Objective: Challenging position in which I can apply my profound technical experience in construction projects.
I enclose my C.V. for your kind consideration and would like to state that I have acquired a tremendous experience in
the field of Technical office during my last 13 years of service with different companies.
I believe that my education and professional experience will give me the advantage and the added confidence to
effectively contribute to the organization.
I characterized myself as an enthusiastic, mature, hard working and diplomatic team player, always thriving for
excellence.
Position: Senior Civil Technical Office Engineer
Reports to the Technical Projects Manager and contact with other Department Superintendents, Division and
Department Managers.
Main Accountabilities:
• Plan, control and co-ordinate the office engineering activities to ensure that the company objectives are fully
met and inline with the standard practices.
• Check, review structural system, model, design concepts and design drawings.
• To participate, supervise, draft and review the detailed drawings such as concrete formwork, steel
reinforcement , steel structures, bar bending list, building coordination between Architectural, Structural,
Plumbing, HVAC & Electrical activities, infrastructure coordination between pipes & cables and leveling of
networks, 3D modeling, isometric based on approved process schemes for finalization of executed projects.
Also responsible for method of statement, specification development and as-built updating of documents
/drawings after completion of the modifications.
• To participate and supervise the design check/review for the concrete and steel structures(main and secondary
items)
• In-charge of Drawing, Documentation and Technical Library to ensure that drawing, record-keeping,
cataloguing moreover, filing activities are efficiently performed, that engineering documents are properly
referenced and stored and that library of such documents, manuals and reference material on design and
equipment is instituted and maintained.
• Ensure updating of documents and drawings to as-built status. Also to control issue / return of various
standards and reference books, magazines, copies of drawings, manuals, data sheets, technical specifications,
as well as CDs.
• Support development of scope of works, Assist Cost Engineer/Planning Engineer in cost estimation and
quantities.
• Co-ordinate for document updating for new Projects and modifications handled by those divisions and co-
ordinate and receive required deliverables for the new projects from the Major projects division.
• Research the specifications and test requirements to facilitate procurement, Analyzes technical data, designs,
preliminary specifications, manufacturing limitations, supplier facilities, and availability of parts and equipment.
• Consults with engineering personnel to establish performance criteria and specifications for manufacturing and
testing, Investigates potential suppliers and recommends those most desirable, Advises company personnel,
suppliers, and customers of nature and function of parts and equipment, Interviews supplier representatives
regarding specifications, costs, inspection, and similar problems relating to parts and equipment.
1 of 6
• Arranges and participates in conferences between suppliers and engineers, purchasers, inspectors, and other
company personnel to facilitate material inspection, substitution, standardization, rework, utilization, and
economical procurement of parts and equipment installed or related products.
Main Challenges:
• To improve the quality of drawing ‘as building’ by developing better registration, tracking and record systems given
the current systems are inadequate.
Yours Faithfully,
Muhamed Madian
C.V.C.V.
Name: Muhamad EL-Sayed Muhamad Madian
Date of Birth: 16.11.1980
Place of Birth: Port Said – Egypt
Nationality: Egyptian
Sex: Male
Marital Status: Married
Address: Egypt-Port Said- El Zohour District- El Forat Block, Entrance No.1- Flat No.1
Phone Number: +2 (066) 325 400 5
Mobile Number: +966 53 64 74 129
E-Mail: M_MADIAN@YAHOO.COM
Driving License: No. 95764 (Egyptian Private) & 2345034959 (Saudi)
Graduation Qualifications:
Civil Engineering Bachelor May (2001-2002); Accumulative Grade (Good)(Good)
Suez Canal University
Graduating Project Analysis & Design of Steel StructureAnalysis & Design of Steel Structure (Gantry Crane);(Gantry Crane); Grade (Excellent)(Excellent)
Engineering Syndicate Membership:
Egyptian No. Of Membership: 25/2122 (Civil Department)
Saudi No. Of Membership: 126171 (Civil Department)
Military Services: Exempted
Other Engineering Courses:
1) Survey CourseSurvey Course of the Cabinet Council in Egyptian General Survey Authority
2) Analysis of Concrete & Steel Structure using SAP2000SAP2000
3) Construction Planning using PrimaveraPrimavera
4)4) Safety InductionSafety Induction of TAISEI CORPORATIONof TAISEI CORPORATION
5) Structural 3D modeling using Revit StructureRevit Structure
Computer fields:
Very Good user in Engineering Programs: AutoCAD, Revit Structure, AutoCAD Structural Detailing, Sap 2000,
Safe, Etabs
Good User for Programs under Windows: Word, Excel, PowerPoint, Outlook
Language:
Arabic (Mother Tongue)
English (Very Good)
International Standards:
• Aware with Egyptian Standard in Design of Reinforcement concrete and Steel Rebar Cutting and Bending
• Aware with Egyptian Standard in Design of Steel Structure
• Aware with British Standard in Steel Rebar Cutting and Bending (8666, 8110)
• Aware with American Standard in Steel Rebar Cutting and Bending (ACI 315)
• Aware with American Concrete Institute (ACI 318)
• Aware with American Institute of Steel Construction (AISC)
• Aware with Uniform Building Code (UBC 1997)
2 of 6
Work Experience:
1) From:
March 2013 up to Now
Location:
Headquarter, Jeddah, Saudi Arabia
Main Contractor:
Saudi Binladin Group – Rush Projects Division (RPD)Saudi Binladin Group – Rush Projects Division (RPD)
Project:
Ajiad Hospital & Hotel , Makah , KSA
Designer & Consultant:
Saudi Diyar Consultant
Description of the project:
 Forty Five Floors Hospital with Four Basements.
