LEED Green Associate V. Acquisition, Installation, and Management of Project
Materials
Question 1:
Which of the following materials can earn credit in the Materials & Resources category?
A Wood that was transported via rail lines
B FSC Certified wood
C Wood that has low life-cycle costs
D Wood that is sealed with low VOC sealants
Question 2:
A construction waste management plan should address what items?
A Rapidly renewable materials
B Source reduction
C What materials should be diverted from the waste stream
D The use of certified wood
Question 3:
A floor covering that can be recycled into a new product at the end of its useful life would be what type of product?
A Cradle to grave
B Passive
C Cradle to cradle
D Renewable
Question 4:
Why should a waste stream audit be conducted for a building's ongoing operations?
A To identify waste haulers
B To determine if the recycling program needs updating
C To increase waste diversion
D To identify environmentally preferable products
Question 5:
What is greenwashing?
A Changing local zoning codes to be greener
B Advertising a product or policy to be more environmentally friendly than it really is
C The implementation of a green cleaning custodial policy
D Building green buildings in an industrial area
Question 6:
Which item is considered pre-consumer recycled content?
A Milk jugs
B Cardboard boxes
C Soda cans
D Wood chips from a mill
Question 7:
Which item can NOT contribute to Construction Waste Management?
A Recycling packaging material
B PCB removal
C Wood given to a salvage hauler
D Ground up brick used for drainage
Question 8:
What is a financial benefit of implementing an occupant recycling program?
A Reduced landfill fees
B Minimized air pollution
C Reduced extraction of virgin materials
D Reduced energy use
Question 9:
Which of the following are examples of post-consumer recycled content?
A Construction and demolition debris sent to a recycling plant
B Scraps reclaimed from the manufacturing line
C Magazines from a print overrun
D Planer shavings used to make composite wood
Question 10:
What item would NOT be included in commingled recycling?
A Metal
B Cardboard
C Glass
D Food waste
Question 11:
What defines the total of the energy necessary for an entire product's lifecycle?
A Life cycle assessment
B Embodied energy
C Simple payback
D Life cycle costing
Question 12:
What types of old materials/items does LEED NOT suggest reusing on a project?
A Flooring
B Asphalt
C Furniture
D Showerheads
Question 13:
Some wood flooring recovered onsite from a renovation project was refurbished and reused onsite. What type of
material is the wood flooring considered?
A Recycled content
B Regional/local material
C Virgin wood
D Salvaged material
Question 14:
Which items are considered pre-consumer recycled items?
A Demolition debris used on another project
B Carpets made from nylon that include scraps reclaimed from production
C Steel beams created from metal reclaimed from the manufacturing line
D Cotton insulation manufactured from factory-reject denim jeans
Question 15:
To earn LEED credits for environmentally preferable materials wood used on a project should be:
A ASHRAE approved
B Harvested within 1,500 miles of the project site
C FSC certified
D Green Seal certified
Question 16:
Within what distance must a material be extracted, harvested, recovered, or manufactured to be considered a
regional material?
A 100 miles
B 250 miles
C 500 miles
D 200 miles
Question 17:
Selecting products that have been developed with a sustainable design is an example of:
A Reuse
B Recycling
C Source reduction
D Waste diversion
Question 18:
Construction and demolition debris includes all but which of the following?
A Steel from a demolished building
B Rocks
C Drywall
D Concrete from a demolished building
Question 19:
What is applicable to the ongoing operations and maintenance of a building?
A Sustainable purchasing policy
B Commissioning
C Passive design strategies
D Floor area ratio
Question 20:
What document does the project team create for the administrative and procedural requirements for salvaging,
recycling, and disposing of non-hazardous demolition and construction waste?
A Building commissioning plan
B Construction waste management plan
C Building recycling plan
D Measurement and verification plan
Question 20:
What document does the project team create for the administrative and procedural requirements for salvaging,
recycling, and disposing of non-hazardous demolition and construction waste?
A Building commissioning plan
B Construction waste management plan
C Building recycling plan
D Measurement and verification plan
Question 22:
A counter made of recycled glass obtained and manufactured within 500 miles of project would contribute toward:
A Regional materials only
B Recycled materials only
C Neither regional nor recycled materials
D Both regional and recycled materials
Question 23:
What are the three R's of construction waste management?
A Reduce
B Recycle
C Resourcing
D Reuse
E Refilling
Question 24:
What are the environmental benefits of using salvaged wood flooring in a residential project?
A The wood flooring will have a lower cost since it did not have to be extracted from a forest
B The wood flooring will increase the tax base of the local economy
C The wood flooring will reduce the demand for virgin resources
D The wood flooring will have a lower installation cost
Question 25:
What benefit to the environment does a project that uses Recycled Materials contribute?
A Reduced air and water pollution
B Reducing a project's soft costs
C Reducing demand for virgin resources
D Supporting the use of local resources
Question 26:
What encourages recycling among building occupants?
A The size of the recycling area
B Accessibility and convenience to recycling bins
C The cost of waste haulers
D Installing can crushers and cardboard bailers
Question 27:
What is FSC Certified wood?
A Wood that has been procured from well managed forests
B Composite wood that does not contain any urea formaldehyde
C Composite wood that contains post-consumer recycled wood, usually from construction and demolition
debris
D Wood that has been extracted and harvested within 500 miles of the project site
Question 27:
What is FSC Certified wood?
