PROJECT PORTOFOLIO
Eng. Marius Sorin
Soare
• SITUATED NEAR WITNEY TOWN IN OXFORDSHIRE
• DURATION: 01.02 – 25.04.2015
• 13 Mw POWER INSTALLED
• SADEF STRUCTURE, BYD SOLAR MODULES OF 255 Wp
• CENTRALIZED POWER CONNECTION: SMA INVERTERS
DUTIES: Coordination the works for following categories of operations:
1.Ramming and concreting of the foundation piles
2.Mounting the Sadef structure
3.Mounting the BYD solar panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
WESTERFIELD SOLAR FARM
UNITED KINGDOM
WESTERFIELD SOLAR FARM
UNITED KINGDOM
SOLAR FARMS : POSITION ON GOOGLE EARTH (file Projects Google Earth.kmz attached)
ROMANIAN SOLAR FARMS
‘LUKOIL’ SOLAR FARM – 9 Mw
• SITUATED NEAR PLOIESTI TOWN IN PRAHOVA COUNTY
• DURATION: 01.2014 - 03.2015
• 9 Mw POWER INSTALLED
• ALUMIL STRUCTURE, REC SOLAR MODULES OF 255 Wp
• CENTRALIZED POWER CONNECTION: POWER ONE INVERTERS
DUTIES: Coordination the works for following categories of operations:
1.Ramming and concreting of the foundation piles
2.Mounting the Alumil structure
3.Mounting the REC solar panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
7.Mounting the inverters
8.Supervising the testes and
connection to the grid
‘LUKOIL’ SOLAR FARM – 9 Mw
‘MAXINENI’ SOLAR FARM – 5.5 Mw
• SITUATED NEAR BRAILA TOWN IN BRAILA COUNTY
• DURATION: 08.2013 - 10.2013
• 5.5 Mw POWER INSTALLED
• ALUMIL STRUCTURE, PHONO SOLAR MODULES OF 240 Wp
• CENTRALIZED POWER CONNECTION: ABB INVERTERS
DUTIES: Coordination the works for following categories of operations:
1.Ramming the foundation piles
2.Mounting the Alumil structure
3.Mounting the PHONO SOLAR panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
7.Mounting the inverters
8.Supervising the testes and
connection to the grid
‘MAXINENI’ SOLAR FARM – 5.5 Mw
‘VIDELE’ SOLAR FARM – 2.2 Mw
• SITUATED NEAR VIDELE TOWN IN GIURGIU COUNTY
• DURATION: 10.2013 - 11.2013
• 2.2 Mw POWER INSTALLED
• ALUMIL STRUCTURE, AXITEX SOLAR MODULES OF 245 Wp
• CENTRALIZED POWER CONNECTION: ABB INVERTERS
DUTIES: Coordination the works for following categories of operations:
1.Ramming the foundation piles
2.Mounting the Alumil structure
3.Mounting the AXITEX SOLAR panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
7.Mounting the inverters
8.Supervising the testes and
connection to the grid
‘VIDELE’ SOLAR FARM – 2.2 Mw
‘SLOBOZIA’ SOLAR FARM – 1.9 Mw
• SITUATED NEAR SLOBOZIA TOWN IN IALOMITA COUNTY
• DURATION: 05.2013 - 07.2013
• 1.9 Mw POWER INSTALLED
• ALUMIL STRUCTURE, CONERGY SOLAR MODULES OF 250 Wp
• POWER CONNECTION: 65 pcs POWER ONE INVERTERS (27.6 Kv)
DUTIES: Coordination the works for following categories of operations:
1.Ramming the foundation piles
2.Mounting the Alumil structure
3.Mounting the CONERGY SOLAR panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
7.Mounting the inverters
8.Supervising the testes and
connection to the grid
‘SLOBOZIA’ SOLAR FARM – 1.9 Mw
‘APRODEX’ SOLAR FARM – 0.50 Mw
• SITUATED IN BUCHAREST, ROOFTOP MOUNTING STRUCTURE
• DURATION: 08.2014 - 09.2014
• 0.50 Mw POWER INSTALLED
• ALUMIL STRUCTURE, CONERGY SOLAR MODULES OF 250 Wp
• POWER CONNECTION: 18 pcs POWER ONE INVERTERS (27.6 Kv)
DUTIES: Coordination the works for following categories of operations:
1.Preparing the foundation connections on roof structure
2.Mounting the Alumil structure
3.Mounting the CONERGY SOLAR panels
4.Mounting the AC, DC and MV cables
5.Mounting the inverters
6.Supervising the testes and
connection to the grid
‘APRODEX’ SOLAR FARM – 0.50 Mw
‘LECHINTA’ SOLAR FARM – 5 Mw
• SITUATED IN LECHINTA TOWN IN BISTRITA COUNTY
• DURATION: 07.2012 - 11.2012
• 5 Mw POWER INSTALLED
• ALUMIL STRUCTURE, SOLAR WORLD MODULES OF 235 Wp
• POWER CONNECTION: POWER ONE INVERTERS
DUTIES: Coordination the works for following categories of operations:
1.Ramming the foundation piles
2.Mounting the Alumil structure
3.Mounting the SOLAR WORLD panels
4.Mounting the AC, DC and MV cables
5.Foundations for the transformers
6.Mounting the transformers
7.Mounting the inverters
8.Supervising the testes and
connection to the grid
‘LECHINTA’ SOLAR FARM – 5 Mw

