Operational Excellence
   Model (MOPEX)




   DEVELOPED BY :-
   Mattcons Services Private Limited
ABSTRACT
 What is Operational Excellence and our Process.
 Key Results from Operational Excellence
 Time line for OE Model.
 Methodologies we used.
 Sector’s that MOPEX model Cover.
 Our Client Achievements
 About Mattcons
 Mattcons Client’s
 Contact us


                                   Bakery Industry
OPERATIONAL EXCELLENCE

 Operational excellence model    helps achieve
 business goals while lowering costs and
 improving cycle times.


 It standardizes processes and integrates
 operations across multiple channels of supply
 and distribution, supporting high-volume, low-
 margin business strategies.



                                  MOPEX Model
KEY RESULTS FROM OE
 Reduction of Manufacturing Cost by 20 – 30 %
 Improve the Net productivity up by 30 - 60 %
         Number of Breakdown reduced by 10 - 80%
         Overall Plant Effectiveness by 30 - 50 %
 Reduction Defective Products      by 50%
       Customer Complain down by 40 - 60%
 Inventory (Only Spare parts) down by 30%
 Major Accidents reduced by 50%
 Minor Accidents reduced by 40%
 Enhance the Employees Moral by 5 times
       Improvement of Suggestion 10 times minimum.
         Workforce uncertain absent-ism down by 5 times.

                                                     Benefit’s
INTANGIABLE BENEFIT’S
  Achieving full Self Management – Operators have
 ownership on their equipment.
 Enhancing skill and knowledge of workforce by
 training.
  Building CANDO attitude by eliminating breakdowns
 and defects.
 Enhancing the communication among all team
 members.
 Make the workplace clean, bright and lively and Giving
 plant visitors a better image.
 Making all losses more visible and enhance safety of
 plant.
 Making the plant with more visual display.

                                           Benefit’s
MOPEX
Mattcons Operational
 Excellence Model
    PROCESS
Increase Profitability and Cash Flow

   Driving Culture Change

    Supporting the Growth initiatives

     New product Development

    Supply Chain Management

   Focus on Maintenance

Beyond the Basics

                              OE Process
Increase Profitability and Cash Flow

Mattcons strategies, tools and techniques and
our methodologies designed for
       Improving business performance.
       Improve equipment uptime (OEE).
       Reduce scrap.
       Improve yield.
       Improve quality & productivity.
       Accelerate set-up/change-over times.
       Reduce lead times.
       Optimize inventory.


                                          OE Process
Driving Culture Change


Companies who successfully leverage operational
excellence as part of a strategic platform for
growth often achieve market performance well
beyond their nearest competitors.

    We can help you how to expand continuous
     improvement into non-manufacturing areas.
    Enhance sales force productivity.
    Optimize the maintenance activities.
    Enforcing the employees in all level.


                                     OE Process
Supporting the Growth initiatives


 Creating growth initiatives without losing focus
  on the core business.

 We will share Industry best Kaizens, Suggestions
  that really works and One point Lesson (OPL).

 Help your bottom line to develop more small
  ideas which will help ultimately transform your
  business




                                      OE Process
New product Development


 We will share best practices for applying
  process excellence to new product development
  and commercialization, Efficient product
  development processes closely integrated with
  the operational processes .

 You will gain important advantages, such as
  reduced lead time to market, improved quality
  and increased development capacity.




                                    OE Process
Supply Chain Management



 The complex and often costly internal supply
  chain processes is one area that many
  businesses seek to improve.


 By “killing complexity” in the overall supply
  chain system, companies will experience
  better, faster delivery with lower costs.




                                     OE Process
Focus on Maintenance



 Proper maintenance of plant equipment can
  significantly reduce the overall operating cost,
  while boosting the productivity of the plant.


 Hence another perspective of looking at
  maintenance function is not only to maintain
  but also to enhance the process or the plant
  operation system as a result of turnaround
  planning.



                                       OE Process
Beyond the Basics


 Many manufacturing organizations need to expand
  continuous improvement throughout the enterprise
  and seek training to expand capabilities into
  marketing, customer service, engineering ,new
  product development and quality control.


 Mattcons web Matrix is the helps the organization
  to increase web penetration, getting higher orders
  from online, increase the site rank & traffic.




                                      OE Process
TIME LINE FOR MOPEX MODEL
                                              12 months
                      18 months
                                               TPM Certification.
                                               ISO Certification.
6 months                                       GMP Certification.
                        TPM                    Kaizen Award.
                        Implementation.
                        Lean Manufacturing.
  5S.                   Quality
                        Management.
  KRA Set up.
                        Focus on Online
  RCA .                 Marketing.
  Basic Training to
  Operators.