Position:
Senior Structural Technical Engineer
Responsibilities:
 Review the Structural drawings submittals such as Formwork, Reinforcement, and Builder Work.
 Co-ordination between the site requirements and shop drawing
 Co-ordination with other disciplines requirements, and subcontractors requirements
 Checking of Formwork, Steel Reinforcement Shop drawing
 Checking of Bar Bending List
 Check, review structural system, model, design concepts and design drawings
Cost:
U.S $530 Million
2) From:
December 2011 up to December 2012 (12 months)
Project:
Conversion of the second stage Az-zour South Gas Turbines to Combined Cycle Plant-CCGT2 (450MW), Az-Az-
zour, Kuwaitzour, Kuwait
Client:
Ministry of Electrical and Water-Power Station & Distillation Plant Projects (MEW) – State of KuwaitState of Kuwait
Design Manager:
The Koljian Corporation (TKC)
Structural Consultant:
Parsons Brinckerhoff International (PB)
Main Contractor:
Al-Ghanim International for Industrial Contracting, KuwaitAl-Ghanim International for Industrial Contracting, Kuwait
Description of the project:
 Power plant containing Steam Turbine Gas Building and service structures (EHV Cable Trench,
Electrical Container, Cooling Towers, CW Pump, Fore bay, LV Auxiliary Transformer, Unit
Auxiliary Transformer, Generator Transformer, Transformer Oil Connection Pit, Emergency DG
Skid, Generator Circuit Breaker, Cable/Pipe Bridge, Duct Bank & Electrical Pull Pits, DM Water
Storage Tank, Service Water Storage Tank, Chillers, Water Treatment Plant and Air Compressor,
Storm Water Drain, Plant Drainage, Sanitary Sewer, Stilling Water Basin and Water Pump,
Septic Tank & Percolating pit, HRSG/Stack, Boiler Blow down Pit, Stores, Turbine, Main Switch
Gear, Elevators, Control, CW Chlorination Plant, Annex to STG for workshop/Office )
Position:
Senior Civil Technical Engineer
Responsibilities:
 Following up the material take off with the specifications, substitution, supplying with the
procurement department
 Review and following up the Civil and Structural drawings submittals (Steel, Formwork,
Reinforcement, and Builder Work)
 Following up with the designer for the site requirements
 Co-ordination between the site requirements and shop drawing
 Co-ordination with the subcontractors for the site requirements
 Co-ordination with other disciplines(Architectural, Electrical and Mechanical) requirements
 Monitoring the execution of the terms and conditions of the contract throughout the
design and construction life cycle
3 of 6
 Monitoring the approved planning schedule and milestones and applying scope
verification
 Checking of Civil, Structural design drawings with the project specification
 Checking of Bar Bending List
 Check and Review Structural Design and Redesign if need
 Check the underground services co-ordination between the Infrastructure pipes & Cables and
Leveling of Networks
Cost:
U.S $1.2 Billion
3) From:
October 2009 up to November 2011 (26 months)
Location:
Headquarter, Jeddah, Saudi Arabia
Main Contractor:
Saudi Binladin Group – Rush Projects Division (RPD)Saudi Binladin Group – Rush Projects Division (RPD)
Project:
King Abdullah Financial District, Parcel 1.09, Riyadh, KSA
Design Manager:
PERKINS + WILL and Dar Al-Handasah
Structural Consultant:
Dar Al Riyadh Consultants
Structural Designer:
SKIDMORE, OWINGS & MERRILL, LLP (SOM)
Description of the project:
 Thirty Floors (135.00m x 72.00m by 138.00m Height) Tower with Five Basements.