More Related Content

Viewers also liked

Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
Farming Futures
 
Solar Power Market Update
Solar Power Market UpdateSolar Power Market Update
Solar Power Market Update
Loyd1478
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
Donald Jones
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
macsolar77
 
Getting Solar PV off the ground - some practical feedback from the Worthy Far...
Getting Solar PV off the ground - some practical feedback from the Worthy Far...Getting Solar PV off the ground - some practical feedback from the Worthy Far...
Getting Solar PV off the ground - some practical feedback from the Worthy Far...
Farming Futures
 
Solar energy-report
Solar energy-reportSolar energy-report
Solar energy-report
Ken Wong
 
Presentation solar panels martin
Presentation solar panels  martinPresentation solar panels  martin
Presentation solar panels martin
CKMCforstudents
 

Viewers also liked (7)

Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
Solar PV in Agriculture: on your roofs and in your fields? Paul Cottington (NFU)
 
Solar Power Market Update
Solar Power Market UpdateSolar Power Market Update
Solar Power Market Update
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Getting Solar PV off the ground - some practical feedback from the Worthy Far...
Getting Solar PV off the ground - some practical feedback from the Worthy Far...Getting Solar PV off the ground - some practical feedback from the Worthy Far...
Getting Solar PV off the ground - some practical feedback from the Worthy Far...
 
Solar energy-report
Solar energy-reportSolar energy-report
Solar energy-report
 
Presentation solar panels martin
Presentation solar panels  martinPresentation solar panels  martin
Presentation solar panels martin
 

Similar to Marius Soare Project Portfolio Solar Farms

Floating solar ppt
Floating solar pptFloating solar ppt
Floating solar ppt
NeerajSahu42
 
Solar PV energy principles part 1
Solar PV energy principles part 1Solar PV energy principles part 1
Solar PV energy principles part 1
H Janardan Prabhu
 
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
IndiaMART InterMESH Limited
 
Solar PV Energy Principles
Solar PV Energy PrinciplesSolar PV Energy Principles
Solar PV Energy Principles
H Janardan Prabhu
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
Avirup Ghosh
 
Ashok solar power systems pvt.ltd pune
Ashok solar power systems pvt.ltd puneAshok solar power systems pvt.ltd pune
Ashok solar power systems pvt.ltd pune
Vaibhav Patil
 
Vsquare solar systems pune
Vsquare solar systems puneVsquare solar systems pune
Vsquare solar systems pune
Vaibhav Patil
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
Harish Agarwal
 
solar power tower
solar power towersolar power tower
solar power tower
Aneenapaulson
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdf
OGBONNAYAMARTINS1
 
Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...
Gururaj B Rawoor
 
Go Solar Solutions
Go Solar SolutionsGo Solar Solutions
Go Solar Solutions
Go Solar
 
Go Solar
Go SolarGo Solar
Go Solar
Go Solar
 
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
Simon Kazunda
 
solarmobilechargerff-170807104920 (3).pdf
solarmobilechargerff-170807104920 (3).pdfsolarmobilechargerff-170807104920 (3).pdf
solarmobilechargerff-170807104920 (3).pdf
shravanisrinivas1
 
hiren pathak-CV
hiren pathak-CVhiren pathak-CV
hiren pathak-CV
Hiren Pathak
 
jaycv3.2
jaycv3.2jaycv3.2
jaycv3.2
Jay Dovaston
 
editedfloatingsolarpv-171002135444 (1).pptx
editedfloatingsolarpv-171002135444 (1).pptxeditedfloatingsolarpv-171002135444 (1).pptx
editedfloatingsolarpv-171002135444 (1).pptx
20269vinay
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017
Mark Powell
 
Floating solar pv
Floating solar pvFloating solar pv
Floating solar pv
vikaspanch
 

Similar to Marius Soare Project Portfolio Solar Farms (20)

Floating solar ppt
Floating solar pptFloating solar ppt
Floating solar ppt
 
Solar PV energy principles part 1
Solar PV energy principles part 1Solar PV energy principles part 1
Solar PV energy principles part 1
 
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
 
Solar PV Energy Principles
Solar PV Energy PrinciplesSolar PV Energy Principles
Solar PV Energy Principles
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
Ashok solar power systems pvt.ltd pune
Ashok solar power systems pvt.ltd puneAshok solar power systems pvt.ltd pune
Ashok solar power systems pvt.ltd pune
 
Vsquare solar systems pune
Vsquare solar systems puneVsquare solar systems pune
Vsquare solar systems pune
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
solar power tower
solar power towersolar power tower
solar power tower
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdf
 
Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...
 
Go Solar Solutions
Go Solar SolutionsGo Solar Solutions
Go Solar Solutions
 
Go Solar
Go SolarGo Solar
Go Solar
 
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
 
solarmobilechargerff-170807104920 (3).pdf
solarmobilechargerff-170807104920 (3).pdfsolarmobilechargerff-170807104920 (3).pdf
solarmobilechargerff-170807104920 (3).pdf
 
hiren pathak-CV
hiren pathak-CVhiren pathak-CV
hiren pathak-CV
 
jaycv3.2
jaycv3.2jaycv3.2
jaycv3.2
 
editedfloatingsolarpv-171002135444 (1).pptx
editedfloatingsolarpv-171002135444 (1).pptxeditedfloatingsolarpv-171002135444 (1).pptx
editedfloatingsolarpv-171002135444 (1).pptx
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017
 
