SlideShare a Scribd company logo
1 of 6
Download to read offline
MUHAMMAD IRFAN.
E-MAIL: rana.irfan@rocketmail.com
muhammad.irfan06277@gmail.com
B-TECH CIVIL ENGINEER.
Current Designation: Quantity surveyor.
Current Location: Shahrah-E-Quaid-E-Azam, Lahore . Current Company: Hashoo Group
Address: House No E-241/40 Mohalla Osmania Nationality: Pakistani.
Model Colony#2 Walton road LHR Cantt. Ph.#+92-301-4237799.
+92-314-2975812.
Objective] Work Experience] Education] IT & Other Skill ] Personal Info]
Objective:-
To get challenging position in a growth-oriented organization this offers diverse job responsibilities.
Work Experience:-
Employer: Pearl-Continental Hotel Lahore.
Location of Assignment: Lahore.
Project: Shahrah-E-Quaid-E-Azam, Lahore.
Designation: Quantity Surveyor.
Duration: 21st
July 2014 to Date…..
Duties:
 To manages all costs relating to building
and civil engineering project from the
initial calculations to the final figures.
 To minimize the costs of a project and
enhance value for money, while still
achieving the required standards and
quality.
 To actively monitor a project from the
start, preparing estimates and costs of
the work & keep track of any variations to
the contract that may affect costs and
create reports to show profitability when
the project is in progress.
 To maintain Quality & Quantity at various
stages of construction keeping in view the
standard specifications
 To prepare drawings & BOQ’s /Technical
Reports. Analyzing outcomes and writing
detailed progress reports;
 Preparing tender and contract
documents, including bills of quantities
with the architect and/or the contractor;
 Undertaking cost analysis for repair and
maintenance project work;
 Assisting in establishing requirements and
undertaking feasibility studies for civil
work.
 To supervise all land/ field surveying
activities ensuring implementation of
best practices.
 To plan and execute the development
related to land surveying, calculation and
providing information for map making in
civil construction work.
 To ensure that quality & cost of project
meets the set targets.
 To Check the IPC’s of Contractor.
 To rough cost estimate of the project.
 To detailed estimate of the project.
 To check the Rate Analysis of contractor.
 To check the Detailed Estimate of the
contractor.
 To check the variation Order of the
contractor.
 To check the Final X-Sections/As Built
Drawings of the project.
 To check the bar bending schedules.
 To check the Price Variation.
 To check the Time Line of Project.
 To check the Profit & Loose Statement.
 To check the Project Report/Progress.
 To check the final As Built Auto Cad
Drawings.
 To check the Quality of Work.
 To check the Demarcation.
Employer: Design & Engineering Systems (Pvt.) Ltd.
Location of Assignment: Lahore.
Project: Sunder Industrial Estate Lahore.
Designation: Quantity Surveyor.
Duration: 18th
April 2014 to 19th
July 2014
Duties:
 Preparation of BOQ.
 Preparation of IPC’s.
 Calculate the Quantities of Project.
 Preparation of Rate Analysis.
 Preparation of Detailed Estimate.
 Preparation of variation Order.
 Preparation of Final X-Sections.
 Preparation of bar bending schedules.
 Preparation of Price Variation.
 Preparation of Sub Contractor’s Bills.
 Preparation of Auto cad shop Drawings.
 Preparation of Time Line of Project.
 Preparation of Profit & Loose Statement.
Employer: Nasir Const. (Pvt.) Ltd.
Location of Assignment: Lahore.
Project: Development of Infrastructure Works D.H.A Phase –VIII Lahore.
Designation: Quantity Surveyor.
Duration: 7th
Nov 2012 to 15th
April 2014
Duties:
 Preparation of IPC’s.
