Agenda


1. Background and Context

2. Remuneration trends

3. Benefits practices

4. Staffing issues

5. Expatriate issues

6. Acquiring in Indonesia

7. Conclusion

8. Q&A



Mercer                      2
                            2
Mercer
1. Background and Context
                            1   Background and Context

                            2   Remuneration Trends

                            3   Benefits Practices

                            4   Staffing Issues

                            5   Expatriate Issues

                            6   Acquiring in Indonesia

                            7   Conclusion
Outlook in the region has improved further
Asia Pacific regional GDP forecast

                   Regional: GDP Forecasts, % real growth, 2009-2011
                                  2009   2010   2011 (forecast)

   20


   15


   10


     5


     0


    -5


  -10
         CN   IN   VN   ID   AU     PH   SK     NZ   SG    MY     TW   TH      HK         JP         US

                                                                       Source: IMA Asia Pacific Executive Brief, March 2011



Mercer                                                                                                               4
                                                                                                                     4
Mercer
Inflation is increasing again
Potential impact on compensation increases

                             Regional Inflation Forecasts, % CPI

                                  2009   2010   2011 (forecast)

   15

   13

   11

    9

    7

    5

    3

    1

   -1

   -3
         IN   VN   ID   PH   SK    NZ    AU     HK   MY    SG     CN   TW       TH         JP        US
                                                                        Source: IMA Asia Pacific Executive Brief, March 2011



Mercer                                                                                                                5
                                                                                                                      5
Mercer
Organizations need to plan on the basis of…


   Upward inflationary pressures
    – Potential impact on salary growth
    – Need to target compensation spending

   High fuel prices to continue into the foreseeable future
    – Review operating models
    – Renew focus on efficiency gains




Mercer                                                        6
                                                              6
Mercer
2. Remuneration Trends
                         1   Background and Context

                         2   Remuneration Trends

                         3   Benefits Practices

                         4   Staffing Issues

                         5   Expatriate Issues

                         6   Acquiring in Indonesia

                         7   Conclusion
Compensation: Basics


   Minimum wage
    – Varied by province, district, and sector
    – Multinational companies tend to have a higher compensation
      standard
   Frequency of payments
    – 13 months; the 13th month is a statutory requirement
    – Market practice indicates that employees who work less than a year
      receive pro-rated amount of the 13th month salary




Mercer                                                                     8
                                                                           8
Mercer
Average Industries Salary Increase vs. Inflation
Salary increases continue to outstrip inflation

  Current inflation rate is usually considered for budget increase planning in the
following year


            Inflation rate       All Industries Base Salary Increase


         13.1%
                    10.7%     10.9%                                                       8.4%
         13.0%                                                                            7.5%
                                                              8.2%
                     6.4%      9.8%        9.2%
                                           4.8%               5.1%



         2006        2007      2008        2009               2010                      2011
                                                                                     (forecast)

                                                  Source: IMA Asia Pacific Executive Brief, Mercer Total Remuneration Survey



Mercer                                                                                                                9
                                                                                                                      9
Mercer
Factors Determining Salary Increase

                        Percentage of companies

                 Individual Performance                   96

                Company Performance                  81

                Inflation                            79

                 Position in Salary Range      72

                Job Level           46

                            26     Market Competitiveness


                      14         Length of Service


                                 All Industries
Mercer                                                         10
                                                               10
Mercer
Variable Pay Trends (% of Annual Base Salary)
Average Overall


               24.00
                               22.3                                                          22.6                           22.2
               22.00                                         21.5

               20.00

               18.00
         (%)
               16.00

               14.00

               12.00

               10.00
                                                                     All Industries
                  2008                       2009                              2010                              2011 (forecast)


                         Source: Mercer 2010 Total Remuneration Survey APCBF Report and Preliminary Mercer 2010 Total Remuneration Survey (All Industries)



Mercer                                                                                                                                                       11
                                                                                                                                                             11
Mercer
3. Benefits Practices
                        1   Background and Context

