Salary Guide 2012
Asia pacific
Professional and Technical
An integral component of Kelly Services recruitment solution suite, our Professional and Technical
businesses collectively focus on building best in class networks, in order to provide our customers with niche
talent and knowledge workers at mid to senior career levels.
Whilst operating across 8 countries within the APAC geography, specialisation is at the core of our approach
allowing us to provide our customers and candidates alike with accurate and relevant recruitment solutions.
Our specialist capabilities differ from country to country, to reflect local market landscapes but include
accountancy, banking and finance, engineering, science and technology, and corporate functions. This
dedicated practice focus, coupled with formidable resources and infrastructure built by Kelly Services, offers
our customers the best of both worlds – a company with specific knowledge and expertise, backed by a
respected industry leader that has been staffing the world for more than 60 years.
Contents
2	Australia
16	China
28	 Hong Kong
34	India
42	Indonesia
50	Malaysia
60	 New Zealand
68	Singapore
Kelly Professional and Technical
The aggressive expansion of global companies looking to access
BRICS*, ASEAN and Australasian markets with their wealth of
resources, consumers and technological knowhow has placed the
knowledge of how to source, attract, retain and develop talent firmly
at the top of corporate boardrooms’ agendas.
The APAC region is home to more than 4.2 billion people, over
half the world’s population, with China and India alone accounting
for almost 40% of this figure. People and potential labour pools
are in abundant supply, in principle, but this availability of labour
contrasts sharply with the availability of what we have come to term
as “talent”. These experienced professionals with niche knowledge,
specialist skill sets and leadership capability continue to be highly
sought after across all industry categories and role functionalities
across the region.
Continued strong demand for talent drove employee turnover
rates up to an estimated 14.1% across APAC during 2011. Whilst
there is a slight softening in demand from previous year, 2012 is
showing that there is still profound competition in all countries for
knowledge workers. Talent scarcity in specialist areas of Engineering,
Accountancy, Technology and Financial Services, has heightened in
the light of a continual overall downward trend in unemployment
rates, which are anticipated to approach 7% by 2013.
Other factors that enter the mix include a spate of tragic
natural disasters in 2011 precipitating mammoth post disaster
reconstruction plans, which are expected to boost investment
spending in 2012 and beyond. Our expectation however is that this
may be offset by more moderate private sector hiring, particularly in
countries with high exposure to export demand.
Hiring is still expected to grow despite the new challenges emerging
in 2012, with inflation edging up and capacity shortages starting to
limit expansion.
This growth will exacerbate wage pressures in all countries and
employers should expect to increase employee pay rates or find
other creative solutions in response to these talent dynamics, if they
are serious about attracting and retaining critical skill sets within
their organisations.
Therefore we expect to see the APAC labour markets hold a steady
upward trajectory as we progress through 2012. This may not be
as steep as previous years but the region will continue to lead the
world’s economic growth.
Against this backdrop APAC professionals with niche skills, critical
knowledge and evolved leadership credentials can expect to see
more than modest salary increases across the region, particularly
in the more developing economies, where employers must hike
salaries to keep pace with inflation and to attract and keep hold
of their talent. This will continue to place enormous pressure on
employers from a cost and people retention perspective.
foreword
* The international political organisation of leading emerging economies, Brazil, Russia, India and China now includes South Africa into the BRIC group in 2010.
kellyservices.com.au2
In spite of a growing local economy, the willingness
of Australian businesses to build capacity continues
to be dampened by instability and economic
volatility in Europe, the Middle East, and the
United States.
Accounting and Finance
The impact of the international debt crisis has
directly impacted the accounting and finance sector,
with the entire sector being cautious. Jobs continue
to be shed as companies consolidate, move back-
office processes offshore to drive down costs and
aUSTRALIA
NATIONAL
OVERVIEW
simply downsize. This trend will continue until the
middle of this year when it is expected to stabilise.
Early 2012 has seen resurgence in mid to long
term contract engagements in lieu of permanent
hiring activity.
Banking and Financial Services
Banks, in particular, are shredding numbers from
their finance and IT departments with the back
office being worst hit. There are some bright
points however. Demand for roles with experience
in risk and compliance is growing in response to
tightening governance rules and regulations. There
is still strong hiring activity in areas such as credit,
wealth management, financial planning, private
and corporate banking. Some areas of corporate
finance remain steady and, although not hiring
as aggressively as last year, they continue to offer
opportunities to the right level of candidates. In
2012, the career focal point for experienced bankers
will shift dramatically from Europe and the Americas
to the Asia Pacific region.
Information Technology
The IT industry has stabilised with more job openings
available for skilled candidates in 2012. Roles that
are increasingly in demand include application
testing, storage and data centre management. Banks
continue to create much of the demand for IT roles
even though they are moving many development
projects offsite. This is largely because much of the
strategy, architecture, maintenance and program
development work remains in Australia.
3Figures are in AUD and represent base salary only
Australia
kellyservices.com.au4
5Figures are in AUD and represent base salary only
Engineering
Mining sector
As the Australian mining industry continues to
boom, employers are looking for people who have
core engineering skills as well as on-site mining
experience. There is ongoing strong demand for
workers right across every part of the mining sector,
from blue collar through to senior management.
Finding qualified employees to meet this demand
will remain a challenge for the mining sector for the
foreseeable future.
Civil engineering and infrastructure sector
Increasing population growth in Australian capitals
and satellite cities is putting extra pressure on public
infrastructure such as rail links, roads, health and
education. Funding these basic public services will
remain a key priority for government, which will
underpin steady job growth in this sector.
Construction sector
The construction jobs market has steadily declined
post Australian Government stimulus packages. The
commercial fit out and refurbishment sub sector is
particularly struggling and it is not uncommon to
find businesses that employed 30 staff two years ago
to have cut back to less than ten. Employers are now
relying on contractors to meet short-term peaks in
work. This is expected to continue at least for the
first half of 2012.
Architecture
There is an emerging skills gap in this sector with
many experienced architects not trained to use
REVIT, the dominant 3D modelling and design
software. As a result, graduates with a high degree
of skill in this and similar software, are being
increasingly sought after.
Mechanical & Electrical
While the high Australian dollar and resulting
decrease in exports in the high tech manufacturing
industry has led to an uncertain start, the overall
skill shortage in M&E means that this sector will
continue to be relatively buoyant for 2012. Industries
associated with the mining and resources boom will
continue to grow rapidly during the year.
Scientific
A significant shift toward the use of temporary and
contract staff has been one of the standout changes
to the scientific industry over the past twelve months
as funding sources become less reliable. Demand
for temporary or contract staff continues to climb
across all industries, particularly the chemical,
pharmaceutical and food/beverage manufacturing
sectors.
Hiring levels for permanent staff have remained
relatively stable throughout 2011. However there
are marked differences state by state. A significant
demand gap has opened up between Western
Australia/South Australia and the Eastern states.
Most notable is the slight decline for permanent
positions in Victoria throughout 2011.
Australia
kellyservices.com.au6
ACCOUNTING & FINANCE
Accountant 60K 90K
Accounting Manager 75K 110K
Assistant Accountant 50K 75K
Accounts Receivable/ Credit Manager 70K 100K
Accounts Receivable/ Credit Supervisor 60K 85K
Accounts Receivable Officer 40K 60K
Accounts Payable Manager 65K 85K
Accounts Payable Supervisor 50K 70K
Accounts Payable Officer 35K 45K
Reconciliations Clerk 45K 65K
Senior Auditor 130K 180K
Audit Manager 100K 140K
Auditor 70K 90K
Chief Financial Officer 160K 220K+
Finance Director 140K 200K
Financial Controller 115K 250K
Project Accountant 100K 150K
Management Accountant 85K 140K
Financial Analyst 80K 125K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
aUSTRALIA
Financial Accountant 75K 115K
Financial Reporting Analyst 70K 95K
Business Analyst 65K 95K
Entry Level/ Graduate Accountant 40K 60K
Payroll Manager 75K 115K
Payroll Supervisor 60K 85K
Payroll Officer 45K 60K
Product Control 80K 140K
Tax Manager 90K 140K
BANKING & FINANCIAL SERVICES
Branch Staff
Branch Manager 70K 115K
Bank Teller 35K 50K
Customer Service Consultant 35K 55K
Retail Banking
Document Prep/ Settlements 40K 60K
Loans Manager 60K 90K
Loan Administration Manager 60K 80K
Loans Officer 45K 65K
Mobile Banker 65K 85K
Personal Banker 60K 80K
7Figures are in AUD and represent base salary only
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Business & Corporate Banking
State Manager 180K 250K
Regional Manager 150K 220K
Business Development Manager 130K 180K
Senior Relationship Manager 120K 170K
Relationship Manager/Banker 90K 130K
Assistant Manager 65K 90K
Corporate Finance/Advisory
Director 230+ 350K+
Associate Director 150K 220K
Manager 120K 160K
Associate 90K 130K
Analyst 80K 110K
Financial Markets (FX/MM/Derivs/Fixed Income)
Senior Manager 110K 150K
Manager 80K 110K
Team Leader 60K 80K
Officer 40K 60K
Risk and Compliance
Senior Compliance Manager 120K 160K
Compliance Manager 80K 130K
Compliance Analyst 70K 90K
Senior Credit/Risk Manager 130K 180K
Credit/Risk Manager 110K 150K
Senior Credit Analyst 80K 120K
Credit Analyst 70K 100K
Insurance
Senior Claims Manager 85K 135K
Claims Manager 70K 120K
Claims Assessor 45K 70K
Underwriting Manager 80K 130K
Senior Insurance Underwriter 65K 100K
Insurance Underwriter 50K 85K
Insurance Clerk 40K 60K
Australia
kellyservices.com.au8
aUSTRALIA
Wealth Management
Dealership Manager 130K 210K
Practice Manager 110K 160K
Private Banking - Relationship Manager 85K 125K
Senior Financial Planner/CFP 80K 130K
Financial Planner 70K 120K
Para Planner 50K 80K
Operations
Senior Manager 80K 140K
Operations Manager 70K 90K
Team Leader 60K 75K
Officer 35K 50K
ENGINEERING
Civil / Water / Rail / Power
Senior Contracts Administrator 120K 150K
Contracts Administrator (5+ years) 90K 130K
Contracts Administrator (2-5 years) 60K 80K
Cadet / Contracts Administrator 40K 60K
Chief Estimator 160K 230K
Senior Estimator 120K 175K
Estimator 75K 130K
Cadet / Estimator 35K 60K
Commercial Manager 150K 230K
Construction Manager 170K 250K
Design Manager 125K 180K
Environmental Manager 140K 180K
Environmental Engineer 75K 130K
General Foreman 120K 150K
Foreman 85K 125K
HSE Manager 90K 160K
HSE Advisor 75K 90K
Leading Hand 55K 88K
Planner 135K 220K
Plant Manager 90K 130K
Procurement Manager 75K 130K
Senior Project Manager 160K 200K
Project Manager 130K 170K
Junior Project Manager 75K 100K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
9Figures are in AUD and represent base salary only
Senior Project Engineer 120K 145K
Project Engineer 80K 120K
Quality Manager 85K 125K
Quantity Surveyor 75K 130K
Site Engineer (5+ years) 80K 95K
Site Engineer (2-5 years) 65K 80K
Cadet / Engineer 40K 60K
Supervisor 75K 95K
Manufacturing / Process
Instrumentation & Electrical Engineer (10+ years) 100K 150K
Instrumentation & Electrical Engineer (5-10 years) 80K 120K
Instrumentation & Electrical Engineer (2-5 years) 60K 75K
Instrumentation & Electrical Engineer (0-2 years) 40K 50K
Manufacturing Engineer (10+ years) 100K 150K
Manufacturing Engineer (5-10 years) 80K 120K
Manufacturing Engineer (2-5 years) 60K 75K
Manufacturing Engineer (0-2 years) 40K 50K
Plant Engineer (10+ years) 100K 150K
Plant Engineer (5-10 years) 80K 120K
Plant Engineer (2-5 years) 60K 75K
Plant Engineer (0-2 years) 40K 50K
Production Engineer (10+ years) 100K 150K
Production Engineer (5-10 years) 80K 120K
Production Engineer (2-5 years) 60K 75K
Production Engineer (0-2 years) 40K 50K
Construction
Architect (10+ years) 100K 160K
Architect (5-10 years) 60K 110K
Architectural Designer 60K 100K
Architect (2-5 years) 45K 65K
Architectural Drafter 45K 70K
Architect (0-2 years) 43K 50K
Building Surveyor 65K 90K
Chief Estimator 150K 220K
Senior Estimator 120K 175K
Estimator 75K 130K
Cadet / Estimator 35K 60K
Commercial Manager 150K 220K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Australia
kellyservices.com.au10
aUSTRALIA
Construction Manager 155K 230K
Contracts Manager 120K 175K
Senior Contracts Administrator 115K 150K
Contracts Administrator (5+ years) 90K 130K
Contracts Administrator (2-5 years) 75K 110K
Cadet / Contracts Administrator 35K 60K
Design Manager 125K 180K
Facilities Manager 75K 110K
Foreman 90K 130K
HSE Manager 90K 160K
HSE Advisor 75K 90K
Junior Project Manager 75K 100K
Leading Hand 55K 88K
Operations Manager 170K 260K
Procurement Manager 75K 130K
Senior Project Engineer 140K 200K
Project Engineer 100K 165K
Senior Project Manager 125K 200K
Project Manager 90K 160K
Site Manager 120K 150K
Site Engineer (5+ years) 90K 130K
Site Engineer (2-5 years) 65K 90K
Cadet / Engineer 35K 60K
Structural Engineer (10+ years) 100K 150K
Structural Engineer (5-10 years) 80K 120K
Structural Engineer (2-5 years) 60K 75K
Structural Engineer (0-2 years) 40K 50K
Mechanical & Electrical
Electrical Engineer (10+ years) 100K 150K
Electrical Engineer (5-10 years) 80K 120K
Electrical Engineer (2-5 years) 60K 75K
Electrical Engineer (0-2 years) 40K 50K
Electronics Designer 65K 90K
Mechanical Engineer (10+ years) 100K 150K
Mechanical Engineer (5-10 years) 80K 120K
Mechanical Designer (2-5 years) 65K 90K
Mechanical Drafter 50K 90K
Mechanical Engineer (0-2 years) 40K 50K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
11Figures are in AUD and represent base salary only
Mining, Resources
CHPP Manager 170K 230K
Construction Manager 150K 225K
Contracts Manager 150K 240K
Contracts Administrator 100K 160K
Deputy 110K 150K
Drill & Blast Engineer 105K 130K
Electrical Engineer 90K 160K
Engineering Manager 150K 210K
Environmental Manager / Superintendent 145K 200K
Environmental Officer 90K 155K
Estimator 115K 150K
Graduate Engineer 55K 85K
Maintenance Manager 170K 220K
Maintenance Superintendent 140K 180K
Maintenance Planner 90K 135K
Mechanical Engineer 90K 155K
Mine Geologist 90K 145K
Mine Manager 180K 250K
Mining Engineer 110K 150K
Mine Planning Engineer 95K 165K
OH&S Manager 120K 160K
OH&S Coordinator 90K 130K
Open Cut Examiner 135K 180K
Open Cut Supervisor 115K 165K
Production Superintendant 140K 180K
Project Manager 120K 200K
Senior Estimator 150K 210K
Senior Geologist 130K 170K
Senior Planner 145K 200K
Planner 120K 145K
Surveyor 90K 135K
Technical Services Manager 160K 210K
Underground Supervisor 120K 175K
Undermanager 140K 180K
Workshop Supervisor 120K 150K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Australia
kellyservices.com.au12
aUSTRALIA
INFORMATION TECHNOLOGY
IT Management
CIO/IT Director 160K 350K
Applications Development Manager 120K 150K
Computer Operations Manager 120K 130K
I.T. Manager 120K 170K
Infrastructure Manager 110K 160K
Help Desk Manager 90K 130K
Infrastructure & IT Support
Infrastructure Architect 120K 155K
Operations Manager 120K 145K
Security Architect 120K 160K
Security Engineer 65K 95K
Security Administrator 80K 135K
Service Delivery Manager 110K 150K
Change Manager 100K 130K
Data Communications Engineer 75K 120K
DBA - DB2 80K 120K
DBA - Oracle 75K 125K
DBA - SQL Server 75K 110K
DBA - Sybase 75K 110K
Desktop/PC Support 60K 80K
ERP Technical Consultant 85K 165K
ERP Functional Consultant 75K 120K
Help Desk Support 50K 75K
Incident Manager 75K 95K
Network Designer (WAN) 90K 130K
Network Administrator 75K 115K
Operations Analyst 55K 80K
Operator 48K 65K
Problem Manager 80K 115K
Trainer 45K 95K
Unix Systems Administration 85K 145K
WAN Engineer 80K 115K
Web Content Manager/Web Master 75K 115K
Wintel Server Engineer 75K 115K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
13Figures are in AUD and represent base salary only
Application Development & Testing
Test Manager 100K 130K
Test Team Leader 85K 120K
Senior Tester 75K 95K
Tester 60K 80K
ETL Developer 90K 110K
BI Architect 90K 170K
Team Leader - (.Net or J2EE) 90K 125K
Applications Architect 85K 160K
C++ Software Developer 60K 110K
Java (J2EE) Developer 60K 120K
Analyst/Programmer - Oracle 60K 100K
.Net Developer (C#/VB.Net/ASP.Net) 55K 110K
Mainframe Developer (Cobol, CICS, DB2) 55K 110K
Project Management & Business Analysis
Project Director 125K 180K
Project Manager 110K 140K
Senior Business Analyst 85K 110K
Business Analyst 70K 95K
Systems Analyst 65K 90K
Project Coordinator 65K 85K
Project Administrator 50K 70K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Australia
kellyservices.com.au14
aUSTRALIA
Scientific
Analytical Chemist 55K 80K
Biomedical Scientist 55K 81K
Chief Chemist 75K 100K
Senior Chemist 68K 80K
Environmental Scientist 63K 110K
Senior Food Technologist 75K 100K
Food Technologist 50K 82K
Formulation/R&D Manager 85K 150K
Formulations Chemist 60K 95K
Industrial Chemist 55K 80K
Instrument Technician 50K 75K
Laboratory Manager 80K 130K
Laboratory Supervisor 60K 75K
Laboratory Technician 40K 52K
Laboratory Assistant 38K 45K
Microbiologist 38K 65K
Molecular Biologist 55K 81K
New Graduate 38K 50K
Project Manager - Development 85K 130K
QA Manager 80K 130K
QA Supervisor 60K 85K
QA/QC Analyst 48K 65K
Senior Research Scientist 69K 90K
Research Chemist 62K 80K
Research Assistant 50K 63K
Scientific Officer 65K 78.2K
Sensory Analyst 50K 80K
Technical Manager 80K 180K
Technical Officer 50K 65K
Regulatory Affairs
Compliance Manager 85K 140K
Compliance Associate 50K 65K
QA Associate 55K 84K
Regional Regulatory Affairs Director 175K 250K
Regulatory Affairs Director 145K 200K
Senior Regulatory Affairs Associate 85K 105K
Regulatory Affairs Manager 80K 150K
Regulatory Affairs Associate 60K 80K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
15Figures are in AUD and represent base salary only
Clinical Research
Clinical Business Manager 100K 150K
Clinical Data Manager 60K 70K
Senior Clinical Data Associate 65K 85K
Clinical Operations Manager 110K 140K
Clinical Project Manager 90K 130K
Senior Clinical Research Associate CRA 75K 100K
Clinical Research Associate CRA 55K 80K
Clinical Statistician Manager 100K 150K
Clinical Statistician 80K 130K
Clinical Trial Administer CTA 40K 60K
Drug Safety Manager 110K 150K
Drug Safety Associate/Senior Associate 55K 110K
Health Economist 75K 130K
Medical Director 180K 250K
Medical Science Liaison Manager 100K 150K
Medical Affairs Manager 90K 130K
Medical Affairs Associate 70K 110K
Medical Writer 65K 105K
Sales and Marketing
Account Manager 75K 95K
Brand Manager 80K 125K
Business Development Manager 90K 150K
Hospital Representative 75K 95K
GP Representative 55K 75K
Marketing Director 150K 200K
National Marketing Manager 130K 165K
Marketing Manager 120K 150K
Marketing Analyst 80K 110K
Marketing Assistant 55K 65K
Medical Devices Representative 75K 100K
National Sales Manager 130K 185K
Product Manager 95K 125K
Product Specialist 75K 95K
Sales Director 170K 220K
Regional Sales Manager 90K 145K
Scientific Sales Representative 70K 100K
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Australia
kellyservices.cn16
Although the China recruitment outlook is positive,
there is an overall slowdown from last year. The
National Peoples Congress (NPC) has set a 7.5%
growth target and highlighted seven ‘Strategic
Emerging Industries’ where we expect to see an
upswing in recruitment over the coming year,
namely: Clean Energy, Next Generation IT, Biotech,
High End Equipment Manufacturing, Alternative
Energy and New Energy Vehicles. 2012 sees both
domestic and multinational companies in competition
for the best talent.
China
NATIONAL
OVERVIEW
General Industrial &
Manufacturing
We see weakening in hiring in this segment, with
many companies being cautious about their hiring
plans in the second quarter. Demand for sales talent
is now increasing compared to marketing roles
particularly at junior level. Senior technical roles are
‘hot’ this year with Chinese companies increasingly
trying to attract more multinational talent. The
government extension of policies on rebates on
electronics and appliances should continue to
support increased sales, resulting in more companies
establishing manufacturing inland in Central and
Western China.
The NPC has prioritised green industries including
wind and solar power, high-end manufacturing and
aerospace manufacturing as strategic emerging
industries, so we can expect strong demand in 2012
to support this growth.
Automotive
The automotive segment continues to grow, but
much more slowly than 2011. The luxury vehicle
market is expected to decline this year whilst
the budget segment will become increasingly
competitive. JV companies are producing vehicles to
sell under local Chinese brands which compete with
domestic manufacturers. New MNC automotive parts
companies are establishing plants in tier two cities
like Chengdu, with increased hiring uptake expected
this year end into 2013.
17
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
China
kellyservices.cn18
19
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
Chemical
Despite some dampening in the last half of 2011, we
are seeing continued investment since the New Year
hiring strategy reviews, hence growth remains stable.
Strategic and project roles are in demand in this
sector and supply chain, R&D, strategic marketing
and sales roles remain highly sought after. Chemical
firms are trying hard to retain rather than merely
recruit and save on hiring spend but key specialist
skill sets and niche knowledge in the sector will still
be targeted.
Healthcare and Life Science
Hospital reforms and increased insurance and
medical services will provide a challenging
environment as the local pharmaceutical and medical
device sectors grow and prices are expected to
drop. Biotechnology is also one of the NPC’s key
focus sectors and is expected to continue to recruit
aggressively this year.
Banking and Financial Services
The global economic uncertainty and ensuing
controls have driven down overall recruitment,
especially in foreign firms, however some job profiles
are experiencing an upturn, including risk functions
which are in demand from both local and MNC
banks. Chinese banks face capital stress after the
Basel III launch in China and banks need to be more
stringent to meet these requirements which in turn
will create competition for talent.
Consumer
Recruitment in the retail and the luxury sectors
continues to accelerate in China in 2012. The overall
trend is encouraging with store operations, and
sales and marketing roles being most in demand.
A burgeoning middle class coupled with enhanced
spending capability, particularly in the luxury goods
sector, have created high levels of demand for
talented sales professionals with strong contact
networks and a track record of excellence in business
development.
Information Technology
IT recruitment is experiencing particularly strong
growth with increasing numbers of MNCs relocating
their R&D centres taking advantage of China’s
relatively lower labour cost and skilled local talent.
Roles which are in demand this year include first line
developers, testers, architects, project managers
and also strategic and management level roles.
Next Generation IT jobs will be in demand as the
sector becomes further developed and its
potential explored.
Despite dampening demand in some sectors , in
relative terms, China will still see overall strong
growth and will continue to have to develop and
attract both domestic and international specialist
knowledge foreseeably.
