Safety Conference 2016
Footer Text Date
MASH
IMPLEMENTATION AND
OBSTACLES FROM A
STATE PERSPECTIVE
Chris Lindsey, P.E.
Footer Text Date
Table of Contents
3
9-10
11
12
13
4-8Preparing for MASH Implementation
Plan for MASH Implementation
Research
Obstacles with Implementation
Questions?
1
2
3
4
5
Footer Text Date
Preparing for MASH Implementation
1. Create list of existing devices to test to MASH
2. Develop budget for testing
3. Securing funding for MASH testing of existing devices
4. Coordination efforts
4
Footer Text Date
Create List of Existing Devices to test to MASH
§  Factors to consider
–  Has anyone else tested the device?
–  Do we need the device?
–  Elimination of devices that were unlikely to pass MASH testing?
5
Footer Text Date
Develop Budget for testing
§  Consulted with TTI for evaluation of required tests for each device
–  Is the entire test matrix required?
–  Can we run worst case scenario and eliminate tests on similar devices?
§  Consulted with TTI for preliminary test costs
–  TTI agreed with an average estimated cost for Traffic, Maintenance and
Design tests based on previous test costs
–  TTI provided a more detailed estimate for the bridge railing tests due to
the construction and time involved in conducting these tests.
6
Footer Text Date
Securing funding for MASH testing
§  Option A- Request funding from administration specifically for testing of
existing devices to MASH
–  Option A is in progress. We have not secured funding as of yet
§  Option B- Use our existing research budget to propose MASH testing
–  Option B would limit eliminate our resources for innovative research in
roadside safety for the near future
7
Footer Text Date
Coordination Efforts
§  Although funding has not been secured, we are investigating possibilities
with CalTrans and Florida DOT currently.
–  We have traded lists of items we wish to test to MASH
–  CalTrans and TxDOT are both reviewing the lists to determine the common
items that we may be able to collaborate on.
–  Florida Contacted TxDOT about specific items that we may be able to
coordinate testing with.
–  Once funding is secured we will develop details of the collaboration
–  TxDOT is open to collaboration with other states
8
Footer Text Date
TxDOT MASH Implementation Plan
§  MASH Implementation Dates
–  TxDOT will adopt sunset dates mandated in the implementation
agreement. We will not adopt MASH early.
§  Hardware that has not been crash tested to NCHRP 350 or later?
–  Will replace with current approved device when encountered on a 3R or
4R project
–  Actively seeking out obsolete MBGF, transitions, and MBGF end
treatments used to protect bridge rail ends. We will replace hardware
when bridge rails require replacement as well.
§  NCHRP 350 tested devices and later?
–  TxDOT has yet to define “Damaged beyond repair”
9
Footer Text Date
Prioritizing Testing
§  TxDOT created plan, budget, and priority list based on approval of devices
with reduced test matrices when engineering judgement supports the
decision.
§  Factors considered for prioritization
–  Sunset dates
•  What if device fails testing?
•  Time it will take to conduct tests for each device
–  Cost of testing each device
–  Confidence in passing testing
–  What need does the device fill?
–  Proposed research
10
Footer Text Date
Research
§  MASH Coordination Effort- Roadside Pooled Fund
–  TxDOT will use this project to actively seek out partners with similar interests in
testing in an effort to reduce costs
–  TxDOT will also use this project as a vehicle to move closer to standardization.
§  NCHRP 20-7 Systemic Hardware Replacement Tool
–  TxDOT may use this as a cost based tool to evaluate which, if any, pre NCHRP 350
devices to replace.
§  NCHRP 20-7 Bridge Railing NCHRP 350 to MASH equivalency
–  Dependent upon the results of this project we may be able to eliminate one/or
more bridge rails from our to do list.
11
Footer Text Date
Obstacles with implementation
§  How do we implement changes into Maintenance contracts?
–  How do we include new hardware in existing maintenance contracts
–  How will contractors bid on new devices
§  Coordinating elimination of obsolete stock
§  Possibility of delaying innovative research
§  Addition of proprietary items to the QPL
–  Will we have enough time for in service evaluations
12
Footer Text Date
Questions?
Chris Lindsey, P.E.
Design Division
Phone Number- 512-416-2750
Christopher.Lindsey@Txdot.gov
Kenneth Mora, P.E.
Roadway Design Section Director
Design Division
Phone Number- 512-416-2678
Kenneth.Mora@txdot.gov
13