                        2   Remuneration Trends

                        3   Benefits Practices

                        4   Staffing Issues

                        5   Expatriate Issues

                        6   Acquiring in Indonesia

                        7   Conclusion
Benefits: Social Insurance (1 of 2)


   JAMSOSTEK (Jaminan Sosial Tenaga Kerja) is a social security
   scheme in Indonesia that prescribes the minimum coverage for
   retirement, accident, death and health benefits
   Implemented in 1993 as a replacement for ASTEK, which in turn had
   been in place since 1978
   Membership is compulsory for companies with over 10 employees, or
   with a monthly payroll of at least IDR 1 million
   JAMSOSTEK policies for personal accident, life insurance and old-age
   security benefits are compulsory
    – But companies can opt out of JAMSOSTEK’s health benefit as long
      as they provide an equal or better program




Mercer                                                                    13
                                                                          13
Mercer
Benefits: Social Insurance (2 of 2)


   Employers contribute to JAMSOSTEK’s four elements – occupational
   accident, death, health maintenance and old age. The employer’s
   contribution rate for occupational accident varies depending on the
   company’s industrial risk classification
   The contribution rates applied to base salary are as follows:
    – 0.24% to 1.74% of the monthly wage for the occupational accidents
      plan (depending on the nature of business);
    – 5.7% of monthly wage for the old-age saving plan, of which
      employees contribute 2.0% and the company contributes 3.7%;
    – 0.30% of monthly wage for the death benefits plan; and
    – 3% (single) and 6% (married) for the health benefit plan – optional if
      the company provides an equal or better plan
   Total JAMSOSTEK contribution is in the range of 9.24% - 13.74% of
   basic salary

Mercer                                                                         14
                                                                               14
Mercer
Typical Benefits
                                % Companies Provide (All Industries)


                                       Health care*                97%

                       Training & Education                        95%

                               Vehicle benefits                   82%

                                 Life Insurance*            57%

                                             ADD*           51%

                              Travel Insurance          47%

                                       Retirements      46%

                                            Loans      37%

           Company products Discount                  21%

   *On top of statutory requirements


Mercer                                                                   15
                                                                         15
Mercer
Health Benefits and Insurance
Outpatient Benefits - Clinical
•   Typically outpatient covered clinical and dental. The cap including dependants
•   If reimbursement is only partially given, then the typical percentage reimbursed is 90%

Inpatient Benefits
•   Most of companies provide inpatient benefit for employees and dependants
•   Typical inpatient clinical is capped at maximum daily room and board rate

Life Insurance Trends
•   55% of companies provide Life Insurance benefits
•   Around 71% of companies who have Life Insurance benefits provide in terms of months’
    salaries, on average 23MBS for Executive, Professional Sales, Professional Non-Sales, Para
    Professional level and 35MBS for Management level

Accidental Death & Disability (AD&D) Trends
• 42% of companies provide ADD benefits
• Around 69% of companies who have ADD benefits provide in terms of months’ salaries, on
  average 34MBS for Executive, Management, Professional Sales level; 33MBS for Professional
  Non-Sales level and 37MBS for Para Professional level

Mercer                                                                                        16
                                                                                              16
Mercer
Labour Law 13/2003                         Service Year (Y)   Severance    Gratuity
                                                               (months)   (months)
Severance and Gratuity Pay
                                                   Y<1            1          0

   Payable to all employees who                1    Y<2           2          0
   have been terminated from the               2    Y<3           3          0
   company due to the attainment
                                               3    Y<4           4          2
   of retirement age and also pre-
   retirement age termination                  4    Y<5           5          2
     – Severance pay is calculated at a        5    Y<6           6          2
       base rate of one month’s wages
       for each year of service, up to a       6    Y<7           7          3
       maximum of nine months pay              7    Y<8           8          3
     – Payment for reward of service
                                               8    Y<9           9          3
       consists of adding one month’s
       pay for every three years of           9     Y < 12        9          4
       employment, starting with two
                                              12    Y < 15        9          5
       month’s pay for 3 years, up to a
       maximum of 10-months wages             15    Y < 18        9          6
       for 24 years of service
                                              18    Y < 21        9          7
   Fully sponsored by Employer                21    Y < 24        9          8

                                                   24   Y         9          10


Mercer                                                                                17
                                                                                      17
Mercer
Employment System: Hiring and Firing
Index: ASEAN Comparison

