SlideShare a Scribd company logo
1 of 5
Download to read offline
PG/QMS/SF/012/00 CV Standard Format Page 1 of 5
Standard Curriculum Vitae
M
Personal Details:
Full Name:
Mohamed Waleed El Saed Hasan
Date of Birth: (DD MMM YY) 23 Nov 1974
Nationality: Egyptian
Marital Status: Married
Permanent Address: Giza-Egypt
Temporary Address: N/A
Passport:
Number: 483912
Country of Issue: Egypt
Contact Details:
Mobile / Home: 01220022397 - 02/33883369
E-mail:
Mohamedwaled@allamsons.com / emanwaleed2005@yahoo.com
Mohamedwaled2892013@gmail.com
Education:
Primary Qualification:
Level: (MSc, BSc, etc) 1. BSC
Discipline: (e.g. Civil Eng, etc)
graduation year
Civil Eng / may-1998
Continuing Professional Development: (Reverse chronological order, i.e. latest first)
Dates (DD MMM YY) Courses
From To Subject Provider
1/6/2011 30/6/2011
Project management
professional (PMP)
Becom-acadimy
11/5/2010 11/5/2010 OSHA MIRDIF Security and safety Consultant
8/3/2009 12/3/2009
ISO 9001/2008- internal quality
management auditor
Kaizen Egypt
1/2/2009 5/2/2009
Establishing of QMS in
accordance with ISO
9001/2008
Kaizen Egypt
3/7/2006 10/7/2006 Primavera project planner
PROMASTER
Core Competencies:
 Leadership  Solving problem
 Systematic
 Planning  Working under pressure
 High communication skills
PG/QMS/SF/012/00 CV Standard Format Page 2 of 5
Career Summary: (Reverse chronological order, i.e. latest first)
Years
Job Titles EmployersFrom
(YYYY)
TO
(YYYY)
Duration
(+/- 0.25 yr)
2011 Now 4.0 Yrs.
Quality Control Manager
Hassan Allam Construction
2007 2010 4.0 yrs quality Control Manager
Orascom Construction Industries
(OCI)
2006 2007 1 yr Junior site manager El Gabry general contracting Co
2005 2006 1 yr Senior site engineer
JV industrial engineering enterprise &
VCC
2004 2005 1.5 yrs Lead civil quality control engineer MORGANTI AIC/ LLC (Joint Venture)
2003 2004 1.1 Quality Control Engineer ABB Susa INC.
2002 2003 1 Quality Control Engineer
JV Washington international. /
Contrak
2000 2002 2 Quality Control Engineer
JV Washington international. /
Contrak
1998 2000 1.5 Quality Control Engineer
JV Washington international. /
Contrak
Career History: (Reverse chronological order, i.e. latest first)
Year From: February 2011
Year To: Now
Job Title: Quality Control Manager
Employer/
project:
Hassan Allam Construction
Project: 40 West Project at Beverly Hills.
Owner : (SODIC)
Consultant: MEDHAT ABOU ZEID (MZECH)
Budget : 550 million L.E
List Main Duties:
 Responsible for overall monitoring of QA/QC staff in the project and report to the quality director and the
project manager.