A Wood that has been procured from well managed forests
B Composite wood that does not contain any urea formaldehyde
C Composite wood that contains post-consumer recycled wood, usually from construction and demolition
debris
D Wood that has been extracted and harvested within 500 miles of the project site
Question 29:
A project team demolishes an existing building and will reuse the shell of the building and recycle the rest of the
construction and demolition debris. What credit areas could the project earn points under?
A Recycled Content
B Construction Waste Management
C Building Reuse
D Community Connectivity
Question 30:
An office cubicle that contains post-consumer aluminum content would contribute to what credit area?
A Construction Waste Management
B Rapidly Renewable Materials
C Certified Materials
D Recycled Content
Question 31:
Which of the following materials, if reused, would be considered pre-consumer recycled content?
A Milk jugs
B Construction and demolition debris
C Sunflower seed hulls
D Sawdust
E Walnut shells
Question 32:
A project being certified under LEED for Existing Building Operations and Maintenance would have what ongoing
features that a new construction project would not?
A Sustainable purchasing policy
B Water efficient landscaping
C Waste stream audits, including recycling
D Minimum energy efficiency
E Refrigerant management
Question 33:
What type of construction materials are recovered from building sites and reused on different building sites in the
same or a different capacity?
A Pre-consumer recycled material
B Post-consumer recycled material
C Durable material
D Salvaged material
Question 34:
A project team for a new home has selected insulation made partly of recycled newspaper. What type of material is
the insulation considered?
A Post-consumer recycled content
B Salvaged
C Certified recycled wood content
D Rapidly renewable
Question 35:
What attribute should recycled materials have in order to take advantage of synergies with regional materials?
A Lower life-cycle costs
B More durability
C Remanufactured regionally
D Low VOCs
Question 36:
What should be included in a construction waste management plan?
A The distance products were purchased from the construction site
B If any construction waste materials to be recycled will be commingled or separated
C New technologies and materials that will help reduce waste
D Which existing building materials - if any - will be reused
Question 37:
Which of the following can reduce the volume of recycled materials sent to recycling facilities?
A Purchasing materials with recycled content
B Reusing materials
C Installing recycling chutes
D Using commingled recycling
Question 38:
What practice would be used to investigate lumber from the point where the lumber was extracted to the point where
the lumber was disposed of?
A Upcycling
B Cradle to cradle
C Regenerative design
D Cradle to grave
Question 39:
Which items can contribute to Construction Waste Management credit?
A Sheetrock
B Asbestos flooring
C Brick
D Tree stumps
Question 40:
How can projects reduce sending waste to a landfill?
A Reuse materials
B Use local materials
C Use materials with low lifecycle costs
D Recycle materials
Question 41:
What are examples of waste diversion for construction waste management?
A Incineration
B Disposal in landfills
C Recycling
D Reuse
Question 42:
What strategies does the EPA recommend for waste reduction?
A Source reduction
B Sustainable materials
C Locally manufactured materials
D Reuse
E Recycling
Question 43:
What types of wood are considered sustainable materials?
A Virgin wood
B Salvaged wood
C Certified wood
D Slow growth wood
Question 44:
Cabinetry made from walnut shells would help contribute toward earning what LEED credit?
A Construction Waste Management
B Regional Materials
C Building Reuse
D Recycled Materials
Question 45:
What products would be considered pre-consumer recycled content under LEED?
A Countertops made of glass bottles
B Ground up tires used for walkways
C Salvaged doors
D Concrete containing fly-ash as supplementary cementitious material
Question 46:
Reusing an existing building can help earn credit in what category?
A Water Efficiency
B Sustainable Sites
C Energy and Atmosphere
D Materials and Resources
Question 47:
Some FSC Certified wood was extracted 450 miles from a project site, milled into lumber 550 miles from the project
site, and purchased from a manufacturer located 500 miles from the project site. What is true about this scenario?
A Half of the material can count as Regional Materials because the lumber was milled outside of the 500 mile
radius required for Regional Materials but was extracted within the 500 mile radius
B All of the wood counts as Regional Materials
C Only 2/3 of the material can count as Regional Materials because the lumber was milled outside of the 500
mile radius required for Regional Materials
D None of the wood can count towards Regional Materials
Question 48:
Which of the following are strategies to reduce construction waste?
A Give unused materials to a salvage yard
B Use FSC certified materials
C Haul unused materials to a landfill
D Select sustainable building materials
Question 49:
What statement is true regarding products used to earn LEED credits?
A Products can only contribute to strategies that will help earn a credit
B Project teams should choose products that are LEED certified
C Project teams should choose products that are LEED approved
D The use of endorsed products can help earn Innovation in Design credit
Question 50:
A product made in part from cardboard boxes collected at curbside pickups or from an onsite, commingled recycling
area is an example of what material?
A Recycled material
B Durable material
C Salvaged material
D Remanufactured material
Question 51:
An old door taken from one project site and reused on another project site is considered what type of material?
A Rapidly renewable
B Certified wood
C Locally harvested
D Salvaged
Question 52:
What items would NOT be included in commingled recycling?
A Stone
B Cardboard
C Plastic
D Aluminum cans
Question 53:
How is the quantity of locally harvested and manufactured materials used on a project calculated?
A By the amount of leftovers diverted from landfills
B By the number of board feet
