SlideShare a Scribd company logo
Management Information System




                        No 13 Jalan Trompet 33/8, Seksyen 33,
                       40400 Shah Alam, Selangor Darul Ehsan,
                                      MALAYSIA
Management Information System




                           Table Of Contents



                1.1    -        MIS Motto

                1.2    -        MIS Vision

                1.3    -        MIS Organization Chart

                1.4    -        KPI and MAP

                1.5    -        MIS New KPI and MAP
Management Information System




                Supporting Your Growth
Management Information System




            Towards migration of IT infrastructure
            to support and integrate within TIC
            organization
Management Information System
KPI & Management Action Plan
      September 2010– August 2011




COP / MP / SP              KPI                          Target             Result       Status

                                               *Logistic Department      Not Achieved
                                               ( < 1.5 Hours)             (42.8%)
                                               Target: 80%
                 Response Turnaround
                        Time
                                               *Others Department          Achieved
                                               ( <36 Hours)                (100%)
 Information                                   Target: 80%
  Technology
     (IT)
                  Hardware Turnover            <30k / Years               Achieved



                                               Implementation within 2
                       ERP System                                        Not Achieved
                                               years

                  *Exclude hardware failure and involving third party
                  problem (Etc: Service provider by Telekom and
                  Rental Vendor).
Management Information System




               Percentage (%)      Status


               42.8<    < 43.0    achieved


                                 Not achieved
               57.1<   < 58.0
Bil   Department                          Description / Problem                             Hours Complete   Status

 1     Logistics   Change CELCOM USB to DIGI Broadband / Remove software                       2 Hours
                   CELCOM and install DIGI Software.
 2     Logistics   Internet and wireless network connection not display / seem                 15 Minute
                   wireless card not seat properly.

 3     Logistics   Sharing Printer / Install printer driver and share the printer               1 Hour


 4     Logistics   Can’t start IE and other programs / Install ‘Malware bytes’ and scan,       2 Hours

 5     Logistics   Windows corrupted and D-Link wireless access point failure /                36 Hours
                   Reformat windows and install TP-Link usb wireless
 6     Logistics   Can’t on computer / Change power supply and reformat the PC                 36 Hours

 7     Logistics   Internet problem and symentac AV got error / Full format and install        6 Hours
                   new AV (Free edition)
 8     Logistic    Problem with IE (internet explore) and virus infected with spyware           1 hour
                   win – windows error connection / uninstall spyware and reinstall
                   ‘malware anti-malware’ and scan
 9     Logistic    Windows file corrupt and D-link access point failure / brought the          26 hours
                   station to MIS room and reformat and install the
                   Application software
10     Logistic    Computer cannot turn on (power supply failure) / brought to MIS             24 hours
                   room and testing with another power supply. Also reformat to tune
                   up the performance
11     Logistic    Infected by virus and no connection to internet / uninstall avira free       2 hours
                   edition and replace with kaspersky antivirus and internet security

12     Logistic    Upgrade Antivirus avg free edition to Avira Antivirus Premium                1 hour
                   (2 stations)
13     Logistic    Virus detected (computer perform slow) / reformat and install                2 hours
                   windows and application software
14     Logistic    Digi Broadband can’t start / checking bill (have to pay)                     1hour
Management Information System




            Percentage (%)     Status



                  = 100       achieved


                 =0          Not achieved
Bil   Department                          Description / Problem                              Hours     Status
                                                                                            Complete
1        QC        New printer (RICOH) SP 3410DN / setup and install                         1 hour

2        QC        Printer cannot print out (not detect cartridge) / restart computer        ½ hour
                   Unplug cable printer and plug in back, reset
3        QC        station suddenly restart itself and virus detected / backup data ,        1 hour
                   reformat and re-install windows and application software
4      FINANCE     Upgrade Antivirus (AVG free version to Avira Antivirus Premium) for 3     2 hours
                   unit station / remove antivirus and replace installation with Avira
5      FINANCE     Internet connection got problem (unstable) with usb wireless problem
                   (TP-LINK) / change to wireless PCI card (level one WNC-0301)              ½ hour
6        MIS       Network problem(streamyx) become unstable. Reset modem and still
                   not ‘working’ and have direction from technical support from TM           1 hour
                   center and still not ‘working’. In fact, TM center will call back for
                   passing information and after lead-time(15 minutes) try test the
                   connection and it’s working
7        MIS       Kaspersky license key out of date (notebook HP540 and desktop
                   DC7900) / called technical support from rental vendor (ICT Zone)          2 hours
8        HR        Microsoft office cannot activate (some file.exe was missing or
                   corrupt) and also for another program (exp: IE), virus infected /         2hours
                   backup file and reformat to install new windows system
9     PUCHASING    Relocate and setup the station / reinstall wireless driver and sharing
                   printer                                                                   1 hour