 Lead effectively a team of quality engineers to achieve the project specified inspection and testing
requirements on site and off site.
 Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.
 Managing calibration of measurements & laboratories equipments.
 Managing periodic quality reporting at prescribe interval & format.
 Managing submission of time quality documentation and record for handover.
 Communicate all Hassan Allam QMS requirements, procedure and manage the implementation of this
system.
 Maintain the record of the inspections of the incoming materials and to reject the defective materials.
 Managing non conformities process and propose the corrective actions.
 Expedite close out of the punch list items during the periodical meeting with the construction team.
PG/QMS/SF/012/00 CV Standard Format Page 3 of 5
Year From: 2007
Year To: 2011
Job Title: (Quality Control Manager)
Employer/
project:
Orascom Construction Industries
Project: El-Tebbin Thermal Power Plant 350x2MW (Oil / Gas Fired Units) Project.
Budget : 950 million L.E
List Main Duties:
 Responsible for overall monitoring of QA/QC staff in the project and report to the project manager and
business unit quality manager.
 Lead effectively a team of quality engineers to achieve the project specified inspection and testing
requirements on site and off site.
 Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.
 Managing calibration of measurements & laboratories equipments.
 Managing periodic quality reporting at prescribe interval & format.
 Managing submission of time quality documentation and record for handover.
 Communicate all Orascom QMS requirements, procedure and manage the implementation of this system.
 Maintain the record of the inspections of the incoming materials and to reject the defective materials.
 Managing non conformities process.
 Expedite close out of the punch list items during the periodical meeting with the construction team.
List Any Notable Achievements:
 Completed and lead the QC team for the project within the contract specifications and obligations
and without any major quality issues and without any claims from the client.
Year From: 2006
Year To: 2007
Job Title: Junior site manager
Employer/
project:
El Gabry general contracting Co.
Project :sun shine hotel in Neama bay sharm el shekh
Budget : 52 million L.E
 Insuring the project run to the schedule and budget.
 Managing programs of work (planning)
 Arranging delivery of material.
 Managing arrange of subcontractors.
 Contact and communicate with the local authorities for work permits.
 Conducting a regular site safety checks.
 Maintaining of strict quality control procedures.
 Liaising with client/consultant periodical meetings to keep them informed of progress.
Year From: 2005
Year To: 2006
Job Title: Senior site engineer
Employer/
project:
JV industrial engineering enterprise & VCC
Project : urban water and sanitation project (waste water treatment
plant and pump stations and related buildings)
Budget : 103 million L.E
List Main Duties:
 Providing a technical advice to subcontractors and construction junior site engineers.
 Supervising (setting out, levelling, surveying the site.
 Ensure delivering of the materials and their quantities.
 Checking plans, drawings and quantities for accuracy of calculations.
 Day to day management of the site including supervision and monitoring the site labour force and the work
of any subcontractor.
 Resolving any unexpected technical difficulties.
 Overseeing quality control, health and safety matters at site.
List Any Notable Achievements:
PG/QMS/SF/012/00 CV Standard Format Page 4 of 5
 Completed the project with minor punch list items
Year From: 2004
Year To: 2005
Job Title: Lead civil quality control engineer.
Employer/
project:
MORGANTI AIC/ LLC (Joint Venture)
Project : Alexandria water general authority
Egypt utilities management /Alexandria
USAID Grant NO 263-0270.20
Contract NO. 263-C-00-01-00016-00
Budget : 112 million L.E
List Main Duties:
 Leading a staff of junior QC engineers and inspectors
 Monitoring all inspection activities related to rehabilitation of a water treatment plant and erecting of new
water treatment plant
 Monitoring inspection and transmission and distribution pipe line on installation.
 Monitoring inspection and testing pipes (D.I, PVC, CS) for hydrostatic and disinfection tests.
 Review all inspection report for compliance
 Assist QC manager in the organization, maintenance and control of quality system.
 Assist QC manager and construction engineers in resolving any discrepancies
 Prepare non conformance report to QA/QC manager
 Review the work procedures and method statement for compliance
 Attending a weekly meeting with client to discuss the quality issues
List Any Notable Achievements:
 Complete the water treatment plant with issuance minor amount of non conformance reports from
the consultant.
Year From: 2003
Year To: 2004
Job Title: Quality control engineer
Employer/
project:
ABB Susa INC.
Design/build construction project for middle Egypt cities.
Budget : 101 million L.E
List Main Duties:
 Perform a complete inspection for the delivered material
 Prepare MRR for all the approved material
 Perform all inspection activities related to erection of new water treatment plant including (concrete work,
finishing work and paving, landscaping)
 Perform inspection of the installation and testing of gravity and pressure pipe line
 Verify the work procedures and MS for compliance.
 Ensure the work is correctly prepared prior to any inspection being undertaken.
 Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).
 Prepare a QC daily report and NCR to the QC manger.
List Any Notable Achievements:
 Complete the project without issuance any surveillance notice report from the consultant.
PG/QMS/SF/012/00 CV Standard Format Page 5 of 5
Year From: 2002
Year To: 2003
Job Title: Quality control engineer
Employer/
project:
JV Washington international. / Contrak
Project : Luxor Waste Water Facilities Project
Budget : 40 million L.E
List Main Duties:
 Perform inspection and testing for precast concrete and various type of pipes (PVC, RC, DI)
 Perform inspection on the Suring system of deep excavation according to the design drawing
 Insuring the work is correctly prepared prior to inspection
 Perform the inspection of all the delivered materials and prepare the MRR
 Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).
 Prepare a QC daily report to the QC manger.
 Prepare non conformance report to the QA/QC manager if needed.
List Any Notable Achievements:
 Complete the project within the targeted quality according to the project specifications.
From March 2000 to feb.2002
Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V. `
With camp dresser&Mckee international inc.
Owner : National organization of potable water and sanitary drainage (NOPWSD)
Contractor : Morrison Knudson International / Contrak (J.V.).
Project : Aswan Cities Water & Waste Water Facilities Project
USAID : Project with total cost 108 million $ - Grand NO.263 -0236.
Job : Quality Control Engineer
Duties : Inspection and testing for R.C, PVC, and VCP.
Inspection and testing and finishing for precast
manhole and cast in place
Manholes and precast house connection following lab activities
through the project including material acceptance.
From July 1998 to Feb. 2000
Quality control Engineer for “Consulting Engineering Laboratories” for canal cities water and
wastewater project for sewer rehabilitation of Port Said contract variation order “CVO – 009 –
PS”
Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V
With camp dresser&Mckee international Inc.
Owner : National organization of potable water and sanitary drainage (NOPWSD)
Contractor : Morrison Knudson International / Contrak (J.V.).
Project : port said Water & Waste Water Facilities Project
USAID : Project with total cost 91million $ - Grand NO.263 -0262.
Job : Quality Control Engineer
Duties : Inspection and testing for R.C, PVC, and VCP.
Inspection and testing and finishing for precast
manhole and cast in place.