China
kellyservices.cn20
Automotive
Area Sales Manager 5-8 180K–300K 150K–220K
Brand Manager 5+ 250K–400K 180K–300K
Commodity Manager 5+ 300K–500K 200K–350K
Dealer Networking Director 10+ 600K–800K 600K–800K
Design Manager 8+ 300K–400K 180K–300K
Engineering Director / R&D Director 10+ 600K–900K 450K–650K
Engineering Manager / R&D Manager 8+ 300K–500K 180K–350K
General Manager – Country 10+ 1.5M–2.5M 1.5M–2.5M
General Manager – Country (sales focus) 10+ 900K–1.5M 900K–1.5M
Industrial Engineering Manager 5+ 280K–400K 200K–350K
Key Account Manager 3+ 180K–350K 120K–280K
Lean Manager / CI Manager (Country level) 8+ 500K–700K 400K–700K
Lean Manager / CI Manager 5+ 250K–400K 180K–300K
Logistics Director 10+ 600K–800K 600K–800K
Logistics Manager 5+ 250K–420K 180K–350K
Manufacturing Director 10+ 600K–900K 500K–900K
Manufacturing / Production Manager 8+ 280K–450K 200K–350K
Marketing Director 10+ 600K–1M 600K–1M
Marketing Manager 8+ 350K–550K 200K–350K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Marketing Communications Manager 5+ 300K–500K 200K–350K
Marketing Intelligence Manager 5+ 300K–500K 180K–350K
Operations Manager 10+ 450K–600K 300K–450K
Plant Manager 10+ 500K–900K 400K–800K
Procurement Director 10+ 500K–900K 400K
Product Manager 5+ 250K–400K 180K–350K
Program Director 10+ 550K–800K 500K–800K
Project Manager 3+ 200K–400K 150K–300K
Purchasing Manager 5+ 300K–500K 200K–400K
Quality Director 10+ 600K–900K 500K–900K
Quality Manager 5+ 200K–500K 150K–300K
Regional Sales Director 10+ 600K–1M 500K–800K
Regional Sales Manager / Distribution Manager 5+ 350K–600K 250K–500K
Senior Program Manager 8+ 400K–600K 300K–450K
Sourcing Manager 5+ 300K–600K 250K–450K
Supplier Quality Manager 5+ 300K–500K 200K–400K
Supply Chain Director 10+ 600K–1M 600K–1M
Supply Chain Manager 8+ 400K–700K 300K-500K
China
21
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Banking & Finance
Personal Banking
Credit Risk Mortgage VP 10+ 600K–850K 350K–500K
Credit Risk Mortgage AVP 5-10 400K–600K 200K–300K
Credit Risk Mortgage Associate <5 180K–300K 120K–150K
Product Management / Marketing VP 10+ 600K+ 300K+
Product Management / Marketing AVP 5-10 400K–500K 200K–300K
Product Management / Marketing Associate <5 180K–300K 120K–150K
Relationship Manager - VP 10+ 500K–1M + 400K–700K
Relationship Manager - AVP 5-10 300K–500K 180K–300K
Relationship Manager - Associate <5 200K–300K 150K–250K
Wealth Management Sales VP 10+ 350K+ 250K+
Wealth Management Sales AVP 5-10 200K–400K 200K–250K
Wealth Management Sales Associate <5 80K–200K 40K–120K
Corporate Banking
Cash Product Management VP 10+ 500K–800K 200K–400K
Cash Product Management AVP 5-10 300K–500K 200K–300K
Cash Product Management Associate <5 200K–300K 150K–250K
Cash Sales VP 10+ 500K–700K 250K–500K
Cash Sales AVP 5-10 350K–450K 180K–250K
Cash Sales Associate <5 200K–350K 100K–180K
Credit Risk Management VP 10+ 500K–1M+ 300K–800K
Credit Risk Management AVP 5-10 300K–500K 120K–300K
Credit Risk Management Associate <5 120K–350K 100K–120K
Trade Finance Product Management VP 10+ 500K–1M+ 300K–500K
Trade Finance Product Management AVP 5-10 300K–600K 180K–400K
Trade Finance Product Management Associate <5 200K–300K 120K–180K
Trade Finance Sales VP 10+ 500K– 900K 300K–500K
Trade Finance Sales AVP 5-10 300K–500K 150K–300K
Trade Finance Sales Associate <5 180K–300K 100K–150K
Investment Banking and Global Markets
Front Desk - Corporate Finance Managing
Director
15+ 1.5M–2M 800K–1.2M
Front Desk - Corporate Finance Director 10-15 1M–1.5M 600K–1.2M
Front Desk - Corporate Finance VP 8-12 600K–1M 300K–800K
Front Desk - Corporate Finance Associate 5-8 150K–400K 180K–300K
Front Desk - Corporate Finance Analyst <5 120K–150K 100K–180K
Front Desk - Debt Capital Market Managing
Director
15+ 1.5M–3M 800K–1.8M
Front Desk - Debt Capital Market Director 10-15 1M–1.5M 600K–800K
Front Desk - Debt Capital Market VP 8-12 700K–1M 400K–600K
China
kellyservices.cn22
Front Desk - Debt Capital Market AVP 5-8 500K–700K 250K–400K
Front Desk - Debt Capital Market Associate 3-5 300K–500K 150K–250K
Front Desk - Debt Capital Market Analyst <3 200K–300K 80K–150K
Front Desk - Equity Research Managing
Director
10+ 1.5M–2M 600K–1.5M
Front Desk - Equity Research Director 8-10 700K–1.5M 400K–600K
Front Desk - Equity Research VP 5-8 500K–800K 300K–400K
Front Desk - Equity Research AVP 3-5 400K–600K 200K–300K
Front Desk - Equity Research Associate 1-3 250K–400K 180K–200K
Front Desk - Equity Research Analyst 1-3 200K–250K 100K–180K
Middle Office, Back Office & Finance Accounting
Back Office - Operations VP 15+ 420K–1M 280K–600K
Back Office - Operations AVP 10-15 200K–420K 120K–280K
Back Office - Operations Associate 5-8 125K–200K 80K–120K
Finance Control / Financial Reporting VP 8-15 450K–700K 200K–450K
Finance Control / Financial Reporting AVP 5-8 300K–450K 120K–200K
Finance Control / Financial Reporting Associate <5 200K–300K 80K–120K
Internal Audit VP 8-15 450K–600K 350K–500K
Internal Audit AVP 5-8 300K–450K 200K–350K
Internal Audit Associate 3-5 180K–300K 100K–200K
Management Reporting VP 10+ 400K–600K 150K–400K
Management Reporting AVP 5-8 200K–300K 120K–150K
Management Reporting Associate <5 150K–200K 80K–120K
Middle Office / Back Office - Compliance VP 10+ 500K–1.2M 300K–800K
Middle Office / Back Office - Compliance AVP 5-10 300K–500K 150K–300K
Middle Office / Back Office - Compliance
Associate
<5 180K–300K 100K–150K
Middle Office / Back Office - Marketing Risk VP 15+ 500K–1M+ 300K–800K
Middle Office / Back Office - Marketing Risk
AVP
10-15 400K–500K 180K–300K
Middle Office / Back Office - Marketing Risk
Associate
<5 120K–300K 100K–180K
Middle Office / Back Office - Product Control
VP
15+ 550K–800K 300K–500K
Middle Office / Back Office - Product Control
AVP
5-10 350K–550K 200K–300K
Middle Office / Back Office - Product Control
Associate
<5 200K–350K 100K–200K
Middle Office / Back Office -Trader/Credit Risk
VP
10+ 550K–1M 300K–800K
Middle Office / Back Office -Trader/Credit Risk
AVP
5-10 300K–550K 150K–300K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
23
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
Middle Office / Back Office -Trader/Credit Risk
Associate
<5 250K–300K 120K–150K
Chemical
Account Manager 3-7 130K–250K 120K–240K
EHS Manager 8-15 300K–700K 200K–400K
Electrical Engineer 5-10 80K–180K 70K–120K
Engineering Manager 10-20 230K–450K 200K–400K
General Manager 10-15 590K–1.5M 400K+
Instrument Engineer 5-10 80K–180K 80K–150K
Marketing Director 12-15 500K–900K 300K–500K
Marketing Manager 7-10 280K–600K 150K–300K
Marketing Communications Manager 8-12 150K–500K 130K–300K
Mechanical Engineer 5-10 110K–180K 70K–120K
Plant Manager 15-20 400K–800K 300K–600K
Process Safety Engineer 4-8 250K–800K 150K–400K
Production Manager 10-15 220K–400K 150K–300K
Production Supervisor 6-9 150K–200K 100K–150K
Production Engineer 2-5 100K–180K 70K–100K
Project Manager 15-20 300K–500K 200K–400K
Project Engineer 5-10 180K–300K 120K–250K
Quality Manager 10-15 200K–400K 150K–300K
Quality Engineer 3-8 100K–180K 70K–130K
R&D Director 15-20 600K–1.5M 390K+
R&D Manager 10-12 260K–600K 180K+
Sales Director 12-15 400K–1M 260K–450K
Sales Manager 5-10 250K–650K 130K– 260K
Sourcing Director / Manager 8-15 300K–800K 180K– 400K
Sourcing Engineer 3-6 120K–200K 80K–150K
Technical Service Manager 8-12 200K–400K 100K – 150K
Comsumer, Sales & Marketing
Area Operations Manager 10 500K–600K 200K–300K
Business Development / Expansion Manager 7-12 300K–1.2M 130K–230K
Channel Sales Manager 5-10 300K–450K 130K–260K
Country Manager 15-25 1.5M–3M 390K–580K
Marketing Director 10-15 900K–1.5M 400K–600K
Marketing Manager 5-10 300K–700K 200K–300K
Marketing Executive 3-6 100K–200K 70K–100K
Merchandising / Buying Manager 5-10 450K–700K 200K–300K
National Sales Director 10-15 1M–1.5M 500K–800K
Product / Brand Manager 3-10 300K–1M 130K–300K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
kellyservices.cn24
Project / Construction Manager 7-12 300K–500K 120K–260K
Public Relations / Communications Manager 5-10 400K–700K 150K–250K
Retail Operations Manager 10-15 800K–1.2M 120K–300K
Store Manager 5-10 250K–800K 120K–450K
Visual Merchandising Manager 5-10 300K–600K 90K–200K
Healthcare & Life Science
Pharmaceutical
Brand Manager 5-7 400K–600K 300K–450K
Clinical Research Manager 5+ 300K–500K 250k–400K
District Manager 5+ 300K–500K 200K–250K
Marketing Director 10+ 680K–1M 500K–800K
Marketing Manager 8-10 450K–700K 300k–600k
Medical Affairs Manager 5-8 350K–450K 250K–350K
Product Manager 3-5 200K–400K 200k–300k
Project Manager (Clinical) 4-5 200K–300K 150K–250K
QA Manager 5+ 200K–400K 150K–300K
R&D Director 15-20 800K–1.5M 500K–800K
Regional Manager 5-8 350K–450K 180K–300K
Regulatory Manager 5+ 300K–400K 250K–350K
Sales Director 15+ 600K–900K 500K–700K
Medical Devices
Brand Manager 5-7 400K–600K 300K–500K
Commercial Manager 5+ 300K–400K 200K–300K
District Manager 5-8 300K–450K 200K–300K
Marketing Director 10+ 600K–800K 500K–700K
Marketing Manager 8+ 450K–600K 350K–500K
Operations Director 15+ 700K–1.2M 500K–700K
Product Manager 5 200K–400K 150K–300K
QA Manager 5+ 200K–400K 150K–300K
Regional Manager 5-8 350K–600K 250K–500K
Regulatory Manager 5+ 200K–400K 150K–300K
Sales Director 15+ 800K–1M 700K–900K
Human Resources
Compensation & Benefits Manager 10 500K–800K 150K–300K
Compensation & Benefits Supervisor 3-5 200K–350K 80K–300K
Compensation & Benefits Specialist 1-3 100K–200K 60K–100K
HR Department Head 10+ 800K–2M 250K–450K
Generalist HR Manager 8 300K–700K 100K–180K
HR - Organization Development Consultant 5+ 560K–800K 120K–260K
Learning & Development Manager 8 350K–500K 120K–240K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
25
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
Recruitment Supervisor 3-5 200K–350K 90K–200K
Site HR Manager 8-10 280K–400K 180K–350K
Talent Acquisition Manager 8 400K–500K 320K–400K
Training Supervisor 3-5 200K–250K 120K–240K
Industrial & Manufacturing
Engineering VP 20+ 800K–1.5M 600K–800K
Engineering Director 15+ 500K–850K 240K–500K
Engineering Manager 10+ 200K–450K 150K–400K
General Manager 20+ 750K–1.5M 250K–1M
Lean Manufacturing Manager 15+ 400K–550K 200K–250K
Manufacturing Manager 8-12 350K–400K 140K–360K
Marketing Director / Manager 15+ 500K–1M 300K+
Merchandising Manager 5-8 150K–200K 300K–500K
Operations VP 20+ 1M+ 800K+
Operations Director 15+ 600K–850K 500K–700K
Operations Manager 10+ 350K–400K 200K–480K
Product Manager 5-8 300K–600K 120K–300K
Production Director 10+ 350K–850K 280K – 640K
Production Manager 3-5 250K–400K 140K–380K
Project Manager 10+ 250K–450K 140K–380K
Purchasing Director 15+ 500K–1M 300K–500K
Quality Director 15+ 450K–600K 300K–500K
Quality Manager 5-8 200K–400K 140K–300K
R&D Director 15+ 400K–900K 500K–800K
Senior Logistics Manager 5-8 250K–350K 200K–400K
Senior Sales Manager 3-5 350K–500K 150K–300K
Sourcing / Supply Chain Director 5-8 400K–500K 450K–550K
Sourcing & Purchasing Director 15+ 500K–1M 200K–550K
Sourcing & Purchasing Manager 3-5 200K–600K 120K–400K
Supply Chain VP 15+ 1.5m–2M 800K–1M
Supply Chain Director 10+ 400K–600K 400K–500K
Supply Chain Manager 5-8 300K–500K 180K–370K
Technical Head 15+ 250K–800K 180K–600K
Information Technology
Software
ABAP 5-7 240K–360K 120K–240K
Business Analyst 5 120K–350K 120K–250K
Chief Information Officer 10 500K+ 300K–600K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
kellyservices.cn26
Chief Technology Officer 10 500K+ 300K–600K
Database Administrator 3 100K–300K 60K–120K
Embedded Software Engineer 3 -5 120K–240K 60K–200K
ERP Consultant 5-8 180K–600K 120K–500K
Linux / Unix Stem Engineer 2-3 120K–250K 60K–210K
Project Manager 6 240K–500K 180K–350K
R&D Director 10 500K+ 250K–600K
Service Delivery Manager 8 180K–500K 120K–350K
Software Director 10 500K+ 250K–500K
Software Leader 5 180K–300K 120K–240K
Software Manager 6-8 240K–400K 120K–300K
Software Engineer 3-6 120K–350K 60K–120K
Stem / Solution Architect 6 240K–450K 120K–300K
Technical Support Engineer 1-3 180K–300K 120K–240K
Testing Engineer 3-5 120K–300K 100K–240K
Hardware
Architect 5+ 240K–500K 180K–300K
Board Engineer 3-5 180K–300K 120K–240K
Field Service Engineer 3-5 180K–300K 120K–240K
Hardware Director 10 500K+ 250K–450K
Hardware Manager 8 300K–600K 240K–450K
Hardware Engineer 5+ 180K–300K 120K–240K
Helpdesk Engineer 3 120K–300K 60K–120K
Mechanical Engineer 5 180K–350K 120K–240K
PCB Layout Engineer 5 180K–300K 120K–240K
Storage Solutions Engineer 5 180K–400K 120K–240K
Stem Administrator 3+ 180K–300K 120K–240K
Testing Engineer 3+ 180K–300K 120K–240K
Thermal Development Engineer 3+ 180K–300K 120K–240K
Internet
Algorithm Engineer 5 180K–400K 120K–240K
Flash Engineer 3-5 180K–250K 120K–200K
HTML Designer 6-8 180K–250K 120K–200K
Operations Director 8 300K+ 240K–360K
Operations Manager 6 180K–360K 150K–300K
Perl / PHP Software Engineer 3-5 180K–300K 120K–240K
Planning Manager 6 180K–360K 150K–300K
Producer - Games 5 180K–400K 120K–240K
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
27
Tier 1 Cities*: Shanghai, Beijing, Guangzhou
Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only
Product Manager 6 180K–400K 120K–240K
Product Operations Manager 6-8 180K–400K 120K–240K
Search Engine Development Engineer 5 180K–300K 120K–240K
Search Engine Optimisation Engineer 5 180K–300K 120K–240K
UI / UE Engineer 3-5 180K–400K 120K–240K
Web Architect 5 180K–400K 120K–240K
Web Designer 3 180K–250K 120K–200K
Procurement, Supply Chain and Quality
Procurement
Commodity Manager 10 250K–400K 150K–300K
MRO Manager 8 350K–400K 180K–300K
Procurement VP 20 1.5K–2M 800K–1M
Procurement Director 18 700M–1.2M 560K-960K
Procurement Manager 16 350K–700K 200K+
Procurement Supervisor 7 180K–300K 150K+
Senior Procurement Manager 19 350K–700K 180K+
Sourcing VP 25 1.5M–2M 800K–1M
Sourcing Director 18 1M–1.2M 900K–1M
Senior Sourcing Manager 16 500K–900K 180K+
Sourcing Manager 15 400K–800K 180K+
Senior Sourcing Engineer 6 200K–300K 150K+
Supply Chain
Logistics Manager 15 400K–600K 200K+
Supply Chain VP 22 1.5M–2M 800K–1M
Supply Chain Director 20 1M–1.2M 900K–1M
Supply Chain Manager 12 400K–800K 200K–600K
Supply Chain Engineer 6 200K–300K 120K+
Supply Development Manager 15 400K–800K 180K+
Supply Quality Manager 14 350K–700K 180K+
Supply Quality Engineer 6 200K–300K 120K+
Quality
Quality and Engineering VP 20 800K–1.2M 500K–900K
Quality Director 16 600K–800K 250K+
Quality Manager 12 400K–800K 200K+
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
Occupation Title
Experience
(years)
Range of Annual Base Salary
(in local currency)
Tier 1 Cities* Tier 2 Cities*
China
kellyservices.com.hk28
The return of market confidence in 2010 has
helped to stir up the local job market in the past
two years. However the concerns brought by the
Euro zone crisis have given employers second
thoughts at the start of 2012, about engaging in
new hiring. Companies are elongating the decision
making processes and choosing to defer new hiring
to later parts of the year as they watch to see
the true extent of the crisis and its impact on the
global economy.
The hesitation of new hiring is reflected more in
the financial industry and companies within the
B2B sectors. However, the war for talent remains
strong in the retail sector. Overall, unlike the
pre-global financial crisis, companies in general are
not offering “mega” compensation packages to
attract, which makes the talent attraction challenging
for employers.
Banking & Financial Services
With financial instability sweeping the world,
international banks are the worst hit in the local
job market. However, mainland Chinese financial
institutions remain as the driving engine in
expansion. With new branches opening in the
territory, relationship managers with proven track
records are in high demand. Unlike a few years ago,
more banking professionals are now creating new
career horizons with Chinese banks.
Despite this global turbulence some financial
services disciplines still remain robust and we
expect to see buoyancy in insurance, wealth
management and private banking segments
creating opportunities across the sales and
marketing disciplines. The tightening of regulatory
requirements will also see a need for compliance
professionals with both external and internal audit
skills. Hong Kong is still largely seen as the Asian
trading hub, where there is a need for a variety of
trade support roles and client services disciplines.
hong kong
NATIONAL
OVERVIEW
29Figures are in HKD and represent base salary only
HongkOng
kellyservices.com.hk30
31Figures are in HKD and represent base salary only
Information Technology
The rapid rate of technological change and greater
demands in bottom line cost savings continues
to push businesses to place a huge focus on IT
enablement. As such the market for IT developers
with strong industry and domain knowledge prevails.
Despite the 2011 crisis where many projects in the
banking and financial services sector were put on
hold, skilled IT professionals with two to five years
experience are still in high demand within the
Hong Kong market. The substantial reduction in
student enrolment taking up IT in local universities
in recent years has created a shortage of home-
grown IT professionals in the market. This has in
turn created wage pressures for companies looking
to engage mid career IT talent. Another noticeable
trend is the resurgence in the use of contract IT
professionals as an alternative to address the ad-hoc
requirements as well as to minimize the FTE growth.
UNIX and network administration being areas of high
deployment of this labour type.
HongkOng
kellyservices.com.hk32
BANKING
Consumer Banking
Strategic Planning 10+ $720K $1M
Product Development / Marketing
(Management)
8+ $600K $1M
Credit Risk (Management) 8+ $480K $700K
Relationship Manager 4+ $400K $600K
Product Development / Marketing Executive 3+ $300K $480K
Investment Consultant 2+ $240K $396K
Credit Risk Executive 2+ $240K $360K
Personal Banking Sales 2+ $240K $300K
Commercial/Corporate Banking
Credit Risk Management 3+ $360K $1M+
Credit Analyst 2+ $240K $720K
Credit Administration 2+ $240K $720K
Relationship Manager 3+ $300K $600K
Associate Relationship Manager 1.5+ $180K $300K
Investment Banking/Global Markets
Institutional Sales (Executive to Team Head) 2+ 240K 1.8M+
Product Control 4+ 400K 1.4M+
Compliance 3+ 360K 1.4M+
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Debt Captial Market 2+ 240K 1.4M+
Equity Captial Market 2+ 240K 1.4M+
Market Risk 3+ 360K 1.2M+
Operational Risk 3+ 360K 1.2M+
Corporate Finance 3+ 360K 1.2M+
Internal Audit 2+ 240K 1.2M+
Middle Office/Trade Support 3+ 360K 1M
Settlements 3+ 360K 1M
INSURANCE
Claims
Assistant Manager - Manager 5+ 300K 600K+
Officer - Senior Officer 3+ 156K 288K+
Policy Administration
Policy Administration Manager 6+ 288K 420K+
Policy Administration Officer 3+ 156K 216K+
Actuary
Actuary 5+ 480K 780K+
Assistant Actuary 3+ 240K 360K+
hong kong
33Figures are in HKD and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Underwriting
Senior Manager - Head of Underwriting 10+ 750K 1200K+
Assistant Manager - Manager 5+ 350K 800K+
Officer - Senior Officer 1+ 120K 400K+
Business Development
Director 10+ 720K+ $1M+
Manager - Senior Manager 5+ 420K 720K+
Assistant Manager 3+ 264K 360K+
INFORMATION TECHNOLOGY
Executive/General Management
Chief Information Officer 15+ 1.8M 3M
Chief Technology Officer 12+ 1.2M 2M
Managing Director 15+ 1.5M 2.5M
Head of IT 12+ 800K 1.5M
IT Manager 10+ 600K 1M
Sales
Sales Director 12+ 1M 2.5M
Sales Manager 8+ 600K 1.2M
Account Manager 5+ 400K 800K
Projects
Project Director 15+ 1M 1.5M
Project Manager 8+ 500K 900K
Project Leader 6+ 400K 600K
Business Analyst
Lead Business Analyst 12+ 700K 1.2M
Business Analyst 5+ 450K 850K
Application/System Development
Solutions Architect 12+ 600K 1.2M
Systems Analyst 6+ 420K 700K
Developer 3+ 240K 500K
Infrastructure
Systems Architect 12+ 550K 1M
Systems Administration 5+ 360K 600K
Senior Engineer 5+ 360K 480K
Database
Senior DBA 10+ 540K 900K
DBA 5+ 360K 500K
HongkOng
kellyservices.co.in34
The GDP growth for 2012 is pegged at 7% with
an estimate of over 200 million people between
the working ages of 18-60 years being added to
the workforce in the next two decades. According
to the India Chamber of Commerce, the Indian
economy will create 87.37 million jobs by 2015.
Over the next decade, India will have over 125
million college-educated professionals and an equal
number of vocationally trained people. The speed
of India’s sustained growth is necessitating a need
of 500 million skilled people to enter the market.
This is a definitive precursor for a talent war
which will ultimately drive up business costs. The
problem of ‘plenty’ needs to be resolved by up
skilling an anticipated 250 million people over
this decade.
Information Technology
India’s IT industry is fast reaching the 100 billion
dollar mark and it is still growing in double digits,
creating a substantial number of new jobs. The
Indian IT industry is expected to add in excess of
240,000 new jobs and as expected IT companies
have set aggressive targets for graduate and lateral
hiring in 2012.
This year, IT companies are expected to be more
stable in their hiring plans than last year as most
companies have already factored in economic
turbulences. Banking and financial institutions
and IT companies servicing this sector continue
to be one of the largest IT talent employers.
Telecommunications is also expected to continue
hiring in 2012 as increased infrastructure and
connectivity buoyed by a growing consumer demand
is seeing growth in this sector. Skill sets in emerging
areas like cloud computing and e-commerce will
be highly sought after as companies realise the
potential impact of these advanced technologies on
their future business.
INdia
NATIONAL
OVERVIEW
35Figures are in INR and represent base salary only
India
kellyservices.co.in36
37Figures are in INR and represent base salary only
India
Engineering
Engineering is the largest sector in overall industrial
segments in India. The sector employs more than
five million skilled and semi skilled workers. India is
rapidly investing in infrastructure to connect the vast
country and witnessing large amounts of foreign
investment in the power and automotive sectors in
particular.
Oil & Gas
India’s oil and gas sector holds strategic importance
in the economy as it meets around 42% of the
country’s primary energy demand and contributes
over 15% to the gross domestic product (GDP).
With an interesting mix of private and government
companies, the industry is scaling new heights in
domestic and international markets. India is the
world’s fifth-largest energy consumer; oil accounts for
30% of the total energy consumption.
Locating new fields for exploration will increase
the demand for skilled labour and oilfield services
both in upstream & downstream sectors. All these
unexplored rigs will require substantial manpower
support to keep the industry running. The oil and
gas industry is looking forward to deploy innovative
technologies to locate and extract oil. This has
resulted in significant rise in the demand for
petroleum engineers and geo-scientists worldwide.
Automotive
The automotive industry in India has been growing
at a rapid pace in both the OEM and ancillary
segments resulting in strong demand across a
variety of skill sets. New technologies entering the
Indian market will create intensified demand for
R&D professionals. Increased export levels of cars
compared to 2011 coupled with further investments
in India from companies like Ford, Bosch and
Chrysler will increase the need to employ skilled
automobile engineers, quality professionals and
create opportunities across the supply chain
industry accordingly.
Power & Infrastructure
India accounts for 4% of global power generation,
and has the fifth largest generation capacity in the
world with an overall installed capacity of 159,398.50
mega watt (MW) as on March 31, 2010. The total
installed generation capacity in the country as on
September 20, 2011 stood at 182,344.62 MW,
with thermal power contributing 118,695.98 MW,
nuclear 4,780.00 MW and hydro power 38,706.40
MW, according to Central Electricity Authority data.
Infrastructure sector in India has witnessed rapid
growth in its different sectors with the development
of urbanisation and increased involvement of foreign
investments in this field. The Government of India
has taken various steps to develop the infrastructure.
Engineering Services
The engineering services sector deals with design,
manufacturing and operation of structures, machines
or devices. This is the largest of all industrial sectors
and accounts for 12% of the GDP. Engineering
exports grew by 94% and 60% during Q1 & Q2
respectively in 2011. Indeed the engineering design
market is estimated to be around US$40 billion
by 2020 with many European OEMs establishing
their design and engineering back offices in India.
This will move several job opportunities for design,
hardware & software engineers to the region
and thus creating enormous demand in this
talent segment.
India
kellyservices.co.in38
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Information Technology
Analyst Programmer 2-5 300K 700K
Analyst Programmer / Software Engineer 3-7 500K 900K
Application Architect 7+ 1.2M 1.6M
Application Developer 3-7 500K 900K
Business Analyst 3-6 500K 800K
Database Manager 10+ 1.5M 2.2M
Database Architect 10-14 1.3M 1.6M
Database Administrator 7-10 900K 1.2M
Database Administrator 5-7 600K 800K
Database Administrator 2-5 300K 600K
Desktop Support 2-5 300K 500K
Enterprise Architect 10+ 1.5M 2.2M
ERP Specialist 2-8 500K 1M
Head of IT Operations 15 3.5M 5M
Head of Information Systems 10+ 2M 2.2M
Head of Software Development 15 4M 6M
Helpdesk Analyst 2-5 300K 500K
Information Technology Director 15-20 5M 8M
Information Technology Manager 13-16 2M 2.5M
Information Technology Specialist 10-14 2M 2.5M
Infrastructure Architect 10+ 1.5M 2.2M
Inside Sales Representative 4-8 700K 1.2M
IT Auditor 9-11 1.8M 2.5M
IT Business Analyst 3-6 500K 800K
IT Security Manager 5-9 1.2M 1.6M
Lead Software Developer 9-11 1.5M 1.8M
Network Manager 10-14 1.3M 1.6M
Network Engineer 7-10 800K 1.2M
Project Manager 11-15 1.5M 2M
Project Manager - Infrastructure 11-15 1.5M 2.5M
SAP Implementation Consultant 4-7 600K 900K
SAP Project Manager 11-15 1.5M 2M
Security Consultant 3-6 500K 800K
Senior Technical Writer 8-12 1M 1.5M
Software Architect 7-10 1.3M 1.6M
INdia
39Figures are in INR and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Software Engineer 3-7 600K 900K
Software QA / Test Analyst 5-8 700K 1M
Solution Architect 13-15 1.5M 2M
Storage Consultant 5-8 800K 1.4M
Systems / Network Administrator 4-8 600K 1.2M
Systems Administrator 3-5 500K 800K
Technical Delivery Manager 12-15 1.6M 2.4M
Technical Writer 4-7 500K 800K
Engineering & Technical
Application Engineering Manager 8-10 1M 1.2M
Business Unit Head-Automation 20-30 3M 4M
CAE Manager 8-10 1M 1.6M
CFD Manager 7-10 1M 1.2M
Chemical Engineer 2-5 300K 600K
Civil Engineer 8-12 1M 1.5M
Civil Engineer 2-5 300K 600K
Contracting Engineer Manager 5-8 600K 1M
Corrosion Engineer 8-12 900K 1.5M
Development Engineer 5-8 500K 900K
Distribution Manager 8-10 800K 1.2M
Electrical & Instrumentation Control Engineer 5-9 800K 1.2M
Electrical / Mech-Maintenance Manager 8-10 800K 1.2M
Electrical Design Engineer 5-9 600K 800K
Electrical Engineer 2-5 300K 600K
Embedded System/Design Principal Engineer 5-9 600K 1.2M
Engineering Director 18-24 3M 5M
Engineering Manager 14-17 1.8M 2.2M
Environment Health & Safety Manager 15-20 1.8M 2.5M
Environmental Engineer 10-15 800K 1.2M
Equipment Manager 8-12 700K 1.1M
Expediting Co-ordinator 6-8 650K 100K
Fire Engineer 5-8 800K 1.2M
India
kellyservices.co.in40
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Geologist 8-10 1.5M 1.8M
Geophysicist 8-15 1.4M 3M
Geotechnical 8-10 1.5M 2M
Head CAE 15-18 2M 3M
Head HSE 15-20 2.1M 3M
Head of Applications Engineering 15-20 1.8M 2.5M
Head of Customer Engineering 15-20 1.8M 2.5M
Head of Environment Health & Safety 20 2.5M 3M
Head of Manufacturing Engineering 20 2.5M 3M
Head of Quality 20 2M 2.5M
Head of R&D Center 15-20 2M 2.5M
Head of Systems Engineering 15-20 2M 2.5M
Head of Technical Services 12-14 1.5M 2M
Industrial Engineering Manager 5-8 800K 1.2M
Inspection Engineer 8-12 900K 1.5M
Logistics Manager 8-10 800K 1.2M
Maintenance Manager 13-18 2M 2.5M
Manager Operations & Maintenance 15 1.7M 2.5M
Manager Production-Body Shop 8-10 1M 1.4M
Manager Production-Final Assembly Shop 8-10 1M 1.4M
Manager Quality Assurance Manager 15 1.5M 2M
Manufacturing Engineering Manager 8-12 600K 1.5M
Materials Manager 8-12 600K 1.5M
Mechanical Design Engineer 2-5 350K 800K
Mechanical Engineer 2-5 350K 800K
Mechanical Technician 2-5 350K 800K
Metallurgist 5-8 600K 1M
Mining Engineer 5-9 1M 1.5M
Operations Manager 10-14 1M 1.5M
Piping Engineer 4-7 600K 900K
Planning Engineer 8-15 1M 2M
Process Engineer 5-8 600K 1M
Process Engineer 2-5 350K 800K
Procurement Manager 10-12 1M 1.5M
Product Engineer 2-5 350K 800K
Product Engineering Manager 8-10 1M 1.5M
Production Engineer 2-5 350K 800K
Project Control Engineer 8-12 1M 2M
INdia
41Figures are in INR and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Project Manager 8-10 1M 1.5M
Project Engineer 2-5 350K 800K
Purchasing / Sourcing Manager 10-15 1.3M 1.8M
Quality Manager 10-14 1M 1.5M
QA Engineer 5-9 800K 1.2M
R&D Engineer 2-5 350K 600K
Reservoir Engineer 6-10 800K 1.8M
Roads/bridges Engineer 5-9 800K 1.2M
Sales Engineer 4-7 600K 800K
SCM Head 18-22 2.5M 3.2M
Senior Application Engineer 5-7 700K 900K
Senior Design Engineer 4-7 700K 900K
Senior Design Engineer (Automation) 3-10 500K 1.5M
Senior Buyer 15-18 2M 2.5M
Senior Project Manager Power 15-20 2M 2.5M
Structural Engineer 4-9 550K 1.2M
Supplier Technical Assistant 6-8 800K 1M
Supply Chain Manager 10-15 1.2M 2M
Technician 1-2 120K 240K
India
kellyservices.co.id42
Interest in the archipelago has led to many new
companies investing and expanding their footprint in
Indonesia. This growth focus has created challenges
in talent management across most industries –
specifically how to recruit, retain and develop
talent in a country anecdotally labelled as “the
missing BRIC.”
banking and Financial Services
The banking sector has both broadened and
deepened and interest rates continue to sink. These
factors have combined to boost the already growing
demand for financial services, from microcredit to
mezzanine finance. Volume of lending continues
to increase in 2012 with loans to SMEs being a
core driver of growth. This is creating a need for
experienced talent across the whole middle and
back office within this sector
Consumer Goods
The FMCG industry is expected to have double
digit growth this year. As the FMCG market in
Indonesia is becoming more appealing, more
foreign direct investment is finding its way to
the country. It is clear that more products will be
produced and pushed to market which is creating
demand for marketing and sales professionals,
coupled with a need for technical skill sets across
manufacturing and supply chain management.
