SlideShare a Scribd company logo
JOHN P. HALPIN
11916 W. 101st Terrace ▪ Lenexa, KS 66215 ▪ 913-515-0554
halpinjohnp@gmail.com
EHS & ENGINEERING / MANAGER
EHS and Engineering Professional experienced in Risk Management, Compliance, Safety and Project Engineering.
Change agent capable of implementing Health and Safety programs driving towards world class performance in a
manufacturing operation. Diverse engineering and equipment knowledge compliments my effectiveness to deliver
results that are meaningful and sustainable.
Areas of expertise include:
 OSHA Compliance  Air / Water / Process Permits  Equipment Installation
 Logical Problem Resolution
 Capital Budget
 Environmental Health and
Safety (EHS)
 Root Cause Failure Analysis
 Training and Certifications
 Process and Reliability
Engineering
 Maintenance Management
 Hazardous Waste
 Planning and Communication
Skills
PROFESSIONAL EXPERIENCE
TreeHouse Private Brands (ConAgra Foods), Pasta/Food Manufacturing, Excelsior Springs, MO
Cost Engineer (Contractor position via MRI Edison, NJ), 05/2014 to present
 Provide forecasts of project costs and budget reporting to Project Team and Leadership (3 facilities)
 Responsible for development and maintenance of engineering project cost reports
 Validate and write purchase requisitions for all capital and expense procurement
 Analyze monthly CIP (Capital Investment Project) report for accuracy and G/L detail
 Work with Project Managers on our capital and expense policy and budget procedures
 Establish and Maintain Capital Project records system
 Communicate and negotiate payment and term requirements with vendors
 Prepare fixed asset documentation and placing equipment in service for asset capitalization
GENESYS, Systems Integrator & Engineering Consultants, Kansas City, MO
Project Engineer, 01/2012 to 12/2012
 Utilized technology and application development expertise to create customized solutions
 Interfaced with clients in developing project concepts and final design objectives, responsible for resource
planning, constructability reviews and providing a liaison of integration between company and client
 Attended all customer(s) Safety Training and communicated that information prior to our construction /
installation crew onsite
 Responsible for project tracking, producing bill of materials, cost reports, Engineering Change Notices (ECN)
and schedules to ongoing projects
 Oversee document control activities, submittal drawings, approval drawings, outgoing project correspondence
to vendors and customer, made changes to AutoCAD drawings as needed
 Supported Project Manager and Detailers to accomplish scope of work on time and under budget
 Provided Project & Safety Management during equipment installations with Construction Team
ATK, Small Arms Ammunition Manufacturing, Independence, MO
Manufacturing Engineer, 10/2010 to 11/2011
 Improved Operational Availability (OA) 20% - military cartridge manufacturing equipment with line speeds of
300 parts per minute through design changes and failure mode assessment
 Led 3-8 person cross functional teams in conducting Root Cause Analyses (RCAs) for production equipment
reducing downtime, guarding and safety operational deficiencies
 Wrote JSA’s and operating procedures for production equipment within department
 Conducted analyses of equipment utilizing calipers, gauges, motor analysis, oil analysis, and high speed film
 Utilized Maximo/CMMS to Produce Maintenance Work Procedures, Daily Operator Work Procedures, Inventory
tracking and visual documentation support
 Worked with Project Managers, Department Leaders, Engineering and Maintenance to review productivity
reports, progress analysis and establish JIT inventory levels
Heatron, Flexible Cartridge Heater Manufacturing, Leavenworth, KS
EHS Team Leader, 02/2007 to 10/2009
 Responsible for 3 local facilities and an additional 4th facility in Erie PA for
o Etched Foil and Flexible Heating Elements
o Tubular Cartridge Heaters
o Circuit Board and LED device manufacturing and assembly
o Aluminum Casting Foundry