More Related Content

What's hot

Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERMOHAMMED ZUBAIR
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Last Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CVLast Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CVHesham Mokhtar Ali
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEERSathura Giri
 
senior painting-coating-insulation inspector 2016
senior painting-coating-insulation  inspector 2016senior painting-coating-insulation  inspector 2016
senior painting-coating-insulation inspector 2016mostafa mohamed
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolioMohamed Farouk
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 

What's hot (20)

Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
ACE TRIA
ACE TRIAACE TRIA
ACE TRIA
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
QC. CV
QC. CVQC. CV
QC. CV
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Last Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CVLast Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CV
 
YOGARAJ CV
YOGARAJ CVYOGARAJ CV
YOGARAJ CV
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
 
senior painting-coating-insulation inspector 2016
senior painting-coating-insulation  inspector 2016senior painting-coating-insulation  inspector 2016
senior painting-coating-insulation inspector 2016
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 

Similar to mohamed waleed CV .april 2015

Similar to mohamed waleed CV .april 2015 (20)

RESUME Khaled 2017
RESUME Khaled  2017RESUME Khaled  2017
RESUME Khaled 2017
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
peercv- 1
peercv- 1peercv- 1
peercv- 1
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Document Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq UllahDocument Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq Ullah
 
RESUME=
RESUME=RESUME=
RESUME=
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 

