Emma Kate Robson
N00110709
The Redundancy of Feminism?
A Qualitative Analysis of Young Women’s Perceptions of
Post-Feminism
Internal Supervisor: Dr. Carol MacKeogh
BA in English, Media and Cultural Studies.
Date of submission: 14 April 2015.
Faculty of Enterprise and Humanities
Institute of Art, Design and Technology, Dun Laoghaire.
Abstract
Post-feminism is a highly ambiguous term. Subject to severe negative critique by second
wave feminists, post-feminists in academic circles are looked upon with distain. Post-
feminism supposedly signifies an era of shallow women who believe that in an age of
gender equality they may use their bodies to get ahead in life.
Literature refers to post-feminism as proliferating within the categories of white,
western educated, middle to upper class young women in contemporary society since the
early 1990s.1
Personally, falling into the criteria of the post-feminist I feel that many of
the accusations made by critics may be too general and unjust. With regard to academic
critique into the area, there seems to be a great lack of empirical evidence accompanying
the theories laid out.
Thus it seems the area of post-feminism is ripe for investigation. Such a study will,
therefore, be conducted through the qualitative analysis form of focus groups. It will aim
to shed some new light on the current perceptions of feminism in young women today,
and, also, see if post-feminism truly does proliferate in twenty-first century Ireland.
1
Diane Negra, What a Girl Wants? Fantasizing the Reclamation of self in Postfeminism (Oxon,
Routledge, 2009), pp. 10-90.
Angela McRobbie, The Aftermath of Feminism (London: SAGE Publications Ltd, 2009), p.1.
Table of Contents
Introduction.....................................................................................................................1
Chapter One – Literature Review - The Current Standing of Post-feminist
Critique............................................................................................................................5
Chapter Two - Method and Methodology..................................................................15
2.1 Researching Research.........................................................................................15
2.2 Practical Application of Research Method.......................................................19
Chapter Three - Analysis .............................................................................................24
3.1 Analysis Introduction......................................................................................24
3.2 Analysis of Central Questions............................................................................27
3.2 A Discussion of Analysis in Relation to the Literature Review. .....................40
Conclusion .....................................................................................................................43
Appendices..................................................................................................................A. 1
Appendix ‘A’ - Question Guide- Prior to Focus Group Dry Run. ....................A. 1
Appendix ‘B’ - Final Draft of Question Guide. ................................................... B. 1
Appendix ‘C’ - College Ethics Form ....................................................................C. 1
Appendix ‘D’ - Participant Ethics Form..............................................................D. 1
Appendix ‘E’ – Notation System........................................................................... E. 1
Appendix ‘F’ - Focus group ‘A’ transcript...........................................................F. 1
Appendix ‘G’ - Focus group ‘B’ transcript. ........................................................G. 1
Bibliography..................................................................................................................94
Acknowledgements
First and foremost, I would like to express my deepest gratitude to my supervisor, Dr.
Carol MacKeogh, for the patient guidance and valuable suggestions she provided during
the development. Her willingness to give her time so generously was deeply appreciated.
I would also like to thank my family for their continuing love, encouragement and
support given to me throughout my studies. In particular I would like to thank my niece
for inspiring my interest in the area of post-feminism.
Lastly, I would like to thank the participants who gave up there time and gave
invaluable empirical insight without which my dissertation would not have happened.
Declaration
I hereby declare that this project represents my own original work and has not been
submitted, in whole or in part, by me or another person, for the purpose of obtaining any
other credit/grade. I agree that this project may be made available by the College to
future students.
Signature:
1
Introduction
The term feminism was originally used in political and academic circles as a signifier for
an equality movement of the sexes. However, over time it has become a highly
problematical term. The currency of the term feminism has evolved and now circulates
on a colloquial level as well as at a political and academic one. Within the twenty-first
century the media is key in the circulation of ideas and it is here where many impressions
of feminism are constructed and consumed by the general public. This has led to
feminism being a highly ambiguous term with the connotations varying throughout
society. To some the label of feminist would be construed as a compliment, however, in
recent decades the label has become an insult and dirty word to many. Time magazine, in
a poll of words that should be banned in 2015, included feminism in the short list.2
Although an apology was issued stating they only wished to ‘invite debate’, it shows the
deep ideological rupture with regard to the term feminism in contemporary times.3
Thus,
even those who claim to be feminists, are highly aware of oppositional ideologies which
will attach the label of man hater to those individuals. The concept is, therefore, in current
times, a highly questionable one.
According to the Oxford dictionary, feminism, in its most basic form, is defined
as 'The advocacy of women’s rights on the ground of the equality of the sexes'.4
In 1792
Mary Wollstonecraft wrote A Vindication of the Rights of Woman in response to Charles
Maurice de Talleyrand-Périgord's report on female education. She wrote that women
should not be confined to education of the domestic sphere. Her work is commonly
2
Katy Steinmetz, ‘Which Word Should Be Banned in 2015?’, Time Magazine ( Nov. 2014) <
http://time.com/3576870/worst-words-poll-2014/ > [accessed 20 Jan 2015].
3
Steinmetz.
4 ‘
Feminism’, Oxford Dictionary.com (2014)
<http://www.oxforddictionaries.com/definition/english/feminism > [accessed Oct. 2014].
2
thought to be the primary contributor to the theory that became known as feminism.
However, '[t]he feminist literary criticism of today is the direct product of the 'woman's
movement' of the 1960s’, namely second wave feminism.5
Their central concerns were
with regard to the 'conditioning' and 'socialisation' which underpins the role of woman.6
The sentiment of second wave feminism continued, quite successfully, for three decades
before a new phenomenon, known as postfeminism or post-feminism, is said to have
come into being in the 1990s. Particularly ambiguous and unconfirmed terms in
themselves, the current uncertainty with regard to feminism further confuses the attempt
at specificity. I will set out simplified definitions for the sake of coherency throughout
this project. Although both terms refer to the same category of woman, the inclusion or
exclusion of the hyphen delivers alternating meanings. Postfeminism, birthed by second
wave feminists indicates that the need for feminism is ongoing. However, post-feminism,
naturalised within popular discourse, in its literal sense means the end of feminism. The
inclusion of a hyphen concluding that feminism is a thing of the past, it signifies that
equality has been achieved. I will from here out occupy the ‘naturalised’ position, but,
note the problematic nature of the term by referring to it as post-feminism.
Many second wave feminist theorists today focus on a critique of young women,
referring to them as post-feminists. A primarily academic notion, these theorists both
create and critique post-feminism. Their arguments pay particular attention to the turn
away from feminism in a society which celebrates the re-instalment of stereotypical
female gender roles or ‘truths’.7
This may involve embracing categories such as slut,
consumer and poseur. Although there has been much critique regarding post-feminism it
5
Peter Barry, Beginning Theory (Manchester: Manchester University Press, 1995), p.121.
6
Barry, p.122.
7
Negra, p.2.
3
seems much of this may be based on purely theoretical levels. In my knowledge of
feminism, based on college teachings, it seems that much of the critique of post-feminism
appears harsh and provides little empirical evidence.
It is said that post-feminism proliferates within western society. With specificity
placed on white, middle to upper class and well educated young women. It might be said
then that I personally may be labelled as a post-feminist. Perhaps my college education
on the matter does give me an understanding of feminism beyond that of the average
woman in my position. However, it is from here that I established an interest in post-
feminism and developed feelings of indignation at the accusations that post-feminism,
and, perhaps, I personally, disregard notions of equality and place an emphasis instead
upon bodily appeal and 'to-be-looked-at-ness'. 8
Yet in saying this, a discussion with my
nine-year old niece revealed to me that she wants to be like singer Rihanna. A woman
who notoriously uses nudity for publicity. I, therefore, feel torn in my feelings towards
the accuracy of the accusations made by second wave feminists, is it postfeminism, where
feminism is still necessary, as they suggest? Is it post-feminism where one may focus on
the individual self not a community fighting for equality? Or, is it possible to make the
issue this black and white at all?
Although I do understand both feminism’s aims and objectives and their critique
of what they term post-feminism, I feel that the area needs more work conducted to truly
understand the phenomenon. This project, as a result, proposes to, if only on a small scale,
provide further insight and understanding into post-feminism and those who fall under its
identity markers. This will be done by conducting qualitative research, specifically focus
8
Andi Zeisler, Feminism and Pop Culture (California: Seal Press, 2008), p.8.
4
groups, to gain clear empirical insight into young women who fit the post-feminist criteria
laid out by second wave feminists.
The key motives of investigating the idea of post-feminism come from, firstly, the
apparent lack of tangible evidence provided in critiques of the area. Secondly, my slight
indignation at being labelled as such a, perhaps, superficial being who disregards the need
for equality.9
This research project, therefore, moves forward by investigating whether
there is a shortage of empirical evidence for the harsh accusations made by second wave
feminists? Would there be any justification for such a lack of research? Can this research
provide a new insight into the matter? Do young women actually fit the theorists’ models?
What stance do they have with regard to gender politics? How do they relate to current
gender structures and media structures? Is there a presence of feminist or post-feminist
teaching in general education? Do all young women, like my niece, admire someone who
capitalises off her body? And, ultimately, does the label of post-feminism fit? While the
number of participants in the research is small and does not permit generalisation, the
findings resulting from such questions can begin to tease out these ideas and the status of
post-feminism within Irish culture.
When attempting to type postfeminism into Microsoft Word the word is marked
as incorrect. However, post-feminism is deemed correct. This shows the current ideology
of western society to, perhaps, be concurring with a naturalised disregard of feminism.
However, it will not be until concluding that I will place my verdict on which grammatical
way I believe it should be spelled, or, if, indeed, either term is fully appropriate.
9
Negra, p. 2
5
Chapter One – Literature Review - The Current Standing of
Post-feminist Critique
In order to gain a firmer understanding of post-feminism, the concept will be explored
through a broad range of critical literature. The theorists examined here may be seen as
primarily second wave feminists, or, are well versed in second wave feminist theory.
These ideas are rooted in achieving equality of the sexes. Most literature present in the
area stands in opposition to post-feminism. Tracing through the central ideas that occur
throughout this body of work will serve to give an insight into the current state of research
and critique regarding post-feminism. Investigating what each theorist brings forward and
the manner in which they concur.
As a starting point, I have selected Interrogating post-feminism by Tasker and
Negra as it was the prescribed post-feminism text within my college course. It appears, to
me, to hold a very negative view of post-feminism and is written in quite a polemic
manner. They categorise post-feminism as a backlash against its feminist predecessors.
The post-feminist movement, according to Tasker and Negra, has stemmed from the
media's implied redundancy of feminism.10
Fuelled through magazines, cinema and
popular music there is an obsession with youth and a popularising of the idea that
fulfilment can be gained through 'empowerment'.11
An empowerment that seems to
revolve around the idea of, perhaps, the have it all woman. As many writers point out in
their work, there is no concrete definition for the term post-feminism. There are, however,
certain areas on which many critics agree. This view of post-feminism as a backlash
against its predecessors re-occurs throughout post-feminist critique. Tasker and Negra in
10
Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke University Press,
2007), p.1.
11
Tasker and Negra, pp. 1-5.
6
their writing appear to be placing a great amount of blame upon the media’s role in the
proliferation of post-feminism.
This notion of the media being to blame is also taken up by critic Rosalind Gill.12
She also believes that central to post-feminism is a sense of empowerment. She locates
this empowerment as a superficial or ‘makeover paradigm’ generated through media
discourse.13
Gill also notes the difficulty there is in defining a set of specific
characteristics within post-feminism. Although Gill fails to give a strict definition to the
term post-feminism, she highlights what she believes to be the central facet of post-
feminism. She categorises it as a sensibility of femininity and the body involving self-
surveillance and empowerment.14
It may be argued then that women having developed a
strong awareness of what is expected of them with regard to their bodies.
Angela McRobbie, is yet another critic that notes the difficulty she has in defining
post-feminism. However, unlike Tasker and Negra, she believes that it is not merely a
backlash, but has been instilled within contemporary society at an institutional level.15
She writes of a new sexual contract for the females of the western world. Within this
contract, they must ‘make good use of the opportunity to work, to gain qualifications, to
control fertility and to earn enough money to participate in the consumer culture’.16
This
sexual contract is instilled within women at an educational level, where, given the open
mind set of the students, it will yield the most effective results.17
McRobbie further
expands on this idea by stating that within educational spheres there are also aggressive
policies by which feminism is eradicated and seen as a thing of the past.18
The notion,
12
Rosalind Gill, 'Postfeminist media culture: elements of a sensibility', European journal of cultural
studies, 10.2, (2007), 147-166. (p. 5) < http://eprints.lse.ac.uk > [accessed 25 February 2014].
13
Gill, p.3.
14
Gill, p. 3
15
McRobbie, p.1.
16
McRobbie, p. 54.
17
McRobbie, pp. 72-75.
18
McRobbie, p. 76.
7
illustrated in McRobbie’s work, that the institution of education is the hub of post-
feminism, highlights that it is the youth of society who are central to the phenomenon,
and, in completing education, are bringing it into the work place and later life.
This idea of the instillation of post-feminism at an institutional level can also be
detected in Nina Power's book The One Dimensional Woman. Here, this idea is illustrated
through her selection of American high profile politician, Sarah Palin, as a subject whom,
as she quotes from Alain Miller, 'represents a certain kind of ''post-feminist'' woman', one
that understands the phallus as merely a ‘semblance’.19
Power documents how Palin is
often described as a 'pitbull in lipstick' due to the fact she has managed to avoid the
traditionally female dichotomies of 'mother/politician, attractive/ successful [. . .] by
embodying both sides of each at once'.20
It may be concluded, therefore, that she is the
embodiment of the notion of the 'empowered woman'. The term which continues to crop
up as this investigation unfolds. For Power the ‘empowered woman’ is a woman who has
it all, as with Palin, 'women want to be her, many men [. . .] want to have sex with her'.21
Power also stresses the importance of the body in her work. Post-feminism is an age in
which the notion of the ‘walking c.v’ has proliferated, women essentially 'sell
themselves', their body and aesthetic qualities being central in their employability.22
Her
stance as a second wave feminist sees her, as with many others from the same origin,
condemning post-feminism and viewing it as a negative. In her words, in a post-feminist
society, 'you are your breasts'.23
In Diane Negra’s What a Girl Wants? she states that post-feminism 'trades on a
notion of feminism as rigid’, in contrast with this she highlights how post-feminism
19
Nina Power, One Dimensional Woman (Hants.: O Books, 2009), p. 7.
20
Power, p. 8.
21
Power, p. 9.
22
Power, p. 23.
23
Power, p. 24.
8
‘offers the pleasure and comfort of (re)claiming an identity uncomplicated by gender
politics'.24
She also concurs with the idea that post-feminism is a 'backlash' against
second wave feminism.25
For Negra, post-feminism places feminism as being something
of the past, irrelevant in contemporary culture and practices. Today, there has instead
been a turn to a commodity driven achievement of self.26
Negra also addresses the issue
where by post-feminist 'culture revived the “truths”' of femininity. 27
Creating a society
that claims and often celebrates their stigmatisation as bitches and gold-diggers.28
The notion of youth is also highlighted, Negra points out that, within post-
feminism, there appears to be a breakdown between girlhood and womanhood. Here,
similar to Power’s previously mentioned idea of the walking c.v, women bring forward
girlish qualities to adulthood in order to be both successful and desirable.29
Adhering to
this 'generalized sense of appearance', Negra believes, is based around the re-proliferation
of discrimination in post-feminist culture.30
Thus, she believes post-feminists embrace the
gender stereotype of women as superficial; which second wave feminists have fought
against.
Negra's work seems to stick to the general consensus laid out by the previously
mentioned second wave feminists. She, like many others, sees post-feminism as
proliferating within the context of 'white females'.31
She also points out that post-feminism
'flourishes under the conditions of private wealth'.32
These categories, alongside the
importance of educational hubs, highlight where the proliferation of post-feminism may
24
Negra, p.2.
25
Negra, p.4.
26
Negra, p. 4.
27
Negra,p. 12.
28
Negra,p. 12.
29
Negra, pp. 12-14.
30
Negra, p. 90.
31
Negra, p. 10.
32
Negra, p. 91.
9
occur. These theorists have so far held strong opposition to post-feminism. They seem to
believe that young women today have no interest in continuing a fight for equality. In
spelling post-feminism without a hyphen, they are, thus, pointing to the continued need
for feminism in contrast to post-feminism where it is deemed redundant.
There are an abundance of critical texts regarding post-feminism, however, most
are written by those who come out of an age of second wave feminism. It is clear, through
the polemic nature of their speech and the lack of empirical evidence that they come from
a very specific mind set. It is harder to find younger theorists who have critiqued post-
feminism. However, there are some more contemporary texts and theorists who although
well versed in second wave feminism do not stand in severe opposition to post-feminism.
These exceptions include Andi Zeisler and her 2008 text Feminism and Pop
Culture. Zeisler was in her early twenties in the early 1990s which is often identified as
when post-feminism commenced. For Zeisler, feminism and post-feminism are inherently
linked with popular culture and the rhetoric it employs. In its most basic sense, popular
culture 'is any cultural product that has a mass audience' and is available to anyone with
enough money to access it.33
When investigating the relationship between popular culture and feminism Zeisler
points out that popular culture has loosened the divide between high and low culture.34
This may be linked with Negra's idea, previously outlined, that there has been acceptance
and even a celebration of previously low brow female labelling. Formally derogatory
terms have been naturalised in popular culture. Also, within advertising woman are the
'focus' dictated by 'the male gaze'.35
This serves to highlight the importance of popular
culture and in propelling the idea of post-feminism. It serves as a mediator between
33
Zeisler, pp.1-2.
34
Zeisler, p.4.
35
Zeisler, pp.4-7.
10
instilled patriarchal ideologies and young women.
Zeisler is not so rigid in her ideas about why post-feminism came into being as
she provides the reader with two versions. It could be described, in unity with critics
previously cited, that within post-feminism 'the overall affect is grotesquely distorted to
maximise its worst features'. 36
However, on a more positive note it may alternatively be
described, 'as a funhouse-mirror view' of second wave feminism.37
Zeisler, thus, seems
to break down the positive/negative divide between postfeminism and post-feminism, by
indicating that young women may not be viewed in black and white terms.
Zeisler points out that post-feminism was encouraged and developed most
significantly within the facets of television, advertisement and music. Zeisler crudely puts
it that you often now have women talk about 'fucking men rather than being fucked'.38
She also states that within post-feminism, there is a celebration of 'single women's
economic independence’.39
She believes that within post-feminism, money is
everything.40
She backs this up by giving examples of how the wealth of the likes of Julia
Roberts and Oprah Winfrey became central in media publications, basically, wealth
became a 'shorthand for their power'.41
This 'success' reflects across all popular culture,
including the likes of advertising. Here the 'new “badass”' category of advertisement
came into being whereby the 'language of liberation' has been capitalised upon.42
The
products advertised were to become simulations of independence, 'trinkets that
“celebrated” their independence'.43
Lastly then is the outlet of music and most notable
within post-feminism is the Spice Girls.44
A group with the mantra 'girl power' and who
36
Zeisler, p. 14.
37
Zeisler, p. 14.
38
Zeisler, p. 90.
39
Zeisler, pp.100-101.
40
Zeisler, p.101.
41
Zeisler, p.101.
42
Zeisler, pp. 102-104.
43
Zeisler, p.104.
44
Zeisler, p.107.
11
wore 'push-up bras and hot pants', women who sang about the surface issues of the
male/female divide but failed to look at why.45
They were the 'empowered woman'
exemplified, a dilution of feminism that could sell and be harnessed by popular culture.46
However, Zeisler notes that this 'girl power' was not a wholly negative move in the field
of feminism as it was brought to light that children exposed to the Spice Girls 'often
believes in themselves [... more than] young women'.47
Within the work of Andi Zeisler we see a more neutral stance taken towards post-
feminism. Unlike others previously mentioned, who locate their critique purely within a
second wave feminist point of view, she does not completely disregard post-feminism as
completely countering the work of second wave feminists. Zeisler also uses some basic
examples to illustrate her work which are rarely found within the work of second wave
feminism with regard to post-feminism. From her work, it is clear that the role of popular
culture and in particular female music icons are central in the proliferation of post-
feminism.
Jacki Willson is another theorist who, although, well versed in the critical work
of second wave feminism, offers a more neutral appraisal of post-feminism. She does this
successfully by including examples of successful post-feminist women and admitting that
the labelling of the post-feminism generation as those who 'disregard and disrespect' the
work and achievements of second wave feminists is, essentially, a crude over-
exaggeration.48
Like many of the theorists mentioned already, Willson seems to believe
that the notion of 'empowerment' is a central concept within post-feminism and within
The Happy Stripper she holds up a magnifying glass to this notion of empowerment, with
45
Zeisler, pp.107-108.g
46
Zeisler. p.108.
47
Zeisler, p. 109.
48
Jacki Willson, The Happy Stripper: Pleasures and Politics of the New Burlesque (New York: I.B.
Tauris and co, 2008), p.9.
12
specificity placed on the work place.49
Her views seem to somewhat mirror those of
Power in that the body is a central facet for women in contemporary society. Also similar
to Negra's theory of women reclaiming derogatory and weak characteristics within
contemporary society, Willson says many 'feminine' qualities have been 'inverted to
suggest [. . .] business strengths rather than womanly weaknesses'.50
She explains how, in
the past, the combination of 'femininity' and 'business' were not seen as 'compatible
bedfellows' and if they did share a bed it was purely on a 'prostitution' basis.51
However,
Willson points out that society has evolved and that feminine traits which were 'formally
seen as oppressive and restrictive' have become advantageous.52
Examples such as
Madonna and Dita Von Teese are given to provide evidence of such a shift. Her work
suggests that a breakdown between labor and popular culture has occurred. Although her
work focuses on the burlesque element, Willson states that what was once confined to the
darkened room is now encompassed in a 'new burgeoning model of womanhood'.53
The
post-feminist work environment, therefore, has ultimately become a 'marketplace that
promotes the idea of the “bad” girl who needs to dress sexily' as well as being a
'successful, astute business woman'.54
This marketplace can be contrasted with the more traditional model put forward
by second wave French feminist, Luce Irigaray. In 1977 she published This Sex Which is
Not One, a critique of women being mere objects within the marketplace. This societal
marketplace, which formed the basis of much second wave feminist unrest, functioned
on the 'exchange of women'.55
They are encouraged to be passive as both market
49
Willson, p. 10.
50
Willson, p. 83.
51
Willson, pp. 88-89.
52
Willson, p. 94.
53
Willson, p. 79.
54
Willson, p. 94.
55
Luce Irigaray, This Sex Which is Not One, trans. by Catherine Porter (New York: Cornell University
Press, 1985), p. 170.
13
commodities and market consumers. Consumerism and superficiality driving their
success as an asset to a man. Women are reduced to the status of wife, daughter or sister
and maintain exchange value 'only in that they serve as the possibility of, and potential
benefit in, relations among men'.56
Within Irigaray's model of the marketplace, men and popular culture controlled
women. The women were, essentially, pawns. However, within post-feminism something
similar to the post-colonial theory of 'adopt, adapt, adept' seems to have occurred.57
Willson's post-feminist presentation of the marketplace, seems to correspond with the
'adept' phase of this theory. In women accepting the roles placed upon them a sort of
hybridity has occurred. Women still encompass many of these so called 'desirable' traits,
however, perhaps it could be said that these have merged with residue of second wave
feminism. Instead of occupying one side of the binary of career success versus
object/consumer, women have found a way to occupy both. A breakdown seems to have
occurred between labor and popular culture. Thus, resulting in a marketplace in which
women now occupy a higher subject position than originally attributed to them. A
palimpsest effect of sorts has thus occurred.
Willson’s work provides an insight into how the body and concepts of femininity
may positively play a role within the work place. She opens up the negative connotations
that stem from second wave feminist critiques regarding women’s contemporary role
within the workplace and popular culture. Questions, therefore, appear that need to be
addressed; does the body play a central role in popular culture and the lives of young
women? And is this always a negative thing?
Zeisler and Willson are theorists who see some hope and positives for post-
56
Irigaray, p. 172.
57
Barry, 196.
14
feminism. However, similar to the more negative critique laid out, they provide little
empirical evidence for their claims. Although they serve to break down the distinction of
post-feminism holding purely negative connotations, they also further illustrate the need
for empirical research into the area.
In conclusion, through the investigation of these texts, there are several points to
be made. Firstly, is to point out that post-feminism appears to be a particularly ambiguous
term. With some of the older publications positioning it as merely a ‘backlash’ against
the work of second wave feminists, while later ones admitting that this idea may be a bit
harsh. Secondly, although there seems to be an absence in definition of the notion itself,
there appears to be precision with regard to pinpointing where post-feminism proliferates.
It seems to thrive most certainly amongst females within western society, but more
specifically, within the educated white females of middle and upper classes. Thirdly,
there are some areas which seem to re-occur throughout all the texts examined here, most
predominant are the importance of the role of popular culture within post-feminism, and,
the escalation of the notion of ‘the empowered woman’.
Lastly, and the main concept that has justified the creation of this dissertation, is
the issue of evidence. Within these texts there is an abundance of theory, however, there
is an extreme lack of empirical research demonstrated. The limited evidence of a
spattering of advertisements and a select few examples does not justify the grand claims
being made across the critiques of post-feminism. Therefore, it may be said that there is
a void regarding empirical research within the work of second wave feminists and general
criticisms of post-feminism. Forcing questions of validity to arise thus poses an
opportunity for research to be done within a relatively unexplored field; post-feminism.
15
Chapter Two - Method and Methodology
This chapter will outline both the current state of feminist research. It will also illustrate
the practical application of my chosen methodology.
2.1 Researching Research
As has been already established, a central issue with the notion of post-feminism is the
clear lack of empirical research. This chapter seeks to outline the possible reasons for the
shortage of research within the critiques of post-feminism. It also looks to identify
methods which are suitable for such research.
Prior to second wave feminism, during the rule of quantitative research, Ann
Oakley claimed that within both life and sociology ‘women as a social group are
invisible’.58
An influential figure in the field of feminist research she appears to have
dismissed sociology as being dictated by patriarchy and placing sociology as a purely
male orientated field. Her work also states that ‘“objectivity”’ has resulted in the
proliferation of a patriarchal narrative.59
An objectivity which ‘may reduce many obvious
biases, but [. . .] do not seem to have affected [. . .] sexism’.60
For Oakley then, it seems
objectivity is useless as it is based on the Eurocentric man and denies the point of view
of others. Dominant quantitative forms of research, therefore, recreated patriarchy.
Nicole Westmarland also writes of objectivity, outlining the problems feminist
researchers have identified with regard to objectivity and quantitative methods.61
She
states that ‘knowledge has traditionally been measured by how objective it is deemed to
58
Ann Oakley, The Ann Oakley Reader: Gender, Women and Social Science (Bristol: Policy Press,
2005), p. 189. Google book.
59
Oakley, p. 189.
60
Oakley, p. 189.
61
Nicole Westmarland, 'The Quantitative/Qualitative Debate and Feminist Research: A Subjective View
of Objectivity', Qualitative Social Research , 2.1, (2001), 1-28, in Different Approaches for Inter-Relating
Qualitative and Quantitative Method < http://www.qualitative-research.net/ > [accessed 29 December
2014].