C By the materials' average distance from the project site
D By the materials' proportion of cost
Question 54:
What are the negative consequences that can result from not diverting construction demolition and debris?
A Landfill gas emissions
B Ozone depletion
C Sedimentation
D Groundwater contamination
Question 55:
What products would NOT count towards Regional Materials or Materials Reuse?
A Brick
B Copper piping
C Furniture
D Flooring
E Elevator
Question 56:
A school project will use some old school lockers that were salvaged from a fitness center located 70 miles away.
What LEED credits will this decision help with?
A Regional Materials
B Recycled Materials
C Materials Reuse
D Construction Waste Management
E Building Reuse
Question 57:
What should be included in a construction waste management plan for the demolition of an existing building?
A The design of the size of the building
B The removal of any CFC-based refrigerants
C Where to dispose of any PCBs
D The installation of a composting system for occupants
Question 58:
Which of the following materials would be considered post-consumer recycled content?
A Bamboo flooring
B Certified wood flooring
C Wool carpet made from wool leftover from the manufacturing process
D Flooring made from recycled milk jugs and sawdust
Question 59:
Which items can contribute to Construction Waste Management?
A Hazardous construction debris
B Concrete
C Fill dirt
D Steel and wallboard
Question 60:
Which of the following is not a strategy to reduce construction waste?
A Maximize the building footprint
B Recycle materials
C Use salvaged materials
D Sell unused materials
Question 61:
A material must be _________ to be considered a Regional Material.
A Certified by FSC
B LEED certified
C Harvested within 10 years or less
D Extracted, processed, and manufactured close to the project site
Question 62:
Why use commingled recycling?
A Commingled recycling takes up less space
B Materials are less likely to be contaminated
C More kinds of materials can be recycled
D Recycled materials can be sold for more money
Question 63:
What is true regarding carpet made from recycled milk jugs?
A The carpet is more durable than conventional carpets
B The carpet contains post-consumer recycled content
C The carpet has lower life cycle costs than conventional carpets
D The material would reduce the need for virgin materials
Question 64:
What is source reduction?
A Reducing the heat island effect
B Reducing energy use in a building
C Reducing the amount of stormwater runoff
D Decreasing the materials used for manufacturing products
Question 65:
A granite countertop taken from a demolition project and reused in a residence is what type of product?
A Locally manufactured
B Locally extracted
C Locally recovered
D Salvaged
Question 66:
The choice of a building material used for a project should be determined by what criteria?
A The corporate philosophy of the material's supplier
B The impact the material has on society
C The cost of the material
D How long the material has been used in other projects
E The environmental impact of extracting and manufacturing the material
Question 67:
What provides detailed information on the chemical composition, health effects, safety procedures, and other
characteristics of products and materials?
A IPMVP Volume III
B Green Seal Certification
C Material Safety Data Sheets (MSDS)
D Measurement and Verification (M&V) plan
Question 68:
What are the collection requirements for the storage and collection of recyclables in a building?
A Include space to collect organic materials (food)
B Collect either light bulbs or batteries
C The area must be easily accessible
D Collect light bulbs and batteries
Question 69:
Which of the following is used to determine if a product is pre-consumer or post-consumer recycled content?
A ASHRAE 62.1
B LEED Online Calculators
C ISO 14021
D Local codes
Question 70:
Which of the following are strategies to reduce construction waste?
A Incinerate the remaining waste
B Purchase materials that are locally manufactured
C Donate unused materials to Habitat for Humanity
D Purchase materials with lower lifecycle costs
Question 71:
The recycling of construction and demolition debris helps with what issue?
A Reducing the amount of materials needed for a construction project
B Reducing demand for virgin resources
C Keeping hazardous materials out of landfills
D Reducing CFCs leaked into the atmosphere
Question 72:
What statement is true regarding wool carpet made from wool leftover from the carpet manufacturing process?
A This material is an example of post-industrial recycled content
B This material does not contain recycled content
C This material is an example of post-consumer recycled content
D This material is an example of pre-consumer recycled content
Question 73:
A door found onsite and turned into a table as part of a major renovation would automatically qualify as:
A Pre-consumer content
B Commingled material
C Rapidly renewable material
D Regional material
Question 74:
What is an economic benefit of using Regional Materials?
A Support the use of local resources
B Encourage responsible forest management
C Reduce transportation costs
D Reduce the use and depletion of finite raw materials
Question 75:
What strategy is least applicable to successful waste reduction?
A Finding local haulers to reduce transportation costs
B Installing personal recycling bins
C Finding products that use less packaging
D Providing reusable water bottles to occupants
Question 76:
What is purchasing products with less packaging an example of?
A Construction waste management
B Waste diversion
C Commingled recycling
D Source reduction
Question 77:
What benefit to society does a project that uses Regional Materials contribute?
A Reduced air and water pollution
B Supporting the local economy
C Reducing demand for virgin resources
D Reducing a project's soft costs
Question 78:
Which of the following is an example of a source control waste reduction strategy?
A Reusing salvaged materials onsite
B Using commingled recycling
C Pre-ordering materials cut to size
D Installing recycling bins onsite
Question 79:
What materials should not be included in commingled recycling?
A Junk mail
B Light bulbs
C Cereal boxes
D Food waste
E Batteries

