MUHAMMAD YOUSUF SHAIKH
(Architect)
B. Arch. MPCATP, MAIAP
MSAP, MWAA
Contact Numbers & Email:
Permanent Contact Details:
Mobile No:
Email:
House # A-298, Block – J, North Nazimabad,, KARACHI-74700
+92-333-5720022
yousuf1951@gmail.com
Educational Background / General Overview
Nationality:
Education:
Professional:
Affiliations:
Professional:
Registrations:
Pakistani
B. Arch (5 years),Dawood College of Engg. & Tech.Karachi (Degree Affiliated from
Karachi University)in 1975
A.I.A.P. (Associate Member ofInstitute ofArch.Pakistan)
M.S.A.P. (Member of Society Of Architects Pakistan)
Registered (Life-Member) with Pakistan Council Of Architects &T.Pl. (PCATP) In 1984
(Reg. No.A-119).
Practicing License From Karachi Building Control Authority (K.D.A License No.Al-01-51)
Practicing License From Karachi Building Control Authority (K.B.C.A Lic.No.Al-01-399)
Practicing License From Karachi Cantonment Board.
Practicing License From CDA, Islamabad (CDA)/D-Arch-2(72)531/A/2007/222
35 Years
RESUME
Total Experiences:
1st.November 2015 to Present: M/S MEINHARDT (Architect-Civil-Electrical-Mechanical
Consultant)
Major duties: Resident Engineer / Resident -Architect
February 2014 to 31st
.October2015: M/S (Patel Foundation) Patel Hospital Gulshan-e-Iqbal
Karachi.
Major duties: Head of Department for Project-Management of( Construction&Maintenance
/ Operational works)
Project work details Head of Department of 230 Bedded Hospital for Manage of all New
Construction/ Renovation works & manage all maintenance / operation work
to Co-ordination with Medical Staff/
Doctors/Managements & other Departments in corporate to follow the
Architectural/ Interiors/ Civil/ Structural and all MEP related matters and to
fulfill the concern requirements with hospitality.
May 2013 to Jan 2014 M/S Abdullah Group ( Continental-Enterprizes) Karachi/ Hyderabad.
Major duties ProjectsManager / Construction&Architecture
Project work details As per designationof ProjectManager (for M/S Abdullah Sports Shopping
Mall / Abdullah Sports Towers under constructionproject ) am Managed of
all Constructional Works for High Rise Complex Projecthaving Big Shopping
Mall/ 750 Apartments Buildings of6 Blocks inclusive Basements Parking
Area, Ground Floors Shops & 12 storiedApartments, This is only the First
huge / Large Project having of about 1250 Piles Foundation Works,This
Project is exist inSindh Province near Super High Way at Hyderabad City
(Qasimabad) of Pakistan.
Jan2009 to Jan 2013 M/S Pak Telecom Mobile Limited (UFONE) Head Office Islmabad.
Major duties Project Manager (Construction/Architecture / Interior-Works)
Project work details Co- ordinate of all constructional /architectural/civil/interior -designing
matters/MEP Issues & resolve all matters as per site requirements,making
of scope of work, verification of contractors bills,check quality of works.
July 2008 to Dec 2008: M/S I J M Gulf- Pakistan (Pvt.) Ltd. D.H.A. Phase-II,
(Owner: M/S Al-Ghurair Geiga Group)
Major duties Construction manager/Project-Architect
Project cost & details Under Construction Project (world-Trade Centre), Sheikh Zayed Bin Sultan Al-
Nahyan , Road,D.H.A. Phase-II,ISLAMABAD.Project Cost:Pak Rs. 24 billion .
Area ofLand is about 40Acres.
May 2007 To June 2008 M/S Consult-Tech International, Karachi
Major duties Construction Manager-completed/ constructed project (Metro Cash & Carry,
Multan Road,Lahore) and (Metro Cash & Carry Islamabad)
 Project management, control&planning
 Supervision andguidance to staff
 Checking ofdrawings
 Attending meetings,technicalcorrespondence,coordination with head office
& client
 Preparation ofregular progress report &reporting to head office
 Checking of all architectural finishing work/structural/MEPmatters.
