1
Mahmoud Ahmed Aboelhassan
 Name ofFirm: Khatiband Alami
 Branch of Operation:Cairo Mohandessin
 Profession:Engineer
 MembershipinProfessional Societies:
 No.48/01967
 EgyptianEngineersSyndicate
 31/12/2016
 Qualifications
Mr. Mahmoud Ahmed has 3 years of experience as Environmental and civil engineer in
environmental and infrastructure projects located in Egypt, Iraq and Oman.
His responsibilities include:-
 The preparation of landfills master plans
 Planning and design of Landfill Cells, Calculation the Landfill cells capacities.
 Planninganddesignof urbanroads, Designof Profiles,Gradingworks, settingoutworks,
preparation of bill of quantities and specifications, preparation of design report and
Calculation of The Earthworks and lining system Quantities.
 Education
 2014 – Ongoing: M.Sc. In Civil Engineering - Highway Engineering, Minufiya University,
Egypt.
 2008 - 2013: Bachelorof Science inCivil Engineering, MinufiyaUniversity,Egypt.
 Additional Training / Certifications
 February 2005 – Marsh 2005: AutoCAD2D, EngineersSyndicate,Egypt
 February 2011 –: ICDL SN. EGY 000329174
 January 2014 – February 2014: Development of Thinking and Managerial Skills- Managerial
Approach- PathwaytoHigherEducation, Cairouniversity,Egypt
2
 Professional Experience
2015 – Present: Khatib and Alami – Mohandessin- Egypt
2015-present: Engineer
2015-2016 Al Sowaydra wastewater treatment plant – Saudi Arabia.
The project constituted of studies, detailed design and tender documents for
Waste Water treatmentPlantStage 1 – Capacity6000 m3/day.
Client: Ministry Of Water and Electricity- General Directorate For Water At Al-
MadinahAl-Mounawarah Region.
Role: Engineer
Duties:
 Urban Roads designduringConcept,PreliminaryanddetailedDesign
stages.
 Planning and design of urban roads, Design of Profiles, Grading ,Spot
levels, Setting out, Planning and design of intersections, Preparing
the BOQ and Finishingandrevisingdrawingsforsubmittal
2015 The ExtensionofMarba water treatment plant (Marba phase 3 )– Saudi Arabia.
The project constituted of studies, detailed design and tender documents for
watertreatmentPlantCapacity 50,000 m3/day.
The Medical city waste water treatment plant– Saudi Arabia.
The project constituted of studies, detailed design and tender documents for
Wastewater Treatment Plant Project in king Faisal Medical City Capacity 6500
m3/day.
Client: Ministry Of Water and Electricity- General Directorate For Water At Asir
Region.
Role: Engineer
Duties:
 Urban Roads designduringConcept,PreliminaryanddetailedDesign
stages.
 Planning and design of urban roads, Design of Profiles, Grading ,Spot
levels, Setting out, Planning and design of intersections, Preparing
the BOQ and Finishingandrevisingdrawingsforsubmittal
2015 Engineering,ProcurementandConstruction of Phase 2 of the Industrial
Waste Handling and Treatment Facility Porposal – Oman
The IWTF will be implementedinphasesasshownbelow
- Phase 0 Temporarystorage of waste inLiwa,existing(establishedin2007)
- Phase 1 Temporarystorage for slag,operational 2015
- Phase 2 Slag reclamation, approx. 12 mill m3, Industrial waste Landfill, 3 mill
m3, Solidification plant 100,000 t/y, Storage Facility, operational beginning
2016
3
- Phase 3 Industrial Waste Treatment facility incl. all infrastructure, reception
facilities, storage, laboratory, Physical/Chemical Treatment 1000 t/y, drum
emptying and pre-treatment, tank farm, oil recycling facility 5,000 t/y, facility
for highlytoxicwaste,Thermal Treatmentplant50,000 t/y
DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN
KHASAB MUSANDAMGOVERNORATE Proposal – Oman
Design, Procurement and Construction of municipal solid waste cell with
capacitymore than1,000,000 m3
and EvaporationPondwithcapacity5,000 m3
DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN
IBRI Al-DHAHIRAH GOVERNORATE Proposal – Oman
Design, Procurement and Construction of municipal solid waste cell with
capacity more than 1,000,000 m3
, Evaporation Pond with capacity 5,000 m3
and otherFacility
Client:TeejanTrading& ContractingCompany
Ownedby: OmanEnvironmental Services HoldingCompanyS.A.O.C(be’ah)
Role: Engineer
Duties:
 Participatingin LandfilldesignConceptandPreliminarystages.