Position:
Structural Engineer
Responsibilities: My duties include, but are not limited to the following
 Review the Structural drawings submittals such as Formwork, Reinforcement, and Builder Work
 Co-ordination between the site requirements and shop drawing
 Co-ordination with other disciplines requirements, and subcontractors requirements
 Monitoring the execution of the terms and conditions of the contract throughout the
design life cycle
 Monitoring the approved planning schedule and milestones and applying scope
verification
 Checking of Formwork, Steel Reinforcement Shop drawing
 Preparing and Checking of Bar Bending List
 Review Structural Design and Redesign if need
4) From:
March 2009 up to September 2009 (7 months)
Project:
Centralized Rebar Workshop, 6th
October City, Cairo, Egypt
Main Contractor:
Orascom Construction Industries (OCI)Orascom Construction Industries (OCI)
Description of the project:
 Workshop for Rebar Cutting and Bending
Position:
Technical Office Engineer
Responsibilities:
 Preparing and Checking of Steel Reinforcement Shop drawing
 Preparing and Checking of Bar Bending List
 Preparing the Time Schedule of the Projects and Production of the Workshop
 Following up the Fabricated Rebar Quantities and the Fabricated Rebar Shipping
5) From:
June 2007 up to February 2009 (21 months)
Project:
Down Town, Jebel Ali Zone-1, Block-2, Parcels MX01 TO MX04, Jebel Ali Free Zone, DUBAI, UAE
Client:
Limitless LLC Down Town, Jebel Ali, Dubai, United Arab Emirates
Municipality Supervision:
Jebel Ali Free Zone Authority (JAFZA)
Structural Consultant:
4 of 6
CASSIA & Partners Engineering Consultants
Project Manager:
Bovis Lend Lease
Main Contractor:
TAISEI CORPORATION,TAISEI CORPORATION, Dubai Branch, UAEDubai Branch, UAE
Description of the project:
 Thirty Floors (304.00m x 81.00m by 117.30m Height, Area about 24,000m2
) Tower, Demarcated
to Four Buildings Containing Podium, Offices, Apartments, Tunnels and Roof Pool.
Position:
Project Engineer
Responsibilities:
 Preparing and Checking of Concrete Dimension drawing
 Preparing and Checking of Steel Reinforcement drawing According to British Standard
 Preparing and Checking of Bar Bending List According to British Standard
 Preparing of Request for Information (RFI) during studying of the drawings
 Following up the Fabricated Rebar Supplying with the Subcontractor
Cost:
U.S $379 Million
6) From:
June 2006 to May 2007 (12 months)
Project:
Chaparral Missile Maintenance Facility- Wadi Houf, Egypt
Client:
Egyptian Ministry of Defense and US Agency for International Development (USAID)
Consultant:
US Army Corps of Engineers Transatlantic Programs Center (COE)
Main Contractor:
American International Contractors Inc. (AICI)American International Contractors Inc. (AICI)
Description of the project:
 Maintenance Building
 Missile Storage Magazine
 Two Steel Tanks
 Fire Pump Station
 Reinforced Concrete Fence (CMU)
 Road Pavement
Position:
Technical Office Engineer
Responsibilities:
 Preparing of As Built drawing
 Preparing of Shop drawing
 Take off for Steel Rebar and estimating wastage
 Preparing and Updating of Time Schedule
Cost:
U.S $2.5 Million
7) From:
September 2005 to February 2006 (6 months)
Project:
Two Complexes of villas at Al Gharafa-DOHA, QATAR
Client:
Sheikh: Mohamed Bin Eid Al -Thani
Consultant:
Arab Bureau for Consultants
Main Contractor:
Arabian Engineering Cont. & Trad. Co.Arabian Engineering Cont. & Trad. Co.
Description of the project:
 52 Villas, 2 Electrical Substations, 2 Septic Tanks, 2 Social Clubs, Masjid, Swimming Pool
Position:
In Technical Office in:
 Preparing of Bar Bending Schedules
 Preparation of Methods of Statement
 Preparing of Time and Resources Schedule
 Preparing of Invoices and Reports(Cash Flow, Progress report, Delay Report)
 Take off for Structural Activities (Concrete and Steel)
5 of 6
 Preparing of Shop drawings, Builder Work drawings
 Coordination of Infrastructure between pipes & Cables and Leveling of Networks
In Site in:
 Inspections for all Activities and it's Requests
Cost:
Q.R 16.5 Million
8) From:
March 2004 to August 2005 (18 months)
Project:
Port Said East Container Terminal & Service Buildings-Port Said, Egypt
Client:
Suez Canal Container Terminal (SCCT)
Consultant:
Posford – Haskoning – Pacer Consultants
Main Contractor:
Archirodon for Construction (Overseas) Co. S.AArchirodon for Construction (Overseas) Co. S.A.