 Promoted plant safety performance through administration of company policy/procedure and training consistent
with the objectives of the company and in compliance with OSHA and State Agencies
 Facilitated our culture of employee responsibility in health and safety which led to a 60% reduction in Lost Time
Accidents
 Developed a comprehensive 26-point training program for new employee orientation, led monthly safety
meetings of 20-60 associates to ensure compliance with relevant regulations
 Trained all new employees joining the company for my first year, then trained HR personnel to perform the
training and they took on the role
 Developed and maintained budget for all EHS activities. Wrote purchase orders, approved receipt and
maintained daily status reporting
 Evaluated and closed out pre-existing Workman’s Comp Claims and Lawsuits with Insurance Carrier
 Case Manager for any new LTA’s and Recordable Incidents
 Support Maintenance on equipment as necessary and upgraded our lockout procedures
 Performed bi-weekly audits on all facilities and worked with Plant Managers to resolve any issue
Varco Pruden Building, Panel Building Manufacturing, St. Joseph, MO
Sr. Plant Engineer, 07/2000 to 02/2007
 Managed EHS program for the facility
 Responsible for managing the activities of the maintenance department to keep building and equipment in
proper state of repair
 Developed and managed $1.5 million annual Capex budget, provide weekly status reports of project
progression, monies spent to date and estimates of completed project.
 Work with corporate finance on asset inventory, value and all documentation as required.
 Utilized TPM, Continuous Improvement methods improving Equipment Maintenance, reduced downtime 15%
 Provided hands-on experience to solve equipment breakdowns to improve the effectiveness of the Maintenance
Department and technical resources
 Modified and installed many new pieces of equipment and made significant process improvements: Paint
Operations, Roll Forming, Welding, Coil and Plate material handling
 Wrote/edited Job Safety Analysis and performed training for production equipment
 Trained supervisors to be trainers and coaches of Safety, supported them for weekly tool box meetings
Northrop / Grumman, Automotive Truck Assembly Plant, MI
Manufacturing and Maintenance Manager, 01/1995 to 02/1998
 Completed $14 million modernization initiative, increased production capacity 150%
 Provide technical assistance to production departments: diagnose and make recommendations to eliminate
production problems and to improve operating effectiveness through more efficient use and care of equipment
 Managed department of 16 personnel, set goals, schedules, training, and performance reviews
 Responsible for Overhead Crane, Construction, Electrical and General Contractors
 Responsible for 3 separate facilities on 150 acres’ land
 Developed several large pieces of equipment implementing complete safety and efficiency into design
 Approved capital equipment purchases, oversee daily budget log, variances and completion schedules on
numerous multi-project events
Morrison Knudsen, Transit Rail Car Manufacturer, Oakland, CA
Safety / Facilities / Project Manager, 08/1991 to 12/1994
 Managed 15-70 union craftsmen to revamp 20 year vacated, 300,000 sq/ft facility
 Managed $7 million project and all budgeted expenses executed in 9 months for the assembly of BART transit
rail cars in San Francisco, California
 Designed building, nozzle framework, pump and filtering system for water testing of rail cars
 Developed Assembly Line Sequence and Work Center Procedures
 Managed Maintenance and Safety Department personnel
 Executed negotiations with CAL-OSHA and local authorities to secure all permits
 Trained nearly 500 employees during start-up of plant
 Customized Corporate Safety Manual and procedures for State of California operations
EDUCATION
State University of New York, Bachelor of Professional Studies
Mohawk Valley Community College, Associate of Science in Mechanical / Electrical Technology
MILITARY
Marine Corps – Enlisted 3 years