More Related Content

What's hot

Leed green associate pool g - answer
Leed green associate   pool g - answer Leed green associate   pool g - answer
Leed green associate pool g - answer
Bilal Mohamed
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer
Bilal Mohamed
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer
Bilal Mohamed
 
Leed green associate pool a - answer
Leed green associate    pool a - answer Leed green associate    pool a - answer
Leed green associate pool a - answer
Bilal Mohamed
 
Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer
Bilal Mohamed
 
Leed green associate pool a - question
Leed green associate    pool a - questionLeed green associate    pool a - question
Leed green associate pool a - question
Bilal Mohamed
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...
Bilal Mohamed
 
Leed green associate pool g - question
Leed green associate   pool g - questionLeed green associate   pool g - question
Leed green associate pool g - question
Bilal Mohamed
 
Leed green associate pool c - question
Leed green associate   pool c - questionLeed green associate   pool c - question
Leed green associate pool c - question
Bilal Mohamed
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach question
Bilal Mohamed
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer
Bilal Mohamed
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer
Bilal Mohamed
 
Leed ga answer
Leed ga answerLeed ga answer
Leed ga answer
Bilal Mohamed
 
LEED v4 GA exam flashcards
LEED v4 GA exam flashcardsLEED v4 GA exam flashcards
LEED v4 GA exam flashcards
Rob Freeman
 
Intro to LEED for Existing Buildings (EBOM) v4
Intro to LEED for Existing Buildings (EBOM) v4Intro to LEED for Existing Buildings (EBOM) v4
Intro to LEED for Existing Buildings (EBOM) v4
Ana Avila
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
Melad Alaqra, PMP MIET
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
Bilal Mohamed
 
17 Concepts for the LEED v4 GA Exam
17 Concepts for the LEED v4 GA Exam17 Concepts for the LEED v4 GA Exam
17 Concepts for the LEED v4 GA Exam
Chamarra McCrorey
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
Rob Freeman
 
LEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable ChoiceLEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable Choice
Renewable Choice Energy
 

What's hot (20)

Leed green associate pool g - answer
Leed green associate   pool g - answer Leed green associate   pool g - answer
Leed green associate pool g - answer
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer
 
Leed green associate pool a - answer
Leed green associate    pool a - answer Leed green associate    pool a - answer
Leed green associate pool a - answer
 
Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer
 
Leed green associate pool a - question
Leed green associate    pool a - questionLeed green associate    pool a - question
Leed green associate pool a - question
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...
 
Leed green associate pool g - question
Leed green associate   pool g - questionLeed green associate   pool g - question
Leed green associate pool g - question
 
Leed green associate pool c - question
Leed green associate   pool c - questionLeed green associate   pool c - question
Leed green associate pool c - question
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach question
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer
 
Leed ga answer
Leed ga answerLeed ga answer
Leed ga answer
 
LEED v4 GA exam flashcards
LEED v4 GA exam flashcardsLEED v4 GA exam flashcards
LEED v4 GA exam flashcards
 
Intro to LEED for Existing Buildings (EBOM) v4
Intro to LEED for Existing Buildings (EBOM) v4Intro to LEED for Existing Buildings (EBOM) v4
Intro to LEED for Existing Buildings (EBOM) v4
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
 
17 Concepts for the LEED v4 GA Exam
17 Concepts for the LEED v4 GA Exam17 Concepts for the LEED v4 GA Exam
17 Concepts for the LEED v4 GA Exam
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
 
LEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable ChoiceLEED Green Building Presentation - Renewable Choice
LEED Green Building Presentation - Renewable Choice
 

Similar to Leed green associate v. acquisition, installation, and management of project materials question

Leed green associate pool d question
Leed green associate pool d   questionLeed green associate pool d   question
Leed green associate pool d question
Bilal Mohamed
 
Leed green associate iii. water management question
Leed green associate iii. water management   questionLeed green associate iii. water management   question
Leed green associate iii. water management question
Bilal Mohamed
 
Leed green associate pool e - question
Leed green associate   pool e - questionLeed green associate   pool e - question
Leed green associate pool e - question
Bilal Mohamed
 
Green building
Green buildingGreen building
Green building
Abhijeet Parashar
 
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
Association for Project Management
 
Leed green associate vi. stakeholder involvement in innovation question
Leed green associate vi. stakeholder involvement in innovation   questionLeed green associate vi. stakeholder involvement in innovation   question
Leed green associate vi. stakeholder involvement in innovation question
Bilal Mohamed
 
Sci5 1st app with tos
Sci5 1st  app with tosSci5 1st  app with tos
Sci5 1st app with tos
javesarausas
 
MATERIALS AND RESOURCES
MATERIALS AND RESOURCES MATERIALS AND RESOURCES
MATERIALS AND RESOURCES
Ťåbü Śđ
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and Specifications
Andrej_M
 
New Union South Sustainability 6.1.2009
New Union South Sustainability 6.1.2009New Union South Sustainability 6.1.2009
New Union South Sustainability 6.1.2009
shaynahetzel
 
Green Buildings and Eco-friendlyssffd.ppt
Green Buildings and Eco-friendlyssffd.pptGreen Buildings and Eco-friendlyssffd.ppt
Green Buildings and Eco-friendlyssffd.ppt
PranavDevale2
 
Green buildings
Green buildingsGreen buildings
Green buildings
Rohit Sharma
 
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
LorenSwift1
 
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
LorenSwift1
 
Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...
Manthan Shah
 
nikita PPT.pptx
nikita PPT.pptxnikita PPT.pptx
nikita PPT.pptx
ShoaibIqbalKhan
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
baburajiv2007
 
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki FinlandMichael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
World Circular Economy Forum
 
Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National AssociationGalala University
 

Similar to Leed green associate v. acquisition, installation, and management of project materials question (20)

Leed green associate pool d question
Leed green associate pool d   questionLeed green associate pool d   question
Leed green associate pool d question
 
Leed green associate iii. water management question
Leed green associate iii. water management   questionLeed green associate iii. water management   question
Leed green associate iii. water management question
 
Leed green associate pool e - question
Leed green associate   pool e - questionLeed green associate   pool e - question
Leed green associate pool e - question
 
Green building
Green buildingGreen building
Green building
 
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
Benefits and Value and Governance SIG Conference, Building for Legacy - The L...
 
Leed green associate vi. stakeholder involvement in innovation question
Leed green associate vi. stakeholder involvement in innovation   questionLeed green associate vi. stakeholder involvement in innovation   question
Leed green associate vi. stakeholder involvement in innovation question
 
Sci5 1st app with tos
Sci5 1st  app with tosSci5 1st  app with tos
Sci5 1st app with tos
 
MATERIALS AND RESOURCES
MATERIALS AND RESOURCES MATERIALS AND RESOURCES
MATERIALS AND RESOURCES
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and Specifications
 
New Union South Sustainability 6.1.2009
New Union South Sustainability 6.1.2009New Union South Sustainability 6.1.2009
New Union South Sustainability 6.1.2009
 
Green Buildings and Eco-friendlyssffd.ppt
Green Buildings and Eco-friendlyssffd.pptGreen Buildings and Eco-friendlyssffd.ppt
Green Buildings and Eco-friendlyssffd.ppt
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
 
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...The Evolution of Sustainable Construction Materials - A Green Building Revolu...
The Evolution of Sustainable Construction Materials - A Green Building Revolu...
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING
 
Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...
 
nikita PPT.pptx
nikita PPT.pptxnikita PPT.pptx
nikita PPT.pptx
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki FinlandMichael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
Michael Bayer Thomsen World Circular Economy Forum 2017 Helsinki Finland
 
Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National Association
 

Recently uploaded

Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

Leed green associate v. acquisition, installation, and management of project materials question