16
be’ and if it was deemed subjective it would be classified as ‘“untrue”’.62
However,
Westmarland states that quantitative research, like qualitative research, ‘is interpreted and
often manipulated’.63
This points out the inability of achieving objectivity in any kind of
research. According to Westmarland, many feminists view quantitative methods as crude
and their attempt at impartiality make ‘participants feel uncomfortable with the
researcher’.64
She continues by outlining the advantages feminists associate with
qualitative methods. Primarily, through a positivist approach that they aim to achieve
‘validity, rather than objectivity’.65
Authority of knowledge would, therefore, be found
through words not statistics, interviews and not surveys. However, she warns that using
only qualitative methods in feminist research ‘simply reinforces traditional
dichotomies’.66
Researching women, therefore, should not automatically rule out
quantitative methods.
Similar to Westmarland’s idea that there is no one perfect method for feminist
research, Marjorie L. DeVault talks of a liberating method, leaving researchers free to
resist ‘routine practices’.67
She insists that feminist ideologies and methods should be
ambiguous ‘that answers to questions should fit with the contours of women’s lives’.68
This suggests feminist research should be based on lived experience rather than a strict
research method. DeVault traces the major shift in research methods with regard to
feminist research to the second wave feminist movement in the 1960s where they began
to think ‘skeptically about existing research methods’. There seems to have been a turn
away from identifying surface problems and instead conducting an ‘“excavation”’ into
62
Westmarland, p. 6.
63
Westmarland, p.6.
64
Westmarland, pp 6-12.
65
Westmarland, p. 21.
66
Westmarland, p. 17.
67
Marjorie L. DeVault, Liberating Method: Feminism and Social Research (Philadelphia: Temple
University Press, 1999), p. 1. Google book.
68
DeVault, p. 23.
17
the lives of women. 69
According to DeVault, feminist methods tend ‘to subvert the notion
of objectivity’.70
In situ with Westmarland’s ideas, they indicate a shift toward positivist
research. Positive research, however, is something that many feminists have also rejected
as it is based on the idea that the researcher can accurately interpret the information and
make general assumptions. Yet, DeVault’s ideas seem to point out the need for action in
research and suggests that positivism in association with qualitative methods may be the
answer. However, she also indicates that the researcher should attempt a level of
objectivity.71
It is important to note the significance of the dates DeVault sets forward with
regard to radical changes in research methods. She notes that, although, feminist
researchers began moving towards more suitable methods in the 1960s, such research
remained uncommon until the 1980s.72
Thus, giving an insight into why there appears to
be a lack of evidence from second wave feminists with regard to post-feminism. It seems
research was not common practice for many second wave feminists during their time of
academic development.
(Re)searching Women is a book which gives another possible reason for this lack
of empirical evidence. It suggests that it may be due to the fact that many feminist
theorists are writing from a time of doubt regarding qualitative research.73
Firstly, that it
is labelled 'feminist' research sets up a binary between feminists and non-feminists, those
not identifying with the term turn away from such research.74
Secondly, that from the
1970s through to the 1990s qualitative research did not receive much economic funding.75
69
DeVault, p. 30.
70
DeVault, p. 38.
71
DeVault, p. 59.
72
DeVault, p. 28.
73 (
Re)searching Women, ed by. Anne Byrne & Ronit Lentin (Dublin: Institute of Public Administration,
2000). Google book.
74
Byrne, p. 2.
75
Byrne, p. 15.
18
Lastly, the editors, in carrying out research for the book itself, found ' a respondent
observed that in identifying herself as a feminist researcher [her work. . .] would not be
considered as legitimate scholarship'. 76
In the world of academia the feminist is
stigmatised.
Stanley and Wise also see the social sciences as ‘sexist’.77
They believe social
science is distorting ‘the experiences of women’ and creating a unitary view of woman.78
In placing women in parameters outlined by and designed for men, women’s vast
experience is flattened out into a single narrative. Although Stanley and Wise criticize
the social sciences for their patriarchal values they also seem to criticize those feminists
who seem to withdraw themselves from research altogether. They claim many feminists
fail ‘to examine critically the relationship between theory and research’.79
These feminists
serve in the proliferation of what Stanley and Wise refer to as ‘[g]rand theory’.80
Grand
theory appears to involve a disregard for research and supposes a unified female
experience. This, however, sounds quite similar to the suppression placed upon women
by patriarchal social sciences. This irony is noted by Stanley and Wise who suggest the
impossibility of a static female identity. They state that the female experience ‘will
inevitably change’ from person to person.81
This suggests that, perhaps, post-feminism is
more of an open category than most critics state.
Stanley and Wise suggest a very useful way in which feminism may regain
credibility. They state that ‘through doing feminist consciousness that we can really
76
Byrne, p. 21.
77
Liz Stanley and Sue Wise, Breaking Out Again: Feminist Ontology and Epistemology (London:
Routledge, 1993), p.26. Ebrary.
78
Stanley, pp. 3-27.
79
Stanley, p. 58.
80
Stanley, p. 44.
81
Stanley, p. 123.
19
understand its dimensions, content and parameters’.82
They propose that there must be a
return to the investigation of female experience, giving it sufficient merit.
In conclusion, each text examined here sets out reasons that may be designated to
an understanding into why there is a void in post-feminist critique. The heart of these
explanations revolves around the fulcrum of the quantitative/qualitative debate. There
appears to be a general consensus that traditional research methods have been saturated
in patriarchy. The primary problem for feminist research seems to be in finding a suitable
alternative to the quantitative methods associated with social science. If feminism were
to fully embrace the qualitative methods they only serve to add to the already instilled
binary of male and female knowledge. They also run the risk of a lack of academic
credibility and, as a result, funding. Perhaps though, the key finding may be that feminist
research did not start to proliferate until the 1980s. This meaning that the grand theory of
the 1960s may have been what second wave feminists were most familiar with. Perhaps,
then they knew no better.
This idea of grand theory appears to be reoccurring within the critique of post-
feminism, perhaps this is because it was common practice for second wave feminists.
Although, this may possibly explain the popular negation of empirical research regarding
post-feminism it cannot, however, I feel, be excused in the current climate of academic
knowledge.
2.2 Practical Application of Research Method
This section will outline the practical elements I undertook in selecting and applying a
research method to my project.
82
Stanley, p. 132.
20
Selection of Method/Methodology
In an ideal scenario I would have undertook a mixed method research project
involving both qualitative and quantitative methods, however, there were certain
restraints that needed to be kept in mind. These included: Time, monitory, ethical and
practical issues.
Taking these issues into consideration I decided to conduct my research using the
method typically associated with feminist research, that of a qualitative analysis.
However, I will add reflexive qualities to my analysis, and draw influence from positivist
approaches. In selecting a qualitative approach the method of focus groups seemed the
most practical as it allowed me to gain a broad range of epistemological opinions within
a short time. There would be two focus groups of four women.
Recruitment
Given the supposed criteria for where post-feminism proliferates; white,
middle/upper class and western, there are those who more ideally fit into the categories
of post-feminism. Also due to the importance of free flowing discussion I decided to use
personal connections in recruiting to encourage a relaxed environment. However, I
avoided close friends or humanities students as they would have a heightened awareness
of my project/subject.
Having attended a boarding school I feel many of my acquaintances may be
labeled post-feminists as such a school generally holds upper class connotations. Using
Facebook I got in contact with such women. Everyone was initially very enthusiastic.
However, it proved very hard to get them to commit to a date. In the end the eighteen
21
year-old woman with whom I was most acquainted offered the services of her college
housemates. A similar thing happened within the older group.
Although not the scenario I had originally envisaged, these women also hold a
common societal position which reflects upon the theoretical characteristics of post-
feminism laid out in the literature. The fact that I knew one member of each group prior
to conducting the interviews seemed to benefit the flow of the focus group as they assisted
greatly in creating a comfortable environment. They did this, in both groups, by
introducing me prior to the focus group and taking a primary role in the first few minutes
of conversation.
Selection of Questions
Research indicated that the conversation should be based around the female experience.
Also the questions should be more of a guide than a strict structure. The idea being that
the loose structure will allow for participants to speak freely.
Over several drafts, I devolved a question guide which I felt comfortable with.83
It was broken into the segments commencing with me, the researcher, stating that these
would be strictly their views and opinions and that there would be no right or wrong
answers. In a bid to create a friendly environment, I asked a question which I answered
before asking each participant in turn to so do. From here the guide developed through
the stages before reaching the ones most central to my research project. This process,
inspired by the book Successful Qualitative Research, aimed to allow an organic
unfurling of conversation.84
83
Please see appendix ‘A’.
84
Virginia Braun and Victoria Clarke, Successful Qualitative Research: A Practical Guide for Beginners
(London: SAGE, 2013), pp.117-120.
22
It was through prompts and contemporary examples within popular culture that I
intended to guide the focus group and build theories.
Dry run
Here I discovered the difficulty the researcher may have in removing their personal
views and opinions. I also decided that a loose time-frame of up to one hour should be
used. With regard to the questions more colloquial language and some more prompts
were needed.85
I, therefore added as many generic prompts to my question list as
possible and on the days of each focus group I trolled through social media to find up to
date, relevant prompts and popular culture examples.
Ethical Procedure
In filling out an ethics form distributed by the college, it became clear that there
are many restrictions in place for an undergraduate research project.86
Age limitations
were my primary concern. Therefore, within the two focus groups, one would focus on
eighteen year-olds and the other on twenty-one year-olds.
I then created an ethical consent form for participants to sign.87
It sought to
equalise the power relationship and reiterate their position as anonymous volunteers.
85
Please see appendix ‘B’.
86
Please see appendix ‘C’.
87
Please see appendix ‘D’.
23
Conducting the Focus Groups
Each focus group participant was informed why this research was being carried out and
each was issued an ethical consent form and I stressed the key factors of it vocally as well
illustrating I would be using my laptop as a recording device.
The focus group containing eighteen year-olds (focus group A) was carried out in
the sitting room of the house in which they resided. There was a fire and we sat in a semi-
circle around the fire eating the Cadbury’s Roses I brought with me. It was very
comfortable and discussion was animated and lively.
The focus group containing twenty to twenty-two year olds (focus group B) was
conducted under quite different circumstances. Having not confirmed a date for us to
meet a participant of focus group B texted me and informed me that they would all be
together the following evening prior to a night out.
We conducted the focus group within the kitchen of one of the participants.
Although each greeted me with enthusiasm the entire discussion felt rushed. The
discussion barely reached the fort-five minute marker and everyone seemed a little
uncomfortable. However, all the relevant questions were asked and answered.
Post-Focus Group
After each focus group I took some notes on the layout and any factors I felt important to
the analysis.
The following day I took some further notes on issues or areas that had stayed
with me and that I believed were relevant upon further reflection.
24
Chapter Three - Analysis
This chapter will focus on all elements of analysis involved in my research into young
women’s perspectives regarding post-feminism. For clarity please find my notation
system listed in appendix ‘E’.88
3.1 Analysis Introduction
As with any research there are both advantages and disadvantages with every method. I,
therefore, bearing in mind restrictions, created what I believe to be a suitable approach
for investigating post-feminism and attempting to reach empirically based results.
Selecting a qualitative method seemed logical as it is the method most associated
with feminist research. I also believed it to be relevant to my investigation of post-
feminism as it is based on constructivism. Unlike quantitative methods, it does not serve
to merely test ideas but to generate them. This seemed highly applicable to an area which
has a blatant lack of research accompanying the theory on it. This is because a key feature
of qualitative analysis is opening up discussion to a deep and personal level. Thus, this
research would not attempt to merely test the soundness of post-feminist critique, but also,
generate new ideas of post-feminism founded on empirical evidence.
Although qualitative methods are generally associated with the constructivist idea
that there are no inherent truths, I feel it necessary to draw on positivism within this
analysis. Positivism, is the suggestion that there are inherent certainties and it is often
viewed as an essentialist method, however, I belief it is a necessary step in developing
post-feminist understanding. Although this analysis focuses on a very limited sample in
which participants and researcher share both class and nationality and may not be
88
Please see appendix ‘E’, p. E. 1.
25
generalised to a great extent, it is still empirical research which goes beyond most post-
feminist critique. Providing, to at least some level, a new platform for post-feminist
understanding.
The selection of focus groups went beyond mere practical elements as they also
possess research advantages for my analysis. The fact that they would be based on
conversation at a peer level would develop a comfortable environment. The equality of
such a relationship would encourage participants to feel at ease in the focus group
scenario. While not personally being friends with any of the participants meant that they
would have less of an agenda to help me. Although not typically associated with
qualitative methods, this would help bring a level of objectivity to the analysis. Stemming
from my investigation into feminist research it became clear that method hybridity is
central in generating more reliable results, bringing about my decision to aspire to this at
some level within my project.
Trying to generate a certain level of objectivity involved reflection at every level
of research conduction. Judi Marshal talks about the importance of ‘inner and outer arcs
of attention’ in research. 89
The researcher should, at all times, have ‘self-awareness’, be
aware of themselves, their thoughts and their actions.90
This is the inner arc and in
conducting the focus groups, I found this very useful. It was often difficult to remove my
views, avoid projecting my own ideas and also to regulate my language so as not to lead
or influence the answers of the participants. However, to be successful in research one
must also turn to the outer arc of attention. Meaning that, to truly learn something, the
researcher must engage ‘with other people’.91
This, Marshal believes, leaves the
89
Judi Marshall, 'Self-reflective Inquiry Practices', in The SAGE Handbook of Action Research, ed. by
Peter Reason and Hilary Bradbury(London: SAGE Publications Ltd, 2001), pp. 433- 439 (p. 433).
90
Marshal, p. 433.
91
Marshal, p. 434.
26
researcher in a constant state of moving between action and reflection and being active
and receptive.92
These provided my basis for many aspects of my research. For example,
in each focus group I had to gauge the tone and language of the group and alter the
wording of questions accordingly. This seemed to have gone well as although I did not
always stick to the exact questions I had laid out, the issues were raised or addressed in
one way or another. For example:
‘How often do you interact with these elements of popular culture’.93
Below is how the question became altered within focus group A.
‘Int: So they are all elements of pop culture so then how often do you interact
with them (.) I mean would it be hourly you check Facebook and stuff or (.)’94
This ambiguity of the question also illustrates the fact that the questions I had
prepared served as a mere guide. This allowed for impromptu action to alter and change
questions if conversation went in a way I had not been expecting. A key feature of
qualitative analysis is that the interview has a relatively low level of structure encouraging
participants to open up at a personal and experience based level.
On reflecting upon the experiences of carrying out the focus groups my eyes were
opened to both the complexity of conducting good qualitative research and the
importance of empirical evidence in forming a basis for theory. I thus concur with
Marshal’s idea that a researcher is constantly moving between ‘project planning,
encounter and communication’ continually ‘thinking and making sense’ of things within
the inner and outer arcs of attention.95
92
Marshal, pp. 433 - 435.
93
Please see appendix ‘B’, p. B. 1.
94
Please see appendix ‘F’, p. F. 4.
95
Marshal, pp. 433-435.
27
3.2 Analysis of Central Questions
This section will examine the focus groups through thematic analysis which ultimately
deals with the most interesting points of discovery made throughout my two focus groups.
Can you try and define the term ‘popular culture’?
Following my study of post-feminist critique, specifically the ideas of Andi Zeisler in
Feminism and Pop Culture, it became clear that popular culture was a key player in both
creating and maintaining the ideas of post-feminism. Theory indicates that post-feminists
are, perhaps, obsessed with popular culture.96
It was therefore interesting to develop an
understanding into the participant’s understanding of popular culture.
In the interviews there was initial difficulty in finding a suitable definition,
however, after initial trepidation, a member of focus group B supplied the definition of it
being
‘The norms of society’ (Gia).97
What proceeded from this kind of definition, within both groups, is the importance of
popular culture and in particular the internet in popular culture with Grace in focus group
A stating that
‘yeah internet is deffo popular culture’.98
None of the participants appeared to have an issue with the term, meaning that it
must be in general circulation. However, it is in pinning down an exact definition that the
96
Zeisler, pp.1-2.
97
Please see appendix ‘G’, p. G. 2.
98
Please see appendix ‘F’, p. F. 5.
28
participants struggled with, they instead found it easier to give examples of what they
believe to be popular culture. In both groups Facebook is confirmed as a central factor of
popular culture for these young women. All members of each group admitting that
Facebook is a central part of their daily lives. With many stating that they check it as
soon as they wake up in the morning and agreeing with the members from each group
that put forward that Facebook would be checked ‘hourly anyways’.99
Perhaps a little
shocking is that members of focus group A also agreed that they believe Facebook is a
sufficient source of world news with Mary stating
‘Yeah I’d never go out and buy a newspaper’.100
Prior to the focus groups I had considered the importance of Facebook in the lives
of young women as it is important to me. This notion was confirmed to also be true of
these women. It thus seems that in accordance to theory on post-feminism, such as Zeisler,
that these women hold popular culture to be highly important within their day to day
lives.
What do you feel your own role/or that of people around you is within popular culture?
Literature regarding post-feminism from second wave theorists’ such as Tasker and Negra
puts forward the idea that post-feminists, have essentially been brain washed by popular
culture into fulfilling the role of the consumer.101
Posing a question to investigate this
idea sparked a bit of debate between participants with members of focus group B
99
Please see appendix ‘F’, p. F. 4.
100
Please see appendix ‘F’, p. F. 5.
101
Tasker and Negra, pp. 1-5.
29
becoming quiet passionate. Gia believed that she does not possess a role within popular
culture, however, Dee argued that Gia in fact does,
‘Come on you totally buy into popular culture you with your oh look at this and
everyone knows this and oh I want that’102
This resolved with Gia agreeing that maybe she does but they both confirm that it is
ambivalent consumption.
‘Yeah but it’s innocent enough I don’t really realise I’m doing it’103
And Dee agreeing and stating that it is more so a spectator sport.
‘Yeah I’m not involved in it like making it I’m just on the side lines watching
it’104
Interestingly, Group A concurred with the conclusion reached by Gia and Dee,
that they consume popular culture, without any debate.
‘Grace: Yeah I just kinda sit back and like let it happen
Mary: Yeah I’m like aware of it but (…)
Int: you’re ‘aware of it’
Mary: Yeah like you don’t actually stop and think about it like (.) you don’t (.
. .)’.105
This, makes an interesting point as it gives an insight into the way in which these
women interact with popular culture. Within the interview most participants, even before
102
Please see appendix ‘G’, p. G. 1.
103
Please see appendix ‘G’ p. G. 1.
104
Please see appendix ‘G’, p. G. 1.
105
Please see appendix ‘F’, p. F. 6.
30
conversation developed, indicated that they are aware of their role as ambivalent
consumers of popular culture. In contrast with the literature, this result shows that these
women, who fit within the categories of post-feminists, are fully aware of their situation
and choose to continue the interaction. Yet the point remains that they do in fact note
their passivity, therefore, conforming to the norms of popular culture without much
debate or question.
What elements of your identity are important in forming your relationship with
popular culture?
It is suggested by second wave feminists such as Tasker and Negra that women are the
targets of a popular culture discourse that implies the redundancy of feminism and the
goal of the equality of the sexes.106
They indicate that popular discourse is naturalising
the drive for female consumerism as a method for empowerment. 107
Many second wave
feminists such as Tasker and Negra seem to blame popular culture for the supposed
culturally submissive young woman.
When addressing the idea of identity in popular culture there was initial confusion
at the question and I attempted to use the idea of advertising as a prompt. From here there
was preliminary defiance that outside influence might have a place within their
relationship with popular culture. Grace indicating that this relationship is based purely
on her own views and opinions,
‘What I agree with and what I don’t agree with is that an answer’.108
106
Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke University Press,
2007), p.1.
107
Tasker and Negra, pp. 1-5.
108
Please see appendix ‘F’, p. F. 7.
31
Mary proceeded to reinsert this idea by adding that,
‘Well you obviously choose what you interact with no one forces you to sign up
or anything’.109
From the literature I had read in the area of post-feminism I had preconceived
notions of what kind of issues I was looking for when addressing this question. Primarily,
the issue of the relationship of gender and age within popular culture. However, focus
group A did not start a discussion on any of these areas so I was forced to ask bluntly
about aspects such as gender and age. This perhaps indicating that because I was the one
to put them in the agenda that these issues are not of primary importance to these
participants.
‘Mary: Em (.) I think women definitely do consume more but I think like (. . .)
mmm sorry like lads are buying into it more now like there definitely be more
women like older and younger in relation but I think now like one of our house
mates he definitely does more online shopping than I do ((Laughs)) em (.) so I
think it definitely is more female orientated but there is
Grace: ((In overlap)) I dunno I think it’s kind of it’s it’s equal now
Mary: Yeah but the age thing
Grace: ((In overlap)) well like not old men but young men yeah I think boys are
just (.)
Mary: Yeah boys our age are very into getting like their new trainers or
whatever’.110
109
Please see appendix ‘F’, p. F. 7.
110
Please see appendix ‘F’, p. F. 9.
32
Here they seem to be making the point that although age is traditionally a factor in the
relationships between people and popular culture, the binary between men and women in
relation to consumerism is breaking down. These participants indicate that the
relationship between men and popular culture and women and popular culture is
becoming more equal. The main example given within the focus group being the extent
to which men now buy their clothes online.
Focus group B, did as I had initially expected, addressing the issues of age and
gender straight away. They too agreed with the sentiments displayed in focus group A.
‘Deb: Yeah more and more men are getting into their looks these days
Dee: But I think it’s still definitely still aimed at women like women ads are all
over Facebook and stuff like that
Ellen: ((In overlap)) well no I think it’s definitely more aimed at men these days
[. . .]
Gia: Just their hair and their dress and stuff like that’.111
These participants appear to indicate that young men are starting to play the same
role in popular culture as young women. They seem to be implying that the sexes are
becoming equally targeted by popular culture. It thus seems, from the interviewing of
participants, that a kind of inversion of the feminist idea that women are victims of
popular culture has occurred. An equality seems to be emerging, or a perceived sense of
one. Not through women resisting the power from popular culture, but, in men investing
in a similar relationship with it.
111
Please see appendix ‘G’, p. G. 3.
33
What, in pop culture, is being a woman? / What are the expectations attached?
On addressing this question I expected, due to the research carried out on post-feminism,
that these young women’s central concerns would revolve around superficiality.
According to Nina Power the rise of post-feminism has brought with it the idea of the
walking c.v, here women essentially 'sell themselves' at the level of their visual
qualities.112
Both groups established the idea that life has changed for women, with focus
group B highlighting the idea that women are allowed make many more choices in life
and their success and happiness does not depend on men.
‘Dee: It’s like being independent (.) like they don’t need a man’.113
Dee also states,
‘I don’t think the ultimate goal in life is to get married anymore (.)’.114
Members of group A suggested alternative gaols for women of their situation.
Each member illustrated the importance of the career, at both the educational level and
the employment level.
‘Mary: Yeah definitely finish college get a job’.115
This is in contrast with the literature as here each member indicated the
importance of education and being independent from men in their success. Each of these
being areas which were central facets of second wave feminism. Also, interesting to note
112
Power, p. 23.
113
Please see appendix ‘G’, p. G. 5.
114
Please see appendix ‘G’, p. G. 5.
115
Please see appendix ‘F’, p. F. 14.
34
is that education and independence is valued above visual appeal. In reference to
Angelina Jolie, Gia states,
‘Yeah she is amazing (.) like she has a career family charity work and she is shit
hot’.116
Here, although visual appeal is mentioned, it is at the bottom of a list of attributes which
the participants seem to feel are of greater importance. This seems to resonate the views
of Jacki Willson who has suggested that the age of post-feminism allows 'femininity' and
'business' to be 'compatible bedfellows'. 117
Possibly, the age of post-feminism is not as
wholly superficial as many second wave feminists suggest. Thus breaking down the
opposition of positive and negative, postfeminism and post-feminism.
Is this then what the notion of the ‘empowered woman’ is or how do you perceive it?
In both focus groups this question seemed like a natural companion to asking them the
expectations they felt as women. Their answers overlapped greatly with those they had
given about what they feel is expected of them in life. A new word, that I think resonates
all the ideas put forward by all the women, was thrown in by Sal in group A, the word
‘Strong’.118
As an overlap of the previous question this strength appears, to the
participants, to be a strength of self, with emphasis on career drive and the power of the
individual woman.
116
Please see appendix ‘G’, p. G. 5.
117
Willson, pp. 88-89.
118
Please see appendix ‘F’, p. F. 16.
35
A further insight into the definition of what they thought the empowered woman
is was discovered when I asked them to give examples of who they feel these women are.
Group A centred around a comparison of Victoria Beckham, as an empowered woman,
‘Mary: Clothing lines perfume her own shops
Sal: Yeah all sorts like she was actually nominated or she won business woman
of the year yeah but she built it all up herself like’119
against Kim Kardashian, who’s success they attribute to the fact she uses her body as a
tool of power.
‘Sal: Victoria Beckham didn’t get her ass out for a bit of money’.120
This sentiment continued into focus group B where a debate formed that was a little
worrying for all involved. Although they all admitted that Kim Kardashian is famous for,
as Dee said, putting a picture of herself
‘naked across the whole internet’.121
Debate formed when Ellen started talking about younger women. She proposed
that although women her age don’t agree with Kim Kardashian, she has been normalised
into the lives of younger women who have grown up watching Keeping up with the
Kardashians.122
Although the issue was not fully resolved, it is very interesting to compare with
post-feminist critique. The views of these women contrasted greatly with the expectations
of second wave feminists, in that they put their careers above beauty. Thus putting post-
119
Please see appendix ‘F’, p. F. 17.
120
Please see appendix ‘F’, p. F. 18.
121
Please see appendix ‘G’, p. G. 6.
122
Please see appendix ‘G’, p. G. 6.
36
feminism into a more positive light than is common within critique. However, the results
of focus group B sheds what many participants found to be a worrying light on the matter.
They have noted the possibility of younger women becoming the body crazed, 'you are
your breasts' sort of women the literature has indicated these participants (post-feminists)
to be.123
Can you tell me what you understand by the term feminism?
This question was met with mixed answers and sentiment. There was one member of
each group that vocally expressed the negative connotations they related to feminists.
Grace of focus group A stated;
‘I dunno someone who hates men I don’t really know’.124
While Gia of group B simply replied with
‘Fucking women’.125
Having studied what second-wave feminists claim these women should think on the
matter I was not surprised to hear this backlash against feminism. Here, it appears, the
backlash is extremely gendered. They seem to believe that feminism is a pitting of the
sexes against one another. There is even outrage expressed at women whom they may
deem feminists, those who hate men.
123
Power, p. 24.
124
Please see appendix ‘F’, p. F. 19.
125
Please see appendix ‘G’, p. G. 8.
37
However, after some discussion the participants moved past their initial emotional
response and the women of each group developed definitions with which they felt more
comfortable.
‘Mary: Just yeah I learnt this the other day but yeah I think we should all have
equal rights and equal pay’.126
‘Dee: believes in the social and economic wellbeing of the sexes (.) something
like that’.127
These two statements seem relatively recently learnt showing perhaps that such issues
were not as salient in their youth. In drawing their definitions from recently learnt
understandings, it implies this empirical stance was not always there. I say recently learnt
as in the case of Mary she expresses the fact that she has only very recently learnt this
within college. In the case of Dee she is quoting a line from contemporary singer
Beyoncé. An anomaly in the context of post-feminist critique as the popular culture sector
is where anti-feminist sentiment is meant to stem.
