SlideShare a Scribd company logo
1 of 48
Labour cost
 Human efforts used for conversion of materials
into finished products or doing various jobs in the
business are known as labour. Payment made
towards the labour is called labour cost. It can also
be direct and indirect.
Direct Labour: Direct labour is all labour expended and
directly involved in altering the condition, composition
or construction of the product. The wages paid to
skilled and unskilled workers for manual work or
mechanical work for operating machinery, which can
be specifically allocated to a particular unit of
production, is known as direct wages or direct labour
cost. Hence, 'direct wage' may be defined as the
measure of direct labour in terms of money. It is
specifically and conveniently traceable to the specific
products Wages paid to the goldsmith for making gold
ornament is an example of direct labour.
Example of direct labour
• Machine operator
• Shoe-maker
• Carpenter
• Weaver
• tailor
INDIRECT LABOUR
• Indirect Labour: Labour employed to perform
work incidental to production of goods or
those engaged for office work, selling and
distribution activities are known as 'indirect
labour'. The wages paid to such workers are
known as 'indirect wages' or indirect labour
cost.
• Example: Salary paid to the driver of the
delivery van used for distribution of the
product.
Example of indirect labour
• Supervisor
• Inspector
• Cleaner
• Clerk
• Peon
• watchman
Organisation for accounting and control of labour
cost
There are mainly five departments in an organisation
which deal with labour .
These are as follows:
Personnel department
Engineering department
Time-keeping department
Payroll department
cost accounting department
Labour Turnover
 In all business organisation , it is a common
feature that some workers leave the
employment and new workers join in place of
those leaving .this change in work force is
known as labour turnover . Labour turnover
is this thus defined as ‘the rate of change in
the composition of the labour force in an
organisation.’ Labour turnover varies greatly
between different trades and industries .for
eg, where part-time and seasonal labour is
employed ,the rate will be higher.
Measurement of labour Turnover
 To facilitate comparisons between different
periods and different undertakings , labour
turnover may be expressed in rate .
 There are three alternative methods by
which this rate is computed .once a particular
method is used ,it should be consistently
followed for comparative analysis.
 The methods are:
1-separation method:
Measurement of L T
 2-Replacement method
 3- Flux method
 Separation method:This method takes in to
account only those workers who have left
during a particular period .its formula is:
 LABOUR TURNOVER RATE=
NO.OF WORKERS LEFT DURING APERIOD X100
AVERAGE NO. OF WORKERS DURING THE PERIOD
SEPRATION METHOD
 AVERAGE NO. OF WORKERS=
NO.OF WORKERS IN THE BEGINNING. + NO.OF WORKER AT THEEND
2
 MULTIPLICATION BY 100 IN THE ABOVEFORMULA
INDICATES RATE IN PERCENTAGE.
REPLACEMENT METHOD
 This method takes into account only those new
workers who have joined in place of those who
have left. Its formula is:
 Labour turn over =
No. of workers replaced during the period
x100
Average no. of workers during the period
 If new workers are engaged for expansion program or any
other such purpose, they are not considered for this
computation.
FLUX METHOD
 This shows the total change in the
composition of labour force due to
separations and additions of workers .its
formula is:
 Labour turnover rate =
No. of workers left + no. of workers replaced x 100
Average no. of workers
PRACTICAL PROBLEM
From the following data given by the personnel
department. calculate the labour turn over rate
by applying:
(a) Separation method
(b) Replacement method, and
(c) Flux method
No. of workers on the payroll:
At the beginning of the month
At the end of the month
900
1100
Practical
During the month 10 workers left, 40 persons were
discharged and 150 workers were recruited .Of
these , 25 workers are recruited in the vacancies of
those leaving while the rest were engaged for an
expansion scheme.
Casual worker
 The casual or ‘badli’ workers are temporary
workers who are not in the regular payroll of the
factory .they are appointed on daily basis to
meet additional work load or to stand in for
absentee workers.
The appointment of casual workers is a very
common source of fraud in the payment of
wages .it is, therefore, very important to have
control over there appointments, their time of
work and their payment of wages.
Steps should be taken for
accounting and control of casual
workers
 A)Full control regarding appointment and
discharge of such workers should be maintain.
 B) The appointment of such workers should be
sanctioned by a competent executive.
 C)Payment of wages should be made by a
person other than one who appointed them .
 D)When they are appointed as indirect
Workers ,Time sheets should be issued to
them.
STEPS
 E) when casual worker are employed at
site for some contract work ,surprise
visits should be paid to check their
number.
OUT- WORKERS
 These are the workers who work out
side the factory premises on behalf of
the under taking known as out- workers.
out-workers are classified in to two
categories as given below:
 A)Worker who work from their homes:
they are supplied with raw materials and
thy work either with their own tools or
tools supplied by the concern .such
worker are usually paid on piece basis .
CONTROL OVER SUCH WORKER
SHOULD BE EXERCISD IN THE
FOLLOWING MANNER
 1)All materials supplied should be accounted
for and there should be no undue wear and
tear of tools supplied by the concern.
 2) The work should be delivered within the
stipulated time.
 3)The quality of finished work should be
carefully inspected.
(B)Workers sent to
site
 Some workers may be sent to site or customers
premises for performing work. For example-
some companies supplying engineering
products provide after sales service and
workers sent to customers place when so
required. such out workers may while away
their time when they go out for work .job cards
should be issued to them so that labour cost of
work done can be ascertained.
Idle Time
 Idle time represents time lost by workers who
are paid on time basis .when workers are paid
on time basis , some difference between the
time for which they are paid and that they
actually spend on production is bound to arise.
this difference is known as idle time. idle time
represents the time for which they are paid but
no production is obtained . For example : time
lost between factory gate and department, time
when production is interrupted by machine
maintenance ,tea breaks etc.
Causes idle time may occur owing to
productive, administrative or economic causes
 1-Productive causes: The productive causes are those
which result in loss of production. These include:
 (a)idle time due to machine break down.
 (b)power failures.
 (c)waiting for tools and /or raw materials.
 (d) waiting for work
 (e)waiting for instructions
 Idle time due to productive causes is usually controllable
by proper planning, strict supervision and proper
maintenance of plant and machinery.
2-Administrative causes
 Idle time is sometimes caused by administrative
decisions .This usually happens during
depressions when some of machines have got
to work below normal capacity and regular
workers paid full amount of wages . This is
because the management does not want to
discharge trained workers temporarily. Such
abnormal idle time arises out of abnormal
situation and is generally not controllable.
3-Economic causes
 Idle time may also be caused by fall in the demand
of products , say due to sever competition
,seasonal nature of certain industries like woolen
goods, ice-cream ,etc. where production can not
be evenly distributed throughout the year. In such
cases it is not possible to get rid of workers during
slack season. Such surplus labour force is utilised
for doing some other jobs and if such
complementary jobs can not be found ,there will be
some idle time which is beyond control.
Treatment of idle time
 From the point of view of treatment in cost accounts ,idle time
may be classified as normal and abnormal .
 Normal idle time :This is that waste of time which we can
not stop because it is normal and employer has to pay
laborers for this idle time. For example :
a) Walking time from one department to other department.
b) Consuming time to start any job in factory.
c) Consuming time for fulfilling personal needs like drinking of
water, refreshment and rest.
d) Consuming time to set the machines.
Treatment of the Cost of
Normal Idle Time
 1)-As overhead-It must be charged as indirect
expenses in factory. For example, if a laborer
gets Rs. 1 per hr and he spend 8 hrs in
factory and his total wage will be Rs. 8 but he
utilized his productive time 7 hrs, then direct
labor cost will be 8 hrs X Rs. 1 = Rs. 8 and 1hr
will be overhead of idle time and Rs. 1 per hr
idle time will be written in factory expenses in
cost sheet.
2)-As direct wages
 We can also increase the cost of labor rate.
with following way