Floating solar pv
Floating solar pvFloating solar pv
Floating solar pv
 

Marius Soare Project Portfolio Solar Farms

  • 2. • SITUATED NEAR WITNEY TOWN IN OXFORDSHIRE • DURATION: 01.02 – 25.04.2015 • 13 Mw POWER INSTALLED • SADEF STRUCTURE, BYD SOLAR MODULES OF 255 Wp • CENTRALIZED POWER CONNECTION: SMA INVERTERS DUTIES: Coordination the works for following categories of operations: 1.Ramming and concreting of the foundation piles 2.Mounting the Sadef structure 3.Mounting the BYD solar panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers WESTERFIELD SOLAR FARM UNITED KINGDOM
  • 4. SOLAR FARMS : POSITION ON GOOGLE EARTH (file Projects Google Earth.kmz attached) ROMANIAN SOLAR FARMS
  • 5. ‘LUKOIL’ SOLAR FARM – 9 Mw • SITUATED NEAR PLOIESTI TOWN IN PRAHOVA COUNTY • DURATION: 01.2014 - 03.2015 • 9 Mw POWER INSTALLED • ALUMIL STRUCTURE, REC SOLAR MODULES OF 255 Wp • CENTRALIZED POWER CONNECTION: POWER ONE INVERTERS DUTIES: Coordination the works for following categories of operations: 1.Ramming and concreting of the foundation piles 2.Mounting the Alumil structure 3.Mounting the REC solar panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers 7.Mounting the inverters 8.Supervising the testes and connection to the grid
  • 7. ‘MAXINENI’ SOLAR FARM – 5.5 Mw • SITUATED NEAR BRAILA TOWN IN BRAILA COUNTY • DURATION: 08.2013 - 10.2013 • 5.5 Mw POWER INSTALLED • ALUMIL STRUCTURE, PHONO SOLAR MODULES OF 240 Wp • CENTRALIZED POWER CONNECTION: ABB INVERTERS DUTIES: Coordination the works for following categories of operations: 1.Ramming the foundation piles 2.Mounting the Alumil structure 3.Mounting the PHONO SOLAR panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers 7.Mounting the inverters 8.Supervising the testes and connection to the grid
  • 9. ‘VIDELE’ SOLAR FARM – 2.2 Mw • SITUATED NEAR VIDELE TOWN IN GIURGIU COUNTY • DURATION: 10.2013 - 11.2013 • 2.2 Mw POWER INSTALLED • ALUMIL STRUCTURE, AXITEX SOLAR MODULES OF 245 Wp • CENTRALIZED POWER CONNECTION: ABB INVERTERS DUTIES: Coordination the works for following categories of operations: 1.Ramming the foundation piles 2.Mounting the Alumil structure 3.Mounting the AXITEX SOLAR panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers 7.Mounting the inverters 8.Supervising the testes and connection to the grid
  • 11. ‘SLOBOZIA’ SOLAR FARM – 1.9 Mw • SITUATED NEAR SLOBOZIA TOWN IN IALOMITA COUNTY • DURATION: 05.2013 - 07.2013 • 1.9 Mw POWER INSTALLED • ALUMIL STRUCTURE, CONERGY SOLAR MODULES OF 250 Wp • POWER CONNECTION: 65 pcs POWER ONE INVERTERS (27.6 Kv) DUTIES: Coordination the works for following categories of operations: 1.Ramming the foundation piles 2.Mounting the Alumil structure 3.Mounting the CONERGY SOLAR panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers 7.Mounting the inverters 8.Supervising the testes and connection to the grid
  • 13. ‘APRODEX’ SOLAR FARM – 0.50 Mw • SITUATED IN BUCHAREST, ROOFTOP MOUNTING STRUCTURE • DURATION: 08.2014 - 09.2014 • 0.50 Mw POWER INSTALLED • ALUMIL STRUCTURE, CONERGY SOLAR MODULES OF 250 Wp • POWER CONNECTION: 18 pcs POWER ONE INVERTERS (27.6 Kv) DUTIES: Coordination the works for following categories of operations: 1.Preparing the foundation connections on roof structure 2.Mounting the Alumil structure 3.Mounting the CONERGY SOLAR panels 4.Mounting the AC, DC and MV cables 5.Mounting the inverters 6.Supervising the testes and connection to the grid
  • 15. ‘LECHINTA’ SOLAR FARM – 5 Mw • SITUATED IN LECHINTA TOWN IN BISTRITA COUNTY • DURATION: 07.2012 - 11.2012 • 5 Mw POWER INSTALLED • ALUMIL STRUCTURE, SOLAR WORLD MODULES OF 235 Wp • POWER CONNECTION: POWER ONE INVERTERS DUTIES: Coordination the works for following categories of operations: 1.Ramming the foundation piles 2.Mounting the Alumil structure 3.Mounting the SOLAR WORLD panels 4.Mounting the AC, DC and MV cables 5.Foundations for the transformers 6.Mounting the transformers 7.Mounting the inverters 8.Supervising the testes and connection to the grid