What is very interesting to note is that even though the groups all conceded that
they were happy with the definition of equality, three out of the four women in group A
strongly disagreed with considering themselves feminists while Mary remained unsure
saying
‘Maybe but not in like a hate men way but I believe in equal rights’.128
These women do seem in a way to fit into the category of a backlash against
feminism, with the majority not wishing to associate with the word feminist and many
126
Please see appendix ‘F’, p. F. 21.
127
Please see appendix ‘G’, p. G. 9.
128
Please see appendix ‘F’, p. F. 21.
38
expressing a mild anger at the notion. However, it must be noted that although there
clearly seems to be a backlash against the popular notion of feminism, these women do
seem to believe in the core beliefs of feminism but do not choose to label it so.
Are you aware, or have an understanding of the notion of post-feminism? Is feminism
over?
The participants generally stated that they were not aware of the term post-feminist with
only one noting that they had even heard of the term. I thus gave a brief explanation of
the term and asked them if they thought feminism was over. Each again replied that no
they didn’t and, interestingly, also noted that they do not believe it should be either.
Gia from group B stating that it is
‘Because there are so many more issues to be dealt with coz like even all those
high paid jobs and all that in the economy are all men’.129
Members of group A also shared sentiments with Mary saying
‘Well I don’t think it’s over but I think it’s justified by like that it doesn’t need to
be as like out there as the sixties you know’.130
It is interesting that when they talk about feminism it is in reference to the 1960s. In
saying that the major objectives of feminism have been achieved they appear to label the
need for such a movement firmly as historical.
‘Mary: Yeah like the big things like votes for women and you know like women
can do these jobs and they don’t need to quit their jobs after they get married and
129
Please see appendix ‘G’, p. G. 11.
130
Please see appendix ‘F’, p. F. 22.
39
you know the big things aren’t there anymore so feminists wouldn’t have as much
to be vocal about anymore’.131
Members of group A went on to state that they think forms of protest are much
more subtle in contemporary times, but explain they think this because the larger issues
such as voting, marriage and work have been resolved. Their indication of being
conscious of contemporary forms of protest seem to indicate an awareness of the
continued need for feminism. However, they wouldn’t, in day-to-day practice, place the
label of feminism upon such issues and sentiment.
The most interesting thing, I feel, that came about in response to this question was
one member of group B redefining feminism for her group,
‘Deb: But your being so against men like it shouldn’t be men men men and like
women against men it should be rights in general’.132
Although this idea is central to the idea of feminism, none of the participants
associated this idea with feminism and the feminist. The idea of feminism then, perhaps
as the literature has stated, has in some way been tainted within contemporary society at
an institutional level.133
It is interesting to note the participants’ outcry against feminists in the last
question addressed in comparison to their response to this one. Here, they seem to believe
that feminism is not redundant but still an ever present factor in their lives. This feminism
though, stems from their definition of the importance of equality rather than the women
versus men agenda that they seem to associate with feminism. They also, interestingly,
stress the idea that although they do believe issues of equality are still present, it is now
131
Please see appendix ‘F’, p. F. 23.
132
Please see appendix ‘G’, p. G. 11.
133
McRobbie, p.1.
40
more so of an undertone as opposed to a narrative to live and fight for. There does then,
for these women at least, seem to be a rift between the idea of feminism and the feminist.
This issue of labelling seems central in the conflict between young women and feminism.
3.2 A Discussion of Analysis in Relation to the Literature Review.
Although I do recognise that this is only a sample of women who fit into the categories
of the post-feminist laid down in theory, many interesting comparisons have appeared
with regard to post-feminist critique. Within the context of the information I have
gathered it is clear that there are many breaches between theory and the empirically
learned experiences of these young women.
First perhaps, it should be pointed out that although there are moments of
disconnect between theory and this analysis there are also areas which do correlate.
Primarily, this can be seen in allocating popular culture as a key aspect within the lives
of young women. Post-feminist critique states that popular culture has had a central role
to play in creating the post-feminist mind set. A mind set laid out by Diane Negra as being
based on superficiality, consumption and a disregard for the goals of the feminists before
them.134
In the case of the interviews analysed here it seems that these women admit to
often falling into the role of ambivalent consumer and judges of beauty. However, they
are aware of their position. They note that on a day-to-day basis they do not see a problem
with consumption as they do not believe it impacts them at a deep level.
Literary critique has outlined the importance of the empowered woman or the
have-it-all woman in relation to post-feminism. Wealth, superficiality, consumerism and
134
Negra, p. 4.
41
sex are laid down as being central to the empowered woman.135
However, the idea of the
empowered woman seems to hold slightly different connotations for these young women.
Although both seem to concur at some level about the importance of economics, the
participants believe empowerment lies in strong independent women who have forged
their own careers through hard work and dedication rather than their beauty, consumerism
and their sex partner. On a comparison of Kim Kardashian and the likes of Victoria
Beckham and Angelina Jolie it can be seen that these participants have not engaged with
the notions of superficiality, sex and consumerism and as the central pillars for the have-
it-all woman. Although they do admit to consuming superficial popular culture they state
that their goals in life are not to find a man to take care of them but rather make their own
path and build a future with someone.
Literature regarding post-feminists places it as disregarding feminism and being
a backlash against the achievements of predecessors.136
Within the participants analysed
here not one openly identified as a feminist. However, as the interviews developed it
became clear that this disregard was primarily for the label of feminist. The connotations
of feminist as men haters seems to have tainted the idea of what feminism is. If one were
to have conducted a survey it would have been stated as fact that these women were post-
feminists due to their disregard and negative sentiments towards feminism. However,
qualitative analysis proved to be highly applicable in this instance as it picked up on
deeper sentiment.
Although it might be said that the post-feminist critics may have been right in their
claim that popular culture would create this backlash, this backlash, in the case of these
women, only runs skin deep. On further discussion it became clear that these women do
135
Zeisler, pp. 100-108.
136
Tasker and Negra, p. 1.
42
in fact believe in the goals of feminism, primarily the equality of the sexes. However,
they do not seem to accredit this idea to the notion of feminism.
This analysis highlights the fact that there seems to have be a disjuncture between
sign and meaning. The participants give the impression that ‘feminist’ has become a dirty
word. Yet, it seems the ideals associated with it have not. It thus seems these women are
not actively contributing to a backlash against the achievements of feminism and in fact,
appear to be feminists. However, they remain reluctant to associate with such a label.
43
Conclusion
Overall, I found the conducting of focus groups and the process associated with the
method enjoyable and rewarding. I have a new found admiration for qualitative
researchers and their ability to be able to encourage deep conversation, but, also, remain
passive in their emotional and personal input. In attempting to replicate their work, I have
developed new skills and learnt about my strengths, abilities and weaknesses while
gaining an insight into the views and opinions of my participants who fall into the
theoretical categories of the post-feminist.
In pinpointing a lack of empirical evidence with regard to post-feminism I
discovered many justifications. However, the point remains that within the twenty-first
century there is no solid defence for the second wave feminist’s critique of post-feminism.
In making generalisations and contributing to grand theory on the area, little critique goes
beyond the theoretical level. There can be no claim of empirical evidence regarding post-
feminism as almost no research has been conducted into post-feminist subjects. Although
I do accept that my research is very limited, it stems from the empirically learnt
experiences of those who fit the categories of post-feminism. Maybe this research can
partially fill the void of true understanding with regard to post-feminism.
I also feel this research has helped to better understand a personal predicament. A
predicament stemming from the fact that although I am well versed in second wave
feminism, I fit the tropes of post-feminism. Most post-feminist critique notes the
consumer driven nature of post-feminist society. I personally know this to be true as many
breaks I have taken from this project involve online store browsing. Those I interviewed
also indicated their participation in consumerism. However, the post-feminism critique
which places this emphasis on consumerism also notes that this consumerism involves
44
women passively taking on board and accepting the subject position placed on them. Thus
creating an unconscientious society as such. Although my participants indicated that to
some extent it is passive consumption, this theory is problematic. The participants seem
to believe that it is not complete inactive consumption, there is a conscious recognition
of culture which attempts to dictate their choice. They appear to accept their role as
consumer, as well as placing this role on the young men within their social circles. They
brought a level of critical awareness to my attention by indicating that they are aware of
gender divides and certain inequalities, however, they stress that they believe that men
often fall victim to issues of equality in the current climate.
In commencing this project I had an understanding that there were problems with
regard to the definitions of the words feminism, feminist, postfeminism and post-feminism.
As a result, what has come to light is that this is due to the ambiguity of such ideas. There
has been a clear rupture between signifier and signified. It is essentially a problem of
labels and labelling.
With regard to feminism and the feminist, the rift between contemporary society
and these words appears to have stemmed from ambiguous connotations. First there is
the academically learnt ideas of equality, however, these juxtapose with the more
colloquial connotations that circulate within popular culture such as ideas of feminists
being men haters. Ultimately, the result appears to be that young women blend the ideas
and are left with believing that feminism is the fight for women being equal to men, not
gender equality in general. The latter being more relatable and relevant to the current
climate.
The words postfeminism and post-feminism, I believe, have been slightly un-
problematised through this analysis. Although I do note that in order to conduct research
45
with regard to such terms I had to simplify and attach definitions to each word, I believe
this analysis clears up, to some extent, the issue of the use of the hyphen. The participants
here are defiantly anti-hyphen, this indicating the continued need for feminism. I say this
because while filling the categories of post-feminism laid out by second wave feminists,
they admit to being consumers of popular culture and generally would not wish to be
associated with feminism. They seem conscious of their consumerist position and
critically aware of the issues of gender equality still prevalent today. As well as admitting
their involvement in consumerism, they seem to be aware of the restrictions of their
identity within consumer capitalism. Their self-professed position serves in breaking
down the accusations made by second wave feminists that these women are participating
in a backlash against the feminist achievements. These accusations, therefore, seem
unjust and ill explored.
I say this even though the participants had issues with the words feminism and
feminist, on deeper discussion it seems this was where it ends; it is purely a problem with
the words. These woman still seem to believe gender equality is an issue in Ireland today
and reformative action should not cease. Thus it seems that it is labelling which is the
main cause of problems for feminism. Feminists cannot hope that they will be able to
reclaim feminism in the current climate. The word seems to have become too dirty. As a
result I believe that any way forward for the feminist movement must attempt to re-claim
the idea of the movement from the word itself. The movement needs re-appropriation to
deal with the current climate in which focus appears to be needed in gender equality with
less emphasis on women. The fem of feminism is placing clear emphasis on the plight of
the woman. However, in the twenty-first century there are many issues of gender equality
across the sexes. The feminist movement may seek to include such issues, however, the
46
message has become blurred through popular culture. Although the idea behind the
movement remains sound, the term seems redundant in twenty-first century Ireland.
In conclusion, I believe re-branding is necessary for the continuation of the ideals
behind feminism.
A. 1
Appendices
Appendix ‘A’ - Question Guide- Prior to Focus Group Dry Run.
 I am seeking your thoughts and opinions and there is no right or wrong answers.
 You are welcome to bring in examples, whether personal or otherwise.
 One at a time could you all please state your name and tell me, when you were
younger, what you wanted to be when you grew up? I go first.
Intro Qs:
 What comes to mind when I say the words ‘popular culture’?
 Do you feel you interact with popular culture?- daily, hourly, weekly..?
 What elements of popular culture do you think people interact with most?-
advertising(magazines, online, billboards, radio) – Online (twitter, facebook,
etc.) –Shopping (what kind of shops do people go to mostly?-high street, centres,
locals)
Transition Qs:
 What do you feel your own role/or that of people around you is within popular
culture? (passive, consumer, etc)
 What elements of your identity are important in forming your relationship with
pop culture? - Age, class, ethnicity, looks, gender?
 Give example of perhaps Kim Kardashian in pop culture, why does she command
such attention?
Key Questions:
A. 2
 So it might be said that gender is a key part of the interaction with pop culture? –
advertising space, shopping, how a photo is taken, pressure, role models
 What, in pop culture, in being a woman?- Our roles, what is expected, consumer?
Importance of looks
 Is this then what the notion of the ‘empowered woman’ is or how do you perceive
it?
 We talked of Kim K earlier, does she embody this ‘empowered woman’ notion?
–why? Why not? (rich, has a man, pretty, good body, has a baby, famous)
o If she isn’t who is? Brittany, beyonce, oprah, Jennifer lawrance
 Do you think the idea of the empowered woman is inherently linked with the
production of popular culture?- think about how and why you are aware of it?
Who are these empowered women?
Closing:
 Do you have any further thoughts on any area?
 Can you tell me if this is what you expected? Why/why not?
 Did anything new come to light that you perhaps hadn’t considered before of think
differently about now?
B. 1
Appendix ‘B’ - Final Draft of Question Guide.
 I am seeking your thoughts and opinions and there is no right or wrong answers.
 You are welcome to bring in examples, whether personal or otherwise.
 One at a time could you all please state your name and tell me, when you were
younger, were there female family members who you admired, or perhaps didn’t
and why- I go first.
Intro Qs:
 How do you feel you interact with the world at large? – what are your
connections? How do you find out your information? –online- news papers
 What elements of popular culture do you think people interact with most?-
advertising(magazines, online, billboards, radio) – Online (twitter, facebook,
etc.) –Shopping (what kind of shops do people go to mostly?-high street, centres,
locals)
 How often do you interact with these elements of popular culture?- daily, hourly,
weekly..?
 Can you try and define the term ‘popular culture’?
Transition Qs:
 What do you feel your own role/or that of people around you is within popular
culture? (passive, consumer, etc)
 What elements of your identity are important in forming your relationship with
pop culture? - Age, class, ethnicity, looks, gender?
 Have you ever thought, or had to categorise, your ethnicity? - how would you?
B. 2
 Do you feel class differences are obvious in your life? – how would you identify
yourself within this system?
 Give example of perhaps Kim Kardashian in pop culture, why does she command
such attention?
Key Questions:
 So it might be said that gender is a key part of the interaction with pop culture? –
advertising space, shopping, how a photo is taken, pressure, role models
 What, in pop culture, in being a woman?- Our roles, what is expected, consumer?
Importance of looks
 Is this then what the notion of the ‘empowered woman’ is or how do you perceive
it?
 We talked of Kim K earlier, does she embody this ‘empowered woman’ notion?
–why? Why not? (rich, has a man, pretty, good body, has a baby, famous)
o If she isn’t who is? Brittany, beyonce, oprah, Jennifer lawrance,
Angelina Jolie etc.
 Do you think the idea of the empowered woman is inherently linked with the
production of popular culture?- think about how and why you are aware of it?
Who are these empowered women?
Closing:
 Can you tell me what you understand by the term feminism? -equality
 Are you aware, or have an understanding of the notion of post-feminism?
 Post-feminism is said to have come in to being in the 1990’s (Spice Girls) - often
described as a backlash against feminism – empowered woman etc.
B. 3
There is dispute over post-feminism, whether feminism is in fact over with or not.
–has it fulfilled its goal of equality.
 Do you feel feminism is over? – why?/ why not?
 Do you have any further thoughts on any area?
 Can you tell me if this is what you expected? Why/why not?
 Did anything new come to light that you perhaps hadn’t considered before of think
differently about now?
C. 1
Appendix ‘C’ - College Ethics Form
C. 2
D. 1
Appendix ‘D’ - Participant Ethics Form.
Dear Participant,
I am a final year English, Media and Cultural Studies student at the Dun Laoghaire
Institute of Art Design and Technology (IADT). I require, for the purpose of my research,
the application of a focus group, to commence on __________. I am looking for willing
participants to take part in this study.
The aim of this focus group will be to discuss young women in Ireland today. It will have
4 members and will explore various areas relevant to my project. The session should last
between forty-five minutes to one hour.
You will be asked to give your permission for the interview to be audio recorded. These
recording will be typed up on a computer. However, all information collected will be
completely anonymous and confidential. The records from the interview will only be seen
in full by me the researcher. Short quotes may be extracted and copied into the final
report, but no person will be identified as being the origin of the quote.
Please note; your participation in the study is completely voluntary, you do not have to
answer any question you do not wish to and you may leave at any time. If for any reason
you wish to withdraw from the study your contributions will be immediately withdrawn.
You are free to ask the researcher any questions pertinent to the study prior to, during, or
after the focus group session.
Your consent
I have received an explanation of the study and agree to participate. I understand that my
participation in this study is completely voluntary
______________________ _______________________ _____________
Name-Print Name-Signature Date
I agree for the focus group to be recorded
_______________________ ________________________ ______________
Name-Print Name-Signature Date
E. 1
Appendix ‘E’ – Notation System
Please note that within the focus group transcripts non-verbal utterances and colloquial
terms have been spelled phonetically. Punctuation has also been excluded as to avoid
misinterpretation of participants intended meanings.
Notation Feature
Gen General Reaction
. . . Some Words Missing
(. . .) Long Pause
(.) Short Pause
(/) Section Missing
? Unknown Speaker
((In Overlap)) Speech Overlaps
((Laughs)) Individual Laughs
((General Laughter)) All Laugh
F. 1
Appendix ‘F’ - Focus group ‘A’ transcript
Int: Ok so I first have to just tell you that what you say are your own thoughts and
opinions and that there are like no wrong or right answers basically and you are
welcome to bring in examples or if you don’t want to talk about yourself you can
talk about family friends (.) eh people in general kind of thing (.) So firstly I want
everyone just to say their name and then like pick if you can think of like a female
family member whom either you admire and why or like really don’t admire and
why and I’ll go first I have an aunt and em when I was younger I actually just
hated her so much she is like the embodiment of like the house wife she just used
to drive me insane all her dinners were perfect and you know she used to make
the children sit at the children’s table (.) I don’t like that
((General laughter))
Int: Anyways (.) who would like to start (. . .)
Mary: em Mary em I think my mom (. . .)
Int: Of course
Mary: Yup and eh (. . .)
Int: Well do you admire or
Mary: ((in overlap)) oh yeah yeah I admire my mother (.) she’s eh very smart yeah but
not in a annoying way (.) you know like not one of those annoyingly smart people
(/)
F. 2
Sal: Sal (.) my auntie I absolutely love her she’s my favourite person in the world
((laughs)) she’s so good to me and all my other cousins and coz she has no kids
of her own so she’s (.) like a big mother to us all and just I dunno…
Int: Great (.) well would you girls like to go?
Mia: Eh yeah I’ll go (. . .) Mia and my mum coz like she does everything for us and
like never complains
Mary: ((in overlap)) ‘She does everything for you’
((General laughter))
Mary: Well not like dat but you know like do lots of stuff for us and she’d never like
complain and like well you know (. . .) not like in a slavery way or nothing
((General laughter))
Grace: Em Grace and my sister because she’s just always there for me always has my
back and just always knows to tell me right from wrong
Int: You guys are all so nice and positive (.) I swear I love my mummy too
((General Laughter))
(/)
Int: … How do you connect with the outside world (.) get your news stuff like that
Mary: Like Facebook and stuff
Int: Yeah ‘Like Facebook and’
Mary: ((In overlap)) Like media
Int: Well yeah
F. 3
Mary: Yup media ((laughs)) (.) eh I dunno
Int: Ok so on Facebook what do you get from it
Mary: Well I guess celebrity news that’s all Facebook
Sal: Yeah and apps and stuff
Mary: Yeah I use apps for news like news in general like like world news or (.)
Int: Yeah sure
Mary: Well BBC app
Grace: Yeah I’ve the BBC app
(/)
Int: So is it mainly Facebook?
Grace: Yeah and the radio (. . .) and the six o’clock news
Int: So are you always in the car for the six o’clock news
Grace: Na I just watch it on the telly coz my dad will always have it on
Int: So are there any other elements of popular culture you interact with regularly
Mary: Well Twitter
Sal: Yeah Instagram and like Snapchat now
Mary: Whatsapp Viber
Sal: ((In overlap)) Snapchat’s actually really good for lots of news like it has the
stories
Grace: ((In overlap)) yeah you find lots of things going on like the the the
F. 4
Mary: ((In overlap)) oh yeah that’s true
Grace: Yeah they had that art festival on and they had
Sal: ((In overlap)) and the World Cup
Grace: Yeah yeah the World Cup
Sal: And that music awards that were on last week
Grace: Oh yeah (.) what was that
Mary: I dunno was it the MA’s
Sal: Yeah
Mary: Very informative Snapchat
((General laughter))
Int: So they are all elements of pop culture so then how often do you interact with
them(.) I mean would it be hourly you check Facebook and stuff or (.)
Mary: Oh God (.) yeah
((General laughter))
Grace: Yeah it would be hourly anyways
Int: When you wake up in the morning would you check it
Mary: Oh yeah
Sal: ((In overlap)) yeah
Mia: ((In overlap)) mmm
F. 5
Grace: ((In overlap)) no (. . .) but just coz I get up so early for college and I’m in too
much of a hurry
(/)
Int: So would you guys read newspapers at all
Mia: Mmm I would if it was at home (. . .)
Int: So you wouldn’t actively seek one
Sal: Na but you might if you were bored and there was one lying around
Int: So Facebook and stuff is sufficient for you to get your news from
Gen: Yeah
Mary: Yeah I’d never go out and buy a newspaper
Int: Mmm so we are talking about popular culture, how would you guys understand
the term popular culture and could you like define it?
Mary: Like media we use and like (. . .)
Grace: And popular culture like going out at the weekends or something
Int: Yeah they are all elements of popular culture
Grace: Ok then yeah internet is deffo popular culture
Mia: ((Inaudible))
((General laughter))
Mary: A lot of stuff is popular culture (.) like music is popular culture oh and like fashion
I spose you could say eh like sport
F. 6
?: ((In overlap)) G.A.A
Mary: Yeah there is so much you could bring in (. . .) there’s a lot isn’t there (. . .) that’s
very broad now
(/)
Int: Then what do you guys feel your role within popular culture is
Mary: eh(.)
Int: Well do you contribute to it are you just completely submissive (.)
Grace: Yeah I just kinda sit back and like let it happen
Mary: Yeah I’m like aware of it but (…)
Int: you’re ‘aware of it’
Mary: Yeah like you don’t actually stop and think about it like (.) you don’t (. . .)
Int: Well therefore would you say you are active it it but in a passive sort of way
Mary: Yeah yeah yeah coz I definitely (.) like I check Facebook wake up and the first
thing I do is check my phone
Int: So you’re consuming it I guess
Mary: Yeah consuming it but you don’t realise it like you never think about it you never
stop and think about it like we would never sit around just like ‘oh how do you’
like you just wouldn’t
Gen: ((In overlap)) mmm
Mary: Like yeah you just wouldn’t ((laughs))
F. 7
Int: So if we are talking about popular culture and the media and stuff like what parts
of your identity do you feel are important in your interaction with them does that
make sense
?: Em
Int: So say advertising is a big part of it and like what part of you dictates with how
you interact with it
Grace: What I agree with and what I don’t agree with is that an answer
Int: Sure ((laughs))
Mary: Well you obviously choose what you interact with no one forces you to sign up
or anything
Sal: But people put so much stuff up like even if you don’t want to talk about it it’s
there
(/)
Int: So then is age a thing
Mary: Oh yeah definitely
Gen: Mmm
Int: is the media therefore playing of your age
Mary: Oh yeah definitely coz you wouldn’t see like ads for like walker things on
Facebook coz that would be stupid
((General Laughter))
F. 8
Mary: Well you wouldn’t like coz who would be buying them you see ads for Boohoo
or whatever yeah and they know who they are aiming for it is all like it would be
mainly younger people (. . .)
Int: So is there anything else than about yourself like those kind of elements (. . .)
Mia: Your friends (. . .)
Int: Yeah yeah how so
Mia: Em (. . .)
Int: Well yeah they would obviously be a big thing as you see what they share and
where they go and what they wear and stuff
Mia: Yeah it comes up in your newsfeed and stuff
Int: If we are saying age friends (.) what other elements is there then
Mary: I don’t like what
Int: As in what elements of your identity so if we are talking about Facebook you
know those Facebook ads that come up come up judging on what you have liked
and what you have searched and what info you have given to Facebook like your
age sex country of origin etc etc etc (.) that’s basically funnelling what you see (.)
(/)
Int: Is gender a big factor?
Sal: Yeah it would be like coz boys aren’t gonna have like Newlook and stuff coming
up
Mary: Yeah ((laughs))
F. 9
Int: Do you think then as women your more I dunno like actively consuming than
males would be in popular culture
Mary: Em (.) I think women definitely do consume more but I think like (. . .) mmm
sorry like lads are buying into it more now like there definitely be more women
like older and younger in relation but I think now like one of our house mates he
definitely does more online shopping than I do ((Laughs)) em (.) so I think it
definitely is more female orientated but there is
Grace: ((In overlap)) I dunno I think it’s kind of it’s it’s equal now
Mary: Yeah but the age thing
Grace: ((In overlap)) well like not old men but young men yeah I think boys are just (.)
Mary: Yeah boys our age are very into getting like their new trainers or whatever
(/)
Int: Then I just mentioned earlier ethnicity and have you guys ever been asked to
classify your ethnicity
Mary: Yeah loads of time
Sal: Yeah
Grace: I don’t know what ethnicity means
Int: Like your country of origin and your cultural background (.) nationality
Grace: Oh yeah (.) like Irish
Mary: Yeah Caucasian Irish that’s what I’d say anyways ((laughs))
F. 10
Int: Ok cool and then what about class coz class is obviously a big thing in popular
culture like even talking about our Facebook marks a certain class so how do you
feel about class positions
Sal: I don’t think they are obvious now
Mary Definitely a lot less obvious than they would have been
Sal: Yeah but
Mary: But at the same time if you see someone and your like not in a bad way but like I
don’t know how to say this but like if you saw someone was a traveller you would
be like ‘oh she’s a traveller’ whatever you know like as an example
Grace: ((In overlap)) yeah yeah you would yeah
Mary: But at the same time you wouldn’t be like they are lower class
Grace: ((In overlap)) Or you wouldn’t be like(.) well you know just by like their page by
their pictures by what they put up the way they word it or whatever you know so
yeah (.) it is kinda (.)
Mary: So yeah it’s definitely there but it wouldn’t be like ‘oh she’s middle class he’s
lower class’
((General laughter))
(/)
Int: Would you guys feel there is a similar class identity amongst you here and your
friends
Mary: Yeah I spose so like us ye
F. 11
Sal: Mmm yeah
Int: So what would you classify the group as (.) sorry im being a bit personal but
roughly as a group what would you classify yourself as
Grace: I’d definitely just classify myself as normal
Mary: Yeah but what is normal (.) maybe like middle class that’s a thing yeah yeah
Gen: Mmm
Mary: Yeah I spose then middle class like we are all able to go to college we are all able
to pay for rent here you know we all have like we are all ok I dunno (.)
Int: Would everyone else agree
Sal: Yeah
Grace: Yeah (. . .)