If a labor works for 8 hrs, he gets = Rs. 1 per hr
If a labor works for 7 hrs, he gets = Rs. 1 / 8 X 7
= Rs. 1.14 per hr
Now labor cost will increase by 0.14 paise
Abnormal Idle Time
 This is that wastage of time which we can stop
by good supervision.
a)waste of time due to inefficiency of
engineers.
b) Power failure
c) Delay of supply of material to factory
d) Strike and lockout
Treatment of the cost of Abnormal
Idle Time
 Wage for abnormal idle time is loss of
business and it must be transferred to
costing profit and loss account.
Over time
 Over time occurs when a worker works beyond
the normal working hours. The normal working
hours are laid down in the factories act.
Acordingly,any worker working for more than 9
hours per day or more or more than 48 hours
per week is entitled to over time payment..The
factories act also provides for payment of
overtime wages at double the normal rates of
wages .the overtime work therefore, a costly
affair and should be avoided as far as possible
.
Leave with pay
 According to the factories act , workers are
entitled to annual leave with full pay for a
specified number of days in a year. This may
include casual leave , medical leave ,special
leave etc. The cost of paid leave can not be
charged to any work order or cost unit since no
work is done during this period .it is there fore
,treated as indirect labour cost and charged to
over head.
Leave with pay
 Alternatively, leave wages may be treated as
direct labour cost in which case the wage
rate is inflated. This is done by estimating in
advance the amount of leave wages and
spreading it over the actual no. of working
hours to give an inflated hourly rate.
Holiday with pay
 Workers are also entitled to certain holidays
like diwali,id, Republic day, independence
day etc. Like leave wages, payment of
these wages of holiday is also unproductive
in the sense that no production work is
done on these days. Payment for such
holidays should there fore be treated in the
same way as leave wages.
Worker's Remuneration:
 The remuneration for labour is wages. The workers
put effort & get wages in exchange of that. On the
basis of pay scale & other allowances which are
prescribed in the terms of employment, calculation
of wages paid to direct or indirect workers is done.
By terms of agreement between the employees &
the employer, this may be modified from time to
time. On the basis of job evaluation, merit rating,
incentive plans, profit sharing & labour contract, the
wages for the workers are determined.
Features essential for a successful wage plan:
A successful wage plan should have the under mentioned essential features:
Fairness:
A wage plan which is based on scientific time & motion study becomes fair to both
employer & employee.
Minimum Wage guarantee:
Minimum wage guarantee must be given to the workers, whether under legal
compulsion or not. This minimum wage must be fairly above subsistence level of
income.
Link between effort & remuneration:
Unless there is a link between the value of work done & the remuneration payable,
there will be unfair to either the employer or the worker.
Satisfaction for the workers:
The worker must be satisfied by the wage plan which will result in high morale & low
labour turnover.
Work guarantee:
If there is payment by result, worker's earnings will not besatisfactory,
even if the rate is too high, unless continuous work is there, which is
available to them.
Conformity with legal provisions & trade agreements:
The wage plan should always be in accordance with any of theprovisions
of law relating to the payment of wage & also there should not be any
violation of trade agreement.
Flexibility: The wage plan must be flexible & not rigid. In case of change
in situations, incorporation of some change may have to be there in the
wage plan also. Unlike rigid plan, modification can be made in the flexible
plan without much disturbance.
Cost of implementation: The wage plan cost of implementation must
be as low as possible
LABOUR COST
Methods of Remuneration (systems of wage payment)
There are two basic methods of labour remuneration:
(a) Time Rate System; and (b) Piece Rate System
Time Rate System
Under the time rate system, workers are paid according to the time for
which they work. Payment may be on hourly basis, daily basis or monthly
basis. In this system, no consideration is given to the quantity or quality of
work done. When payment is made on hourly basis, total wages payable
are calculated as follows:
Wages = No. of hours worked x Rate per hour
Piece Rate System
Wages under this system are paid according to the quantity of work done.
A rate is fixed per unit of production and wages are calculated by the
following formula:
Wages = Rate per unit x No. of units produced.
Various Incentive Plans
Straight Piece Rate Method
The method rewards employees based on their output.A fixed rate of wage