   Country /   Difficulty of    Rigidity of   Difficulty of    Rigidity of              Firing Costs
    Region     Hiring Index    Hours index    Firing Index    Employment                  (Weeks)
                                                                 Index

East Asia &         20             30              22             24                            52
Pacific

Indonesia           61             40              70             57                           157

Malaysia            0               0              10              3                            74

Singapore           0               0              0               0                             4

Philippines         22             60              40             41                            90

Thailand            67             40              20             42                            47




                                                                       Source: Doing Business 2004, World Bank



                                                                                                         18
Mercer                                                                                                           18
                                                                                                                 18
Mercer
4. Staffing Issues
                     1   Background and Context

                     2   Remuneration Trends

                     3   Benefits Practices

                     4   Staffing Issues

                     5   Expatriate Issues

                     6   Acquiring in Indonesia

                     7   Conclusion
Hiring Intention – Next 12 months
More companies plan to recruit/add headcount in 2010


                 Percentage of companies (All Industries)


                       8                            3


                                                    37
                      49




                                                    60
                      44



                     2009                          2010

                   Recruiting/Adding   No Change   Reducing




Mercer                                                        20
                                                              20
Mercer
Hiring Intentions
Asia Pacific 2010

90                                Hiring Intentions - Next 12 Months
                   Increase headcount (%)        No change (%)   Reduce headcount (%)
80

70                                60%

60

50

40

30

20

10

 0
         IN   CN     VN      ID     KR      MY      SG    TH     PH    JP   TW      HK          NZ         AU
                                                                                 Source: Mercer 2010 Total Remuneration Survey


Mercer                                                                                                                21
                                                                                                                      21
Mercer
Turnover rate by Industry
Industry                  2007                   2008                           2009
All Industries                8.1%                7.4%                              7.3%
Consumer Goods                7.7%              4.7%                                6.9%
Automotive                    7.4%                7.6%                        4.6%
Chemical                 4.8%                     6.6%                      3.8%
Hi-Tech                1.3%                            10.4%                           13.9%
Life Insurance                       13.9%                     17.2%                            16.9%

Manufacturing             5.7%                  4.0%                           5.1%

Mining                   3.6%                  2.6%                                      9.1%

Mining Services                                  5.8%                                   8.7%

Pharmaceutical                       13.5%               12.0%                        13.0%

Shipping & Logistics                   15.0%      7.5%                            6.4%

Telecommunication               8.1%                  8.3%                            7.8%

                                                                 Source: Mercer Total Remuneration Survey

Mercer                                                                                                      22
                                                                                                            22
Mercer
5. Expatriate Issues
                       1   Background and Context

                       2   Remuneration Trends

                       3   Benefits Practices

                       4   Staffing Issues

                       5   Expatriate Issues

                       6   Acquiring in Indonesia

                       7   Conclusion
Cost of Living – Asia Pacific cities

                                                            Cost of Living - Base City Singapore
          140

                                                                                                                                                                                      118
          120
                                                                                                                                                                98        100
                                                                                                                             94          96          96
          100                                                                                                        89
                                                                                                            86
                                                         76        77           77        78      79
Ranking




          80                               70
                67       67       68

          60

          40

          20

           0




                                                                                                                             Hong Kong
                                          Kuala Lumpur




                                                                                                                                                     Shanghai
                                                                   Wellington




                                                                                          Hanoi

                                                                                                  Jakarta




                                                                                                                                                                          Singapore
                                                         Bangkok
                Mumbai




                                  Dhaka




                                                                                                                     Seoul
                                                                                                            Taipei
                         Manila




                                                                                                                                         Sydney




                                                                                                                                                                                      Tokyo
                                                                                                                                                                Beijing
                                                                                Colombo




                                                                                                                                                  Source: Mercer Cost of Living Calculator, Mar 2010


 Mercer                                                                                                                                                                                       24
                                                                                                                                                                                              24
 Mercer
Quality of Living – Asia Pacific cities