 Planninganddesignof Landfill Cells,CalculationThe Landfill cells
capacities,Grading,Spot levels,CalculationThe Earthworks and
liningsystemQuantities,Preparingthe BOQ andFinishingand
revisingdrawings andreports forsubmittal
2015-present Solid Waste Management Plan for Al Dhaid Park. Al Sharjah , United Arab
Emarites
Al Dhaid Park is a protected area comprises of 1690 ha, safari park in the south-
eastern corner of the site, recreational area, administration area and animals
nurseryandcages.
Client: GOVERNMENTOF SHARJAH.
Role:Engineer
Duties:
 Participatingin the solidwaste management plan
 Estimationof solidwaste generationrates.
 Managementplanof solidwaste collectionfromvariousschedule
areas, selectingof the propersolidwaste collection bins.
 Estimationof solidwaste composition.
 Temporarystorage area designrequirements andFinal
destinationof the collected waste
4
2016 Waste MnagementPlan – Acacia Avenue,Riyadh,Saudi Arabia.
Design and studies of Waste Management System for Acacia Avenue, new
residentialcompoundinRiyadh –SAUDIARABIA.
The project constituted of studies, detailed design and tender documents for
Waste Management Plan, collection, separate collection for recyclables,
workshopbuilding,washingunit,andstreetsweeping.
Client:
Role: Engineer
Duties:
 Assistingin the following:-
 Preparingprojectmanagementplan,time scheduleandquality.
 Preparing several alternatives in order to select the best one from
technical andeconomical pointof view.
2016 King salman Center,Riyadh, Saudi Arabia
Project consists of administration and educational building, and multiple story
parking.Solidwaste managementplanispartof designpackage.
Client:
Role:Engineer
Duties:
 Participatingin Waste calculation,binsizinganddistribution,refrigerated
kitchenwaste storage andbincalculations
2016 Solid Waste Mangement Plan for Zahia Shopping Center- Al Sharjah , United
Arab Emarites
The project comprises the development of Al Zahia City Center 137,000 m2
as part
of Al Zahia Development in Sharjah. The project is a new MAF retail mall that is
expectedtoattract local residentsandvisitorsof Sharjah.
Client: MAJIDAL FUTTAIM.
Role:Engineer
Duties:
 Participatinginsolidwaste managementreport
 Estimationof solidwaste generationrates.
 Managementplanof solidwaste collectionfromvariousschedule
areas, selectingof the propersolidwaste collection bins.
 Estimationof solidwaste composition.
5
2014 –2015: Chemonics- Egypt
Engineer
2014-2015 DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN
THUMRAYT – Oman
Detail Design, Procurement and Construction of municipal solid waste cell with
capacity more than 2,000,000 m3
, Evaporation Pond with capacity 5,000 m3
and
otherFacility
Client:OmanEnvironmental ServicesHoldingCompanyS.A.O.C(be’ah)
Role:Engineer
Duties:
 Participatingin Landfilldetaildesignstages.
 Designof Landfill Cells,CalculationThe Landfill cellscapacities,
Grading, Spot levels,CalculationThe Earthworksandlining
systemQuantities,Preparingthe BOQ andFinishingandrevising
drawings andreports for submittal
 Urban Roads designduringConcept,PreliminaryanddetailedDesign
stages.
 Planninganddesignof urbanroads,Designof Profiles, Grading
,Spotlevels,Settingout, Planninganddesignof intersections,
Preparingthe BOQand Finishingandrevisingdrawingsfor
submittal
2014-2015 PRELIMINARY DESIGN AND TENDER DOCUMENT OF AN ENGINEERED SANITARY
LANDFILL IN KARBLAA – IRAQ
Preliminary Design and Tender document of municipal solid waste two cell with
capacity more than 10,000,000 m3
, Evaporation Pond with capacity 5,000 m3
and
leachate TreatmentPlant
Client:The Ministryof MunicipalitiesandPublicWorks - Iraq
Role:Engineer
Duties:
 Participatingin LandfilldesignConceptand Preliminary stages.