Description of the project:
 Container Stacking Area including infrastructure (1200x550) m
 Concrete buildings such as Administration, Service, Workshop, Electrical Main Station, Sea
Water Pump Station, Substations, Amenities & Mosque
 Steel buildings such as Reefers, Workshop, Personnel Shelters & Gate Canopy
 Pre-cast Concrete such as Fence, Infrastructure Manholes
Position:
In Technical Office in:
 Preparing of Shop drawing, Builder Work drawing
 Buildings Coordination between Architectural, Structural, Plumbing, HVAC & Electrical Activities
 Infrastructure Coordination between pipes & Cables and Leveling of Networks
 Blocking out of Pre-cast Manholes
 Preparing and Updating of Time Schedule
In Site in:
 Construction of all Finishing Works of Workshop Building
 Construction of Aluminum Cladding (Flat and Corrugated Sheets)
 Construction of Punch List Items of the Buildings
Cost:
U.S $52.15 Million
9) From:
August 2002 to February 2004 (19 months)
Project:
Several Buildings & Towers
Main Office:
Art Center for Architecture and ConstructionsArt Center for Architecture and Constructions
Description of the project:
R.C. & Steel Design and preparation of Design Sheet and Construction Drawings for many Projects
Position:
Designer EngineerDesigner Engineer
Training Experience:
1. Training in El-Tameer Company for Engineering ConsultationsEl-Tameer Company for Engineering Consultations in project of General Authority for Building &
Housing in Construction of (57 blocks in A20 region & 31 blocks in B8 region in Port Said)
From 6/1998 to 9/1998 and from 6/1999 to 9/1999
2. Training in Consultant Group for Architecture & PlanningConsultant Group for Architecture & Planning in Design & Construction of a Tower in Saleh
Seleem land in Port Said
From 6/2000 to 9/2000
3. Training in Housing AuthorityHousing Authority in Construction of Factorial Powers building
From 6/2001 to 9/2001
Reference List:
Name Position Tel. / Email
Ayman Abbas QC/QA Manager (AICI) 0020127542854
Yusataka Araki Engineering Manager (TAISEI CORP.) 008109066555992
Yushiaki Takimoto Project Manager (TAISEI CORP.) 00971506403246
6 of 6
 Preparing of Shop drawings, Builder Work drawings
 Coordination of Infrastructure between pipes & Cables and Leveling of Networks
In Site in:
 Inspections for all Activities and it's Requests
Cost:
Q.R 16.5 Million
8) From:
March 2004 to August 2005 (18 months)
Project:
Port Said East Container Terminal & Service Buildings-Port Said, Egypt
Client:
Suez Canal Container Terminal (SCCT)
Consultant:
Posford – Haskoning – Pacer Consultants
Main Contractor:
Archirodon for Construction (Overseas) Co. S.AArchirodon for Construction (Overseas) Co. S.A.
Description of the project:
 Container Stacking Area including infrastructure (1200x550) m
 Concrete buildings such as Administration, Service, Workshop, Electrical Main Station, Sea
Water Pump Station, Substations, Amenities & Mosque
 Steel buildings such as Reefers, Workshop, Personnel Shelters & Gate Canopy
 Pre-cast Concrete such as Fence, Infrastructure Manholes
Position:
In Technical Office in:
 Preparing of Shop drawing, Builder Work drawing
 Buildings Coordination between Architectural, Structural, Plumbing, HVAC & Electrical Activities
 Infrastructure Coordination between pipes & Cables and Leveling of Networks
 Blocking out of Pre-cast Manholes
 Preparing and Updating of Time Schedule
In Site in:
 Construction of all Finishing Works of Workshop Building
 Construction of Aluminum Cladding (Flat and Corrugated Sheets)
 Construction of Punch List Items of the Buildings
Cost:
U.S $52.15 Million
9) From:
August 2002 to February 2004 (19 months)
Project:
Several Buildings & Towers
Main Office:
Art Center for Architecture and ConstructionsArt Center for Architecture and Constructions
Description of the project:
R.C. & Steel Design and preparation of Design Sheet and Construction Drawings for many Projects
Position:
Designer EngineerDesigner Engineer
Training Experience:
1. Training in El-Tameer Company for Engineering ConsultationsEl-Tameer Company for Engineering Consultations in project of General Authority for Building &
Housing in Construction of (57 blocks in A20 region & 31 blocks in B8 region in Port Said)
From 6/1998 to 9/1998 and from 6/1999 to 9/1999
2. Training in Consultant Group for Architecture & PlanningConsultant Group for Architecture & Planning in Design & Construction of a Tower in Saleh
Seleem land in Port Said
From 6/2000 to 9/2000
3. Training in Housing AuthorityHousing Authority in Construction of Factorial Powers building
From 6/2001 to 9/2001
Reference List:
Name Position Tel. / Email
Ayman Abbas QC/QA Manager (AICI) 0020127542854
Yusataka Araki Engineering Manager (TAISEI CORP.) 008109066555992
Yushiaki Takimoto Project Manager (TAISEI CORP.) 00971506403246
6 of 6

Madian CV_Sr Civil Structural Tech Eng

  • 1.