This has a relational impact on companies servicing
this sector.
Information Technology
Improvements in Indonesia’s telecoms and ICT
infrastructure are expected to drive long-term
growth in the Indonesian IT services market.
Commercial data centres are being built, linked to
growing rollout by public sector and commercial
organisations of e-government or e-commerce
services. However, most opportunities are still
in fundamental service areas such as system
integration, support systems, training, professional
services, and outsourcing and internet services,
with demand for a mixture of employment types,
from permanent through to contract and
temporary professionals.
INdonesia
NATIONAL
OVERVIEW
43Figures are in IDR and represent 13 months annual salary
INdonesia
kellyservices.co.id44
45Figures are in IDR and represent 13 months annual salary
Telecommunications
The growth of the telecommunications industry this
year is estimated to range between 8% to 9%. The
main driving force being competition by five major
carriers of the 10 operators who hold an estimated
90% market share of the telecommunication industry
in Indonesia. The telecommunication industry still
requires a lot of specialised talent due to strong
growth in line with the expansion hence skill sets
such as RF Engineers and other technical services
will continue to be highly prized.
Pharmaceutical
The Indonesian pharmaceutical market is projected
to grow at a high single-digit CAGR in US dollar
terms during the forecast period, and it will be
the sixth largest pharmaceutical market in the
Asia Pacific region by 2016. In 2010, there were
around 250 pharmaceutical manufacturers, with the
vast majority located in Java. Despite the country
possessing huge manufacturing capabilities, the
lack of R&D within local companies could affect the
market, especially if IPR regulations are tightened,
requiring all drugs to be originated in Indonesia.
Potentially this is bad news for multinational
companies but it could potentially reduce costs
in the long term for both the manufacturer and
the consumer. Resultantly the need for R&D talent
will surge as well as that for specialist chemical
manufacturing expertise.
Energy
Energy consumption in Indonesia has been increasing
rapidly, to meet the growing demands among
various sectors, in particular the transportation
and manufacturing sector, who boast the highest
consumption levels of all industries. Coal production
is set to surge in 2012 as coal miners bolster their
businesses and several new mines commence
production. Indonesia’s production of thermal and
coking coal is forecast to hit 380 million tons in 2012,
up 5.5% on this year’s estimate, which will create
demand for all level of mining engineers, health and
safety and environmental specialists
Overall Indonesia can look forward to robust growth
across all their major markets. The challenge will be
the need for highly skilled talent as its position on
the global economic stage is realised.
INdonesia
kellyservices.co.id46
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Engineering & Technical
Engineering Manager 10+ 455M 650M
Environment Health & Safety Manager 10+ 390M 585M
Environment Engineer 7+ 130M 195M
Facility Manager 10 + 455M 585M
Field Service Engineer 5+ 65M 104M
Geologist 10+ 520M 975M
Geophysicist 10+ 520M 975M
HVAC Project Manager 10+ 325M 520M
HVAC Service Manager 10+ 260M 455M
Industrial Engineering Manager 10+ 390M 455M
Mechanical Engineer 10+ 130M 325M
Metallurgist 5+ 195M 260M
Mining Manager 10+ 780M 1,300M
Mining Engineer 5+ 260M 325M
Petroleum Engineer 10+ 520M 975M
Project Manager 10+ 520M 1,040M
Sales Engineer 7+ 130M 234M
Manufacturing
Manufacturing Engineering Manager 15+ 455M 780M
Materials Manager 7+ 130M 260M
Process Engineer 4+ 65M 130M
Production Engineer 4+ 65M 130M
Project Manager 10+ 260M 455M
Project Engineer 5+ 130M 195M
Purchasing/ Sourcing Manager 7+ 221M 364M
QA Manager 10+ 260M 455M
QA Officer 4+ 65M 130M
R&D Manager 8+ 234M 455M
R&D Engineer 5+ 91M 195M
Supply Chain Manager 10+ 325M 650M
Warehouse Manager 10+ 182M 260M
Finance
Accounting Director 12+ 455M 520M
Accounting Manager 10+ 260M 325M
Accounts Payable Manager 7+ 195M 260M
Accounts Receivable Manager 7+ 195M 260M
Audit Director 12+ 520M 780M
Auditor 3+ 91M 130M
Billing Operations Manager 10+ 260M 325M
Business Analyst 7+ 260M 520M
Compliance Senior Manager 10+ 455M 585M
INdonesia
47Figures are in IDR and represent 13 months annual salary
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Cost Accountant 5+ 78M 130M
Costing Manager 10+ 260M 390M
Credit & Collections Manager 10+ 260M 390M
Credit & Collections Supervisor 7+ 130M 234M
Credit Manager 10+ 325M 390M
Financial Accountant 8+ 195M 325M
Financial Planning Manager 15+ 455M 650M
Financial Planning & Analysis Manager 12+ 195M 325M
Head of Syariah Compliance 10+ 390M 520M
Head of Treasury 12+ 520M 780M
Insurance and Risk Management Manager 12+ 390M 520M
Management Accountant 10+ 325M 390M
Payroll Manager 8+ 195M 260M
Relationship Manager 7+ 130M 195M
Head of Credit Risk 10+ 325M 520M
Tax Analyst 8+ 195M 260M
Treasury Analyst 8+ 195M 325M
Claims Manager 10+ 260M 390M
Head of Risk 10+ 390M 585M
Accountant 3+ 65M 91M
Finance Director (Banking) 15+ 1,300M 2,340M
Financial Controller (Banking) 12+ 585M 1,040M
Finance Manager (Banking) 12+ 455M 585M
Tax Accountant (Banking) 6+ 130M 195M
Treasury Manager (Banking) 10+ 390M 520M
Tax Manager (Banking) 10+ 325M 455M
Claims Manager (Banking) 10+ 325M 390M
Financial Analyst (Banking) 8+ 234M 325M
Accountant (Banking) 5+ 130M 195M
Audit Manager (Banking ) 10+ 260M 455M
Internal Audit Manager (Banking) 10+ 260M 455M
Finance Director (Commerce and Industry) 15+ 1,040M 1,950M
Financial Controller (Commerce and Industry) 12+ 585M 910M
Tax Director (Commerce and Industry) 15+ 650M 780M
Tax Manager (Commerce and Industry) 10+ 260M 390M
Tax Accountant (Commerce and Industry) 6+ 130M 195M
Finance Manager (Commerce and Industry) 12+ 390M 520M
Treasury Manager (Commerce and Industry) 10+ 325M 455M
Tax Director (Private Practice) 15+ 975M 1,105M
Tax Manager (Private Practice) 10+ 260M 390M
Audit Manager (Private Practice) 10+ 325M 390M
Financial Analyst 8+ 195M 260M
INdonesia
kellyservices.co.id48
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Human Resources
Compensation & Benefits - Head 12+ 455M 910M
Compensation & Benefits - Analyst 5+ 91M 104M
Human Resources Director 15+ 910M 1,950M
HR Director (Local) 15+ 780M 1,625M
HR Manager 12+ 325M 585M
HR Generalist 7+ 130M 234M
HRIS Manager 10+ 390M 455M
Industrial Relations Manager 10+ 260M 455M
Organisational Development Manager 12+ 390M 910M
Recruitment Manager 10+ 195M 325M
Recruitment Lead 5+ 91M 130M
Technical Training Manager 10 325M 455M
Training & Development Director 15+ 520M 780M
Training & Development Manager 10+ 325M 455M
Information Technology
Account Manager / Sales Manager 10+ 325M 30M
Account Manager 10+ 260M 25M
Analyst Programmer / Software Engineer 5+ 65M 10M
Business / Systems Analyst 8+ 195M 20M
Chief Information Officer 15+ 975M 1,950M
Chief Technology Officer 15+ 975M 1,950M
Country Manager 15+ 780M 1,625M
Database Manager 10+ 195M 325M
Database Architect 5+ 65M 130M
Desktop support 5+ 65M 104M
Digital Marketing 10+ 325M 520M
ERP Business Analyst 10+ 325M 455M
Head IT Operations 12+ 520M 650M
Head of Information Systems 12+ 520M 650M
Head of Software Development 10+ 390M 520M
Information Technology Director 15+ 780M 1,300M
Information Technology Manager 10+ 325M 520M
IT Operations Manager 10+ 260M 390M
IT Security Manager 10+ 390M 520M
MIS Manager 10+ 390M 520M
Network Manager 10+ 260M 325M
Program Director 15+ 520M 780M
Program Manager 10+ 260M 390M
Project Manager 10+ 260M 390M
INdonesia
49Figures are in IDR and represent 13 months annual salary
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Sales Director 15+ 650M 1,040M
SAP Implementation Consultant 8+ 325M 390M
SAP Project Manager 8+ 390M 455M
Sales & Marketing
Brand / Product Manager 7+ 195M 325M
Business Development Director 15+ 975M 1,170M
Business Development Manager 10+ 455M 585M
Category Management Manager 10+ 325M 520M
Division / Region Merchandise Manager 10+ 325M 455M
Head of Market Research 10+ 325M 650M
Market Research Manager 10+ 325M 455M
Key Account Manager 7+ 195M 260M
Marketing Communications Manager 10+ 455M 585M
Marketing Director 15+ 975M 1,950M
Marketing Manager 12+ 585M 975M
National Key Account Manager 12+ 585M 650M
National Sales Manager 12+ 325M 715M
PR Manager 10+ 325M 520M
Pricing Manager 10+ 260M 325M
Sales & Marketing Director 15 1,040M 1,950M
Sales & Marketing Manager 12+ 585M 780M
Sales Director 15+ 845M 1,625M
Telemarketing Manager 12+ 195M 260M
Trade Marketing Senior Manager 12+ 390M 650M
Web Marketing Manager 12+ 325M 585M
INdonesia
kellyservices.com.my50
The Malaysian economy is projected to grow
by 4% to 5% this year, with domestic demand
remaining the anchor of growth, as it has been
over the past few years despite the global
environment remaining challenging. The growth
for 2012 will moderate to between 4% and
5% after expanding by 5.1% last year but the
steady pace of growth will largely depend on
external developments. Regardless, talent scarcity
remains an issue the economy has to contend with.
Malaysia’s aspiration is to advance towards
becoming a high-income, high value-added
economy in the next decade, with growth that is
underpinned by greater innovation, productivity and
enhanced efficiency. Key initiatives to address this
area are in the areas of human capital development,
developing a conducive and competitive business
environment and establishing the required physical
infrastructure for a modern economy.
Accounting and Finance
The increasing trend of Malaysian corporations
venturing abroad to leverage on joint partnership
and expansion of business globally has resulted in
fundamental measures to support the presence of
domestic businesses globally. Given the importance
of having appropriate risk management practices to
the financial health of companies, middle to senior
levels of auditors, accountants, and credit managers
are in continually sought after.
There is also a continued demand for business
partners who can value add in terms of providing
sound business advice and acumen due to stricter
internal controls via expense management and push
for profitability.
Banking and Financial Services
The development of talent for the financial sector
continues to present considerable challenges for
the industry as demand continues to exceed supply.
In the medium to longer term, this can increase
pressure on wages, and could undermine the ability
of financial institutions to maintain competitive
positions and effectively control risks.
Malaysia
NATIONAL
OVERVIEW
51Figures are in MYR and represent base salary only
malaysia
kellyservices.com.my52
53Figures are in MYR and represent base salary only
The foreign exchange market experienced robust
growth during the year with Malaysian financial
markets continuing to support the effective and
efficient intermediation of funds for economic
activity, diversifying domestic funding sources which
contribute to financial stability. For 2011, growth in
total financing by the banking system to businesses
remained strong, increasing at a faster pace of
13.5% (2010: 9.4%)
Engineering and Technical
The construction sector is projected to record a
stronger growth with a projected rate of 6.6%
compared with 3.5% in 2011, supported by the
implementation of major infrastructure projects
and the special stimulus package. This robust
performance benefitted both the fabricated metal
and non-metallic mineral product industries.
However, civil engineering and special trade
sub-sectors registered a slower growth following
completion of several major highway projects,
maintenance and upgrading works.
Capital investments in the resource-based industries
and new growth areas encompassing renewable
energy, oil and gas, utilities and advanced electrical
and electronic products provides opportunities
for continued demand for engineers and technical
workforce. The higher demand for natural gas from
Japan provided opportunities of employment at
processing plants and facilities in Peninsula Malaysia.
Human Resources
As the role of HR practitioners transform from
a transactional to a transformational scope, the
demand for HR specialist handling a full spectrum
of HR activities continues. As more companies are
focusing on hiring the right talent to compete within
their industry and markets, there is an unabated
demand for Human Resources professionals with
a focus on areas such as compensation & benefits,
learning & development and talent acquisition and
retention.
Information Technology
The communication sub-sector growth was led
mainly by the continued expansion in the broadband
segment. The broadband penetration rose to 62.3%
of households at end 2011 as a result of wider
and improved coverage by key industry players.
Expansion into rural areas boosted the higher
broadband penetration rate due to provision of
broadband facilities and this resulted in continued
hiring demand for ICT job positions. In promoting
e-payments as a viable alternative to paper-based
payment, IT professionals in the middle level space
continued to be in demand. Contracting is expected
to pick up in the IT industry where roles such as
project managers, technical architect, infrastructure
managers and software specialists will be required
to meet the development of offering on mobile
banking, payment services via a multi-bank and
mobile network-neutral infrastructure.
Procurement, Supply Chain
and Logistics
In line with the moderation in trade and
manufacturing-related activity, the transportation
and storage, and utilities sub-sector recorded a
modest expansion. Demand for cargo-related
transport services was lower amid the weakness in
external demand and reduction in exports and the
weaker performance in the manufacturing sector.
With organizations placing a higher importance in
improving processes and productivity, mid and senior
management positions such as project managers,
operations directors and supply/demand/inventory
planners are in demand.
Sales and Marketing
Sales talent with strong performance track records
are still sought after, as companies compete for
bigger and wider share of the markets. Commission-
based packages are favoured for sales workforce
while brand managers, marketing directors, channel
managers continue to be in demand as companies
extend marketing and advertising campaigns
beyond conventional and traditional advertising,
moving into digital and online marketing.
malaysia
kellyservices.com.my54
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Banking
Assistant Manager (Credit/Operational Risk) 5-8 84K 120K
Assistant Manager (Finance/Financial Analysis/
MIS/Regulatory Reporting/Statutory Reporting)
5-11 60K 120K
Assistant Manager (Market Risk) 5-8 84K 144K
AVP Corporate Finance 5-8 90K 120K
AVP Legal 5-8 84K 120K
Chief Internal Audit 15-20 240K 600K
Chief Risk Officer 15-20 240K 600K
District Manager 8-10 96K 180K
Head (Telesales) 10-15 180K 240K
Head Business Development (Deposit/Trustee) 10-15 156K 240K
Head Compliance (Consumer Banking) 10-15 180K 360K
Head Compliance (Investment Banking) 10-15 180K 360K
Head Corporate Communications 10-15 180K 360K
Head Corporate Finance 10-15 216K 300K
Head Debt Capital Market 10-15 240K 360K
Head Islamic Banking 10-15 180K 360K
Head Marketing (Unsecured/Cards) 10-15 240K 360K
Head Mortgage 10-15 180K 360K
Head Treasury Operations 10-15 180K 360K
Head Wealth Management 10-15 180K 360K
Head/AVP Research 8-12 120K 180K
Head/VP Knowledge Management 10-15 180K 240K
Head/VP/AGM (Credit/Operational Risk) 10-15 144K 360K
Head/VP/AGM Market Risk 10-15 144K 360K
Manager/AVP (Credit/Operational Risk) 8-12 120K 144K
Manager/AVP (Finance/Financial Analysis/MIS/
Regulatory Reporting/Statutory Reporting)
8-12 120K 168K
Manager/AVP Audit 6-9 84K 156K
Manager/AVP Market Risk 8-12 144K 180K
Regional Manager 10-15 180K 240K
Senior Executive Audit 2-5 36K 72K
Senior Manager/Team Lead Wealth
Management
8-10 156K 180K
VP Compliance (Consumer Banking) 8-12 180K 216K
VP Compliance (Investment Banking) 8-12 180K 216K
VP Corporate Finance 8-10 144K 180K
Malaysia
55Figures are in MYR and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
VP/Head (Credit Audit/Operations Audit/IT
Audit)
10-15 180K 360K
VP/Head Finance 10-15 180K 360K
VP Legal 10-15 180K 240K
Human Resources
Compensation & Benefits Specialist 10-15 180K 240K
Head Industrial Relations 10-15 144K 216K
Head Recruitment/Manpower Planning 10-15 144K 240K
Head Talent Management 10-15 180K 240K
HR Director (Regional) 10-15 240K 480K
HR Director (Local) 10-15 180K 360K
Senior HR Generalist 10-15 216K 300K
HR Generalist 8-10 96K 180K
HR Relationship Senior Manager 8-12 96K 144K
HR Relationship Manager 5-10 60K 96K
Industrial Relations Manager 5-8 96K 144K
Manager/AVP Talent Management 8-12 120K 180K
Manager/Senior Manager Recruitment 8-12 120K 156K
Sales and Marketing
SVP/AGM/Head of Marketing 12-20 204K 360K
Sales Director/SVP 10-15 180K 300K
Area Sales Manager 10-15 168K 216K
Head Business Development 10-15 144K 240K
Business Development Manager 10-15 72K 120K
VP/Head of Channel Management 10-15 144K 216K
Head Customer Service 10-15 168K 240K
Head of Market Research 10-15 216K 300K
Market Research Manager 5-8 96K 180K
Marketing Manager 5-8 96K 144K
Marketing Communications Manager 5-8 72K 120K
malaysia
kellyservices.com.my56
Engineering
Architect 7-10 96K 156K
Building Surveyor 5 60K 84K
Chemical Engineer 7-10 96K 192K
Civil Engineer 5 48K 72K
Electrical Design Engineer 3-5 54K 84K
Electrical Engineer 3-5 48K 72K
Electrical & Instrumentation Control Engineer 3-5 48K 72K
Electrical & Instrument Engineer 3-5 54K 78K
Electrical Project Manager 5-7 72K 96K
Electrical Service Manager 5-7 72K 96K
Electrical Technician 1-3 18K 30K
Environment Engineer 3-5 48K 60K
Environment Health & Safety Manager 5-7 60K 96K
Estimator 4-7 60K 108K
Facility Manager 5-7 60K 96K
Field Service Engineer 5-7 72K 120K
Head of Environment Health & Safety 6-10 120K 180K
Head of Quality 5-8 84K 144K
HVAC Project Manager 5-7 72K 96K
HVAC Service Manager 5-7 72K 96K
HVAC Supervisor 3-5 30K 54K
Interior Designer 3-5 30K 54K
Mechanical Design Engineer 3-5 30K 60K
Senior Mechanical Engineer 5-7 84K 144K
Mechanical Engineer 3-5 36K 78K
Mechanical Technician 2-5 24K 42K
Molding & Tool Designer Manager 5-7 66K 96K
Operations Manager 7-10 96K 168K
Planning Manager 5-8 90K 156K
Process Engineer 5-7 84K 144K
Product Engineering Manager 8-10 108K 192K
Product Engineer 4-6 54K 78K
Project Manager 6-9 84K 156K
Purchasing/ Sourcing Manager 5-8 54K 108K
Quality Manager 7-8 84K 156K
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Malaysia
57Figures are in MYR and represent base salary only
R&D Engineer 2-5 36K 60K
Sales Engineer 2-4 28.8K 48K
Senior Design Engineer 3-5 60K 96K
Supply Chain Manager 5-8 60K 96K
Technician 1-3 14.4K 36K
Test Engineer 1-2 30K 42K
Information Technology
Account Manager 3-4 42K 62.4K
Account Manager / Sales Manager 5-7 60K 120K
Analyst Programmer / Software Engineer 2-6 42K 96K
Application Architect 2-8 54K 120K
Application Developer 2-6 42K 96K
Business Analyst 6-10 96K 180K
Business / Systems Analyst 3-6 60K 96K
Chief Information Officer 10-18 300K 600K
Chief Technology Officer 10-18 300K 600K
Country Manager 7-8 144K 240K
Database Administrator 3-7 72K 156K
Database Architect 8-15 180K 216K
Database Manager 8-15 180K 240K
Desktop Support 2-5 36K 60K
Enterprise Architect 8-12 156K 216K
ERP Business Analyst 4-6 60K 96K
ERP Specialist 2-4 42K 60K
Head IT Operations 8-12 216K 360K
Head of Software Development 8-15 216K 360K
Helpdesk Manager 4-6 72K 120K
Helpdesk Analyst 1-4 36K 60K
Information Technology Director 8-12 216K 360K
Information Technology Manager 6-10 84K 144K
Information Technology Specialist 2-5 36K 60K
Infrastucture Architect 5-10 96K 156K
Inside Sales Representative 2-6 42K 72K
IT Auditor 4-7 72K 108K
IT Business Analyst 4-8 60K 96K
IT Operations Manager 6-10 84K 144K
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
malaysia
kellyservices.com.my58
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
IT Security Manager 6-10 120K 180K
IT Security Professional 6-8 96K 144K
IT Support Analyst 2-4 36K 60K
IT Support Manager 6-10 72K 96K
Lead Software Developer 5-8 96K 144K
MIS Manager 6-10 84K 144K
Network Manager 6-10 96K 180K
Network Specialist 5-8 72K 120K
Network Engineer 4-6 54K 72K
Post-sales Consultant 5-10 72K 144K
Pre-sales Consultant 5-10 84K 180K
Programme Director 12-18 216K 480K
Programme Manager 8-10 144K 216K
Project Manager 5-8 84K 144K
Project Manager - Infrastructure 5-8 84K 144K
Sales Director (Regional) 8-15 300K 480K
Sales Director 8-15 180K 360K
SAP Implementation Consultant 5-10 120K 240K
SAP Project Manager 10-15 360K 600K
Security Consultant 5-7 96K 180K
Senior Business Analyst 8-12 96K 180K
Senior Technical Writer 5-8 60K 84K
Senior Web Designer 4-6 60K 84K
Service Delivery Management Director 12-18 216K 300K
Software Architect 8-10 120K 180K
Software Development Manager 8-12 96K 156K
Software Development Engineer 4-6 60K 84K
Software Engineer 2-3 42K 60K
Software QA / Test Analyst 3-6 48K 72K
Solutions Architect (Senior) 8-10 96K 180K
Solutions Architect 5-10 84K 180K
Storage Consultant 3-7 60K 144K
Systems Administrator 2-6 42K 72K
Systems Analyst 6-10 72K 120K
Systems Architect 5-10 84K 180K
Systems Engineer 2-3 42K 54K
Malaysia
59Figures are in MYR and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Systems / Network Administrator 2-6 42K 72K
Systems Programmer 4-6 60K 120K
Systems Programmer (junior) 2-4 42K 60K
Technical Consultant 3-6 54K 84K
Technical Delivery Manager 5-8 72K 120K
Technical Writer 3-5 42K 66K
Technology Manager - IT Infrastructure 6-10 84K 144K
Test Manager 5-10 96K 144K
Unix Specialist 5-8 84K 144K
Web Applications Developer Manager 8-10 96K 144K
Web Applications Developer 3-5 54K 72K
Wintel Specialist 5-8 72K 108K
malaysia
kellyservices.co.nz60
With slower than expected economic performance,
sliding consumer confidence and a complex
international picture of patchy recovery, New
Zealand businesses are continuing to take a cautious
approach to building capacity. However, a significant
expected boost from the Canterbury post earthquake
recovery, as well as ongoing strength in several
key sectors, is seeing some short-term growth
and considerable expected demand over the
coming years.
The recovery of Christchurch after the devastating
earthquakes in 2010 – 2011 is likely to exert
significant pressure on the job market across the
new zealand
NATIONAL
OVERVIEW
whole country at the end of 2012, with upwards of
30,000 workers required not just in the construction
industry, but also in a wide range of specialist and
support areas – from local government planning and
engineering, to finance, administration and HR.
Accounting and finance
As in most OECD countries, the New Zealand
accounting and finance sector is continuing to
manage the fallout from the international debt crisis.
After a number of years of restructuring, and the
influence of a considerable change in consumer
debt patterns and business investment, the industry
is yet to stabilise, with jobs still to be shed. The
performance of the sector in Australia, where many
of New Zealand’s major financial institutions and large
enterprises are headquartered, also continues to
restrict hiring intentions.
Information Technology
After weathering much of the recession with
little impact, the IT sector has returned strongly
to growth, outperforming most other industries
outside the agri-business sector. Convergence in
smart devices, consumerism, hi-tech manufacturing,
and bioinformatics and strong swelling in the
gaming and digital content domain is seeing the
IT sector enhancing its credentials dramatically
both domestically and internationally. This growth
transformation and all round solid performance
has been reflected in continued skills shortages
across all categories of knowledge workers. Areas of
particularly critical scarcity include programming and
development disciplines.