mohamed waleed CV .april 2015

  • 1. PG/QMS/SF/012/00 CV Standard Format Page 1 of 5 Standard Curriculum Vitae M Personal Details: Full Name: Mohamed Waleed El Saed Hasan Date of Birth: (DD MMM YY) 23 Nov 1974 Nationality: Egyptian Marital Status: Married Permanent Address: Giza-Egypt Temporary Address: N/A Passport: Number: 483912 Country of Issue: Egypt Contact Details: Mobile / Home: 01220022397 - 02/33883369 E-mail: Mohamedwaled@allamsons.com / emanwaleed2005@yahoo.com Mohamedwaled2892013@gmail.com Education: Primary Qualification: Level: (MSc, BSc, etc) 1. BSC Discipline: (e.g. Civil Eng, etc) graduation year Civil Eng / may-1998 Continuing Professional Development: (Reverse chronological order, i.e. latest first) Dates (DD MMM YY) Courses From To Subject Provider 1/6/2011 30/6/2011 Project management professional (PMP) Becom-acadimy 11/5/2010 11/5/2010 OSHA MIRDIF Security and safety Consultant 8/3/2009 12/3/2009 ISO 9001/2008- internal quality management auditor Kaizen Egypt 1/2/2009 5/2/2009 Establishing of QMS in accordance with ISO 9001/2008 Kaizen Egypt 3/7/2006 10/7/2006 Primavera project planner PROMASTER Core Competencies:  Leadership  Solving problem  Systematic  Planning  Working under pressure  High communication skills
  • 2. PG/QMS/SF/012/00 CV Standard Format Page 2 of 5 Career Summary: (Reverse chronological order, i.e. latest first) Years Job Titles EmployersFrom (YYYY) TO (YYYY) Duration (+/- 0.25 yr) 2011 Now 4.0 Yrs. Quality Control Manager Hassan Allam Construction 2007 2010 4.0 yrs quality Control Manager Orascom Construction Industries (OCI) 2006 2007 1 yr Junior site manager El Gabry general contracting Co 2005 2006 1 yr Senior site engineer JV industrial engineering enterprise & VCC 2004 2005 1.5 yrs Lead civil quality control engineer MORGANTI AIC/ LLC (Joint Venture) 2003 2004 1.1 Quality Control Engineer ABB Susa INC. 2002 2003 1 Quality Control Engineer JV Washington international. / Contrak 2000 2002 2 Quality Control Engineer JV Washington international. / Contrak 1998 2000 1.5 Quality Control Engineer JV Washington international. / Contrak Career History: (Reverse chronological order, i.e. latest first) Year From: February 2011 Year To: Now Job Title: Quality Control Manager Employer/ project: Hassan Allam Construction Project: 40 West Project at Beverly Hills. Owner : (SODIC) Consultant: MEDHAT ABOU ZEID (MZECH) Budget : 550 million L.E List Main Duties:  Responsible for overall monitoring of QA/QC staff in the project and report to the quality director and the project manager.   Lead effectively a team of quality engineers to achieve the project specified inspection and testing requirements on site and off site.  Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.  Managing calibration of measurements & laboratories equipments.  Managing periodic quality reporting at prescribe interval & format.  Managing submission of time quality documentation and record for handover.  Communicate all Hassan Allam QMS requirements, procedure and manage the implementation of this system.  Maintain the record of the inspections of the incoming materials and to reject the defective materials.  Managing non conformities process and propose the corrective actions.  Expedite close out of the punch list items during the periodical meeting with the construction team.
  • 3. PG/QMS/SF/012/00 CV Standard Format Page 3 of 5 Year From: 2007 Year To: 2011 Job Title: (Quality Control Manager) Employer/ project: Orascom Construction Industries Project: El-Tebbin Thermal Power Plant 350x2MW (Oil / Gas Fired Units) Project. Budget : 950 million L.E List Main Duties:  Responsible for overall monitoring of QA/QC staff in the project and report to the project manager and business unit quality manager.  Lead effectively a team of quality engineers to achieve the project specified inspection and testing requirements on site and off site.  Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.  Managing calibration of measurements & laboratories equipments.  Managing periodic quality reporting at prescribe interval & format.  Managing submission of time quality documentation and record for handover.  Communicate all Orascom QMS requirements, procedure and manage the implementation of this system.  Maintain the record of the inspections of the incoming materials and to reject the defective materials.  Managing non conformities process.  Expedite close out of the punch list items during the periodical meeting with the construction team. List Any Notable Achievements:  Completed and lead the QC team for the project within the contract specifications and obligations and without any major quality issues and without any claims from the client. Year From: 2006 Year To: 2007 Job Title: Junior site manager Employer/ project: El Gabry general contracting Co. Project :sun shine hotel in Neama bay sharm el shekh Budget : 52 million L.E  Insuring the project run to the schedule and budget.  Managing programs of work (planning)  Arranging delivery of material.  Managing arrange of subcontractors.  Contact and communicate with the local authorities for work permits.  Conducting a regular site safety checks.  Maintaining of strict quality control procedures.  