  • 1. LEED Green Associate V. Acquisition, Installation, and Management of Project Materials Question 1: Which of the following materials can earn credit in the Materials & Resources category? A Wood that was transported via rail lines B FSC Certified wood C Wood that has low life-cycle costs D Wood that is sealed with low VOC sealants Question 2: A construction waste management plan should address what items? A Rapidly renewable materials B Source reduction C What materials should be diverted from the waste stream D The use of certified wood Question 3: A floor covering that can be recycled into a new product at the end of its useful life would be what type of product? A Cradle to grave B Passive C Cradle to cradle D Renewable Question 4: Why should a waste stream audit be conducted for a building's ongoing operations? A To identify waste haulers
  • 2. B To determine if the recycling program needs updating C To increase waste diversion D To identify environmentally preferable products Question 5: What is greenwashing? A Changing local zoning codes to be greener B Advertising a product or policy to be more environmentally friendly than it really is C The implementation of a green cleaning custodial policy D Building green buildings in an industrial area Question 6: Which item is considered pre-consumer recycled content? A Milk jugs B Cardboard boxes C Soda cans D Wood chips from a mill Question 7: Which item can NOT contribute to Construction Waste Management? A Recycling packaging material B PCB removal C Wood given to a salvage hauler D Ground up brick used for drainage Question 8: What is a financial benefit of implementing an occupant recycling program?
  • 3. A Reduced landfill fees B Minimized air pollution C Reduced extraction of virgin materials D Reduced energy use Question 9: Which of the following are examples of post-consumer recycled content? A Construction and demolition debris sent to a recycling plant B Scraps reclaimed from the manufacturing line C Magazines from a print overrun D Planer shavings used to make composite wood Question 10: What item would NOT be included in commingled recycling? A Metal B Cardboard C Glass D Food waste Question 11: What defines the total of the energy necessary for an entire product's lifecycle? A Life cycle assessment B Embodied energy C Simple payback D Life cycle costing
  • 4. Question 12: What types of old materials/items does LEED NOT suggest reusing on a project? A Flooring B Asphalt C Furniture D Showerheads Question 13: Some wood flooring recovered onsite from a renovation project was refurbished and reused onsite. What type of material is the wood flooring considered? A Recycled content B Regional/local material C Virgin wood D Salvaged material Question 14: Which items are considered pre-consumer recycled items? A Demolition debris used on another project B Carpets made from nylon that include scraps reclaimed from production C Steel beams created from metal reclaimed from the manufacturing line D Cotton insulation manufactured from factory-reject denim jeans Question 15: To earn LEED credits for environmentally preferable materials wood used on a project should be: A ASHRAE approved
  • 5. B Harvested within 1,500 miles of the project site C FSC certified D Green Seal certified Question 16: Within what distance must a material be extracted, harvested, recovered, or manufactured to be considered a regional material? A 100 miles B 250 miles C 500 miles D 200 miles Question 17: Selecting products that have been developed with a sustainable design is an example of: A Reuse B Recycling C Source reduction D Waste diversion Question 18: Construction and demolition debris includes all but which of the following? A Steel from a demolished building B Rocks C Drywall D Concrete from a demolished building
  • 6. Question 19: What is applicable to the ongoing operations and maintenance of a building? A Sustainable purchasing policy B Commissioning C Passive design strategies D Floor area ratio Question 20: What document does the project team create for the administrative and procedural requirements for salvaging, recycling, and disposing of non-hazardous demolition and construction waste? A Building commissioning plan B Construction waste management plan C Building recycling plan D Measurement and verification plan Question 20: What document does the project team create for the administrative and procedural requirements for salvaging, recycling, and disposing of non-hazardous demolition and construction waste? A Building commissioning plan B Construction waste management plan C Building recycling plan D Measurement and verification plan Question 22: A counter made of recycled glass obtained and manufactured within 500 miles of project would contribute toward: A Regional materials only B Recycled materials only
  • 7. C Neither regional nor recycled materials D Both regional and recycled materials Question 23: What are the three R's of construction waste management? A Reduce B Recycle C Resourcing D Reuse E Refilling Question 24: What are the environmental benefits of using salvaged wood flooring in a residential project? A The wood flooring will have a lower cost since it did not have to be extracted from a forest B The wood flooring will increase the tax base of the local economy C The wood flooring will reduce the demand for virgin resources D The wood flooring will have a lower installation cost Question 25: What benefit to the environment does a project that uses Recycled Materials contribute? A Reduced air and water pollution B Reducing a project's soft costs C Reducing demand for virgin resources D Supporting the use of local resources
  • 8. Question 26: What encourages recycling among building occupants? A The size of the recycling area B Accessibility and convenience to recycling bins C The cost of waste haulers D Installing can crushers and cardboard bailers Question 27: What is FSC Certified wood? A Wood that has been procured from well managed forests B Composite wood that does not contain any urea formaldehyde C Composite wood that contains post-consumer recycled wood, usually from construction and demolition debris D Wood that has been extracted and harvested within 500 miles of the project site Question 27: What is FSC Certified wood? A Wood that has been procured from well managed forests B Composite wood that does not contain any urea formaldehyde C Composite wood that contains post-consumer recycled wood, usually from construction and demolition debris D Wood that has been extracted and harvested within 500 miles of the project site Question 29: A project team demolishes an existing building and will reuse the shell of the building and recycle the rest of the construction and demolition debris. What credit areas could the project earn points under? A Recycled Content B Construction Waste Management