Project cost & details PKR 1.5 Billion, project area ofland about 12 acres
It is the very first project of Metro group GmbH, Germany in Pakistan Under this project
a huge super store having western shopping style.
Sep 2004 To May 2007 M/S Impact Design International, Islamabad
Major duties Project Manager(“Uch Power Station”) Dera Murad Jamali” Baluchistan
Pakistan)
Complete project management and drawings coordination with clients, consultants&
contractors Quality assurance,checking ofcontractors work done and bills
Project cost & tasks PKR 400 Million (Some of the major tasks are as following).
80 nos.ofapartment units for officers accommodation
Mess building for officer staff
Security building for 200 security guards


 Helipad, roads development with street lights and development oflandscape
areas
 Car parking, RCC shed structure for admin block
 Large equipment parking structure for big vehicles andcrane
 Fire-Fighting, water supply and drainage sewerage system
 Development workforStaff ,s Residential colony
Jan 2003 To Aug 2004 M/S Jason Construction Co. (Pvt.) Ltd. Shahrah-e-Faisal, Karachi
Project Manager/ Project Architect On 4-Star Hotel (184 Rooms. F-8, Markaz At
Islamabad)
Jul 2001 To Dec2002 M/S. Shaikh Associates Karachi
Project Architect (Islamabad Serena Hotel)
 Architectural,Planning, Design Development.
 Working Drawings, Interior Decoration Design.
 Coordination with MEP Design/Drawings.
 Quality Supervision,ArchitecturalSpecifications and BOQ”s
 Site Supervision To ControlArchitectural Finishes.
 Review& ApprovalofShop Drawings.
 Islamabad Serena Hotel (5-Star) Islamabad.
Nov 1997 To Jun 2001 M/S Jason Construction Co. (Pvt.) Ltd. Shahrah-e-Faisal, Karachi
Project Manager/ Project Architect
 4-Star Hotel (184 Rooms) Project Located At F-8 Markaz Islamabad.
 Worked At Samwood Shopping Mall At Clifton Karachi.
 Windsor Shopping Mall At Gulistan-e- Jauhar Karachi.
 Jason Gulshan-Gala Karachi.
Jul 1996 To Oct 1997 M/S Consultants Group, Defence Housing Authority, Karachi
Resident Architect
 Renovation Work Of“ Mazaar Laal Shahbaz Qalandar” Sindh (Sehwan Sharif)
 Beverly Centre Shopping Plaza At Blue Area Islamabad.
 8-Kanal Bungalow at Sector F-8/2 Islamabad.
Jan 1988 To Jun 1996 M/S Qamran Construction (Pvt.) Ltd., Karachi (A Group Of Sea Breeze
Pvt. Ltd.)
Construction Manager
 16-Storied High-Rise Buildings: “City-View/City shopping Mall” At Saddar
Karachi.
 15-Storied High-Rise Building:” Marine Drive” At Clifton, Karachi.
 15 Storied High Rise Building: “Marina Elevation” At Clifton, Karachi.
 12 Storied High Rise Building: “Beach Blessing”,Clifton, Karachi
Jan 1986 To May 1987 M/S Naveed A. Sheikh & Associates, Karachi
Senior Architect
 AuditoriumFor Gul-E-Rana Community Center.
 Workshop For Mercedes Cars &Trucks For ShahnawazLtd.
 Hospital &Community center at North Nazimabad, Karachi.
 Hamdard Factory Peshawar, For Hamdard Dawakhana.
 Karachi Diagnostic Center, Shaheed-e-Millat Road, Karachi.
 German School Building At OrangiTown Karachi
.
Jan 1984 To Dec 1985 M/S Shahzad Associates,Karachi
Architect
 Apartment Buildings For NIPA, Karachi.
 Car Showroom& Apartment Building, Karachi.
 Private Residence Bungalows At Karachi& Islamabad
Mar 1981 To Dec 1983 M/S Ibrahim Saleh Al-Kadi, Jeddah, Saudi Arabia
Architect
 Mosque At Mecca Road,Jeddah, SaudiArabia.