10     TOOLING     Transfer station Malaysia Plastic to tooling department / reconfigure
                   printer, and backup file                                                  2 hours


11       EDO       Internet got problem (TP-LINK usb) with list of wireless not shown /
                   update wireless driver and restart                                        1/2hour
TARGET                        NOT
NUM   DEPARTMENT                       ACHIEVED               PERCENTAGE STATUS
                     PERCENTAGE                    ACHIEVED

 1      Logistic         100%              6          8         42.90%

 2      Others           100%             11          0         100.0%



                            Case vs department

                    15
             Case




                    10

                    5

                    0
                          Logistic     Others
                                     Departments
The initial method used to
                                               Clash between more than 1 case
                  rectify problems
                                               at the same time
                  1,4,5,6,7,9,10 &13 was
                  inaccurate.


                        METHOD                             MAN




Did not
reach the
Turnaround               MONEY                          MACHINE
Time
Targeted
             Time to purchase equipment or spare     A few stations are outdated and need
             part delayed and some purchases need    to be upgraded or replaced to the
             lead time to order                      latest specification (*preferably,
                                                     native specification)
ROOT CASE             PROBLEM                           ACTION / SOLUTION
Money       Take time to purchase              1. To look for IT supplier willing to
            equipment or spare part               give credit terms

                                               2. To request petty cash for MIS dept

                                               3. Follow up with finance department
                                                  on PR issued
Machine     -a few station need to upgrade     1. To buy new PC or reallocate better
            or replace to the latest              specification PC from other dept to
            specification                         logistic dept.

            - if upgrade or replace, have to   2. Need to ‘ghost ‘all PC system
            be the same specification              (OS) in order to keep all system
                                                   environment running healthily to
                                                   ensure lead time to repair is
                                                   shorter.
Man         Try to avoid clash between         1. To perform preventive maintenance
            more than 1 case at the same       from time to time and not wait for
            time                               incident report to react.
Percentage (%)    Status



                 achieved
     = 100
PURCHASE                                                                            REQUESTED
                                DATE       SUPPLIER   DESCRIPTION   QUANTITY   PRICE (RM)   AMOUNT
                   NUM                                                                                  BY




*Excluding Repairing by third party (exp: data
recovery)/cartridge printer / Rental
Management Information System
Month of 2010-2012


                                                         Sept Oct    Nov Dec     Jan Feb Mar Apr May        Jun Jul Aug Sep Oct Nov         Dec Jan Feb      Mar Apr     May
                                                         2010 2010   2010 2010   2011 2011 2011 2011 2011   2011 2011 2011 2011 2011 2011   2011 2012 2012   2012 2012   2012 ……..


Subject and Details
ERP Software
Conduct needs analysis
Search for ERP vendor with support in Malaysia-

1.       Server or web based ERP system
2.       Cost management
3.       IT infrastructure
4.       After sales support
Study benefits of using ERP system. Its advantages and
disadvantages

Shortlist vendors who meet initial criteria
Conduct demo or discussion

1.     Between MIS & vendor
Between vendor & end user
Conduct comparison & evaluation process by:

1.       Cost analysis
2.       Meeting functional & needs objectives
3.       Maintenance & support
Final Selection of ERP system and recommendation to
Board of Directors report preparation includes:

1.       Needs analysis
2.       Cause and benefits of ERP
3.       Selection criteria
4.       Shortlisted vendors’ profile
5.       Comparison & evaluation of shortlisted vendor
6.       Hardware requirements
7.       Recommendation
8.       Suggested implementation program
Roll out implementation program to staff.