is paid for each unit produced, or number of operations completed or job
completed. The wages payable is calculated by multiplying the number of
pieces produced by the wage rate. There is generally a guaranteed hourly
rate for workers who are unable to attain the standard in order to pay the
minimum ‘day wages’.
Flat Time Rate Method
This method is used for paying remuneration to employees based on their
attendance. A fixed rate of wage is paid hourly, or daily, or weekly on the
basis of time spent on the shop floor (i.e. production department) in
production. The wages payable is calculated by multiplying thehours/days
spent in production by the hourly/daily wage rate.
•Halsey Premium Bonus Plan (Halsey Plan and Halsey-Weir Plan)
This plan was introduced by F A Halsey in 1891. It isa simple combination
of time and piece rate systems. A worker is paid a guaranteed base rate
and is rewarded when his performance exceeds standard.A standard time
is established in respect of each job or unit. Bonus is paid on the basis of
50% of time saved. The total wages payable is calculated as under:
= (Hourly rate X Time taken) + (50% X Time saved X Hourlyrate)
As a result of increased productivity, conversion cost per unit falls. This is
because fixed overhead gets distributed over larger volume of output.
Thus, the firm finds it possible to reward workers directly in proportion to
production.
In the case of Halsey Weir plan, the percentage used is 30 instead of
50.
Rowan Premium Bonus Plan (Variable Sharing
plan)
A standard time is established in respect of each job
or process. There is a guaranteed base rate. A
bonus is paid on the basis of time saved computed
as a proportion of the time taken which the time
saved bears to the standard time. The total wages
payable is calculated as under:
= (hourly rate x time taken) + ( time saved x time taken) x hourly rate
time allowed
Taylor Differential Piece Rate Method
This system was introduced by F
. W. T
aylor, the father of Scientific
Management. The main features of this incentive plan are as follows:
1)Day wages are not guaranteed, i.e. it does not assure any minimum
amount of wages to workers.
2)A standard time for each job is set very carefully after timeand
motion studies.
3)Two piece rates are set for each job- the lower rate and the higher
rate.
The lower piece rate is payable where a worker takes a longer time
than the standard time to complete the work.
Higher rate is payable when a worker completes the work within the
standard time.
In other words, lower piece rate is payable to inefficient workers and
higher piece rate is payable to efficient workers. It will be seen that
there is a great difference between the wages of an efficient and an
inefficient worker.
Problem 1
You are presented with the following information by Olympia
Engineering Company related to the first week of December
1999.
The firm employs 5 workers at an early rate of 2. During the
week, they worked for 4 days for a total period of 40 hours
each and completed a job for which the standard time was
48 hours for each worker. Calculate the labour cost under the
Halsey method and Rowan method of incentive plan
payments.
Solution of Problem # 1
Hasley Method = (Hourly rate x Time taken) + (50% x Time Saved x Hourlyrate)
= (10 x 40) + (0.5 x 8 x 10)
= 440
Rowan Method = (Hourly rate x Time taken) + (Time Saved x Time Taken) x Hourly Rate
TimeAllowed
= (10 x 40) + (8 x 40) x 10
48
= 467
Problem 2
A worker is allowed 10 hours to complete a job on daily
wages. He takes 6 hours to complete the job under a scheme
of payment by results. His day rate is Rs. 6 per hour and piece
rate is Rs. 36. The material cost of the product is Rs.40 and
the overheads are charged at 150% of the total direct wages.
Calculate the factory cost of the product under
i) Piece work plan
ii) Rowan Plan
iii) Halsey plan
Solution of Problem # 2
Price Rate System = Rate per Unit x No. of Units produced
= 6 x 6
= 36
Rowan Method = (Hourly rate x Time taken) + (Time Saved x Time Taken) x Hourly Rate
Time Allowed
= (6 x 6) + (4 x 6) x 6
10
= 50.40
Hasley Method = (Hourly rate x Time taken) + (50% x Time Saved x Hourly rate)
= (6 x 6) + (0.5 x 4 x 6)
= 48
Problem 3
From the following particulars calculate wages earned by
workers A and B respectively under TaylorsSystem:
Standard time allowed
Normal wage rate
10 units per hour
Rs. 1 per hour
Differential rates to be applied:
90% of piece rate when below standard efficiency
125% of piece rate when at or above standard production
on a day of 8 hours
A – 75 units
B -85 units
Solution of Problem # 3
Unit rate= 1/10 =0.1 Rs/ unit
Below efficiency Rate = 0.10 = 0.10*0.9 = 0.09 Rs/unit.
Above efficiency Rate = 0.10 = 0.10*1.25 = 0.125 Rs/unit.
WorkerA:-
Produced unit = 75
Therefore, wage= 75*0.090 = 6.75Rs (ANS)
Worker B:-
Produced Unit = 85
Therefore, wage= 85*0.125 = 10.625 ~ 10.63Rs (ANS)
THANK YOU