                                               Time line
TOOLS THAT WE USED
 TPM- Total Productive Maintenance and 5S.
 SMED and RCA – Root Cause Analysis.
 Kaizen and FMEA – Failure Mode Effect Analysis.
 Lean Manufacturing.
 Value Chain and Value added analysis.
 Management System.
 Strategic Alignment.
 RCM and TQM – Total Quality Management.
 Mattcons web matrix.
INDUSTRY COVER
 Steel Plant                    Food Processing Plant
 Cement Plant                   Pharma     and Healthcare

 Sponge Iron Plant              Bottling Plant
 Power Plant (Coal Based)       Automobile Company
 Chemical Plant                 Glass Manufacturing
 Fertilizer Plant               Oil and Gas
 Formaldehyde Plant             Textile Plant
 FMCG                          Many more visit our Client Portal
                                        for more details.
 Bakery Plant
                                 www.mattcons.com
CLIENT’S ACHIVEMENT
      Plant OEE - Productivity                                       Machine Down Time
90                                                        1200
80
                                                          1000
                                                                             1,064
70
                                              80
60                         72                             800                               642
50           63                                           600                                             400
40
30                                                        400
20
                                                          200
10
 0                                                             0
          2010            2011          2012 (EXPECTED)               2010           2011         2012 (EXPECTED)




                  R&M Budget                                       Avg. Delivery Lead Time
EGP 14,000,000                                            70
                                 10804525
EGP 12,000,000                                            60                         53
EGP 10,000,000       11756450                             50          64
 EGP 8,000,000
                                                          40
 EGP 6,000,000
                                            8000000                                                      45
                                                          30
 EGP 4,000,000
 EGP 2,000,000                                            20
        EGP 0                                             10
                   2010          2011          2012       0
                                            (EXPECTED)               2010            2011         2012 (EXPECTED)




                                        Formaldehyde Plant Located in Egypt
CLIENT’S ACHIVEMENT
     M/C Break Down(Major)                                             5S Score
40                                               100
             37
35                                                90
30                                                80
25
                                                  70
                                                                           83              90
                                                  60
20                                                50
15                                                40       28
10                       11                       30
5                                                 20
                                       1          10
0
                                                   0
      2010        2011        2012 (EXPECTED)
                                                            2010          2011       2012 (EXPECTED)



     Inventory - Spare Parts                           Energy Consumption - KWH
90                                               9000000
80                                               8000000                               6500000
70                                               7000000
       80                            50                     7873514
60                                               6000000
                                                                           6782805
50                                               5000000
40                                               4000000
                   55                            3000000
30
20                                               2000000
10                                               1000000
 0                                                     0
      2010        2011         2012 (EXPECTED)                  2010        2011     2012 (EXPECTED)




                              Formaldehyde Plant Located in Egypt
CLIENT’S ACHIVEMENT
             Mattcons Web matrix                                     Number of Suggestions
                                                              600
100                                                                                             500
 90                                                 95
 80
                             73.6                             500
                                                                               364
 70                                                           400
 60
 50                                                           300
 40
                                                              200
 30
 20                                                           100    10
 10             10.8
  0                                                            0
             2010             2011         2012 (EXPECTED)            2010      2011   2012 (EXPECTED)



              Website Global Rank
25,000,000
                19,785,320
20,000,000
                                                                      Visit our website for
15,000,000                                                                More details :
10,000,000                          5,421,678
                                                                    www.mattcons.com
 5,000,000
                                                  800,000
        0
                    2010            2011    2012 (EXPECTED)




                                           Formaldehyde Plant Located in Egypt
ABOUT MATTCONS
 The company was setup with the objective of providing
  senior managers, Top management with a more effective
  resource to help resolve complex strategic and operational
  issues.
 Our reputation and credibility have been built through
  delivering practical and implementable solutions to clients –
  both domestic and international covering both the
  manufacturing and the service sector.

  one stop company for all services that you need with most
 cost effective way with higher return over investment value.

                                            About Mattcons
MATTCONS OFFERINGS
Management Consulting
Green Consulting
Condition Monitoring
Project Management
Operation Outsourcing
Industrial Trainings
Maintenance Products.