1.       Selected vendor
2.       Budget allocation
3.       Time line
4.       Preparation of IT infrastructure: hardware &
         network readiness
5.       Installation of software
6.       Training for users
7.       Data migration
Management Information System
Target                                       September    August
                                                                                                     2011       2012
COP / MP / SOP           Objective                                     Action Plan         PIC   S O N D J F M A M J J A
                                                 Old       New                                   e c o e a e a p a u u u
                                                                                                 p t v c n b r r y n l g
                    To reduce action                                 Ensure that all
                    time for logistics                               Computer
                    Department, so that                              hardware and
                    All tasks can be done       Logistics  Logistics Device equipment
                                               <1.5 Hours <1.5 Hours
    Response        More quickly and                                 is In the best
                                                                                           MIS
 Turnaround Time    Efficiently.                 Others     Others   Condition. Some
                                               <36 Hours <36 Hours PC needs to be
                                                                     upgraded or
                                                                     changed for better
                                                                     specification. (PM)
                    Increase to RM 30K                               OS Software
                    (Due to possibility of                           -Upgrade all
                    purchasing     servers                           Client PC to OS
                    and some higher spec                             XP version.
                    computers to support                             (Minimum)
                    ERP, also upgrading of                           -Licensing (select
                    Cadem facilities and                             agreement / open
                    others departments)                              license)
Hardware Turnover                              <30k/ Year <30k/ Year                       MIS
                                                                     -Server upgrade
                                                                     and migration.
                                                                     Hardware/
                                                                     Devices.
                                                                     -Centralized
                                                                     Network printer
                                                                     -Network
                                                                     Infrastructure
                    Integrate all activities                         Refer Timeline
Mrb march 2011   october 2011(cloud)

More Related Content

Viewers also liked

Partes internas del cpu
Partes internas del cpuPartes internas del cpu
Partes internas del cpu
J023PH12
 
Surat permohonan surat izin kerja apoteker sisca y
Surat permohonan surat izin kerja apoteker sisca ySurat permohonan surat izin kerja apoteker sisca y
Surat permohonan surat izin kerja apoteker sisca y
Sisca Yoliza
 
La journée de la non violence contre les femmes
La journée de la non violence contre les femmesLa journée de la non violence contre les femmes
La journée de la non violence contre les femmes
rafaelmateos1
 
tradução juramentada de documentos
tradução juramentada de documentostradução juramentada de documentos
tradução juramentada de documentos
Laerte J Silva
 
Junkyard wars
Junkyard warsJunkyard wars
Junkyard wars
Vilija Herrera , PMP
 
Teori bab 1
Teori bab 1Teori bab 1
Teori bab 1
ranifajar
 
Kd1
Kd1Kd1
Antibiotik AKPER PEMKAB MUNA
Antibiotik  AKPER PEMKAB MUNA Antibiotik  AKPER PEMKAB MUNA
Antibiotik AKPER PEMKAB MUNA
Operator Warnet Vast Raha
 
Digital marketing youtube.com giadinhenfa-23-5
Digital marketing youtube.com giadinhenfa-23-5Digital marketing youtube.com giadinhenfa-23-5
Digital marketing youtube.com giadinhenfa-23-5Nam Le
 
Best buy credentials
Best buy credentialsBest buy credentials
Best buy credentials
LibanNooh
 
Guia 1 gestion de la comunicación
Guia 1   gestion de la comunicaciónGuia 1   gestion de la comunicación
Guia 1 gestion de la comunicación
michi28
 
St James' Exhibition Guide 4
St James' Exhibition Guide 4St James' Exhibition Guide 4
St James' Exhibition Guide 4Neil Dymond-Green
 
Dekstop Publishing Logo
Dekstop Publishing LogoDekstop Publishing Logo
Dekstop Publishing Logo
nixfairy
 
Facebook (2)
Facebook (2)Facebook (2)
Facebook (2)
Mjuzik Pisut
 
Excursión a caravaca
Excursión a caravacaExcursión a caravaca
Excursión a caravaca
Jose Morales Sanchez
 
Makalah yulianti b.indo
Makalah yulianti b.indoMakalah yulianti b.indo
Makalah yulianti b.indo
Yahya D'Liquifaction
 

Viewers also liked (19)

Partes internas del cpu
Partes internas del cpuPartes internas del cpu
Partes internas del cpu
 