More Related Content

Similar to Labour cost. cost and management accounting

Unit 2 (Part 1).pptx.pdf bba sem 2 timep
Unit 2 (Part 1).pptx.pdf bba sem 2 timepUnit 2 (Part 1).pptx.pdf bba sem 2 timep
Unit 2 (Part 1).pptx.pdf bba sem 2 timepredminoteproplus795
 
ACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSKriace Ward
 
Labour turnover
Labour        turnoverLabour        turnover
Labour turnoverAmenda Joy
 
Cost & management Accounting
Cost & management AccountingCost & management Accounting
Cost & management AccountingJisjissyChandran
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurementAkash Bakshi
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETMdRakibHasan27
 
Standard & labour costing
Standard & labour costingStandard & labour costing
Standard & labour costingamitrawool32
 
CA Presentation.pptx
CA Presentation.pptxCA Presentation.pptx
CA Presentation.pptxSree45865
 
Bba ii cost and management accounting u 1
Bba ii cost and management accounting u 1Bba ii cost and management accounting u 1
Bba ii cost and management accounting u 1Rai University
 
CA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTINGCA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTINGKanoon Ke Rakhwale India
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
Chapter 3 acc165
Chapter 3 acc165Chapter 3 acc165
Chapter 3 acc165intangrr
 
Labour cost accounting
Labour cost accountingLabour cost accounting
Labour cost accountingSaurabh Kumar
 
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...ShreyasKhandekar2
 

Similar to Labour cost. cost and management accounting (20)

Unit 2 (Part 1).pptx.pdf bba sem 2 timep
Unit 2 (Part 1).pptx.pdf bba sem 2 timepUnit 2 (Part 1).pptx.pdf bba sem 2 timep
Unit 2 (Part 1).pptx.pdf bba sem 2 timep
 
ACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWS
 
Labour turnover
Labour        turnoverLabour        turnover
Labour turnover
 
Cost & management Accounting
Cost & management AccountingCost & management Accounting
Cost & management Accounting
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
Chapter 04 Labour Costs
Chapter 04   Labour CostsChapter 04   Labour Costs
Chapter 04 Labour Costs
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Standard & labour costing
Standard & labour costingStandard & labour costing
Standard & labour costing
 
Job and batch costing
Job and batch costingJob and batch costing
Job and batch costing
 
CA Presentation.pptx
CA Presentation.pptxCA Presentation.pptx
CA Presentation.pptx
 
Bba ii cost and management accounting u 1
Bba ii cost and management accounting u 1Bba ii cost and management accounting u 1
Bba ii cost and management accounting u 1
 