    Objective: Challenging positionin which I can apply my profound technical experience in construction projects. I enclose my C.V. for your kind consideration and would like to state that I have acquired a tremendous experience in the field of Technical office during my last 13 years of service with different companies. I believe that my education and professional experience will give me the advantage and the added confidence to effectively contribute to the organization. I characterized myself as an enthusiastic, mature, hard working and diplomatic team player, always thriving for excellence. Position: Senior Civil Technical Office Engineer Reports to the Technical Projects Manager and contact with other Department Superintendents, Division and Department Managers. Main Accountabilities: • Plan, control and co-ordinate the office engineering activities to ensure that the company objectives are fully met and inline with the standard practices. • Check, review structural system, model, design concepts and design drawings. • To participate, supervise, draft and review the detailed drawings such as concrete formwork, steel reinforcement , steel structures, bar bending list, building coordination between Architectural, Structural, Plumbing, HVAC & Electrical activities, infrastructure coordination between pipes & cables and leveling of networks, 3D modeling, isometric based on approved process schemes for finalization of executed projects. Also responsible for method of statement, specification development and as-built updating of documents /drawings after completion of the modifications. • To participate and supervise the design check/review for the concrete and steel structures(main and secondary items) • In-charge of Drawing, Documentation and Technical Library to ensure that drawing, record-keeping, cataloguing moreover, filing activities are efficiently performed, that engineering documents are properly referenced and stored and that library of such documents, manuals and reference material on design and equipment is instituted and maintained. • Ensure updating of documents and drawings to as-built status. Also to control issue / return of various standards and reference books, magazines, copies of drawings, manuals, data sheets, technical specifications, as well as CDs. • Support development of scope of works, Assist Cost Engineer/Planning Engineer in cost estimation and quantities. • Co-ordinate for document updating for new Projects and modifications handled by those divisions and co- ordinate and receive required deliverables for the new projects from the Major projects division. • Research the specifications and test requirements to facilitate procurement, Analyzes technical data, designs, preliminary specifications, manufacturing limitations, supplier facilities, and availability of parts and equipment. • Consults with engineering personnel to establish performance criteria and specifications for manufacturing and testing, Investigates potential suppliers and recommends those most desirable, Advises company personnel, suppliers, and customers of nature and function of parts and equipment, Interviews supplier representatives regarding specifications, costs, inspection, and similar problems relating to parts and equipment. 1 of 6
  • 2.
    • Arranges andparticipates in conferences between suppliers and engineers, purchasers, inspectors, and other company personnel to facilitate material inspection, substitution, standardization, rework, utilization, and economical procurement of parts and equipment installed or related products. Main Challenges: • To improve the quality of drawing ‘as building’ by developing better registration, tracking and record systems given the current systems are inadequate. Yours Faithfully, Muhamed Madian C.V.C.V. Name: Muhamad EL-Sayed Muhamad Madian Date of Birth: 16.11.1980 Place of Birth: Port Said – Egypt Nationality: Egyptian Sex: Male Marital Status: Married Address: Egypt-Port Said- El Zohour District- El Forat Block, Entrance No.1- Flat No.1 Phone Number: +2 (066) 325 400 5 Mobile Number: +966 53 64 74 129 E-Mail: M_MADIAN@YAHOO.COM Driving License: No. 95764 (Egyptian Private) & 2345034959 (Saudi) Graduation Qualifications: Civil Engineering Bachelor May (2001-2002); Accumulative Grade (Good)(Good) Suez Canal University Graduating Project Analysis & Design of Steel StructureAnalysis & Design of Steel Structure (Gantry Crane);(Gantry Crane); Grade (Excellent)(Excellent) Engineering Syndicate Membership: Egyptian No. Of Membership: 25/2122 (Civil Department) Saudi No. Of Membership: 126171 (Civil Department) Military Services: Exempted Other Engineering Courses: 1) Survey CourseSurvey Course of the Cabinet Council in Egyptian General Survey Authority 2) Analysis of Concrete & Steel Structure using SAP2000SAP2000 3) Construction Planning using PrimaveraPrimavera 4)4) Safety InductionSafety Induction of TAISEI CORPORATIONof TAISEI CORPORATION 5) Structural 3D modeling using Revit StructureRevit Structure Computer fields: Very Good user in Engineering Programs: AutoCAD, Revit Structure, AutoCAD Structural Detailing, Sap 2000, Safe, Etabs Good User for Programs under Windows: Word, Excel, PowerPoint, Outlook Language: Arabic (Mother Tongue) English (Very Good) International Standards: • Aware with Egyptian Standard in Design of Reinforcement concrete and Steel Rebar Cutting and Bending • Aware with Egyptian Standard in Design of Steel Structure • Aware with British Standard in Steel Rebar Cutting and Bending (8666, 8110) • Aware with American Standard in Steel Rebar Cutting and Bending (ACI 315) • Aware with American Concrete Institute (ACI 318) • Aware with American Institute of Steel Construction (AISC) • Aware with Uniform Building Code (UBC 1997) 2 of 6
  • 3.
