SlideShare a Scribd company logo
CURRICULUM VITAE
ELECTRICAL SUPERVISOR
NAZIM EQUBAL
Mob, +918083309424/+919973249460
E-mail:nazimeqbal@gmail.com.com/nazimeqbal@yahoo.com
OBJECTIVE:
Around13 yearsof experience inOil &GasIndustries, Petro-chemical Industries Seeking a position as an
Electrical Supervisorina stable organizationengagedinconstructionwhere I can perform my skills what I
have achieved from my past and be the part of that organization.
ACHIEVEMENT:
,
BOSIET (Basic offshore induction and emergency training)
 PTW FSI & TSTI Trainingl Agip Kco Kazakhstan
 Practical leadership, Training Agip Kco Kazakhstan
 Lock-out and Tag-out Training Agip Kco Kazakhstan
SUMMARY OF QUALIFICATION:
 Electrical Engineering, Diploma
 Total work experience More than 13 years/ Function & Responsibilities
 Experience in EPC & Construction Green field and Brownfield pipeline projects in Oil & Gas
 Coordinates with contractors/Sub contractors and vendors, expedite document review cycle
 components, and systems for commercial and industrial purposes
 Manage & Monitor and inspect the electrical erection/installation activities of the contractor.
 Handle all aspects of Electrical Construction activities including site investigations,
 Good knowledge in reading and understanding Equipment Layout drawings.
 Computer literate MS Office (Excel, Word and Access).
 Co-ordinate and supervise construction work teams and plan future work programs
 Knowledge of how to assess and minimize risks associated with working on Hazardous area
 Review and Approval of Materials and Method Statements
WORK EXPERIENCES:
Company CEGELEC QATAR
Project RLESC
Position Electrical Construction Supervisor
Period From27/09/2014 to 26/01/2015
Job Responsibilities:
Installation of two new power Gas turbines generators, construction of new sub-station and other
associated facilities including electro-mech. work modification to the existing facilities and tie ins.
providingcontrol of the electrical constructionworks asdirected.Providingdirectionandleadershiptothe
Contractor works scope in all electrical related works. Co-ordinate and interface with other Technical
Departments, Business Units, Operations, and contractors/consultants to resolve technical issues and
ensure quality Electrical/Instrument Engineering execution and integrity.
Trainings and Seminars:
Company N.P.C.C ABU DHABI
Project Fujairah Refinery plant
Position Electrical Supervisor
Client ZADCO
Period From23/03/2014 to 01/08/2014
Job Responsibilities:
Responsible for Construction 35 KV Substation LER comprising of two 35/10KV, 6MVA, four 6.6/415KV,
2MVA and Transformers6.6KV and 10kv switchgear& softstarterpanelsLV panelsIRP UPS control Panels
and Desksinstallationof aviationLight&installation of Battery with Electrolyte Field Work in CPF & Inlet
Facilitiesinstallationof lightingDB,JB& MOV panelsHeattracingAndcathodicprotectionandInstallation
of HV, MV &LV Switchboard & motors fin fan Cable Termination & Hi-pot test cable laying And Monitor
Workforce ProgressProvide Technical input to Facilitate and assist Subcontractor to safely Work Prepare
the three Week forecast for submission to The Planning department for review & to Draw up the final
ExecutionPlanforthe Electrical DepartInitial projectmeetingwiththe Management&Superintendent to
Ensure the Entire Requirement Preparation of materials as per site Requirement Serve as day-to-day
interface withContractorCraftlaborprovidingafocuson safety and Quality• Ensure that procedures and
processesare Understoodandfollowed by the Construction Personnel• Monitor and ensure compliance
with Specification procedures and plans provide on-site Knowledge of project specific electrical
installation Requirement.
Nature of Work:
Job Responsibility.
