
 
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of TestingCuriosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of TestingCuriosity Software Ireland
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajalAJAL A J
 
MDA Vs Web Ratio for Non It
MDA Vs Web Ratio for Non ItMDA Vs Web Ratio for Non It
MDA Vs Web Ratio for Non Itanicolay
 
Migration Decoded
Migration DecodedMigration Decoded
Migration DecodedCognizant
 
Software requirements engineering
Software requirements engineeringSoftware requirements engineering
Software requirements engineeringAbdul Basit
 
IBM Collaborative Lifecycle Management Solution for DevOps v6
IBM Collaborative Lifecycle Management Solution for DevOps v6IBM Collaborative Lifecycle Management Solution for DevOps v6
IBM Collaborative Lifecycle Management Solution for DevOps v6Strongback Consulting
 
Transforming Construction with Knowledge Management
Transforming Construction with Knowledge ManagementTransforming Construction with Knowledge Management
Transforming Construction with Knowledge ManagementShelley Armato
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPMshravansam
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6keith inman
 
Xsemble - Make software like they make cars!
Xsemble - Make software like they make cars!Xsemble - Make software like they make cars!
Xsemble - Make software like they make cars!Ashish Belagali
 
Ki it pm_big6 frm 20+yrs
Ki it pm_big6 frm 20+yrsKi it pm_big6 frm 20+yrs
Ki it pm_big6 frm 20+yrskeith inman
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleSoftware Guru
 
Software requirements engineering lecture 01
Software requirements engineering   lecture 01Software requirements engineering   lecture 01
Software requirements engineering lecture 01Abdul Basit
 
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksUsing Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksIBM UrbanCode Products
 

Similar to MyEpcTeam v1.1 (20)

The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream Architecture
 
FAQs on Billings and Project Milestones
FAQs on Billings and Project MilestonesFAQs on Billings and Project Milestones
FAQs on Billings and Project Milestones
 
ShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction Software
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of TestingCuriosity Software, Infuse and Kumoco present: The Democratisation of Testing
Curiosity Software, Infuse and Kumoco present: The Democratisation of Testing
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
MDA Vs Web Ratio for Non It
MDA Vs Web Ratio for Non ItMDA Vs Web Ratio for Non It
MDA Vs Web Ratio for Non It
 
Migration Decoded
Migration DecodedMigration Decoded
Migration Decoded
 
Software requirements engineering
Software requirements engineeringSoftware requirements engineering
Software requirements engineering
 
IBM Collaborative Lifecycle Management Solution for DevOps v6
IBM Collaborative Lifecycle Management Solution for DevOps v6IBM Collaborative Lifecycle Management Solution for DevOps v6
IBM Collaborative Lifecycle Management Solution for DevOps v6
 
Transforming Construction with Knowledge Management
Transforming Construction with Knowledge ManagementTransforming Construction with Knowledge Management
Transforming Construction with Knowledge Management
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPM
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Xsemble - Make software like they make cars!
Xsemble - Make software like they make cars!Xsemble - Make software like they make cars!
Xsemble - Make software like they make cars!
 
Ki it pm_big6 frm 20+yrs
Ki it pm_big6 frm 20+yrsKi it pm_big6 frm 20+yrs
Ki it pm_big6 frm 20+yrs
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application Lifecycle
 
Software requirements engineering lecture 01
Software requirements engineering   lecture 01Software requirements engineering   lecture 01
Software requirements engineering lecture 01
 
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksUsing Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
 