CA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTINGCA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTING
 
Overhead cost
Overhead costOverhead cost
Overhead cost
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Chapter 3 acc165
Chapter 3 acc165Chapter 3 acc165
Chapter 3 acc165
 
Labour cost accounting
Labour cost accountingLabour cost accounting
Labour cost accounting
 
Unit 3 problems
Unit 3 problemsUnit 3 problems
Unit 3 problems
 
Work measurement
Work measurementWork measurement
Work measurement
 
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
 

More from Chandrika Prasad Das

Chapter 18, Derivative and Risk Management
Chapter 18, Derivative and Risk ManagementChapter 18, Derivative and Risk Management
Chapter 18, Derivative and Risk ManagementChandrika Prasad Das
 
3. Financial Market Constituents.pptx finance
3. Financial Market Constituents.pptx finance3. Financial Market Constituents.pptx finance
3. Financial Market Constituents.pptx financeChandrika Prasad Das
 
4. Investment in Government Securities - Why and How for Retail Investors.pptx
4. Investment in Government Securities - Why and How for Retail Investors.pptx4. Investment in Government Securities - Why and How for Retail Investors.pptx
4. Investment in Government Securities - Why and How for Retail Investors.pptxChandrika Prasad Das
 
6. Recent developments in Indian Financial System.pptx
6. Recent developments in Indian Financial System.pptx6. Recent developments in Indian Financial System.pptx
6. Recent developments in Indian Financial System.pptxChandrika Prasad Das
 
3.Material pricing.pptx cost and management accounting
3.Material pricing.pptx cost and management accounting3.Material pricing.pptx cost and management accounting
3.Material pricing.pptx cost and management accountingChandrika Prasad Das
 
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICE
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICEPRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICE
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICEChandrika Prasad Das
 

More from Chandrika Prasad Das (6)

Chapter 18, Derivative and Risk Management
Chapter 18, Derivative and Risk ManagementChapter 18, Derivative and Risk Management
Chapter 18, Derivative and Risk Management
 
3. Financial Market Constituents.pptx finance
3. Financial Market Constituents.pptx finance3. Financial Market Constituents.pptx finance
3. Financial Market Constituents.pptx finance
 
4. Investment in Government Securities - Why and How for Retail Investors.pptx
4. Investment in Government Securities - Why and How for Retail Investors.pptx4. Investment in Government Securities - Why and How for Retail Investors.pptx
4. Investment in Government Securities - Why and How for Retail Investors.pptx
 
6. Recent developments in Indian Financial System.pptx
6. Recent developments in Indian Financial System.pptx6. Recent developments in Indian Financial System.pptx
6. Recent developments in Indian Financial System.pptx
 
3.Material pricing.pptx cost and management accounting
3.Material pricing.pptx cost and management accounting3.Material pricing.pptx cost and management accounting
3.Material pricing.pptx cost and management accounting
 
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICE
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICEPRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICE
PRICE LEVEL.pptx ECONOMICS MONEY SUPPY PRICE
 

Recently uploaded

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Recently uploaded (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 