 Private Apartment Buildings, Jeddah, Saudi Arabia.
 Shopping Center / Supermarkets, Jeddah, SaudiArabia.
 Private Residences &Villas, Jeddah,SaudiArabia.
 40 Rooms Hotel Project At Riyadh, Saudi Arabia.
 Site Supervision For SchoolBuildings At Al-Baha, Saudi Arabia
Mar 1977 To Feb 1981 M/S Naqvi & Siddique Associates, Karachi
Architect
 National Assembly Building,Islamabad.
 Libya Insurance Complex, Tripoli, Libya.
 State Guest House,Libya.
 Race Course At Sebha,Libya.
 Data Darbar Mosque, Lahore.
 Star Cinema, Karachi.
 HotelAt Chitral For PTDC
 King Khalid Palace at Al- Taif, Saudi Arabia.
 State Life Building, Head Office, Karachi.
 Private ResidentialBungalows And Villas.
 Ayub MedicalComplex Competition Project at Abottabad
Jan 1975 To Feb 1977 M/S M.Bilal Rashid,Associate, Karachi
Architect
 Roti Plant Factory,Karachi.
 Private ResidentialBungalows At Karachi
Part time work done during studies in Architecture
Dec 1973 To Dec 1974 M/S Pyarali Merali & Associates, (present M/s Arshad-Shahid
Abdullah )
Architectural Assistanct
 Lyari Hospital, Karachi.
 Swimming Pool / Sport Complex At Kashmir Road, Karachi.
 Deaf, Dumb And Blind School At Karachi.
 Private ResidentialBungalows At Karachi.
1972 To 1973 M/S Surti & Partners, Karachi
Architectural Assistant
 Rimpa Plaza, M.A.Jinnah Road,Karachi.
 Rimpa Apartment Buildings, Karachi.
 Private ResidentialBuildings, Karachi.
 Pehlavi University,Sheraz,Iran.
1971 To 1972 M/S Salim Ahmed & Associates, Karachi
Architectural Draftsman
 Cantonment Hospital, Gujranwala
 P.I.A Ground Training School Karachi.
 Various Multi-Storied Buildings Drafting Work.
Languages
Fluent in English, Arabic, Urdu

Meinhardt Latest Resume

  • 1.
    MUHAMMAD YOUSUF SHAIKH (Architect) B.Arch. MPCATP, MAIAP MSAP, MWAA Contact Numbers & Email: Permanent Contact Details: Mobile No: Email: House # A-298, Block – J, North Nazimabad,, KARACHI-74700 +92-333-5720022 yousuf1951@gmail.com Educational Background / General Overview Nationality: Education: Professional: Affiliations: Professional: Registrations: Pakistani B. Arch (5 years),Dawood College of Engg. & Tech.Karachi (Degree Affiliated from Karachi University)in 1975 A.I.A.P. (Associate Member ofInstitute ofArch.Pakistan) M.S.A.P. (Member of Society Of Architects Pakistan) Registered (Life-Member) with Pakistan Council Of Architects &T.Pl. (PCATP) In 1984 (Reg. No.A-119). Practicing License From Karachi Building Control Authority (K.D.A License No.Al-01-51) Practicing License From Karachi Building Control Authority (K.B.C.A Lic.No.Al-01-399) Practicing License From Karachi Cantonment Board. Practicing License From CDA, Islamabad (CDA)/D-Arch-2(72)531/A/2007/222 35 Years RESUME Total Experiences: 1st.November 2015 to Present: M/S MEINHARDT (Architect-Civil-Electrical-Mechanical Consultant) Major duties: Resident Engineer / Resident -Architect February 2014 to 31st .October2015: M/S (Patel Foundation) Patel Hospital Gulshan-e-Iqbal Karachi. Major duties: Head of Department for Project-Management of( Construction&Maintenance / Operational works) Project work details Head of Department of 230 Bedded Hospital for Manage of all New Construction/ Renovation works & manage all maintenance / operation work to Co-ordination with Medical Staff/ Doctors/Managements & other Departments in corporate to follow the Architectural/ Interiors/ Civil/ Structural and all MEP related matters and to fulfill the concern requirements with hospitality. May 2013 to Jan 2014 M/S Abdullah Group ( Continental-Enterprizes) Karachi/ Hyderabad. Major duties ProjectsManager / Construction&Architecture Project work details As per designationof ProjectManager (for M/S Abdullah Sports Shopping Mall / Abdullah Sports Towers under constructionproject ) am Managed of all Constructional Works for High Rise Complex Projecthaving Big Shopping
  • 2.