More Related Content

Similar to Manual for Assessing Safety Hardware (MASH) 2016 Implementation Process and Obstacles from a State Perspective

Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
Breaking the Gridlock in Marine Renewables
Breaking the Gridlock in Marine RenewablesBreaking the Gridlock in Marine Renewables
Breaking the Gridlock in Marine RenewablesCarolyn Elefant
 
Breaking the Gridlock in Marine Renewable Energy Development
Breaking the Gridlock in Marine Renewable Energy DevelopmentBreaking the Gridlock in Marine Renewable Energy Development
Breaking the Gridlock in Marine Renewable Energy DevelopmentCarolyn Elefant
 
5 june 7 nfstpp overview and relationship to ufd_carter
5  june 7 nfstpp overview and relationship to ufd_carter5  june 7 nfstpp overview and relationship to ufd_carter
5 june 7 nfstpp overview and relationship to ufd_carterleann_mays
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docxSUBHI7
 
DesignOps Skunk Works
DesignOps Skunk WorksDesignOps Skunk Works
DesignOps Skunk WorksRuss U
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1Bruce Carr
 
ASC Product Supply Network Modeling Handout (1)
ASC Product Supply Network Modeling Handout (1)ASC Product Supply Network Modeling Handout (1)
ASC Product Supply Network Modeling Handout (1)Andrew Lee
 
Sentinel Lessons Learned
Sentinel Lessons LearnedSentinel Lessons Learned
Sentinel Lessons LearnedH4Diadmin
 
Sentinel Lessons Learned H4D Stanford 2016
Sentinel Lessons Learned H4D Stanford 2016Sentinel Lessons Learned H4D Stanford 2016
Sentinel Lessons Learned H4D Stanford 2016Stanford University
 
HOCH,_Randall_E_2
HOCH,_Randall_E_2HOCH,_Randall_E_2
HOCH,_Randall_E_2Randy Hoch
 
Seven Degrees Presentation for 2015 ICEAA
Seven Degrees Presentation for 2015 ICEAASeven Degrees Presentation for 2015 ICEAA
Seven Degrees Presentation for 2015 ICEAAJames Lawlor
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxMaxytjClarkf
 
Complying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsComplying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsSergio A. Guerra
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...MECConference
 

Similar to Manual for Assessing Safety Hardware (MASH) 2016 Implementation Process and Obstacles from a State Perspective (20)

Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Breaking the Gridlock in Marine Renewables
Breaking the Gridlock in Marine RenewablesBreaking the Gridlock in Marine Renewables
Breaking the Gridlock in Marine Renewables
 
Breaking the Gridlock in Marine Renewable Energy Development
Breaking the Gridlock in Marine Renewable Energy DevelopmentBreaking the Gridlock in Marine Renewable Energy Development
Breaking the Gridlock in Marine Renewable Energy Development
 
5 june 7 nfstpp overview and relationship to ufd_carter
5  june 7 nfstpp overview and relationship to ufd_carter5  june 7 nfstpp overview and relationship to ufd_carter
5 june 7 nfstpp overview and relationship to ufd_carter
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
 
DesignOps Skunk Works
DesignOps Skunk WorksDesignOps Skunk Works
DesignOps Skunk Works
 
Challenges for EPD implementation
Challenges for EPD implementationChallenges for EPD implementation
Challenges for EPD implementation
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1
 
ASC Product Supply Network Modeling Handout (1)
ASC Product Supply Network Modeling Handout (1)ASC Product Supply Network Modeling Handout (1)
ASC Product Supply Network Modeling Handout (1)
 
Sentinel Lessons Learned
Sentinel Lessons LearnedSentinel Lessons Learned
Sentinel Lessons Learned
 
Sentinel Lessons Learned H4D Stanford 2016
Sentinel Lessons Learned H4D Stanford 2016Sentinel Lessons Learned H4D Stanford 2016
Sentinel Lessons Learned H4D Stanford 2016
 
HOCH,_Randall_E_2
HOCH,_Randall_E_2HOCH,_Randall_E_2
HOCH,_Randall_E_2
 
Seven Degrees Presentation for 2015 ICEAA
Seven Degrees Presentation for 2015 ICEAASeven Degrees Presentation for 2015 ICEAA
Seven Degrees Presentation for 2015 ICEAA
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docx
 