Surat permohonan surat izin kerja apoteker sisca y
Surat permohonan surat izin kerja apoteker sisca ySurat permohonan surat izin kerja apoteker sisca y
Surat permohonan surat izin kerja apoteker sisca y
 
La journée de la non violence contre les femmes
La journée de la non violence contre les femmesLa journée de la non violence contre les femmes
La journée de la non violence contre les femmes
 
tradução juramentada de documentos
tradução juramentada de documentostradução juramentada de documentos
tradução juramentada de documentos
 
Junkyard wars
Junkyard warsJunkyard wars
Junkyard wars
 
facebook
facebookfacebook
facebook
 
Pde bab 2
Pde bab 2Pde bab 2
Pde bab 2
 
Teori bab 1
Teori bab 1Teori bab 1
Teori bab 1
 
Kd1
Kd1Kd1
Kd1
 
Antibiotik AKPER PEMKAB MUNA
Antibiotik  AKPER PEMKAB MUNA Antibiotik  AKPER PEMKAB MUNA
Antibiotik AKPER PEMKAB MUNA
 
Digital marketing youtube.com giadinhenfa-23-5
Digital marketing youtube.com giadinhenfa-23-5Digital marketing youtube.com giadinhenfa-23-5
Digital marketing youtube.com giadinhenfa-23-5
 
Best buy credentials
Best buy credentialsBest buy credentials
Best buy credentials
 
Guia 1 gestion de la comunicación
Guia 1   gestion de la comunicaciónGuia 1   gestion de la comunicación
Guia 1 gestion de la comunicación
 
St James' Exhibition Guide 4
St James' Exhibition Guide 4St James' Exhibition Guide 4
St James' Exhibition Guide 4
 
Dekstop Publishing Logo
Dekstop Publishing LogoDekstop Publishing Logo
Dekstop Publishing Logo
 
Facebook (2)
Facebook (2)Facebook (2)
Facebook (2)
 
Excursión a caravaca
Excursión a caravacaExcursión a caravaca
Excursión a caravaca
 
Makalah yulianti b.indo
Makalah yulianti b.indoMakalah yulianti b.indo
Makalah yulianti b.indo
 
tinkom paket A
tinkom paket Atinkom paket A
tinkom paket A
 

Similar to Mrb march 2011 october 2011(cloud)

Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
CHANDRASEKHAR REDROUTHU
 
Patch Management: 4 Best Practices and More for Today's Healthcare IT
Patch Management: 4 Best Practices and More for Today's Healthcare ITPatch Management: 4 Best Practices and More for Today's Healthcare IT
Patch Management: 4 Best Practices and More for Today's Healthcare IT
Kaseya
 
4 Best Practices for Patch Management in Education IT
4 Best Practices for Patch Management in Education IT4 Best Practices for Patch Management in Education IT
4 Best Practices for Patch Management in Education IT
Kaseya
 
Hari proposal
Hari proposalHari proposal
Hari proposal
Rey Jefferson
 
Using ai and automation to build resiliency into azure dev ops
Using ai and automation to build resiliency into azure dev opsUsing ai and automation to build resiliency into azure dev ops
Using ai and automation to build resiliency into azure dev ops
Rob Jahn
 
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
Emerson Exchange
 
Kaseya: 5 Tips for Healthcare IT Directors
Kaseya: 5 Tips for Healthcare IT DirectorsKaseya: 5 Tips for Healthcare IT Directors
Kaseya: 5 Tips for Healthcare IT Directors
Kaseya
 
Kaseya: 5 Strategies for Banking IT Directors
Kaseya: 5 Strategies for Banking IT DirectorsKaseya: 5 Strategies for Banking IT Directors
Kaseya: 5 Strategies for Banking IT Directors
Kaseya
 
From Duke of DevOps to Queen of Chaos - Api days 2018
From Duke of DevOps to Queen of Chaos - Api days 2018From Duke of DevOps to Queen of Chaos - Api days 2018
From Duke of DevOps to Queen of Chaos - Api days 2018
Christophe Rochefolle
 
Warwickshire County Council and Schools with Windows 7
Warwickshire County Council and Schools with Windows 7Warwickshire County Council and Schools with Windows 7
Warwickshire County Council and Schools with Windows 7
Mike Herrity
 