 Planninganddesignof Landfill Cells,CalculationThe Landfill cells
capacities,Grading,Spot levels,CalculationThe Earthworksand
liningsystemQuantities,Preparingthe BOQ andFinishingand
revisingdrawings andreports forsubmittal
 Urban Roads design duringConcept, PreliminaryanddetailedDesign
stages.
 Planninganddesignof urbanroads,Designof Profiles, Grading
,Spotlevels,Settingout, Planninganddesignof intersections,
Preparingthe BOQand Finishingandrevisingdrawingsfor
submittal
6
2014-2015 Preliminary Design of El- Khatarah Sanitary Landfill, and tender Documents,
El- Sharqya Governorate in Egypt; which consistsof :
Preliminary Design and Tender document of municipal solid waste, two cells with
capacitymore than1,000,000 m3
,EvaporationPond5,000 m3
capacity.
Client: El- SharqyaGovernorate-inEgypt
Role:SanitaryLandfill Engineer
Duties:
 Participatinginthe Preliminarydesignandmasterplanningof Landfill
site.
 Calculation the Landfill cellscapacities,preparationof Profiles,
Grading, Spotlevelsand Preparingthe BOQof The Earthworksand
liningsystemQuantities.
 Urban Roads design duringConcept, PreliminaryanddetailedDesign
stages.
 Planninganddesignof urbanroads,Designof Profiles, Grading
,Spotlevels,Settingout, Planninganddesignof intersections,
Preparingthe BOQand Finishingandrevisingdrawingsfor
submittal
 SupplementaryInformation
ComputerSkills
 AutoCAD
 AutoCADCIVIL3D
 Office XP(Word/Excel/PowerPoint)
 GLOBAL MAPPER
 Languages
Reading Speaking Writing
Arabic Excellent Excellent Excellent
English Good Good Good

MAHMOUD ABOELHASSAN CV 2016

  • 1.
    1 Mahmoud Ahmed Aboelhassan Name ofFirm: Khatiband Alami  Branch of Operation:Cairo Mohandessin  Profession:Engineer  MembershipinProfessional Societies:  No.48/01967  EgyptianEngineersSyndicate  31/12/2016  Qualifications Mr. Mahmoud Ahmed has 3 years of experience as Environmental and civil engineer in environmental and infrastructure projects located in Egypt, Iraq and Oman. His responsibilities include:-  The preparation of landfills master plans  Planning and design of Landfill Cells, Calculation the Landfill cells capacities.  Planninganddesignof urbanroads, Designof Profiles,Gradingworks, settingoutworks, preparation of bill of quantities and specifications, preparation of design report and Calculation of The Earthworks and lining system Quantities.  Education  2014 – Ongoing: M.Sc. In Civil Engineering - Highway Engineering, Minufiya University, Egypt.  2008 - 2013: Bachelorof Science inCivil Engineering, MinufiyaUniversity,Egypt.  Additional Training / Certifications  February 2005 – Marsh 2005: AutoCAD2D, EngineersSyndicate,Egypt  February 2011 –: ICDL SN. EGY 000329174  January 2014 – February 2014: Development of Thinking and Managerial Skills- Managerial Approach- PathwaytoHigherEducation, Cairouniversity,Egypt
  • 2.