More Related Content

What's hot

Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Dane Wise
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CRoderick Pruks
 
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty ResumeEd McCarty
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15Cary Hamar
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017Clemmie Crocker
 
Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4Joe Ungvarsky
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
Arun Das
 
Ronnie Meridyth Resume 2
Ronnie Meridyth Resume 2Ronnie Meridyth Resume 2
Ronnie Meridyth Resume 2Ronnie Meridyth
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager ResumeJohn Bloom
 
Rab Nawaz Khan up date CV 2016 2
Rab Nawaz Khan up date CV 2016 2Rab Nawaz Khan up date CV 2016 2
Rab Nawaz Khan up date CV 2016 2rabnawaz khan
 

What's hot (20)

Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
 
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty Resume
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Bauernfeind, Resume12 SMET
Bauernfeind, Resume12 SMETBauernfeind, Resume12 SMET
Bauernfeind, Resume12 SMET
 
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017
 
Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15
 
LANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIESLANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIES
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
Resume
ResumeResume
Resume
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
Ronnie Meridyth Resume 2
Ronnie Meridyth Resume 2Ronnie Meridyth Resume 2
Ronnie Meridyth Resume 2
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager Resume
 
Rab Nawaz Khan up date CV 2016 2
Rab Nawaz Khan up date CV 2016 2Rab Nawaz Khan up date CV 2016 2
Rab Nawaz Khan up date CV 2016 2
 

Viewers also liked

7 article azojete vol 9 69 81
7 article azojete vol 9 69 817 article azojete vol 9 69 81
7 article azojete vol 9 69 81
Oyeniyi Samuel
 
Kuwn Moei Ting
Kuwn Moei TingKuwn Moei Ting
Kuwn Moei TingMavis Kuwn
 
ambiental
ambientalambiental
ambiental
RUTHORDONEZ
 
Frank Monroe Professional Persona Project
Frank Monroe Professional Persona ProjectFrank Monroe Professional Persona Project
Frank Monroe Professional Persona Project
Frank Monroe
 
Brand audit
Brand auditBrand audit
Tecnologías aplicadas a la educación
Tecnologías aplicadas a la educaciónTecnologías aplicadas a la educación
Tecnologías aplicadas a la educación
mayeline07
 
Национальный совет по профессиональным квалификациям провел первое заседание ...
Национальный совет по профессиональным квалификациям провел первое заседание ...Национальный совет по профессиональным квалификациям провел первое заседание ...
Национальный совет по профессиональным квалификациям провел первое заседание ...
RSPP-Telecom
 
Презентация GUSAROV digital
Презентация GUSAROV digitalПрезентация GUSAROV digital
Презентация GUSAROV digital
Gusarov Group
 
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
peshukll
 
Borneo April 2010
Borneo April 2010Borneo April 2010
Borneo April 2010kazziep
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativos
CarlosFernandez150214
 
CongressDenmark 2017
CongressDenmark 2017CongressDenmark 2017
CongressDenmark 2017
Hans Jensen
 
Livro dos Espiritos Q.447a452 ESE cap3
Livro dos Espiritos Q.447a452 ESE cap3Livro dos Espiritos Q.447a452 ESE cap3
Livro dos Espiritos Q.447a452 ESE cap3
Patricia Farias
 
L1 sej dan politik (1.1, 1.2)
L1   sej dan politik (1.1, 1.2)L1   sej dan politik (1.1, 1.2)
L1 sej dan politik (1.1, 1.2)
gunavathy suppiah
 
L1 bab 1- vokal dan diptong
L1   bab 1- vokal dan diptongL1   bab 1- vokal dan diptong
L1 bab 1- vokal dan diptong
gunavathy suppiah
 
L5 ethnic and society ( 3.3 )
L5   ethnic and society  ( 3.3 )L5   ethnic and society  ( 3.3 )
L5 ethnic and society ( 3.3 )
gunavathy suppiah
 
Sistem pemerintahan dan pentadbiran (BAB 3)
Sistem pemerintahan dan pentadbiran (BAB 3)Sistem pemerintahan dan pentadbiran (BAB 3)
Sistem pemerintahan dan pentadbiran (BAB 3)
dka1d
 
SpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch VehicleSpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch Vehicle
C Saravana kumar
 
Батецкий район
Батецкий район Батецкий район
Батецкий район
fizikiiliriki
 

Viewers also liked (20)

7 article azojete vol 9 69 81
7 article azojete vol 9 69 817 article azojete vol 9 69 81
7 article azojete vol 9 69 81
 