Otto Vinter - Analysing Your Defect Data for Improvement Potential
Otto Vinter - Analysing Your Defect Data for Improvement PotentialOtto Vinter - Analysing Your Defect Data for Improvement Potential
Otto Vinter - Analysing Your Defect Data for Improvement Potential
TEST Huddle
 
DevOps Transformations
DevOps TransformationsDevOps Transformations
DevOps Transformations
Ernest Mueller
 
J Bdemo101215
J Bdemo101215J Bdemo101215
J Bdemo101215
kgirt
 
Kaseya: 5 Tips for Education IT Directors
Kaseya: 5 Tips for Education IT DirectorsKaseya: 5 Tips for Education IT Directors
Kaseya: 5 Tips for Education IT Directors
Kaseya
 
onTune Case Study sep 2012
onTune Case Study sep 2012onTune Case Study sep 2012
onTune Case Study sep 2012
TeemStone Pty Ltd
 
Fault tolerance
Fault toleranceFault tolerance
Fault tolerance
Aman Balutia
 
DMAIC Case Study: Improving System Availability
DMAIC Case Study: Improving System AvailabilityDMAIC Case Study: Improving System Availability
DMAIC Case Study: Improving System Availability
unevendock6891
 
3. quality.ppt
3. quality.ppt3. quality.ppt
3. quality.ppt
AkashA993877
 
Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016
Splunk
 
Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016
Kirsty Lambert
 

Similar to Mrb march 2011 october 2011(cloud) (20)

Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
Patch Management: 4 Best Practices and More for Today's Healthcare IT
Patch Management: 4 Best Practices and More for Today's Healthcare ITPatch Management: 4 Best Practices and More for Today's Healthcare IT
Patch Management: 4 Best Practices and More for Today's Healthcare IT
 
4 Best Practices for Patch Management in Education IT
4 Best Practices for Patch Management in Education IT4 Best Practices for Patch Management in Education IT
4 Best Practices for Patch Management in Education IT
 
Hari proposal
Hari proposalHari proposal
Hari proposal
 
Using ai and automation to build resiliency into azure dev ops
Using ai and automation to build resiliency into azure dev opsUsing ai and automation to build resiliency into azure dev ops
Using ai and automation to build resiliency into azure dev ops
 
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
 
Kaseya: 5 Tips for Healthcare IT Directors
Kaseya: 5 Tips for Healthcare IT DirectorsKaseya: 5 Tips for Healthcare IT Directors
Kaseya: 5 Tips for Healthcare IT Directors
 
Kaseya: 5 Strategies for Banking IT Directors
Kaseya: 5 Strategies for Banking IT DirectorsKaseya: 5 Strategies for Banking IT Directors
Kaseya: 5 Strategies for Banking IT Directors
 
From Duke of DevOps to Queen of Chaos - Api days 2018
From Duke of DevOps to Queen of Chaos - Api days 2018From Duke of DevOps to Queen of Chaos - Api days 2018
From Duke of DevOps to Queen of Chaos - Api days 2018
 
Warwickshire County Council and Schools with Windows 7
Warwickshire County Council and Schools with Windows 7Warwickshire County Council and Schools with Windows 7
Warwickshire County Council and Schools with Windows 7
 
Otto Vinter - Analysing Your Defect Data for Improvement Potential
Otto Vinter - Analysing Your Defect Data for Improvement PotentialOtto Vinter - Analysing Your Defect Data for Improvement Potential
Otto Vinter - Analysing Your Defect Data for Improvement Potential
 
DevOps Transformations
DevOps TransformationsDevOps Transformations
DevOps Transformations
 
J Bdemo101215
J Bdemo101215J Bdemo101215
J Bdemo101215
 
Kaseya: 5 Tips for Education IT Directors
Kaseya: 5 Tips for Education IT DirectorsKaseya: 5 Tips for Education IT Directors
Kaseya: 5 Tips for Education IT Directors
 
onTune Case Study sep 2012
onTune Case Study sep 2012onTune Case Study sep 2012
onTune Case Study sep 2012
 
Fault tolerance
Fault toleranceFault tolerance
Fault tolerance
 
DMAIC Case Study: Improving System Availability
DMAIC Case Study: Improving System AvailabilityDMAIC Case Study: Improving System Availability
DMAIC Case Study: Improving System Availability
 