For More details kindly visit our website www.mattcons.com or

           Drop an email at askus@mattcons.com

                                           About Mattcons
MATTCONS CLIENT’S




                                                        Visit our Client
                                                        Portal for More
                                                             details

Some of the project was executed with the help of AMC - Asset Management
Consultant & TPMWAY - A subsidiaries of Mattcons.
                                                 About Mattcons
CONTACT US
         Email                   ::           askus@mattcons.com
         Open Line               ::           +91 – 902 900 5850
         Phone                   ::           +91 – 22 – 412 36 302


                         Office Location
Mumbai - India                        BBSR - India                     Mansura - Egypt

Mattcons Services (P) Limited.        Mattcons Services (P) Limited.     Mattcons – EMEA Region
Waghbill Naka, Thane – West,             Kalyan Nagar, Pallahat,       Business Development Center.
      Mumbai – 400607                       Khurda, – 752055            Aga-Dakahlia–Egypt – 35516
Email – askus@mattcons.com            Email – askus@mattcons.com       Email – askus@mattcons.com
  Phone - +91 – 412 36 302             Phone - +91 – 986 101 5544       Phone - +20 – 106 378 4682



 www.mattcons.com                                                            THANK YOU

Mopex model From Mattcons

  • 1.
    Operational Excellence Model (MOPEX) DEVELOPED BY :- Mattcons Services Private Limited
  • 2.
    ABSTRACT  What isOperational Excellence and our Process.  Key Results from Operational Excellence  Time line for OE Model.  Methodologies we used.  Sector’s that MOPEX model Cover.  Our Client Achievements  About Mattcons  Mattcons Client’s  Contact us Bakery Industry
  • 3.
    OPERATIONAL EXCELLENCE  Operationalexcellence model helps achieve business goals while lowering costs and improving cycle times.  It standardizes processes and integrates operations across multiple channels of supply and distribution, supporting high-volume, low- margin business strategies. MOPEX Model
  • 4.
    KEY RESULTS FROMOE  Reduction of Manufacturing Cost by 20 – 30 %  Improve the Net productivity up by 30 - 60 %  Number of Breakdown reduced by 10 - 80%  Overall Plant Effectiveness by 30 - 50 %  Reduction Defective Products by 50%  Customer Complain down by 40 - 60%  Inventory (Only Spare parts) down by 30%  Major Accidents reduced by 50%  Minor Accidents reduced by 40%  Enhance the Employees Moral by 5 times  Improvement of Suggestion 10 times minimum.  Workforce uncertain absent-ism down by 5 times. Benefit’s
  • 5.
    INTANGIABLE BENEFIT’S  Achieving full Self Management – Operators have ownership on their equipment.  Enhancing skill and knowledge of workforce by training.  Building CANDO attitude by eliminating breakdowns and defects.  Enhancing the communication among all team members.  Make the workplace clean, bright and lively and Giving plant visitors a better image.  Making all losses more visible and enhance safety of plant.  Making the plant with more visual display. Benefit’s
  • 6.
  • 7.
    Increase Profitability andCash Flow Driving Culture Change Supporting the Growth initiatives New product Development Supply Chain Management Focus on Maintenance Beyond the Basics OE Process
  • 8.
    Increase Profitability andCash Flow Mattcons strategies, tools and techniques and our methodologies designed for  Improving business performance.  Improve equipment uptime (OEE).  Reduce scrap.  Improve yield.  Improve quality & productivity.  Accelerate set-up/change-over times.  Reduce lead times.  Optimize inventory. OE Process
  • 9.
    Driving Culture Change Companieswho successfully leverage operational excellence as part of a strategic platform for growth often achieve market performance well beyond their nearest competitors.  We can help you how to expand continuous improvement into non-manufacturing areas.  Enhance sales force productivity.  Optimize the maintenance activities.  Enforcing the employees in all level. OE Process
  • 10.
    Supporting the Growthinitiatives  Creating growth initiatives without losing focus on the core business.  We will share Industry best Kaizens, Suggestions that really works and One point Lesson (OPL).  Help your bottom line to develop more small ideas which will help ultimately transform your business OE Process
  • 11.
    New product Development We will share best practices for applying process excellence to new product development and commercialization, Efficient product development processes closely integrated with the operational processes .  You will gain important advantages, such as reduced lead time to market, improved quality and increased development capacity. OE Process
  • 12.