((General laughter))
Edel: I dunno (.) I think so
(/)
Int: So just hopping back into pop culture did you guys see well you probably did if
you’re on Facebook every hour but the whole Kim Kardashian thingy like two
weeks ago
Mary: ((Gasp)) yeah
Grace: Yeah the whole break the internet thing with her big arse
((General laughter))
F. 12
Int: Yeah like why do you she commands such attention online and like why is her
presence not even online but even on TV shows
Mary: ((In overlap)) I dunno it’s so weird
Sal: I think it’s the way she broke into like how she became famous and that like
everyone you either love them or hate them (.) like so like everyone has an opinion
on her and like so like were saying about that picture ‘oh what is she at why would
she do that that’s so stupid’ or they were saying like ‘she can do it so why not’
Int: So you think they kind of have equal measures in how she gets popularised
Sal: Mmm
Mary: Yeah I don’t even understand (. . .) she is so fake (. . .) she looks so wrong
(/)
Int: So is she kind of capitalising of her body
Mary: Yeah she has the perfect body (.) but like the size of her in them pictures
Grace: But like she is being told by social media and stuff that she does
Mary: Oh yeah definitely
Grace: The reason she does those photo shoots is because her head’s so big like she has
been told so
(/)
Mary: But even like ‘break the internet’ the fact she thought she had the power to do that
Sal: Well she kinda did I mean she got everyone talking
F. 13
Grace: I dunno coz she got a lot of hate like like she thinks she is something big and she
has a sex tape and stuff and it just keeps repeating on her I dunno maybe she is
just trying to (. . .)
Mary: Yeah I dunno
Int: So do think your body is important within popular culture like how do you feel
about it
Grace: Like yeah I would never click into a clothes website that had a plus size model in
their ad (. . .) but I’m only after really thinking of that now
Mary: Yeah there is definitely a lot of pressure put on to look like this when people are
coming out with their pictures but then again Kim Kardashian but yeah there
definitely is a lot of pressure even with the ads and the way that the models look
like they’re all (.) and plus size ones are actually just normal sized
Gen: Yeah
Int: And filters
Grace: Yeah you can dictate how the world will see you and how you look good
Mary: Yeah definitely you only give a representation (.) like I’m definitely guilty of the
snap chat filter
Sal: ((laughs)) ye me too (. . .) and like instafamous people getting famous for their
good looks usually
Mary: Some it’s more than that like if they are travelling or anything
Sal: Yeah
Mary: But ye it’s basically good looks (.) lifestyle (.) and your house really
F. 14
Sal: ((laughs)) yeah basically like if you’re living in a giant mansion
Mia: And your clothes like there is a lot on dresses and stuff
Grace: Yeah it’s all about image
(/)
Int: … As women in popular culture what do you feel your roles are like what is
expected of you
Mary: Like stereotypically or nowadays or just (.)
Int: Well it can be stereotype or like from your mum your brother whatever people in
general (.) youngins
Mia: To go to college and to get a job (.) yeaah
Mary: Yeah definitely finish college get a job
Sal: Definitely like to get a degree of some sort
Gen: Yeah yeah
Sal: Because (.) most people like (.) like (.) like before like eighteen years ago it
wouldn’t have been the normal thing really and it’s just backfiring on everyone
now coz like now all of us like our age need to go get degrees to actually get good
jobs (.) well paid jobs like
Mia: I think lads have it easier because like my brother like he’s a farmer now he didn’t
really have to study in school coz he’s just getting the farm ((laughs)) whereas
with girls your parents would be like oh are you studying hard studying hard to
get to college and all this
F. 15
((General laughter))
(/)
Int: So you believe the key part of success is to get a good job?
Mary: Well yeah definitely but at the same time I still want to have kids like have family
obviously not now ((laughs)) but in in the future
((General laughter))
Mary: But yeah no definitely want kids but I feel it’s less as expected now
Sal: ((In overlap)) its more people like having kids later now and coz like lots of my
aunties would have had kids and stuff when they were my age like so now like it
wouldn’t be what’s expected (.) like its expected of us to go to college and get a
job
Grace: Yeah that’s what is expected like it’s not expected for you to have a kid at twenty
like people would say oh my god she is so young
Sal: ((In overlap)) yeah yeah
Grace: Whereas twenty years ago we probably would be like starting
Sal: ((In overlap)) yeah most women would be married by twenty
Int: Pressures on so
((General laughter))
Int: So you are all mentioning family do you think this is central to a successful life
(.) like if you were to think when I die in a perfect scenario my life would look
F. 16
like this (.) you know like what do you think fully is the key to being perfectly
successful
Grace: Do what I want to do for me and for nobody else
Mary: Definitely finish college get a good job like one your happy with like something
that you really want to be doing then like have family and happily ever after really
((General laughter))
Grace: And a nice house I want a house with a big back garden ((laughs))
Sal: Yeah mine’s gonna be on the beach in Miami
((General laughter))
Int: So you guys are kinda touching on the idea but I want to kinda go further into it
and that’s the notion of the empowered woman
Mary: Well like independent and definitely there are a lot of empowered women these
days like (. . .) ugh I can’t think of any right now but like women doing things
that weren’t really seen as women’s jobs just like independent women like with
their own good jobs and taking care of themselves just (. . .)
Sal: Strong (.)
Int: It is often described instead as like the have it all woman like what do you guys
think all is
Mary: Its not a great example but you know your one in The Proposal
Int: Sandra Bulluck
F. 17
Mary: Yeah but you know her character like obviously she was lonely but apart from
being lonely like you know she had great apartment expensive clothes great job
but just forget about the lonely bit ((laughs)) but she gets a man in the end
anyways
Grace: And like your own Eva Longoria from Desperate Housewife’s her like
Mary: Yeah she is actually
Grace: ((In overlap)) yeah like she had the money and her husband with the great job and
she kinda wore the trousers in the house she was just like you know like
Sal: Victoria Beckham was also recently described as one of the most empowered
women
Mary: ((In overlap)) Angelina Jolie
Sal: She has her own perfume and clothes line and because like when you hear of
people who get married to successful people but like before they got married
David Beckham wasn’t that famous and as known as he is and they like built their
lives together and now she has what does she have
Mary: Clothing lines perfume her own shops
Sal: Yeah all sorts like she was actually nominated or she won business woman of the
year yeah but she built it all up herself like
Mary: You forget like she was
Grace: ((In overlap)) a Spice Girl and the one who couldn’t sing or dance
((General laughter))
Int: So she is the empowered women then?
F. 18
Grace: Yeah coz she isn’t like Kim K famous she built it all up like proved she could do
it all
Mary: Like yeah she isn’t famous for nothing
Sal: She actually earned all her money
Int: So you’re saying Kim Kardashian isn’t one
Grace: No because she grew up in money and I think money is power and if she has
grown up in it it isn’t really her power.
Sal: Victoria Beckham didn’t get her ass out for a bit of money
(/)
Mary: There are certain expectations dress a certain way act a certain way have a man
Grace: Take a hot guy say Justin Bieber and like if I see a picture of the girl he is dating
even if she is beautiful I would be like ‘oh my god she’s so ugly’ I would do that
but that like because I expect him to be going out with like a super model or
something because I have that expectation
Mary: ((In overlap)) yeah yeah
Grace: Like because of the media and all that kinda thing and like I’m aware I’m doing
it but like I would never stop and think about it
Mary: We we are pretty judgmental of other women being like ‘oh she’s wrotten’ and
stuff when they really aren’t
Grace: Or ‘you could do so much better than her’
F. 19
Sal: Yeah like with celebrities like without make-up and your like ‘oh my god why do
you look like that’ like you have an expectation of them
Mary: Yeah you just expect them to be perfect all the time
(/)
Int: What do you guys understand by the term feminism
Mary: Mmm equal rights we did this in class the other day so yeah equal rights
Int: Yeah yeah
Mary: I mean I know a lot of people think feminists are cut short haired burn the men
and stuff
((General laughs))
Grace: Like what’s a feminist
Int: Ye what do you think a feminist is
Grace: I dunno someone who hates men I don’t really know
Int: Well ok if I were to say feminism or feminist to you like what’s the first thing that
comes to mind
Grace: Well if you said feminism to me I would think that women think they are better I
honestly don’t really know how to define it
Int: It’s ok I don’t need like correct answers I just want your ideas and like would you
ever categorise yourself as a feminist
F. 20
Grace: I don’t know I don’t think so ((laughs)) no I don’t think so like I don’t think I’m
better than men or other women or anything (.) I don’t really know I’m probably
talking shite
((General laughter))
Int: Well anyone else what would you think of feminism
Mia: Woman’s rights
Int: Yeah
Mia: Like in in the Dail where there is you know like less women than men and they
try and get more women (.)
Mary: Like there’s not equal pay between men and women their pay isn’t equal in a lot
of places
Sal: I think femin feman bla feminism
((General laughter))
Sal: It can be like really like em like when you think of like women in certain kinds of
jobs like you’d never see like a boy beauty therapist like going into wax your
eyebrows like in hair dressing and stuff there are more now but it’s always been
like a female kinda job like and stuff so I think feminism kinda defines your job
and stuff like you don’t hear of women builders and stuff and yeah like stuff like
that
Int: And would you ever say you were a feminist
Sal: No
Int: No
F. 21
Mia: No
Mary: Maybe but not in like a hate men way but I believe in equal rights
Sal: ((In overlap)) Like I’d always say like just because like when my aunties were
younger they said it was always unfair that the girls had to do everything but now
at dinner they are there saying ‘oh girls do the dishes’ and we are like ‘no we all
have to do it’ like it’s not just going to be the girls that do it like in that sense I
would be a bit like that but I wouldn’t be like what Mary said ‘burn all the men’
((General laughter))
Mary: Just yeah I learnt this the other day but yeah I think we should all have equal rights
and equal pay
Gen: Yeah
Int: Mmmhmm
Mary: But in the same way that men don’t have somethings women have like maternity
leave or paternity leave I spose it would be like men don’t get that and that’s
another way we aren’t equal rights ((laughs)) you know that’s just an example of
how something that isn’t equal and where women get stuff that men don’t but
then again there is a lot of stuff men get that women don’t so I’d definitely be for
equal rights
Int: Ok cool so tell me do you guys know about or have ever heard of post-feminism
Gen: No
Int: No
Mary: Think I’ve heard of it but I can’t remember what it is
F. 22
(/)
Int: Do you guys think feminism is over
Mary: No
Int: No
Mary: No sure there is still people protesting for equal rights there’s like um (.) what’s
it called (.) petitions yes petitions or like links on Facebook for sign up for this
equal rights no there is definitely is like a presence but maybe it’s like a different
type like I don’t think it would be as aggressive or whatever as it used to be but
it’s definitely still there I think
(/)
Int: In the fact that you said you didn’t know what feminism was and now your saying
it’s not over would you just not have been aware of it before
Grace: No no like not really I mean just after what you are saying things are coming into
my mind so I guess I notice them but wouldn’t ever think of them as feminist
issues or even think like too much about them before now (.) so like I think it’s
still there but like I’d never have put a label on it or anything if you know what I
mean
Int: So now if I was to use the term post-feminism what would you guys think of like
having heard my description how would you describe it or do you think there is a
justification for post-feminism like that feminism is completely over (.)
Mary: Well I don’t think it’s over but I think it’s justified by like that it doesn’t need to
be as like out there as the sixties you know
F. 23
Grace: I think it’s more evaluating now like there are still issues but we keep them more
quiet and personal and talk about them rather than like protesting and stuff like
we aren’t going to go and start a massive petition coz it’s not a huge issue anymore
Mary: Yeah like the big things like votes for women and you know like women can do
these jobs and they don’t need to quit their jobs after they get married and you
know the big things aren’t there anymore so feminists wouldn’t have as much to
be vocal about anymore
Grace: Mmm like my granny after I turned eighteen asked if I was registered to vote and
I said ‘no’ coz I obviously haven’t and she was like ‘why women fought for your
right to be equal’ and she was like ‘you shouldn’t abuse it’ so maybe you know
she is a little feminist
(/)
Int: … The argument for the empowerment of pole dancing where do you stand on it
Mary: Ah you know it’s just a bit of craic like you know if they aren’t in a pole dancing
club like
Grace: Yeah if they aren’t abusing the art I spose
Mary: ((In overlap)) Just for exercise
Grace: Like if it’s just for exercise and not in a club like if it’s a skill like gymnastics like
I’d love to do it
Mary: Yeah
Grace: Like it would be a bit of fun
Mary: Yeah if it’s just for a bit of exercise
F. 24
Sal: ((In overlap)) I think like it was like (.)
Grace: Like it was always classed as a big slutty thing
Sal: Yeah but now people don’t do it in their underwear and like I know a girl who
does it for strength and she teaches classes and you just go in your tracksuit and
like people think it’s about swinging around a pole in your underwear but it’s not
no like it’s an exercise more than a job on a pole
Mary: Yeah there is a difference between like doing it for men’s pleasure and not being
slutty
Grace: It’s only very recent that this all has publically changed like before I woulda
thought of it as slutty
Int: So is that an area that might be classified as post-feminist like with the hyphen
Gen: Yeah
Int: So have you guys any further thoughts (.) on feminism (.) post-feminism (.)
celebrities
Grace: Oh my god Ariana Grande have you seen her
Mary: She actually makes me so uncomfortable like with her dressing like she does and
looking like twelve
Grace: Yeah she really annoys me like she is kinda (.) whats the word (.) hypocritical
like she acts like a little girl and then dresses in a bra and hot pants like
Mia: Yeah and I don’t like it like my little sister is nine and she has grown up watching
like oh what was it called (.)
Sal: Victorious
F. 25
Mia: Yeah yeah and now she watches all her music videos being like oh isn’t she so
pretty and cool like its scary
Mary: Yeah I just find her very creepy (.) but she is famous
(/)
Int: Lastly did anything come to light you perhaps hadn’t considered before
Grace: Feminism
Mia: And that Kim Kardashian is bad
((General laughter))
Int: Well what did you think before hand
Mia: I never really thought much of what she did I was just like yeah yeah ok when I
see anything about her
Mary: Yeah yeah I think a lot of people must do that but she is so fake like I don’t think
there is anything wrong with growing old it happens to us all
Sal: Yeah I hate when people are so fake
Gen: Mmm
Int: Alright that’s it unless anyone has anything else to say (. . .) no well thanks a
million guys and you know how to contact me if you have any problems or issues
G. 1
Appendix ‘G’ - Focus group ‘B’ transcript.
Int: Alright well first I have to just tell you that what you say are your own thoughts
and opinions and like there are like no wrong or right answers and you are also
welcome to bring in examples like if you don’t want to talk about yourself or
anything you can talk about family friends (.) So firstly I want everyone just to
say their name and then pick a female family member whom either you admire
and why or like really don’t admire and why and I’ll go first (.) I have an aunt and
who when I was younger I actually just hated so much she is like the embodiment
of the perfect 1950s house wife she just used to drive me insane because all her
dinners were perfect and she used to make the children sit at the children’s table
it was awful and I still don’t really like her because of her ways
(/)
Int: So How do you connect with the outside world like interacting and getting your
news stuff like that
Dee: Unfortunately it’s Facebook can’t really go a day like you couldn’t even go a day
(.) is that what you want like
Int: Sure yeah
Gen: ((In overlap)) no me either
Deb: Whenever I have wifi
Dee: Yeah hourly
Deb: Yeah probably hourly…. Like when I’m at home or college…well basically all
the time ((laughs))
Dee: Well anyone who has something to say just sets up a blog like (.) it’s all online
G. 2
Int: Mmm so we are talking about popular culture, how would you guys understand
the term popular culture and could you like define it?
Ellen: Eh
Gia: The norms of society
Dee: Trends like whats ongoing
Int: What do you feel you role within popular culture might be
Gia: What none really
Dee: Come on you totally buy into popular culture you with your oh look at this and
everyone knows this and oh I want that
Gia: Yeah but it’s innocent enough I don’t really realise I’m doing it
Dee: Yeah I’m not involved in it like making it I’m just on the side lines watching it
Gia: ((In overlap)) Yeah like on Facebook and stuff
Ellen: Stalking
((general laughter))
Dee: Having a gawk
Int: What elements of your own personal identity factor in your relationship with
popular culture
Ellen: Definiately your age is a big thing (…)
Int: Well what do you think about gender and looks
Gia: Ugh I hate these fellas with fucking pony tails on top of their heads ((laughs))
G. 3
Deb: Yeah more and more men are getting into their looks these days
Dee: But I think it’s still definitely still aimed at women like women ads are all over
Facebook and stuff like that
Ellen: ((In overlap)) well no I think it’s definitely more aimed at men these days
Dee: Now though or do you mean in the past
Ellen: No no I mean like it’s definitely more aimed at men than it used to be so
Dee: ((In overlap)) yeah yeah I guess so
Gia: Just their hair and their dress and stuff like that (.) those feckin men
Deb: But for women looks are obviously just a massive thing today like people get so
dressed up for a day at college like I do think what’s the point but I feel the need
to do it
Int: And do you think they are doing it for themselves
Deb: No
Dee: ((In overlap)) no sure they are doing it for other people and Facebook likes on
their pictures
Bed: But it’s for women to give compliments to each other it’s not like purely for men,
its more women against women
Gia: Mmmm yeah
Ellen: Yeah you can be like oh I look way better than her
Dee: And it also like makes you feel better about yourself
Deb: Well yeah
G. 4
Dee: ((In overlap)) but your right it is mostly about other people seeing you that day (.)
I’d think anyway
Ellen: Ah yeah I’d agree
Dee: Also they get you ahead in life like they are up there with your achievement
Deb: No I wouldn’t think so
Dee: Yeah think about it, if you go to an interview and you’re the same as someone
else on paper they will pick the most attractive
Gia: Mmm yeah I guess so then
(/)
Int: Why does Kim Kardashian command such attention
Dee: Coz she is a porn star (.) she is so photo shopped she is famous coz of her ass like
Gia: Coz men want to ride her
Ellen: ((In overlap)) yeah they think she’s perfect I don’t but loads do
Int: Do you think as women that there are like certain roles expected of you within
popular culture?
Dee: Well definitely the pressure of marriage has gone coz like we have more
empowered now like 50 years ago we would have been married by now like we
can have more of an opinion now
Gia: ((In overlap)) yeah we have more choice
Int: You said empowered so what is like the empowered woman then
Dee: It’s like being independent (.) like they don’t need a man
G. 5
Ellen: ((In overlap)) yeah it must to be family children the house
Deb: Its different now like (.)
Gia: Like they still want their families and cars and houses and stuff but there isn’t as
much pressure now like marry later and stuff
Dee: ((In overlap)) later and they don’t have to marry to get somewhere in life
Gen: Yeah
Dee: Like I don’t think the ultimate gaol in life is to get married anymore (.) like I’d
say if this was 50 years ago there would be so much pressure on us to get married
like
Deb: Ah sure we would be past it
((General laughter))
Dee: Whereas now there isn’t like
Int: Can you give me an example of women you might think of as empowered within
popular culture today
Dee: Eh Emma Watson like that speech but like it’s obviously her looks and personality
that got her up there but she obviously has brains behind it (.)
Int: What about Angelina Jolie
Gia: Yeah she is amazing (.) like she has a career family charity work and she is shit
hot
Int: So why isn’t Kim Kardashian empowered
G. 6
Ellen: I know we are saying Kim Kardashian isn’t one but maybe to younger women she
will be their idol
Gia: No
Dee: Do you think
Deb: I don’t think so
Ellen: Well all them younger people love them like if you think about it they have grown
up with the Keeping Up With the Kardashians
Dee: Yeah (.) do you not think its worrying though that like that’s their fucking role
model
Ellen: Well she doesn’t go get twisted every night
Dee: She just put a picture of her naked across the whole internet
Ellen: Well I dunno it’s just what I think
Int: So who is the Kim Kardashian of our age group
Dee: Well Friends
Gia: Yeah Jennifer Aniston
Deb: What a legend
Dee: Oh and she isn’t old but Jennifer Lawrence
Gia: Ah yeah her too
Int: So would you say that the notion of the empowered women is inherently linked
with popular culture?
G. 7
Ellen: Well I’d say it’s kinda linked with each generation I think
Dee: Are you talking about like Facebook and stuff
Int: Well yeah do you think to be like famous in popular culture do you think women
need to be like the empowered woman
Dee: I spose but it’s hard to know coz you don’t know how they started out do you do
you get me like your one So Sue Me how famous has she become and how did
she start by like writing a blog and now she is like all over your Instagram all
over your Facebook and every girl looks up to her and I think its across like a
wide range of women like there are girls younger than me commenting on it and
ones older than me commenting and asking (.) yeah and she is so pretty (.) and
blonde
(/)
Int: Are you very aware that these women are empowered and do you feel any
pressure on yourselves
Dee: ((In overlap)) yes
Gia: ((In overlap)) I don’t but
Dee: ((In overlap)) like I think there is a massive one
Gia: Well I don’t
Dee: But the reason you’re putting make-up on is because you’re going
Gia: ((In overlap)) out yeah
Dee: but like why
G. 8
Gia: I rarely do though
Dee: But why are you gonna do it now
Gia: I wanna feel nice for a change
Dee: Exactly and like who do you wanna look nice for
Gia: Well me I mean I look shit most of the time
Dee: But what’s your aim tonight
Gia: Go out (.) get drunk
Ellen: And is there anything else
((General laughter))
Gia: Try not to get sick
Dee: Ah come on we know why you wanna shift a jockey
Gia: Nooooo ((laughs))
Dee: Always shift a jockey
Gia: No not anymore
Deb: Yeah the make-up is for ourselves
Dee: That’s a big lie I can honestly say I’m doing it because everyone else is
Gia: Ah but sure it’s all the same
(/)
Int: Can you guys tell me what you understand by the term feminism
Gia: Fucking women
G. 9
Dee: Oh what’s the line in that Beyoncé song
Deb: Women standing up for women’s rights
Dee: believes in the social and economic wellbeing of the sexes (.) something like that
Ellen: Wow that was impressive ((laughs)) but yeah
Gia: Actually yeah (.)
((General laughter))
Int: Ok cool but Gia what do you actually understand it to be though
Gia: Ah women and rights and them complaining and causing trouble
Ellen: Mmm yeah I’d agree (…)
Int: Um ok so would you guys have ever hears of the term post-feminism
Gia: No
Ellen: Never
Int: If you had to guess
Deb: After
Dee: Yeah post so after feminism
(/)
Int: Do you think feminism is over
Dee: No not at all no like why
Ellen: ((In overlap)) should be
G. 10
Deb: I don’t think it should necessarily be over like there should always be a hint of it
there but (.)
Int: Do you think it’s reached its goal
Deb: No
Dee: Exactly
Gia: ((In overlap)) no coz even men in the horsey industry have everything
Deb: ((Laughs)) but no I don’t think it should be over and I don’t think it is over because
well it shouldn’t be
Gia: I don’t think it should be either
Dee: Definitely with the whole abortion thing anyway (.) like I’m saying it’s obviously
not and definitely not over in Ireland because we still don’t have the right to go
and get an abortion if we need to
Int: Mmmhmm
Dee: So like how (.) how old school is that
Gia: Yeah we mightn’t want it but it should be our right, we should be allowed (.) if
we want fuckin children we will have them and if we don’t or can’t well we have
to have them anyway like
Int: So then what do you consider post-feminism to be (…) you would spell it without
the hyphen then
Dee: Ye coz it hasn’t that’s for fucking sure
Gia: I don’t think it should be finished either (.)
G. 11
Int: Why don’t you
Gia: Because there are so many more issues to be dealt with coz like even all those
high paid jobs and all that in the economy are all men
Ellen: Ye actually the H.R lady taught us that
Deb: But your being so against men like it shouldn’t be men men men and like women
against men it should be rights in general
Gia: So like women and men
Dee: ((In overlap)) together
((General laughter))
Int: It came up in my last focus group but where do you guys stand on pole dancing
Gia: Hon the pole dancing
Deb: Ah yeah it looks like great craic
Dee: I’m all for it
Ellen: It looks like a good and fun way to get fit like its big over in America don’t they
even get poles in their houses
Dee: Hmm but would you rather get a pole or go for a run
Gia: Ah I’d prefer to go running
Dee: Why
Gia: Because I wouldn’t want others to see me like outside of say the circle of the class
Dee: Mmm so I guess why would you choose pole dancing class
G. 12
Deb: Well I’ve heard it’s very good for your core but I guess you might seem more
attractive
Gia If you can pole dance well you can do anything
((General laughter))
Int: What do you mean
Gia: Well you will have both strength and confidence in yourself
(/)
Int: So have you guys any further thoughts (.) on feminism (.) post-feminism (.)
celebrities
Ellen: Na I’m good
Gia: That I associate feminists with man haters but I actually don’t think feminism is
over
Dee: Yeah I’d agree
Deb: Yeah and just also that it shouldn’t be man versus woman you know (.) like they
have issues too
(/)
Int: Was this what you were expecting from this focus group
Dee: No not really
Deb: Didn’t really know quite what to expect to be honest
((General laughter))
G. 13
Int: Ok then has anything come to light that perhaps you hadn’t thought of before or
feel different about now
Gia: Well I’ll think differently when I go to put on my make-up anyway
((General laughter))
Ellen: Yeah I think I might be a bit more cynical now…. Like perhaps think a bit more
about why I’m looking at things and buying things you know
Dee: Well basically yeah and just that I guess we are all kinda (.) feminists then (.)
maybe no
Gia: Well I dunno about feminists but definitely believe in feminism (…)
Int: Alright well that’s it unless anyone has anything else to say (. . .) well thanks a
million guys and you know how to contact me if you have any problems or issues
and enjoy your night
94
Bibliography
Barry, Peter, Beginning Theory (Manchester: Manchester University Press, 1995).
Braun, Virginia and Victoria Clarke, Successful Qualitative Research: A Practical
hhhhh Guide for Beginners (London: SAGE, 2013).
DeVault, Marjorie L., Liberating Method: Feminism and Social Research hhhhh
hhhhh(Philadelphia: Temple Universtiy Press, 1999). Google book.
Feminism’, Oxford Dictionary.com (2014)
hhhhh<http://www.oxforddictionaries.com/definition/english/feminism > [accessed
hhhhhOct. 2014].
Gill, Rosalind, 'Postfeminist media culture: elements of a sensibility', European journal
hhhhhof cultural studies, 10.2, (2007), 147-166. < http://eprints.lse.ac.uk > [accessed 25
hhhhhFebruary 2014].
Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke
hhhhhUniversity Press, 2007).
Irigaray, Luce, This Sex Which is Not One, trans. by Catherine Porter (New York:
hhhhhCornell University Press, 1985).
Marshall, Judi, 'Self-reflective Inquiry Practices', in The SAGE Handbook of Action
hhhhhResearch, ed. by Peter Reason and Hilary Bradbury(London: SAGE Publications
hhhhhLtd, 2001), pp. 433- 439.
McRobbie, Angela, The Aftermath of Feminism (London: SAGE Publications Ltd,
hhhhh2009).
Negra, Diane, What a Girl Wants? Fantasizing the Reclamation of self in Postfeminism
hhhhh (Oxon, Routledge, 2009).
Oakley, Ann, The Ann Oakley Reader: Gender, Women and Social Science (Bristol:
hhhhhPolicy Press, 2005). Google book.
95
Power, Nina, One Dimensional Woman (Hants.: O Books, 2009).
Re)searching Women, ed by. Anne Byrne & Ronit Lentin (Dublin: Institute of Public
hhhhhAdministration, 2000). Google book.
