In times of scarcity…
… pool resources !
Money
Knowhow
…etc.
Local
Contacts
Common
Goals
 Just as financial
instruments such as
guarantees or subsidies
can catalyze investments in
development projects...
 ... already existing projects can mobilize
resources for beneficiary projects, so called:
piggybacking.
 There is no need to reinvent the wheel each
time and fully provide new infrastructure for
each project, if it is already on hand or is in
the process of being established.
 By linking projects, it would be possible to
maximize the impact and sustainability of
each project.
 A solar energy project in development could
be adapted to include provision of energy to
a hospital construction project.
Example:
 For the energy project: demand on assets is
solidified (consumer guarantee).
 For the hospital project: assurance that a key
infrastructure requirement will be met.
 Bottom line = risk reduction and added value
for both projects
(increased attractiveness for long-term investors)
Incentives
(for both public and private
financers/investors)
The premise of piggybacking development
projects is scalable and adaptable: it can
expand to apply to a number of countries and
for a number of sectors depending on local
infrastructure requirements.
Further examples:
Water & Sanitation + Housing
Telecommunications + Schools/Universities
Public transportation + Urbanization
Ideally, mutually beneficial projects should be
designed and coordinated as early as possible.
This requires solid communication and transparent
information between development stakeholders to
match appropriate infrastructure development plans.
Platforms such as the Global Infrastructure Hub or
the UN Global Compact are important resources for
bringing private and public sectors together.
 http://globalinfrastructurehub.org/
 https://www.unglobalcompact.org/
 Engaging non-traditional donors/investors
demands reliability, credibility, due diligence
and innovation.
 Multistakeholder partnering can distribute
risk more broadly and deliver sustainable,
mutually beneficial projects.

More Related Content

Similar to Mutually Beneficial Projects Through Multistakeholder Partnering

afdb_presentation.pptx
afdb_presentation.pptxafdb_presentation.pptx
afdb_presentation.pptx
RaghuramBoddupalli1
 
Project finance good one
Project finance good oneProject finance good one
Project finance good one
StudsPlanet.com
 
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEF
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEFFinancing the Transition to a Net-Zero Future: Manuela Fulga - WEF
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEF
OECD Environment
 
Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10
steveallen
 
Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014
OECD Environment
 
Project finance
Project financeProject finance
Project finance
Dharmik
 
Venture capital 1
Venture capital 1Venture capital 1
Venture capital 1
Dharmik
 
develomental Economics and economics and finance
develomental Economics and economics and financedevelomental Economics and economics and finance
develomental Economics and economics and finance
gizaw15
 
How to finance and fund infrastructure and energy projects.pdf
How to finance and fund infrastructure and energy projects.pdfHow to finance and fund infrastructure and energy projects.pdf
How to finance and fund infrastructure and energy projects.pdf
Native World
 
public private partnership
public private partnershippublic private partnership
public private partnership
DiyaGarg5
 
Pm0010 introduction to project management
Pm0010   introduction to project managementPm0010   introduction to project management
Pm0010 introduction to project management
smumbahelp
 
Vskills project finance sample material
Vskills project finance sample materialVskills project finance sample material
Vskills project finance sample material
Vskills
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
Eugene Chao
 
Pm0010 introduction to project management
Pm0010   introduction to project managementPm0010   introduction to project management
Pm0010 introduction to project management
Study Stuff
 
Project finance emu
Project finance emuProject finance emu
Project finance emu
bejoylinp
 
Renewable energy project financing of infrastructure development company limi...
Renewable energy project financing of infrastructure development company limi...Renewable energy project financing of infrastructure development company limi...
Renewable energy project financing of infrastructure development company limi...
Mehdi Hassan
 
Internship report reachers report about Renewable energy project financing of...
Internship report reachers report about Renewable energy project financing of...Internship report reachers report about Renewable energy project financing of...
Internship report reachers report about Renewable energy project financing of...
Mehdi Hassan
 
Project management material from chapter one up to chapter four
Project management material from chapter one up to chapter fourProject management material from chapter one up to chapter four
Project management material from chapter one up to chapter four
GetachewAbera3
 
Session 4 - Presentation by Andreas Lunding, Green Climate Fund
Session 4 - Presentation by Andreas Lunding, Green Climate FundSession 4 - Presentation by Andreas Lunding, Green Climate Fund
Session 4 - Presentation by Andreas Lunding, Green Climate Fund
OECD Environment
 