             Sydney                                                                               103
         Wellington                                                                               102
Base City Singapore                                                                             100
               Tokyo                                                                           98
         Hong Kong                                                                     92
      Kuala Lumpur                                                              87
               Seoul                                                           85
               Taipei                                                          84
           Shanghai                                                       79
            Bangkok                                                 72
              Beijing                                               72
               Manila                                          68
              Jakarta                                     63
           Colombo                                       62
             Mumbai                                     62
               Hanoi                                   60
          Islamabad                          50

                        0   20     40             60                     80                100                      120
                                                  Rank
                                                                               Source: Mercer Quality of Living Calculator, Mar 2010


   Mercer                                                                                                                  25
                                                                                                                           25
   Mercer
Expatriates: Common issues


   When executives are relocated from one country to another, companies
   need clear, objective information that establishes the quality-of-living
   differences between cities
   The differences in the quality of living are other important factors that
   affect employees’ willingness to relocate
   Cost of living has a direct impact on employees’ living standards




Mercer                                                                         26
                                                                               26
Mercer
6. Acquiring in Indonesia
                            1   Background and Context

                            2   Remuneration Trends

                            3   Benefits Practices

                            4   Staffing Issues

                            5   Expatriate Issues

                            6   Acquiring in Indonesia

                            7   Conclusion
The M&A landscape


   A look at some recent examples
   What’s driving this activity




Mercer                              28
                                    28
Mercer
Deals in Indonesia have largely been Out-In and In-In transactions and
  in the Resource, Financial Services and Consumer Retail sectors




Note: Deal Volume chart includes deals with unannounced deal values, which may not be reflected in the Deal Value chart; Data only for deals with at least 30% stake;
Deals denote either target/seller OR bidder (as opposed to target/seller AND bidder) within each specified geography; by announcement date
Source: MergerMarket; Mercer Analysis


  Mercer                                                                                                                                                                29
                                                                                                                                                                        29
  Mercer
M&A checklist for HR
A summary of key things to keep in mind
                                         SEVERANCE and RETENTION
         • Union plans, if any
         • Retention plans
         • Restructuring costs

                                               COMPENSATION
         • Incentive plan cash flows
         • At-risk compensation
         • High level of benefit costs

                                                 RETIREMENT
         • Defined benefit plan liabilities and projected costs
         • Increasing pension plan governance


                                            HEALTH & BENEFITS
         • Retiree medical liabilities and projected costs
         • Cost escalation
         • Many plans and vendors


Mercer                                                             30
                                                                   30
Mercer
Indicative characteristics of Indonesian national culture




   Collectivism –
   Individualism              Collective                                                                                                                                           Individual


Power Distance
                               Small                                                                                                                                                   Large


 Time Orientation
                              Short-term                                                                                                                                          Long-term

     Femininity –
     Masculinity
                             Collaboration &                                                                                                                      Competition & Strength
                             Consensus
      Uncertainty
       Avoidance
                               Uncertainty is a given                                                                                                                        Uncertainty is
                                                                                                                                                                                 avoided




Source: Hofstede, R. M. (2001). Culture's Consequences: Comparing Values, Behaviours, Institutions and Organizations Across Nations, Thousand Oaks, California: Sage Publications, Mercer Analysis




         Mercer                                                                                                                                                                                31
                                                                                                                                                                                               31
         Mercer
Key actions and issues – Culture and communication

   Culture
     – Indonesians tend to obey their leaders without questioning authority
     – However, they like to be informed well in advance if there is a change
     – In general, seniority is valued and confrontation, especially to those who are older,
         should be avoided


   Effective Change Communication in M&As
     – Communicate culture, history, philosophies, visions, goals, core values, practices
       and achievements of the acquiring company to remove uncertainty and give
       employees a level of comfort, to understand the effectiveness of both formal and
       informal communication channels and utilize these channels, and to treat those
       leaving with the same respect and attention as those staying
     – English language might be a problem for direct labor level staff. Higher level staff
       usually have higher educational levels and English language proficiencies




Mercer                                                                                         32
                                                                                               32
Mercer
7. Conclusion
                1   Background and Context