Labour cost. cost and management accounting

  • 1. Labour cost  Human efforts used for conversion of materials into finished products or doing various jobs in the business are known as labour. Payment made towards the labour is called labour cost. It can also be direct and indirect.
  • 2. Direct Labour: Direct labour is all labour expended and directly involved in altering the condition, composition or construction of the product. The wages paid to skilled and unskilled workers for manual work or mechanical work for operating machinery, which can be specifically allocated to a particular unit of production, is known as direct wages or direct labour cost. Hence, 'direct wage' may be defined as the measure of direct labour in terms of money. It is specifically and conveniently traceable to the specific products Wages paid to the goldsmith for making gold ornament is an example of direct labour.
  • 3. Example of direct labour • Machine operator • Shoe-maker • Carpenter • Weaver • tailor
  • 4. INDIRECT LABOUR • Indirect Labour: Labour employed to perform work incidental to production of goods or those engaged for office work, selling and distribution activities are known as 'indirect labour'. The wages paid to such workers are known as 'indirect wages' or indirect labour cost. • Example: Salary paid to the driver of the delivery van used for distribution of the product.
  • 5. Example of indirect labour • Supervisor • Inspector • Cleaner • Clerk • Peon • watchman
  • 6. Organisation for accounting and control of labour cost There are mainly five departments in an organisation which deal with labour . These are as follows: Personnel department Engineering department Time-keeping department Payroll department cost accounting department
  • 7. Labour Turnover  In all business organisation , it is a common feature that some workers leave the employment and new workers join in place of those leaving .this change in work force is known as labour turnover . Labour turnover is this thus defined as ‘the rate of change in the composition of the labour force in an organisation.’ Labour turnover varies greatly between different trades and industries .for eg, where part-time and seasonal labour is employed ,the rate will be higher.
  • 8. Measurement of labour Turnover  To facilitate comparisons between different periods and different undertakings , labour turnover may be expressed in rate .  There are three alternative methods by which this rate is computed .once a particular method is used ,it should be consistently followed for comparative analysis.  The methods are: 1-separation method:
  • 9. Measurement of L T  2-Replacement method  3- Flux method  Separation method:This method takes in to account only those workers who have left during a particular period .its formula is:  LABOUR TURNOVER RATE= NO.OF WORKERS LEFT DURING APERIOD X100 AVERAGE NO. OF WORKERS DURING THE PERIOD
  • 10. SEPRATION METHOD  AVERAGE NO. OF WORKERS= NO.OF WORKERS IN THE BEGINNING. + NO.OF WORKER AT THEEND 2  MULTIPLICATION BY 100 IN THE ABOVEFORMULA INDICATES RATE IN PERCENTAGE.
  • 11. REPLACEMENT METHOD  This method takes into account only those new workers who have joined in place of those who have left. Its formula is:  Labour turn over = No. of workers replaced during the period x100 Average no. of workers during the period  If new workers are engaged for expansion program or any other such purpose, they are not considered for this computation.
  • 12. FLUX METHOD  This shows the total change in the composition of labour force due to separations and additions of workers .its formula is:  Labour turnover rate = No. of workers left + no. of workers replaced x 100 Average no. of workers
  • 13. PRACTICAL PROBLEM From the following data given by the personnel department. calculate the labour turn over rate by applying: (a) Separation method (b) Replacement method, and (c) Flux method No. of workers on the payroll: At the beginning of the month At the end of the month 900 1100
  • 14. Practical During the month 10 workers left, 40 persons were discharged and 150 workers were recruited .Of these , 25 workers are recruited in the vacancies of those leaving while the rest were engaged for an expansion scheme.
  • 15. Casual worker  The casual or ‘badli’ workers are temporary workers who are not in the regular payroll of the factory .they are appointed on daily basis to meet additional work load or to stand in for absentee workers. The appointment of casual workers is a very common source of fraud in the payment of wages .it is, therefore, very important to have control over there appointments, their time of work and their payment of wages.
  • 16. Steps should be taken for accounting and control of casual workers  A)Full control regarding appointment and discharge of such workers should be maintain.  B) The appointment of such workers should be sanctioned by a competent executive.  C)Payment of wages should be made by a person other than one who appointed them .  D)When they are appointed as indirect Workers ,Time sheets should be issued to them.
  • 17. STEPS  E) when casual worker are employed at site for some contract work ,surprise visits should be paid to check their number.
  • 18. OUT- WORKERS  These are the workers who work out side the factory premises on behalf of the under taking known as out- workers. out-workers are classified in to two categories as given below:  A)Worker who work from their homes: they are supplied with raw materials and thy work either with their own tools or tools supplied by the concern .such worker are usually paid on piece basis .
  • 19. CONTROL OVER SUCH WORKER SHOULD BE EXERCISD IN THE FOLLOWING MANNER  1)All materials supplied should be accounted for and there should be no undue wear and tear of tools supplied by the concern.  2) The work should be delivered within the stipulated time.  3)The quality of finished work should be carefully inspected.
  • 20. (B)Workers sent to site  Some workers may be sent to site or customers premises for performing work. For example- some companies supplying engineering products provide after sales service and workers sent to customers place when so required. such out workers may while away their time when they go out for work .job cards should be issued to them so that labour cost of work done can be ascertained.