  • 9. C Building Reuse D Community Connectivity Question 30: An office cubicle that contains post-consumer aluminum content would contribute to what credit area? A Construction Waste Management B Rapidly Renewable Materials C Certified Materials D Recycled Content Question 31: Which of the following materials, if reused, would be considered pre-consumer recycled content? A Milk jugs B Construction and demolition debris C Sunflower seed hulls D Sawdust E Walnut shells Question 32: A project being certified under LEED for Existing Building Operations and Maintenance would have what ongoing features that a new construction project would not? A Sustainable purchasing policy B Water efficient landscaping C Waste stream audits, including recycling D Minimum energy efficiency E Refrigerant management
  • 10. Question 33: What type of construction materials are recovered from building sites and reused on different building sites in the same or a different capacity? A Pre-consumer recycled material B Post-consumer recycled material C Durable material D Salvaged material Question 34: A project team for a new home has selected insulation made partly of recycled newspaper. What type of material is the insulation considered? A Post-consumer recycled content B Salvaged C Certified recycled wood content D Rapidly renewable Question 35: What attribute should recycled materials have in order to take advantage of synergies with regional materials? A Lower life-cycle costs B More durability C Remanufactured regionally D Low VOCs Question 36: What should be included in a construction waste management plan? A The distance products were purchased from the construction site B If any construction waste materials to be recycled will be commingled or separated
  • 11. C New technologies and materials that will help reduce waste D Which existing building materials - if any - will be reused Question 37: Which of the following can reduce the volume of recycled materials sent to recycling facilities? A Purchasing materials with recycled content B Reusing materials C Installing recycling chutes D Using commingled recycling Question 38: What practice would be used to investigate lumber from the point where the lumber was extracted to the point where the lumber was disposed of? A Upcycling B Cradle to cradle C Regenerative design D Cradle to grave Question 39: Which items can contribute to Construction Waste Management credit? A Sheetrock B Asbestos flooring C Brick D Tree stumps Question 40: How can projects reduce sending waste to a landfill? A Reuse materials
  • 12. B Use local materials C Use materials with low lifecycle costs D Recycle materials Question 41: What are examples of waste diversion for construction waste management? A Incineration B Disposal in landfills C Recycling D Reuse Question 42: What strategies does the EPA recommend for waste reduction? A Source reduction B Sustainable materials C Locally manufactured materials D Reuse E Recycling Question 43: What types of wood are considered sustainable materials? A Virgin wood B Salvaged wood C Certified wood D Slow growth wood Question 44: Cabinetry made from walnut shells would help contribute toward earning what LEED credit?
  • 13. A Construction Waste Management B Regional Materials C Building Reuse D Recycled Materials Question 45: What products would be considered pre-consumer recycled content under LEED? A Countertops made of glass bottles B Ground up tires used for walkways C Salvaged doors D Concrete containing fly-ash as supplementary cementitious material Question 46: Reusing an existing building can help earn credit in what category? A Water Efficiency B Sustainable Sites C Energy and Atmosphere D Materials and Resources Question 47: Some FSC Certified wood was extracted 450 miles from a project site, milled into lumber 550 miles from the project site, and purchased from a manufacturer located 500 miles from the project site. What is true about this scenario? A Half of the material can count as Regional Materials because the lumber was milled outside of the 500 mile radius required for Regional Materials but was extracted within the 500 mile radius B All of the wood counts as Regional Materials C Only 2/3 of the material can count as Regional Materials because the lumber was milled outside of the 500 mile radius required for Regional Materials D None of the wood can count towards Regional Materials Question 48: Which of the following are strategies to reduce construction waste?
  • 14. A Give unused materials to a salvage yard B Use FSC certified materials C Haul unused materials to a landfill D Select sustainable building materials Question 49: What statement is true regarding products used to earn LEED credits? A Products can only contribute to strategies that will help earn a credit B Project teams should choose products that are LEED certified C Project teams should choose products that are LEED approved D The use of endorsed products can help earn Innovation in Design credit Question 50: A product made in part from cardboard boxes collected at curbside pickups or from an onsite, commingled recycling area is an example of what material? A Recycled material B Durable material C Salvaged material D Remanufactured material Question 51: An old door taken from one project site and reused on another project site is considered what type of material? A Rapidly renewable B Certified wood C Locally harvested D Salvaged