Kuwn Moei Ting
Kuwn Moei TingKuwn Moei Ting
Kuwn Moei Ting
 
ambiental
ambientalambiental
ambiental
 
PGDHRM-DHK- 2015final
PGDHRM-DHK- 2015finalPGDHRM-DHK- 2015final
PGDHRM-DHK- 2015final
 
Frank Monroe Professional Persona Project
Frank Monroe Professional Persona ProjectFrank Monroe Professional Persona Project
Frank Monroe Professional Persona Project
 
Brand audit
Brand auditBrand audit
Brand audit
 
Tecnologías aplicadas a la educación
Tecnologías aplicadas a la educaciónTecnologías aplicadas a la educación
Tecnologías aplicadas a la educación
 
Национальный совет по профессиональным квалификациям провел первое заседание ...
Национальный совет по профессиональным квалификациям провел первое заседание ...Национальный совет по профессиональным квалификациям провел первое заседание ...
Национальный совет по профессиональным квалификациям провел первое заседание ...
 
Презентация GUSAROV digital
Презентация GUSAROV digitalПрезентация GUSAROV digital
Презентация GUSAROV digital
 
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
тема 1. класифікація вторинної сировини, хімічний склад, властивості, ветерин...
 
Borneo April 2010
Borneo April 2010Borneo April 2010
Borneo April 2010
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativos
 
CongressDenmark 2017
CongressDenmark 2017CongressDenmark 2017
CongressDenmark 2017
 
Livro dos Espiritos Q.447a452 ESE cap3
Livro dos Espiritos Q.447a452 ESE cap3Livro dos Espiritos Q.447a452 ESE cap3
Livro dos Espiritos Q.447a452 ESE cap3
 
L1 sej dan politik (1.1, 1.2)
L1   sej dan politik (1.1, 1.2)L1   sej dan politik (1.1, 1.2)
L1 sej dan politik (1.1, 1.2)
 
L1 bab 1- vokal dan diptong
L1   bab 1- vokal dan diptongL1   bab 1- vokal dan diptong
L1 bab 1- vokal dan diptong
 
L5 ethnic and society ( 3.3 )
L5   ethnic and society  ( 3.3 )L5   ethnic and society  ( 3.3 )
L5 ethnic and society ( 3.3 )
 
Sistem pemerintahan dan pentadbiran (BAB 3)
Sistem pemerintahan dan pentadbiran (BAB 3)Sistem pemerintahan dan pentadbiran (BAB 3)
Sistem pemerintahan dan pentadbiran (BAB 3)
 
SpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch VehicleSpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch Vehicle
 
Батецкий район
Батецкий район Батецкий район
Батецкий район
 

Similar to JOHN HALPIN EHS MANAGER

Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer Lee
 
Jason Kitchenham 2016highlights
Jason Kitchenham 2016highlightsJason Kitchenham 2016highlights
Jason Kitchenham 2016highlightsJason Kitchenham
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
Tony Lowery
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
Tito Camps (LION, Open Networker, Never IDK)
 
RESUME_Eric Ostrom_EFS 09-03-16 PGE
RESUME_Eric Ostrom_EFS 09-03-16 PGERESUME_Eric Ostrom_EFS 09-03-16 PGE
RESUME_Eric Ostrom_EFS 09-03-16 PGEEric Ostrom
 
Breshears k 2017
Breshears k  2017Breshears k  2017
Breshears k 2017
Keaton Breshears
 
Bw resume 2013 share
Bw resume 2013 shareBw resume 2013 share
Bw resume 2013 shareBrian Wilson
 
K marques resume 2015 oel
K marques resume 2015 oelK marques resume 2015 oel
K marques resume 2015 oel
Kim Marques, LSSBB, CPC
 
Kent Waldron Cur.V_10-17
Kent Waldron Cur.V_10-17Kent Waldron Cur.V_10-17
Kent Waldron Cur.V_10-17Kent Waldron
 

Similar to JOHN HALPIN EHS MANAGER (20)

JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
A Falana.4.8.15_Resume ...
A Falana.4.8.15_Resume                                                       ...A Falana.4.8.15_Resume                                                       ...
A Falana.4.8.15_Resume ...
 
Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)
 
Jason Kitchenham 2016highlights
Jason Kitchenham 2016highlightsJason Kitchenham 2016highlights
Jason Kitchenham 2016highlights
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
RESUME_Eric Ostrom_EFS 09-03-16 PGE
RESUME_Eric Ostrom_EFS 09-03-16 PGERESUME_Eric Ostrom_EFS 09-03-16 PGE
RESUME_Eric Ostrom_EFS 09-03-16 PGE
 
Murray_Michaelene-150718
Murray_Michaelene-150718Murray_Michaelene-150718
Murray_Michaelene-150718
 
Breshears k 2017
Breshears k  2017Breshears k  2017
Breshears k 2017
 
Linkedin Resume
Linkedin ResumeLinkedin Resume
Linkedin Resume
 
Markeithporterresume
MarkeithporterresumeMarkeithporterresume
Markeithporterresume
 
Resume_Lerry Schaftlein
Resume_Lerry SchaftleinResume_Lerry Schaftlein
Resume_Lerry Schaftlein
 
Resume[1][2]
Resume[1][2]Resume[1][2]
Resume[1][2]
 
Resume M. McLaughlin
Resume M.  McLaughlinResume M.  McLaughlin
Resume M. McLaughlin
 
Bw resume 2013 share
Bw resume 2013 shareBw resume 2013 share
Bw resume 2013 share
 
K marques resume 2015 oel
K marques resume 2015 oelK marques resume 2015 oel
K marques resume 2015 oel
 
ResumeAbraham2016
ResumeAbraham2016ResumeAbraham2016
ResumeAbraham2016
 
ResumeAbraham2016
ResumeAbraham2016ResumeAbraham2016
ResumeAbraham2016
 
Kent Waldron Cur.V_10-17
Kent Waldron Cur.V_10-17Kent Waldron Cur.V_10-17
Kent Waldron Cur.V_10-17
 