  • 21. Idle Time  Idle time represents time lost by workers who are paid on time basis .when workers are paid on time basis , some difference between the time for which they are paid and that they actually spend on production is bound to arise. this difference is known as idle time. idle time represents the time for which they are paid but no production is obtained . For example : time lost between factory gate and department, time when production is interrupted by machine maintenance ,tea breaks etc.
  • 22. Causes idle time may occur owing to productive, administrative or economic causes  1-Productive causes: The productive causes are those which result in loss of production. These include:  (a)idle time due to machine break down.  (b)power failures.  (c)waiting for tools and /or raw materials.  (d) waiting for work  (e)waiting for instructions  Idle time due to productive causes is usually controllable by proper planning, strict supervision and proper maintenance of plant and machinery.
  • 23. 2-Administrative causes  Idle time is sometimes caused by administrative decisions .This usually happens during depressions when some of machines have got to work below normal capacity and regular workers paid full amount of wages . This is because the management does not want to discharge trained workers temporarily. Such abnormal idle time arises out of abnormal situation and is generally not controllable.
  • 24. 3-Economic causes  Idle time may also be caused by fall in the demand of products , say due to sever competition ,seasonal nature of certain industries like woolen goods, ice-cream ,etc. where production can not be evenly distributed throughout the year. In such cases it is not possible to get rid of workers during slack season. Such surplus labour force is utilised for doing some other jobs and if such complementary jobs can not be found ,there will be some idle time which is beyond control.
  • 25. Treatment of idle time  From the point of view of treatment in cost accounts ,idle time may be classified as normal and abnormal .  Normal idle time :This is that waste of time which we can not stop because it is normal and employer has to pay laborers for this idle time. For example : a) Walking time from one department to other department. b) Consuming time to start any job in factory. c) Consuming time for fulfilling personal needs like drinking of water, refreshment and rest. d) Consuming time to set the machines.
  • 26. Treatment of the Cost of Normal Idle Time  1)-As overhead-It must be charged as indirect expenses in factory. For example, if a laborer gets Rs. 1 per hr and he spend 8 hrs in factory and his total wage will be Rs. 8 but he utilized his productive time 7 hrs, then direct labor cost will be 8 hrs X Rs. 1 = Rs. 8 and 1hr will be overhead of idle time and Rs. 1 per hr idle time will be written in factory expenses in cost sheet.
  • 27. 2)-As direct wages  We can also increase the cost of labor rate. with following way  If a labor works for 8 hrs, he gets = Rs. 1 per hr If a labor works for 7 hrs, he gets = Rs. 1 / 8 X 7 = Rs. 1.14 per hr Now labor cost will increase by 0.14 paise
  • 28. Abnormal Idle Time  This is that wastage of time which we can stop by good supervision. a)waste of time due to inefficiency of engineers. b) Power failure c) Delay of supply of material to factory d) Strike and lockout
  • 29. Treatment of the cost of Abnormal Idle Time  Wage for abnormal idle time is loss of business and it must be transferred to costing profit and loss account.
  • 30. Over time  Over time occurs when a worker works beyond the normal working hours. The normal working hours are laid down in the factories act. Acordingly,any worker working for more than 9 hours per day or more or more than 48 hours per week is entitled to over time payment..The factories act also provides for payment of overtime wages at double the normal rates of wages .the overtime work therefore, a costly affair and should be avoided as far as possible .
  • 31. Leave with pay  According to the factories act , workers are entitled to annual leave with full pay for a specified number of days in a year. This may include casual leave , medical leave ,special leave etc. The cost of paid leave can not be charged to any work order or cost unit since no work is done during this period .it is there fore ,treated as indirect labour cost and charged to over head.
  • 32. Leave with pay  Alternatively, leave wages may be treated as direct labour cost in which case the wage rate is inflated. This is done by estimating in advance the amount of leave wages and spreading it over the actual no. of working hours to give an inflated hourly rate.
  • 33. Holiday with pay  Workers are also entitled to certain holidays like diwali,id, Republic day, independence day etc. Like leave wages, payment of these wages of holiday is also unproductive in the sense that no production work is done on these days. Payment for such holidays should there fore be treated in the same way as leave wages.
  • 34. Worker's Remuneration:  The remuneration for labour is wages. The workers put effort & get wages in exchange of that. On the basis of pay scale & other allowances which are prescribed in the terms of employment, calculation of wages paid to direct or indirect workers is done. By terms of agreement between the employees & the employer, this may be modified from time to time. On the basis of job evaluation, merit rating, incentive plans, profit sharing & labour contract, the wages for the workers are determined.
  • 35. Features essential for a successful wage plan: A successful wage plan should have the under mentioned essential features: Fairness: A wage plan which is based on scientific time & motion study becomes fair to both employer & employee. Minimum Wage guarantee: Minimum wage guarantee must be given to the workers, whether under legal compulsion or not. This minimum wage must be fairly above subsistence level of income. Link between effort & remuneration: Unless there is a link between the value of work done & the remuneration payable, there will be unfair to either the employer or the worker. Satisfaction for the workers: The worker must be satisfied by the wage plan which will result in high morale & low labour turnover.