    2  Professional Experience 2015– Present: Khatib and Alami – Mohandessin- Egypt 2015-present: Engineer 2015-2016 Al Sowaydra wastewater treatment plant – Saudi Arabia. The project constituted of studies, detailed design and tender documents for Waste Water treatmentPlantStage 1 – Capacity6000 m3/day. Client: Ministry Of Water and Electricity- General Directorate For Water At Al- MadinahAl-Mounawarah Region. Role: Engineer Duties:  Urban Roads designduringConcept,PreliminaryanddetailedDesign stages.  Planning and design of urban roads, Design of Profiles, Grading ,Spot levels, Setting out, Planning and design of intersections, Preparing the BOQ and Finishingandrevisingdrawingsforsubmittal 2015 The ExtensionofMarba water treatment plant (Marba phase 3 )– Saudi Arabia. The project constituted of studies, detailed design and tender documents for watertreatmentPlantCapacity 50,000 m3/day. The Medical city waste water treatment plant– Saudi Arabia. The project constituted of studies, detailed design and tender documents for Wastewater Treatment Plant Project in king Faisal Medical City Capacity 6500 m3/day. Client: Ministry Of Water and Electricity- General Directorate For Water At Asir Region. Role: Engineer Duties:  Urban Roads designduringConcept,PreliminaryanddetailedDesign stages.  Planning and design of urban roads, Design of Profiles, Grading ,Spot levels, Setting out, Planning and design of intersections, Preparing the BOQ and Finishingandrevisingdrawingsforsubmittal 2015 Engineering,ProcurementandConstruction of Phase 2 of the Industrial Waste Handling and Treatment Facility Porposal – Oman The IWTF will be implementedinphasesasshownbelow - Phase 0 Temporarystorage of waste inLiwa,existing(establishedin2007) - Phase 1 Temporarystorage for slag,operational 2015 - Phase 2 Slag reclamation, approx. 12 mill m3, Industrial waste Landfill, 3 mill m3, Solidification plant 100,000 t/y, Storage Facility, operational beginning 2016
  • 3.
    3 - Phase 3Industrial Waste Treatment facility incl. all infrastructure, reception facilities, storage, laboratory, Physical/Chemical Treatment 1000 t/y, drum emptying and pre-treatment, tank farm, oil recycling facility 5,000 t/y, facility for highlytoxicwaste,Thermal Treatmentplant50,000 t/y DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN KHASAB MUSANDAMGOVERNORATE Proposal – Oman Design, Procurement and Construction of municipal solid waste cell with capacitymore than1,000,000 m3 and EvaporationPondwithcapacity5,000 m3 DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN IBRI Al-DHAHIRAH GOVERNORATE Proposal – Oman Design, Procurement and Construction of municipal solid waste cell with capacity more than 1,000,000 m3 , Evaporation Pond with capacity 5,000 m3 and otherFacility Client:TeejanTrading& ContractingCompany Ownedby: OmanEnvironmental Services HoldingCompanyS.A.O.C(be’ah) Role: Engineer Duties:  Participatingin LandfilldesignConceptandPreliminarystages.  Planninganddesignof Landfill Cells,CalculationThe Landfill cells capacities,Grading,Spot levels,CalculationThe Earthworks and liningsystemQuantities,Preparingthe BOQ andFinishingand revisingdrawings andreports forsubmittal 2015-present Solid Waste Management Plan for Al Dhaid Park. Al Sharjah , United Arab Emarites Al Dhaid Park is a protected area comprises of 1690 ha, safari park in the south- eastern corner of the site, recreational area, administration area and animals nurseryandcages. Client: GOVERNMENTOF SHARJAH. Role:Engineer Duties:  Participatingin the solidwaste management plan  Estimationof solidwaste generationrates.  Managementplanof solidwaste collectionfromvariousschedule areas, selectingof the propersolidwaste collection bins.  Estimationof solidwaste composition.  Temporarystorage area designrequirements andFinal destinationof the collected waste
  • 4.