    Work Experience: 1) From: March2013 up to Now Location: Headquarter, Jeddah, Saudi Arabia Main Contractor: Saudi Binladin Group – Rush Projects Division (RPD)Saudi Binladin Group – Rush Projects Division (RPD) Project: Ajiad Hospital & Hotel , Makah , KSA Designer & Consultant: Saudi Diyar Consultant Description of the project:  Forty Five Floors Hospital with Four Basements. Position: Senior Structural Technical Engineer Responsibilities:  Review the Structural drawings submittals such as Formwork, Reinforcement, and Builder Work.  Co-ordination between the site requirements and shop drawing  Co-ordination with other disciplines requirements, and subcontractors requirements  Checking of Formwork, Steel Reinforcement Shop drawing  Checking of Bar Bending List  Check, review structural system, model, design concepts and design drawings Cost: U.S $530 Million 2) From: December 2011 up to December 2012 (12 months) Project: Conversion of the second stage Az-zour South Gas Turbines to Combined Cycle Plant-CCGT2 (450MW), Az-Az- zour, Kuwaitzour, Kuwait Client: Ministry of Electrical and Water-Power Station & Distillation Plant Projects (MEW) – State of KuwaitState of Kuwait Design Manager: The Koljian Corporation (TKC) Structural Consultant: Parsons Brinckerhoff International (PB) Main Contractor: Al-Ghanim International for Industrial Contracting, KuwaitAl-Ghanim International for Industrial Contracting, Kuwait Description of the project:  Power plant containing Steam Turbine Gas Building and service structures (EHV Cable Trench, Electrical Container, Cooling Towers, CW Pump, Fore bay, LV Auxiliary Transformer, Unit Auxiliary Transformer, Generator Transformer, Transformer Oil Connection Pit, Emergency DG Skid, Generator Circuit Breaker, Cable/Pipe Bridge, Duct Bank & Electrical Pull Pits, DM Water Storage Tank, Service Water Storage Tank, Chillers, Water Treatment Plant and Air Compressor, Storm Water Drain, Plant Drainage, Sanitary Sewer, Stilling Water Basin and Water Pump, Septic Tank & Percolating pit, HRSG/Stack, Boiler Blow down Pit, Stores, Turbine, Main Switch Gear, Elevators, Control, CW Chlorination Plant, Annex to STG for workshop/Office ) Position: Senior Civil Technical Engineer Responsibilities:  Following up the material take off with the specifications, substitution, supplying with the procurement department  Review and following up the Civil and Structural drawings submittals (Steel, Formwork, Reinforcement, and Builder Work)  Following up with the designer for the site requirements  Co-ordination between the site requirements and shop drawing  Co-ordination with the subcontractors for the site requirements  Co-ordination with other disciplines(Architectural, Electrical and Mechanical) requirements  Monitoring the execution of the terms and conditions of the contract throughout the design and construction life cycle 3 of 6
  • 4.