This project was involved on pipeline around 150 km Brownfield construction of 135 Megawatt CCGT
Cogeneration power projects with Laying of 115 KV high voltage cable from GIS substation to power
Transformer installation & erection of GIS switchgear power and control panels UPS System fire & gas
sys16.5/115kv 250 Mva powertransformer5000 ampere isolatedbus duct from CGTG to transformer low
Voltage & medium Voltage cable laying cable tray for power lighting welding Outlet field Lighting
GlandingTermination in switchgear motor & solo run test low & medium voltage Initial project meeting
with the management & superintendent to ensure the entire requirement Utilize and control the
manpowerinaccordance to giventhe workscheduledtosubcontractor.Periodic monitoring time to time
to subcontractors Preparation of materials as per site requirement Project specification given by Saudi
Aramco Provide work scheduled as per priority of requirement of Project according to management
Alwaysconsciousaboutthe qualitycontrol of workforce asper WorkScheduledandpriority.Monitoring
and preservation all of the olefins project for requirement Such of Power transformer LV & MV motor,
distributiontransformer13.8kV & lowvoltage switchgearEffective Manage interfaces between new and
existing facilities ensure adherence to company golden HSE Policies and Aramco specification, without
Effective the subcontractor’s schedule
Job responsibilities:
ThisProjectisinvolvedonfull constructionof 34.5/4.16 kV SubstationandFAR buildingwiththe 4no’s,
10 mva & 14nos 2.5mva transformerinstallationof switchgearmediumandLow voltage marshaling
Company AGIP KCO (ENI) Kazakhstan
Project Kshaghan project
Position Construction Electrical Supervisor
Client AGIP KCO
PeriodAug. From11/06/2011 to 22/06/2013
Company CEGELEC CBI (QATAR)
Project QAFCO
Position Construction Electrical Supervisor
Period From April 2010.to April 2011
CabinetAlsoinstallationof cable trayInstallationof complete subStationbuildingworkincludingMCC
Relaypanel &patch panel fire alarmSystemAnnunciatorpanelsetc.
Job responsibilities:
Responsible for Construction installation, of Sub-station comprising of two 33/6.6KV, 6MVA, four
6.6/.415KV,2MVA And Two 6.6/415 Transformers,6.6KV panels, LV panels, lighting Panels, IRP, RTU UPS,
BC panels and Field work in CPF and Inlet Facilities, power & control cable Laying and glanding
Termination & installation of lighting DB cable tray, GI, RGS & EMT Conduit & Street light structural
Lighting etc.
Job Responsibility:
Supervision of electrical Construction installation work. This project involved installation of HV MV LV
switchgear MCC panel & IRP UPS, lighting & Distribution Board, 750 KVA transformer 5 HP to 50HP LT
motors,HT/ LT cable layingterminationAndinstallation of lighting fixture Ladder cable tray conduit etc.
Job Responsibility:
Work outline:Electrical activities inthe sub-station and compressor Installation of panels, cable ladders,
cable trays,conduits,cable laying,Glandingterminationof Power&control Cables, installation of lighting
systems and grounding systems, loop checking
Personal Details:
• Name : Nazim Eqbal
• Fathers ‘Name : Asim Eqbal
• Birth Date : June 30, 1982
• Height/Weight : 5’7”/70 kg
• Old Passport No : F-4139881
• New passport no : L-3005636(ECNR)
• Date of Expiry : Aug, 26, 2023
• Dist. west Champaran
• State: Bihar-845438
• India
• Contact: +918083309424/+919973
• 249460
Company C.C.C Abu Dhabi (Supply By Kentech)
Project GASCO
Position Construction Electrical Supervisor
Period from Oct 2006 to Nov 2009
Company TECNIMONT ICB INDIA
Project water& distillation plant
Position Electrical Foreman
Period from OCT. 2004 to NOV.2006.
Company ARTSON ENGG. INDIA
Project HPCL POWER PLANT
Position Electrical Foreman
Period from DEC 2001 to JULY 2004.
MY CV