 Preparation of RAR’s.
 Calculate the Quantities of Project.
 Preparation of Rate Analysis.
 Preparation of Detailed Estimate.
 Preparation of variation Order.
 Preparation of Final X-Sections.
 Preparation of bar bending schedules.
 Preparation of Price Variation.
 Preparation of Sub Contractor’s Bills.
 Preparation of Auto cad shop Drawings.
 Preparation of Time Line of Project.
 Preparation of L-Section.
Employer: Ifthikhar & Co. (Pvt.) Ltd.
Location of Assignment: Lahore.
Project: PHA Apartments D & E Type.
Designation: Site Engineer.
Duration: 27 th
Sep 2010 to 27th
Oct 2012.
 Demarcation.
 Monitoring all kinds of construction works.
 To ensure compliance with engineering
and client specification.
 To check the quality of concrete and steel
work to achieve the strength and quality
according to the design and requirement.
 To ensure the bar bending schedule
according to structural drawings.
 To discussing the problems in any activity
with client on site and reporting about
each activity.
 To give the direction and technical support
to the subordinates to complete work in
time.
 The technical work of the project and
implementing the quality rules to fulfill the
criteria.
 To check the quality of paint, Flooring,
Dado work and Door, Window Fixing etc.
 Check the IPC’s.
 X-Check IPC’s overall measurement of
Project.
Employer: Ibrar Hussain Bukhari.
Location of Assignment: Lahore.
Project: Bukhari House D.H.A Phase -V.
Designation: Site Engineer.
Duration: 11th
Dec 2009 to 27th
Sep 2010.
 Demarcation.
 Monitoring all kinds of construction works.
 To ensure compliance with engineering
and client specification.
 To check the quality of concrete and steel
work to achieve the strength and quality
according to the design and requirement.
 To ensure the bar bending schedule
according to structural drawings.
 To discussing the problems in any activity
with client on site and reporting about
each activity.
 To give the direction and technical support
to the subordinates to complete work in
time.
 The technical work of the project and
implementing the quality rules to fulfill the
criteria.
 To check the quality of paint, Flooring,
Dado work and Door, Window Fixing etc.
 Check the IPC’s.
Employer: Niaz Builder.
Location of Assignment: Lahore.
Project: Joint Venture World Call & Multinet (Pvt.) Ltd.
Fiber Optical Cable (FOC) Laid From Muslim
League to Wahga Border.
Designation: Site Supervisor.
Duration: 21th
Aug 2009 to 17th
Nov 2009.
Employer: Husnain Cotex (Pvt.) Ltd.
Location of Assignment: Lahore.
Project: BAB-E-Pakistan.
Designation: Asst. Quantity Surveyor.
Duration: 7th
June 2009 to 21th
Aug 2009.
Education:-
1. B-Tech from Preston Institute of Management, Science and Technology (PIMSAT). 2012
2. DAE from Punjab Board of Technical Education Lahore (PBTE). 2009
3. Matric from Board of Intermediate and Secondary Education Lahore (BISE). 2006
Computer and Other Skills:-
1. Microsoft Office.
2. Auto Cad 2D & 3D.
3. 3D Studio Max.
4. Corel Draw.
5. Adobe Photoshop Cs2.
6. Flash, Flax & Swish, cool Move.
7. Computer Hardware.
8. Communication & Mobile repairing PTCL Sarwar Ali road LHR Cantt.
9. Home appliances (Electrical) T.T.C Gulberg.
10. Eagle Point.
11. Operating Windows XP, 7 & 8.
12. Installation Windows & Application Software.
Personal Info:-
Father Name: Muhammad Haroon.
Date of birth: 10, November, 1988.
NIC #: 35201-2058521-1.
Religion: Islam.
Domicile: Lahore. (Punjab).
Marital status: Married.
Permanent address: House No E-241/40 Mohalla Osmania
Model Colony#2 Walton road LHR Cantt.
Languages:-
1. URDU.
2. English.
Interesting:-
Reading Books.
Cricket.