                2   Remuneration Trends

                3   Benefits Practices

                4   Staffing Issues

                5   Expatriate Issues

                6   Acquiring in Indonesia

                7   Conclusion
In Summary
   Labour costs in Indonesia remain comparatively low
    – However, higher salary increases estimated in 2011 as compared to 2010, and getting
      closer to pre crisis levels
    – With clear signs of economic recovery and organisations starting to hire again, attrition
      rates starting to trend upwards
     – Inflation could create bigger mismatch between employer/employee expectations
   Six in every 10 companies looking to add headcount in the next 12 months
    – Employers need to keep pace with market practice in order to attract and retain talent
    – Organisations would need to focus on:
            Focused talent management, including segmentation
            Leadership development
            Compelling employee value proposition
   Employers will need holistic human capital approach to drive increased productivity.
   Expatriate managers can facilitate this process, but employers need to be mindful of cost and
   quality of living issues to ensure success
   Also need to monitor legislative changes to ensure compliance with the law
   Indonesia is a hot market for M&A, with a number of recent deals in the Resource, Financial
   Services and Consumer Retail sectors
   Attention to communication and culture is critical for success

Mercer                                                                                             34
                                                                                                   34
Mercer
Questions?
For more information on regional strategies, risks and opportunities


Visit our Breaking Down Borders
website to access articles, points of
view, podcasts and more information on
investing in Indonesia.

www.mercer.com/breakingdownborders

         Su-Yen Wong
         Senior Partner and ASEAN Managing Director, Mercer
         su-yen.wong@mercer.com



         Ake Ayawongs
         ASEAN Head of M&A Consulting Services, Mercer
         ake.ayawongs@mercer.com




Mercer                                                                 36
                                                                       36
Mercer
Next in the Breaking Down Borders webcast series

    Doing business in Australia
    27 April 2011

    Access recordings of past webcasts on
    www.mercer.com/breakingdownborders
    - Doing business in India
    - Doing business in Japan
    - Doing business in China
    - Doing business in Korea




Mercer                                             37
                                                   37
Mercer
www.mercer.com