    4 2016 Waste MnagementPlan– Acacia Avenue,Riyadh,Saudi Arabia. Design and studies of Waste Management System for Acacia Avenue, new residentialcompoundinRiyadh –SAUDIARABIA. The project constituted of studies, detailed design and tender documents for Waste Management Plan, collection, separate collection for recyclables, workshopbuilding,washingunit,andstreetsweeping. Client: Role: Engineer Duties:  Assistingin the following:-  Preparingprojectmanagementplan,time scheduleandquality.  Preparing several alternatives in order to select the best one from technical andeconomical pointof view. 2016 King salman Center,Riyadh, Saudi Arabia Project consists of administration and educational building, and multiple story parking.Solidwaste managementplanispartof designpackage. Client: Role:Engineer Duties:  Participatingin Waste calculation,binsizinganddistribution,refrigerated kitchenwaste storage andbincalculations 2016 Solid Waste Mangement Plan for Zahia Shopping Center- Al Sharjah , United Arab Emarites The project comprises the development of Al Zahia City Center 137,000 m2 as part of Al Zahia Development in Sharjah. The project is a new MAF retail mall that is expectedtoattract local residentsandvisitorsof Sharjah. Client: MAJIDAL FUTTAIM. Role:Engineer Duties:  Participatinginsolidwaste managementreport  Estimationof solidwaste generationrates.  Managementplanof solidwaste collectionfromvariousschedule areas, selectingof the propersolidwaste collection bins.  Estimationof solidwaste composition.
  • 5.
    5 2014 –2015: Chemonics-Egypt Engineer 2014-2015 DESIGN AND CONSTRUCTION OF AN ENGINEERED SANITARY LANDFILL IN THUMRAYT – Oman Detail Design, Procurement and Construction of municipal solid waste cell with capacity more than 2,000,000 m3 , Evaporation Pond with capacity 5,000 m3 and otherFacility Client:OmanEnvironmental ServicesHoldingCompanyS.A.O.C(be’ah) Role:Engineer Duties:  Participatingin Landfilldetaildesignstages.  Designof Landfill Cells,CalculationThe Landfill cellscapacities, Grading, Spot levels,CalculationThe Earthworksandlining systemQuantities,Preparingthe BOQ andFinishingandrevising drawings andreports for submittal  Urban Roads designduringConcept,PreliminaryanddetailedDesign stages.  Planninganddesignof urbanroads,Designof Profiles, Grading ,Spotlevels,Settingout, Planninganddesignof intersections, Preparingthe BOQand Finishingandrevisingdrawingsfor submittal 2014-2015 PRELIMINARY DESIGN AND TENDER DOCUMENT OF AN ENGINEERED SANITARY LANDFILL IN KARBLAA – IRAQ Preliminary Design and Tender document of municipal solid waste two cell with capacity more than 10,000,000 m3 , Evaporation Pond with capacity 5,000 m3 and leachate TreatmentPlant Client:The Ministryof MunicipalitiesandPublicWorks - Iraq Role:Engineer Duties:  Participatingin LandfilldesignConceptand Preliminary stages.  Planninganddesignof Landfill Cells,CalculationThe Landfill cells capacities,Grading,Spot levels,CalculationThe Earthworksand liningsystemQuantities,Preparingthe BOQ andFinishingand revisingdrawings andreports forsubmittal  Urban Roads design duringConcept, PreliminaryanddetailedDesign stages.  Planninganddesignof urbanroads,Designof Profiles, Grading ,Spotlevels,Settingout, Planninganddesignof intersections, Preparingthe BOQand Finishingandrevisingdrawingsfor submittal
  • 6.
    6 2014-2015 Preliminary Designof El- Khatarah Sanitary Landfill, and tender Documents, El- Sharqya Governorate in Egypt; which consistsof : Preliminary Design and Tender document of municipal solid waste, two cells with capacitymore than1,000,000 m3 ,EvaporationPond5,000 m3 capacity. Client: El- SharqyaGovernorate-inEgypt Role:SanitaryLandfill Engineer Duties:  Participatinginthe Preliminarydesignandmasterplanningof Landfill site.  Calculation the Landfill cellscapacities,preparationof Profiles, Grading, Spotlevelsand Preparingthe BOQof The Earthworksand liningsystemQuantities.  Urban Roads design duringConcept, PreliminaryanddetailedDesign stages.  Planninganddesignof urbanroads,Designof Profiles, Grading ,Spotlevels,Settingout, Planninganddesignof intersections, Preparingthe BOQand Finishingandrevisingdrawingsfor submittal  SupplementaryInformation ComputerSkills  AutoCAD  AutoCADCIVIL3D  Office XP(Word/Excel/PowerPoint)  GLOBAL MAPPER  Languages Reading Speaking Writing Arabic Excellent Excellent Excellent English Good Good Good