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
Camilla Schramek
 

Similar to Mutually Beneficial Projects Through Multistakeholder Partnering (20)

afdb_presentation.pptx
afdb_presentation.pptxafdb_presentation.pptx
afdb_presentation.pptx
 
Project finance good one
Project finance good oneProject finance good one
Project finance good one
 
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEF
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEFFinancing the Transition to a Net-Zero Future: Manuela Fulga - WEF
Financing the Transition to a Net-Zero Future: Manuela Fulga - WEF
 
Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10
 
Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014
 
Project finance
Project financeProject finance
Project finance
 
Venture capital 1
Venture capital 1Venture capital 1
Venture capital 1
 
develomental Economics and economics and finance
develomental Economics and economics and financedevelomental Economics and economics and finance
develomental Economics and economics and finance
 
How to finance and fund infrastructure and energy projects.pdf
How to finance and fund infrastructure and energy projects.pdfHow to finance and fund infrastructure and energy projects.pdf
How to finance and fund infrastructure and energy projects.pdf
 
public private partnership
public private partnershippublic private partnership
public private partnership
 
Pm0010 introduction to project management
Pm0010   introduction to project managementPm0010   introduction to project management
Pm0010 introduction to project management
 
Vskills project finance sample material
Vskills project finance sample materialVskills project finance sample material
Vskills project finance sample material
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
 
Pm0010 introduction to project management
Pm0010   introduction to project managementPm0010   introduction to project management
Pm0010 introduction to project management
 
Project finance emu
Project finance emuProject finance emu
Project finance emu
 
Renewable energy project financing of infrastructure development company limi...
Renewable energy project financing of infrastructure development company limi...Renewable energy project financing of infrastructure development company limi...
Renewable energy project financing of infrastructure development company limi...
 
Internship report reachers report about Renewable energy project financing of...
Internship report reachers report about Renewable energy project financing of...Internship report reachers report about Renewable energy project financing of...
Internship report reachers report about Renewable energy project financing of...
 
Project management material from chapter one up to chapter four
Project management material from chapter one up to chapter fourProject management material from chapter one up to chapter four
Project management material from chapter one up to chapter four
 
Session 4 - Presentation by Andreas Lunding, Green Climate Fund
Session 4 - Presentation by Andreas Lunding, Green Climate FundSession 4 - Presentation by Andreas Lunding, Green Climate Fund
Session 4 - Presentation by Andreas Lunding, Green Climate Fund
 
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
Energy Efficiency Policy Case Studies_DNVGL Summary_Schramek
 

Recently uploaded

Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
ahcitycouncil
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 

Recently uploaded (20)

Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 

Mutually Beneficial Projects Through Multistakeholder Partnering

  • 1. Mutually Beneficial Projects Through Multistakeholder Partnering Finance for Development Final Project, December 2015 M. A. Goeschl
  • 2. In times of scarcity…
  • 3. … pool resources ! Money Knowhow …etc. Local Contacts Common Goals
  • 4.  Just as financial instruments such as guarantees or subsidies can catalyze investments in development projects...  ... already existing projects can mobilize resources for beneficiary projects, so called: piggybacking.
  • 5.  There is no need to reinvent the wheel each time and fully provide new infrastructure for each project, if it is already on hand or is in the process of being established.  By linking projects, it would be possible to maximize the impact and sustainability of each project.
  • 6.  A solar energy project in development could be adapted to include provision of energy to a hospital construction project. Example:
  • 7.  For the energy project: demand on assets is solidified (consumer guarantee).  For the hospital project: assurance that a key infrastructure requirement will be met.  Bottom line = risk reduction and added value for both projects (increased attractiveness for long-term investors) Incentives (for both public and private financers/investors)
  • 8. The premise of piggybacking development projects is scalable and adaptable: it can expand to apply to a number of countries and for a number of sectors depending on local infrastructure requirements. Further examples: Water & Sanitation + Housing Telecommunications + Schools/Universities Public transportation + Urbanization
  • 9. Ideally, mutually beneficial projects should be designed and coordinated as early as possible. This requires solid communication and transparent information between development stakeholders to match appropriate infrastructure development plans. Platforms such as the Global Infrastructure Hub or the UN Global Compact are important resources for bringing private and public sectors together.  http://globalinfrastructurehub.org/  https://www.unglobalcompact.org/
  • 10.  Engaging non-traditional donors/investors demands reliability, credibility, due diligence and innovation.  Multistakeholder partnering can distribute risk more broadly and deliver sustainable, mutually beneficial projects.