Mercer bdb doing_business_in_indonesia_mar_2011

  • 1.
    Breaking Down Borders Doingbusiness in Indonesia Su-Yen Wong, Senior Partner and ASEAN Managing Director Ake Ayawongs, ASEAN Head of M&A Consulting Services www.mercer.com
  • 2.
    Speakers Su-Yen Wong Senior Partner and ASEAN Managing Director, Mercer Ake Ayawongs ASEAN Head of M&A Consulting Services, Mercer Mercer 1 1 Mercer
  • 3.
    Agenda 1. Background andContext 2. Remuneration trends 3. Benefits practices 4. Staffing issues 5. Expatriate issues 6. Acquiring in Indonesia 7. Conclusion 8. Q&A Mercer 2 2 Mercer
  • 4.
    1. Background andContext 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 5.
    Outlook in theregion has improved further Asia Pacific regional GDP forecast Regional: GDP Forecasts, % real growth, 2009-2011 2009 2010 2011 (forecast) 20 15 10 5 0 -5 -10 CN IN VN ID AU PH SK NZ SG MY TW TH HK JP US Source: IMA Asia Pacific Executive Brief, March 2011 Mercer 4 4 Mercer
  • 6.
    Inflation is increasingagain Potential impact on compensation increases Regional Inflation Forecasts, % CPI 2009 2010 2011 (forecast) 15 13 11 9 7 5 3 1 -1 -3 IN VN ID PH SK NZ AU HK MY SG CN TW TH JP US Source: IMA Asia Pacific Executive Brief, March 2011 Mercer 5 5 Mercer
  • 7.
    Organizations need toplan on the basis of… Upward inflationary pressures – Potential impact on salary growth – Need to target compensation spending High fuel prices to continue into the foreseeable future – Review operating models – Renew focus on efficiency gains Mercer 6 6 Mercer
  • 8.
    2. Remuneration Trends 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 9.
    Compensation: Basics Minimum wage – Varied by province, district, and sector – Multinational companies tend to have a higher compensation standard Frequency of payments – 13 months; the 13th month is a statutory requirement – Market practice indicates that employees who work less than a year receive pro-rated amount of the 13th month salary Mercer 8 8 Mercer
  • 10.
    Average Industries SalaryIncrease vs. Inflation Salary increases continue to outstrip inflation Current inflation rate is usually considered for budget increase planning in the following year Inflation rate All Industries Base Salary Increase 13.1% 10.7% 10.9% 8.4% 13.0% 7.5% 8.2% 6.4% 9.8% 9.2% 4.8% 5.1% 2006 2007 2008 2009 2010 2011 (forecast) Source: IMA Asia Pacific Executive Brief, Mercer Total Remuneration Survey Mercer 9 9 Mercer
  • 11.
    Factors Determining SalaryIncrease Percentage of companies Individual Performance 96 Company Performance 81 Inflation 79 Position in Salary Range 72 Job Level 46 26 Market Competitiveness 14 Length of Service All Industries Mercer 10 10 Mercer
  • 12.
    Variable Pay Trends(% of Annual Base Salary) Average Overall 24.00 22.3 22.6 22.2 22.00 21.5 20.00 18.00 (%) 16.00 14.00 12.00 10.00 All Industries 2008 2009 2010 2011 (forecast) Source: Mercer 2010 Total Remuneration Survey APCBF Report and Preliminary Mercer 2010 Total Remuneration Survey (All Industries) Mercer 11 11 Mercer
  • 13.
    3. Benefits Practices 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 14.
    Benefits: Social Insurance(1 of 2) JAMSOSTEK (Jaminan Sosial Tenaga Kerja) is a social security scheme in Indonesia that prescribes the minimum coverage for retirement, accident, death and health benefits Implemented in 1993 as a replacement for ASTEK, which in turn had been in place since 1978 Membership is compulsory for companies with over 10 employees, or with a monthly payroll of at least IDR 1 million JAMSOSTEK policies for personal accident, life insurance and old-age security benefits are compulsory – But companies can opt out of JAMSOSTEK’s health benefit as long as they provide an equal or better program Mercer 13 13 Mercer
  • 15.
    Benefits: Social Insurance(2 of 2) Employers contribute to JAMSOSTEK’s four elements – occupational accident, death, health maintenance and old age. The employer’s contribution rate for occupational accident varies depending on the company’s industrial risk classification The contribution rates applied to base salary are as follows: – 0.24% to 1.74% of the monthly wage for the occupational accidents plan (depending on the nature of business); – 5.7% of monthly wage for the old-age saving plan, of which employees contribute 2.0% and the company contributes 3.7%; – 0.30% of monthly wage for the death benefits plan; and – 3% (single) and 6% (married) for the health benefit plan – optional if the company provides an equal or better plan Total JAMSOSTEK contribution is in the range of 9.24% - 13.74% of basic salary Mercer 14 14 Mercer
  • 16.