61Figures are in NZD and represent base salary only
newzealand
kellyservices.co.nz62
63Figures are in NZD and represent base salary only
In addition, there will be 75,000 new specialised
manager jobs by 2018, including
•	 Production and Operation Managers
•	 Finance and Administration Managers
•	 Human Resources Managers
•	 Sales and Marketing Managers
•	 Supply and Distribution Managers
•	 Information Technology Managers
•	 Research and Development Managers
This growth will inevitably create competition and
wage pressure in these areas for the foreseeable
future.
Engineering
The Canterbury recovery is likely to exert the
biggest influence over the demand for experienced
engineering sector candidates over the next 12 – 24
months.
Civil engineering and infrastructure
In addition to a significant investment in the
redevelopment of Christchurch’s badly damaged
infrastructure, both local and central government
investment is planned in major transport initiatives,
particularly in Wellington and Auckland. A resurgent
housing market, and the shift of the Christchurch
population – with a projected 25,000 residential
sections being brought onto the market in the next
five years – will also increase demand from the
private sector.
Construction
Christchurch will be the focus of considerable
demand for the construction sector once the rebuild
gains momentum. This is predicted to occur by the
end of 2012, and with over $20 billion of investment
to be made into the rebuilding of the city, will
continue to exert a major influence in the economy
for up to a decade.
Mining
While the Australian industry has been the major
attraction for skilled local candidates, a major focus
on mineral resources development on the part of the
National Government, and a number of promising
investigations throughout the country, could
significantly change the local sector in coming years.
Mechanical and Electrical
Despite softness in the wider market, the hi-tech
manufacturing field, in particular, is going from
strength to strength, and will continue to see strong
demand for expert staff across a variety of disciplines.
Longer term
Taking a longer-term view, nearly 200,000 jobs
will be created in New Zealand during the 5-year
period from 2010-2015. Employment growth will be
seen in almost all of the higher-skilled occupations,
including business, finance and ICT professionals,
and technicians and associates.
newzealand
kellyservices.co.nz64
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Engineering & Technical
Development Engineer 3-5 60K 75K
Electrical & Instrumentation Control Engineer 3-5 75K 85K
Electrical Design Engineer 3-5 75K 85K
Electrical Engineer 3-5 65K 80K
Electrical (& Instrument) Engineer 4-6 75K 85K
Electrical Technician 1-3 60K 75K
Engineering Director 10+ 130K 180K
Engineering Manager 10+ 110K+
Head of Quality 8 100K 110K
Material Manager 5-8 65K 75K
Mechanical Design Engineer 3-5 65K 75K
Mechanical Engineer 5-7 65K 75K
Mechanical Engineer 3-5 65K 75K
Operations Manager 7 80K 100K
PCB Design Engineer 3-5 70K 80K
Planning Manager 3-5 70K 80K
Process Engineer 3-7 60K 100K
Product Engineer 4-6 60K 70K
Production Engineer 3-5 60K 75K
Project Manager 4-8 70K 100K
Project Engineer 3-5 70K 80K
QA Engineer 3-5 60K 75K
Quality Manager 7-8 75K 85K
R&D Engineer 2-3 70K 80K
Sales Engineer 3-5 60K 85K
Senior Design Engineer 3-5 80K 90K
Senior Design Engineer (Automation) 5-7 80K 90K
Technician 1-2 55K 65K
Test Engineer 1-2 65K 70K
Finance
Accountant 4-5 70K 85K
Accounting Director 10+ 90K 110K
Accounting Manager 5-8 80K 100K
Accounts Payable Manager 5-6 45K 55K
Accounts Receivable Manager 3-5 90K 150K
Audit Director 10+ 90K 120K
Auditor 2-4 48K 53K
Billing Operations Manager 4-6 75K 92K
Business Analyst 3-5 85K 97K
new zealand
65Figures are in NZD and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Chartered Accountant 3-5 75K 90K
Claims Manager (Insurance) 5+ 75K 100K
Compliance Senior Manager 5 85K 105K
Cost Accountant 3-4 75K 90K
Costing Manager 4-6 75K 100K
Credit & Collections Manager 5-8 42K 55K
Credit & Collections Supervisor 3-5 40K 50K
Credit Manager 5-8 60K 72K
Finance Director (Commerce and Industry) 12+ 160K 250K
Financial Controller (Commerce and Industry) 10-12 110K 150K
Finance Manager (Commerce and Industry) 6-8 120K+
Financial Analyst (Commerce and Industry) 3-7 60K 75K
Tax Director (Commerce and Industry) 8+ 100K 145K
Tax Manager (Commerce and Industry) 5-7 88K 105K
Tax Accountant (Commerce and Industry) 3-5 60K 80K
Treasury Manager (Commerce Industry) 5-7 70K 96K
Finance Director (Banking) 12+ 180K 250K
Financial Controller (Banking) 10-12 100K 160K
Finance Manager (Banking) 6-8 85K 130K
Finance Manager (Banking) 6-7 90K 130K
Head of Risk (Banking) 12+ 125K 200K
Tax Manager (Banking) 6-10 85K 110K
Tax Accountant (Banking) 2-5 65K 80K
Treasury Manager (Banking) 7-10 80K 105K
Accountant (Banking) 5-7 105K 120K
Audit Manager (Banking) 5-7 83K 103K
Internal Audit Manager (Banking) 5 100K 150K
Claims Manager (Banking) 4-5 72K 100K
Finance Supervisor 2-4 60K 82K
Financial Accountant 3-5 65K 85K
Financial Analyst 2-3 45K 61K
Financial Analyst 2-4 45K 60K
Financial Planning & Analysis Manager 8+ 90K 120K
Financial Planning Manager 8+ 90K 102K
Head of Financial Control 10-12 110K 135K
Head of Credit Risk 8 116K 160K
Head of Treasury 10+ 100K 210K
Insolvancy Accountant 5-8 70K 90K
Insurance and Risk Management Manager 4-6 88K 109K
Internal Auditor 2-3 68K 82K
newzealand
kellyservices.co.nz66
Management Accountant 5-8 75K 120K
Payroll Manager 4-6 58K 90K
Relationship Manager 3-5 55K 75K
Risk Management Analyst 2-5 41K 60K
Senior Billing Operations Analyst 2-3 45K 62K
Senior Costing Executive 2-4 45K 66K
Tax Analyst 2-3 60K 80K
Tax Director (Private Practice) 10+ 100K 145K
Tax Manager (Private Practice) 5-8 82K 106K
Audit Manager (Private Practice) 5-8 88K 102K
Treasury Analyst 2-3 67K 88K
Information Technology
Analyst Programmer 2 40K 60K
Analyst Programmer / Software Engineer 2-6 85K 100K
Business / Systems Analyst 3-6 75K 100K
Chief Information Officer 12-18 150K+
Database Manager 8 60K 80K
Database Adminstrator 4-7 80K 100K
Enterprise Architect 8-12 120K 150K
ERP Business Analyst 6 80K 95K
Helpdesk Manager 6 75K 85K
Helpdesk Analyst 1-3 40K 50K
IT Auditor 4-7 80K+
IT Business Analyst 8 70K 80K
IT Operations Manager 8 110K 135K
IT Security Manager 14 120K+
IT Security Professional 8 75K+
IT Support Manager 6 70K 80K
IT Support Analyst 4 45K 55K
Lead Software Developer 5-8 70K 80K
Network Manager 6 110K 120K
Network Engineer 6 65K 80K
Network Specialist 6 50K 60K
Project Manager - Infrastructure 5-10 110K 135K
Project Manager 3-10 70K 110K
Service Delivery Directors 12-18 120K+
Software Development Engineer 6 80K+
Software Development Manager 12 100K+
Software Engineer 2-3 50K 60K
Software QA / Test Analyst 3-6 60K+
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
new zealand
67Figures are in NZD and represent base salary only
Solutions Architect 5-10 110K 120K
Solutions Architect (Senior) 6-10 100K+
Solutions Architect (Junior) 2-4 80K+
Storage Consultant 3-7 90K+
Systems / Network Administrator 2-6 40K 50K
Systems Administrator 8 75K+
Systems Analyst 3-8 40K 90K
Systems Analyst Programmer 5 50K 60K
Systems Engineer 2-3 40K 50K
Technical Writer 3-5 60K+
Test Manager 5-10 80K+
Unix Specialist 5-8 80K+
Web Applications Developer 8 80K+
Wintel Specialist 4-8 60K 90K
Life Sciences
Quality Manager (Assurance) 5-7 70K 100K
Quality Manager (& Regulatory Affairs) 2-11 80K 120K
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Sales & Marketing
Area Sales Manager 5-8 80K 110K
Brand / Product Manager 3-4 65K 85K
Brand Manager 5-8 75K 95K
Business Development Director 8-10 110K 130
Business Development Manager 8 80K 110K
Corporate Communications Director 8-10 110K 140K
Key Account Manager 3-5 65K 85K
Marketing Manager 4-5+ 65K 95K
Product Manager 3-7 85K 105K
Sales / Key Account Manager 5-10 65K 85K
Sales Director 10+ 110K 130K
Sales Manager 4-7 90K 125K
Sales Manager - Channel Sales 5-7 85K 105K
newzealand
kellyservices.com.sg68
Although Singapore’s economy grew 4.9% in 2011,
the government has maintained a growth forecast of
between 1-3% for 2012. The Singapore employment
rate is relatively strong with a total employment
growth of 122,600 in the whole of 2011 or 3.9%
higher as compared to 2010.
Accounting and Finance
In 2012, we see a continued demand for business
partners who can value add in terms of providing
sound business advice as compared to traditional
accountants. Middle level positions such as senior
accountants, auditors and credit managers are in
demand due to stricter internal controls via expense
management and push for profitability. This increase
in controls and regulations has also created strong
appetite for professionals in the compliance domain.
Banking and Financial Services
Banks have been retrenching employees in Europe
and America but this has had a less radical impact
in Asia due to the fact that we have two major
banking hubs located in Singapore and Hong
Kong. Although the banking and financial services
industry is relatively stable in Singapore, we do see
some caution in hiring. Banks are focusing on more
business critical positions especially in the area of
risk and compliance as regulatory requirements
continue to become more stringent. This said,
whilst the investment banking community continues
to be somewhat unpredictable, there seems to
be a refocus on consumer wealth-based business
lines management professionals in particular. The
insurance, asset management and reinsurance
sectors are experiencing solid growth creating
appetite for skills such as quantitative analysis and
actuarial related disciplines
Engineering and Technical
Similar to other industries, most organisations
will have a cautious approach in hiring. We see
continued hiring in the oil and gas, construction
and water sectors due to consistent growth and
potential. As the Singapore government continues to
support the construction sector via housing projects
and major public works, the construction industry is
expected to continue its buoyancy throughout 2012
leading to a strong demand for all categories of
construction engineers.
singapore
NATIONAL
OVERVIEW
69Figures are in NZD and represent base salary only 69Figures are in SGD and represent base salary only
newzealandsingapore
kellyservices.com.sg70
71Figures are in NZD and represent base salary only 71Figures are in SGD and represent base salary only
Healthcare and Life Sciences
With Singapore government’s initiative in building
Singapore as a medical and life sciences hub, we see
an increase in the hiring of medical and life science
professionals across the board. Particular emphasis
will be placed on professionals with strong expertise
in pharmaceutical, regulatory affairs, research and
development, quality assurance and technical sales.
Human Resources
As organisations seek to optimise their structures
whilst still attracting, developing and retaining talent
across the board, HR will continue to come to the
foreground as a critical hire. We see consistent hiring
of human resource professionals with a demand
focus in areas such as compensation and benefits,
learning and development and talent acquisition and
retention. Increasingly we also see companies setting
up their own in-house recruitment teams aimed at
reducing their direct costs, creating some demand
for core recruitment skills. Similar to other functional
roles, human resource professionals are now
expected to play a business partner role, providing
commercial advice that are in line with achieving
business objectives. This places much attention on
HR professionals who have shifted their expertise
demonstrably from transactional to strategic.
Information Technology
IT professionals in the middle level space continue to
be in demand in banking and financial services, end-
user commerce, IT vendor and consulting sectors.
The increase in demand for IT professionals in the
banking sector have resulted from an increased
awareness of i-banking, banking security lapses and
a higher demand for improved phone-banking
security. Contracting is also expected to pick up in
the IT industry where roles such as project managers,
technical architects, infrastructure managers and
software specialists will be in demand as companies
look to inject skills for core periods of complex
projects without the long term cost burden of a
permanent hire.
Procurement, Supply Chain and
Logistics
With organisations placing a higher importance
on improving processes efficiency and maximising
returns on investment, positions across the
procurement spectrum will continue to be in strong
demand. Category led positions across both direct
and indirect spend will be a prime focus particularly
for talent with experience of demonstrating
substantial and innovative cost savings across
supplier channels regionally and globally. Talent
with specific focus in categories such as marketing
services, technology, workforce management and
in direct categories across all commodities will be
highly prized. Expertise in low cost country sourcing
will also be a sought after skill set. In tandem with
this we would expect to see companies investing
in supply chain optimisation in a bid to run with
maximum efficiency which will see demand for
professionals such as project managers, operations
directors and supply/demand/inventory planners and
those with Lean methodology expertise.
Sales and Marketing
Traditional marketing budgets have been hit by
cost cutting measures leading to the hiring of sales
and marketing professionals mainly for replacement,
accessing niche specialisations and regional
portfolio expansion.
Demand still continues however, in skill sets
such as account management, social media
optimisation, market/competitor analysis and
corporate communications. This is due to
organisations grappling with changing technology
and the way consumers and clientele prefer
to purchase goods and services, as well as the
borderless nature of their competitive landscape.
As ever, we see the continued demand for highly
networked specialist sales professionals with a
successful track record of business growth across
corporate and consumer sectors.
Overall with the current global economic uncertainty,
organisations across industries are expected to
be cautious in hiring. There is still a demand
for professionals in the middle to senior level
management, but employers are taking their time
and are more selective in finding the right talent for
their companies.
newzealandsingapore
kellyservices.com.sg72
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
ENGINEERING AND TECHNICAL
Chemical Engineer 3-6 48K 72K
Civil Engineer 5-7 42K 60K
Electrical & Instrumentation Control Engineer 5-8 42K 60K
Electrical Design Engineer 6-8 42K 60K
Electrical Engineer 5-7 42K 60K
Electrical (Instrument) Engineer 4-7 36K 54K
Electrical Project Manager 10+ 96K 132K
Engineering Manager 10-12 96K 144K
Environment Health & Safety Manager 8-12 84K 144K
Facility Manager 5-8 72K 96K
Materials Manager 7-10 78K 108K
Mechanical Design Engineer 5-7 40K 48K
Mechanical Engineer 5-7 42K 48K
Operations Manager 6-10 96K 156K
Planning Manager 10+ 90K 120K
Process Engineer 3-7 42K 72K
Product Engineer 3-7 42K 72K
Production Engineer 3-6 42K 66K
Project Manager 5-13 66K 144K
Quality Manager 10+ 96K 144K
QA Engineer 6-8 42K 66K
Sales Engineer 3-5 36K 84K
Structural Engineer 6-7 42K 54K
FINANCE
Accountant 3-5 48K 78K
Accounting Director 10+ 120K 180K
Accounting Manager 5+ 72K 96K
Accounts Payable Manager 3-5 34K 51K
Accounts Receivable Manager 5-7 54K 84K
Internal Audit Director 15+ 216K 300K
Audit Manager (Private Practice) 4-6 65K 93K
Auditor 2-4 36K 58K
Claims Manager 4-6 96K 150K
Cost Accountant 5+ 48K 72K
Costing Manager 10+ 60K 84K
Finance Director (Banking) 10+ 240K 360K
Finance Manager (Banking) 6-8 72K 132K
Finance Manager (Banking) 6-8 84K 156K
Finance Manager - Investment (Banking) 6-9 96K 180K
Financial Controller (Banking) 12+ 180K 300K
Head of Risk (Banking) 10+ 222K 300K
singapore
73Figures are in NZD and represent base salary only 73Figures are in SGD and represent base salary only
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Tax Accountant (Banking) 3-4 54K 78K
Tax Manager (Banking) 5-10 84K 180K
Treasury Manager (Banking) 7-10 96K 132K
Accountant (Banking) 3-5 42K 90K
Audit Manager (Banking) 4-6 60K 126K
Internal Audit Manager (Banking) 4-6 60K 108K
Finance Supervisor 5+ 48K 84K
Financial Accountant 4+ 60K 110K
Financial Analyst 3+ 36K 54K
Finance Director (Commerce and Industry) 9+ 180K 240K
Finance Manager (Commerce and Industry) 7+ 84K 108K
Financial Analyst (Commerce and Industry) 5+ 60K 90K
Financial Controller (Commerce and Industry) 10+ 120K 180K
Tax Director (Commerce and Industry) 15+ 180K 240K
Tax Manager (Commerce and Industry) 7+ 84K 144K
Tax Accountant (Commerce and Industry) 5+ 60K 96K
Treasury Manager (Commerce and Industry) 7+ 84K 120K
Financial Planning & Analysis Manager 6+ 84K 120K
Financial Planning Manager 6+ 72K 120K
Head of Financial Control 5-8 96K 180K
Head of Credit Risk 8-10 144K 216K
Head of Syariah Compliance 8-10 144K 216K
Head of Treasury 15+ 216K 276K
Insolvancy Accountant 2-5 60K 96K
Insurance & Risk Management Manager 9+ 144K 216K
Internal Auditor 4+ 60K 96K
Management Accountant 5+ 54K 84K
Relationship Manager 3-5 42K 84K
Risk Management Analyst 3-5 42K 60K
Tax Analyst 5+ 60K 96K
Treasury Analyst 4+ 60K 84K
HUMAN RESOURCES
Compensation & Benefits - Director 10+ 180K+
Compensation & Benefits - Manager 5-10 102K 150K
Compensation & Benefits - Analyst 3-5 60K 84K
Employee Communications Manager 4-10 72K 120K
Employee Relations Manager 4-10 72K 120K
HRIS Manager 4-8 48K 72K
HRIS Specialist 3-5 84K 144K
HR Director (Regional) 10+ 144K+
HR Director (Local) 10+ 120K+
Human Resources Generalist 4-8 60K 96K
newzealandsingapore
kellyservices.com.sg74
HR Business Partner (Regional) 5-10 72K 144K
HR Business Partner (Local) 4-8 60K 96K
HR Manager (Regional) 5-10 84K 180K
HR Manager (Local) 4-10 60K 144K
Human Resources Specialist 3-6 36K 60K
Industrial Relations Manager 5-10 60K 120K
Industrial Relations Specialist 3-8 48K 72K
Organisational Development Director 8+ 120K+
Organisational Development Manager 5-10 60K 120K
Payroll Manager 4-10 72K 144K
Payroll Supervisor 3-5 48K 84K
Recruitment Lead 10+ 120K+
Recruitment Manager 6-12 72K 120K
Recruitment Specialist 4-8 60K 84K
Talent Acquisition Manager 6-12 72K 120K
Training & Development Director 12+ 144K+
Training & Development Manager 5-10 48K 120K
Talent Management Manager 6-10 60K 120K
Talent Management Director 12+ 120K+
INFORMATION TECHNOLOGY
Account Manager 5-8 60K 84K
Account Manager / Sales Manager 5-8 72K 96K
Analyst Programmer / Software Engineer 4-6 36K 60K
Application Architect 8-10 84K 108K
Application Developer 4-6 48K 72K
Business / Systems Analyst 5-8 60K 84K
Business Analyst 5-8 60K 84K
Chief Information Officer 15-25 300K 420K
Chief Technology Officer 15-25 300K 420K
Country Manager 10-15 192K 240K
Database Administrator 6-11 60K 96K
Database Manager 10-15 102K 132K
Database Architect 6-10 84K 120K
Desktop Support 3-6 30K 48K
Enterprise Architect 10-15 144K 168K
ERP Business Analyst 6-9 72K 108K
ERP Specialist 5-8 72K 108K
Head of IT Operations 10-18 156K 192K
Head of Information Systems 15-18 156K 216K
Head of Software Development 10-18 156K 216K
Helpdesk Manager 8-11 72K 108K
Helpdesk Analyst 3-5 30K 48K
Information Technology Director 15-20 168K 216K
Information Technology Manager 12-18 120K 156K
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
singapore
75Figures are in NZD and represent base salary only 75Figures are in SGD and represent base salary only
Information Technology Specialist 7-10 72K 96K
Infrastructure Architect 8-12 108K 156K
Inside Sales Representative 5-8 48K 72K
IT Business Analyst 7-10 60K 96K
IT Operations Manager 10-15 84K 120K
IT Security Manager 10-15 96K 144K
IT Security Professional 7-10 60K 96K
IT Support Manager 8-10 90K 120K
IT Support Analyst 4-7 36K 60K
Lead Software Developer 8-10 60K 84K
MIS Manager 10-15 78K 96K
Network Manager 10-12 84K 120K
Network Specialist 5-8 54K 84K
Network Engineer 3-7 42K 66K
Post-sales Consultant 8-10 96K 144K
Pre-sales Consultant 8-12 96K 144K
Program Director 15-20 156K 192K
Program Manager 12-18 120K 156K
Project Manager 10-15 96K 150K
Project Manager - Infrastructure 10-12 96K 150K
Sales Director (Regional) 15-20 192K 240K
Sales Director 12-18 156K 204K
SAP Project Manager 8-12 108K 144K
SAP Implementation Consultant 7-10 78K 102K
Security Consultant 6-9 60K 96K
Senior Business Analyst 8-10 84K 108K
Senior Technical Writer 7-10 72K 96K
Senior Web Designer 5-8 48K 78K
Service Delivery Director 10-15 156K 204K
Software Architect 8-15 90K 120K
Software Development Manager 8-12 108K 144K
Software Development Engineer 6-8 48K 72K
Software Engineer 5-7 42K 66K
Software QA / Test Analyst 5-7 42K 72K
Solutions Architect (Senior) 10-12 96K 144K
Solutions Architect (Junior) 7-9 72K 96K
Storage Consultant 7-10 60K 96K
Systems / Network Administrator 5-7 42K 66K
Systems Administrator 3-6 42K 66K
Systems Analyst 3-6 42K 66K
Systems Analyst Programmer 3-7 42K 66K
Systems Architect 8-12 84K 120K
Systems Development Manager 10-12 96K 144K
Systems Development Project Leader 8-12 78K 102K
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
newzealandsingapore
kellyservices.com.sg76
Systems Engineer 6-9 48K 72K
Systems Programmer 5-8 48K 72K
Team Leader Sales Manager 10-15 120K 156K
Technical Consultant 8-10 60K 96K
Technical Delivery Manager 8-10 96K 132K
Technical Writer 6-8 48K 96K
Technology Manager - IT Infrastructure 10-12 96K 144K
Test Manager 10-15 96K 144K
Unix Specialist 5-8 54K 72K
Web Applications Developer Manager 10-15 96K 144K
Web Applications Developer 4-7 48K 72K
Web Design Manager 8-10 96K 144K
Web Tester 4-8 42K 66K
Website Manager 8-10 84K 120K
Wintel Specialist 8-12 60K 84K
LIFE SCIENCES
Account Manager - Hospital Sales 4-8 48K 72K
Account Manager - Medical Sales 4-8 48K 78K
Biostatistician 2-5 36K 60K
Clinical Pharmacologist 2-5 36K 60K
Clinical Research Manager 5-7 60K 84K
Clinical Research Specialist 2-5 42K 60K
Clinical Trials / Study Manager 4-6 54K 78K
Clinical Trials / Study Leader 3-5 48K 72K
Data Management Manager 4-6 48K 72K
Head of Clinical Research 8-10 96K 120K
Head of Medical Sales 8-12 96K 120K
Head of Regulatory Affairs 8-12 108K 144K
Hospital Sales Manager 5-9 66K 84K
Hospital Sales Representative 2-5 36K 54K
Medical Affairs Manager 4-10 96K 120K
Medical Affairs Executive 2-5 48K 72K
Medical Director 10-15 180K 240K
Medical Sales Manager 6-10 72K 96K
Medical Sales Representative 2-5 36K 54K
Microbiologist 2-5 30K 54K
Nutritional Manager 6-10 78K 108K
Nutritionist 4-6 42K 72K
Pharmacist 2-5 36K 54K
Principal Scientist 5-8 60K 84K
Quality Manager (Assurance) 6-8 78K 96K
Quality Manager (Regulatory Affairs) 6-8 72K 108K
Senior Scientist 3-6 48K 78K
Scientist 2-5 30K 60K
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
singapore
77Figures are in NZD and represent base salary only 77Figures are in SGD and represent base salary only
Senior Research Associate 6-8 60K 84K
Validation Manager 6-8 78K 96K
Validation Engineer 3-6 54K 72K
Validation Specialist 4-6 60K 78K
SALES & MARKETING
Agency Account Manager 4-6 60K 96K
Area Sales Manager 4-6 60K 96K
Bid & Proposal Manager 4-6 60K 96K
Bid & Proposal Executive 2-4 42K 60K
Brand / Product Manager 6-8 60K 120K
Business Development Director 6-10 60K 120K
Business Development Manager 6-8 48K 96K
Category Management Manager 6-8 48K 96K
Corporate Communications Director 6-10 84K 120K
Digital Marketing Specialist 3-6 48K 78K
Division / Regional Merchandise Manager 3-6 48K 96K
Experiential Marketing Specialist 3-6 48K 96K
General Manager 10-20 120K 360K
Head of Bid & Proposal 6-10 72K 120K
Head of Channel Management 6-10 72K 120K
Head of Market Research 6-10 72K 120K
Head of Technical Marketing 6-10 72K 120K
Key Account Manager 6-8 60K 96K
Market Research Manager 8-10 72K 120K
Market Analyst 6-8 60K 96K
Marketing Communications Manager 8-10 72K 120K
Marketing Director 10-15 120K 264K
Marketing Manager 6-10 60K 120K
PR Manager 8-10 60K 120K
PR Manager 6-8 48K 96K
Pricing Manager 6-8 48K 96K
Product Manager 6-8 48K 102K
Sales / Key Account Manager 6-10 72K 150K
Sales Administration Manager 6-8 48K 96K
Sales Director 8-15 96K 240K
Sales Manager 6-8 48K 96K
Sales Manager 4-7 42K 84K
Sales Manager - Channel Sales 4-7 42K 84K
Sales Manager - Technical Sales 4-7 42K 84K
Sales Planning Manager 4-7 42K 84K
Trade Marketing Senior Manager 6-10 72K 120K
Web Marketing Manager 6-8 54K 96K
Occupation Title
Experience
(years)
Min. Annual
Salary
Max. Annual
Salary
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
Occupation Title
Experience
(years)
Min. Annual
Salary
(in local currency)
Max. Annual
Salary
(in local currency)
newzealandsingapore
NOTES ABOUT THIS GUIDE
As we meet our clients across the region, one question that comes up
frequently is the desire for knowledge around specialised talent pools in
the region. In order to address this question, we put together this guide to
showcase professional and technical positions across the major countries in
APAC. This is to enable leadership teams to understand the talent landscape
in the region and then determine optimum resourcing strategies to tap into
these specialised talent pools and effectively fill their talent needs.
The salary information provided in this guide is a compilation of actual
placements we made in our areas of specialisations in 2011/2012. We have
chosen to report on actual transactions between our clients and candidates as
it is then an actual reflection of what is happening in the marketplace and will
allow hiring managers to make informed decisions.
Please note the information presented in this document should be used
as a general guide only. As different organisations have different corporate
structures and titling practices, we have used typical corporate titles to
maintain simplicity and to allow for easy comparisons. Where number of
years’ experience is mentioned, it is only to give an approximate framework
in which to gauge what a typical professional is likely to earn with the level
of experience shown for each country. Please also note that we list annual
salaries without information on bonuses or benefits.