MyEpcTeam v1.1

  • 1. “cloud based project management solution for construction industry – a Make-in-India product” www.myepcteam.com Sunil Vaishnav :+91-9811115163 Nitin Gupta :+91-9987671199 MyEpcTeam.com
  • 2. Commonly adopted strategies to control project schedule ©2016 MyEpcTeam ALL RIGHT RESERVED 21% 57% 75% 79% 93% 18% 25% 11% 11% 7% 25% 15% 7% 10% 25% 3% 11% 7% Risk and Reward for Project Team Standardization of Processes Automated Tools and Software (MS Project, Primavera, etc) Independent Monitoring of Projects by Experienced Managers Periodic/Secondary Reviews Frequently Less Frequently Sometimes Seldom Never Source: PMI-India chapter.
  • 3. Reasons for Cost Overruns Source: KPMG in India- PMI survey on cost and schedule overruns, 2012 ©2016 MyEpcTeam ALL RIGHT RESERVED 20% 30% 50% 56% 60% 60% 70% 90% 90% 100% 71% 35% 53% 88% 53% 82% 71% 94% 71% 88% Weak procurement planning Poor selection of technology/equipments Contractual disputes due to poor framing of contract document Incremental financial costs (foreign exchange volatility, borrowing cost, etc.) Weak contract administration and claim management Location and connectivity of project site Inadequate availability of skilled resources Escalation in labour costs/ineffective utilization of labour Design changes/iterations Material price escalations beyond projections Non-PSU PSU
  • 4. Reasons for Schedule Overruns Source: KPMG in India- PMI survey on cost and schedule overruns, 2012 ©2016 MyEpcTeam ALL RIGHT RESERVED 50% 10% 20% 20% 22% 30% 30% 44% 44% 50% 50% 60% 78% 37% 37% 58% 68% 37% 61% 37% 5% 63% 58% 58% 47% 79% Delay in regulatory approvals (for commissioning) Lack of awareness of modern technology Geographical challenges and cultural diffrences Geological surprises Ineffective project monitoring Coordination issue with project team/Vendors Ineffective programme management Unavailability of funds Inadequate availability of skilled resources Industrial relations and law problems Contractual disputes Pre-commissioning teething troubles Design/scope changes Non-PSU PSU
  • 5. Challenge 1: Owner/Contractor/Consultant maintains individual dataset and information to manage project. Cloud Based Platform creates centralized database for all and sets data modification rules as per users responsibility and discipline. Challenge 2: Unrealistic planning due to Top-Down approach ignoring inputs of Bottom-Line participants. Integrates Management level schedule and set realistic milestones with inputs from Site Executives and Planning team. ©2016 MyEpcTeam ALL RIGHT RESERVED Challenges of Projects Management Solutions by MyEpcTeam.com
  • 6. Challenge 3: Information chasing before meetings and claims and counter-claims on facts during review meetings consumes substantial time and efforts thus impacting project performance. All the information like project progress status reports including approvals, documents, transmittal records, real-time S-curves, site photos are available on Mouse click. Challenge 4: Different software(s) required for Scheduling, Procurement and Document Management. Everything is available on one common platform that reduces time and cost of the project. Challenge 5: Key departments such as Engineering, Procurement and Construction works in silos. Engineering, Procurement and Construction activities are totally integrated with successor and predecessor linkages and visible to all stake holders. ©2016 MyEpcTeam ALL RIGHT RESERVED Challenges of Projects Management Solutions by MyEpcTeam.com
  • 7. Challenge 6: Lack of scope/specifications clarity leads to frequent revisions/changes in engineering drawings which impacts project cost/time and leads to disputes. Transmittal Record System in Engineering Module keeps updates of latest revisions of drawings with their pendency, delivery dates and reason for changes including historical data. Challenge 7: Costly software and thus limited number of license(s). Low subscription cost make it affordable to almost all stake holders. ©2016 MyEpcTeam ALL RIGHT RESERVED Challenges of Projects Management Solutions by MyEpcTeam.com
  • 8. Salient Features of MyEpcTeam.com • Construction Driven Scheduling – which sets drawing and material requirements based on construction activities. Improves cash flow and also provides reasonable time for construction. • Online Engineering workflow – online submission & approval of engineering drawings between project Owner, engineering consultant and contractors along with status reports. • Procurement Tracking System – tracks status of procurement activities such as order placement, vendor drawing approval, inspection, MDCC and receipt at site. This is well integrated with engineering and construction module. ©2016 MyEpcTeam ALL RIGHT RESERVED
  • 9. • Scope based Progress Measurement System – evaluates project progress based on actual executed quantity instead of conventional % progress update and/or duration based updates. • Issue Management System – easy tracking and resolution of various issues between stake holders along with reports. • Punch List Management System – records list of quality defects and incomplete work in a project with assigned responsibilities. ©2016 MyEpcTeam ALL RIGHT RESERVED Salient Features of MyEpcTeam.com
  • 10. How It looks Like - Portfolio
  • 11. How It looks Like – Schedule (Work Breakdown Structure)
  • 12. How It looks Like – Schedule (Activities)
  • 13. How It looks Like – Engineering Module (Engineering Breakdown Structure)
  • 14. How It looks Like – Engineering Module (Drawing List)
  • 15. How It looks Like – Engineering Module (Transmittals)
  • 16. How It looks Like – Procurement Module (Procurement Breakdown Structure)
  • 17. How It looks Like – Procurement Module (Material List)
  • 18. How It looks Like – Issue Management Module
  • 19. How It looks Like – Punch Point Module
  • 20. Subscription Pricing Details for MyEpcTeam.com No. of Users Rate Per User Per Quarter Rate Per User Per Year 1 - 5 USD 60 USD 180 6 - 20 USD 55 USD 140 21 - 100 USD 50 USD 110 100+ USD 40 USD 90 No. of Users Rate Per User Per Quarter Rate Per User Per Year 1 - 5 INR 4000 INR 12000 6 - 20 INR 3500 INR 9000 21 - 100 INR 3000 INR 7000 100+ INR 2500 INR 6000 * for Indian customers Tax at the rate of 20% (15 % service tax + 5% VAT) is applicable. ** for International customers Tax is not applicable. USD INR
  • 21. Get your Free Subscription today

Editor's Notes

  1. No need for desktop software installation
  2. No need for desktop software installation
  3. Three Idea’s behind Point: Communications lines are under recorded and are traced with between Client and Consultant/Contractor.