    Typical Benefits % Companies Provide (All Industries) Health care* 97% Training & Education 95% Vehicle benefits 82% Life Insurance* 57% ADD* 51% Travel Insurance 47% Retirements 46% Loans 37% Company products Discount 21% *On top of statutory requirements Mercer 15 15 Mercer
  • 17.
    Health Benefits andInsurance Outpatient Benefits - Clinical • Typically outpatient covered clinical and dental. The cap including dependants • If reimbursement is only partially given, then the typical percentage reimbursed is 90% Inpatient Benefits • Most of companies provide inpatient benefit for employees and dependants • Typical inpatient clinical is capped at maximum daily room and board rate Life Insurance Trends • 55% of companies provide Life Insurance benefits • Around 71% of companies who have Life Insurance benefits provide in terms of months’ salaries, on average 23MBS for Executive, Professional Sales, Professional Non-Sales, Para Professional level and 35MBS for Management level Accidental Death & Disability (AD&D) Trends • 42% of companies provide ADD benefits • Around 69% of companies who have ADD benefits provide in terms of months’ salaries, on average 34MBS for Executive, Management, Professional Sales level; 33MBS for Professional Non-Sales level and 37MBS for Para Professional level Mercer 16 16 Mercer
  • 18.
    Labour Law 13/2003 Service Year (Y) Severance Gratuity (months) (months) Severance and Gratuity Pay Y<1 1 0 Payable to all employees who 1 Y<2 2 0 have been terminated from the 2 Y<3 3 0 company due to the attainment 3 Y<4 4 2 of retirement age and also pre- retirement age termination 4 Y<5 5 2 – Severance pay is calculated at a 5 Y<6 6 2 base rate of one month’s wages for each year of service, up to a 6 Y<7 7 3 maximum of nine months pay 7 Y<8 8 3 – Payment for reward of service 8 Y<9 9 3 consists of adding one month’s pay for every three years of 9 Y < 12 9 4 employment, starting with two 12 Y < 15 9 5 month’s pay for 3 years, up to a maximum of 10-months wages 15 Y < 18 9 6 for 24 years of service 18 Y < 21 9 7 Fully sponsored by Employer 21 Y < 24 9 8 24 Y 9 10 Mercer 17 17 Mercer
  • 19.
    Employment System: Hiringand Firing Index: ASEAN Comparison Country / Difficulty of Rigidity of Difficulty of Rigidity of Firing Costs Region Hiring Index Hours index Firing Index Employment (Weeks) Index East Asia & 20 30 22 24 52 Pacific Indonesia 61 40 70 57 157 Malaysia 0 0 10 3 74 Singapore 0 0 0 0 4 Philippines 22 60 40 41 90 Thailand 67 40 20 42 47 Source: Doing Business 2004, World Bank 18 Mercer 18 18 Mercer
  • 20.
    4. Staffing Issues 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 21.
    Hiring Intention –Next 12 months More companies plan to recruit/add headcount in 2010 Percentage of companies (All Industries) 8 3 37 49 60 44 2009 2010 Recruiting/Adding No Change Reducing Mercer 20 20 Mercer
  • 22.
    Hiring Intentions Asia Pacific2010 90 Hiring Intentions - Next 12 Months Increase headcount (%) No change (%) Reduce headcount (%) 80 70 60% 60 50 40 30 20 10 0 IN CN VN ID KR MY SG TH PH JP TW HK NZ AU Source: Mercer 2010 Total Remuneration Survey Mercer 21 21 Mercer
  • 23.
    Turnover rate byIndustry Industry 2007 2008 2009 All Industries 8.1% 7.4% 7.3% Consumer Goods 7.7% 4.7% 6.9% Automotive 7.4% 7.6% 4.6% Chemical 4.8% 6.6% 3.8% Hi-Tech 1.3% 10.4% 13.9% Life Insurance 13.9% 17.2% 16.9% Manufacturing 5.7% 4.0% 5.1% Mining 3.6% 2.6% 9.1% Mining Services 5.8% 8.7% Pharmaceutical 13.5% 12.0% 13.0% Shipping & Logistics 15.0% 7.5% 6.4% Telecommunication 8.1% 8.3% 7.8% Source: Mercer Total Remuneration Survey Mercer 22 22 Mercer
  • 24.
    5. Expatriate Issues 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 25.
    Cost of Living– Asia Pacific cities Cost of Living - Base City Singapore 140 118 120 98 100 94 96 96 100 89 86 76 77 77 78 79 Ranking 80 70 67 67 68 60 40 20 0 Hong Kong Kuala Lumpur Shanghai Wellington Hanoi Jakarta Singapore Bangkok Mumbai Dhaka Seoul Taipei Manila Sydney Tokyo Beijing Colombo Source: Mercer Cost of Living Calculator, Mar 2010 Mercer 24 24 Mercer
  • 26.
    Quality of Living– Asia Pacific cities Sydney 103 Wellington 102 Base City Singapore 100 Tokyo 98 Hong Kong 92 Kuala Lumpur 87 Seoul 85 Taipei 84 Shanghai 79 Bangkok 72 Beijing 72 Manila 68 Jakarta 63 Colombo 62 Mumbai 62 Hanoi 60 Islamabad 50 0 20 40 60 80 100 120 Rank Source: Mercer Quality of Living Calculator, Mar 2010 Mercer 25 25 Mercer
  • 27.
    Expatriates: Common issues When executives are relocated from one country to another, companies need clear, objective information that establishes the quality-of-living differences between cities The differences in the quality of living are other important factors that affect employees’ willingness to relocate Cost of living has a direct impact on employees’ living standards Mercer 26 26 Mercer
  • 28.