All rights reserved. No part of this book may be reproduced or transmitted in any form without the written permission
from Kelly Services. The information contained in the Asia Pacific Professional and Technical Salary Guide 2012 is
intended for educational purposes only. Kelly Services takes no responsibility for any liabilities that emerge based on
the information contained in this guide.
APAC Corporate Office
20 Anson Road #05-03, Twenty Anson,
Singapore 079912
Tel: (65) 6494 6060 Fax: (65) 6221 5652
Email: apacinfo@kellyservices.com.sg
Australia
Ground Floor, 15 Castlereagh Street,
Sydney, NSW 2000 Australia
Tel: (61) 2 9246 6000 Fax: (61) 2 9246 6793
Email: au_marketing@kellyservices.com
China
Unit 9D-9E, Zhao Feng World Trade Building,
No. 369 Jiang Su Road, Shanghai 200050 China
Tel: (86) 21 5240 0840 Fax: (86) 21 5240 0660
Email: info@kellyservices.cn
Hong Kong
15/F Prosperity Tower, 39 Queen’s Road Central,
Hong Kong
Tel: (852) 2522 1186 Fax: (852) 2522 1501
Email: info@kellyservices.com.hk
India
Unitech Cyber Park, Tower - C, 10th floor,
Unit #1003, Sec- 39, Gurgaon, Haryana - 122002 India
Tel: (91) 124 472 6666 Fax: (91) 124 472 6699
Email: info@kellyservices.co.in
Indonesia
Mayapada Tower 18th Floor, Suite 18-01B,
Jl. Jend. Sudirman Kav. 28, Jakarta 12920 Indonesia
Tel: (62) 21 521 1873 Fax: (62) 21 521 1874
Email: kellyjkt@kellyservices.co.id
Malaysia
Lot 12.01, 12th Floor MCB Plaza,
6 Changkat Raja Chulan, 50200 Kuala Lumpur Malaysia
Tel: (60) 3 2072 1112 Fax: (60) 3 2070 4360
Email: info@kellyservices.com.my
New Zealand
Level 2, 35b Leslie Hills Drive,
Riccarton Christchurch 8001, New Zealand
Tel: (64) 3 379 2963 Fax: (64) 3 379 2964
Email: nz_marketing@kellyservices.com
Singapore
10 Anson Road #20-08, International Plaza,
Singapore 079903
Tel: (65) 6501 4700 Fax: (65) 6221 1262
Email: info@kellyservices.com.sg
kellyservices.com

APAC PT Salary Guide 2012

  • 1.
    Salary Guide 2012 Asiapacific Professional and Technical
  • 2.
    An integral componentof Kelly Services recruitment solution suite, our Professional and Technical businesses collectively focus on building best in class networks, in order to provide our customers with niche talent and knowledge workers at mid to senior career levels. Whilst operating across 8 countries within the APAC geography, specialisation is at the core of our approach allowing us to provide our customers and candidates alike with accurate and relevant recruitment solutions. Our specialist capabilities differ from country to country, to reflect local market landscapes but include accountancy, banking and finance, engineering, science and technology, and corporate functions. This dedicated practice focus, coupled with formidable resources and infrastructure built by Kelly Services, offers our customers the best of both worlds – a company with specific knowledge and expertise, backed by a respected industry leader that has been staffing the world for more than 60 years. Contents 2 Australia 16 China 28 Hong Kong 34 India 42 Indonesia 50 Malaysia 60 New Zealand 68 Singapore Kelly Professional and Technical
  • 3.
    The aggressive expansionof global companies looking to access BRICS*, ASEAN and Australasian markets with their wealth of resources, consumers and technological knowhow has placed the knowledge of how to source, attract, retain and develop talent firmly at the top of corporate boardrooms’ agendas. The APAC region is home to more than 4.2 billion people, over half the world’s population, with China and India alone accounting for almost 40% of this figure. People and potential labour pools are in abundant supply, in principle, but this availability of labour contrasts sharply with the availability of what we have come to term as “talent”. These experienced professionals with niche knowledge, specialist skill sets and leadership capability continue to be highly sought after across all industry categories and role functionalities across the region. Continued strong demand for talent drove employee turnover rates up to an estimated 14.1% across APAC during 2011. Whilst there is a slight softening in demand from previous year, 2012 is showing that there is still profound competition in all countries for knowledge workers. Talent scarcity in specialist areas of Engineering, Accountancy, Technology and Financial Services, has heightened in the light of a continual overall downward trend in unemployment rates, which are anticipated to approach 7% by 2013. Other factors that enter the mix include a spate of tragic natural disasters in 2011 precipitating mammoth post disaster reconstruction plans, which are expected to boost investment spending in 2012 and beyond. Our expectation however is that this may be offset by more moderate private sector hiring, particularly in countries with high exposure to export demand. Hiring is still expected to grow despite the new challenges emerging in 2012, with inflation edging up and capacity shortages starting to limit expansion. This growth will exacerbate wage pressures in all countries and employers should expect to increase employee pay rates or find other creative solutions in response to these talent dynamics, if they are serious about attracting and retaining critical skill sets within their organisations. Therefore we expect to see the APAC labour markets hold a steady upward trajectory as we progress through 2012. This may not be as steep as previous years but the region will continue to lead the world’s economic growth. Against this backdrop APAC professionals with niche skills, critical knowledge and evolved leadership credentials can expect to see more than modest salary increases across the region, particularly in the more developing economies, where employers must hike salaries to keep pace with inflation and to attract and keep hold of their talent. This will continue to place enormous pressure on employers from a cost and people retention perspective. foreword * The international political organisation of leading emerging economies, Brazil, Russia, India and China now includes South Africa into the BRIC group in 2010.
  • 4.
    kellyservices.com.au2 In spite ofa growing local economy, the willingness of Australian businesses to build capacity continues to be dampened by instability and economic volatility in Europe, the Middle East, and the United States. Accounting and Finance The impact of the international debt crisis has directly impacted the accounting and finance sector, with the entire sector being cautious. Jobs continue to be shed as companies consolidate, move back- office processes offshore to drive down costs and aUSTRALIA NATIONAL OVERVIEW simply downsize. This trend will continue until the middle of this year when it is expected to stabilise. Early 2012 has seen resurgence in mid to long term contract engagements in lieu of permanent hiring activity. Banking and Financial Services Banks, in particular, are shredding numbers from their finance and IT departments with the back office being worst hit. There are some bright points however. Demand for roles with experience in risk and compliance is growing in response to tightening governance rules and regulations. There is still strong hiring activity in areas such as credit, wealth management, financial planning, private and corporate banking. Some areas of corporate finance remain steady and, although not hiring as aggressively as last year, they continue to offer opportunities to the right level of candidates. In 2012, the career focal point for experienced bankers will shift dramatically from Europe and the Americas to the Asia Pacific region. Information Technology The IT industry has stabilised with more job openings available for skilled candidates in 2012. Roles that are increasingly in demand include application testing, storage and data centre management. Banks continue to create much of the demand for IT roles even though they are moving many development projects offsite. This is largely because much of the strategy, architecture, maintenance and program development work remains in Australia.
  • 5.
    3Figures are inAUD and represent base salary only Australia
  • 6.
  • 7.
    5Figures are inAUD and represent base salary only Engineering Mining sector As the Australian mining industry continues to boom, employers are looking for people who have core engineering skills as well as on-site mining experience. There is ongoing strong demand for workers right across every part of the mining sector, from blue collar through to senior management. Finding qualified employees to meet this demand will remain a challenge for the mining sector for the foreseeable future. Civil engineering and infrastructure sector Increasing population growth in Australian capitals and satellite cities is putting extra pressure on public infrastructure such as rail links, roads, health and education. Funding these basic public services will remain a key priority for government, which will underpin steady job growth in this sector. Construction sector The construction jobs market has steadily declined post Australian Government stimulus packages. The commercial fit out and refurbishment sub sector is particularly struggling and it is not uncommon to find businesses that employed 30 staff two years ago to have cut back to less than ten. Employers are now relying on contractors to meet short-term peaks in work. This is expected to continue at least for the first half of 2012. Architecture There is an emerging skills gap in this sector with many experienced architects not trained to use REVIT, the dominant 3D modelling and design software. As a result, graduates with a high degree of skill in this and similar software, are being increasingly sought after. Mechanical & Electrical While the high Australian dollar and resulting decrease in exports in the high tech manufacturing industry has led to an uncertain start, the overall skill shortage in M&E means that this sector will continue to be relatively buoyant for 2012. Industries associated with the mining and resources boom will continue to grow rapidly during the year. Scientific A significant shift toward the use of temporary and contract staff has been one of the standout changes to the scientific industry over the past twelve months as funding sources become less reliable. Demand for temporary or contract staff continues to climb across all industries, particularly the chemical, pharmaceutical and food/beverage manufacturing sectors. Hiring levels for permanent staff have remained relatively stable throughout 2011. However there are marked differences state by state. A significant demand gap has opened up between Western Australia/South Australia and the Eastern states. Most notable is the slight decline for permanent positions in Victoria throughout 2011. Australia
  • 8.
    kellyservices.com.au6 ACCOUNTING & FINANCE Accountant60K 90K Accounting Manager 75K 110K Assistant Accountant 50K 75K Accounts Receivable/ Credit Manager 70K 100K Accounts Receivable/ Credit Supervisor 60K 85K Accounts Receivable Officer 40K 60K Accounts Payable Manager 65K 85K Accounts Payable Supervisor 50K 70K Accounts Payable Officer 35K 45K Reconciliations Clerk 45K 65K Senior Auditor 130K 180K Audit Manager 100K 140K Auditor 70K 90K Chief Financial Officer 160K 220K+ Finance Director 140K 200K Financial Controller 115K 250K Project Accountant 100K 150K Management Accountant 85K 140K Financial Analyst 80K 125K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) aUSTRALIA Financial Accountant 75K 115K Financial Reporting Analyst 70K 95K Business Analyst 65K 95K Entry Level/ Graduate Accountant 40K 60K Payroll Manager 75K 115K Payroll Supervisor 60K 85K Payroll Officer 45K 60K Product Control 80K 140K Tax Manager 90K 140K BANKING & FINANCIAL SERVICES Branch Staff Branch Manager 70K 115K Bank Teller 35K 50K Customer Service Consultant 35K 55K Retail Banking Document Prep/ Settlements 40K 60K Loans Manager 60K 90K Loan Administration Manager 60K 80K Loans Officer 45K 65K Mobile Banker 65K 85K Personal Banker 60K 80K
  • 9.
    7Figures are inAUD and represent base salary only Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Business & Corporate Banking State Manager 180K 250K Regional Manager 150K 220K Business Development Manager 130K 180K Senior Relationship Manager 120K 170K Relationship Manager/Banker 90K 130K Assistant Manager 65K 90K Corporate Finance/Advisory Director 230+ 350K+ Associate Director 150K 220K Manager 120K 160K Associate 90K 130K Analyst 80K 110K Financial Markets (FX/MM/Derivs/Fixed Income) Senior Manager 110K 150K Manager 80K 110K Team Leader 60K 80K Officer 40K 60K Risk and Compliance Senior Compliance Manager 120K 160K Compliance Manager 80K 130K Compliance Analyst 70K 90K Senior Credit/Risk Manager 130K 180K Credit/Risk Manager 110K 150K Senior Credit Analyst 80K 120K Credit Analyst 70K 100K Insurance Senior Claims Manager 85K 135K Claims Manager 70K 120K Claims Assessor 45K 70K Underwriting Manager 80K 130K Senior Insurance Underwriter 65K 100K Insurance Underwriter 50K 85K Insurance Clerk 40K 60K Australia
  • 10.
    kellyservices.com.au8 aUSTRALIA Wealth Management Dealership Manager130K 210K Practice Manager 110K 160K Private Banking - Relationship Manager 85K 125K Senior Financial Planner/CFP 80K 130K Financial Planner 70K 120K Para Planner 50K 80K Operations Senior Manager 80K 140K Operations Manager 70K 90K Team Leader 60K 75K Officer 35K 50K ENGINEERING Civil / Water / Rail / Power Senior Contracts Administrator 120K 150K Contracts Administrator (5+ years) 90K 130K Contracts Administrator (2-5 years) 60K 80K Cadet / Contracts Administrator 40K 60K Chief Estimator 160K 230K Senior Estimator 120K 175K Estimator 75K 130K Cadet / Estimator 35K 60K Commercial Manager 150K 230K Construction Manager 170K 250K Design Manager 125K 180K Environmental Manager 140K 180K Environmental Engineer 75K 130K General Foreman 120K 150K Foreman 85K 125K HSE Manager 90K 160K HSE Advisor 75K 90K Leading Hand 55K 88K Planner 135K 220K Plant Manager 90K 130K Procurement Manager 75K 130K Senior Project Manager 160K 200K Project Manager 130K 170K Junior Project Manager 75K 100K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency)
  • 11.
    9Figures are inAUD and represent base salary only Senior Project Engineer 120K 145K Project Engineer 80K 120K Quality Manager 85K 125K Quantity Surveyor 75K 130K Site Engineer (5+ years) 80K 95K Site Engineer (2-5 years) 65K 80K Cadet / Engineer 40K 60K Supervisor 75K 95K Manufacturing / Process Instrumentation & Electrical Engineer (10+ years) 100K 150K Instrumentation & Electrical Engineer (5-10 years) 80K 120K Instrumentation & Electrical Engineer (2-5 years) 60K 75K Instrumentation & Electrical Engineer (0-2 years) 40K 50K Manufacturing Engineer (10+ years) 100K 150K Manufacturing Engineer (5-10 years) 80K 120K Manufacturing Engineer (2-5 years) 60K 75K Manufacturing Engineer (0-2 years) 40K 50K Plant Engineer (10+ years) 100K 150K Plant Engineer (5-10 years) 80K 120K Plant Engineer (2-5 years) 60K 75K Plant Engineer (0-2 years) 40K 50K Production Engineer (10+ years) 100K 150K Production Engineer (5-10 years) 80K 120K Production Engineer (2-5 years) 60K 75K Production Engineer (0-2 years) 40K 50K Construction Architect (10+ years) 100K 160K Architect (5-10 years) 60K 110K Architectural Designer 60K 100K Architect (2-5 years) 45K 65K Architectural Drafter 45K 70K Architect (0-2 years) 43K 50K Building Surveyor 65K 90K Chief Estimator 150K 220K Senior Estimator 120K 175K Estimator 75K 130K Cadet / Estimator 35K 60K Commercial Manager 150K 220K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Australia
  • 12.
    kellyservices.com.au10 aUSTRALIA Construction Manager 155K230K Contracts Manager 120K 175K Senior Contracts Administrator 115K 150K Contracts Administrator (5+ years) 90K 130K Contracts Administrator (2-5 years) 75K 110K Cadet / Contracts Administrator 35K 60K Design Manager 125K 180K Facilities Manager 75K 110K Foreman 90K 130K HSE Manager 90K 160K HSE Advisor 75K 90K Junior Project Manager 75K 100K Leading Hand 55K 88K Operations Manager 170K 260K Procurement Manager 75K 130K Senior Project Engineer 140K 200K Project Engineer 100K 165K Senior Project Manager 125K 200K Project Manager 90K 160K Site Manager 120K 150K Site Engineer (5+ years) 90K 130K Site Engineer (2-5 years) 65K 90K Cadet / Engineer 35K 60K Structural Engineer (10+ years) 100K 150K Structural Engineer (5-10 years) 80K 120K Structural Engineer (2-5 years) 60K 75K Structural Engineer (0-2 years) 40K 50K Mechanical & Electrical Electrical Engineer (10+ years) 100K 150K Electrical Engineer (5-10 years) 80K 120K Electrical Engineer (2-5 years) 60K 75K Electrical Engineer (0-2 years) 40K 50K Electronics Designer 65K 90K Mechanical Engineer (10+ years) 100K 150K Mechanical Engineer (5-10 years) 80K 120K Mechanical Designer (2-5 years) 65K 90K Mechanical Drafter 50K 90K Mechanical Engineer (0-2 years) 40K 50K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency)
  • 13.
    11Figures are inAUD and represent base salary only Mining, Resources CHPP Manager 170K 230K Construction Manager 150K 225K Contracts Manager 150K 240K Contracts Administrator 100K 160K Deputy 110K 150K Drill & Blast Engineer 105K 130K Electrical Engineer 90K 160K Engineering Manager 150K 210K Environmental Manager / Superintendent 145K 200K Environmental Officer 90K 155K Estimator 115K 150K Graduate Engineer 55K 85K Maintenance Manager 170K 220K Maintenance Superintendent 140K 180K Maintenance Planner 90K 135K Mechanical Engineer 90K 155K Mine Geologist 90K 145K Mine Manager 180K 250K Mining Engineer 110K 150K Mine Planning Engineer 95K 165K OH&S Manager 120K 160K OH&S Coordinator 90K 130K Open Cut Examiner 135K 180K Open Cut Supervisor 115K 165K Production Superintendant 140K 180K Project Manager 120K 200K Senior Estimator 150K 210K Senior Geologist 130K 170K Senior Planner 145K 200K Planner 120K 145K Surveyor 90K 135K Technical Services Manager 160K 210K Underground Supervisor 120K 175K Undermanager 140K 180K Workshop Supervisor 120K 150K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Australia
  • 14.
    kellyservices.com.au12 aUSTRALIA INFORMATION TECHNOLOGY IT Management CIO/ITDirector 160K 350K Applications Development Manager 120K 150K Computer Operations Manager 120K 130K I.T. Manager 120K 170K Infrastructure Manager 110K 160K Help Desk Manager 90K 130K Infrastructure & IT Support Infrastructure Architect 120K 155K Operations Manager 120K 145K Security Architect 120K 160K Security Engineer 65K 95K Security Administrator 80K 135K Service Delivery Manager 110K 150K Change Manager 100K 130K Data Communications Engineer 75K 120K DBA - DB2 80K 120K DBA - Oracle 75K 125K DBA - SQL Server 75K 110K DBA - Sybase 75K 110K Desktop/PC Support 60K 80K ERP Technical Consultant 85K 165K ERP Functional Consultant 75K 120K Help Desk Support 50K 75K Incident Manager 75K 95K Network Designer (WAN) 90K 130K Network Administrator 75K 115K Operations Analyst 55K 80K Operator 48K 65K Problem Manager 80K 115K Trainer 45K 95K Unix Systems Administration 85K 145K WAN Engineer 80K 115K Web Content Manager/Web Master 75K 115K Wintel Server Engineer 75K 115K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency)
  • 15.
    13Figures are inAUD and represent base salary only Application Development & Testing Test Manager 100K 130K Test Team Leader 85K 120K Senior Tester 75K 95K Tester 60K 80K ETL Developer 90K 110K BI Architect 90K 170K Team Leader - (.Net or J2EE) 90K 125K Applications Architect 85K 160K C++ Software Developer 60K 110K Java (J2EE) Developer 60K 120K Analyst/Programmer - Oracle 60K 100K .Net Developer (C#/VB.Net/ASP.Net) 55K 110K Mainframe Developer (Cobol, CICS, DB2) 55K 110K Project Management & Business Analysis Project Director 125K 180K Project Manager 110K 140K Senior Business Analyst 85K 110K Business Analyst 70K 95K Systems Analyst 65K 90K Project Coordinator 65K 85K Project Administrator 50K 70K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Australia
  • 16.
    kellyservices.com.au14 aUSTRALIA Scientific Analytical Chemist 55K80K Biomedical Scientist 55K 81K Chief Chemist 75K 100K Senior Chemist 68K 80K Environmental Scientist 63K 110K Senior Food Technologist 75K 100K Food Technologist 50K 82K Formulation/R&D Manager 85K 150K Formulations Chemist 60K 95K Industrial Chemist 55K 80K Instrument Technician 50K 75K Laboratory Manager 80K 130K Laboratory Supervisor 60K 75K Laboratory Technician 40K 52K Laboratory Assistant 38K 45K Microbiologist 38K 65K Molecular Biologist 55K 81K New Graduate 38K 50K Project Manager - Development 85K 130K QA Manager 80K 130K QA Supervisor 60K 85K QA/QC Analyst 48K 65K Senior Research Scientist 69K 90K Research Chemist 62K 80K Research Assistant 50K 63K Scientific Officer 65K 78.2K Sensory Analyst 50K 80K Technical Manager 80K 180K Technical Officer 50K 65K Regulatory Affairs Compliance Manager 85K 140K Compliance Associate 50K 65K QA Associate 55K 84K Regional Regulatory Affairs Director 175K 250K Regulatory Affairs Director 145K 200K Senior Regulatory Affairs Associate 85K 105K Regulatory Affairs Manager 80K 150K Regulatory Affairs Associate 60K 80K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency)
  • 17.
    15Figures are inAUD and represent base salary only Clinical Research Clinical Business Manager 100K 150K Clinical Data Manager 60K 70K Senior Clinical Data Associate 65K 85K Clinical Operations Manager 110K 140K Clinical Project Manager 90K 130K Senior Clinical Research Associate CRA 75K 100K Clinical Research Associate CRA 55K 80K Clinical Statistician Manager 100K 150K Clinical Statistician 80K 130K Clinical Trial Administer CTA 40K 60K Drug Safety Manager 110K 150K Drug Safety Associate/Senior Associate 55K 110K Health Economist 75K 130K Medical Director 180K 250K Medical Science Liaison Manager 100K 150K Medical Affairs Manager 90K 130K Medical Affairs Associate 70K 110K Medical Writer 65K 105K Sales and Marketing Account Manager 75K 95K Brand Manager 80K 125K Business Development Manager 90K 150K Hospital Representative 75K 95K GP Representative 55K 75K Marketing Director 150K 200K National Marketing Manager 130K 165K Marketing Manager 120K 150K Marketing Analyst 80K 110K Marketing Assistant 55K 65K Medical Devices Representative 75K 100K National Sales Manager 130K 185K Product Manager 95K 125K Product Specialist 75K 95K Sales Director 170K 220K Regional Sales Manager 90K 145K Scientific Sales Representative 70K 100K Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Australia
  • 18.
    kellyservices.cn16 Although the Chinarecruitment outlook is positive, there is an overall slowdown from last year. The National Peoples Congress (NPC) has set a 7.5% growth target and highlighted seven ‘Strategic Emerging Industries’ where we expect to see an upswing in recruitment over the coming year, namely: Clean Energy, Next Generation IT, Biotech, High End Equipment Manufacturing, Alternative Energy and New Energy Vehicles. 2012 sees both domestic and multinational companies in competition for the best talent. China NATIONAL OVERVIEW General Industrial & Manufacturing We see weakening in hiring in this segment, with many companies being cautious about their hiring plans in the second quarter. Demand for sales talent is now increasing compared to marketing roles particularly at junior level. Senior technical roles are ‘hot’ this year with Chinese companies increasingly trying to attract more multinational talent. The government extension of policies on rebates on electronics and appliances should continue to support increased sales, resulting in more companies establishing manufacturing inland in Central and Western China. The NPC has prioritised green industries including wind and solar power, high-end manufacturing and aerospace manufacturing as strategic emerging industries, so we can expect strong demand in 2012 to support this growth. Automotive The automotive segment continues to grow, but much more slowly than 2011. The luxury vehicle market is expected to decline this year whilst the budget segment will become increasingly competitive. JV companies are producing vehicles to sell under local Chinese brands which compete with domestic manufacturers. New MNC automotive parts companies are establishing plants in tier two cities like Chengdu, with increased hiring uptake expected this year end into 2013.
  • 19.
    17 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only China
  • 20.
  • 21.
    19 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only Chemical Despite some dampening in the last half of 2011, we are seeing continued investment since the New Year hiring strategy reviews, hence growth remains stable. Strategic and project roles are in demand in this sector and supply chain, R&D, strategic marketing and sales roles remain highly sought after. Chemical firms are trying hard to retain rather than merely recruit and save on hiring spend but key specialist skill sets and niche knowledge in the sector will still be targeted. Healthcare and Life Science Hospital reforms and increased insurance and medical services will provide a challenging environment as the local pharmaceutical and medical device sectors grow and prices are expected to drop. Biotechnology is also one of the NPC’s key focus sectors and is expected to continue to recruit aggressively this year. Banking and Financial Services The global economic uncertainty and ensuing controls have driven down overall recruitment, especially in foreign firms, however some job profiles are experiencing an upturn, including risk functions which are in demand from both local and MNC banks. Chinese banks face capital stress after the Basel III launch in China and banks need to be more stringent to meet these requirements which in turn will create competition for talent. Consumer Recruitment in the retail and the luxury sectors continues to accelerate in China in 2012. The overall trend is encouraging with store operations, and sales and marketing roles being most in demand. A burgeoning middle class coupled with enhanced spending capability, particularly in the luxury goods sector, have created high levels of demand for talented sales professionals with strong contact networks and a track record of excellence in business development. Information Technology IT recruitment is experiencing particularly strong growth with increasing numbers of MNCs relocating their R&D centres taking advantage of China’s relatively lower labour cost and skilled local talent. Roles which are in demand this year include first line developers, testers, architects, project managers and also strategic and management level roles. Next Generation IT jobs will be in demand as the sector becomes further developed and its potential explored. Despite dampening demand in some sectors , in relative terms, China will still see overall strong growth and will continue to have to develop and attract both domestic and international specialist knowledge foreseeably. China
  • 22.
    kellyservices.cn20 Automotive Area Sales Manager5-8 180K–300K 150K–220K Brand Manager 5+ 250K–400K 180K–300K Commodity Manager 5+ 300K–500K 200K–350K Dealer Networking Director 10+ 600K–800K 600K–800K Design Manager 8+ 300K–400K 180K–300K Engineering Director / R&D Director 10+ 600K–900K 450K–650K Engineering Manager / R&D Manager 8+ 300K–500K 180K–350K General Manager – Country 10+ 1.5M–2.5M 1.5M–2.5M General Manager – Country (sales focus) 10+ 900K–1.5M 900K–1.5M Industrial Engineering Manager 5+ 280K–400K 200K–350K Key Account Manager 3+ 180K–350K 120K–280K Lean Manager / CI Manager (Country level) 8+ 500K–700K 400K–700K Lean Manager / CI Manager 5+ 250K–400K 180K–300K Logistics Director 10+ 600K–800K 600K–800K Logistics Manager 5+ 250K–420K 180K–350K Manufacturing Director 10+ 600K–900K 500K–900K Manufacturing / Production Manager 8+ 280K–450K 200K–350K Marketing Director 10+ 600K–1M 600K–1M Marketing Manager 8+ 350K–550K 200K–350K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Marketing Communications Manager 5+ 300K–500K 200K–350K Marketing Intelligence Manager 5+ 300K–500K 180K–350K Operations Manager 10+ 450K–600K 300K–450K Plant Manager 10+ 500K–900K 400K–800K Procurement Director 10+ 500K–900K 400K Product Manager 5+ 250K–400K 180K–350K Program Director 10+ 550K–800K 500K–800K Project Manager 3+ 200K–400K 150K–300K Purchasing Manager 5+ 300K–500K 200K–400K Quality Director 10+ 600K–900K 500K–900K Quality Manager 5+ 200K–500K 150K–300K Regional Sales Director 10+ 600K–1M 500K–800K Regional Sales Manager / Distribution Manager 5+ 350K–600K 250K–500K Senior Program Manager 8+ 400K–600K 300K–450K Sourcing Manager 5+ 300K–600K 250K–450K Supplier Quality Manager 5+ 300K–500K 200K–400K Supply Chain Director 10+ 600K–1M 600K–1M Supply Chain Manager 8+ 400K–700K 300K-500K China
  • 23.