More Related Content

What's hot

Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7
 
Cover letter
Cover letterCover letter
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
mohamed hamdy
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016Terry Evans
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 

What's hot (20)

Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Cover letter
Cover letterCover letter
Cover letter
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
CV JC
CV JCCV JC
CV JC
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Yousuf Resume
Yousuf ResumeYousuf Resume
Yousuf Resume
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 

Viewers also liked

YAMILET PEREZ RESUME (2)
YAMILET PEREZ RESUME (2)YAMILET PEREZ RESUME (2)
YAMILET PEREZ RESUME (2)yamilet perez
 
Senario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
Senario Masyarakat Islam di Akhir Era Khulafa’ al-RashidinSenario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
Senario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
Ezad Azraai Jamsari
 
Allianz life technologies i have serviced
Allianz life technologies i have servicedAllianz life technologies i have serviced
Allianz life technologies i have serviceddlbrazelton
 
15 ooad uml-20
15 ooad uml-2015 ooad uml-20
15 ooad uml-20Niit Care
 
Absolvente Natālija Stepčenko
Absolvente Natālija StepčenkoAbsolvente Natālija Stepčenko
Absolvente Natālija Stepčenko
Malnavas koledža
 
13 ooad uml-17
13 ooad uml-1713 ooad uml-17
13 ooad uml-17Niit Care
 
Kerajaan Qaramitah
Kerajaan QaramitahKerajaan Qaramitah
Kerajaan Qaramitah
Ezad Azraai Jamsari
 
Woodcraft presentation V2
Woodcraft presentation V2Woodcraft presentation V2
Woodcraft presentation V2Robert Farnon
 
Database schema
Database schemaDatabase schema
Database schema
Mahmoud Almadhoun
 
ERDigram
ERDigramERDigram
ملحق قواعد البايانات - تكنولوجيا الصف العاشر
ملحق قواعد البايانات - تكنولوجيا الصف العاشرملحق قواعد البايانات - تكنولوجيا الصف العاشر
ملحق قواعد البايانات - تكنولوجيا الصف العاشر
Haneen Droubi
 
مادة استدراكية للصف العاشر
مادة استدراكية للصف العاشرمادة استدراكية للصف العاشر
مادة استدراكية للصف العاشر
Shireen Syoure
 

Viewers also liked (13)

cv_Abadi (Update)
cv_Abadi (Update)cv_Abadi (Update)
cv_Abadi (Update)
 
YAMILET PEREZ RESUME (2)
YAMILET PEREZ RESUME (2)YAMILET PEREZ RESUME (2)
YAMILET PEREZ RESUME (2)
 
Senario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
Senario Masyarakat Islam di Akhir Era Khulafa’ al-RashidinSenario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
Senario Masyarakat Islam di Akhir Era Khulafa’ al-Rashidin
 
Allianz life technologies i have serviced
Allianz life technologies i have servicedAllianz life technologies i have serviced
Allianz life technologies i have serviced
 
15 ooad uml-20
15 ooad uml-2015 ooad uml-20
15 ooad uml-20
 
Absolvente Natālija Stepčenko
Absolvente Natālija StepčenkoAbsolvente Natālija Stepčenko
Absolvente Natālija Stepčenko
 
13 ooad uml-17
13 ooad uml-1713 ooad uml-17
13 ooad uml-17
 
Kerajaan Qaramitah
Kerajaan QaramitahKerajaan Qaramitah
Kerajaan Qaramitah
 
Woodcraft presentation V2
Woodcraft presentation V2Woodcraft presentation V2
Woodcraft presentation V2
 
Database schema
Database schemaDatabase schema
Database schema
 
ERDigram
ERDigramERDigram
ERDigram
 
ملحق قواعد البايانات - تكنولوجيا الصف العاشر
ملحق قواعد البايانات - تكنولوجيا الصف العاشرملحق قواعد البايانات - تكنولوجيا الصف العاشر
ملحق قواعد البايانات - تكنولوجيا الصف العاشر
 