Stanley, Liz and Sue Wise, Breaking Out Again: Feminist Ontology and
hhhhhEpistemology (London: Routledge, 1993). Ebrary.
Steinmetz, Katy ‘Which Word Should Be Banned in 2015?’, Time Magazine ( Nov.
hhhhh2014) < http://time.com/3576870/worst-words-poll-2014/ > [accessed 20 Jan
hhhhh2015].
Westmarland, Nicole, 'The Quantitative/Qualitative Debate and Feminist Research: A
hhhhhSubjective View of Objectivity', Qualitative Social Research , 2.1, (2001), 1-28,
hhhhhin Different Approaches for Inter-Relating Qualitative and Quantitative Method
hhhhh< http://www.qualitative-research.net/ > [accessed 29 December].
Willson, Jacki, The Happy Stripper: Pleasures and Politics of the New Burlesque (New
hhhhhYork: I.B. Tauris and co, 2008).
Zeilser, Andi, Feminism and Pop Culture (California: Seal Press, 2008).

Kate Robson Dissertation

  • 1.
    Emma Kate Robson N00110709 TheRedundancy of Feminism? A Qualitative Analysis of Young Women’s Perceptions of Post-Feminism Internal Supervisor: Dr. Carol MacKeogh BA in English, Media and Cultural Studies. Date of submission: 14 April 2015. Faculty of Enterprise and Humanities Institute of Art, Design and Technology, Dun Laoghaire.
  • 2.
    Abstract Post-feminism is ahighly ambiguous term. Subject to severe negative critique by second wave feminists, post-feminists in academic circles are looked upon with distain. Post- feminism supposedly signifies an era of shallow women who believe that in an age of gender equality they may use their bodies to get ahead in life. Literature refers to post-feminism as proliferating within the categories of white, western educated, middle to upper class young women in contemporary society since the early 1990s.1 Personally, falling into the criteria of the post-feminist I feel that many of the accusations made by critics may be too general and unjust. With regard to academic critique into the area, there seems to be a great lack of empirical evidence accompanying the theories laid out. Thus it seems the area of post-feminism is ripe for investigation. Such a study will, therefore, be conducted through the qualitative analysis form of focus groups. It will aim to shed some new light on the current perceptions of feminism in young women today, and, also, see if post-feminism truly does proliferate in twenty-first century Ireland. 1 Diane Negra, What a Girl Wants? Fantasizing the Reclamation of self in Postfeminism (Oxon, Routledge, 2009), pp. 10-90. Angela McRobbie, The Aftermath of Feminism (London: SAGE Publications Ltd, 2009), p.1.
  • 3.
    Table of Contents Introduction.....................................................................................................................1 ChapterOne – Literature Review - The Current Standing of Post-feminist Critique............................................................................................................................5 Chapter Two - Method and Methodology..................................................................15 2.1 Researching Research.........................................................................................15 2.2 Practical Application of Research Method.......................................................19 Chapter Three - Analysis .............................................................................................24 3.1 Analysis Introduction......................................................................................24 3.2 Analysis of Central Questions............................................................................27 3.2 A Discussion of Analysis in Relation to the Literature Review. .....................40 Conclusion .....................................................................................................................43 Appendices..................................................................................................................A. 1 Appendix ‘A’ - Question Guide- Prior to Focus Group Dry Run. ....................A. 1 Appendix ‘B’ - Final Draft of Question Guide. ................................................... B. 1 Appendix ‘C’ - College Ethics Form ....................................................................C. 1 Appendix ‘D’ - Participant Ethics Form..............................................................D. 1 Appendix ‘E’ – Notation System........................................................................... E. 1 Appendix ‘F’ - Focus group ‘A’ transcript...........................................................F. 1 Appendix ‘G’ - Focus group ‘B’ transcript. ........................................................G. 1 Bibliography..................................................................................................................94
  • 4.
    Acknowledgements First and foremost,I would like to express my deepest gratitude to my supervisor, Dr. Carol MacKeogh, for the patient guidance and valuable suggestions she provided during the development. Her willingness to give her time so generously was deeply appreciated. I would also like to thank my family for their continuing love, encouragement and support given to me throughout my studies. In particular I would like to thank my niece for inspiring my interest in the area of post-feminism. Lastly, I would like to thank the participants who gave up there time and gave invaluable empirical insight without which my dissertation would not have happened.
  • 5.
    Declaration I hereby declarethat this project represents my own original work and has not been submitted, in whole or in part, by me or another person, for the purpose of obtaining any other credit/grade. I agree that this project may be made available by the College to future students. Signature:
  • 6.
    1 Introduction The term feminismwas originally used in political and academic circles as a signifier for an equality movement of the sexes. However, over time it has become a highly problematical term. The currency of the term feminism has evolved and now circulates on a colloquial level as well as at a political and academic one. Within the twenty-first century the media is key in the circulation of ideas and it is here where many impressions of feminism are constructed and consumed by the general public. This has led to feminism being a highly ambiguous term with the connotations varying throughout society. To some the label of feminist would be construed as a compliment, however, in recent decades the label has become an insult and dirty word to many. Time magazine, in a poll of words that should be banned in 2015, included feminism in the short list.2 Although an apology was issued stating they only wished to ‘invite debate’, it shows the deep ideological rupture with regard to the term feminism in contemporary times.3 Thus, even those who claim to be feminists, are highly aware of oppositional ideologies which will attach the label of man hater to those individuals. The concept is, therefore, in current times, a highly questionable one. According to the Oxford dictionary, feminism, in its most basic form, is defined as 'The advocacy of women’s rights on the ground of the equality of the sexes'.4 In 1792 Mary Wollstonecraft wrote A Vindication of the Rights of Woman in response to Charles Maurice de Talleyrand-Périgord's report on female education. She wrote that women should not be confined to education of the domestic sphere. Her work is commonly 2 Katy Steinmetz, ‘Which Word Should Be Banned in 2015?’, Time Magazine ( Nov. 2014) < http://time.com/3576870/worst-words-poll-2014/ > [accessed 20 Jan 2015]. 3 Steinmetz. 4 ‘ Feminism’, Oxford Dictionary.com (2014) <http://www.oxforddictionaries.com/definition/english/feminism > [accessed Oct. 2014].
  • 7.
    2 thought to bethe primary contributor to the theory that became known as feminism. However, '[t]he feminist literary criticism of today is the direct product of the 'woman's movement' of the 1960s’, namely second wave feminism.5 Their central concerns were with regard to the 'conditioning' and 'socialisation' which underpins the role of woman.6 The sentiment of second wave feminism continued, quite successfully, for three decades before a new phenomenon, known as postfeminism or post-feminism, is said to have come into being in the 1990s. Particularly ambiguous and unconfirmed terms in themselves, the current uncertainty with regard to feminism further confuses the attempt at specificity. I will set out simplified definitions for the sake of coherency throughout this project. Although both terms refer to the same category of woman, the inclusion or exclusion of the hyphen delivers alternating meanings. Postfeminism, birthed by second wave feminists indicates that the need for feminism is ongoing. However, post-feminism, naturalised within popular discourse, in its literal sense means the end of feminism. The inclusion of a hyphen concluding that feminism is a thing of the past, it signifies that equality has been achieved. I will from here out occupy the ‘naturalised’ position, but, note the problematic nature of the term by referring to it as post-feminism. Many second wave feminist theorists today focus on a critique of young women, referring to them as post-feminists. A primarily academic notion, these theorists both create and critique post-feminism. Their arguments pay particular attention to the turn away from feminism in a society which celebrates the re-instalment of stereotypical female gender roles or ‘truths’.7 This may involve embracing categories such as slut, consumer and poseur. Although there has been much critique regarding post-feminism it 5 Peter Barry, Beginning Theory (Manchester: Manchester University Press, 1995), p.121. 6 Barry, p.122. 7 Negra, p.2.
  • 8.
    3 seems much ofthis may be based on purely theoretical levels. In my knowledge of feminism, based on college teachings, it seems that much of the critique of post-feminism appears harsh and provides little empirical evidence. It is said that post-feminism proliferates within western society. With specificity placed on white, middle to upper class and well educated young women. It might be said then that I personally may be labelled as a post-feminist. Perhaps my college education on the matter does give me an understanding of feminism beyond that of the average woman in my position. However, it is from here that I established an interest in post- feminism and developed feelings of indignation at the accusations that post-feminism, and, perhaps, I personally, disregard notions of equality and place an emphasis instead upon bodily appeal and 'to-be-looked-at-ness'. 8 Yet in saying this, a discussion with my nine-year old niece revealed to me that she wants to be like singer Rihanna. A woman who notoriously uses nudity for publicity. I, therefore, feel torn in my feelings towards the accuracy of the accusations made by second wave feminists, is it postfeminism, where feminism is still necessary, as they suggest? Is it post-feminism where one may focus on the individual self not a community fighting for equality? Or, is it possible to make the issue this black and white at all? Although I do understand both feminism’s aims and objectives and their critique of what they term post-feminism, I feel that the area needs more work conducted to truly understand the phenomenon. This project, as a result, proposes to, if only on a small scale, provide further insight and understanding into post-feminism and those who fall under its identity markers. This will be done by conducting qualitative research, specifically focus 8 Andi Zeisler, Feminism and Pop Culture (California: Seal Press, 2008), p.8.
  • 9.
    4 groups, to gainclear empirical insight into young women who fit the post-feminist criteria laid out by second wave feminists. The key motives of investigating the idea of post-feminism come from, firstly, the apparent lack of tangible evidence provided in critiques of the area. Secondly, my slight indignation at being labelled as such a, perhaps, superficial being who disregards the need for equality.9 This research project, therefore, moves forward by investigating whether there is a shortage of empirical evidence for the harsh accusations made by second wave feminists? Would there be any justification for such a lack of research? Can this research provide a new insight into the matter? Do young women actually fit the theorists’ models? What stance do they have with regard to gender politics? How do they relate to current gender structures and media structures? Is there a presence of feminist or post-feminist teaching in general education? Do all young women, like my niece, admire someone who capitalises off her body? And, ultimately, does the label of post-feminism fit? While the number of participants in the research is small and does not permit generalisation, the findings resulting from such questions can begin to tease out these ideas and the status of post-feminism within Irish culture. When attempting to type postfeminism into Microsoft Word the word is marked as incorrect. However, post-feminism is deemed correct. This shows the current ideology of western society to, perhaps, be concurring with a naturalised disregard of feminism. However, it will not be until concluding that I will place my verdict on which grammatical way I believe it should be spelled, or, if, indeed, either term is fully appropriate. 9 Negra, p. 2
  • 10.
    5 Chapter One –Literature Review - The Current Standing of Post-feminist Critique In order to gain a firmer understanding of post-feminism, the concept will be explored through a broad range of critical literature. The theorists examined here may be seen as primarily second wave feminists, or, are well versed in second wave feminist theory. These ideas are rooted in achieving equality of the sexes. Most literature present in the area stands in opposition to post-feminism. Tracing through the central ideas that occur throughout this body of work will serve to give an insight into the current state of research and critique regarding post-feminism. Investigating what each theorist brings forward and the manner in which they concur. As a starting point, I have selected Interrogating post-feminism by Tasker and Negra as it was the prescribed post-feminism text within my college course. It appears, to me, to hold a very negative view of post-feminism and is written in quite a polemic manner. They categorise post-feminism as a backlash against its feminist predecessors. The post-feminist movement, according to Tasker and Negra, has stemmed from the media's implied redundancy of feminism.10 Fuelled through magazines, cinema and popular music there is an obsession with youth and a popularising of the idea that fulfilment can be gained through 'empowerment'.11 An empowerment that seems to revolve around the idea of, perhaps, the have it all woman. As many writers point out in their work, there is no concrete definition for the term post-feminism. There are, however, certain areas on which many critics agree. This view of post-feminism as a backlash against its predecessors re-occurs throughout post-feminist critique. Tasker and Negra in 10 Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke University Press, 2007), p.1. 11 Tasker and Negra, pp. 1-5.
  • 11.
    6 their writing appearto be placing a great amount of blame upon the media’s role in the proliferation of post-feminism. This notion of the media being to blame is also taken up by critic Rosalind Gill.12 She also believes that central to post-feminism is a sense of empowerment. She locates this empowerment as a superficial or ‘makeover paradigm’ generated through media discourse.13 Gill also notes the difficulty there is in defining a set of specific characteristics within post-feminism. Although Gill fails to give a strict definition to the term post-feminism, she highlights what she believes to be the central facet of post- feminism. She categorises it as a sensibility of femininity and the body involving self- surveillance and empowerment.14 It may be argued then that women having developed a strong awareness of what is expected of them with regard to their bodies. Angela McRobbie, is yet another critic that notes the difficulty she has in defining post-feminism. However, unlike Tasker and Negra, she believes that it is not merely a backlash, but has been instilled within contemporary society at an institutional level.15 She writes of a new sexual contract for the females of the western world. Within this contract, they must ‘make good use of the opportunity to work, to gain qualifications, to control fertility and to earn enough money to participate in the consumer culture’.16 This sexual contract is instilled within women at an educational level, where, given the open mind set of the students, it will yield the most effective results.17 McRobbie further expands on this idea by stating that within educational spheres there are also aggressive policies by which feminism is eradicated and seen as a thing of the past.18 The notion, 12 Rosalind Gill, 'Postfeminist media culture: elements of a sensibility', European journal of cultural studies, 10.2, (2007), 147-166. (p. 5) < http://eprints.lse.ac.uk > [accessed 25 February 2014]. 13 Gill, p.3. 14 Gill, p. 3 15 McRobbie, p.1. 16 McRobbie, p. 54. 17 McRobbie, pp. 72-75. 18 McRobbie, p. 76.
  • 12.
    7 illustrated in McRobbie’swork, that the institution of education is the hub of post- feminism, highlights that it is the youth of society who are central to the phenomenon, and, in completing education, are bringing it into the work place and later life. This idea of the instillation of post-feminism at an institutional level can also be detected in Nina Power's book The One Dimensional Woman. Here, this idea is illustrated through her selection of American high profile politician, Sarah Palin, as a subject whom, as she quotes from Alain Miller, 'represents a certain kind of ''post-feminist'' woman', one that understands the phallus as merely a ‘semblance’.19 Power documents how Palin is often described as a 'pitbull in lipstick' due to the fact she has managed to avoid the traditionally female dichotomies of 'mother/politician, attractive/ successful [. . .] by embodying both sides of each at once'.20 It may be concluded, therefore, that she is the embodiment of the notion of the 'empowered woman'. The term which continues to crop up as this investigation unfolds. For Power the ‘empowered woman’ is a woman who has it all, as with Palin, 'women want to be her, many men [. . .] want to have sex with her'.21 Power also stresses the importance of the body in her work. Post-feminism is an age in which the notion of the ‘walking c.v’ has proliferated, women essentially 'sell themselves', their body and aesthetic qualities being central in their employability.22 Her stance as a second wave feminist sees her, as with many others from the same origin, condemning post-feminism and viewing it as a negative. In her words, in a post-feminist society, 'you are your breasts'.23 In Diane Negra’s What a Girl Wants? she states that post-feminism 'trades on a notion of feminism as rigid’, in contrast with this she highlights how post-feminism 19 Nina Power, One Dimensional Woman (Hants.: O Books, 2009), p. 7. 20 Power, p. 8. 21 Power, p. 9. 22 Power, p. 23. 23 Power, p. 24.
  • 13.
    8 ‘offers the pleasureand comfort of (re)claiming an identity uncomplicated by gender politics'.24 She also concurs with the idea that post-feminism is a 'backlash' against second wave feminism.25 For Negra, post-feminism places feminism as being something of the past, irrelevant in contemporary culture and practices. Today, there has instead been a turn to a commodity driven achievement of self.26 Negra also addresses the issue where by post-feminist 'culture revived the “truths”' of femininity. 27 Creating a society that claims and often celebrates their stigmatisation as bitches and gold-diggers.28 The notion of youth is also highlighted, Negra points out that, within post- feminism, there appears to be a breakdown between girlhood and womanhood. Here, similar to Power’s previously mentioned idea of the walking c.v, women bring forward girlish qualities to adulthood in order to be both successful and desirable.29 Adhering to this 'generalized sense of appearance', Negra believes, is based around the re-proliferation of discrimination in post-feminist culture.30 Thus, she believes post-feminists embrace the gender stereotype of women as superficial; which second wave feminists have fought against. Negra's work seems to stick to the general consensus laid out by the previously mentioned second wave feminists. She, like many others, sees post-feminism as proliferating within the context of 'white females'.31 She also points out that post-feminism 'flourishes under the conditions of private wealth'.32 These categories, alongside the importance of educational hubs, highlight where the proliferation of post-feminism may 24 Negra, p.2. 25 Negra, p.4. 26 Negra, p. 4. 27 Negra,p. 12. 28 Negra,p. 12. 29 Negra, pp. 12-14. 30 Negra, p. 90. 31 Negra, p. 10. 32 Negra, p. 91.
  • 14.
    9 occur. These theoristshave so far held strong opposition to post-feminism. They seem to believe that young women today have no interest in continuing a fight for equality. In spelling post-feminism without a hyphen, they are, thus, pointing to the continued need for feminism in contrast to post-feminism where it is deemed redundant. There are an abundance of critical texts regarding post-feminism, however, most are written by those who come out of an age of second wave feminism. It is clear, through the polemic nature of their speech and the lack of empirical evidence that they come from a very specific mind set. It is harder to find younger theorists who have critiqued post- feminism. However, there are some more contemporary texts and theorists who although well versed in second wave feminism do not stand in severe opposition to post-feminism. These exceptions include Andi Zeisler and her 2008 text Feminism and Pop Culture. Zeisler was in her early twenties in the early 1990s which is often identified as when post-feminism commenced. For Zeisler, feminism and post-feminism are inherently linked with popular culture and the rhetoric it employs. In its most basic sense, popular culture 'is any cultural product that has a mass audience' and is available to anyone with enough money to access it.33 When investigating the relationship between popular culture and feminism Zeisler points out that popular culture has loosened the divide between high and low culture.34 This may be linked with Negra's idea, previously outlined, that there has been acceptance and even a celebration of previously low brow female labelling. Formally derogatory terms have been naturalised in popular culture. Also, within advertising woman are the 'focus' dictated by 'the male gaze'.35 This serves to highlight the importance of popular culture and in propelling the idea of post-feminism. It serves as a mediator between 33 Zeisler, pp.1-2. 34 Zeisler, p.4. 35 Zeisler, pp.4-7.
  • 15.
    10 instilled patriarchal ideologiesand young women. Zeisler is not so rigid in her ideas about why post-feminism came into being as she provides the reader with two versions. It could be described, in unity with critics previously cited, that within post-feminism 'the overall affect is grotesquely distorted to maximise its worst features'. 36 However, on a more positive note it may alternatively be described, 'as a funhouse-mirror view' of second wave feminism.37 Zeisler, thus, seems to break down the positive/negative divide between postfeminism and post-feminism, by indicating that young women may not be viewed in black and white terms. Zeisler points out that post-feminism was encouraged and developed most significantly within the facets of television, advertisement and music. Zeisler crudely puts it that you often now have women talk about 'fucking men rather than being fucked'.38 She also states that within post-feminism, there is a celebration of 'single women's economic independence’.39 She believes that within post-feminism, money is everything.40 She backs this up by giving examples of how the wealth of the likes of Julia Roberts and Oprah Winfrey became central in media publications, basically, wealth became a 'shorthand for their power'.41 This 'success' reflects across all popular culture, including the likes of advertising. Here the 'new “badass”' category of advertisement came into being whereby the 'language of liberation' has been capitalised upon.42 The products advertised were to become simulations of independence, 'trinkets that “celebrated” their independence'.43 Lastly then is the outlet of music and most notable within post-feminism is the Spice Girls.44 A group with the mantra 'girl power' and who 36 Zeisler, p. 14. 37 Zeisler, p. 14. 38 Zeisler, p. 90. 39 Zeisler, pp.100-101. 40 Zeisler, p.101. 41 Zeisler, p.101. 42 Zeisler, pp. 102-104. 43 Zeisler, p.104. 44 Zeisler, p.107.
  • 16.
    11 wore 'push-up brasand hot pants', women who sang about the surface issues of the male/female divide but failed to look at why.45 They were the 'empowered woman' exemplified, a dilution of feminism that could sell and be harnessed by popular culture.46 However, Zeisler notes that this 'girl power' was not a wholly negative move in the field of feminism as it was brought to light that children exposed to the Spice Girls 'often believes in themselves [... more than] young women'.47 Within the work of Andi Zeisler we see a more neutral stance taken towards post- feminism. Unlike others previously mentioned, who locate their critique purely within a second wave feminist point of view, she does not completely disregard post-feminism as completely countering the work of second wave feminists. Zeisler also uses some basic examples to illustrate her work which are rarely found within the work of second wave feminism with regard to post-feminism. From her work, it is clear that the role of popular culture and in particular female music icons are central in the proliferation of post- feminism. Jacki Willson is another theorist who, although, well versed in the critical work of second wave feminism, offers a more neutral appraisal of post-feminism. She does this successfully by including examples of successful post-feminist women and admitting that the labelling of the post-feminism generation as those who 'disregard and disrespect' the work and achievements of second wave feminists is, essentially, a crude over- exaggeration.48 Like many of the theorists mentioned already, Willson seems to believe that the notion of 'empowerment' is a central concept within post-feminism and within The Happy Stripper she holds up a magnifying glass to this notion of empowerment, with 45 Zeisler, pp.107-108.g 46 Zeisler. p.108. 47 Zeisler, p. 109. 48 Jacki Willson, The Happy Stripper: Pleasures and Politics of the New Burlesque (New York: I.B. Tauris and co, 2008), p.9.
  • 17.
    12 specificity placed onthe work place.49 Her views seem to somewhat mirror those of Power in that the body is a central facet for women in contemporary society. Also similar to Negra's theory of women reclaiming derogatory and weak characteristics within contemporary society, Willson says many 'feminine' qualities have been 'inverted to suggest [. . .] business strengths rather than womanly weaknesses'.50 She explains how, in the past, the combination of 'femininity' and 'business' were not seen as 'compatible bedfellows' and if they did share a bed it was purely on a 'prostitution' basis.51 However, Willson points out that society has evolved and that feminine traits which were 'formally seen as oppressive and restrictive' have become advantageous.52 Examples such as Madonna and Dita Von Teese are given to provide evidence of such a shift. Her work suggests that a breakdown between labor and popular culture has occurred. Although her work focuses on the burlesque element, Willson states that what was once confined to the darkened room is now encompassed in a 'new burgeoning model of womanhood'.53 The post-feminist work environment, therefore, has ultimately become a 'marketplace that promotes the idea of the “bad” girl who needs to dress sexily' as well as being a 'successful, astute business woman'.54 This marketplace can be contrasted with the more traditional model put forward by second wave French feminist, Luce Irigaray. In 1977 she published This Sex Which is Not One, a critique of women being mere objects within the marketplace. This societal marketplace, which formed the basis of much second wave feminist unrest, functioned on the 'exchange of women'.55 They are encouraged to be passive as both market 49 Willson, p. 10. 50 Willson, p. 83. 51 Willson, pp. 88-89. 52 Willson, p. 94. 53 Willson, p. 79. 54 Willson, p. 94. 55 Luce Irigaray, This Sex Which is Not One, trans. by Catherine Porter (New York: Cornell University Press, 1985), p. 170.
  • 18.
    13 commodities and marketconsumers. Consumerism and superficiality driving their success as an asset to a man. Women are reduced to the status of wife, daughter or sister and maintain exchange value 'only in that they serve as the possibility of, and potential benefit in, relations among men'.56 Within Irigaray's model of the marketplace, men and popular culture controlled women. The women were, essentially, pawns. However, within post-feminism something similar to the post-colonial theory of 'adopt, adapt, adept' seems to have occurred.57 Willson's post-feminist presentation of the marketplace, seems to correspond with the 'adept' phase of this theory. In women accepting the roles placed upon them a sort of hybridity has occurred. Women still encompass many of these so called 'desirable' traits, however, perhaps it could be said that these have merged with residue of second wave feminism. Instead of occupying one side of the binary of career success versus object/consumer, women have found a way to occupy both. A breakdown seems to have occurred between labor and popular culture. Thus, resulting in a marketplace in which women now occupy a higher subject position than originally attributed to them. A palimpsest effect of sorts has thus occurred. Willson’s work provides an insight into how the body and concepts of femininity may positively play a role within the work place. She opens up the negative connotations that stem from second wave feminist critiques regarding women’s contemporary role within the workplace and popular culture. Questions, therefore, appear that need to be addressed; does the body play a central role in popular culture and the lives of young women? And is this always a negative thing? Zeisler and Willson are theorists who see some hope and positives for post- 56 Irigaray, p. 172. 57 Barry, 196.
  • 19.
    14 feminism. However, similarto the more negative critique laid out, they provide little empirical evidence for their claims. Although they serve to break down the distinction of post-feminism holding purely negative connotations, they also further illustrate the need for empirical research into the area. In conclusion, through the investigation of these texts, there are several points to be made. Firstly, is to point out that post-feminism appears to be a particularly ambiguous term. With some of the older publications positioning it as merely a ‘backlash’ against the work of second wave feminists, while later ones admitting that this idea may be a bit harsh. Secondly, although there seems to be an absence in definition of the notion itself, there appears to be precision with regard to pinpointing where post-feminism proliferates. It seems to thrive most certainly amongst females within western society, but more specifically, within the educated white females of middle and upper classes. Thirdly, there are some areas which seem to re-occur throughout all the texts examined here, most predominant are the importance of the role of popular culture within post-feminism, and, the escalation of the notion of ‘the empowered woman’. Lastly, and the main concept that has justified the creation of this dissertation, is the issue of evidence. Within these texts there is an abundance of theory, however, there is an extreme lack of empirical research demonstrated. The limited evidence of a spattering of advertisements and a select few examples does not justify the grand claims being made across the critiques of post-feminism. Therefore, it may be said that there is a void regarding empirical research within the work of second wave feminists and general criticisms of post-feminism. Forcing questions of validity to arise thus poses an opportunity for research to be done within a relatively unexplored field; post-feminism.
  • 20.
    15 Chapter Two -Method and Methodology This chapter will outline both the current state of feminist research. It will also illustrate the practical application of my chosen methodology. 2.1 Researching Research As has been already established, a central issue with the notion of post-feminism is the clear lack of empirical research. This chapter seeks to outline the possible reasons for the shortage of research within the critiques of post-feminism. It also looks to identify methods which are suitable for such research. Prior to second wave feminism, during the rule of quantitative research, Ann Oakley claimed that within both life and sociology ‘women as a social group are invisible’.58 An influential figure in the field of feminist research she appears to have dismissed sociology as being dictated by patriarchy and placing sociology as a purely male orientated field. Her work also states that ‘“objectivity”’ has resulted in the proliferation of a patriarchal narrative.59 An objectivity which ‘may reduce many obvious biases, but [. . .] do not seem to have affected [. . .] sexism’.60 For Oakley then, it seems objectivity is useless as it is based on the Eurocentric man and denies the point of view of others. Dominant quantitative forms of research, therefore, recreated patriarchy. Nicole Westmarland also writes of objectivity, outlining the problems feminist researchers have identified with regard to objectivity and quantitative methods.61 She states that ‘knowledge has traditionally been measured by how objective it is deemed to 58 Ann Oakley, The Ann Oakley Reader: Gender, Women and Social Science (Bristol: Policy Press, 2005), p. 189. Google book. 59 Oakley, p. 189. 60 Oakley, p. 189. 61 Nicole Westmarland, 'The Quantitative/Qualitative Debate and Feminist Research: A Subjective View of Objectivity', Qualitative Social Research , 2.1, (2001), 1-28, in Different Approaches for Inter-Relating Qualitative and Quantitative Method < http://www.qualitative-research.net/ > [accessed 29 December 2014].