    21 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Banking & Finance Personal Banking Credit Risk Mortgage VP 10+ 600K–850K 350K–500K Credit Risk Mortgage AVP 5-10 400K–600K 200K–300K Credit Risk Mortgage Associate <5 180K–300K 120K–150K Product Management / Marketing VP 10+ 600K+ 300K+ Product Management / Marketing AVP 5-10 400K–500K 200K–300K Product Management / Marketing Associate <5 180K–300K 120K–150K Relationship Manager - VP 10+ 500K–1M + 400K–700K Relationship Manager - AVP 5-10 300K–500K 180K–300K Relationship Manager - Associate <5 200K–300K 150K–250K Wealth Management Sales VP 10+ 350K+ 250K+ Wealth Management Sales AVP 5-10 200K–400K 200K–250K Wealth Management Sales Associate <5 80K–200K 40K–120K Corporate Banking Cash Product Management VP 10+ 500K–800K 200K–400K Cash Product Management AVP 5-10 300K–500K 200K–300K Cash Product Management Associate <5 200K–300K 150K–250K Cash Sales VP 10+ 500K–700K 250K–500K Cash Sales AVP 5-10 350K–450K 180K–250K Cash Sales Associate <5 200K–350K 100K–180K Credit Risk Management VP 10+ 500K–1M+ 300K–800K Credit Risk Management AVP 5-10 300K–500K 120K–300K Credit Risk Management Associate <5 120K–350K 100K–120K Trade Finance Product Management VP 10+ 500K–1M+ 300K–500K Trade Finance Product Management AVP 5-10 300K–600K 180K–400K Trade Finance Product Management Associate <5 200K–300K 120K–180K Trade Finance Sales VP 10+ 500K– 900K 300K–500K Trade Finance Sales AVP 5-10 300K–500K 150K–300K Trade Finance Sales Associate <5 180K–300K 100K–150K Investment Banking and Global Markets Front Desk - Corporate Finance Managing Director 15+ 1.5M–2M 800K–1.2M Front Desk - Corporate Finance Director 10-15 1M–1.5M 600K–1.2M Front Desk - Corporate Finance VP 8-12 600K–1M 300K–800K Front Desk - Corporate Finance Associate 5-8 150K–400K 180K–300K Front Desk - Corporate Finance Analyst <5 120K–150K 100K–180K Front Desk - Debt Capital Market Managing Director 15+ 1.5M–3M 800K–1.8M Front Desk - Debt Capital Market Director 10-15 1M–1.5M 600K–800K Front Desk - Debt Capital Market VP 8-12 700K–1M 400K–600K China
  • 24.
    kellyservices.cn22 Front Desk -Debt Capital Market AVP 5-8 500K–700K 250K–400K Front Desk - Debt Capital Market Associate 3-5 300K–500K 150K–250K Front Desk - Debt Capital Market Analyst <3 200K–300K 80K–150K Front Desk - Equity Research Managing Director 10+ 1.5M–2M 600K–1.5M Front Desk - Equity Research Director 8-10 700K–1.5M 400K–600K Front Desk - Equity Research VP 5-8 500K–800K 300K–400K Front Desk - Equity Research AVP 3-5 400K–600K 200K–300K Front Desk - Equity Research Associate 1-3 250K–400K 180K–200K Front Desk - Equity Research Analyst 1-3 200K–250K 100K–180K Middle Office, Back Office & Finance Accounting Back Office - Operations VP 15+ 420K–1M 280K–600K Back Office - Operations AVP 10-15 200K–420K 120K–280K Back Office - Operations Associate 5-8 125K–200K 80K–120K Finance Control / Financial Reporting VP 8-15 450K–700K 200K–450K Finance Control / Financial Reporting AVP 5-8 300K–450K 120K–200K Finance Control / Financial Reporting Associate <5 200K–300K 80K–120K Internal Audit VP 8-15 450K–600K 350K–500K Internal Audit AVP 5-8 300K–450K 200K–350K Internal Audit Associate 3-5 180K–300K 100K–200K Management Reporting VP 10+ 400K–600K 150K–400K Management Reporting AVP 5-8 200K–300K 120K–150K Management Reporting Associate <5 150K–200K 80K–120K Middle Office / Back Office - Compliance VP 10+ 500K–1.2M 300K–800K Middle Office / Back Office - Compliance AVP 5-10 300K–500K 150K–300K Middle Office / Back Office - Compliance Associate <5 180K–300K 100K–150K Middle Office / Back Office - Marketing Risk VP 15+ 500K–1M+ 300K–800K Middle Office / Back Office - Marketing Risk AVP 10-15 400K–500K 180K–300K Middle Office / Back Office - Marketing Risk Associate <5 120K–300K 100K–180K Middle Office / Back Office - Product Control VP 15+ 550K–800K 300K–500K Middle Office / Back Office - Product Control AVP 5-10 350K–550K 200K–300K Middle Office / Back Office - Product Control Associate <5 200K–350K 100K–200K Middle Office / Back Office -Trader/Credit Risk VP 10+ 550K–1M 300K–800K Middle Office / Back Office -Trader/Credit Risk AVP 5-10 300K–550K 150K–300K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 25.
    23 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only Middle Office / Back Office -Trader/Credit Risk Associate <5 250K–300K 120K–150K Chemical Account Manager 3-7 130K–250K 120K–240K EHS Manager 8-15 300K–700K 200K–400K Electrical Engineer 5-10 80K–180K 70K–120K Engineering Manager 10-20 230K–450K 200K–400K General Manager 10-15 590K–1.5M 400K+ Instrument Engineer 5-10 80K–180K 80K–150K Marketing Director 12-15 500K–900K 300K–500K Marketing Manager 7-10 280K–600K 150K–300K Marketing Communications Manager 8-12 150K–500K 130K–300K Mechanical Engineer 5-10 110K–180K 70K–120K Plant Manager 15-20 400K–800K 300K–600K Process Safety Engineer 4-8 250K–800K 150K–400K Production Manager 10-15 220K–400K 150K–300K Production Supervisor 6-9 150K–200K 100K–150K Production Engineer 2-5 100K–180K 70K–100K Project Manager 15-20 300K–500K 200K–400K Project Engineer 5-10 180K–300K 120K–250K Quality Manager 10-15 200K–400K 150K–300K Quality Engineer 3-8 100K–180K 70K–130K R&D Director 15-20 600K–1.5M 390K+ R&D Manager 10-12 260K–600K 180K+ Sales Director 12-15 400K–1M 260K–450K Sales Manager 5-10 250K–650K 130K– 260K Sourcing Director / Manager 8-15 300K–800K 180K– 400K Sourcing Engineer 3-6 120K–200K 80K–150K Technical Service Manager 8-12 200K–400K 100K – 150K Comsumer, Sales & Marketing Area Operations Manager 10 500K–600K 200K–300K Business Development / Expansion Manager 7-12 300K–1.2M 130K–230K Channel Sales Manager 5-10 300K–450K 130K–260K Country Manager 15-25 1.5M–3M 390K–580K Marketing Director 10-15 900K–1.5M 400K–600K Marketing Manager 5-10 300K–700K 200K–300K Marketing Executive 3-6 100K–200K 70K–100K Merchandising / Buying Manager 5-10 450K–700K 200K–300K National Sales Director 10-15 1M–1.5M 500K–800K Product / Brand Manager 3-10 300K–1M 130K–300K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 26.
    kellyservices.cn24 Project / ConstructionManager 7-12 300K–500K 120K–260K Public Relations / Communications Manager 5-10 400K–700K 150K–250K Retail Operations Manager 10-15 800K–1.2M 120K–300K Store Manager 5-10 250K–800K 120K–450K Visual Merchandising Manager 5-10 300K–600K 90K–200K Healthcare & Life Science Pharmaceutical Brand Manager 5-7 400K–600K 300K–450K Clinical Research Manager 5+ 300K–500K 250k–400K District Manager 5+ 300K–500K 200K–250K Marketing Director 10+ 680K–1M 500K–800K Marketing Manager 8-10 450K–700K 300k–600k Medical Affairs Manager 5-8 350K–450K 250K–350K Product Manager 3-5 200K–400K 200k–300k Project Manager (Clinical) 4-5 200K–300K 150K–250K QA Manager 5+ 200K–400K 150K–300K R&D Director 15-20 800K–1.5M 500K–800K Regional Manager 5-8 350K–450K 180K–300K Regulatory Manager 5+ 300K–400K 250K–350K Sales Director 15+ 600K–900K 500K–700K Medical Devices Brand Manager 5-7 400K–600K 300K–500K Commercial Manager 5+ 300K–400K 200K–300K District Manager 5-8 300K–450K 200K–300K Marketing Director 10+ 600K–800K 500K–700K Marketing Manager 8+ 450K–600K 350K–500K Operations Director 15+ 700K–1.2M 500K–700K Product Manager 5 200K–400K 150K–300K QA Manager 5+ 200K–400K 150K–300K Regional Manager 5-8 350K–600K 250K–500K Regulatory Manager 5+ 200K–400K 150K–300K Sales Director 15+ 800K–1M 700K–900K Human Resources Compensation & Benefits Manager 10 500K–800K 150K–300K Compensation & Benefits Supervisor 3-5 200K–350K 80K–300K Compensation & Benefits Specialist 1-3 100K–200K 60K–100K HR Department Head 10+ 800K–2M 250K–450K Generalist HR Manager 8 300K–700K 100K–180K HR - Organization Development Consultant 5+ 560K–800K 120K–260K Learning & Development Manager 8 350K–500K 120K–240K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 27.
    25 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only Recruitment Supervisor 3-5 200K–350K 90K–200K Site HR Manager 8-10 280K–400K 180K–350K Talent Acquisition Manager 8 400K–500K 320K–400K Training Supervisor 3-5 200K–250K 120K–240K Industrial & Manufacturing Engineering VP 20+ 800K–1.5M 600K–800K Engineering Director 15+ 500K–850K 240K–500K Engineering Manager 10+ 200K–450K 150K–400K General Manager 20+ 750K–1.5M 250K–1M Lean Manufacturing Manager 15+ 400K–550K 200K–250K Manufacturing Manager 8-12 350K–400K 140K–360K Marketing Director / Manager 15+ 500K–1M 300K+ Merchandising Manager 5-8 150K–200K 300K–500K Operations VP 20+ 1M+ 800K+ Operations Director 15+ 600K–850K 500K–700K Operations Manager 10+ 350K–400K 200K–480K Product Manager 5-8 300K–600K 120K–300K Production Director 10+ 350K–850K 280K – 640K Production Manager 3-5 250K–400K 140K–380K Project Manager 10+ 250K–450K 140K–380K Purchasing Director 15+ 500K–1M 300K–500K Quality Director 15+ 450K–600K 300K–500K Quality Manager 5-8 200K–400K 140K–300K R&D Director 15+ 400K–900K 500K–800K Senior Logistics Manager 5-8 250K–350K 200K–400K Senior Sales Manager 3-5 350K–500K 150K–300K Sourcing / Supply Chain Director 5-8 400K–500K 450K–550K Sourcing & Purchasing Director 15+ 500K–1M 200K–550K Sourcing & Purchasing Manager 3-5 200K–600K 120K–400K Supply Chain VP 15+ 1.5m–2M 800K–1M Supply Chain Director 10+ 400K–600K 400K–500K Supply Chain Manager 5-8 300K–500K 180K–370K Technical Head 15+ 250K–800K 180K–600K Information Technology Software ABAP 5-7 240K–360K 120K–240K Business Analyst 5 120K–350K 120K–250K Chief Information Officer 10 500K+ 300K–600K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 28.
    kellyservices.cn26 Chief Technology Officer10 500K+ 300K–600K Database Administrator 3 100K–300K 60K–120K Embedded Software Engineer 3 -5 120K–240K 60K–200K ERP Consultant 5-8 180K–600K 120K–500K Linux / Unix Stem Engineer 2-3 120K–250K 60K–210K Project Manager 6 240K–500K 180K–350K R&D Director 10 500K+ 250K–600K Service Delivery Manager 8 180K–500K 120K–350K Software Director 10 500K+ 250K–500K Software Leader 5 180K–300K 120K–240K Software Manager 6-8 240K–400K 120K–300K Software Engineer 3-6 120K–350K 60K–120K Stem / Solution Architect 6 240K–450K 120K–300K Technical Support Engineer 1-3 180K–300K 120K–240K Testing Engineer 3-5 120K–300K 100K–240K Hardware Architect 5+ 240K–500K 180K–300K Board Engineer 3-5 180K–300K 120K–240K Field Service Engineer 3-5 180K–300K 120K–240K Hardware Director 10 500K+ 250K–450K Hardware Manager 8 300K–600K 240K–450K Hardware Engineer 5+ 180K–300K 120K–240K Helpdesk Engineer 3 120K–300K 60K–120K Mechanical Engineer 5 180K–350K 120K–240K PCB Layout Engineer 5 180K–300K 120K–240K Storage Solutions Engineer 5 180K–400K 120K–240K Stem Administrator 3+ 180K–300K 120K–240K Testing Engineer 3+ 180K–300K 120K–240K Thermal Development Engineer 3+ 180K–300K 120K–240K Internet Algorithm Engineer 5 180K–400K 120K–240K Flash Engineer 3-5 180K–250K 120K–200K HTML Designer 6-8 180K–250K 120K–200K Operations Director 8 300K+ 240K–360K Operations Manager 6 180K–360K 150K–300K Perl / PHP Software Engineer 3-5 180K–300K 120K–240K Planning Manager 6 180K–360K 150K–300K Producer - Games 5 180K–400K 120K–240K Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 29.
    27 Tier 1 Cities*:Shanghai, Beijing, Guangzhou Tier 2 Cities*: Provincial capital cities and thriving cities such as Tianjin, Suzhou, Chengdu, Chongqing, etc Figures are in CNY and represent base salary only Product Manager 6 180K–400K 120K–240K Product Operations Manager 6-8 180K–400K 120K–240K Search Engine Development Engineer 5 180K–300K 120K–240K Search Engine Optimisation Engineer 5 180K–300K 120K–240K UI / UE Engineer 3-5 180K–400K 120K–240K Web Architect 5 180K–400K 120K–240K Web Designer 3 180K–250K 120K–200K Procurement, Supply Chain and Quality Procurement Commodity Manager 10 250K–400K 150K–300K MRO Manager 8 350K–400K 180K–300K Procurement VP 20 1.5K–2M 800K–1M Procurement Director 18 700M–1.2M 560K-960K Procurement Manager 16 350K–700K 200K+ Procurement Supervisor 7 180K–300K 150K+ Senior Procurement Manager 19 350K–700K 180K+ Sourcing VP 25 1.5M–2M 800K–1M Sourcing Director 18 1M–1.2M 900K–1M Senior Sourcing Manager 16 500K–900K 180K+ Sourcing Manager 15 400K–800K 180K+ Senior Sourcing Engineer 6 200K–300K 150K+ Supply Chain Logistics Manager 15 400K–600K 200K+ Supply Chain VP 22 1.5M–2M 800K–1M Supply Chain Director 20 1M–1.2M 900K–1M Supply Chain Manager 12 400K–800K 200K–600K Supply Chain Engineer 6 200K–300K 120K+ Supply Development Manager 15 400K–800K 180K+ Supply Quality Manager 14 350K–700K 180K+ Supply Quality Engineer 6 200K–300K 120K+ Quality Quality and Engineering VP 20 800K–1.2M 500K–900K Quality Director 16 600K–800K 250K+ Quality Manager 12 400K–800K 200K+ Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* Occupation Title Experience (years) Range of Annual Base Salary (in local currency) Tier 1 Cities* Tier 2 Cities* China
  • 30.
    kellyservices.com.hk28 The return ofmarket confidence in 2010 has helped to stir up the local job market in the past two years. However the concerns brought by the Euro zone crisis have given employers second thoughts at the start of 2012, about engaging in new hiring. Companies are elongating the decision making processes and choosing to defer new hiring to later parts of the year as they watch to see the true extent of the crisis and its impact on the global economy. The hesitation of new hiring is reflected more in the financial industry and companies within the B2B sectors. However, the war for talent remains strong in the retail sector. Overall, unlike the pre-global financial crisis, companies in general are not offering “mega” compensation packages to attract, which makes the talent attraction challenging for employers. Banking & Financial Services With financial instability sweeping the world, international banks are the worst hit in the local job market. However, mainland Chinese financial institutions remain as the driving engine in expansion. With new branches opening in the territory, relationship managers with proven track records are in high demand. Unlike a few years ago, more banking professionals are now creating new career horizons with Chinese banks. Despite this global turbulence some financial services disciplines still remain robust and we expect to see buoyancy in insurance, wealth management and private banking segments creating opportunities across the sales and marketing disciplines. The tightening of regulatory requirements will also see a need for compliance professionals with both external and internal audit skills. Hong Kong is still largely seen as the Asian trading hub, where there is a need for a variety of trade support roles and client services disciplines. hong kong NATIONAL OVERVIEW
  • 31.
    29Figures are inHKD and represent base salary only HongkOng
  • 32.
  • 33.
    31Figures are inHKD and represent base salary only Information Technology The rapid rate of technological change and greater demands in bottom line cost savings continues to push businesses to place a huge focus on IT enablement. As such the market for IT developers with strong industry and domain knowledge prevails. Despite the 2011 crisis where many projects in the banking and financial services sector were put on hold, skilled IT professionals with two to five years experience are still in high demand within the Hong Kong market. The substantial reduction in student enrolment taking up IT in local universities in recent years has created a shortage of home- grown IT professionals in the market. This has in turn created wage pressures for companies looking to engage mid career IT talent. Another noticeable trend is the resurgence in the use of contract IT professionals as an alternative to address the ad-hoc requirements as well as to minimize the FTE growth. UNIX and network administration being areas of high deployment of this labour type. HongkOng
  • 34.
    kellyservices.com.hk32 BANKING Consumer Banking Strategic Planning10+ $720K $1M Product Development / Marketing (Management) 8+ $600K $1M Credit Risk (Management) 8+ $480K $700K Relationship Manager 4+ $400K $600K Product Development / Marketing Executive 3+ $300K $480K Investment Consultant 2+ $240K $396K Credit Risk Executive 2+ $240K $360K Personal Banking Sales 2+ $240K $300K Commercial/Corporate Banking Credit Risk Management 3+ $360K $1M+ Credit Analyst 2+ $240K $720K Credit Administration 2+ $240K $720K Relationship Manager 3+ $300K $600K Associate Relationship Manager 1.5+ $180K $300K Investment Banking/Global Markets Institutional Sales (Executive to Team Head) 2+ 240K 1.8M+ Product Control 4+ 400K 1.4M+ Compliance 3+ 360K 1.4M+ Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Debt Captial Market 2+ 240K 1.4M+ Equity Captial Market 2+ 240K 1.4M+ Market Risk 3+ 360K 1.2M+ Operational Risk 3+ 360K 1.2M+ Corporate Finance 3+ 360K 1.2M+ Internal Audit 2+ 240K 1.2M+ Middle Office/Trade Support 3+ 360K 1M Settlements 3+ 360K 1M INSURANCE Claims Assistant Manager - Manager 5+ 300K 600K+ Officer - Senior Officer 3+ 156K 288K+ Policy Administration Policy Administration Manager 6+ 288K 420K+ Policy Administration Officer 3+ 156K 216K+ Actuary Actuary 5+ 480K 780K+ Assistant Actuary 3+ 240K 360K+ hong kong
  • 35.
    33Figures are inHKD and represent base salary only Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Underwriting Senior Manager - Head of Underwriting 10+ 750K 1200K+ Assistant Manager - Manager 5+ 350K 800K+ Officer - Senior Officer 1+ 120K 400K+ Business Development Director 10+ 720K+ $1M+ Manager - Senior Manager 5+ 420K 720K+ Assistant Manager 3+ 264K 360K+ INFORMATION TECHNOLOGY Executive/General Management Chief Information Officer 15+ 1.8M 3M Chief Technology Officer 12+ 1.2M 2M Managing Director 15+ 1.5M 2.5M Head of IT 12+ 800K 1.5M IT Manager 10+ 600K 1M Sales Sales Director 12+ 1M 2.5M Sales Manager 8+ 600K 1.2M Account Manager 5+ 400K 800K Projects Project Director 15+ 1M 1.5M Project Manager 8+ 500K 900K Project Leader 6+ 400K 600K Business Analyst Lead Business Analyst 12+ 700K 1.2M Business Analyst 5+ 450K 850K Application/System Development Solutions Architect 12+ 600K 1.2M Systems Analyst 6+ 420K 700K Developer 3+ 240K 500K Infrastructure Systems Architect 12+ 550K 1M Systems Administration 5+ 360K 600K Senior Engineer 5+ 360K 480K Database Senior DBA 10+ 540K 900K DBA 5+ 360K 500K HongkOng
  • 36.
    kellyservices.co.in34 The GDP growthfor 2012 is pegged at 7% with an estimate of over 200 million people between the working ages of 18-60 years being added to the workforce in the next two decades. According to the India Chamber of Commerce, the Indian economy will create 87.37 million jobs by 2015. Over the next decade, India will have over 125 million college-educated professionals and an equal number of vocationally trained people. The speed of India’s sustained growth is necessitating a need of 500 million skilled people to enter the market. This is a definitive precursor for a talent war which will ultimately drive up business costs. The problem of ‘plenty’ needs to be resolved by up skilling an anticipated 250 million people over this decade. Information Technology India’s IT industry is fast reaching the 100 billion dollar mark and it is still growing in double digits, creating a substantial number of new jobs. The Indian IT industry is expected to add in excess of 240,000 new jobs and as expected IT companies have set aggressive targets for graduate and lateral hiring in 2012. This year, IT companies are expected to be more stable in their hiring plans than last year as most companies have already factored in economic turbulences. Banking and financial institutions and IT companies servicing this sector continue to be one of the largest IT talent employers. Telecommunications is also expected to continue hiring in 2012 as increased infrastructure and connectivity buoyed by a growing consumer demand is seeing growth in this sector. Skill sets in emerging areas like cloud computing and e-commerce will be highly sought after as companies realise the potential impact of these advanced technologies on their future business. INdia NATIONAL OVERVIEW
  • 37.
    35Figures are inINR and represent base salary only India
  • 38.
  • 39.
    37Figures are inINR and represent base salary only India Engineering Engineering is the largest sector in overall industrial segments in India. The sector employs more than five million skilled and semi skilled workers. India is rapidly investing in infrastructure to connect the vast country and witnessing large amounts of foreign investment in the power and automotive sectors in particular. Oil & Gas India’s oil and gas sector holds strategic importance in the economy as it meets around 42% of the country’s primary energy demand and contributes over 15% to the gross domestic product (GDP). With an interesting mix of private and government companies, the industry is scaling new heights in domestic and international markets. India is the world’s fifth-largest energy consumer; oil accounts for 30% of the total energy consumption. Locating new fields for exploration will increase the demand for skilled labour and oilfield services both in upstream & downstream sectors. All these unexplored rigs will require substantial manpower support to keep the industry running. The oil and gas industry is looking forward to deploy innovative technologies to locate and extract oil. This has resulted in significant rise in the demand for petroleum engineers and geo-scientists worldwide. Automotive The automotive industry in India has been growing at a rapid pace in both the OEM and ancillary segments resulting in strong demand across a variety of skill sets. New technologies entering the Indian market will create intensified demand for R&D professionals. Increased export levels of cars compared to 2011 coupled with further investments in India from companies like Ford, Bosch and Chrysler will increase the need to employ skilled automobile engineers, quality professionals and create opportunities across the supply chain industry accordingly. Power & Infrastructure India accounts for 4% of global power generation, and has the fifth largest generation capacity in the world with an overall installed capacity of 159,398.50 mega watt (MW) as on March 31, 2010. The total installed generation capacity in the country as on September 20, 2011 stood at 182,344.62 MW, with thermal power contributing 118,695.98 MW, nuclear 4,780.00 MW and hydro power 38,706.40 MW, according to Central Electricity Authority data. Infrastructure sector in India has witnessed rapid growth in its different sectors with the development of urbanisation and increased involvement of foreign investments in this field. The Government of India has taken various steps to develop the infrastructure. Engineering Services The engineering services sector deals with design, manufacturing and operation of structures, machines or devices. This is the largest of all industrial sectors and accounts for 12% of the GDP. Engineering exports grew by 94% and 60% during Q1 & Q2 respectively in 2011. Indeed the engineering design market is estimated to be around US$40 billion by 2020 with many European OEMs establishing their design and engineering back offices in India. This will move several job opportunities for design, hardware & software engineers to the region and thus creating enormous demand in this talent segment. India
  • 40.
    kellyservices.co.in38 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Information Technology Analyst Programmer 2-5 300K 700K Analyst Programmer / Software Engineer 3-7 500K 900K Application Architect 7+ 1.2M 1.6M Application Developer 3-7 500K 900K Business Analyst 3-6 500K 800K Database Manager 10+ 1.5M 2.2M Database Architect 10-14 1.3M 1.6M Database Administrator 7-10 900K 1.2M Database Administrator 5-7 600K 800K Database Administrator 2-5 300K 600K Desktop Support 2-5 300K 500K Enterprise Architect 10+ 1.5M 2.2M ERP Specialist 2-8 500K 1M Head of IT Operations 15 3.5M 5M Head of Information Systems 10+ 2M 2.2M Head of Software Development 15 4M 6M Helpdesk Analyst 2-5 300K 500K Information Technology Director 15-20 5M 8M Information Technology Manager 13-16 2M 2.5M Information Technology Specialist 10-14 2M 2.5M Infrastructure Architect 10+ 1.5M 2.2M Inside Sales Representative 4-8 700K 1.2M IT Auditor 9-11 1.8M 2.5M IT Business Analyst 3-6 500K 800K IT Security Manager 5-9 1.2M 1.6M Lead Software Developer 9-11 1.5M 1.8M Network Manager 10-14 1.3M 1.6M Network Engineer 7-10 800K 1.2M Project Manager 11-15 1.5M 2M Project Manager - Infrastructure 11-15 1.5M 2.5M SAP Implementation Consultant 4-7 600K 900K SAP Project Manager 11-15 1.5M 2M Security Consultant 3-6 500K 800K Senior Technical Writer 8-12 1M 1.5M Software Architect 7-10 1.3M 1.6M INdia
  • 41.
    39Figures are inINR and represent base salary only Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Software Engineer 3-7 600K 900K Software QA / Test Analyst 5-8 700K 1M Solution Architect 13-15 1.5M 2M Storage Consultant 5-8 800K 1.4M Systems / Network Administrator 4-8 600K 1.2M Systems Administrator 3-5 500K 800K Technical Delivery Manager 12-15 1.6M 2.4M Technical Writer 4-7 500K 800K Engineering & Technical Application Engineering Manager 8-10 1M 1.2M Business Unit Head-Automation 20-30 3M 4M CAE Manager 8-10 1M 1.6M CFD Manager 7-10 1M 1.2M Chemical Engineer 2-5 300K 600K Civil Engineer 8-12 1M 1.5M Civil Engineer 2-5 300K 600K Contracting Engineer Manager 5-8 600K 1M Corrosion Engineer 8-12 900K 1.5M Development Engineer 5-8 500K 900K Distribution Manager 8-10 800K 1.2M Electrical & Instrumentation Control Engineer 5-9 800K 1.2M Electrical / Mech-Maintenance Manager 8-10 800K 1.2M Electrical Design Engineer 5-9 600K 800K Electrical Engineer 2-5 300K 600K Embedded System/Design Principal Engineer 5-9 600K 1.2M Engineering Director 18-24 3M 5M Engineering Manager 14-17 1.8M 2.2M Environment Health & Safety Manager 15-20 1.8M 2.5M Environmental Engineer 10-15 800K 1.2M Equipment Manager 8-12 700K 1.1M Expediting Co-ordinator 6-8 650K 100K Fire Engineer 5-8 800K 1.2M India
  • 42.
    kellyservices.co.in40 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Geologist 8-10 1.5M 1.8M Geophysicist 8-15 1.4M 3M Geotechnical 8-10 1.5M 2M Head CAE 15-18 2M 3M Head HSE 15-20 2.1M 3M Head of Applications Engineering 15-20 1.8M 2.5M Head of Customer Engineering 15-20 1.8M 2.5M Head of Environment Health & Safety 20 2.5M 3M Head of Manufacturing Engineering 20 2.5M 3M Head of Quality 20 2M 2.5M Head of R&D Center 15-20 2M 2.5M Head of Systems Engineering 15-20 2M 2.5M Head of Technical Services 12-14 1.5M 2M Industrial Engineering Manager 5-8 800K 1.2M Inspection Engineer 8-12 900K 1.5M Logistics Manager 8-10 800K 1.2M Maintenance Manager 13-18 2M 2.5M Manager Operations & Maintenance 15 1.7M 2.5M Manager Production-Body Shop 8-10 1M 1.4M Manager Production-Final Assembly Shop 8-10 1M 1.4M Manager Quality Assurance Manager 15 1.5M 2M Manufacturing Engineering Manager 8-12 600K 1.5M Materials Manager 8-12 600K 1.5M Mechanical Design Engineer 2-5 350K 800K Mechanical Engineer 2-5 350K 800K Mechanical Technician 2-5 350K 800K Metallurgist 5-8 600K 1M Mining Engineer 5-9 1M 1.5M Operations Manager 10-14 1M 1.5M Piping Engineer 4-7 600K 900K Planning Engineer 8-15 1M 2M Process Engineer 5-8 600K 1M Process Engineer 2-5 350K 800K Procurement Manager 10-12 1M 1.5M Product Engineer 2-5 350K 800K Product Engineering Manager 8-10 1M 1.5M Production Engineer 2-5 350K 800K Project Control Engineer 8-12 1M 2M INdia
  • 43.