3. quality.ppt
3. quality.ppt3. quality.ppt
3. quality.ppt
 
Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016
 
Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016Computing DevOps Summit, London, July 5, 2016
Computing DevOps Summit, London, July 5, 2016
 

Recently uploaded

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
Amin Marwan
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
ssuser13ffe4
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
S. Raj Kumar
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 

Recently uploaded (20)

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 

Mrb march 2011 october 2011(cloud)

  • 1. Management Information System No 13 Jalan Trompet 33/8, Seksyen 33, 40400 Shah Alam, Selangor Darul Ehsan, MALAYSIA
  • 2. Management Information System Table Of Contents 1.1 - MIS Motto 1.2 - MIS Vision 1.3 - MIS Organization Chart 1.4 - KPI and MAP 1.5 - MIS New KPI and MAP
  • 3. Management Information System Supporting Your Growth
  • 4. Management Information System Towards migration of IT infrastructure to support and integrate within TIC organization
  • 5.
  • 7. KPI & Management Action Plan September 2010– August 2011 COP / MP / SP KPI Target Result Status *Logistic Department Not Achieved ( < 1.5 Hours) (42.8%) Target: 80% Response Turnaround Time *Others Department Achieved ( <36 Hours) (100%) Information Target: 80% Technology (IT) Hardware Turnover <30k / Years Achieved Implementation within 2 ERP System Not Achieved years *Exclude hardware failure and involving third party problem (Etc: Service provider by Telekom and Rental Vendor).
  • 8. Management Information System Percentage (%) Status 42.8< < 43.0 achieved Not achieved 57.1< < 58.0
  • 9. Bil Department Description / Problem Hours Complete Status 1 Logistics Change CELCOM USB to DIGI Broadband / Remove software 2 Hours CELCOM and install DIGI Software. 2 Logistics Internet and wireless network connection not display / seem 15 Minute wireless card not seat properly. 3 Logistics Sharing Printer / Install printer driver and share the printer 1 Hour 4 Logistics Can’t start IE and other programs / Install ‘Malware bytes’ and scan, 2 Hours 5 Logistics Windows corrupted and D-Link wireless access point failure / 36 Hours Reformat windows and install TP-Link usb wireless 6 Logistics Can’t on computer / Change power supply and reformat the PC 36 Hours 7 Logistics Internet problem and symentac AV got error / Full format and install 6 Hours new AV (Free edition) 8 Logistic Problem with IE (internet explore) and virus infected with spyware 1 hour win – windows error connection / uninstall spyware and reinstall ‘malware anti-malware’ and scan 9 Logistic Windows file corrupt and D-link access point failure / brought the 26 hours station to MIS room and reformat and install the Application software 10 Logistic Computer cannot turn on (power supply failure) / brought to MIS 24 hours room and testing with another power supply. Also reformat to tune up the performance 11 Logistic Infected by virus and no connection to internet / uninstall avira free 2 hours edition and replace with kaspersky antivirus and internet security 12 Logistic Upgrade Antivirus avg free edition to Avira Antivirus Premium 1 hour (2 stations) 13 Logistic Virus detected (computer perform slow) / reformat and install 2 hours windows and application software 14 Logistic Digi Broadband can’t start / checking bill (have to pay) 1hour
  • 10. Management Information System Percentage (%) Status = 100 achieved =0 Not achieved
  • 11. Bil Department Description / Problem Hours Status Complete 1 QC New printer (RICOH) SP 3410DN / setup and install 1 hour 2 QC Printer cannot print out (not detect cartridge) / restart computer ½ hour Unplug cable printer and plug in back, reset 3 QC station suddenly restart itself and virus detected / backup data , 1 hour reformat and re-install windows and application software 4 FINANCE Upgrade Antivirus (AVG free version to Avira Antivirus Premium) for 3 2 hours unit station / remove antivirus and replace installation with Avira 5 FINANCE Internet connection got problem (unstable) with usb wireless problem (TP-LINK) / change to wireless PCI card (level one WNC-0301) ½ hour 6 MIS Network problem(streamyx) become unstable. Reset modem and still not ‘working’ and have direction from technical support from TM 1 hour center and still not ‘working’. In fact, TM center will call back for passing information and after lead-time(15 minutes) try test the