  • 21.
    16 be’ and ifit was deemed subjective it would be classified as ‘“untrue”’.62 However, Westmarland states that quantitative research, like qualitative research, ‘is interpreted and often manipulated’.63 This points out the inability of achieving objectivity in any kind of research. According to Westmarland, many feminists view quantitative methods as crude and their attempt at impartiality make ‘participants feel uncomfortable with the researcher’.64 She continues by outlining the advantages feminists associate with qualitative methods. Primarily, through a positivist approach that they aim to achieve ‘validity, rather than objectivity’.65 Authority of knowledge would, therefore, be found through words not statistics, interviews and not surveys. However, she warns that using only qualitative methods in feminist research ‘simply reinforces traditional dichotomies’.66 Researching women, therefore, should not automatically rule out quantitative methods. Similar to Westmarland’s idea that there is no one perfect method for feminist research, Marjorie L. DeVault talks of a liberating method, leaving researchers free to resist ‘routine practices’.67 She insists that feminist ideologies and methods should be ambiguous ‘that answers to questions should fit with the contours of women’s lives’.68 This suggests feminist research should be based on lived experience rather than a strict research method. DeVault traces the major shift in research methods with regard to feminist research to the second wave feminist movement in the 1960s where they began to think ‘skeptically about existing research methods’. There seems to have been a turn away from identifying surface problems and instead conducting an ‘“excavation”’ into 62 Westmarland, p. 6. 63 Westmarland, p.6. 64 Westmarland, pp 6-12. 65 Westmarland, p. 21. 66 Westmarland, p. 17. 67 Marjorie L. DeVault, Liberating Method: Feminism and Social Research (Philadelphia: Temple University Press, 1999), p. 1. Google book. 68 DeVault, p. 23.
  • 22.
    17 the lives ofwomen. 69 According to DeVault, feminist methods tend ‘to subvert the notion of objectivity’.70 In situ with Westmarland’s ideas, they indicate a shift toward positivist research. Positive research, however, is something that many feminists have also rejected as it is based on the idea that the researcher can accurately interpret the information and make general assumptions. Yet, DeVault’s ideas seem to point out the need for action in research and suggests that positivism in association with qualitative methods may be the answer. However, she also indicates that the researcher should attempt a level of objectivity.71 It is important to note the significance of the dates DeVault sets forward with regard to radical changes in research methods. She notes that, although, feminist researchers began moving towards more suitable methods in the 1960s, such research remained uncommon until the 1980s.72 Thus, giving an insight into why there appears to be a lack of evidence from second wave feminists with regard to post-feminism. It seems research was not common practice for many second wave feminists during their time of academic development. (Re)searching Women is a book which gives another possible reason for this lack of empirical evidence. It suggests that it may be due to the fact that many feminist theorists are writing from a time of doubt regarding qualitative research.73 Firstly, that it is labelled 'feminist' research sets up a binary between feminists and non-feminists, those not identifying with the term turn away from such research.74 Secondly, that from the 1970s through to the 1990s qualitative research did not receive much economic funding.75 69 DeVault, p. 30. 70 DeVault, p. 38. 71 DeVault, p. 59. 72 DeVault, p. 28. 73 ( Re)searching Women, ed by. Anne Byrne & Ronit Lentin (Dublin: Institute of Public Administration, 2000). Google book. 74 Byrne, p. 2. 75 Byrne, p. 15.
  • 23.
    18 Lastly, the editors,in carrying out research for the book itself, found ' a respondent observed that in identifying herself as a feminist researcher [her work. . .] would not be considered as legitimate scholarship'. 76 In the world of academia the feminist is stigmatised. Stanley and Wise also see the social sciences as ‘sexist’.77 They believe social science is distorting ‘the experiences of women’ and creating a unitary view of woman.78 In placing women in parameters outlined by and designed for men, women’s vast experience is flattened out into a single narrative. Although Stanley and Wise criticize the social sciences for their patriarchal values they also seem to criticize those feminists who seem to withdraw themselves from research altogether. They claim many feminists fail ‘to examine critically the relationship between theory and research’.79 These feminists serve in the proliferation of what Stanley and Wise refer to as ‘[g]rand theory’.80 Grand theory appears to involve a disregard for research and supposes a unified female experience. This, however, sounds quite similar to the suppression placed upon women by patriarchal social sciences. This irony is noted by Stanley and Wise who suggest the impossibility of a static female identity. They state that the female experience ‘will inevitably change’ from person to person.81 This suggests that, perhaps, post-feminism is more of an open category than most critics state. Stanley and Wise suggest a very useful way in which feminism may regain credibility. They state that ‘through doing feminist consciousness that we can really 76 Byrne, p. 21. 77 Liz Stanley and Sue Wise, Breaking Out Again: Feminist Ontology and Epistemology (London: Routledge, 1993), p.26. Ebrary. 78 Stanley, pp. 3-27. 79 Stanley, p. 58. 80 Stanley, p. 44. 81 Stanley, p. 123.
  • 24.
    19 understand its dimensions,content and parameters’.82 They propose that there must be a return to the investigation of female experience, giving it sufficient merit. In conclusion, each text examined here sets out reasons that may be designated to an understanding into why there is a void in post-feminist critique. The heart of these explanations revolves around the fulcrum of the quantitative/qualitative debate. There appears to be a general consensus that traditional research methods have been saturated in patriarchy. The primary problem for feminist research seems to be in finding a suitable alternative to the quantitative methods associated with social science. If feminism were to fully embrace the qualitative methods they only serve to add to the already instilled binary of male and female knowledge. They also run the risk of a lack of academic credibility and, as a result, funding. Perhaps though, the key finding may be that feminist research did not start to proliferate until the 1980s. This meaning that the grand theory of the 1960s may have been what second wave feminists were most familiar with. Perhaps, then they knew no better. This idea of grand theory appears to be reoccurring within the critique of post- feminism, perhaps this is because it was common practice for second wave feminists. Although, this may possibly explain the popular negation of empirical research regarding post-feminism it cannot, however, I feel, be excused in the current climate of academic knowledge. 2.2 Practical Application of Research Method This section will outline the practical elements I undertook in selecting and applying a research method to my project. 82 Stanley, p. 132.
  • 25.
    20 Selection of Method/Methodology Inan ideal scenario I would have undertook a mixed method research project involving both qualitative and quantitative methods, however, there were certain restraints that needed to be kept in mind. These included: Time, monitory, ethical and practical issues. Taking these issues into consideration I decided to conduct my research using the method typically associated with feminist research, that of a qualitative analysis. However, I will add reflexive qualities to my analysis, and draw influence from positivist approaches. In selecting a qualitative approach the method of focus groups seemed the most practical as it allowed me to gain a broad range of epistemological opinions within a short time. There would be two focus groups of four women. Recruitment Given the supposed criteria for where post-feminism proliferates; white, middle/upper class and western, there are those who more ideally fit into the categories of post-feminism. Also due to the importance of free flowing discussion I decided to use personal connections in recruiting to encourage a relaxed environment. However, I avoided close friends or humanities students as they would have a heightened awareness of my project/subject. Having attended a boarding school I feel many of my acquaintances may be labeled post-feminists as such a school generally holds upper class connotations. Using Facebook I got in contact with such women. Everyone was initially very enthusiastic. However, it proved very hard to get them to commit to a date. In the end the eighteen
  • 26.
    21 year-old woman withwhom I was most acquainted offered the services of her college housemates. A similar thing happened within the older group. Although not the scenario I had originally envisaged, these women also hold a common societal position which reflects upon the theoretical characteristics of post- feminism laid out in the literature. The fact that I knew one member of each group prior to conducting the interviews seemed to benefit the flow of the focus group as they assisted greatly in creating a comfortable environment. They did this, in both groups, by introducing me prior to the focus group and taking a primary role in the first few minutes of conversation. Selection of Questions Research indicated that the conversation should be based around the female experience. Also the questions should be more of a guide than a strict structure. The idea being that the loose structure will allow for participants to speak freely. Over several drafts, I devolved a question guide which I felt comfortable with.83 It was broken into the segments commencing with me, the researcher, stating that these would be strictly their views and opinions and that there would be no right or wrong answers. In a bid to create a friendly environment, I asked a question which I answered before asking each participant in turn to so do. From here the guide developed through the stages before reaching the ones most central to my research project. This process, inspired by the book Successful Qualitative Research, aimed to allow an organic unfurling of conversation.84 83 Please see appendix ‘A’. 84 Virginia Braun and Victoria Clarke, Successful Qualitative Research: A Practical Guide for Beginners (London: SAGE, 2013), pp.117-120.
  • 27.
    22 It was throughprompts and contemporary examples within popular culture that I intended to guide the focus group and build theories. Dry run Here I discovered the difficulty the researcher may have in removing their personal views and opinions. I also decided that a loose time-frame of up to one hour should be used. With regard to the questions more colloquial language and some more prompts were needed.85 I, therefore added as many generic prompts to my question list as possible and on the days of each focus group I trolled through social media to find up to date, relevant prompts and popular culture examples. Ethical Procedure In filling out an ethics form distributed by the college, it became clear that there are many restrictions in place for an undergraduate research project.86 Age limitations were my primary concern. Therefore, within the two focus groups, one would focus on eighteen year-olds and the other on twenty-one year-olds. I then created an ethical consent form for participants to sign.87 It sought to equalise the power relationship and reiterate their position as anonymous volunteers. 85 Please see appendix ‘B’. 86 Please see appendix ‘C’. 87 Please see appendix ‘D’.
  • 28.
    23 Conducting the FocusGroups Each focus group participant was informed why this research was being carried out and each was issued an ethical consent form and I stressed the key factors of it vocally as well illustrating I would be using my laptop as a recording device. The focus group containing eighteen year-olds (focus group A) was carried out in the sitting room of the house in which they resided. There was a fire and we sat in a semi- circle around the fire eating the Cadbury’s Roses I brought with me. It was very comfortable and discussion was animated and lively. The focus group containing twenty to twenty-two year olds (focus group B) was conducted under quite different circumstances. Having not confirmed a date for us to meet a participant of focus group B texted me and informed me that they would all be together the following evening prior to a night out. We conducted the focus group within the kitchen of one of the participants. Although each greeted me with enthusiasm the entire discussion felt rushed. The discussion barely reached the fort-five minute marker and everyone seemed a little uncomfortable. However, all the relevant questions were asked and answered. Post-Focus Group After each focus group I took some notes on the layout and any factors I felt important to the analysis. The following day I took some further notes on issues or areas that had stayed with me and that I believed were relevant upon further reflection.
  • 29.
    24 Chapter Three -Analysis This chapter will focus on all elements of analysis involved in my research into young women’s perspectives regarding post-feminism. For clarity please find my notation system listed in appendix ‘E’.88 3.1 Analysis Introduction As with any research there are both advantages and disadvantages with every method. I, therefore, bearing in mind restrictions, created what I believe to be a suitable approach for investigating post-feminism and attempting to reach empirically based results. Selecting a qualitative method seemed logical as it is the method most associated with feminist research. I also believed it to be relevant to my investigation of post- feminism as it is based on constructivism. Unlike quantitative methods, it does not serve to merely test ideas but to generate them. This seemed highly applicable to an area which has a blatant lack of research accompanying the theory on it. This is because a key feature of qualitative analysis is opening up discussion to a deep and personal level. Thus, this research would not attempt to merely test the soundness of post-feminist critique, but also, generate new ideas of post-feminism founded on empirical evidence. Although qualitative methods are generally associated with the constructivist idea that there are no inherent truths, I feel it necessary to draw on positivism within this analysis. Positivism, is the suggestion that there are inherent certainties and it is often viewed as an essentialist method, however, I belief it is a necessary step in developing post-feminist understanding. Although this analysis focuses on a very limited sample in which participants and researcher share both class and nationality and may not be 88 Please see appendix ‘E’, p. E. 1.
  • 30.
    25 generalised to agreat extent, it is still empirical research which goes beyond most post- feminist critique. Providing, to at least some level, a new platform for post-feminist understanding. The selection of focus groups went beyond mere practical elements as they also possess research advantages for my analysis. The fact that they would be based on conversation at a peer level would develop a comfortable environment. The equality of such a relationship would encourage participants to feel at ease in the focus group scenario. While not personally being friends with any of the participants meant that they would have less of an agenda to help me. Although not typically associated with qualitative methods, this would help bring a level of objectivity to the analysis. Stemming from my investigation into feminist research it became clear that method hybridity is central in generating more reliable results, bringing about my decision to aspire to this at some level within my project. Trying to generate a certain level of objectivity involved reflection at every level of research conduction. Judi Marshal talks about the importance of ‘inner and outer arcs of attention’ in research. 89 The researcher should, at all times, have ‘self-awareness’, be aware of themselves, their thoughts and their actions.90 This is the inner arc and in conducting the focus groups, I found this very useful. It was often difficult to remove my views, avoid projecting my own ideas and also to regulate my language so as not to lead or influence the answers of the participants. However, to be successful in research one must also turn to the outer arc of attention. Meaning that, to truly learn something, the researcher must engage ‘with other people’.91 This, Marshal believes, leaves the 89 Judi Marshall, 'Self-reflective Inquiry Practices', in The SAGE Handbook of Action Research, ed. by Peter Reason and Hilary Bradbury(London: SAGE Publications Ltd, 2001), pp. 433- 439 (p. 433). 90 Marshal, p. 433. 91 Marshal, p. 434.
  • 31.
    26 researcher in aconstant state of moving between action and reflection and being active and receptive.92 These provided my basis for many aspects of my research. For example, in each focus group I had to gauge the tone and language of the group and alter the wording of questions accordingly. This seemed to have gone well as although I did not always stick to the exact questions I had laid out, the issues were raised or addressed in one way or another. For example: ‘How often do you interact with these elements of popular culture’.93 Below is how the question became altered within focus group A. ‘Int: So they are all elements of pop culture so then how often do you interact with them (.) I mean would it be hourly you check Facebook and stuff or (.)’94 This ambiguity of the question also illustrates the fact that the questions I had prepared served as a mere guide. This allowed for impromptu action to alter and change questions if conversation went in a way I had not been expecting. A key feature of qualitative analysis is that the interview has a relatively low level of structure encouraging participants to open up at a personal and experience based level. On reflecting upon the experiences of carrying out the focus groups my eyes were opened to both the complexity of conducting good qualitative research and the importance of empirical evidence in forming a basis for theory. I thus concur with Marshal’s idea that a researcher is constantly moving between ‘project planning, encounter and communication’ continually ‘thinking and making sense’ of things within the inner and outer arcs of attention.95 92 Marshal, pp. 433 - 435. 93 Please see appendix ‘B’, p. B. 1. 94 Please see appendix ‘F’, p. F. 4. 95 Marshal, pp. 433-435.
  • 32.
    27 3.2 Analysis ofCentral Questions This section will examine the focus groups through thematic analysis which ultimately deals with the most interesting points of discovery made throughout my two focus groups. Can you try and define the term ‘popular culture’? Following my study of post-feminist critique, specifically the ideas of Andi Zeisler in Feminism and Pop Culture, it became clear that popular culture was a key player in both creating and maintaining the ideas of post-feminism. Theory indicates that post-feminists are, perhaps, obsessed with popular culture.96 It was therefore interesting to develop an understanding into the participant’s understanding of popular culture. In the interviews there was initial difficulty in finding a suitable definition, however, after initial trepidation, a member of focus group B supplied the definition of it being ‘The norms of society’ (Gia).97 What proceeded from this kind of definition, within both groups, is the importance of popular culture and in particular the internet in popular culture with Grace in focus group A stating that ‘yeah internet is deffo popular culture’.98 None of the participants appeared to have an issue with the term, meaning that it must be in general circulation. However, it is in pinning down an exact definition that the 96 Zeisler, pp.1-2. 97 Please see appendix ‘G’, p. G. 2. 98 Please see appendix ‘F’, p. F. 5.
  • 33.
    28 participants struggled with,they instead found it easier to give examples of what they believe to be popular culture. In both groups Facebook is confirmed as a central factor of popular culture for these young women. All members of each group admitting that Facebook is a central part of their daily lives. With many stating that they check it as soon as they wake up in the morning and agreeing with the members from each group that put forward that Facebook would be checked ‘hourly anyways’.99 Perhaps a little shocking is that members of focus group A also agreed that they believe Facebook is a sufficient source of world news with Mary stating ‘Yeah I’d never go out and buy a newspaper’.100 Prior to the focus groups I had considered the importance of Facebook in the lives of young women as it is important to me. This notion was confirmed to also be true of these women. It thus seems that in accordance to theory on post-feminism, such as Zeisler, that these women hold popular culture to be highly important within their day to day lives. What do you feel your own role/or that of people around you is within popular culture? Literature regarding post-feminism from second wave theorists’ such as Tasker and Negra puts forward the idea that post-feminists, have essentially been brain washed by popular culture into fulfilling the role of the consumer.101 Posing a question to investigate this idea sparked a bit of debate between participants with members of focus group B 99 Please see appendix ‘F’, p. F. 4. 100 Please see appendix ‘F’, p. F. 5. 101 Tasker and Negra, pp. 1-5.
  • 34.
    29 becoming quiet passionate.Gia believed that she does not possess a role within popular culture, however, Dee argued that Gia in fact does, ‘Come on you totally buy into popular culture you with your oh look at this and everyone knows this and oh I want that’102 This resolved with Gia agreeing that maybe she does but they both confirm that it is ambivalent consumption. ‘Yeah but it’s innocent enough I don’t really realise I’m doing it’103 And Dee agreeing and stating that it is more so a spectator sport. ‘Yeah I’m not involved in it like making it I’m just on the side lines watching it’104 Interestingly, Group A concurred with the conclusion reached by Gia and Dee, that they consume popular culture, without any debate. ‘Grace: Yeah I just kinda sit back and like let it happen Mary: Yeah I’m like aware of it but (…) Int: you’re ‘aware of it’ Mary: Yeah like you don’t actually stop and think about it like (.) you don’t (. . .)’.105 This, makes an interesting point as it gives an insight into the way in which these women interact with popular culture. Within the interview most participants, even before 102 Please see appendix ‘G’, p. G. 1. 103 Please see appendix ‘G’ p. G. 1. 104 Please see appendix ‘G’, p. G. 1. 105 Please see appendix ‘F’, p. F. 6.
  • 35.
    30 conversation developed, indicatedthat they are aware of their role as ambivalent consumers of popular culture. In contrast with the literature, this result shows that these women, who fit within the categories of post-feminists, are fully aware of their situation and choose to continue the interaction. Yet the point remains that they do in fact note their passivity, therefore, conforming to the norms of popular culture without much debate or question. What elements of your identity are important in forming your relationship with popular culture? It is suggested by second wave feminists such as Tasker and Negra that women are the targets of a popular culture discourse that implies the redundancy of feminism and the goal of the equality of the sexes.106 They indicate that popular discourse is naturalising the drive for female consumerism as a method for empowerment. 107 Many second wave feminists such as Tasker and Negra seem to blame popular culture for the supposed culturally submissive young woman. When addressing the idea of identity in popular culture there was initial confusion at the question and I attempted to use the idea of advertising as a prompt. From here there was preliminary defiance that outside influence might have a place within their relationship with popular culture. Grace indicating that this relationship is based purely on her own views and opinions, ‘What I agree with and what I don’t agree with is that an answer’.108 106 Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke University Press, 2007), p.1. 107 Tasker and Negra, pp. 1-5. 108 Please see appendix ‘F’, p. F. 7.
  • 36.
    31 Mary proceeded toreinsert this idea by adding that, ‘Well you obviously choose what you interact with no one forces you to sign up or anything’.109 From the literature I had read in the area of post-feminism I had preconceived notions of what kind of issues I was looking for when addressing this question. Primarily, the issue of the relationship of gender and age within popular culture. However, focus group A did not start a discussion on any of these areas so I was forced to ask bluntly about aspects such as gender and age. This perhaps indicating that because I was the one to put them in the agenda that these issues are not of primary importance to these participants. ‘Mary: Em (.) I think women definitely do consume more but I think like (. . .) mmm sorry like lads are buying into it more now like there definitely be more women like older and younger in relation but I think now like one of our house mates he definitely does more online shopping than I do ((Laughs)) em (.) so I think it definitely is more female orientated but there is Grace: ((In overlap)) I dunno I think it’s kind of it’s it’s equal now Mary: Yeah but the age thing Grace: ((In overlap)) well like not old men but young men yeah I think boys are just (.) Mary: Yeah boys our age are very into getting like their new trainers or whatever’.110 109 Please see appendix ‘F’, p. F. 7. 110 Please see appendix ‘F’, p. F. 9.
  • 37.
    32 Here they seemto be making the point that although age is traditionally a factor in the relationships between people and popular culture, the binary between men and women in relation to consumerism is breaking down. These participants indicate that the relationship between men and popular culture and women and popular culture is becoming more equal. The main example given within the focus group being the extent to which men now buy their clothes online. Focus group B, did as I had initially expected, addressing the issues of age and gender straight away. They too agreed with the sentiments displayed in focus group A. ‘Deb: Yeah more and more men are getting into their looks these days Dee: But I think it’s still definitely still aimed at women like women ads are all over Facebook and stuff like that Ellen: ((In overlap)) well no I think it’s definitely more aimed at men these days [. . .] Gia: Just their hair and their dress and stuff like that’.111 These participants appear to indicate that young men are starting to play the same role in popular culture as young women. They seem to be implying that the sexes are becoming equally targeted by popular culture. It thus seems, from the interviewing of participants, that a kind of inversion of the feminist idea that women are victims of popular culture has occurred. An equality seems to be emerging, or a perceived sense of one. Not through women resisting the power from popular culture, but, in men investing in a similar relationship with it. 111 Please see appendix ‘G’, p. G. 3.
  • 38.
    33 What, in popculture, is being a woman? / What are the expectations attached? On addressing this question I expected, due to the research carried out on post-feminism, that these young women’s central concerns would revolve around superficiality. According to Nina Power the rise of post-feminism has brought with it the idea of the walking c.v, here women essentially 'sell themselves' at the level of their visual qualities.112 Both groups established the idea that life has changed for women, with focus group B highlighting the idea that women are allowed make many more choices in life and their success and happiness does not depend on men. ‘Dee: It’s like being independent (.) like they don’t need a man’.113 Dee also states, ‘I don’t think the ultimate goal in life is to get married anymore (.)’.114 Members of group A suggested alternative gaols for women of their situation. Each member illustrated the importance of the career, at both the educational level and the employment level. ‘Mary: Yeah definitely finish college get a job’.115 This is in contrast with the literature as here each member indicated the importance of education and being independent from men in their success. Each of these being areas which were central facets of second wave feminism. Also, interesting to note 112 Power, p. 23. 113 Please see appendix ‘G’, p. G. 5. 114 Please see appendix ‘G’, p. G. 5. 115 Please see appendix ‘F’, p. F. 14.
  • 39.
    34 is that educationand independence is valued above visual appeal. In reference to Angelina Jolie, Gia states, ‘Yeah she is amazing (.) like she has a career family charity work and she is shit hot’.116 Here, although visual appeal is mentioned, it is at the bottom of a list of attributes which the participants seem to feel are of greater importance. This seems to resonate the views of Jacki Willson who has suggested that the age of post-feminism allows 'femininity' and 'business' to be 'compatible bedfellows'. 117 Possibly, the age of post-feminism is not as wholly superficial as many second wave feminists suggest. Thus breaking down the opposition of positive and negative, postfeminism and post-feminism. Is this then what the notion of the ‘empowered woman’ is or how do you perceive it? In both focus groups this question seemed like a natural companion to asking them the expectations they felt as women. Their answers overlapped greatly with those they had given about what they feel is expected of them in life. A new word, that I think resonates all the ideas put forward by all the women, was thrown in by Sal in group A, the word ‘Strong’.118 As an overlap of the previous question this strength appears, to the participants, to be a strength of self, with emphasis on career drive and the power of the individual woman. 116 Please see appendix ‘G’, p. G. 5. 117 Willson, pp. 88-89. 118 Please see appendix ‘F’, p. F. 16.
  • 40.
    35 A further insightinto the definition of what they thought the empowered woman is was discovered when I asked them to give examples of who they feel these women are. Group A centred around a comparison of Victoria Beckham, as an empowered woman, ‘Mary: Clothing lines perfume her own shops Sal: Yeah all sorts like she was actually nominated or she won business woman of the year yeah but she built it all up herself like’119 against Kim Kardashian, who’s success they attribute to the fact she uses her body as a tool of power. ‘Sal: Victoria Beckham didn’t get her ass out for a bit of money’.120 This sentiment continued into focus group B where a debate formed that was a little worrying for all involved. Although they all admitted that Kim Kardashian is famous for, as Dee said, putting a picture of herself ‘naked across the whole internet’.121 Debate formed when Ellen started talking about younger women. She proposed that although women her age don’t agree with Kim Kardashian, she has been normalised into the lives of younger women who have grown up watching Keeping up with the Kardashians.122 Although the issue was not fully resolved, it is very interesting to compare with post-feminist critique. The views of these women contrasted greatly with the expectations of second wave feminists, in that they put their careers above beauty. Thus putting post- 119 Please see appendix ‘F’, p. F. 17. 120 Please see appendix ‘F’, p. F. 18. 121 Please see appendix ‘G’, p. G. 6. 122 Please see appendix ‘G’, p. G. 6.
  • 41.
    36 feminism into amore positive light than is common within critique. However, the results of focus group B sheds what many participants found to be a worrying light on the matter. They have noted the possibility of younger women becoming the body crazed, 'you are your breasts' sort of women the literature has indicated these participants (post-feminists) to be.123 Can you tell me what you understand by the term feminism? This question was met with mixed answers and sentiment. There was one member of each group that vocally expressed the negative connotations they related to feminists. Grace of focus group A stated; ‘I dunno someone who hates men I don’t really know’.124 While Gia of group B simply replied with ‘Fucking women’.125 Having studied what second-wave feminists claim these women should think on the matter I was not surprised to hear this backlash against feminism. Here, it appears, the backlash is extremely gendered. They seem to believe that feminism is a pitting of the sexes against one another. There is even outrage expressed at women whom they may deem feminists, those who hate men. 123 Power, p. 24. 124 Please see appendix ‘F’, p. F. 19. 125 Please see appendix ‘G’, p. G. 8.
  • 42.