Complying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsComplying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 Designations
 
DDMRP Capacity Scheduling
DDMRP Capacity SchedulingDDMRP Capacity Scheduling
DDMRP Capacity Scheduling
 
Dd capacity scheduling
Dd capacity schedulingDd capacity scheduling
Dd capacity scheduling
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
 
Federal perspective from the Federal Highway Administration
Federal perspective from the Federal Highway AdministrationFederal perspective from the Federal Highway Administration
Federal perspective from the Federal Highway Administration
 

More from Texas A&M Transportation Institute

The Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemThe Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemTexas A&M Transportation Institute
 
Texas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute
 

More from Texas A&M Transportation Institute (20)

When Your Urban Core Arrives
When Your Urban Core Arrives When Your Urban Core Arrives
When Your Urban Core Arrives
 
Methods to Measure & Monitor Pedestrian Travel
Methods to Measure & Monitor Pedestrian TravelMethods to Measure & Monitor Pedestrian Travel
Methods to Measure & Monitor Pedestrian Travel
 
Pedestrian Safety in North Texas
Pedestrian Safety in North Texas Pedestrian Safety in North Texas
Pedestrian Safety in North Texas
 
TTI's Visibility Laboratory
TTI's Visibility LaboratoryTTI's Visibility Laboratory
TTI's Visibility Laboratory
 
Truck Platooning at TTI
Truck Platooning at TTI Truck Platooning at TTI
Truck Platooning at TTI
 
The Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination SystemThe Transportation Revenue Estimator and Needs Determination System
The Transportation Revenue Estimator and Needs Determination System
 
Travel Forecasting Program
Travel Forecasting Program Travel Forecasting Program
Travel Forecasting Program
 
Transportation Planning
Transportation Planning Transportation Planning
Transportation Planning
 
Transit Mobility Program at TTI
Transit Mobility Program at TTI Transit Mobility Program at TTI
Transit Mobility Program at TTI
 
Driving Simulator Facilities at TTI
Driving Simulator Facilities at TTI Driving Simulator Facilities at TTI
Driving Simulator Facilities at TTI
 
Sediment and Erosion Control (SEC) Laboratory
Sediment and Erosion Control (SEC) Laboratory Sediment and Erosion Control (SEC) Laboratory
Sediment and Erosion Control (SEC) Laboratory
 
Texas A&M University System - RELLIS Campus
Texas A&M University System - RELLIS CampusTexas A&M University System - RELLIS Campus
Texas A&M University System - RELLIS Campus
 
Multimodal Freight Program
Multimodal Freight Program Multimodal Freight Program
Multimodal Freight Program
 
Public Engagement Planning
Public Engagement PlanningPublic Engagement Planning
Public Engagement Planning
 
I-35 Corridor Project in Texas
I-35 Corridor Project in Texas I-35 Corridor Project in Texas
I-35 Corridor Project in Texas
 
Intelligent Transportation Systems (ITS) Research at TTI
Intelligent Transportation Systems (ITS) Research at TTIIntelligent Transportation Systems (ITS) Research at TTI
Intelligent Transportation Systems (ITS) Research at TTI
 
TTI Facilities for Human Factors Research
TTI Facilities for Human Factors ResearchTTI Facilities for Human Factors Research
TTI Facilities for Human Factors Research
 
Human Factors at TTI
Human Factors at TTIHuman Factors at TTI
Human Factors at TTI
 
Texas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary BrochureTexas A&M Transportation Institute - 60th Anniversary Brochure
Texas A&M Transportation Institute - 60th Anniversary Brochure
 
TTI Aviation Research and Planning
TTI Aviation Research and PlanningTTI Aviation Research and Planning
TTI Aviation Research and Planning
 

Recently uploaded

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptNishitharanjan Rout
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonhttgc7rh9c
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxakanksha16arora
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesSHIVANANDaRV
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxCeline George
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 

Recently uploaded (20)

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Our Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdfOur Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdf
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 

Manual for Assessing Safety Hardware (MASH) 2016 Implementation Process and Obstacles from a State Perspective