connection and it’s working 7 MIS Kaspersky license key out of date (notebook HP540 and desktop DC7900) / called technical support from rental vendor (ICT Zone) 2 hours 8 HR Microsoft office cannot activate (some file.exe was missing or corrupt) and also for another program (exp: IE), virus infected / 2hours backup file and reformat to install new windows system 9 PUCHASING Relocate and setup the station / reinstall wireless driver and sharing printer 1 hour 10 TOOLING Transfer station Malaysia Plastic to tooling department / reconfigure printer, and backup file 2 hours 11 EDO Internet got problem (TP-LINK usb) with list of wireless not shown / update wireless driver and restart 1/2hour
  • 12. TARGET NOT NUM DEPARTMENT ACHIEVED PERCENTAGE STATUS PERCENTAGE ACHIEVED 1 Logistic 100% 6 8 42.90% 2 Others 100% 11 0 100.0% Case vs department 15 Case 10 5 0 Logistic Others Departments
  • 13. The initial method used to Clash between more than 1 case rectify problems at the same time 1,4,5,6,7,9,10 &13 was inaccurate. METHOD MAN Did not reach the Turnaround MONEY MACHINE Time Targeted Time to purchase equipment or spare A few stations are outdated and need part delayed and some purchases need to be upgraded or replaced to the lead time to order latest specification (*preferably, native specification)
  • 14. ROOT CASE PROBLEM ACTION / SOLUTION Money Take time to purchase 1. To look for IT supplier willing to equipment or spare part give credit terms 2. To request petty cash for MIS dept 3. Follow up with finance department on PR issued Machine -a few station need to upgrade 1. To buy new PC or reallocate better or replace to the latest specification PC from other dept to specification logistic dept. - if upgrade or replace, have to 2. Need to ‘ghost ‘all PC system be the same specification (OS) in order to keep all system environment running healthily to ensure lead time to repair is shorter. Man Try to avoid clash between 1. To perform preventive maintenance more than 1 case at the same from time to time and not wait for time incident report to react.
  • 15. Percentage (%) Status achieved = 100
  • 16. PURCHASE REQUESTED DATE SUPPLIER DESCRIPTION QUANTITY PRICE (RM) AMOUNT NUM BY *Excluding Repairing by third party (exp: data recovery)/cartridge printer / Rental
  • 18. Month of 2010-2012 Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2010 2010 2010 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2012 2012 2012 2012 2012 …….. Subject and Details ERP Software Conduct needs analysis Search for ERP vendor with support in Malaysia- 1. Server or web based ERP system 2. Cost management 3. IT infrastructure 4. After sales support Study benefits of using ERP system. Its advantages and disadvantages Shortlist vendors who meet initial criteria Conduct demo or discussion 1. Between MIS & vendor Between vendor & end user Conduct comparison & evaluation process by: 1. Cost analysis 2. Meeting functional & needs objectives 3. Maintenance & support Final Selection of ERP system and recommendation to Board of Directors report preparation includes: 1. Needs analysis 2. Cause and benefits of ERP 3. Selection criteria 4. Shortlisted vendors’ profile 5. Comparison & evaluation of shortlisted vendor 6. Hardware requirements 7. Recommendation 8. Suggested implementation program Roll out implementation program to staff. 1. Selected vendor 2. Budget allocation 3. Time line 4. Preparation of IT infrastructure: hardware & network readiness 5. Installation of software 6. Training for users 7. Data migration
  • 20. Target September August 2011 2012 COP / MP / SOP Objective Action Plan PIC S O N D J F M A M J J A Old New e c o e a e a p a u u u p t v c n b r r y n l g To reduce action Ensure that all time for logistics Computer Department, so that hardware and All tasks can be done Logistics Logistics Device equipment <1.5 Hours <1.5 Hours Response More quickly and is In the best MIS Turnaround Time Efficiently. Others Others Condition. Some <36 Hours <36 Hours PC needs to be upgraded or changed for better specification. (PM) Increase to RM 30K OS Software (Due to possibility of -Upgrade all purchasing servers Client PC to OS and some higher spec XP version. computers to support (Minimum) ERP, also upgrading of -Licensing (select Cadem facilities and agreement / open others departments) license) Hardware Turnover <30k/ Year <30k/ Year MIS -Server upgrade and migration. Hardware/ Devices. -Centralized Network printer -Network Infrastructure Integrate all activities Refer Timeline