    37 However, after somediscussion the participants moved past their initial emotional response and the women of each group developed definitions with which they felt more comfortable. ‘Mary: Just yeah I learnt this the other day but yeah I think we should all have equal rights and equal pay’.126 ‘Dee: believes in the social and economic wellbeing of the sexes (.) something like that’.127 These two statements seem relatively recently learnt showing perhaps that such issues were not as salient in their youth. In drawing their definitions from recently learnt understandings, it implies this empirical stance was not always there. I say recently learnt as in the case of Mary she expresses the fact that she has only very recently learnt this within college. In the case of Dee she is quoting a line from contemporary singer Beyoncé. An anomaly in the context of post-feminist critique as the popular culture sector is where anti-feminist sentiment is meant to stem. What is very interesting to note is that even though the groups all conceded that they were happy with the definition of equality, three out of the four women in group A strongly disagreed with considering themselves feminists while Mary remained unsure saying ‘Maybe but not in like a hate men way but I believe in equal rights’.128 These women do seem in a way to fit into the category of a backlash against feminism, with the majority not wishing to associate with the word feminist and many 126 Please see appendix ‘F’, p. F. 21. 127 Please see appendix ‘G’, p. G. 9. 128 Please see appendix ‘F’, p. F. 21.
  • 43.
    38 expressing a mildanger at the notion. However, it must be noted that although there clearly seems to be a backlash against the popular notion of feminism, these women do seem to believe in the core beliefs of feminism but do not choose to label it so. Are you aware, or have an understanding of the notion of post-feminism? Is feminism over? The participants generally stated that they were not aware of the term post-feminist with only one noting that they had even heard of the term. I thus gave a brief explanation of the term and asked them if they thought feminism was over. Each again replied that no they didn’t and, interestingly, also noted that they do not believe it should be either. Gia from group B stating that it is ‘Because there are so many more issues to be dealt with coz like even all those high paid jobs and all that in the economy are all men’.129 Members of group A also shared sentiments with Mary saying ‘Well I don’t think it’s over but I think it’s justified by like that it doesn’t need to be as like out there as the sixties you know’.130 It is interesting that when they talk about feminism it is in reference to the 1960s. In saying that the major objectives of feminism have been achieved they appear to label the need for such a movement firmly as historical. ‘Mary: Yeah like the big things like votes for women and you know like women can do these jobs and they don’t need to quit their jobs after they get married and 129 Please see appendix ‘G’, p. G. 11. 130 Please see appendix ‘F’, p. F. 22.
  • 44.
    39 you know thebig things aren’t there anymore so feminists wouldn’t have as much to be vocal about anymore’.131 Members of group A went on to state that they think forms of protest are much more subtle in contemporary times, but explain they think this because the larger issues such as voting, marriage and work have been resolved. Their indication of being conscious of contemporary forms of protest seem to indicate an awareness of the continued need for feminism. However, they wouldn’t, in day-to-day practice, place the label of feminism upon such issues and sentiment. The most interesting thing, I feel, that came about in response to this question was one member of group B redefining feminism for her group, ‘Deb: But your being so against men like it shouldn’t be men men men and like women against men it should be rights in general’.132 Although this idea is central to the idea of feminism, none of the participants associated this idea with feminism and the feminist. The idea of feminism then, perhaps as the literature has stated, has in some way been tainted within contemporary society at an institutional level.133 It is interesting to note the participants’ outcry against feminists in the last question addressed in comparison to their response to this one. Here, they seem to believe that feminism is not redundant but still an ever present factor in their lives. This feminism though, stems from their definition of the importance of equality rather than the women versus men agenda that they seem to associate with feminism. They also, interestingly, stress the idea that although they do believe issues of equality are still present, it is now 131 Please see appendix ‘F’, p. F. 23. 132 Please see appendix ‘G’, p. G. 11. 133 McRobbie, p.1.
  • 45.
    40 more so ofan undertone as opposed to a narrative to live and fight for. There does then, for these women at least, seem to be a rift between the idea of feminism and the feminist. This issue of labelling seems central in the conflict between young women and feminism. 3.2 A Discussion of Analysis in Relation to the Literature Review. Although I do recognise that this is only a sample of women who fit into the categories of the post-feminist laid down in theory, many interesting comparisons have appeared with regard to post-feminist critique. Within the context of the information I have gathered it is clear that there are many breaches between theory and the empirically learned experiences of these young women. First perhaps, it should be pointed out that although there are moments of disconnect between theory and this analysis there are also areas which do correlate. Primarily, this can be seen in allocating popular culture as a key aspect within the lives of young women. Post-feminist critique states that popular culture has had a central role to play in creating the post-feminist mind set. A mind set laid out by Diane Negra as being based on superficiality, consumption and a disregard for the goals of the feminists before them.134 In the case of the interviews analysed here it seems that these women admit to often falling into the role of ambivalent consumer and judges of beauty. However, they are aware of their position. They note that on a day-to-day basis they do not see a problem with consumption as they do not believe it impacts them at a deep level. Literary critique has outlined the importance of the empowered woman or the have-it-all woman in relation to post-feminism. Wealth, superficiality, consumerism and 134 Negra, p. 4.
  • 46.
    41 sex are laiddown as being central to the empowered woman.135 However, the idea of the empowered woman seems to hold slightly different connotations for these young women. Although both seem to concur at some level about the importance of economics, the participants believe empowerment lies in strong independent women who have forged their own careers through hard work and dedication rather than their beauty, consumerism and their sex partner. On a comparison of Kim Kardashian and the likes of Victoria Beckham and Angelina Jolie it can be seen that these participants have not engaged with the notions of superficiality, sex and consumerism and as the central pillars for the have- it-all woman. Although they do admit to consuming superficial popular culture they state that their goals in life are not to find a man to take care of them but rather make their own path and build a future with someone. Literature regarding post-feminists places it as disregarding feminism and being a backlash against the achievements of predecessors.136 Within the participants analysed here not one openly identified as a feminist. However, as the interviews developed it became clear that this disregard was primarily for the label of feminist. The connotations of feminist as men haters seems to have tainted the idea of what feminism is. If one were to have conducted a survey it would have been stated as fact that these women were post- feminists due to their disregard and negative sentiments towards feminism. However, qualitative analysis proved to be highly applicable in this instance as it picked up on deeper sentiment. Although it might be said that the post-feminist critics may have been right in their claim that popular culture would create this backlash, this backlash, in the case of these women, only runs skin deep. On further discussion it became clear that these women do 135 Zeisler, pp. 100-108. 136 Tasker and Negra, p. 1.
  • 47.
    42 in fact believein the goals of feminism, primarily the equality of the sexes. However, they do not seem to accredit this idea to the notion of feminism. This analysis highlights the fact that there seems to have be a disjuncture between sign and meaning. The participants give the impression that ‘feminist’ has become a dirty word. Yet, it seems the ideals associated with it have not. It thus seems these women are not actively contributing to a backlash against the achievements of feminism and in fact, appear to be feminists. However, they remain reluctant to associate with such a label.
  • 48.
    43 Conclusion Overall, I foundthe conducting of focus groups and the process associated with the method enjoyable and rewarding. I have a new found admiration for qualitative researchers and their ability to be able to encourage deep conversation, but, also, remain passive in their emotional and personal input. In attempting to replicate their work, I have developed new skills and learnt about my strengths, abilities and weaknesses while gaining an insight into the views and opinions of my participants who fall into the theoretical categories of the post-feminist. In pinpointing a lack of empirical evidence with regard to post-feminism I discovered many justifications. However, the point remains that within the twenty-first century there is no solid defence for the second wave feminist’s critique of post-feminism. In making generalisations and contributing to grand theory on the area, little critique goes beyond the theoretical level. There can be no claim of empirical evidence regarding post- feminism as almost no research has been conducted into post-feminist subjects. Although I do accept that my research is very limited, it stems from the empirically learnt experiences of those who fit the categories of post-feminism. Maybe this research can partially fill the void of true understanding with regard to post-feminism. I also feel this research has helped to better understand a personal predicament. A predicament stemming from the fact that although I am well versed in second wave feminism, I fit the tropes of post-feminism. Most post-feminist critique notes the consumer driven nature of post-feminist society. I personally know this to be true as many breaks I have taken from this project involve online store browsing. Those I interviewed also indicated their participation in consumerism. However, the post-feminism critique which places this emphasis on consumerism also notes that this consumerism involves
  • 49.
    44 women passively takingon board and accepting the subject position placed on them. Thus creating an unconscientious society as such. Although my participants indicated that to some extent it is passive consumption, this theory is problematic. The participants seem to believe that it is not complete inactive consumption, there is a conscious recognition of culture which attempts to dictate their choice. They appear to accept their role as consumer, as well as placing this role on the young men within their social circles. They brought a level of critical awareness to my attention by indicating that they are aware of gender divides and certain inequalities, however, they stress that they believe that men often fall victim to issues of equality in the current climate. In commencing this project I had an understanding that there were problems with regard to the definitions of the words feminism, feminist, postfeminism and post-feminism. As a result, what has come to light is that this is due to the ambiguity of such ideas. There has been a clear rupture between signifier and signified. It is essentially a problem of labels and labelling. With regard to feminism and the feminist, the rift between contemporary society and these words appears to have stemmed from ambiguous connotations. First there is the academically learnt ideas of equality, however, these juxtapose with the more colloquial connotations that circulate within popular culture such as ideas of feminists being men haters. Ultimately, the result appears to be that young women blend the ideas and are left with believing that feminism is the fight for women being equal to men, not gender equality in general. The latter being more relatable and relevant to the current climate. The words postfeminism and post-feminism, I believe, have been slightly un- problematised through this analysis. Although I do note that in order to conduct research
  • 50.
    45 with regard tosuch terms I had to simplify and attach definitions to each word, I believe this analysis clears up, to some extent, the issue of the use of the hyphen. The participants here are defiantly anti-hyphen, this indicating the continued need for feminism. I say this because while filling the categories of post-feminism laid out by second wave feminists, they admit to being consumers of popular culture and generally would not wish to be associated with feminism. They seem conscious of their consumerist position and critically aware of the issues of gender equality still prevalent today. As well as admitting their involvement in consumerism, they seem to be aware of the restrictions of their identity within consumer capitalism. Their self-professed position serves in breaking down the accusations made by second wave feminists that these women are participating in a backlash against the feminist achievements. These accusations, therefore, seem unjust and ill explored. I say this even though the participants had issues with the words feminism and feminist, on deeper discussion it seems this was where it ends; it is purely a problem with the words. These woman still seem to believe gender equality is an issue in Ireland today and reformative action should not cease. Thus it seems that it is labelling which is the main cause of problems for feminism. Feminists cannot hope that they will be able to reclaim feminism in the current climate. The word seems to have become too dirty. As a result I believe that any way forward for the feminist movement must attempt to re-claim the idea of the movement from the word itself. The movement needs re-appropriation to deal with the current climate in which focus appears to be needed in gender equality with less emphasis on women. The fem of feminism is placing clear emphasis on the plight of the woman. However, in the twenty-first century there are many issues of gender equality across the sexes. The feminist movement may seek to include such issues, however, the
  • 51.
    46 message has becomeblurred through popular culture. Although the idea behind the movement remains sound, the term seems redundant in twenty-first century Ireland. In conclusion, I believe re-branding is necessary for the continuation of the ideals behind feminism.
  • 52.
    A. 1 Appendices Appendix ‘A’- Question Guide- Prior to Focus Group Dry Run.  I am seeking your thoughts and opinions and there is no right or wrong answers.  You are welcome to bring in examples, whether personal or otherwise.  One at a time could you all please state your name and tell me, when you were younger, what you wanted to be when you grew up? I go first. Intro Qs:  What comes to mind when I say the words ‘popular culture’?  Do you feel you interact with popular culture?- daily, hourly, weekly..?  What elements of popular culture do you think people interact with most?- advertising(magazines, online, billboards, radio) – Online (twitter, facebook, etc.) –Shopping (what kind of shops do people go to mostly?-high street, centres, locals) Transition Qs:  What do you feel your own role/or that of people around you is within popular culture? (passive, consumer, etc)  What elements of your identity are important in forming your relationship with pop culture? - Age, class, ethnicity, looks, gender?  Give example of perhaps Kim Kardashian in pop culture, why does she command such attention? Key Questions:
  • 53.
    A. 2  Soit might be said that gender is a key part of the interaction with pop culture? – advertising space, shopping, how a photo is taken, pressure, role models  What, in pop culture, in being a woman?- Our roles, what is expected, consumer? Importance of looks  Is this then what the notion of the ‘empowered woman’ is or how do you perceive it?  We talked of Kim K earlier, does she embody this ‘empowered woman’ notion? –why? Why not? (rich, has a man, pretty, good body, has a baby, famous) o If she isn’t who is? Brittany, beyonce, oprah, Jennifer lawrance  Do you think the idea of the empowered woman is inherently linked with the production of popular culture?- think about how and why you are aware of it? Who are these empowered women? Closing:  Do you have any further thoughts on any area?  Can you tell me if this is what you expected? Why/why not?  Did anything new come to light that you perhaps hadn’t considered before of think differently about now?
  • 54.
    B. 1 Appendix ‘B’- Final Draft of Question Guide.  I am seeking your thoughts and opinions and there is no right or wrong answers.  You are welcome to bring in examples, whether personal or otherwise.  One at a time could you all please state your name and tell me, when you were younger, were there female family members who you admired, or perhaps didn’t and why- I go first. Intro Qs:  How do you feel you interact with the world at large? – what are your connections? How do you find out your information? –online- news papers  What elements of popular culture do you think people interact with most?- advertising(magazines, online, billboards, radio) – Online (twitter, facebook, etc.) –Shopping (what kind of shops do people go to mostly?-high street, centres, locals)  How often do you interact with these elements of popular culture?- daily, hourly, weekly..?  Can you try and define the term ‘popular culture’? Transition Qs:  What do you feel your own role/or that of people around you is within popular culture? (passive, consumer, etc)  What elements of your identity are important in forming your relationship with pop culture? - Age, class, ethnicity, looks, gender?  Have you ever thought, or had to categorise, your ethnicity? - how would you?
  • 55.
    B. 2  Doyou feel class differences are obvious in your life? – how would you identify yourself within this system?  Give example of perhaps Kim Kardashian in pop culture, why does she command such attention? Key Questions:  So it might be said that gender is a key part of the interaction with pop culture? – advertising space, shopping, how a photo is taken, pressure, role models  What, in pop culture, in being a woman?- Our roles, what is expected, consumer? Importance of looks  Is this then what the notion of the ‘empowered woman’ is or how do you perceive it?  We talked of Kim K earlier, does she embody this ‘empowered woman’ notion? –why? Why not? (rich, has a man, pretty, good body, has a baby, famous) o If she isn’t who is? Brittany, beyonce, oprah, Jennifer lawrance, Angelina Jolie etc.  Do you think the idea of the empowered woman is inherently linked with the production of popular culture?- think about how and why you are aware of it? Who are these empowered women? Closing:  Can you tell me what you understand by the term feminism? -equality  Are you aware, or have an understanding of the notion of post-feminism?  Post-feminism is said to have come in to being in the 1990’s (Spice Girls) - often described as a backlash against feminism – empowered woman etc.
  • 56.
    B. 3 There isdispute over post-feminism, whether feminism is in fact over with or not. –has it fulfilled its goal of equality.  Do you feel feminism is over? – why?/ why not?  Do you have any further thoughts on any area?  Can you tell me if this is what you expected? Why/why not?  Did anything new come to light that you perhaps hadn’t considered before of think differently about now?
  • 57.
    C. 1 Appendix ‘C’- College Ethics Form
  • 58.
  • 59.
    D. 1 Appendix ‘D’- Participant Ethics Form. Dear Participant, I am a final year English, Media and Cultural Studies student at the Dun Laoghaire Institute of Art Design and Technology (IADT). I require, for the purpose of my research, the application of a focus group, to commence on __________. I am looking for willing participants to take part in this study. The aim of this focus group will be to discuss young women in Ireland today. It will have 4 members and will explore various areas relevant to my project. The session should last between forty-five minutes to one hour. You will be asked to give your permission for the interview to be audio recorded. These recording will be typed up on a computer. However, all information collected will be completely anonymous and confidential. The records from the interview will only be seen in full by me the researcher. Short quotes may be extracted and copied into the final report, but no person will be identified as being the origin of the quote. Please note; your participation in the study is completely voluntary, you do not have to answer any question you do not wish to and you may leave at any time. If for any reason you wish to withdraw from the study your contributions will be immediately withdrawn. You are free to ask the researcher any questions pertinent to the study prior to, during, or after the focus group session. Your consent I have received an explanation of the study and agree to participate. I understand that my participation in this study is completely voluntary ______________________ _______________________ _____________ Name-Print Name-Signature Date I agree for the focus group to be recorded _______________________ ________________________ ______________ Name-Print Name-Signature Date
  • 60.
    E. 1 Appendix ‘E’– Notation System Please note that within the focus group transcripts non-verbal utterances and colloquial terms have been spelled phonetically. Punctuation has also been excluded as to avoid misinterpretation of participants intended meanings. Notation Feature Gen General Reaction . . . Some Words Missing (. . .) Long Pause (.) Short Pause (/) Section Missing ? Unknown Speaker ((In Overlap)) Speech Overlaps ((Laughs)) Individual Laughs ((General Laughter)) All Laugh
  • 61.
    F. 1 Appendix ‘F’- Focus group ‘A’ transcript Int: Ok so I first have to just tell you that what you say are your own thoughts and opinions and that there are like no wrong or right answers basically and you are welcome to bring in examples or if you don’t want to talk about yourself you can talk about family friends (.) eh people in general kind of thing (.) So firstly I want everyone just to say their name and then like pick if you can think of like a female family member whom either you admire and why or like really don’t admire and why and I’ll go first I have an aunt and em when I was younger I actually just hated her so much she is like the embodiment of like the house wife she just used to drive me insane all her dinners were perfect and you know she used to make the children sit at the children’s table (.) I don’t like that ((General laughter)) Int: Anyways (.) who would like to start (. . .) Mary: em Mary em I think my mom (. . .) Int: Of course Mary: Yup and eh (. . .) Int: Well do you admire or Mary: ((in overlap)) oh yeah yeah I admire my mother (.) she’s eh very smart yeah but not in a annoying way (.) you know like not one of those annoyingly smart people (/)
  • 62.
    F. 2 Sal: Sal(.) my auntie I absolutely love her she’s my favourite person in the world ((laughs)) she’s so good to me and all my other cousins and coz she has no kids of her own so she’s (.) like a big mother to us all and just I dunno… Int: Great (.) well would you girls like to go? Mia: Eh yeah I’ll go (. . .) Mia and my mum coz like she does everything for us and like never complains Mary: ((in overlap)) ‘She does everything for you’ ((General laughter)) Mary: Well not like dat but you know like do lots of stuff for us and she’d never like complain and like well you know (. . .) not like in a slavery way or nothing ((General laughter)) Grace: Em Grace and my sister because she’s just always there for me always has my back and just always knows to tell me right from wrong Int: You guys are all so nice and positive (.) I swear I love my mummy too ((General Laughter)) (/) Int: … How do you connect with the outside world (.) get your news stuff like that Mary: Like Facebook and stuff Int: Yeah ‘Like Facebook and’ Mary: ((In overlap)) Like media Int: Well yeah
  • 63.
    F. 3 Mary: Yupmedia ((laughs)) (.) eh I dunno Int: Ok so on Facebook what do you get from it Mary: Well I guess celebrity news that’s all Facebook Sal: Yeah and apps and stuff Mary: Yeah I use apps for news like news in general like like world news or (.) Int: Yeah sure Mary: Well BBC app Grace: Yeah I’ve the BBC app (/) Int: So is it mainly Facebook? Grace: Yeah and the radio (. . .) and the six o’clock news Int: So are you always in the car for the six o’clock news Grace: Na I just watch it on the telly coz my dad will always have it on Int: So are there any other elements of popular culture you interact with regularly Mary: Well Twitter Sal: Yeah Instagram and like Snapchat now Mary: Whatsapp Viber Sal: ((In overlap)) Snapchat’s actually really good for lots of news like it has the stories Grace: ((In overlap)) yeah you find lots of things going on like the the the
  • 64.
    F. 4 Mary: ((Inoverlap)) oh yeah that’s true Grace: Yeah they had that art festival on and they had Sal: ((In overlap)) and the World Cup Grace: Yeah yeah the World Cup Sal: And that music awards that were on last week Grace: Oh yeah (.) what was that Mary: I dunno was it the MA’s Sal: Yeah Mary: Very informative Snapchat ((General laughter)) Int: So they are all elements of pop culture so then how often do you interact with them(.) I mean would it be hourly you check Facebook and stuff or (.) Mary: Oh God (.) yeah ((General laughter)) Grace: Yeah it would be hourly anyways Int: When you wake up in the morning would you check it Mary: Oh yeah Sal: ((In overlap)) yeah Mia: ((In overlap)) mmm
  • 65.
    F. 5 Grace: ((Inoverlap)) no (. . .) but just coz I get up so early for college and I’m in too much of a hurry (/) Int: So would you guys read newspapers at all Mia: Mmm I would if it was at home (. . .) Int: So you wouldn’t actively seek one Sal: Na but you might if you were bored and there was one lying around Int: So Facebook and stuff is sufficient for you to get your news from Gen: Yeah Mary: Yeah I’d never go out and buy a newspaper Int: Mmm so we are talking about popular culture, how would you guys understand the term popular culture and could you like define it? Mary: Like media we use and like (. . .) Grace: And popular culture like going out at the weekends or something Int: Yeah they are all elements of popular culture Grace: Ok then yeah internet is deffo popular culture Mia: ((Inaudible)) ((General laughter)) Mary: A lot of stuff is popular culture (.) like music is popular culture oh and like fashion I spose you could say eh like sport
  • 66.
    F. 6 ?: ((Inoverlap)) G.A.A Mary: Yeah there is so much you could bring in (. . .) there’s a lot isn’t there (. . .) that’s very broad now (/) Int: Then what do you guys feel your role within popular culture is Mary: eh(.) Int: Well do you contribute to it are you just completely submissive (.) Grace: Yeah I just kinda sit back and like let it happen Mary: Yeah I’m like aware of it but (…) Int: you’re ‘aware of it’ Mary: Yeah like you don’t actually stop and think about it like (.) you don’t (. . .) Int: Well therefore would you say you are active it it but in a passive sort of way Mary: Yeah yeah yeah coz I definitely (.) like I check Facebook wake up and the first thing I do is check my phone Int: So you’re consuming it I guess Mary: Yeah consuming it but you don’t realise it like you never think about it you never stop and think about it like we would never sit around just like ‘oh how do you’ like you just wouldn’t Gen: ((In overlap)) mmm Mary: Like yeah you just wouldn’t ((laughs))
  • 67.
    F. 7 Int: Soif we are talking about popular culture and the media and stuff like what parts of your identity do you feel are important in your interaction with them does that make sense ?: Em Int: So say advertising is a big part of it and like what part of you dictates with how you interact with it Grace: What I agree with and what I don’t agree with is that an answer Int: Sure ((laughs)) Mary: Well you obviously choose what you interact with no one forces you to sign up or anything Sal: But people put so much stuff up like even if you don’t want to talk about it it’s there (/) Int: So then is age a thing Mary: Oh yeah definitely Gen: Mmm Int: is the media therefore playing of your age Mary: Oh yeah definitely coz you wouldn’t see like ads for like walker things on Facebook coz that would be stupid ((General Laughter))
  • 68.
    F. 8 Mary: Wellyou wouldn’t like coz who would be buying them you see ads for Boohoo or whatever yeah and they know who they are aiming for it is all like it would be mainly younger people (. . .) Int: So is there anything else than about yourself like those kind of elements (. . .) Mia: Your friends (. . .) Int: Yeah yeah how so Mia: Em (. . .) Int: Well yeah they would obviously be a big thing as you see what they share and where they go and what they wear and stuff Mia: Yeah it comes up in your newsfeed and stuff Int: If we are saying age friends (.) what other elements is there then Mary: I don’t like what Int: As in what elements of your identity so if we are talking about Facebook you know those Facebook ads that come up come up judging on what you have liked and what you have searched and what info you have given to Facebook like your age sex country of origin etc etc etc (.) that’s basically funnelling what you see (.) (/) Int: Is gender a big factor? Sal: Yeah it would be like coz boys aren’t gonna have like Newlook and stuff coming up Mary: Yeah ((laughs))
  • 69.
    F. 9 Int: Doyou think then as women your more I dunno like actively consuming than males would be in popular culture Mary: Em (.) I think women definitely do consume more but I think like (. . .) mmm sorry like lads are buying into it more now like there definitely be more women like older and younger in relation but I think now like one of our house mates he definitely does more online shopping than I do ((Laughs)) em (.) so I think it definitely is more female orientated but there is Grace: ((In overlap)) I dunno I think it’s kind of it’s it’s equal now Mary: Yeah but the age thing Grace: ((In overlap)) well like not old men but young men yeah I think boys are just (.) Mary: Yeah boys our age are very into getting like their new trainers or whatever (/) Int: Then I just mentioned earlier ethnicity and have you guys ever been asked to classify your ethnicity Mary: Yeah loads of time Sal: Yeah Grace: I don’t know what ethnicity means Int: Like your country of origin and your cultural background (.) nationality Grace: Oh yeah (.) like Irish Mary: Yeah Caucasian Irish that’s what I’d say anyways ((laughs))
  • 70.
    F. 10 Int: Okcool and then what about class coz class is obviously a big thing in popular culture like even talking about our Facebook marks a certain class so how do you feel about class positions Sal: I don’t think they are obvious now Mary Definitely a lot less obvious than they would have been Sal: Yeah but Mary: But at the same time if you see someone and your like not in a bad way but like I don’t know how to say this but like if you saw someone was a traveller you would be like ‘oh she’s a traveller’ whatever you know like as an example Grace: ((In overlap)) yeah yeah you would yeah Mary: But at the same time you wouldn’t be like they are lower class Grace: ((In overlap)) Or you wouldn’t be like(.) well you know just by like their page by their pictures by what they put up the way they word it or whatever you know so yeah (.) it is kinda (.) Mary: So yeah it’s definitely there but it wouldn’t be like ‘oh she’s middle class he’s lower class’ ((General laughter)) (/) Int: Would you guys feel there is a similar class identity amongst you here and your friends Mary: Yeah I spose so like us ye
  • 71.
    F. 11 Sal: Mmmyeah Int: So what would you classify the group as (.) sorry im being a bit personal but roughly as a group what would you classify yourself as Grace: I’d definitely just classify myself as normal Mary: Yeah but what is normal (.) maybe like middle class that’s a thing yeah yeah Gen: Mmm Mary: Yeah I spose then middle class like we are all able to go to college we are all able to pay for rent here you know we all have like we are all ok I dunno (.) Int: Would everyone else agree Sal: Yeah Grace: Yeah (. . .) ((General laughter)) Edel: I dunno (.) I think so (/) Int: So just hopping back into pop culture did you guys see well you probably did if you’re on Facebook every hour but the whole Kim Kardashian thingy like two weeks ago Mary: ((Gasp)) yeah Grace: Yeah the whole break the internet thing with her big arse ((General laughter))
  • 72.