     Monitoring theapproved planning schedule and milestones and applying scope verification  Checking of Civil, Structural design drawings with the project specification  Checking of Bar Bending List  Check and Review Structural Design and Redesign if need  Check the underground services co-ordination between the Infrastructure pipes & Cables and Leveling of Networks Cost: U.S $1.2 Billion 3) From: October 2009 up to November 2011 (26 months) Location: Headquarter, Jeddah, Saudi Arabia Main Contractor: Saudi Binladin Group – Rush Projects Division (RPD)Saudi Binladin Group – Rush Projects Division (RPD) Project: King Abdullah Financial District, Parcel 1.09, Riyadh, KSA Design Manager: PERKINS + WILL and Dar Al-Handasah Structural Consultant: Dar Al Riyadh Consultants Structural Designer: SKIDMORE, OWINGS & MERRILL, LLP (SOM) Description of the project:  Thirty Floors (135.00m x 72.00m by 138.00m Height) Tower with Five Basements. Position: Structural Engineer Responsibilities: My duties include, but are not limited to the following  Review the Structural drawings submittals such as Formwork, Reinforcement, and Builder Work  Co-ordination between the site requirements and shop drawing  Co-ordination with other disciplines requirements, and subcontractors requirements  Monitoring the execution of the terms and conditions of the contract throughout the design life cycle  Monitoring the approved planning schedule and milestones and applying scope verification  Checking of Formwork, Steel Reinforcement Shop drawing  Preparing and Checking of Bar Bending List  Review Structural Design and Redesign if need 4) From: March 2009 up to September 2009 (7 months) Project: Centralized Rebar Workshop, 6th October City, Cairo, Egypt Main Contractor: Orascom Construction Industries (OCI)Orascom Construction Industries (OCI) Description of the project:  Workshop for Rebar Cutting and Bending Position: Technical Office Engineer Responsibilities:  Preparing and Checking of Steel Reinforcement Shop drawing  Preparing and Checking of Bar Bending List  Preparing the Time Schedule of the Projects and Production of the Workshop  Following up the Fabricated Rebar Quantities and the Fabricated Rebar Shipping 5) From: June 2007 up to February 2009 (21 months) Project: Down Town, Jebel Ali Zone-1, Block-2, Parcels MX01 TO MX04, Jebel Ali Free Zone, DUBAI, UAE Client: Limitless LLC Down Town, Jebel Ali, Dubai, United Arab Emirates Municipality Supervision: Jebel Ali Free Zone Authority (JAFZA) Structural Consultant: 4 of 6
  • 5.
    CASSIA & PartnersEngineering Consultants Project Manager: Bovis Lend Lease Main Contractor: TAISEI CORPORATION,TAISEI CORPORATION, Dubai Branch, UAEDubai Branch, UAE Description of the project:  Thirty Floors (304.00m x 81.00m by 117.30m Height, Area about 24,000m2 ) Tower, Demarcated to Four Buildings Containing Podium, Offices, Apartments, Tunnels and Roof Pool. Position: Project Engineer Responsibilities:  Preparing and Checking of Concrete Dimension drawing  Preparing and Checking of Steel Reinforcement drawing According to British Standard  Preparing and Checking of Bar Bending List According to British Standard  Preparing of Request for Information (RFI) during studying of the drawings  Following up the Fabricated Rebar Supplying with the Subcontractor Cost: U.S $379 Million 6) From: June 2006 to May 2007 (12 months) Project: Chaparral Missile Maintenance Facility- Wadi Houf, Egypt Client: Egyptian Ministry of Defense and US Agency for International Development (USAID) Consultant: US Army Corps of Engineers Transatlantic Programs Center (COE) Main Contractor: American International Contractors Inc. (AICI)American International Contractors Inc. (AICI) Description of the project:  Maintenance Building  Missile Storage Magazine  Two Steel Tanks  Fire Pump Station  Reinforced Concrete Fence (CMU)  Road Pavement Position: Technical Office Engineer Responsibilities:  Preparing of As Built drawing  Preparing of Shop drawing  Take off for Steel Rebar and estimating wastage  Preparing and Updating of Time Schedule Cost: U.S $2.5 Million 7) From: September 2005 to February 2006 (6 months) Project: Two Complexes of villas at Al Gharafa-DOHA, QATAR Client: Sheikh: Mohamed Bin Eid Al -Thani Consultant: Arab Bureau for Consultants Main Contractor: Arabian Engineering Cont. & Trad. Co.Arabian Engineering Cont. & Trad. Co. Description of the project:  52 Villas, 2 Electrical Substations, 2 Septic Tanks, 2 Social Clubs, Masjid, Swimming Pool Position: In Technical Office in:  Preparing of Bar Bending Schedules  Preparation of Methods of Statement  Preparing of Time and Resources Schedule  Preparing of Invoices and Reports(Cash Flow, Progress report, Delay Report)  Take off for Structural Activities (Concrete and Steel) 5 of 6
  • 6.