More Related Content

What's hot

Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer ResumeRavi Kumar
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & InspectorMOHAMED RASHEED
 
Cv site civil engineer
Cv site civil engineerCv site civil engineer
Cv site civil engineersandeep jangir
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Cv quantity surveyor-ghalib ahmad
Cv quantity surveyor-ghalib ahmadCv quantity surveyor-ghalib ahmad
Cv quantity surveyor-ghalib ahmadGhalib Ahmad
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer - Amir Mohammed
 
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGCV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGEngGalaydh Farah Axmed
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CVvasant koli
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zakZishan khan
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverlettervipin m.v
 
Hyder Cv Quantity Surveyor
Hyder Cv Quantity Surveyor Hyder Cv Quantity Surveyor
Hyder Cv Quantity Surveyor M.G.Hyder Hyder
 

What's hot (20)

Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
 
Cv site civil engineer
Cv site civil engineerCv site civil engineer
Cv site civil engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
RESUME joge
RESUME jogeRESUME joge
RESUME joge
 
Cv quantity surveyor-ghalib ahmad
Cv quantity surveyor-ghalib ahmadCv quantity surveyor-ghalib ahmad
Cv quantity surveyor-ghalib ahmad
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
SAMER CV
SAMER CVSAMER CV
SAMER CV
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity Surveyor
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer -
 
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGCV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CV
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
 
Nps.Cv 2009
Nps.Cv 2009Nps.Cv 2009
Nps.Cv 2009
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletter
 
Hyder Cv Quantity Surveyor
Hyder Cv Quantity Surveyor Hyder Cv Quantity Surveyor
Hyder Cv Quantity Surveyor
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
CV Civil Eng..
CV Civil Eng..CV Civil Eng..
CV Civil Eng..
 
Umar
UmarUmar
Umar
 

Similar to MUHAMMAD IRFAN CV -...

Similar to MUHAMMAD IRFAN CV -... (20)

CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
2442AMIT
2442AMIT2442AMIT
2442AMIT
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
J Jagadeesan- CV
J Jagadeesan- CVJ Jagadeesan- CV
J Jagadeesan- CV
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
SAQIB (2) (1)
SAQIB (2) (1)SAQIB (2) (1)
SAQIB (2) (1)
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 

MUHAMMAD IRFAN CV -...