    Mall/ 750 ApartmentsBuildings of6 Blocks inclusive Basements Parking Area, Ground Floors Shops & 12 storiedApartments, This is only the First huge / Large Project having of about 1250 Piles Foundation Works,This Project is exist inSindh Province near Super High Way at Hyderabad City (Qasimabad) of Pakistan. Jan2009 to Jan 2013 M/S Pak Telecom Mobile Limited (UFONE) Head Office Islmabad. Major duties Project Manager (Construction/Architecture / Interior-Works) Project work details Co- ordinate of all constructional /architectural/civil/interior -designing matters/MEP Issues & resolve all matters as per site requirements,making of scope of work, verification of contractors bills,check quality of works. July 2008 to Dec 2008: M/S I J M Gulf- Pakistan (Pvt.) Ltd. D.H.A. Phase-II, (Owner: M/S Al-Ghurair Geiga Group) Major duties Construction manager/Project-Architect Project cost & details Under Construction Project (world-Trade Centre), Sheikh Zayed Bin Sultan Al- Nahyan , Road,D.H.A. Phase-II,ISLAMABAD.Project Cost:Pak Rs. 24 billion . Area ofLand is about 40Acres. May 2007 To June 2008 M/S Consult-Tech International, Karachi Major duties Construction Manager-completed/ constructed project (Metro Cash & Carry, Multan Road,Lahore) and (Metro Cash & Carry Islamabad)  Project management, control&planning  Supervision andguidance to staff  Checking ofdrawings  Attending meetings,technicalcorrespondence,coordination with head office & client  Preparation ofregular progress report &reporting to head office  Checking of all architectural finishing work/structural/MEPmatters. Project cost & details PKR 1.5 Billion, project area ofland about 12 acres It is the very first project of Metro group GmbH, Germany in Pakistan Under this project a huge super store having western shopping style. Sep 2004 To May 2007 M/S Impact Design International, Islamabad Major duties Project Manager(“Uch Power Station”) Dera Murad Jamali” Baluchistan Pakistan) Complete project management and drawings coordination with clients, consultants& contractors Quality assurance,checking ofcontractors work done and bills Project cost & tasks PKR 400 Million (Some of the major tasks are as following). 80 nos.ofapartment units for officers accommodation Mess building for officer staff Security building for 200 security guards    Helipad, roads development with street lights and development oflandscape areas  Car parking, RCC shed structure for admin block  Large equipment parking structure for big vehicles andcrane  Fire-Fighting, water supply and drainage sewerage system  Development workforStaff ,s Residential colony
  • 3.