مادة استدراكية للصف العاشر
مادة استدراكية للصف العاشرمادة استدراكية للصف العاشر
مادة استدراكية للصف العاشر
 

Similar to MY CV

ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015ashok kumar
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
rana maqsood
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Sanil Balakrishnan
 

Similar to MY CV (20)

UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 

MY CV

  • 1. CURRICULUM VITAE ELECTRICAL SUPERVISOR NAZIM EQUBAL Mob, +918083309424/+919973249460 E-mail:nazimeqbal@gmail.com.com/nazimeqbal@yahoo.com OBJECTIVE: Around13 yearsof experience inOil &GasIndustries, Petro-chemical Industries Seeking a position as an Electrical Supervisorina stable organizationengagedinconstructionwhere I can perform my skills what I have achieved from my past and be the part of that organization. ACHIEVEMENT: , BOSIET (Basic offshore induction and emergency training)  PTW FSI & TSTI Trainingl Agip Kco Kazakhstan  Practical leadership, Training Agip Kco Kazakhstan  Lock-out and Tag-out Training Agip Kco Kazakhstan SUMMARY OF QUALIFICATION:  Electrical Engineering, Diploma  Total work experience More than 13 years/ Function & Responsibilities  Experience in EPC & Construction Green field and Brownfield pipeline projects in Oil & Gas  Coordinates with contractors/Sub contractors and vendors, expedite document review cycle  components, and systems for commercial and industrial purposes  Manage & Monitor and inspect the electrical erection/installation activities of the contractor.  Handle all aspects of Electrical Construction activities including site investigations,  Good knowledge in reading and understanding Equipment Layout drawings.  Computer literate MS Office (Excel, Word and Access).  Co-ordinate and supervise construction work teams and plan future work programs  Knowledge of how to assess and minimize risks associated with working on Hazardous area  Review and Approval of Materials and Method Statements WORK EXPERIENCES: Company CEGELEC QATAR Project RLESC Position Electrical Construction Supervisor Period From27/09/2014 to 26/01/2015 Job Responsibilities: Installation of two new power Gas turbines generators, construction of new sub-station and other associated facilities including electro-mech. work modification to the existing facilities and tie ins. providingcontrol of the electrical constructionworks asdirected.Providingdirectionandleadershiptothe Contractor works scope in all electrical related works. Co-ordinate and interface with other Technical Departments, Business Units, Operations, and contractors/consultants to resolve technical issues and ensure quality Electrical/Instrument Engineering execution and integrity. Trainings and Seminars: Company N.P.C.C ABU DHABI Project Fujairah Refinery plant Position Electrical Supervisor Client ZADCO Period From23/03/2014 to 01/08/2014
  • 2. Job Responsibilities: Responsible for Construction 35 KV Substation LER comprising of two 35/10KV, 6MVA, four 6.6/415KV, 2MVA and Transformers6.6KV and 10kv switchgear& softstarterpanelsLV panelsIRP UPS control Panels and Desksinstallationof aviationLight&installation of Battery with Electrolyte Field Work in CPF & Inlet Facilitiesinstallationof lightingDB,JB& MOV panelsHeattracingAndcathodicprotectionandInstallation of HV, MV &LV Switchboard & motors fin fan Cable Termination & Hi-pot test cable laying And Monitor Workforce ProgressProvide Technical input to Facilitate and assist Subcontractor to safely Work Prepare the three Week forecast for submission to The Planning department for review & to Draw up the final ExecutionPlanforthe Electrical DepartInitial projectmeetingwiththe Management&Superintendent to Ensure the Entire Requirement Preparation of materials as per site Requirement Serve as day-to-day interface withContractorCraftlaborprovidingafocuson safety and Quality• Ensure that procedures and processesare Understoodandfollowed by the Construction Personnel• Monitor