     Preparing ofShop drawings, Builder Work drawings  Coordination of Infrastructure between pipes & Cables and Leveling of Networks In Site in:  Inspections for all Activities and it's Requests Cost: Q.R 16.5 Million 8) From: March 2004 to August 2005 (18 months) Project: Port Said East Container Terminal & Service Buildings-Port Said, Egypt Client: Suez Canal Container Terminal (SCCT) Consultant: Posford – Haskoning – Pacer Consultants Main Contractor: Archirodon for Construction (Overseas) Co. S.AArchirodon for Construction (Overseas) Co. S.A. Description of the project:  Container Stacking Area including infrastructure (1200x550) m  Concrete buildings such as Administration, Service, Workshop, Electrical Main Station, Sea Water Pump Station, Substations, Amenities & Mosque  Steel buildings such as Reefers, Workshop, Personnel Shelters & Gate Canopy  Pre-cast Concrete such as Fence, Infrastructure Manholes Position: In Technical Office in:  Preparing of Shop drawing, Builder Work drawing  Buildings Coordination between Architectural, Structural, Plumbing, HVAC & Electrical Activities  Infrastructure Coordination between pipes & Cables and Leveling of Networks  Blocking out of Pre-cast Manholes  Preparing and Updating of Time Schedule In Site in:  Construction of all Finishing Works of Workshop Building  Construction of Aluminum Cladding (Flat and Corrugated Sheets)  Construction of Punch List Items of the Buildings Cost: U.S $52.15 Million 9) From: August 2002 to February 2004 (19 months) Project: Several Buildings & Towers Main Office: Art Center for Architecture and ConstructionsArt Center for Architecture and Constructions Description of the project: R.C. & Steel Design and preparation of Design Sheet and Construction Drawings for many Projects Position: Designer EngineerDesigner Engineer Training Experience: 1. Training in El-Tameer Company for Engineering ConsultationsEl-Tameer Company for Engineering Consultations in project of General Authority for Building & Housing in Construction of (57 blocks in A20 region & 31 blocks in B8 region in Port Said) From 6/1998 to 9/1998 and from 6/1999 to 9/1999 2. Training in Consultant Group for Architecture & PlanningConsultant Group for Architecture & Planning in Design & Construction of a Tower in Saleh Seleem land in Port Said From 6/2000 to 9/2000 3. Training in Housing AuthorityHousing Authority in Construction of Factorial Powers building From 6/2001 to 9/2001 Reference List: Name Position Tel. / Email Ayman Abbas QC/QA Manager (AICI) 0020127542854 Yusataka Araki Engineering Manager (TAISEI CORP.) 008109066555992 Yushiaki Takimoto Project Manager (TAISEI CORP.) 00971506403246 6 of 6
  • 7.
     Preparing ofShop drawings, Builder Work drawings  Coordination of Infrastructure between pipes & Cables and Leveling of Networks In Site in:  Inspections for all Activities and it's Requests Cost: Q.R 16.5 Million 8) From: March 2004 to August 2005 (18 months) Project: Port Said East Container Terminal & Service Buildings-Port Said, Egypt Client: Suez Canal Container Terminal (SCCT) Consultant: Posford – Haskoning – Pacer Consultants Main Contractor: Archirodon for Construction (Overseas) Co. S.AArchirodon for Construction (Overseas) Co. S.A. Description of the project:  Container Stacking Area including infrastructure (1200x550) m  Concrete buildings such as Administration, Service, Workshop, Electrical Main Station, Sea Water Pump Station, Substations, Amenities & Mosque  Steel buildings such as Reefers, Workshop, Personnel Shelters & Gate Canopy  Pre-cast Concrete such as Fence, Infrastructure Manholes Position: In Technical Office in:  Preparing of Shop drawing, Builder Work drawing  Buildings Coordination between Architectural, Structural, Plumbing, HVAC & Electrical Activities  Infrastructure Coordination between pipes & Cables and Leveling of Networks  Blocking out of Pre-cast Manholes  Preparing and Updating of Time Schedule In Site in:  Construction of all Finishing Works of Workshop Building  Construction of Aluminum Cladding (Flat and Corrugated Sheets)  Construction of Punch List Items of the Buildings Cost: U.S $52.15 Million 9) From: August 2002 to February 2004 (19 months) Project: Several Buildings & Towers Main Office: Art Center for Architecture and ConstructionsArt Center for Architecture and Constructions Description of the project: R.C. & Steel Design and preparation of Design Sheet and Construction Drawings for many Projects Position: Designer EngineerDesigner Engineer Training Experience: 1. Training in El-Tameer Company for Engineering ConsultationsEl-Tameer Company for Engineering Consultations in project of General Authority for Building & Housing in Construction of (57 blocks in A20 region & 31 blocks in B8 region in Port Said) From 6/1998 to 9/1998 and from 6/1999 to 9/1999 2. Training in Consultant Group for Architecture & PlanningConsultant Group for Architecture & Planning in Design & Construction of a Tower in Saleh Seleem land in Port Said From 6/2000 to 9/2000 3. Training in Housing AuthorityHousing Authority in Construction of Factorial Powers building From 6/2001 to 9/2001 Reference List: Name Position Tel. / Email Ayman Abbas QC/QA Manager (AICI) 0020127542854 Yusataka Araki Engineering Manager (TAISEI CORP.) 008109066555992 Yushiaki Takimoto Project Manager (TAISEI CORP.) 00971506403246 6 of 6