    6. Acquiring inIndonesia 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 29.
    The M&A landscape A look at some recent examples What’s driving this activity Mercer 28 28 Mercer
  • 30.
    Deals in Indonesiahave largely been Out-In and In-In transactions and in the Resource, Financial Services and Consumer Retail sectors Note: Deal Volume chart includes deals with unannounced deal values, which may not be reflected in the Deal Value chart; Data only for deals with at least 30% stake; Deals denote either target/seller OR bidder (as opposed to target/seller AND bidder) within each specified geography; by announcement date Source: MergerMarket; Mercer Analysis Mercer 29 29 Mercer
  • 31.
    M&A checklist forHR A summary of key things to keep in mind SEVERANCE and RETENTION • Union plans, if any • Retention plans • Restructuring costs COMPENSATION • Incentive plan cash flows • At-risk compensation • High level of benefit costs RETIREMENT • Defined benefit plan liabilities and projected costs • Increasing pension plan governance HEALTH & BENEFITS • Retiree medical liabilities and projected costs • Cost escalation • Many plans and vendors Mercer 30 30 Mercer
  • 32.
    Indicative characteristics ofIndonesian national culture Collectivism – Individualism Collective Individual Power Distance Small Large Time Orientation Short-term Long-term Femininity – Masculinity Collaboration & Competition & Strength Consensus Uncertainty Avoidance Uncertainty is a given Uncertainty is avoided Source: Hofstede, R. M. (2001). Culture's Consequences: Comparing Values, Behaviours, Institutions and Organizations Across Nations, Thousand Oaks, California: Sage Publications, Mercer Analysis Mercer 31 31 Mercer
  • 33.
    Key actions andissues – Culture and communication Culture – Indonesians tend to obey their leaders without questioning authority – However, they like to be informed well in advance if there is a change – In general, seniority is valued and confrontation, especially to those who are older, should be avoided Effective Change Communication in M&As – Communicate culture, history, philosophies, visions, goals, core values, practices and achievements of the acquiring company to remove uncertainty and give employees a level of comfort, to understand the effectiveness of both formal and informal communication channels and utilize these channels, and to treat those leaving with the same respect and attention as those staying – English language might be a problem for direct labor level staff. Higher level staff usually have higher educational levels and English language proficiencies Mercer 32 32 Mercer
  • 34.
    7. Conclusion 1 Background and Context 2 Remuneration Trends 3 Benefits Practices 4 Staffing Issues 5 Expatriate Issues 6 Acquiring in Indonesia 7 Conclusion
  • 35.
    In Summary Labour costs in Indonesia remain comparatively low – However, higher salary increases estimated in 2011 as compared to 2010, and getting closer to pre crisis levels – With clear signs of economic recovery and organisations starting to hire again, attrition rates starting to trend upwards – Inflation could create bigger mismatch between employer/employee expectations Six in every 10 companies looking to add headcount in the next 12 months – Employers need to keep pace with market practice in order to attract and retain talent – Organisations would need to focus on: Focused talent management, including segmentation Leadership development Compelling employee value proposition Employers will need holistic human capital approach to drive increased productivity. Expatriate managers can facilitate this process, but employers need to be mindful of cost and quality of living issues to ensure success Also need to monitor legislative changes to ensure compliance with the law Indonesia is a hot market for M&A, with a number of recent deals in the Resource, Financial Services and Consumer Retail sectors Attention to communication and culture is critical for success Mercer 34 34 Mercer
  • 36.
  • 37.
    For more informationon regional strategies, risks and opportunities Visit our Breaking Down Borders website to access articles, points of view, podcasts and more information on investing in Indonesia. www.mercer.com/breakingdownborders Su-Yen Wong Senior Partner and ASEAN Managing Director, Mercer su-yen.wong@mercer.com Ake Ayawongs ASEAN Head of M&A Consulting Services, Mercer ake.ayawongs@mercer.com Mercer 36 36 Mercer
  • 38.
    Next in theBreaking Down Borders webcast series Doing business in Australia 27 April 2011 Access recordings of past webcasts on www.mercer.com/breakingdownborders - Doing business in India - Doing business in Japan - Doing business in China - Doing business in Korea Mercer 37 37 Mercer
  • 39.