and ensure compliance with Specification procedures and plans provide on-site Knowledge of project specific electrical installation Requirement. Nature of Work: Job Responsibility. This project was involved on pipeline around 150 km Brownfield construction of 135 Megawatt CCGT Cogeneration power projects with Laying of 115 KV high voltage cable from GIS substation to power Transformer installation & erection of GIS switchgear power and control panels UPS System fire & gas sys16.5/115kv 250 Mva powertransformer5000 ampere isolatedbus duct from CGTG to transformer low Voltage & medium Voltage cable laying cable tray for power lighting welding Outlet field Lighting GlandingTermination in switchgear motor & solo run test low & medium voltage Initial project meeting with the management & superintendent to ensure the entire requirement Utilize and control the manpowerinaccordance to giventhe workscheduledtosubcontractor.Periodic monitoring time to time to subcontractors Preparation of materials as per site requirement Project specification given by Saudi Aramco Provide work scheduled as per priority of requirement of Project according to management Alwaysconsciousaboutthe qualitycontrol of workforce asper WorkScheduledandpriority.Monitoring and preservation all of the olefins project for requirement Such of Power transformer LV & MV motor, distributiontransformer13.8kV & lowvoltage switchgearEffective Manage interfaces between new and existing facilities ensure adherence to company golden HSE Policies and Aramco specification, without Effective the subcontractor’s schedule Job responsibilities: ThisProjectisinvolvedonfull constructionof 34.5/4.16 kV SubstationandFAR buildingwiththe 4no’s, 10 mva & 14nos 2.5mva transformerinstallationof switchgearmediumandLow voltage marshaling Company AGIP KCO (ENI) Kazakhstan Project Kshaghan project Position Construction Electrical Supervisor Client AGIP KCO PeriodAug. From11/06/2011 to 22/06/2013 Company CEGELEC CBI (QATAR) Project QAFCO Position Construction Electrical Supervisor Period From April 2010.to April 2011
  • 3. CabinetAlsoinstallationof cable trayInstallationof complete subStationbuildingworkincludingMCC Relaypanel &patch panel fire alarmSystemAnnunciatorpanelsetc. Job responsibilities: Responsible for Construction installation, of Sub-station comprising of two 33/6.6KV, 6MVA, four 6.6/.415KV,2MVA And Two 6.6/415 Transformers,6.6KV panels, LV panels, lighting Panels, IRP, RTU UPS, BC panels and Field work in CPF and Inlet Facilities, power & control cable Laying and glanding Termination & installation of lighting DB cable tray, GI, RGS & EMT Conduit & Street light structural Lighting etc. Job Responsibility: Supervision of electrical Construction installation work. This project involved installation of HV MV LV switchgear MCC panel & IRP UPS, lighting & Distribution Board, 750 KVA transformer 5 HP to 50HP LT motors,HT/ LT cable layingterminationAndinstallation of lighting fixture Ladder cable tray conduit etc. Job Responsibility: Work outline:Electrical activities inthe sub-station and compressor Installation of panels, cable ladders, cable trays,conduits,cable laying,Glandingterminationof Power&control Cables, installation of lighting systems and grounding systems, loop checking Personal Details: • Name : Nazim Eqbal • Fathers ‘Name : Asim Eqbal • Birth Date : June 30, 1982 • Height/Weight : 5’7”/70 kg • Old Passport No : F-4139881 • New passport no : L-3005636(ECNR) • Date of Expiry : Aug, 26, 2023 • Dist. west Champaran • State: Bihar-845438 • India • Contact: +918083309424/+919973 • 249460 Company C.C.C Abu Dhabi (Supply By Kentech) Project GASCO Position Construction Electrical Supervisor Period from Oct 2006 to Nov 2009 Company TECNIMONT ICB INDIA Project water& distillation plant Position Electrical Foreman Period from OCT. 2004 to NOV.2006. Company ARTSON ENGG. INDIA Project HPCL POWER PLANT Position Electrical Foreman Period from DEC 2001 to JULY 2004.