Liaising with client/consultant periodical meetings to keep them informed of progress. Year From: 2005 Year To: 2006 Job Title: Senior site engineer Employer/ project: JV industrial engineering enterprise & VCC Project : urban water and sanitation project (waste water treatment plant and pump stations and related buildings) Budget : 103 million L.E List Main Duties:  Providing a technical advice to subcontractors and construction junior site engineers.  Supervising (setting out, levelling, surveying the site.  Ensure delivering of the materials and their quantities.  Checking plans, drawings and quantities for accuracy of calculations.  Day to day management of the site including supervision and monitoring the site labour force and the work of any subcontractor.  Resolving any unexpected technical difficulties.  Overseeing quality control, health and safety matters at site. List Any Notable Achievements:
  • 4. PG/QMS/SF/012/00 CV Standard Format Page 4 of 5  Completed the project with minor punch list items Year From: 2004 Year To: 2005 Job Title: Lead civil quality control engineer. Employer/ project: MORGANTI AIC/ LLC (Joint Venture) Project : Alexandria water general authority Egypt utilities management /Alexandria USAID Grant NO 263-0270.20 Contract NO. 263-C-00-01-00016-00 Budget : 112 million L.E List Main Duties:  Leading a staff of junior QC engineers and inspectors  Monitoring all inspection activities related to rehabilitation of a water treatment plant and erecting of new water treatment plant  Monitoring inspection and transmission and distribution pipe line on installation.  Monitoring inspection and testing pipes (D.I, PVC, CS) for hydrostatic and disinfection tests.  Review all inspection report for compliance  Assist QC manager in the organization, maintenance and control of quality system.  Assist QC manager and construction engineers in resolving any discrepancies  Prepare non conformance report to QA/QC manager  Review the work procedures and method statement for compliance  Attending a weekly meeting with client to discuss the quality issues List Any Notable Achievements:  Complete the water treatment plant with issuance minor amount of non conformance reports from the consultant. Year From: 2003 Year To: 2004 Job Title: Quality control engineer Employer/ project: ABB Susa INC. Design/build construction project for middle Egypt cities. Budget : 101 million L.E List Main Duties:  Perform a complete inspection for the delivered material  Prepare MRR for all the approved material  Perform all inspection activities related to erection of new water treatment plant including (concrete work, finishing work and paving, landscaping)  Perform inspection of the installation and testing of gravity and pressure pipe line  Verify the work procedures and MS for compliance.  Ensure the work is correctly prepared prior to any inspection being undertaken.  Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).  Prepare a QC daily report and NCR to the QC manger. List Any Notable Achievements:  Complete the project without issuance any surveillance notice report from the consultant.
  • 5. PG/QMS/SF/012/00 CV Standard Format Page 5 of 5 Year From: 2002 Year To: 2003 Job Title: Quality control engineer Employer/ project: JV Washington international. / Contrak Project : Luxor Waste Water Facilities Project Budget : 40 million L.E List Main Duties:  Perform inspection and testing for precast concrete and various type of pipes (PVC, RC, DI)  Perform inspection on the Suring system of deep excavation according to the design drawing  Insuring the work is correctly prepared prior to inspection  Perform the inspection of all the delivered materials and prepare the MRR  Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).  Prepare a QC daily report to the QC manger.  Prepare non conformance report to the QA/QC manager if needed. List Any Notable Achievements:  Complete the project within the targeted quality according to the project specifications. From March 2000 to feb.2002 Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V. ` With camp dresser&Mckee international inc. Owner : National organization of potable water and sanitary drainage (NOPWSD) Contractor : Morrison Knudson International / Contrak (J.V.). Project : Aswan Cities Water & Waste Water Facilities Project USAID : Project with total cost 108 million $ - Grand NO.263 -0236. Job : Quality Control Engineer Duties : Inspection and testing for R.C, PVC, and VCP. Inspection and testing and finishing for precast manhole and cast in place Manholes and precast house connection following lab activities through the project including material acceptance. From July 1998 to Feb. 2000 Quality control Engineer for “Consulting Engineering Laboratories” for canal cities water and wastewater project for sewer rehabilitation of Port Said contract variation order “CVO – 009 – PS” Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V With camp dresser&Mckee international Inc. Owner : National organization of potable water and sanitary drainage (NOPWSD) Contractor : Morrison Knudson International / Contrak (J.V.). Project : port said Water & Waste Water Facilities Project USAID : Project with total cost 91million $ - Grand NO.263 -0262. Job : Quality Control Engineer Duties : Inspection and testing for R.C, PVC, and VCP. Inspection and testing and finishing for precast manhole and cast in place.