    41Figures are inINR and represent base salary only Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Project Manager 8-10 1M 1.5M Project Engineer 2-5 350K 800K Purchasing / Sourcing Manager 10-15 1.3M 1.8M Quality Manager 10-14 1M 1.5M QA Engineer 5-9 800K 1.2M R&D Engineer 2-5 350K 600K Reservoir Engineer 6-10 800K 1.8M Roads/bridges Engineer 5-9 800K 1.2M Sales Engineer 4-7 600K 800K SCM Head 18-22 2.5M 3.2M Senior Application Engineer 5-7 700K 900K Senior Design Engineer 4-7 700K 900K Senior Design Engineer (Automation) 3-10 500K 1.5M Senior Buyer 15-18 2M 2.5M Senior Project Manager Power 15-20 2M 2.5M Structural Engineer 4-9 550K 1.2M Supplier Technical Assistant 6-8 800K 1M Supply Chain Manager 10-15 1.2M 2M Technician 1-2 120K 240K India
  • 44.
    kellyservices.co.id42 Interest in thearchipelago has led to many new companies investing and expanding their footprint in Indonesia. This growth focus has created challenges in talent management across most industries – specifically how to recruit, retain and develop talent in a country anecdotally labelled as “the missing BRIC.” banking and Financial Services The banking sector has both broadened and deepened and interest rates continue to sink. These factors have combined to boost the already growing demand for financial services, from microcredit to mezzanine finance. Volume of lending continues to increase in 2012 with loans to SMEs being a core driver of growth. This is creating a need for experienced talent across the whole middle and back office within this sector Consumer Goods The FMCG industry is expected to have double digit growth this year. As the FMCG market in Indonesia is becoming more appealing, more foreign direct investment is finding its way to the country. It is clear that more products will be produced and pushed to market which is creating demand for marketing and sales professionals, coupled with a need for technical skill sets across manufacturing and supply chain management. This has a relational impact on companies servicing this sector. Information Technology Improvements in Indonesia’s telecoms and ICT infrastructure are expected to drive long-term growth in the Indonesian IT services market. Commercial data centres are being built, linked to growing rollout by public sector and commercial organisations of e-government or e-commerce services. However, most opportunities are still in fundamental service areas such as system integration, support systems, training, professional services, and outsourcing and internet services, with demand for a mixture of employment types, from permanent through to contract and temporary professionals. INdonesia NATIONAL OVERVIEW
  • 45.
    43Figures are inIDR and represent 13 months annual salary INdonesia
  • 46.
  • 47.
    45Figures are inIDR and represent 13 months annual salary Telecommunications The growth of the telecommunications industry this year is estimated to range between 8% to 9%. The main driving force being competition by five major carriers of the 10 operators who hold an estimated 90% market share of the telecommunication industry in Indonesia. The telecommunication industry still requires a lot of specialised talent due to strong growth in line with the expansion hence skill sets such as RF Engineers and other technical services will continue to be highly prized. Pharmaceutical The Indonesian pharmaceutical market is projected to grow at a high single-digit CAGR in US dollar terms during the forecast period, and it will be the sixth largest pharmaceutical market in the Asia Pacific region by 2016. In 2010, there were around 250 pharmaceutical manufacturers, with the vast majority located in Java. Despite the country possessing huge manufacturing capabilities, the lack of R&D within local companies could affect the market, especially if IPR regulations are tightened, requiring all drugs to be originated in Indonesia. Potentially this is bad news for multinational companies but it could potentially reduce costs in the long term for both the manufacturer and the consumer. Resultantly the need for R&D talent will surge as well as that for specialist chemical manufacturing expertise. Energy Energy consumption in Indonesia has been increasing rapidly, to meet the growing demands among various sectors, in particular the transportation and manufacturing sector, who boast the highest consumption levels of all industries. Coal production is set to surge in 2012 as coal miners bolster their businesses and several new mines commence production. Indonesia’s production of thermal and coking coal is forecast to hit 380 million tons in 2012, up 5.5% on this year’s estimate, which will create demand for all level of mining engineers, health and safety and environmental specialists Overall Indonesia can look forward to robust growth across all their major markets. The challenge will be the need for highly skilled talent as its position on the global economic stage is realised. INdonesia
  • 48.
    kellyservices.co.id46 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Engineering & Technical Engineering Manager 10+ 455M 650M Environment Health & Safety Manager 10+ 390M 585M Environment Engineer 7+ 130M 195M Facility Manager 10 + 455M 585M Field Service Engineer 5+ 65M 104M Geologist 10+ 520M 975M Geophysicist 10+ 520M 975M HVAC Project Manager 10+ 325M 520M HVAC Service Manager 10+ 260M 455M Industrial Engineering Manager 10+ 390M 455M Mechanical Engineer 10+ 130M 325M Metallurgist 5+ 195M 260M Mining Manager 10+ 780M 1,300M Mining Engineer 5+ 260M 325M Petroleum Engineer 10+ 520M 975M Project Manager 10+ 520M 1,040M Sales Engineer 7+ 130M 234M Manufacturing Manufacturing Engineering Manager 15+ 455M 780M Materials Manager 7+ 130M 260M Process Engineer 4+ 65M 130M Production Engineer 4+ 65M 130M Project Manager 10+ 260M 455M Project Engineer 5+ 130M 195M Purchasing/ Sourcing Manager 7+ 221M 364M QA Manager 10+ 260M 455M QA Officer 4+ 65M 130M R&D Manager 8+ 234M 455M R&D Engineer 5+ 91M 195M Supply Chain Manager 10+ 325M 650M Warehouse Manager 10+ 182M 260M Finance Accounting Director 12+ 455M 520M Accounting Manager 10+ 260M 325M Accounts Payable Manager 7+ 195M 260M Accounts Receivable Manager 7+ 195M 260M Audit Director 12+ 520M 780M Auditor 3+ 91M 130M Billing Operations Manager 10+ 260M 325M Business Analyst 7+ 260M 520M Compliance Senior Manager 10+ 455M 585M INdonesia
  • 49.
    47Figures are inIDR and represent 13 months annual salary Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Cost Accountant 5+ 78M 130M Costing Manager 10+ 260M 390M Credit & Collections Manager 10+ 260M 390M Credit & Collections Supervisor 7+ 130M 234M Credit Manager 10+ 325M 390M Financial Accountant 8+ 195M 325M Financial Planning Manager 15+ 455M 650M Financial Planning & Analysis Manager 12+ 195M 325M Head of Syariah Compliance 10+ 390M 520M Head of Treasury 12+ 520M 780M Insurance and Risk Management Manager 12+ 390M 520M Management Accountant 10+ 325M 390M Payroll Manager 8+ 195M 260M Relationship Manager 7+ 130M 195M Head of Credit Risk 10+ 325M 520M Tax Analyst 8+ 195M 260M Treasury Analyst 8+ 195M 325M Claims Manager 10+ 260M 390M Head of Risk 10+ 390M 585M Accountant 3+ 65M 91M Finance Director (Banking) 15+ 1,300M 2,340M Financial Controller (Banking) 12+ 585M 1,040M Finance Manager (Banking) 12+ 455M 585M Tax Accountant (Banking) 6+ 130M 195M Treasury Manager (Banking) 10+ 390M 520M Tax Manager (Banking) 10+ 325M 455M Claims Manager (Banking) 10+ 325M 390M Financial Analyst (Banking) 8+ 234M 325M Accountant (Banking) 5+ 130M 195M Audit Manager (Banking ) 10+ 260M 455M Internal Audit Manager (Banking) 10+ 260M 455M Finance Director (Commerce and Industry) 15+ 1,040M 1,950M Financial Controller (Commerce and Industry) 12+ 585M 910M Tax Director (Commerce and Industry) 15+ 650M 780M Tax Manager (Commerce and Industry) 10+ 260M 390M Tax Accountant (Commerce and Industry) 6+ 130M 195M Finance Manager (Commerce and Industry) 12+ 390M 520M Treasury Manager (Commerce and Industry) 10+ 325M 455M Tax Director (Private Practice) 15+ 975M 1,105M Tax Manager (Private Practice) 10+ 260M 390M Audit Manager (Private Practice) 10+ 325M 390M Financial Analyst 8+ 195M 260M INdonesia
  • 50.
    kellyservices.co.id48 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Human Resources Compensation & Benefits - Head 12+ 455M 910M Compensation & Benefits - Analyst 5+ 91M 104M Human Resources Director 15+ 910M 1,950M HR Director (Local) 15+ 780M 1,625M HR Manager 12+ 325M 585M HR Generalist 7+ 130M 234M HRIS Manager 10+ 390M 455M Industrial Relations Manager 10+ 260M 455M Organisational Development Manager 12+ 390M 910M Recruitment Manager 10+ 195M 325M Recruitment Lead 5+ 91M 130M Technical Training Manager 10 325M 455M Training & Development Director 15+ 520M 780M Training & Development Manager 10+ 325M 455M Information Technology Account Manager / Sales Manager 10+ 325M 30M Account Manager 10+ 260M 25M Analyst Programmer / Software Engineer 5+ 65M 10M Business / Systems Analyst 8+ 195M 20M Chief Information Officer 15+ 975M 1,950M Chief Technology Officer 15+ 975M 1,950M Country Manager 15+ 780M 1,625M Database Manager 10+ 195M 325M Database Architect 5+ 65M 130M Desktop support 5+ 65M 104M Digital Marketing 10+ 325M 520M ERP Business Analyst 10+ 325M 455M Head IT Operations 12+ 520M 650M Head of Information Systems 12+ 520M 650M Head of Software Development 10+ 390M 520M Information Technology Director 15+ 780M 1,300M Information Technology Manager 10+ 325M 520M IT Operations Manager 10+ 260M 390M IT Security Manager 10+ 390M 520M MIS Manager 10+ 390M 520M Network Manager 10+ 260M 325M Program Director 15+ 520M 780M Program Manager 10+ 260M 390M Project Manager 10+ 260M 390M INdonesia
  • 51.
    49Figures are inIDR and represent 13 months annual salary Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Sales Director 15+ 650M 1,040M SAP Implementation Consultant 8+ 325M 390M SAP Project Manager 8+ 390M 455M Sales & Marketing Brand / Product Manager 7+ 195M 325M Business Development Director 15+ 975M 1,170M Business Development Manager 10+ 455M 585M Category Management Manager 10+ 325M 520M Division / Region Merchandise Manager 10+ 325M 455M Head of Market Research 10+ 325M 650M Market Research Manager 10+ 325M 455M Key Account Manager 7+ 195M 260M Marketing Communications Manager 10+ 455M 585M Marketing Director 15+ 975M 1,950M Marketing Manager 12+ 585M 975M National Key Account Manager 12+ 585M 650M National Sales Manager 12+ 325M 715M PR Manager 10+ 325M 520M Pricing Manager 10+ 260M 325M Sales & Marketing Director 15 1,040M 1,950M Sales & Marketing Manager 12+ 585M 780M Sales Director 15+ 845M 1,625M Telemarketing Manager 12+ 195M 260M Trade Marketing Senior Manager 12+ 390M 650M Web Marketing Manager 12+ 325M 585M INdonesia
  • 52.
    kellyservices.com.my50 The Malaysian economyis projected to grow by 4% to 5% this year, with domestic demand remaining the anchor of growth, as it has been over the past few years despite the global environment remaining challenging. The growth for 2012 will moderate to between 4% and 5% after expanding by 5.1% last year but the steady pace of growth will largely depend on external developments. Regardless, talent scarcity remains an issue the economy has to contend with. Malaysia’s aspiration is to advance towards becoming a high-income, high value-added economy in the next decade, with growth that is underpinned by greater innovation, productivity and enhanced efficiency. Key initiatives to address this area are in the areas of human capital development, developing a conducive and competitive business environment and establishing the required physical infrastructure for a modern economy. Accounting and Finance The increasing trend of Malaysian corporations venturing abroad to leverage on joint partnership and expansion of business globally has resulted in fundamental measures to support the presence of domestic businesses globally. Given the importance of having appropriate risk management practices to the financial health of companies, middle to senior levels of auditors, accountants, and credit managers are in continually sought after. There is also a continued demand for business partners who can value add in terms of providing sound business advice and acumen due to stricter internal controls via expense management and push for profitability. Banking and Financial Services The development of talent for the financial sector continues to present considerable challenges for the industry as demand continues to exceed supply. In the medium to longer term, this can increase pressure on wages, and could undermine the ability of financial institutions to maintain competitive positions and effectively control risks. Malaysia NATIONAL OVERVIEW
  • 53.
    51Figures are inMYR and represent base salary only malaysia
  • 54.
  • 55.
    53Figures are inMYR and represent base salary only The foreign exchange market experienced robust growth during the year with Malaysian financial markets continuing to support the effective and efficient intermediation of funds for economic activity, diversifying domestic funding sources which contribute to financial stability. For 2011, growth in total financing by the banking system to businesses remained strong, increasing at a faster pace of 13.5% (2010: 9.4%) Engineering and Technical The construction sector is projected to record a stronger growth with a projected rate of 6.6% compared with 3.5% in 2011, supported by the implementation of major infrastructure projects and the special stimulus package. This robust performance benefitted both the fabricated metal and non-metallic mineral product industries. However, civil engineering and special trade sub-sectors registered a slower growth following completion of several major highway projects, maintenance and upgrading works. Capital investments in the resource-based industries and new growth areas encompassing renewable energy, oil and gas, utilities and advanced electrical and electronic products provides opportunities for continued demand for engineers and technical workforce. The higher demand for natural gas from Japan provided opportunities of employment at processing plants and facilities in Peninsula Malaysia. Human Resources As the role of HR practitioners transform from a transactional to a transformational scope, the demand for HR specialist handling a full spectrum of HR activities continues. As more companies are focusing on hiring the right talent to compete within their industry and markets, there is an unabated demand for Human Resources professionals with a focus on areas such as compensation & benefits, learning & development and talent acquisition and retention. Information Technology The communication sub-sector growth was led mainly by the continued expansion in the broadband segment. The broadband penetration rose to 62.3% of households at end 2011 as a result of wider and improved coverage by key industry players. Expansion into rural areas boosted the higher broadband penetration rate due to provision of broadband facilities and this resulted in continued hiring demand for ICT job positions. In promoting e-payments as a viable alternative to paper-based payment, IT professionals in the middle level space continued to be in demand. Contracting is expected to pick up in the IT industry where roles such as project managers, technical architect, infrastructure managers and software specialists will be required to meet the development of offering on mobile banking, payment services via a multi-bank and mobile network-neutral infrastructure. Procurement, Supply Chain and Logistics In line with the moderation in trade and manufacturing-related activity, the transportation and storage, and utilities sub-sector recorded a modest expansion. Demand for cargo-related transport services was lower amid the weakness in external demand and reduction in exports and the weaker performance in the manufacturing sector. With organizations placing a higher importance in improving processes and productivity, mid and senior management positions such as project managers, operations directors and supply/demand/inventory planners are in demand. Sales and Marketing Sales talent with strong performance track records are still sought after, as companies compete for bigger and wider share of the markets. Commission- based packages are favoured for sales workforce while brand managers, marketing directors, channel managers continue to be in demand as companies extend marketing and advertising campaigns beyond conventional and traditional advertising, moving into digital and online marketing. malaysia
  • 56.
    kellyservices.com.my54 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Banking Assistant Manager (Credit/Operational Risk) 5-8 84K 120K Assistant Manager (Finance/Financial Analysis/ MIS/Regulatory Reporting/Statutory Reporting) 5-11 60K 120K Assistant Manager (Market Risk) 5-8 84K 144K AVP Corporate Finance 5-8 90K 120K AVP Legal 5-8 84K 120K Chief Internal Audit 15-20 240K 600K Chief Risk Officer 15-20 240K 600K District Manager 8-10 96K 180K Head (Telesales) 10-15 180K 240K Head Business Development (Deposit/Trustee) 10-15 156K 240K Head Compliance (Consumer Banking) 10-15 180K 360K Head Compliance (Investment Banking) 10-15 180K 360K Head Corporate Communications 10-15 180K 360K Head Corporate Finance 10-15 216K 300K Head Debt Capital Market 10-15 240K 360K Head Islamic Banking 10-15 180K 360K Head Marketing (Unsecured/Cards) 10-15 240K 360K Head Mortgage 10-15 180K 360K Head Treasury Operations 10-15 180K 360K Head Wealth Management 10-15 180K 360K Head/AVP Research 8-12 120K 180K Head/VP Knowledge Management 10-15 180K 240K Head/VP/AGM (Credit/Operational Risk) 10-15 144K 360K Head/VP/AGM Market Risk 10-15 144K 360K Manager/AVP (Credit/Operational Risk) 8-12 120K 144K Manager/AVP (Finance/Financial Analysis/MIS/ Regulatory Reporting/Statutory Reporting) 8-12 120K 168K Manager/AVP Audit 6-9 84K 156K Manager/AVP Market Risk 8-12 144K 180K Regional Manager 10-15 180K 240K Senior Executive Audit 2-5 36K 72K Senior Manager/Team Lead Wealth Management 8-10 156K 180K VP Compliance (Consumer Banking) 8-12 180K 216K VP Compliance (Investment Banking) 8-12 180K 216K VP Corporate Finance 8-10 144K 180K Malaysia
  • 57.
    55Figures are inMYR and represent base salary only Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) VP/Head (Credit Audit/Operations Audit/IT Audit) 10-15 180K 360K VP/Head Finance 10-15 180K 360K VP Legal 10-15 180K 240K Human Resources Compensation & Benefits Specialist 10-15 180K 240K Head Industrial Relations 10-15 144K 216K Head Recruitment/Manpower Planning 10-15 144K 240K Head Talent Management 10-15 180K 240K HR Director (Regional) 10-15 240K 480K HR Director (Local) 10-15 180K 360K Senior HR Generalist 10-15 216K 300K HR Generalist 8-10 96K 180K HR Relationship Senior Manager 8-12 96K 144K HR Relationship Manager 5-10 60K 96K Industrial Relations Manager 5-8 96K 144K Manager/AVP Talent Management 8-12 120K 180K Manager/Senior Manager Recruitment 8-12 120K 156K Sales and Marketing SVP/AGM/Head of Marketing 12-20 204K 360K Sales Director/SVP 10-15 180K 300K Area Sales Manager 10-15 168K 216K Head Business Development 10-15 144K 240K Business Development Manager 10-15 72K 120K VP/Head of Channel Management 10-15 144K 216K Head Customer Service 10-15 168K 240K Head of Market Research 10-15 216K 300K Market Research Manager 5-8 96K 180K Marketing Manager 5-8 96K 144K Marketing Communications Manager 5-8 72K 120K malaysia
  • 58.
    kellyservices.com.my56 Engineering Architect 7-10 96K156K Building Surveyor 5 60K 84K Chemical Engineer 7-10 96K 192K Civil Engineer 5 48K 72K Electrical Design Engineer 3-5 54K 84K Electrical Engineer 3-5 48K 72K Electrical & Instrumentation Control Engineer 3-5 48K 72K Electrical & Instrument Engineer 3-5 54K 78K Electrical Project Manager 5-7 72K 96K Electrical Service Manager 5-7 72K 96K Electrical Technician 1-3 18K 30K Environment Engineer 3-5 48K 60K Environment Health & Safety Manager 5-7 60K 96K Estimator 4-7 60K 108K Facility Manager 5-7 60K 96K Field Service Engineer 5-7 72K 120K Head of Environment Health & Safety 6-10 120K 180K Head of Quality 5-8 84K 144K HVAC Project Manager 5-7 72K 96K HVAC Service Manager 5-7 72K 96K HVAC Supervisor 3-5 30K 54K Interior Designer 3-5 30K 54K Mechanical Design Engineer 3-5 30K 60K Senior Mechanical Engineer 5-7 84K 144K Mechanical Engineer 3-5 36K 78K Mechanical Technician 2-5 24K 42K Molding & Tool Designer Manager 5-7 66K 96K Operations Manager 7-10 96K 168K Planning Manager 5-8 90K 156K Process Engineer 5-7 84K 144K Product Engineering Manager 8-10 108K 192K Product Engineer 4-6 54K 78K Project Manager 6-9 84K 156K Purchasing/ Sourcing Manager 5-8 54K 108K Quality Manager 7-8 84K 156K Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Malaysia
  • 59.
    57Figures are inMYR and represent base salary only R&D Engineer 2-5 36K 60K Sales Engineer 2-4 28.8K 48K Senior Design Engineer 3-5 60K 96K Supply Chain Manager 5-8 60K 96K Technician 1-3 14.4K 36K Test Engineer 1-2 30K 42K Information Technology Account Manager 3-4 42K 62.4K Account Manager / Sales Manager 5-7 60K 120K Analyst Programmer / Software Engineer 2-6 42K 96K Application Architect 2-8 54K 120K Application Developer 2-6 42K 96K Business Analyst 6-10 96K 180K Business / Systems Analyst 3-6 60K 96K Chief Information Officer 10-18 300K 600K Chief Technology Officer 10-18 300K 600K Country Manager 7-8 144K 240K Database Administrator 3-7 72K 156K Database Architect 8-15 180K 216K Database Manager 8-15 180K 240K Desktop Support 2-5 36K 60K Enterprise Architect 8-12 156K 216K ERP Business Analyst 4-6 60K 96K ERP Specialist 2-4 42K 60K Head IT Operations 8-12 216K 360K Head of Software Development 8-15 216K 360K Helpdesk Manager 4-6 72K 120K Helpdesk Analyst 1-4 36K 60K Information Technology Director 8-12 216K 360K Information Technology Manager 6-10 84K 144K Information Technology Specialist 2-5 36K 60K Infrastucture Architect 5-10 96K 156K Inside Sales Representative 2-6 42K 72K IT Auditor 4-7 72K 108K IT Business Analyst 4-8 60K 96K IT Operations Manager 6-10 84K 144K Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) malaysia
  • 60.
    kellyservices.com.my58 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) IT Security Manager 6-10 120K 180K IT Security Professional 6-8 96K 144K IT Support Analyst 2-4 36K 60K IT Support Manager 6-10 72K 96K Lead Software Developer 5-8 96K 144K MIS Manager 6-10 84K 144K Network Manager 6-10 96K 180K Network Specialist 5-8 72K 120K Network Engineer 4-6 54K 72K Post-sales Consultant 5-10 72K 144K Pre-sales Consultant 5-10 84K 180K Programme Director 12-18 216K 480K Programme Manager 8-10 144K 216K Project Manager 5-8 84K 144K Project Manager - Infrastructure 5-8 84K 144K Sales Director (Regional) 8-15 300K 480K Sales Director 8-15 180K 360K SAP Implementation Consultant 5-10 120K 240K SAP Project Manager 10-15 360K 600K Security Consultant 5-7 96K 180K Senior Business Analyst 8-12 96K 180K Senior Technical Writer 5-8 60K 84K Senior Web Designer 4-6 60K 84K Service Delivery Management Director 12-18 216K 300K Software Architect 8-10 120K 180K Software Development Manager 8-12 96K 156K Software Development Engineer 4-6 60K 84K Software Engineer 2-3 42K 60K Software QA / Test Analyst 3-6 48K 72K Solutions Architect (Senior) 8-10 96K 180K Solutions Architect 5-10 84K 180K Storage Consultant 3-7 60K 144K Systems Administrator 2-6 42K 72K Systems Analyst 6-10 72K 120K Systems Architect 5-10 84K 180K Systems Engineer 2-3 42K 54K Malaysia
  • 61.
    59Figures are inMYR and represent base salary only Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Systems / Network Administrator 2-6 42K 72K Systems Programmer 4-6 60K 120K Systems Programmer (junior) 2-4 42K 60K Technical Consultant 3-6 54K 84K Technical Delivery Manager 5-8 72K 120K Technical Writer 3-5 42K 66K Technology Manager - IT Infrastructure 6-10 84K 144K Test Manager 5-10 96K 144K Unix Specialist 5-8 84K 144K Web Applications Developer Manager 8-10 96K 144K Web Applications Developer 3-5 54K 72K Wintel Specialist 5-8 72K 108K malaysia
  • 62.
    kellyservices.co.nz60 With slower thanexpected economic performance, sliding consumer confidence and a complex international picture of patchy recovery, New Zealand businesses are continuing to take a cautious approach to building capacity. However, a significant expected boost from the Canterbury post earthquake recovery, as well as ongoing strength in several key sectors, is seeing some short-term growth and considerable expected demand over the coming years. The recovery of Christchurch after the devastating earthquakes in 2010 – 2011 is likely to exert significant pressure on the job market across the new zealand NATIONAL OVERVIEW whole country at the end of 2012, with upwards of 30,000 workers required not just in the construction industry, but also in a wide range of specialist and support areas – from local government planning and engineering, to finance, administration and HR. Accounting and finance As in most OECD countries, the New Zealand accounting and finance sector is continuing to manage the fallout from the international debt crisis. After a number of years of restructuring, and the influence of a considerable change in consumer debt patterns and business investment, the industry is yet to stabilise, with jobs still to be shed. The performance of the sector in Australia, where many of New Zealand’s major financial institutions and large enterprises are headquartered, also continues to restrict hiring intentions. Information Technology After weathering much of the recession with little impact, the IT sector has returned strongly to growth, outperforming most other industries outside the agri-business sector. Convergence in smart devices, consumerism, hi-tech manufacturing, and bioinformatics and strong swelling in the gaming and digital content domain is seeing the IT sector enhancing its credentials dramatically both domestically and internationally. This growth transformation and all round solid performance has been reflected in continued skills shortages across all categories of knowledge workers. Areas of particularly critical scarcity include programming and development disciplines.
  • 63.
    61Figures are inNZD and represent base salary only newzealand
  • 64.
  • 65.