  • 1. Footer Text Date Safety Conference 2016
  • 2. Footer Text Date MASH IMPLEMENTATION AND OBSTACLES FROM A STATE PERSPECTIVE Chris Lindsey, P.E.
  • 3. Footer Text Date Table of Contents 3 9-10 11 12 13 4-8Preparing for MASH Implementation Plan for MASH Implementation Research Obstacles with Implementation Questions? 1 2 3 4 5
  • 4. Footer Text Date Preparing for MASH Implementation 1. Create list of existing devices to test to MASH 2. Develop budget for testing 3. Securing funding for MASH testing of existing devices 4. Coordination efforts 4
  • 5. Footer Text Date Create List of Existing Devices to test to MASH §  Factors to consider –  Has anyone else tested the device? –  Do we need the device? –  Elimination of devices that were unlikely to pass MASH testing? 5
  • 6. Footer Text Date Develop Budget for testing §  Consulted with TTI for evaluation of required tests for each device –  Is the entire test matrix required? –  Can we run worst case scenario and eliminate tests on similar devices? §  Consulted with TTI for preliminary test costs –  TTI agreed with an average estimated cost for Traffic, Maintenance and Design tests based on previous test costs –  TTI provided a more detailed estimate for the bridge railing tests due to the construction and time involved in conducting these tests. 6
  • 7. Footer Text Date Securing funding for MASH testing §  Option A- Request funding from administration specifically for testing of existing devices to MASH –  Option A is in progress. We have not secured funding as of yet §  Option B- Use our existing research budget to propose MASH testing –  Option B would limit eliminate our resources for innovative research in roadside safety for the near future 7
  • 8. Footer Text Date Coordination Efforts §  Although funding has not been secured, we are investigating possibilities with CalTrans and Florida DOT currently. –  We have traded lists of items we wish to test to MASH –  CalTrans and TxDOT are both reviewing the lists to determine the common items that we may be able to collaborate on. –  Florida Contacted TxDOT about specific items that we may be able to coordinate testing with. –  Once funding is secured we will develop details of the collaboration –  TxDOT is open to collaboration with other states 8
  • 9. Footer Text Date TxDOT MASH Implementation Plan §  MASH Implementation Dates –  TxDOT will adopt sunset dates mandated in the implementation agreement. We will not adopt MASH early. §  Hardware that has not been crash tested to NCHRP 350 or later? –  Will replace with current approved device when encountered on a 3R or 4R project –  Actively seeking out obsolete MBGF, transitions, and MBGF end treatments used to protect bridge rail ends. We will replace hardware when bridge rails require replacement as well. §  NCHRP 350 tested devices and later? –  TxDOT has yet to define “Damaged beyond repair” 9
  • 10. Footer Text Date Prioritizing Testing §  TxDOT created plan, budget, and priority list based on approval of devices with reduced test matrices when engineering judgement supports the decision. §  Factors considered for prioritization –  Sunset dates •  What if device fails testing? •  Time it will take to conduct tests for each device –  Cost of testing each device –  Confidence in passing testing –  What need does the device fill? –  Proposed research 10
  • 11. Footer Text Date Research §  MASH Coordination Effort- Roadside Pooled Fund –  TxDOT will use this project to actively seek out partners with similar interests in testing in an effort to reduce costs –  TxDOT will also use this project as a vehicle to move closer to standardization. §  NCHRP 20-7 Systemic Hardware Replacement Tool –  TxDOT may use this as a cost based tool to evaluate which, if any, pre NCHRP 350 devices to replace. §  NCHRP 20-7 Bridge Railing NCHRP 350 to MASH equivalency –  Dependent upon the results of this project we may be able to eliminate one/or more bridge rails from our to do list. 11
  • 12. Footer Text Date Obstacles with implementation §  How do we implement changes into Maintenance contracts? –  How do we include new hardware in existing maintenance contracts –  How will contractors bid on new devices §  Coordinating elimination of obsolete stock §  Possibility of delaying innovative research §  Addition of proprietary items to the QPL –  Will we have enough time for in service evaluations 12
  • 13. Footer Text Date Questions? Chris Lindsey, P.E. Design Division Phone Number- 512-416-2750 Christopher.Lindsey@Txdot.gov Kenneth Mora, P.E. Roadway Design Section Director Design Division Phone Number- 512-416-2678 Kenneth.Mora@txdot.gov 13