    F. 12 Int: Yeahlike why do you she commands such attention online and like why is her presence not even online but even on TV shows Mary: ((In overlap)) I dunno it’s so weird Sal: I think it’s the way she broke into like how she became famous and that like everyone you either love them or hate them (.) like so like everyone has an opinion on her and like so like were saying about that picture ‘oh what is she at why would she do that that’s so stupid’ or they were saying like ‘she can do it so why not’ Int: So you think they kind of have equal measures in how she gets popularised Sal: Mmm Mary: Yeah I don’t even understand (. . .) she is so fake (. . .) she looks so wrong (/) Int: So is she kind of capitalising of her body Mary: Yeah she has the perfect body (.) but like the size of her in them pictures Grace: But like she is being told by social media and stuff that she does Mary: Oh yeah definitely Grace: The reason she does those photo shoots is because her head’s so big like she has been told so (/) Mary: But even like ‘break the internet’ the fact she thought she had the power to do that Sal: Well she kinda did I mean she got everyone talking
  • 73.
    F. 13 Grace: Idunno coz she got a lot of hate like like she thinks she is something big and she has a sex tape and stuff and it just keeps repeating on her I dunno maybe she is just trying to (. . .) Mary: Yeah I dunno Int: So do think your body is important within popular culture like how do you feel about it Grace: Like yeah I would never click into a clothes website that had a plus size model in their ad (. . .) but I’m only after really thinking of that now Mary: Yeah there is definitely a lot of pressure put on to look like this when people are coming out with their pictures but then again Kim Kardashian but yeah there definitely is a lot of pressure even with the ads and the way that the models look like they’re all (.) and plus size ones are actually just normal sized Gen: Yeah Int: And filters Grace: Yeah you can dictate how the world will see you and how you look good Mary: Yeah definitely you only give a representation (.) like I’m definitely guilty of the snap chat filter Sal: ((laughs)) ye me too (. . .) and like instafamous people getting famous for their good looks usually Mary: Some it’s more than that like if they are travelling or anything Sal: Yeah Mary: But ye it’s basically good looks (.) lifestyle (.) and your house really
  • 74.
    F. 14 Sal: ((laughs))yeah basically like if you’re living in a giant mansion Mia: And your clothes like there is a lot on dresses and stuff Grace: Yeah it’s all about image (/) Int: … As women in popular culture what do you feel your roles are like what is expected of you Mary: Like stereotypically or nowadays or just (.) Int: Well it can be stereotype or like from your mum your brother whatever people in general (.) youngins Mia: To go to college and to get a job (.) yeaah Mary: Yeah definitely finish college get a job Sal: Definitely like to get a degree of some sort Gen: Yeah yeah Sal: Because (.) most people like (.) like (.) like before like eighteen years ago it wouldn’t have been the normal thing really and it’s just backfiring on everyone now coz like now all of us like our age need to go get degrees to actually get good jobs (.) well paid jobs like Mia: I think lads have it easier because like my brother like he’s a farmer now he didn’t really have to study in school coz he’s just getting the farm ((laughs)) whereas with girls your parents would be like oh are you studying hard studying hard to get to college and all this
  • 75.
    F. 15 ((General laughter)) (/) Int:So you believe the key part of success is to get a good job? Mary: Well yeah definitely but at the same time I still want to have kids like have family obviously not now ((laughs)) but in in the future ((General laughter)) Mary: But yeah no definitely want kids but I feel it’s less as expected now Sal: ((In overlap)) its more people like having kids later now and coz like lots of my aunties would have had kids and stuff when they were my age like so now like it wouldn’t be what’s expected (.) like its expected of us to go to college and get a job Grace: Yeah that’s what is expected like it’s not expected for you to have a kid at twenty like people would say oh my god she is so young Sal: ((In overlap)) yeah yeah Grace: Whereas twenty years ago we probably would be like starting Sal: ((In overlap)) yeah most women would be married by twenty Int: Pressures on so ((General laughter)) Int: So you are all mentioning family do you think this is central to a successful life (.) like if you were to think when I die in a perfect scenario my life would look
  • 76.
    F. 16 like this(.) you know like what do you think fully is the key to being perfectly successful Grace: Do what I want to do for me and for nobody else Mary: Definitely finish college get a good job like one your happy with like something that you really want to be doing then like have family and happily ever after really ((General laughter)) Grace: And a nice house I want a house with a big back garden ((laughs)) Sal: Yeah mine’s gonna be on the beach in Miami ((General laughter)) Int: So you guys are kinda touching on the idea but I want to kinda go further into it and that’s the notion of the empowered woman Mary: Well like independent and definitely there are a lot of empowered women these days like (. . .) ugh I can’t think of any right now but like women doing things that weren’t really seen as women’s jobs just like independent women like with their own good jobs and taking care of themselves just (. . .) Sal: Strong (.) Int: It is often described instead as like the have it all woman like what do you guys think all is Mary: Its not a great example but you know your one in The Proposal Int: Sandra Bulluck
  • 77.
    F. 17 Mary: Yeahbut you know her character like obviously she was lonely but apart from being lonely like you know she had great apartment expensive clothes great job but just forget about the lonely bit ((laughs)) but she gets a man in the end anyways Grace: And like your own Eva Longoria from Desperate Housewife’s her like Mary: Yeah she is actually Grace: ((In overlap)) yeah like she had the money and her husband with the great job and she kinda wore the trousers in the house she was just like you know like Sal: Victoria Beckham was also recently described as one of the most empowered women Mary: ((In overlap)) Angelina Jolie Sal: She has her own perfume and clothes line and because like when you hear of people who get married to successful people but like before they got married David Beckham wasn’t that famous and as known as he is and they like built their lives together and now she has what does she have Mary: Clothing lines perfume her own shops Sal: Yeah all sorts like she was actually nominated or she won business woman of the year yeah but she built it all up herself like Mary: You forget like she was Grace: ((In overlap)) a Spice Girl and the one who couldn’t sing or dance ((General laughter)) Int: So she is the empowered women then?
  • 78.
    F. 18 Grace: Yeahcoz she isn’t like Kim K famous she built it all up like proved she could do it all Mary: Like yeah she isn’t famous for nothing Sal: She actually earned all her money Int: So you’re saying Kim Kardashian isn’t one Grace: No because she grew up in money and I think money is power and if she has grown up in it it isn’t really her power. Sal: Victoria Beckham didn’t get her ass out for a bit of money (/) Mary: There are certain expectations dress a certain way act a certain way have a man Grace: Take a hot guy say Justin Bieber and like if I see a picture of the girl he is dating even if she is beautiful I would be like ‘oh my god she’s so ugly’ I would do that but that like because I expect him to be going out with like a super model or something because I have that expectation Mary: ((In overlap)) yeah yeah Grace: Like because of the media and all that kinda thing and like I’m aware I’m doing it but like I would never stop and think about it Mary: We we are pretty judgmental of other women being like ‘oh she’s wrotten’ and stuff when they really aren’t Grace: Or ‘you could do so much better than her’
  • 79.
    F. 19 Sal: Yeahlike with celebrities like without make-up and your like ‘oh my god why do you look like that’ like you have an expectation of them Mary: Yeah you just expect them to be perfect all the time (/) Int: What do you guys understand by the term feminism Mary: Mmm equal rights we did this in class the other day so yeah equal rights Int: Yeah yeah Mary: I mean I know a lot of people think feminists are cut short haired burn the men and stuff ((General laughs)) Grace: Like what’s a feminist Int: Ye what do you think a feminist is Grace: I dunno someone who hates men I don’t really know Int: Well ok if I were to say feminism or feminist to you like what’s the first thing that comes to mind Grace: Well if you said feminism to me I would think that women think they are better I honestly don’t really know how to define it Int: It’s ok I don’t need like correct answers I just want your ideas and like would you ever categorise yourself as a feminist
  • 80.
    F. 20 Grace: Idon’t know I don’t think so ((laughs)) no I don’t think so like I don’t think I’m better than men or other women or anything (.) I don’t really know I’m probably talking shite ((General laughter)) Int: Well anyone else what would you think of feminism Mia: Woman’s rights Int: Yeah Mia: Like in in the Dail where there is you know like less women than men and they try and get more women (.) Mary: Like there’s not equal pay between men and women their pay isn’t equal in a lot of places Sal: I think femin feman bla feminism ((General laughter)) Sal: It can be like really like em like when you think of like women in certain kinds of jobs like you’d never see like a boy beauty therapist like going into wax your eyebrows like in hair dressing and stuff there are more now but it’s always been like a female kinda job like and stuff so I think feminism kinda defines your job and stuff like you don’t hear of women builders and stuff and yeah like stuff like that Int: And would you ever say you were a feminist Sal: No Int: No
  • 81.
    F. 21 Mia: No Mary:Maybe but not in like a hate men way but I believe in equal rights Sal: ((In overlap)) Like I’d always say like just because like when my aunties were younger they said it was always unfair that the girls had to do everything but now at dinner they are there saying ‘oh girls do the dishes’ and we are like ‘no we all have to do it’ like it’s not just going to be the girls that do it like in that sense I would be a bit like that but I wouldn’t be like what Mary said ‘burn all the men’ ((General laughter)) Mary: Just yeah I learnt this the other day but yeah I think we should all have equal rights and equal pay Gen: Yeah Int: Mmmhmm Mary: But in the same way that men don’t have somethings women have like maternity leave or paternity leave I spose it would be like men don’t get that and that’s another way we aren’t equal rights ((laughs)) you know that’s just an example of how something that isn’t equal and where women get stuff that men don’t but then again there is a lot of stuff men get that women don’t so I’d definitely be for equal rights Int: Ok cool so tell me do you guys know about or have ever heard of post-feminism Gen: No Int: No Mary: Think I’ve heard of it but I can’t remember what it is
  • 82.
    F. 22 (/) Int: Doyou guys think feminism is over Mary: No Int: No Mary: No sure there is still people protesting for equal rights there’s like um (.) what’s it called (.) petitions yes petitions or like links on Facebook for sign up for this equal rights no there is definitely is like a presence but maybe it’s like a different type like I don’t think it would be as aggressive or whatever as it used to be but it’s definitely still there I think (/) Int: In the fact that you said you didn’t know what feminism was and now your saying it’s not over would you just not have been aware of it before Grace: No no like not really I mean just after what you are saying things are coming into my mind so I guess I notice them but wouldn’t ever think of them as feminist issues or even think like too much about them before now (.) so like I think it’s still there but like I’d never have put a label on it or anything if you know what I mean Int: So now if I was to use the term post-feminism what would you guys think of like having heard my description how would you describe it or do you think there is a justification for post-feminism like that feminism is completely over (.) Mary: Well I don’t think it’s over but I think it’s justified by like that it doesn’t need to be as like out there as the sixties you know
  • 83.
    F. 23 Grace: Ithink it’s more evaluating now like there are still issues but we keep them more quiet and personal and talk about them rather than like protesting and stuff like we aren’t going to go and start a massive petition coz it’s not a huge issue anymore Mary: Yeah like the big things like votes for women and you know like women can do these jobs and they don’t need to quit their jobs after they get married and you know the big things aren’t there anymore so feminists wouldn’t have as much to be vocal about anymore Grace: Mmm like my granny after I turned eighteen asked if I was registered to vote and I said ‘no’ coz I obviously haven’t and she was like ‘why women fought for your right to be equal’ and she was like ‘you shouldn’t abuse it’ so maybe you know she is a little feminist (/) Int: … The argument for the empowerment of pole dancing where do you stand on it Mary: Ah you know it’s just a bit of craic like you know if they aren’t in a pole dancing club like Grace: Yeah if they aren’t abusing the art I spose Mary: ((In overlap)) Just for exercise Grace: Like if it’s just for exercise and not in a club like if it’s a skill like gymnastics like I’d love to do it Mary: Yeah Grace: Like it would be a bit of fun Mary: Yeah if it’s just for a bit of exercise
  • 84.
    F. 24 Sal: ((Inoverlap)) I think like it was like (.) Grace: Like it was always classed as a big slutty thing Sal: Yeah but now people don’t do it in their underwear and like I know a girl who does it for strength and she teaches classes and you just go in your tracksuit and like people think it’s about swinging around a pole in your underwear but it’s not no like it’s an exercise more than a job on a pole Mary: Yeah there is a difference between like doing it for men’s pleasure and not being slutty Grace: It’s only very recent that this all has publically changed like before I woulda thought of it as slutty Int: So is that an area that might be classified as post-feminist like with the hyphen Gen: Yeah Int: So have you guys any further thoughts (.) on feminism (.) post-feminism (.) celebrities Grace: Oh my god Ariana Grande have you seen her Mary: She actually makes me so uncomfortable like with her dressing like she does and looking like twelve Grace: Yeah she really annoys me like she is kinda (.) whats the word (.) hypocritical like she acts like a little girl and then dresses in a bra and hot pants like Mia: Yeah and I don’t like it like my little sister is nine and she has grown up watching like oh what was it called (.) Sal: Victorious
  • 85.
    F. 25 Mia: Yeahyeah and now she watches all her music videos being like oh isn’t she so pretty and cool like its scary Mary: Yeah I just find her very creepy (.) but she is famous (/) Int: Lastly did anything come to light you perhaps hadn’t considered before Grace: Feminism Mia: And that Kim Kardashian is bad ((General laughter)) Int: Well what did you think before hand Mia: I never really thought much of what she did I was just like yeah yeah ok when I see anything about her Mary: Yeah yeah I think a lot of people must do that but she is so fake like I don’t think there is anything wrong with growing old it happens to us all Sal: Yeah I hate when people are so fake Gen: Mmm Int: Alright that’s it unless anyone has anything else to say (. . .) no well thanks a million guys and you know how to contact me if you have any problems or issues
  • 86.
    G. 1 Appendix ‘G’- Focus group ‘B’ transcript. Int: Alright well first I have to just tell you that what you say are your own thoughts and opinions and like there are like no wrong or right answers and you are also welcome to bring in examples like if you don’t want to talk about yourself or anything you can talk about family friends (.) So firstly I want everyone just to say their name and then pick a female family member whom either you admire and why or like really don’t admire and why and I’ll go first (.) I have an aunt and who when I was younger I actually just hated so much she is like the embodiment of the perfect 1950s house wife she just used to drive me insane because all her dinners were perfect and she used to make the children sit at the children’s table it was awful and I still don’t really like her because of her ways (/) Int: So How do you connect with the outside world like interacting and getting your news stuff like that Dee: Unfortunately it’s Facebook can’t really go a day like you couldn’t even go a day (.) is that what you want like Int: Sure yeah Gen: ((In overlap)) no me either Deb: Whenever I have wifi Dee: Yeah hourly Deb: Yeah probably hourly…. Like when I’m at home or college…well basically all the time ((laughs)) Dee: Well anyone who has something to say just sets up a blog like (.) it’s all online
  • 87.
    G. 2 Int: Mmmso we are talking about popular culture, how would you guys understand the term popular culture and could you like define it? Ellen: Eh Gia: The norms of society Dee: Trends like whats ongoing Int: What do you feel you role within popular culture might be Gia: What none really Dee: Come on you totally buy into popular culture you with your oh look at this and everyone knows this and oh I want that Gia: Yeah but it’s innocent enough I don’t really realise I’m doing it Dee: Yeah I’m not involved in it like making it I’m just on the side lines watching it Gia: ((In overlap)) Yeah like on Facebook and stuff Ellen: Stalking ((general laughter)) Dee: Having a gawk Int: What elements of your own personal identity factor in your relationship with popular culture Ellen: Definiately your age is a big thing (…) Int: Well what do you think about gender and looks Gia: Ugh I hate these fellas with fucking pony tails on top of their heads ((laughs))
  • 88.
    G. 3 Deb: Yeahmore and more men are getting into their looks these days Dee: But I think it’s still definitely still aimed at women like women ads are all over Facebook and stuff like that Ellen: ((In overlap)) well no I think it’s definitely more aimed at men these days Dee: Now though or do you mean in the past Ellen: No no I mean like it’s definitely more aimed at men than it used to be so Dee: ((In overlap)) yeah yeah I guess so Gia: Just their hair and their dress and stuff like that (.) those feckin men Deb: But for women looks are obviously just a massive thing today like people get so dressed up for a day at college like I do think what’s the point but I feel the need to do it Int: And do you think they are doing it for themselves Deb: No Dee: ((In overlap)) no sure they are doing it for other people and Facebook likes on their pictures Bed: But it’s for women to give compliments to each other it’s not like purely for men, its more women against women Gia: Mmmm yeah Ellen: Yeah you can be like oh I look way better than her Dee: And it also like makes you feel better about yourself Deb: Well yeah
  • 89.
    G. 4 Dee: ((Inoverlap)) but your right it is mostly about other people seeing you that day (.) I’d think anyway Ellen: Ah yeah I’d agree Dee: Also they get you ahead in life like they are up there with your achievement Deb: No I wouldn’t think so Dee: Yeah think about it, if you go to an interview and you’re the same as someone else on paper they will pick the most attractive Gia: Mmm yeah I guess so then (/) Int: Why does Kim Kardashian command such attention Dee: Coz she is a porn star (.) she is so photo shopped she is famous coz of her ass like Gia: Coz men want to ride her Ellen: ((In overlap)) yeah they think she’s perfect I don’t but loads do Int: Do you think as women that there are like certain roles expected of you within popular culture? Dee: Well definitely the pressure of marriage has gone coz like we have more empowered now like 50 years ago we would have been married by now like we can have more of an opinion now Gia: ((In overlap)) yeah we have more choice Int: You said empowered so what is like the empowered woman then Dee: It’s like being independent (.) like they don’t need a man
  • 90.
    G. 5 Ellen: ((Inoverlap)) yeah it must to be family children the house Deb: Its different now like (.) Gia: Like they still want their families and cars and houses and stuff but there isn’t as much pressure now like marry later and stuff Dee: ((In overlap)) later and they don’t have to marry to get somewhere in life Gen: Yeah Dee: Like I don’t think the ultimate gaol in life is to get married anymore (.) like I’d say if this was 50 years ago there would be so much pressure on us to get married like Deb: Ah sure we would be past it ((General laughter)) Dee: Whereas now there isn’t like Int: Can you give me an example of women you might think of as empowered within popular culture today Dee: Eh Emma Watson like that speech but like it’s obviously her looks and personality that got her up there but she obviously has brains behind it (.) Int: What about Angelina Jolie Gia: Yeah she is amazing (.) like she has a career family charity work and she is shit hot Int: So why isn’t Kim Kardashian empowered
  • 91.
    G. 6 Ellen: Iknow we are saying Kim Kardashian isn’t one but maybe to younger women she will be their idol Gia: No Dee: Do you think Deb: I don’t think so Ellen: Well all them younger people love them like if you think about it they have grown up with the Keeping Up With the Kardashians Dee: Yeah (.) do you not think its worrying though that like that’s their fucking role model Ellen: Well she doesn’t go get twisted every night Dee: She just put a picture of her naked across the whole internet Ellen: Well I dunno it’s just what I think Int: So who is the Kim Kardashian of our age group Dee: Well Friends Gia: Yeah Jennifer Aniston Deb: What a legend Dee: Oh and she isn’t old but Jennifer Lawrence Gia: Ah yeah her too Int: So would you say that the notion of the empowered women is inherently linked with popular culture?
  • 92.
    G. 7 Ellen: WellI’d say it’s kinda linked with each generation I think Dee: Are you talking about like Facebook and stuff Int: Well yeah do you think to be like famous in popular culture do you think women need to be like the empowered woman Dee: I spose but it’s hard to know coz you don’t know how they started out do you do you get me like your one So Sue Me how famous has she become and how did she start by like writing a blog and now she is like all over your Instagram all over your Facebook and every girl looks up to her and I think its across like a wide range of women like there are girls younger than me commenting on it and ones older than me commenting and asking (.) yeah and she is so pretty (.) and blonde (/) Int: Are you very aware that these women are empowered and do you feel any pressure on yourselves Dee: ((In overlap)) yes Gia: ((In overlap)) I don’t but Dee: ((In overlap)) like I think there is a massive one Gia: Well I don’t Dee: But the reason you’re putting make-up on is because you’re going Gia: ((In overlap)) out yeah Dee: but like why
  • 93.
    G. 8 Gia: Irarely do though Dee: But why are you gonna do it now Gia: I wanna feel nice for a change Dee: Exactly and like who do you wanna look nice for Gia: Well me I mean I look shit most of the time Dee: But what’s your aim tonight Gia: Go out (.) get drunk Ellen: And is there anything else ((General laughter)) Gia: Try not to get sick Dee: Ah come on we know why you wanna shift a jockey Gia: Nooooo ((laughs)) Dee: Always shift a jockey Gia: No not anymore Deb: Yeah the make-up is for ourselves Dee: That’s a big lie I can honestly say I’m doing it because everyone else is Gia: Ah but sure it’s all the same (/) Int: Can you guys tell me what you understand by the term feminism Gia: Fucking women
  • 94.
    G. 9 Dee: Ohwhat’s the line in that Beyoncé song Deb: Women standing up for women’s rights Dee: believes in the social and economic wellbeing of the sexes (.) something like that Ellen: Wow that was impressive ((laughs)) but yeah Gia: Actually yeah (.) ((General laughter)) Int: Ok cool but Gia what do you actually understand it to be though Gia: Ah women and rights and them complaining and causing trouble Ellen: Mmm yeah I’d agree (…) Int: Um ok so would you guys have ever hears of the term post-feminism Gia: No Ellen: Never Int: If you had to guess Deb: After Dee: Yeah post so after feminism (/) Int: Do you think feminism is over Dee: No not at all no like why Ellen: ((In overlap)) should be
  • 95.
    G. 10 Deb: Idon’t think it should necessarily be over like there should always be a hint of it there but (.) Int: Do you think it’s reached its goal Deb: No Dee: Exactly Gia: ((In overlap)) no coz even men in the horsey industry have everything Deb: ((Laughs)) but no I don’t think it should be over and I don’t think it is over because well it shouldn’t be Gia: I don’t think it should be either Dee: Definitely with the whole abortion thing anyway (.) like I’m saying it’s obviously not and definitely not over in Ireland because we still don’t have the right to go and get an abortion if we need to Int: Mmmhmm Dee: So like how (.) how old school is that Gia: Yeah we mightn’t want it but it should be our right, we should be allowed (.) if we want fuckin children we will have them and if we don’t or can’t well we have to have them anyway like Int: So then what do you consider post-feminism to be (…) you would spell it without the hyphen then Dee: Ye coz it hasn’t that’s for fucking sure Gia: I don’t think it should be finished either (.)
  • 96.
    G. 11 Int: Whydon’t you Gia: Because there are so many more issues to be dealt with coz like even all those high paid jobs and all that in the economy are all men Ellen: Ye actually the H.R lady taught us that Deb: But your being so against men like it shouldn’t be men men men and like women against men it should be rights in general Gia: So like women and men Dee: ((In overlap)) together ((General laughter)) Int: It came up in my last focus group but where do you guys stand on pole dancing Gia: Hon the pole dancing Deb: Ah yeah it looks like great craic Dee: I’m all for it Ellen: It looks like a good and fun way to get fit like its big over in America don’t they even get poles in their houses Dee: Hmm but would you rather get a pole or go for a run Gia: Ah I’d prefer to go running Dee: Why Gia: Because I wouldn’t want others to see me like outside of say the circle of the class Dee: Mmm so I guess why would you choose pole dancing class
  • 97.
    G. 12 Deb: WellI’ve heard it’s very good for your core but I guess you might seem more attractive Gia If you can pole dance well you can do anything ((General laughter)) Int: What do you mean Gia: Well you will have both strength and confidence in yourself (/) Int: So have you guys any further thoughts (.) on feminism (.) post-feminism (.) celebrities Ellen: Na I’m good Gia: That I associate feminists with man haters but I actually don’t think feminism is over Dee: Yeah I’d agree Deb: Yeah and just also that it shouldn’t be man versus woman you know (.) like they have issues too (/) Int: Was this what you were expecting from this focus group Dee: No not really Deb: Didn’t really know quite what to expect to be honest ((General laughter))
  • 98.
    G. 13 Int: Okthen has anything come to light that perhaps you hadn’t thought of before or feel different about now Gia: Well I’ll think differently when I go to put on my make-up anyway ((General laughter)) Ellen: Yeah I think I might be a bit more cynical now…. Like perhaps think a bit more about why I’m looking at things and buying things you know Dee: Well basically yeah and just that I guess we are all kinda (.) feminists then (.) maybe no Gia: Well I dunno about feminists but definitely believe in feminism (…) Int: Alright well that’s it unless anyone has anything else to say (. . .) well thanks a million guys and you know how to contact me if you have any problems or issues and enjoy your night
  • 99.
    94 Bibliography Barry, Peter, BeginningTheory (Manchester: Manchester University Press, 1995). Braun, Virginia and Victoria Clarke, Successful Qualitative Research: A Practical hhhhh Guide for Beginners (London: SAGE, 2013). DeVault, Marjorie L., Liberating Method: Feminism and Social Research hhhhh hhhhh(Philadelphia: Temple Universtiy Press, 1999). Google book. Feminism’, Oxford Dictionary.com (2014) hhhhh<http://www.oxforddictionaries.com/definition/english/feminism > [accessed hhhhhOct. 2014]. Gill, Rosalind, 'Postfeminist media culture: elements of a sensibility', European journal hhhhhof cultural studies, 10.2, (2007), 147-166. < http://eprints.lse.ac.uk > [accessed 25 hhhhhFebruary 2014]. Interrogating post-feminism, ed. by Yvonne Tasker and Diane Negra (USA: Duke hhhhhUniversity Press, 2007). Irigaray, Luce, This Sex Which is Not One, trans. by Catherine Porter (New York: hhhhhCornell University Press, 1985). Marshall, Judi, 'Self-reflective Inquiry Practices', in The SAGE Handbook of Action hhhhhResearch, ed. by Peter Reason and Hilary Bradbury(London: SAGE Publications hhhhhLtd, 2001), pp. 433- 439. McRobbie, Angela, The Aftermath of Feminism (London: SAGE Publications Ltd, hhhhh2009). Negra, Diane, What a Girl Wants? Fantasizing the Reclamation of self in Postfeminism hhhhh (Oxon, Routledge, 2009). Oakley, Ann, The Ann Oakley Reader: Gender, Women and Social Science (Bristol: hhhhhPolicy Press, 2005). Google book.
  • 100.
    95 Power, Nina, OneDimensional Woman (Hants.: O Books, 2009). Re)searching Women, ed by. Anne Byrne & Ronit Lentin (Dublin: Institute of Public hhhhhAdministration, 2000). Google book. Stanley, Liz and Sue Wise, Breaking Out Again: Feminist Ontology and hhhhhEpistemology (London: Routledge, 1993). Ebrary. Steinmetz, Katy ‘Which Word Should Be Banned in 2015?’, Time Magazine ( Nov. hhhhh2014) < http://time.com/3576870/worst-words-poll-2014/ > [accessed 20 Jan hhhhh2015]. Westmarland, Nicole, 'The Quantitative/Qualitative Debate and Feminist Research: A hhhhhSubjective View of Objectivity', Qualitative Social Research , 2.1, (2001), 1-28, hhhhhin Different Approaches for Inter-Relating Qualitative and Quantitative Method hhhhh< http://www.qualitative-research.net/ > [accessed 29 December]. Willson, Jacki, The Happy Stripper: Pleasures and Politics of the New Burlesque (New hhhhhYork: I.B. Tauris and co, 2008). Zeilser, Andi, Feminism and Pop Culture (California: Seal Press, 2008).