    Jan 2003 ToAug 2004 M/S Jason Construction Co. (Pvt.) Ltd. Shahrah-e-Faisal, Karachi Project Manager/ Project Architect On 4-Star Hotel (184 Rooms. F-8, Markaz At Islamabad) Jul 2001 To Dec2002 M/S. Shaikh Associates Karachi Project Architect (Islamabad Serena Hotel)  Architectural,Planning, Design Development.  Working Drawings, Interior Decoration Design.  Coordination with MEP Design/Drawings.  Quality Supervision,ArchitecturalSpecifications and BOQ”s  Site Supervision To ControlArchitectural Finishes.  Review& ApprovalofShop Drawings.  Islamabad Serena Hotel (5-Star) Islamabad. Nov 1997 To Jun 2001 M/S Jason Construction Co. (Pvt.) Ltd. Shahrah-e-Faisal, Karachi Project Manager/ Project Architect  4-Star Hotel (184 Rooms) Project Located At F-8 Markaz Islamabad.  Worked At Samwood Shopping Mall At Clifton Karachi.  Windsor Shopping Mall At Gulistan-e- Jauhar Karachi.  Jason Gulshan-Gala Karachi. Jul 1996 To Oct 1997 M/S Consultants Group, Defence Housing Authority, Karachi Resident Architect  Renovation Work Of“ Mazaar Laal Shahbaz Qalandar” Sindh (Sehwan Sharif)  Beverly Centre Shopping Plaza At Blue Area Islamabad.  8-Kanal Bungalow at Sector F-8/2 Islamabad. Jan 1988 To Jun 1996 M/S Qamran Construction (Pvt.) Ltd., Karachi (A Group Of Sea Breeze Pvt. Ltd.) Construction Manager  16-Storied High-Rise Buildings: “City-View/City shopping Mall” At Saddar Karachi.  15-Storied High-Rise Building:” Marine Drive” At Clifton, Karachi.  15 Storied High Rise Building: “Marina Elevation” At Clifton, Karachi.  12 Storied High Rise Building: “Beach Blessing”,Clifton, Karachi Jan 1986 To May 1987 M/S Naveed A. Sheikh & Associates, Karachi Senior Architect  AuditoriumFor Gul-E-Rana Community Center.  Workshop For Mercedes Cars &Trucks For ShahnawazLtd.  Hospital &Community center at North Nazimabad, Karachi.  Hamdard Factory Peshawar, For Hamdard Dawakhana.  Karachi Diagnostic Center, Shaheed-e-Millat Road, Karachi.  German School Building At OrangiTown Karachi . Jan 1984 To Dec 1985 M/S Shahzad Associates,Karachi Architect  Apartment Buildings For NIPA, Karachi.  Car Showroom& Apartment Building, Karachi.  Private Residence Bungalows At Karachi& Islamabad Mar 1981 To Dec 1983 M/S Ibrahim Saleh Al-Kadi, Jeddah, Saudi Arabia Architect  Mosque At Mecca Road,Jeddah, SaudiArabia.
  • 4.
     Private ApartmentBuildings, Jeddah, Saudi Arabia.  Shopping Center / Supermarkets, Jeddah, SaudiArabia.  Private Residences &Villas, Jeddah,SaudiArabia.  40 Rooms Hotel Project At Riyadh, Saudi Arabia.  Site Supervision For SchoolBuildings At Al-Baha, Saudi Arabia Mar 1977 To Feb 1981 M/S Naqvi & Siddique Associates, Karachi Architect  National Assembly Building,Islamabad.  Libya Insurance Complex, Tripoli, Libya.  State Guest House,Libya.  Race Course At Sebha,Libya.  Data Darbar Mosque, Lahore.  Star Cinema, Karachi.  HotelAt Chitral For PTDC  King Khalid Palace at Al- Taif, Saudi Arabia.  State Life Building, Head Office, Karachi.  Private ResidentialBungalows And Villas.  Ayub MedicalComplex Competition Project at Abottabad Jan 1975 To Feb 1977 M/S M.Bilal Rashid,Associate, Karachi Architect  Roti Plant Factory,Karachi.  Private ResidentialBungalows At Karachi Part time work done during studies in Architecture Dec 1973 To Dec 1974 M/S Pyarali Merali & Associates, (present M/s Arshad-Shahid Abdullah ) Architectural Assistanct  Lyari Hospital, Karachi.  Swimming Pool / Sport Complex At Kashmir Road, Karachi.  Deaf, Dumb And Blind School At Karachi.  Private ResidentialBungalows At Karachi. 1972 To 1973 M/S Surti & Partners, Karachi Architectural Assistant  Rimpa Plaza, M.A.Jinnah Road,Karachi.  Rimpa Apartment Buildings, Karachi.  Private ResidentialBuildings, Karachi.  Pehlavi University,Sheraz,Iran. 1971 To 1972 M/S Salim Ahmed & Associates, Karachi Architectural Draftsman  Cantonment Hospital, Gujranwala  P.I.A Ground Training School Karachi.  Various Multi-Storied Buildings Drafting Work. Languages Fluent in English, Arabic, Urdu