Lalit Kumar Yadav has over 6 years of experience as a mechanical and civil engineer working on water pipeline projects. He is currently working for Larsen and Toubro Ltd on an IT city development project in Mohali, Punjab where he is responsible for public health works, pipe laying, and civil construction. Previously he worked for Wasim & Company and on the Allahabad Water Supply Scheme project. He has experience planning, monitoring, and executing pipe laying as well as coordinating with clients and contractors.
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNationalLaboratory
National laboratory for Geotechnical Investigation & Building Material Testing department has a wide range of specialized testing services and highly-qualified technicians
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNationalLaboratory
National laboratory for Geotechnical Investigation & Building Material Testing department has a wide range of specialized testing services and highly-qualified technicians
Even in marketing and advertising, emotions are a science. Cleverly crafted words and images can entice and win potential customers. So what are the emotive triggers that grab their attention and how do we identify them?
Project Title: Formulation Project (Agro chemical)
Location: Ankleshwar, Gujarat.
Company: UPL-3
• Responsible in project all mechanical work including Strucher, piping & support fabrication and erection.
• Review of all Equipment specification and erection.
• Coordinating with Engineering and Construction and liaise with the detail engineering requirements.
• Existing Equipment, pipeline & structure dismantling and new pipeline equipment erection as per requirement.
• Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
• Preparing Daily & Weekly Project Monitoring Report to the Management.
• Certifying sub-contractors bills and coordinating for preparing the client bills.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Preparation of resources schedule for proper utilization of equipment’s & Preparing Lifting Plan for Heavy Package erections / Installations.
• Manpower handling and stage inspection of mechanical works at site.
• Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively.
• Ensure commissioning work with Production lots.
I am Manish Kumar, currently working in L&T Construction, as a Senior Planning Engineer (Electrical) having 3.7 years of experience in Project Planning & Control.
Completed 2 years of regular PG Program from NICMAR, Pune in Project Engineering Management.
1. CURRICULUM-VITAE
Lalit Kumar Yadav
Communication Address:
Block-B/101,Maya Garden Phase-1&2
VIP Road,Zirakpur(Mohali)
S.A.S Nagar,Punjab
Email-lky@lntecc.com
OFF:-08725036117
MOB:-09915834576
Objective:-
A challenging growth oriented position, where my technical skills can be effectively utilized and
improved eventually leading to contribution in the growth of the organization.
Synopsis:-
1. A goal oriented individual with experience of more than 6.7 Years in the areas of Water pipelines
work.
2. Presently associated with M/S L&T Construction. as an Engineer (Mech.).
3. Proficiency to develop good relationship with client which helped in smooth functioning at site.
Status of Customer Satisfaction is very good both in quality & safety.
4. An effective communicator with exceptional analytical, relationship management and
problem solving skills with ability of resolving critical problem areas.
Organisational Experience:-
Present Employer: - M/S Larsen and Toubro Ltd
Designation: - Engineer (Mech.&Civil)
Duration: -March’12 to till date
1.Current Project :- Area Development of IT City Project, Mohali (Punjab)
Package Owner :- GMADA/PUDA (Greater Mohali Area Development Authority)
Duration: -Nov 2014-Till date
Nature & Score of Responsibilities:-
Presently taking care of Public health Execution,Pipe laying of Storm line(RCC,400 mm-
2200mm)),Sewer line (SGSW,200mm-450mm) ,Water distribution(DI,100mm-600mm) and
civil works Manhole construction
Work description:-
1. Planning,Monitoring and execution of pipe laying as well as tube well works as per the project
2. scope.
2. Co-coordinating with client for finalization of alignment and certification of bill.
3. Proficiency to take responsibility for achieving target within time constraints.
4. Prepared all relevant daily records for site activities.
5. Drafted pipeline network drawings in AutoCAD, the zonal network drawings received appreciations
from client.
6. Planning activities like regular progress monitoring, rate analysis, contractor billing & client
invoicing, time-to-time records maintenance keeping in mind the QMS policy of the company.
7.Created and implemented appreciable alternative solutions for tank-water supply, satisfying client
and users
2. Previous Project: - Allahabad Water Supply Scheme Part-II (Under JNNURM)
Client: - U.P Jal Nigam
Duration: -Mar 2012-Oct 2014
Nature & Score of Responsibilities: - I have successfully worked in following
projects as :-
1.Laying of Pipes of various dia. Of PVC(110mm-160mm), A.C (200mm-600mm), & DI(200mm
-700mm) water pipe line work
2. Planning,Monitoring and execution of pipe laying as well as tube well works as per the project
scope.
3. Co-coordinating with client for finalization of alignment and certification of bill.
4. Proficiency to take responsibility for achieving target within time constraints.
5. Prepared all relevant daily records for site activities.
6. Drafted pipeline network drawings in AutoCAD, the zonal network drawings received fabulous
appreciations from client.
7. Planning activities like regular progress monitoring, rate analysis, contractor billing & client
invoicing, time-to-time records maintenance keeping in mind the QMS policy of the company.
7.Created and implemented appreciable alternative solutions for tank-water supply, satisfying client
and users
Previous Employer: - Wasim & Company
Designation: - Senior-Engineer (Mech.)
Duration: -July’08 to Mar’2012
Responsibilities:-
1. Planning & Execution the pipe laying work
3. 2. Laying of Pipes of various dia. Of PVC, A.C, CI at Sulem Sarai water pipe line work.
3. Co-ordinating with store and other staffs for requirement of Pipes.
4. Planning activities like regular progress monitoring, rate analysis, contractor billing & client
invoicing, time-to-time records maintenance.
5.Site activities like work and resources pre-planning, proper allocation of man power, in-time
material arrangement and qualitative with safe pipeline execution
Professional & Academic Qualification:-
Diploma in Mechanical Engineering from I.E.RT Allahabad with 75.1% in 2008.
10th
from Public Inter College with 56.66% marks (U.P. Board, Allahabad) in 2004.
Computer and Software Skills:-
Microsoft Excel, Auto Cad,Microsoft Office
Personal Details:-
Father’s Name : Deshraj Singh
Date of Birth : 23/12/1988
Marital Status : Married
Nationality : Indian
Passport No. : H 5941476
Permanent Address : VILL-Ram Dayal Pur,Post- Bari Gauhani
Dist-Kaushambi,Pin-212203
Uttar Pradesh
Languages known : English, Hindi
Declaration:
I hereby declare that the information provided above is true, complete and correct to the
best of my knowledge.
Place: Allahabad Yours
(LALIT KUMAR YADAV)