    Supply Chain Management The complex and often costly internal supply chain processes is one area that many businesses seek to improve.  By “killing complexity” in the overall supply chain system, companies will experience better, faster delivery with lower costs. OE Process
  • 13.
    Focus on Maintenance Proper maintenance of plant equipment can significantly reduce the overall operating cost, while boosting the productivity of the plant.  Hence another perspective of looking at maintenance function is not only to maintain but also to enhance the process or the plant operation system as a result of turnaround planning. OE Process
  • 14.
    Beyond the Basics Many manufacturing organizations need to expand continuous improvement throughout the enterprise and seek training to expand capabilities into marketing, customer service, engineering ,new product development and quality control.  Mattcons web Matrix is the helps the organization to increase web penetration, getting higher orders from online, increase the site rank & traffic. OE Process
  • 15.
    TIME LINE FORMOPEX MODEL 12 months 18 months TPM Certification. ISO Certification. 6 months GMP Certification. TPM Kaizen Award. Implementation. Lean Manufacturing. 5S. Quality Management. KRA Set up. Focus on Online RCA . Marketing. Basic Training to Operators. Time line
  • 16.
    TOOLS THAT WEUSED  TPM- Total Productive Maintenance and 5S.  SMED and RCA – Root Cause Analysis.  Kaizen and FMEA – Failure Mode Effect Analysis.  Lean Manufacturing.  Value Chain and Value added analysis.  Management System.  Strategic Alignment.  RCM and TQM – Total Quality Management.  Mattcons web matrix.
  • 17.
    INDUSTRY COVER  SteelPlant  Food Processing Plant  Cement Plant  Pharma and Healthcare  Sponge Iron Plant  Bottling Plant  Power Plant (Coal Based)  Automobile Company  Chemical Plant  Glass Manufacturing  Fertilizer Plant  Oil and Gas  Formaldehyde Plant  Textile Plant  FMCG Many more visit our Client Portal for more details.  Bakery Plant www.mattcons.com
  • 18.
    CLIENT’S ACHIVEMENT Plant OEE - Productivity Machine Down Time 90 1200 80 1000 1,064 70 80 60 72 800 642 50 63 600 400 40 30 400 20 200 10 0 0 2010 2011 2012 (EXPECTED) 2010 2011 2012 (EXPECTED) R&M Budget Avg. Delivery Lead Time EGP 14,000,000 70 10804525 EGP 12,000,000 60 53 EGP 10,000,000 11756450 50 64 EGP 8,000,000 40 EGP 6,000,000 8000000 45 30 EGP 4,000,000 EGP 2,000,000 20 EGP 0 10 2010 2011 2012 0 (EXPECTED) 2010 2011 2012 (EXPECTED) Formaldehyde Plant Located in Egypt
  • 19.
    CLIENT’S ACHIVEMENT M/C Break Down(Major) 5S Score 40 100 37 35 90 30 80 25 70 83 90 60 20 50 15 40 28 10 11 30 5 20 1 10 0 0 2010 2011 2012 (EXPECTED) 2010 2011 2012 (EXPECTED) Inventory - Spare Parts Energy Consumption - KWH 90 9000000 80 8000000 6500000 70 7000000 80 50 7873514 60 6000000 6782805 50 5000000 40 4000000 55 3000000 30 20 2000000 10 1000000 0 0 2010 2011 2012 (EXPECTED) 2010 2011 2012 (EXPECTED) Formaldehyde Plant Located in Egypt
  • 20.
    CLIENT’S ACHIVEMENT Mattcons Web matrix Number of Suggestions 600 100 500 90 95 80 73.6 500 364 70 400 60 50 300 40 200 30 20 100 10 10 10.8 0 0 2010 2011 2012 (EXPECTED) 2010 2011 2012 (EXPECTED) Website Global Rank 25,000,000 19,785,320 20,000,000 Visit our website for 15,000,000 More details : 10,000,000 5,421,678 www.mattcons.com 5,000,000 800,000 0 2010 2011 2012 (EXPECTED) Formaldehyde Plant Located in Egypt
  • 21.
    ABOUT MATTCONS  Thecompany was setup with the objective of providing senior managers, Top management with a more effective resource to help resolve complex strategic and operational issues.  Our reputation and credibility have been built through delivering practical and implementable solutions to clients – both domestic and international covering both the manufacturing and the service sector. one stop company for all services that you need with most cost effective way with higher return over investment value. About Mattcons
  • 22.
    MATTCONS OFFERINGS Management Consulting GreenConsulting Condition Monitoring Project Management Operation Outsourcing Industrial Trainings Maintenance Products. For More details kindly visit our website www.mattcons.com or Drop an email at askus@mattcons.com About Mattcons
  • 23.
    MATTCONS CLIENT’S Visit our Client Portal for More details Some of the project was executed with the help of AMC - Asset Management Consultant & TPMWAY - A subsidiaries of Mattcons. About Mattcons
  • 24.
    CONTACT US Email :: askus@mattcons.com Open Line :: +91 – 902 900 5850 Phone :: +91 – 22 – 412 36 302 Office Location Mumbai - India BBSR - India Mansura - Egypt Mattcons Services (P) Limited. Mattcons Services (P) Limited. Mattcons – EMEA Region Waghbill Naka, Thane – West, Kalyan Nagar, Pallahat, Business Development Center. Mumbai – 400607 Khurda, – 752055 Aga-Dakahlia–Egypt – 35516 Email – askus@mattcons.com Email – askus@mattcons.com Email – askus@mattcons.com Phone - +91 – 412 36 302 Phone - +91 – 986 101 5544 Phone - +20 – 106 378 4682 www.mattcons.com THANK YOU