  • 36. Work guarantee: If there is payment by result, worker's earnings will not besatisfactory, even if the rate is too high, unless continuous work is there, which is available to them. Conformity with legal provisions & trade agreements: The wage plan should always be in accordance with any of theprovisions of law relating to the payment of wage & also there should not be any violation of trade agreement. Flexibility: The wage plan must be flexible & not rigid. In case of change in situations, incorporation of some change may have to be there in the wage plan also. Unlike rigid plan, modification can be made in the flexible plan without much disturbance. Cost of implementation: The wage plan cost of implementation must be as low as possible
  • 37. LABOUR COST Methods of Remuneration (systems of wage payment) There are two basic methods of labour remuneration: (a) Time Rate System; and (b) Piece Rate System Time Rate System Under the time rate system, workers are paid according to the time for which they work. Payment may be on hourly basis, daily basis or monthly basis. In this system, no consideration is given to the quantity or quality of work done. When payment is made on hourly basis, total wages payable are calculated as follows: Wages = No. of hours worked x Rate per hour Piece Rate System Wages under this system are paid according to the quantity of work done. A rate is fixed per unit of production and wages are calculated by the following formula: Wages = Rate per unit x No. of units produced.
  • 38. Various Incentive Plans Straight Piece Rate Method The method rewards employees based on their output.A fixed rate of wage is paid for each unit produced, or number of operations completed or job completed. The wages payable is calculated by multiplying the number of pieces produced by the wage rate. There is generally a guaranteed hourly rate for workers who are unable to attain the standard in order to pay the minimum ‘day wages’. Flat Time Rate Method This method is used for paying remuneration to employees based on their attendance. A fixed rate of wage is paid hourly, or daily, or weekly on the basis of time spent on the shop floor (i.e. production department) in production. The wages payable is calculated by multiplying thehours/days spent in production by the hourly/daily wage rate.
  • 39. •Halsey Premium Bonus Plan (Halsey Plan and Halsey-Weir Plan) This plan was introduced by F A Halsey in 1891. It isa simple combination of time and piece rate systems. A worker is paid a guaranteed base rate and is rewarded when his performance exceeds standard.A standard time is established in respect of each job or unit. Bonus is paid on the basis of 50% of time saved. The total wages payable is calculated as under: = (Hourly rate X Time taken) + (50% X Time saved X Hourlyrate) As a result of increased productivity, conversion cost per unit falls. This is because fixed overhead gets distributed over larger volume of output. Thus, the firm finds it possible to reward workers directly in proportion to production. In the case of Halsey Weir plan, the percentage used is 30 instead of 50.
  • 40. Rowan Premium Bonus Plan (Variable Sharing plan) A standard time is established in respect of each job or process. There is a guaranteed base rate. A bonus is paid on the basis of time saved computed as a proportion of the time taken which the time saved bears to the standard time. The total wages payable is calculated as under: = (hourly rate x time taken) + ( time saved x time taken) x hourly rate time allowed
  • 41. Taylor Differential Piece Rate Method This system was introduced by F . W. T aylor, the father of Scientific Management. The main features of this incentive plan are as follows: 1)Day wages are not guaranteed, i.e. it does not assure any minimum amount of wages to workers. 2)A standard time for each job is set very carefully after timeand motion studies. 3)Two piece rates are set for each job- the lower rate and the higher rate. The lower piece rate is payable where a worker takes a longer time than the standard time to complete the work. Higher rate is payable when a worker completes the work within the standard time. In other words, lower piece rate is payable to inefficient workers and higher piece rate is payable to efficient workers. It will be seen that there is a great difference between the wages of an efficient and an inefficient worker.
  • 42. Problem 1 You are presented with the following information by Olympia Engineering Company related to the first week of December 1999. The firm employs 5 workers at an early rate of 2. During the week, they worked for 4 days for a total period of 40 hours each and completed a job for which the standard time was 48 hours for each worker. Calculate the labour cost under the Halsey method and Rowan method of incentive plan payments.
  • 43. Solution of Problem # 1 Hasley Method = (Hourly rate x Time taken) + (50% x Time Saved x Hourlyrate) = (10 x 40) + (0.5 x 8 x 10) = 440 Rowan Method = (Hourly rate x Time taken) + (Time Saved x Time Taken) x Hourly Rate TimeAllowed = (10 x 40) + (8 x 40) x 10 48 = 467
  • 44. Problem 2 A worker is allowed 10 hours to complete a job on daily wages. He takes 6 hours to complete the job under a scheme of payment by results. His day rate is Rs. 6 per hour and piece rate is Rs. 36. The material cost of the product is Rs.40 and the overheads are charged at 150% of the total direct wages. Calculate the factory cost of the product under i) Piece work plan ii) Rowan Plan iii) Halsey plan
  • 45. Solution of Problem # 2 Price Rate System = Rate per Unit x No. of Units produced = 6 x 6 = 36 Rowan Method = (Hourly rate x Time taken) + (Time Saved x Time Taken) x Hourly Rate Time Allowed = (6 x 6) + (4 x 6) x 6 10 = 50.40 Hasley Method = (Hourly rate x Time taken) + (50% x Time Saved x Hourly rate) = (6 x 6) + (0.5 x 4 x 6) = 48
  • 46. Problem 3 From the following particulars calculate wages earned by workers A and B respectively under TaylorsSystem: Standard time allowed Normal wage rate 10 units per hour Rs. 1 per hour Differential rates to be applied: 90% of piece rate when below standard efficiency 125% of piece rate when at or above standard production on a day of 8 hours A – 75 units B -85 units
  • 47. Solution of Problem # 3 Unit rate= 1/10 =0.1 Rs/ unit Below efficiency Rate = 0.10 = 0.10*0.9 = 0.09 Rs/unit. Above efficiency Rate = 0.10 = 0.10*1.25 = 0.125 Rs/unit. WorkerA:- Produced unit = 75 Therefore, wage= 75*0.090 = 6.75Rs (ANS) Worker B:- Produced Unit = 85 Therefore, wage= 85*0.125 = 10.625 ~ 10.63Rs (ANS)