  • 15. Question 52: What items would NOT be included in commingled recycling? A Stone B Cardboard C Plastic D Aluminum cans Question 53: How is the quantity of locally harvested and manufactured materials used on a project calculated? A By the amount of leftovers diverted from landfills B By the number of board feet C By the materials' average distance from the project site D By the materials' proportion of cost Question 54: What are the negative consequences that can result from not diverting construction demolition and debris? A Landfill gas emissions B Ozone depletion C Sedimentation D Groundwater contamination Question 55: What products would NOT count towards Regional Materials or Materials Reuse? A Brick B Copper piping C Furniture
  • 16. D Flooring E Elevator Question 56: A school project will use some old school lockers that were salvaged from a fitness center located 70 miles away. What LEED credits will this decision help with? A Regional Materials B Recycled Materials C Materials Reuse D Construction Waste Management E Building Reuse Question 57: What should be included in a construction waste management plan for the demolition of an existing building? A The design of the size of the building B The removal of any CFC-based refrigerants C Where to dispose of any PCBs D The installation of a composting system for occupants Question 58: Which of the following materials would be considered post-consumer recycled content? A Bamboo flooring B Certified wood flooring C Wool carpet made from wool leftover from the manufacturing process D Flooring made from recycled milk jugs and sawdust
  • 17. Question 59: Which items can contribute to Construction Waste Management? A Hazardous construction debris B Concrete C Fill dirt D Steel and wallboard Question 60: Which of the following is not a strategy to reduce construction waste? A Maximize the building footprint B Recycle materials C Use salvaged materials D Sell unused materials Question 61: A material must be _________ to be considered a Regional Material. A Certified by FSC B LEED certified C Harvested within 10 years or less D Extracted, processed, and manufactured close to the project site Question 62: Why use commingled recycling? A Commingled recycling takes up less space B Materials are less likely to be contaminated
  • 18. C More kinds of materials can be recycled D Recycled materials can be sold for more money Question 63: What is true regarding carpet made from recycled milk jugs? A The carpet is more durable than conventional carpets B The carpet contains post-consumer recycled content C The carpet has lower life cycle costs than conventional carpets D The material would reduce the need for virgin materials Question 64: What is source reduction? A Reducing the heat island effect B Reducing energy use in a building C Reducing the amount of stormwater runoff D Decreasing the materials used for manufacturing products Question 65: A granite countertop taken from a demolition project and reused in a residence is what type of product? A Locally manufactured B Locally extracted C Locally recovered D Salvaged Question 66: The choice of a building material used for a project should be determined by what criteria?
  • 19. A The corporate philosophy of the material's supplier B The impact the material has on society C The cost of the material D How long the material has been used in other projects E The environmental impact of extracting and manufacturing the material Question 67: What provides detailed information on the chemical composition, health effects, safety procedures, and other characteristics of products and materials? A IPMVP Volume III B Green Seal Certification C Material Safety Data Sheets (MSDS) D Measurement and Verification (M&V) plan Question 68: What are the collection requirements for the storage and collection of recyclables in a building? A Include space to collect organic materials (food) B Collect either light bulbs or batteries C The area must be easily accessible D Collect light bulbs and batteries Question 69: Which of the following is used to determine if a product is pre-consumer or post-consumer recycled content? A ASHRAE 62.1 B LEED Online Calculators C ISO 14021 D Local codes
  • 20. Question 70: Which of the following are strategies to reduce construction waste? A Incinerate the remaining waste B Purchase materials that are locally manufactured C Donate unused materials to Habitat for Humanity D Purchase materials with lower lifecycle costs Question 71: The recycling of construction and demolition debris helps with what issue? A Reducing the amount of materials needed for a construction project B Reducing demand for virgin resources C Keeping hazardous materials out of landfills D Reducing CFCs leaked into the atmosphere Question 72: What statement is true regarding wool carpet made from wool leftover from the carpet manufacturing process? A This material is an example of post-industrial recycled content B This material does not contain recycled content C This material is an example of post-consumer recycled content D This material is an example of pre-consumer recycled content Question 73: A door found onsite and turned into a table as part of a major renovation would automatically qualify as: A Pre-consumer content
  • 21. B Commingled material C Rapidly renewable material D Regional material Question 74: What is an economic benefit of using Regional Materials? A Support the use of local resources B Encourage responsible forest management C Reduce transportation costs D Reduce the use and depletion of finite raw materials Question 75: What strategy is least applicable to successful waste reduction? A Finding local haulers to reduce transportation costs B Installing personal recycling bins C Finding products that use less packaging D Providing reusable water bottles to occupants Question 76: What is purchasing products with less packaging an example of? A Construction waste management B Waste diversion C Commingled recycling D Source reduction Question 77: What benefit to society does a project that uses Regional Materials contribute?
  • 22. A Reduced air and water pollution B Supporting the local economy C Reducing demand for virgin resources D Reducing a project's soft costs Question 78: Which of the following is an example of a source control waste reduction strategy? A Reusing salvaged materials onsite B Using commingled recycling C Pre-ordering materials cut to size D Installing recycling bins onsite Question 79: What materials should not be included in commingled recycling? A Junk mail B Light bulbs C Cereal boxes D Food waste E Batteries