  • 1. MUHAMMAD IRFAN. E-MAIL: rana.irfan@rocketmail.com muhammad.irfan06277@gmail.com B-TECH CIVIL ENGINEER. Current Designation: Quantity surveyor. Current Location: Shahrah-E-Quaid-E-Azam, Lahore . Current Company: Hashoo Group Address: House No E-241/40 Mohalla Osmania Nationality: Pakistani. Model Colony#2 Walton road LHR Cantt. Ph.#+92-301-4237799. +92-314-2975812. Objective] Work Experience] Education] IT & Other Skill ] Personal Info] Objective:- To get challenging position in a growth-oriented organization this offers diverse job responsibilities. Work Experience:- Employer: Pearl-Continental Hotel Lahore. Location of Assignment: Lahore. Project: Shahrah-E-Quaid-E-Azam, Lahore. Designation: Quantity Surveyor. Duration: 21st July 2014 to Date….. Duties:  To manages all costs relating to building and civil engineering project from the initial calculations to the final figures.  To minimize the costs of a project and enhance value for money, while still achieving the required standards and quality.  To actively monitor a project from the start, preparing estimates and costs of the work & keep track of any variations to the contract that may affect costs and create reports to show profitability when the project is in progress.  To maintain Quality & Quantity at various stages of construction keeping in view the standard specifications
  • 2.  To prepare drawings & BOQ’s /Technical Reports. Analyzing outcomes and writing detailed progress reports;  Preparing tender and contract documents, including bills of quantities with the architect and/or the contractor;  Undertaking cost analysis for repair and maintenance project work;  Assisting in establishing requirements and undertaking feasibility studies for civil work.  To supervise all land/ field surveying activities ensuring implementation of best practices.  To plan and execute the development related to land surveying, calculation and providing information for map making in civil construction work.  To ensure that quality & cost of project meets the set targets.  To Check the IPC’s of Contractor.  To rough cost estimate of the project.  To detailed estimate of the project.  To check the Rate Analysis of contractor.  To check the Detailed Estimate of the contractor.  To check the variation Order of the contractor.  To check the Final X-Sections/As Built Drawings of the project.  To check the bar bending schedules.  To check the Price Variation.  To check the Time Line of Project.  To check the Profit & Loose Statement.  To check the Project Report/Progress.  To check the final As Built Auto Cad Drawings.  To check the Quality of Work.  To check the Demarcation.
  • 3. Employer: Design & Engineering Systems (Pvt.) Ltd. Location of Assignment: Lahore. Project: Sunder Industrial Estate Lahore. Designation: Quantity Surveyor. Duration: 18th April 2014 to 19th July 2014 Duties:  Preparation of BOQ.  Preparation of IPC’s.  Calculate the Quantities of Project.  Preparation of Rate Analysis.  Preparation of Detailed Estimate.  Preparation of variation Order.  Preparation of Final X-Sections.  Preparation of bar bending schedules.  Preparation of Price Variation.  Preparation of Sub Contractor’s Bills.  Preparation of Auto cad shop Drawings.  Preparation of Time Line of Project.  Preparation of Profit & Loose Statement. Employer: Nasir Const. (Pvt.) Ltd. Location of Assignment: Lahore. Project: Development of Infrastructure Works D.H.A Phase –VIII Lahore. Designation: Quantity Surveyor. Duration: 7th Nov 2012 to 15th April 2014 Duties:  Preparation of IPC’s.  Preparation of RAR’s.  Calculate the Quantities of Project.  Preparation of Rate Analysis.  Preparation of Detailed Estimate.  Preparation of variation Order.  Preparation of Final X-Sections.  Preparation of bar bending schedules.  Preparation of Price Variation.  Preparation of Sub Contractor’s Bills.  Preparation of Auto cad shop Drawings.  Preparation of Time Line of Project.  Preparation of L-Section.
  • 4. Employer: Ifthikhar & Co. (Pvt.) Ltd. Location of Assignment: Lahore. Project: PHA Apartments D & E Type. Designation: Site Engineer. Duration: 27 th Sep 2010 to 27th Oct 2012.  Demarcation.  Monitoring all kinds of construction works.  To ensure compliance with engineering and client specification.  To check the quality of concrete and steel work to achieve the strength and quality according to the design and requirement.  To ensure the bar bending schedule according to structural drawings.  To discussing the problems in any activity with client on site and reporting about each activity.  To give the direction and technical support to the subordinates to complete work in time.  The technical work of the project and implementing the quality rules to fulfill the criteria.  To check the quality of paint, Flooring, Dado work and Door, Window Fixing etc.  Check the IPC’s.  X-Check IPC’s overall measurement of Project. Employer: Ibrar Hussain Bukhari. Location of Assignment: Lahore. Project: Bukhari House D.H.A Phase -V. Designation: Site Engineer. Duration: 11th Dec 2009 to 27th Sep 2010.  Demarcation.  Monitoring all kinds of construction works.  To ensure compliance with engineering and client specification.  To check the quality of concrete and steel work to achieve the strength and quality according to the design and requirement.  To ensure the bar bending schedule according to structural drawings.  To discussing the problems in any activity with client on site and reporting about each activity.  To give the direction and technical support to the subordinates to complete work in time.  The technical work of the project and implementing the quality rules to fulfill the criteria.  To check the quality of paint, Flooring, Dado work and Door, Window Fixing etc.  Check the IPC’s.
  • 5. Employer: Niaz Builder. Location of Assignment: Lahore. Project: Joint Venture World Call & Multinet (Pvt.) Ltd. Fiber Optical Cable (FOC) Laid From Muslim League to Wahga Border. Designation: Site Supervisor. Duration: 21th Aug 2009 to 17th Nov 2009. Employer: Husnain Cotex (Pvt.) Ltd. Location of Assignment: Lahore. Project: BAB-E-Pakistan. Designation: Asst. Quantity Surveyor. Duration: 7th June 2009 to 21th Aug 2009. Education:- 1. B-Tech from Preston Institute of Management, Science and Technology (PIMSAT). 2012 2. DAE from Punjab Board of Technical Education Lahore (PBTE). 2009 3. Matric from Board of Intermediate and Secondary Education Lahore (BISE). 2006 Computer and Other Skills:- 1. Microsoft Office. 2. Auto Cad 2D & 3D. 3. 3D Studio Max. 4. Corel Draw. 5. Adobe Photoshop Cs2. 6. Flash, Flax & Swish, cool Move. 7. Computer Hardware. 8. Communication & Mobile repairing PTCL Sarwar Ali road LHR Cantt. 9. Home appliances (Electrical) T.T.C Gulberg. 10. Eagle Point. 11. Operating Windows XP, 7 & 8. 12. Installation Windows & Application Software.
  • 6. Personal Info:- Father Name: Muhammad Haroon. Date of birth: 10, November, 1988. NIC #: 35201-2058521-1. Religion: Islam. Domicile: Lahore. (Punjab). Marital status: Married. Permanent address: House No E-241/40 Mohalla Osmania Model Colony#2 Walton road LHR Cantt. Languages:- 1. URDU. 2. English. Interesting:- Reading Books. Cricket.