    63Figures are inNZD and represent base salary only In addition, there will be 75,000 new specialised manager jobs by 2018, including • Production and Operation Managers • Finance and Administration Managers • Human Resources Managers • Sales and Marketing Managers • Supply and Distribution Managers • Information Technology Managers • Research and Development Managers This growth will inevitably create competition and wage pressure in these areas for the foreseeable future. Engineering The Canterbury recovery is likely to exert the biggest influence over the demand for experienced engineering sector candidates over the next 12 – 24 months. Civil engineering and infrastructure In addition to a significant investment in the redevelopment of Christchurch’s badly damaged infrastructure, both local and central government investment is planned in major transport initiatives, particularly in Wellington and Auckland. A resurgent housing market, and the shift of the Christchurch population – with a projected 25,000 residential sections being brought onto the market in the next five years – will also increase demand from the private sector. Construction Christchurch will be the focus of considerable demand for the construction sector once the rebuild gains momentum. This is predicted to occur by the end of 2012, and with over $20 billion of investment to be made into the rebuilding of the city, will continue to exert a major influence in the economy for up to a decade. Mining While the Australian industry has been the major attraction for skilled local candidates, a major focus on mineral resources development on the part of the National Government, and a number of promising investigations throughout the country, could significantly change the local sector in coming years. Mechanical and Electrical Despite softness in the wider market, the hi-tech manufacturing field, in particular, is going from strength to strength, and will continue to see strong demand for expert staff across a variety of disciplines. Longer term Taking a longer-term view, nearly 200,000 jobs will be created in New Zealand during the 5-year period from 2010-2015. Employment growth will be seen in almost all of the higher-skilled occupations, including business, finance and ICT professionals, and technicians and associates. newzealand
  • 66.
    kellyservices.co.nz64 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Engineering & Technical Development Engineer 3-5 60K 75K Electrical & Instrumentation Control Engineer 3-5 75K 85K Electrical Design Engineer 3-5 75K 85K Electrical Engineer 3-5 65K 80K Electrical (& Instrument) Engineer 4-6 75K 85K Electrical Technician 1-3 60K 75K Engineering Director 10+ 130K 180K Engineering Manager 10+ 110K+ Head of Quality 8 100K 110K Material Manager 5-8 65K 75K Mechanical Design Engineer 3-5 65K 75K Mechanical Engineer 5-7 65K 75K Mechanical Engineer 3-5 65K 75K Operations Manager 7 80K 100K PCB Design Engineer 3-5 70K 80K Planning Manager 3-5 70K 80K Process Engineer 3-7 60K 100K Product Engineer 4-6 60K 70K Production Engineer 3-5 60K 75K Project Manager 4-8 70K 100K Project Engineer 3-5 70K 80K QA Engineer 3-5 60K 75K Quality Manager 7-8 75K 85K R&D Engineer 2-3 70K 80K Sales Engineer 3-5 60K 85K Senior Design Engineer 3-5 80K 90K Senior Design Engineer (Automation) 5-7 80K 90K Technician 1-2 55K 65K Test Engineer 1-2 65K 70K Finance Accountant 4-5 70K 85K Accounting Director 10+ 90K 110K Accounting Manager 5-8 80K 100K Accounts Payable Manager 5-6 45K 55K Accounts Receivable Manager 3-5 90K 150K Audit Director 10+ 90K 120K Auditor 2-4 48K 53K Billing Operations Manager 4-6 75K 92K Business Analyst 3-5 85K 97K new zealand
  • 67.
    65Figures are inNZD and represent base salary only Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Chartered Accountant 3-5 75K 90K Claims Manager (Insurance) 5+ 75K 100K Compliance Senior Manager 5 85K 105K Cost Accountant 3-4 75K 90K Costing Manager 4-6 75K 100K Credit & Collections Manager 5-8 42K 55K Credit & Collections Supervisor 3-5 40K 50K Credit Manager 5-8 60K 72K Finance Director (Commerce and Industry) 12+ 160K 250K Financial Controller (Commerce and Industry) 10-12 110K 150K Finance Manager (Commerce and Industry) 6-8 120K+ Financial Analyst (Commerce and Industry) 3-7 60K 75K Tax Director (Commerce and Industry) 8+ 100K 145K Tax Manager (Commerce and Industry) 5-7 88K 105K Tax Accountant (Commerce and Industry) 3-5 60K 80K Treasury Manager (Commerce Industry) 5-7 70K 96K Finance Director (Banking) 12+ 180K 250K Financial Controller (Banking) 10-12 100K 160K Finance Manager (Banking) 6-8 85K 130K Finance Manager (Banking) 6-7 90K 130K Head of Risk (Banking) 12+ 125K 200K Tax Manager (Banking) 6-10 85K 110K Tax Accountant (Banking) 2-5 65K 80K Treasury Manager (Banking) 7-10 80K 105K Accountant (Banking) 5-7 105K 120K Audit Manager (Banking) 5-7 83K 103K Internal Audit Manager (Banking) 5 100K 150K Claims Manager (Banking) 4-5 72K 100K Finance Supervisor 2-4 60K 82K Financial Accountant 3-5 65K 85K Financial Analyst 2-3 45K 61K Financial Analyst 2-4 45K 60K Financial Planning & Analysis Manager 8+ 90K 120K Financial Planning Manager 8+ 90K 102K Head of Financial Control 10-12 110K 135K Head of Credit Risk 8 116K 160K Head of Treasury 10+ 100K 210K Insolvancy Accountant 5-8 70K 90K Insurance and Risk Management Manager 4-6 88K 109K Internal Auditor 2-3 68K 82K newzealand
  • 68.
    kellyservices.co.nz66 Management Accountant 5-875K 120K Payroll Manager 4-6 58K 90K Relationship Manager 3-5 55K 75K Risk Management Analyst 2-5 41K 60K Senior Billing Operations Analyst 2-3 45K 62K Senior Costing Executive 2-4 45K 66K Tax Analyst 2-3 60K 80K Tax Director (Private Practice) 10+ 100K 145K Tax Manager (Private Practice) 5-8 82K 106K Audit Manager (Private Practice) 5-8 88K 102K Treasury Analyst 2-3 67K 88K Information Technology Analyst Programmer 2 40K 60K Analyst Programmer / Software Engineer 2-6 85K 100K Business / Systems Analyst 3-6 75K 100K Chief Information Officer 12-18 150K+ Database Manager 8 60K 80K Database Adminstrator 4-7 80K 100K Enterprise Architect 8-12 120K 150K ERP Business Analyst 6 80K 95K Helpdesk Manager 6 75K 85K Helpdesk Analyst 1-3 40K 50K IT Auditor 4-7 80K+ IT Business Analyst 8 70K 80K IT Operations Manager 8 110K 135K IT Security Manager 14 120K+ IT Security Professional 8 75K+ IT Support Manager 6 70K 80K IT Support Analyst 4 45K 55K Lead Software Developer 5-8 70K 80K Network Manager 6 110K 120K Network Engineer 6 65K 80K Network Specialist 6 50K 60K Project Manager - Infrastructure 5-10 110K 135K Project Manager 3-10 70K 110K Service Delivery Directors 12-18 120K+ Software Development Engineer 6 80K+ Software Development Manager 12 100K+ Software Engineer 2-3 50K 60K Software QA / Test Analyst 3-6 60K+ Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) new zealand
  • 69.
    67Figures are inNZD and represent base salary only Solutions Architect 5-10 110K 120K Solutions Architect (Senior) 6-10 100K+ Solutions Architect (Junior) 2-4 80K+ Storage Consultant 3-7 90K+ Systems / Network Administrator 2-6 40K 50K Systems Administrator 8 75K+ Systems Analyst 3-8 40K 90K Systems Analyst Programmer 5 50K 60K Systems Engineer 2-3 40K 50K Technical Writer 3-5 60K+ Test Manager 5-10 80K+ Unix Specialist 5-8 80K+ Web Applications Developer 8 80K+ Wintel Specialist 4-8 60K 90K Life Sciences Quality Manager (Assurance) 5-7 70K 100K Quality Manager (& Regulatory Affairs) 2-11 80K 120K Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Sales & Marketing Area Sales Manager 5-8 80K 110K Brand / Product Manager 3-4 65K 85K Brand Manager 5-8 75K 95K Business Development Director 8-10 110K 130 Business Development Manager 8 80K 110K Corporate Communications Director 8-10 110K 140K Key Account Manager 3-5 65K 85K Marketing Manager 4-5+ 65K 95K Product Manager 3-7 85K 105K Sales / Key Account Manager 5-10 65K 85K Sales Director 10+ 110K 130K Sales Manager 4-7 90K 125K Sales Manager - Channel Sales 5-7 85K 105K newzealand
  • 70.
    kellyservices.com.sg68 Although Singapore’s economygrew 4.9% in 2011, the government has maintained a growth forecast of between 1-3% for 2012. The Singapore employment rate is relatively strong with a total employment growth of 122,600 in the whole of 2011 or 3.9% higher as compared to 2010. Accounting and Finance In 2012, we see a continued demand for business partners who can value add in terms of providing sound business advice as compared to traditional accountants. Middle level positions such as senior accountants, auditors and credit managers are in demand due to stricter internal controls via expense management and push for profitability. This increase in controls and regulations has also created strong appetite for professionals in the compliance domain. Banking and Financial Services Banks have been retrenching employees in Europe and America but this has had a less radical impact in Asia due to the fact that we have two major banking hubs located in Singapore and Hong Kong. Although the banking and financial services industry is relatively stable in Singapore, we do see some caution in hiring. Banks are focusing on more business critical positions especially in the area of risk and compliance as regulatory requirements continue to become more stringent. This said, whilst the investment banking community continues to be somewhat unpredictable, there seems to be a refocus on consumer wealth-based business lines management professionals in particular. The insurance, asset management and reinsurance sectors are experiencing solid growth creating appetite for skills such as quantitative analysis and actuarial related disciplines Engineering and Technical Similar to other industries, most organisations will have a cautious approach in hiring. We see continued hiring in the oil and gas, construction and water sectors due to consistent growth and potential. As the Singapore government continues to support the construction sector via housing projects and major public works, the construction industry is expected to continue its buoyancy throughout 2012 leading to a strong demand for all categories of construction engineers. singapore NATIONAL OVERVIEW
  • 71.
    69Figures are inNZD and represent base salary only 69Figures are in SGD and represent base salary only newzealandsingapore
  • 72.
  • 73.
    71Figures are inNZD and represent base salary only 71Figures are in SGD and represent base salary only Healthcare and Life Sciences With Singapore government’s initiative in building Singapore as a medical and life sciences hub, we see an increase in the hiring of medical and life science professionals across the board. Particular emphasis will be placed on professionals with strong expertise in pharmaceutical, regulatory affairs, research and development, quality assurance and technical sales. Human Resources As organisations seek to optimise their structures whilst still attracting, developing and retaining talent across the board, HR will continue to come to the foreground as a critical hire. We see consistent hiring of human resource professionals with a demand focus in areas such as compensation and benefits, learning and development and talent acquisition and retention. Increasingly we also see companies setting up their own in-house recruitment teams aimed at reducing their direct costs, creating some demand for core recruitment skills. Similar to other functional roles, human resource professionals are now expected to play a business partner role, providing commercial advice that are in line with achieving business objectives. This places much attention on HR professionals who have shifted their expertise demonstrably from transactional to strategic. Information Technology IT professionals in the middle level space continue to be in demand in banking and financial services, end- user commerce, IT vendor and consulting sectors. The increase in demand for IT professionals in the banking sector have resulted from an increased awareness of i-banking, banking security lapses and a higher demand for improved phone-banking security. Contracting is also expected to pick up in the IT industry where roles such as project managers, technical architects, infrastructure managers and software specialists will be in demand as companies look to inject skills for core periods of complex projects without the long term cost burden of a permanent hire. Procurement, Supply Chain and Logistics With organisations placing a higher importance on improving processes efficiency and maximising returns on investment, positions across the procurement spectrum will continue to be in strong demand. Category led positions across both direct and indirect spend will be a prime focus particularly for talent with experience of demonstrating substantial and innovative cost savings across supplier channels regionally and globally. Talent with specific focus in categories such as marketing services, technology, workforce management and in direct categories across all commodities will be highly prized. Expertise in low cost country sourcing will also be a sought after skill set. In tandem with this we would expect to see companies investing in supply chain optimisation in a bid to run with maximum efficiency which will see demand for professionals such as project managers, operations directors and supply/demand/inventory planners and those with Lean methodology expertise. Sales and Marketing Traditional marketing budgets have been hit by cost cutting measures leading to the hiring of sales and marketing professionals mainly for replacement, accessing niche specialisations and regional portfolio expansion. Demand still continues however, in skill sets such as account management, social media optimisation, market/competitor analysis and corporate communications. This is due to organisations grappling with changing technology and the way consumers and clientele prefer to purchase goods and services, as well as the borderless nature of their competitive landscape. As ever, we see the continued demand for highly networked specialist sales professionals with a successful track record of business growth across corporate and consumer sectors. Overall with the current global economic uncertainty, organisations across industries are expected to be cautious in hiring. There is still a demand for professionals in the middle to senior level management, but employers are taking their time and are more selective in finding the right talent for their companies. newzealandsingapore
  • 74.
    kellyservices.com.sg72 Occupation Title Experience (years) Min. Annual Salary (inlocal currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) ENGINEERING AND TECHNICAL Chemical Engineer 3-6 48K 72K Civil Engineer 5-7 42K 60K Electrical & Instrumentation Control Engineer 5-8 42K 60K Electrical Design Engineer 6-8 42K 60K Electrical Engineer 5-7 42K 60K Electrical (Instrument) Engineer 4-7 36K 54K Electrical Project Manager 10+ 96K 132K Engineering Manager 10-12 96K 144K Environment Health & Safety Manager 8-12 84K 144K Facility Manager 5-8 72K 96K Materials Manager 7-10 78K 108K Mechanical Design Engineer 5-7 40K 48K Mechanical Engineer 5-7 42K 48K Operations Manager 6-10 96K 156K Planning Manager 10+ 90K 120K Process Engineer 3-7 42K 72K Product Engineer 3-7 42K 72K Production Engineer 3-6 42K 66K Project Manager 5-13 66K 144K Quality Manager 10+ 96K 144K QA Engineer 6-8 42K 66K Sales Engineer 3-5 36K 84K Structural Engineer 6-7 42K 54K FINANCE Accountant 3-5 48K 78K Accounting Director 10+ 120K 180K Accounting Manager 5+ 72K 96K Accounts Payable Manager 3-5 34K 51K Accounts Receivable Manager 5-7 54K 84K Internal Audit Director 15+ 216K 300K Audit Manager (Private Practice) 4-6 65K 93K Auditor 2-4 36K 58K Claims Manager 4-6 96K 150K Cost Accountant 5+ 48K 72K Costing Manager 10+ 60K 84K Finance Director (Banking) 10+ 240K 360K Finance Manager (Banking) 6-8 72K 132K Finance Manager (Banking) 6-8 84K 156K Finance Manager - Investment (Banking) 6-9 96K 180K Financial Controller (Banking) 12+ 180K 300K Head of Risk (Banking) 10+ 222K 300K singapore
  • 75.
    73Figures are inNZD and represent base salary only 73Figures are in SGD and represent base salary only Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Tax Accountant (Banking) 3-4 54K 78K Tax Manager (Banking) 5-10 84K 180K Treasury Manager (Banking) 7-10 96K 132K Accountant (Banking) 3-5 42K 90K Audit Manager (Banking) 4-6 60K 126K Internal Audit Manager (Banking) 4-6 60K 108K Finance Supervisor 5+ 48K 84K Financial Accountant 4+ 60K 110K Financial Analyst 3+ 36K 54K Finance Director (Commerce and Industry) 9+ 180K 240K Finance Manager (Commerce and Industry) 7+ 84K 108K Financial Analyst (Commerce and Industry) 5+ 60K 90K Financial Controller (Commerce and Industry) 10+ 120K 180K Tax Director (Commerce and Industry) 15+ 180K 240K Tax Manager (Commerce and Industry) 7+ 84K 144K Tax Accountant (Commerce and Industry) 5+ 60K 96K Treasury Manager (Commerce and Industry) 7+ 84K 120K Financial Planning & Analysis Manager 6+ 84K 120K Financial Planning Manager 6+ 72K 120K Head of Financial Control 5-8 96K 180K Head of Credit Risk 8-10 144K 216K Head of Syariah Compliance 8-10 144K 216K Head of Treasury 15+ 216K 276K Insolvancy Accountant 2-5 60K 96K Insurance & Risk Management Manager 9+ 144K 216K Internal Auditor 4+ 60K 96K Management Accountant 5+ 54K 84K Relationship Manager 3-5 42K 84K Risk Management Analyst 3-5 42K 60K Tax Analyst 5+ 60K 96K Treasury Analyst 4+ 60K 84K HUMAN RESOURCES Compensation & Benefits - Director 10+ 180K+ Compensation & Benefits - Manager 5-10 102K 150K Compensation & Benefits - Analyst 3-5 60K 84K Employee Communications Manager 4-10 72K 120K Employee Relations Manager 4-10 72K 120K HRIS Manager 4-8 48K 72K HRIS Specialist 3-5 84K 144K HR Director (Regional) 10+ 144K+ HR Director (Local) 10+ 120K+ Human Resources Generalist 4-8 60K 96K newzealandsingapore
  • 76.
    kellyservices.com.sg74 HR Business Partner(Regional) 5-10 72K 144K HR Business Partner (Local) 4-8 60K 96K HR Manager (Regional) 5-10 84K 180K HR Manager (Local) 4-10 60K 144K Human Resources Specialist 3-6 36K 60K Industrial Relations Manager 5-10 60K 120K Industrial Relations Specialist 3-8 48K 72K Organisational Development Director 8+ 120K+ Organisational Development Manager 5-10 60K 120K Payroll Manager 4-10 72K 144K Payroll Supervisor 3-5 48K 84K Recruitment Lead 10+ 120K+ Recruitment Manager 6-12 72K 120K Recruitment Specialist 4-8 60K 84K Talent Acquisition Manager 6-12 72K 120K Training & Development Director 12+ 144K+ Training & Development Manager 5-10 48K 120K Talent Management Manager 6-10 60K 120K Talent Management Director 12+ 120K+ INFORMATION TECHNOLOGY Account Manager 5-8 60K 84K Account Manager / Sales Manager 5-8 72K 96K Analyst Programmer / Software Engineer 4-6 36K 60K Application Architect 8-10 84K 108K Application Developer 4-6 48K 72K Business / Systems Analyst 5-8 60K 84K Business Analyst 5-8 60K 84K Chief Information Officer 15-25 300K 420K Chief Technology Officer 15-25 300K 420K Country Manager 10-15 192K 240K Database Administrator 6-11 60K 96K Database Manager 10-15 102K 132K Database Architect 6-10 84K 120K Desktop Support 3-6 30K 48K Enterprise Architect 10-15 144K 168K ERP Business Analyst 6-9 72K 108K ERP Specialist 5-8 72K 108K Head of IT Operations 10-18 156K 192K Head of Information Systems 15-18 156K 216K Head of Software Development 10-18 156K 216K Helpdesk Manager 8-11 72K 108K Helpdesk Analyst 3-5 30K 48K Information Technology Director 15-20 168K 216K Information Technology Manager 12-18 120K 156K Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) singapore
  • 77.
    75Figures are inNZD and represent base salary only 75Figures are in SGD and represent base salary only Information Technology Specialist 7-10 72K 96K Infrastructure Architect 8-12 108K 156K Inside Sales Representative 5-8 48K 72K IT Business Analyst 7-10 60K 96K IT Operations Manager 10-15 84K 120K IT Security Manager 10-15 96K 144K IT Security Professional 7-10 60K 96K IT Support Manager 8-10 90K 120K IT Support Analyst 4-7 36K 60K Lead Software Developer 8-10 60K 84K MIS Manager 10-15 78K 96K Network Manager 10-12 84K 120K Network Specialist 5-8 54K 84K Network Engineer 3-7 42K 66K Post-sales Consultant 8-10 96K 144K Pre-sales Consultant 8-12 96K 144K Program Director 15-20 156K 192K Program Manager 12-18 120K 156K Project Manager 10-15 96K 150K Project Manager - Infrastructure 10-12 96K 150K Sales Director (Regional) 15-20 192K 240K Sales Director 12-18 156K 204K SAP Project Manager 8-12 108K 144K SAP Implementation Consultant 7-10 78K 102K Security Consultant 6-9 60K 96K Senior Business Analyst 8-10 84K 108K Senior Technical Writer 7-10 72K 96K Senior Web Designer 5-8 48K 78K Service Delivery Director 10-15 156K 204K Software Architect 8-15 90K 120K Software Development Manager 8-12 108K 144K Software Development Engineer 6-8 48K 72K Software Engineer 5-7 42K 66K Software QA / Test Analyst 5-7 42K 72K Solutions Architect (Senior) 10-12 96K 144K Solutions Architect (Junior) 7-9 72K 96K Storage Consultant 7-10 60K 96K Systems / Network Administrator 5-7 42K 66K Systems Administrator 3-6 42K 66K Systems Analyst 3-6 42K 66K Systems Analyst Programmer 3-7 42K 66K Systems Architect 8-12 84K 120K Systems Development Manager 10-12 96K 144K Systems Development Project Leader 8-12 78K 102K Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) newzealandsingapore
  • 78.
    kellyservices.com.sg76 Systems Engineer 6-948K 72K Systems Programmer 5-8 48K 72K Team Leader Sales Manager 10-15 120K 156K Technical Consultant 8-10 60K 96K Technical Delivery Manager 8-10 96K 132K Technical Writer 6-8 48K 96K Technology Manager - IT Infrastructure 10-12 96K 144K Test Manager 10-15 96K 144K Unix Specialist 5-8 54K 72K Web Applications Developer Manager 10-15 96K 144K Web Applications Developer 4-7 48K 72K Web Design Manager 8-10 96K 144K Web Tester 4-8 42K 66K Website Manager 8-10 84K 120K Wintel Specialist 8-12 60K 84K LIFE SCIENCES Account Manager - Hospital Sales 4-8 48K 72K Account Manager - Medical Sales 4-8 48K 78K Biostatistician 2-5 36K 60K Clinical Pharmacologist 2-5 36K 60K Clinical Research Manager 5-7 60K 84K Clinical Research Specialist 2-5 42K 60K Clinical Trials / Study Manager 4-6 54K 78K Clinical Trials / Study Leader 3-5 48K 72K Data Management Manager 4-6 48K 72K Head of Clinical Research 8-10 96K 120K Head of Medical Sales 8-12 96K 120K Head of Regulatory Affairs 8-12 108K 144K Hospital Sales Manager 5-9 66K 84K Hospital Sales Representative 2-5 36K 54K Medical Affairs Manager 4-10 96K 120K Medical Affairs Executive 2-5 48K 72K Medical Director 10-15 180K 240K Medical Sales Manager 6-10 72K 96K Medical Sales Representative 2-5 36K 54K Microbiologist 2-5 30K 54K Nutritional Manager 6-10 78K 108K Nutritionist 4-6 42K 72K Pharmacist 2-5 36K 54K Principal Scientist 5-8 60K 84K Quality Manager (Assurance) 6-8 78K 96K Quality Manager (Regulatory Affairs) 6-8 72K 108K Senior Scientist 3-6 48K 78K Scientist 2-5 30K 60K Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) singapore
  • 79.
    77Figures are inNZD and represent base salary only 77Figures are in SGD and represent base salary only Senior Research Associate 6-8 60K 84K Validation Manager 6-8 78K 96K Validation Engineer 3-6 54K 72K Validation Specialist 4-6 60K 78K SALES & MARKETING Agency Account Manager 4-6 60K 96K Area Sales Manager 4-6 60K 96K Bid & Proposal Manager 4-6 60K 96K Bid & Proposal Executive 2-4 42K 60K Brand / Product Manager 6-8 60K 120K Business Development Director 6-10 60K 120K Business Development Manager 6-8 48K 96K Category Management Manager 6-8 48K 96K Corporate Communications Director 6-10 84K 120K Digital Marketing Specialist 3-6 48K 78K Division / Regional Merchandise Manager 3-6 48K 96K Experiential Marketing Specialist 3-6 48K 96K General Manager 10-20 120K 360K Head of Bid & Proposal 6-10 72K 120K Head of Channel Management 6-10 72K 120K Head of Market Research 6-10 72K 120K Head of Technical Marketing 6-10 72K 120K Key Account Manager 6-8 60K 96K Market Research Manager 8-10 72K 120K Market Analyst 6-8 60K 96K Marketing Communications Manager 8-10 72K 120K Marketing Director 10-15 120K 264K Marketing Manager 6-10 60K 120K PR Manager 8-10 60K 120K PR Manager 6-8 48K 96K Pricing Manager 6-8 48K 96K Product Manager 6-8 48K 102K Sales / Key Account Manager 6-10 72K 150K Sales Administration Manager 6-8 48K 96K Sales Director 8-15 96K 240K Sales Manager 6-8 48K 96K Sales Manager 4-7 42K 84K Sales Manager - Channel Sales 4-7 42K 84K Sales Manager - Technical Sales 4-7 42K 84K Sales Planning Manager 4-7 42K 84K Trade Marketing Senior Manager 6-10 72K 120K Web Marketing Manager 6-8 54K 96K Occupation Title Experience (years) Min. Annual Salary Max. Annual Salary Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) Occupation Title Experience (years) Min. Annual Salary (in local currency) Max. Annual Salary (in local currency) newzealandsingapore
  • 80.
    NOTES ABOUT THISGUIDE As we meet our clients across the region, one question that comes up frequently is the desire for knowledge around specialised talent pools in the region. In order to address this question, we put together this guide to showcase professional and technical positions across the major countries in APAC. This is to enable leadership teams to understand the talent landscape in the region and then determine optimum resourcing strategies to tap into these specialised talent pools and effectively fill their talent needs. The salary information provided in this guide is a compilation of actual placements we made in our areas of specialisations in 2011/2012. We have chosen to report on actual transactions between our clients and candidates as it is then an actual reflection of what is happening in the marketplace and will allow hiring managers to make informed decisions. Please note the information presented in this document should be used as a general guide only. As different organisations have different corporate structures and titling practices, we have used typical corporate titles to maintain simplicity and to allow for easy comparisons. Where number of years’ experience is mentioned, it is only to give an approximate framework in which to gauge what a typical professional is likely to earn with the level of experience shown for each country. Please also note that we list annual salaries without information on bonuses or benefits. All rights reserved. No part of this book may be reproduced or transmitted in any form without the written permission from Kelly Services. The information contained in the Asia Pacific Professional and Technical Salary Guide 2012 is intended for educational purposes only. Kelly Services takes no responsibility for any liabilities that emerge based on the information contained in this guide.
  • 82.
    APAC Corporate Office 20Anson Road #05-03, Twenty Anson, Singapore 079912 Tel: (65) 6494 6060 Fax: (65) 6221 5652 Email: apacinfo@kellyservices.com.sg Australia Ground Floor, 15 Castlereagh Street, Sydney, NSW 2000 Australia Tel: (61) 2 9246 6000 Fax: (61) 2 9246 6793 Email: au_marketing@kellyservices.com China Unit 9D-9E, Zhao Feng World Trade Building, No. 369 Jiang Su Road, Shanghai 200050 China Tel: (86) 21 5240 0840 Fax: (86) 21 5240 0660 Email: info@kellyservices.cn Hong Kong 15/F Prosperity Tower, 39 Queen’s Road Central, Hong Kong Tel: (852) 2522 1186 Fax: (852) 2522 1501 Email: info@kellyservices.com.hk India Unitech Cyber Park, Tower - C, 10th floor, Unit #1003, Sec- 39, Gurgaon, Haryana - 122002 India Tel: (91) 124 472 6666 Fax: (91) 124 472 6699 Email: info@kellyservices.co.in Indonesia Mayapada Tower 18th Floor, Suite 18-01B, Jl. Jend. Sudirman Kav. 28, Jakarta 12920 Indonesia Tel: (62) 21 521 1873 Fax: (62) 21 521 1874 Email: kellyjkt@kellyservices.co.id Malaysia Lot 12.01, 12th Floor MCB Plaza, 6 Changkat Raja Chulan, 50200 Kuala Lumpur Malaysia Tel: (60) 3 2072 1112 Fax: (60) 3 2070 4360 Email: info@kellyservices.com.my New Zealand Level 2, 35b Leslie Hills Drive, Riccarton Christchurch 8001, New Zealand Tel: (64) 3 379 2963 Fax: (64) 3 379 2964 Email: nz_marketing@kellyservices.com Singapore 10 Anson Road #20-08, International Plaza, Singapore 079903 Tel: (65) 6501 4700 Fax: (65) 6221 1262 Email: info@kellyservices.com.sg
  • 84.