JOHN HALPIN EHS MANAGER

  • 1. JOHN P. HALPIN 11916 W. 101st Terrace ▪ Lenexa, KS 66215 ▪ 913-515-0554 halpinjohnp@gmail.com EHS & ENGINEERING / MANAGER EHS and Engineering Professional experienced in Risk Management, Compliance, Safety and Project Engineering. Change agent capable of implementing Health and Safety programs driving towards world class performance in a manufacturing operation. Diverse engineering and equipment knowledge compliments my effectiveness to deliver results that are meaningful and sustainable. Areas of expertise include:  OSHA Compliance  Air / Water / Process Permits  Equipment Installation  Logical Problem Resolution  Capital Budget  Environmental Health and Safety (EHS)  Root Cause Failure Analysis  Training and Certifications  Process and Reliability Engineering  Maintenance Management  Hazardous Waste  Planning and Communication Skills PROFESSIONAL EXPERIENCE TreeHouse Private Brands (ConAgra Foods), Pasta/Food Manufacturing, Excelsior Springs, MO Cost Engineer (Contractor position via MRI Edison, NJ), 05/2014 to present  Provide forecasts of project costs and budget reporting to Project Team and Leadership (3 facilities)  Responsible for development and maintenance of engineering project cost reports  Validate and write purchase requisitions for all capital and expense procurement  Analyze monthly CIP (Capital Investment Project) report for accuracy and G/L detail  Work with Project Managers on our capital and expense policy and budget procedures  Establish and Maintain Capital Project records system  Communicate and negotiate payment and term requirements with vendors  Prepare fixed asset documentation and placing equipment in service for asset capitalization GENESYS, Systems Integrator & Engineering Consultants, Kansas City, MO Project Engineer, 01/2012 to 12/2012  Utilized technology and application development expertise to create customized solutions  Interfaced with clients in developing project concepts and final design objectives, responsible for resource planning, constructability reviews and providing a liaison of integration between company and client  Attended all customer(s) Safety Training and communicated that information prior to our construction / installation crew onsite  Responsible for project tracking, producing bill of materials, cost reports, Engineering Change Notices (ECN) and schedules to ongoing projects  Oversee document control activities, submittal drawings, approval drawings, outgoing project correspondence to vendors and customer, made changes to AutoCAD drawings as needed  Supported Project Manager and Detailers to accomplish scope of work on time and under budget  Provided Project & Safety Management during equipment installations with Construction Team
  • 2. ATK, Small Arms Ammunition Manufacturing, Independence, MO Manufacturing Engineer, 10/2010 to 11/2011  Improved Operational Availability (OA) 20% - military cartridge manufacturing equipment with line speeds of 300 parts per minute through design changes and failure mode assessment  Led 3-8 person cross functional teams in conducting Root Cause Analyses (RCAs) for production equipment reducing downtime, guarding and safety operational deficiencies  Wrote JSA’s and operating procedures for production equipment within department  Conducted analyses of equipment utilizing calipers, gauges, motor analysis, oil analysis, and high speed film  Utilized Maximo/CMMS to Produce Maintenance Work Procedures, Daily Operator Work Procedures, Inventory tracking and visual documentation support  Worked with Project Managers, Department Leaders, Engineering and Maintenance to review productivity reports, progress analysis and establish JIT inventory levels Heatron, Flexible Cartridge Heater Manufacturing, Leavenworth, KS EHS Team Leader, 02/2007 to 10/2009  Responsible for 3 local facilities and an additional 4th facility in Erie PA for o Etched Foil and Flexible Heating Elements o Tubular Cartridge Heaters o Circuit Board and LED device manufacturing and assembly o Aluminum Casting Foundry  Promoted plant safety performance through administration of company policy/procedure and training consistent with the objectives of the company and in compliance with OSHA and State Agencies  Facilitated our culture of employee responsibility in health and safety which led to a 60% reduction in Lost Time Accidents  Developed a comprehensive 26-point training program for new employee orientation, led monthly safety meetings of 20-60 associates to ensure compliance with relevant regulations  Trained all new employees joining the company for my first year, then trained HR personnel to perform the training and they took on the role  Developed and maintained budget for all EHS activities. Wrote purchase orders, approved receipt and maintained daily status reporting  Evaluated and closed out pre-existing Workman’s Comp Claims and Lawsuits with Insurance Carrier  Case Manager for any new LTA’s and Recordable Incidents  Support Maintenance on equipment as necessary and upgraded our lockout procedures  Performed bi-weekly audits on all facilities and worked with Plant Managers to resolve any issue Varco Pruden Building, Panel Building Manufacturing, St. Joseph, MO Sr. Plant Engineer, 07/2000 to 02/2007  Managed EHS program for the facility  Responsible for managing the activities of the maintenance department to keep building and equipment in proper state of repair  Developed and managed $1.5 million annual Capex budget, provide weekly status reports of project progression, monies spent to date and estimates of completed project.  Work with corporate finance on asset inventory, value and all documentation as required.  Utilized TPM, Continuous Improvement methods improving Equipment Maintenance, reduced downtime 15%  Provided hands-on experience to solve equipment breakdowns to improve the effectiveness of the Maintenance Department and technical resources  Modified and installed many new pieces of equipment and made significant process improvements: Paint Operations, Roll Forming, Welding, Coil and Plate material handling  Wrote/edited Job Safety Analysis and performed training for production equipment  Trained supervisors to be trainers and coaches of Safety, supported them for weekly tool box meetings
  • 3. Northrop / Grumman, Automotive Truck Assembly Plant, MI Manufacturing and Maintenance Manager, 01/1995 to 02/1998  Completed $14 million modernization initiative, increased production capacity 150%  Provide technical assistance to production departments: diagnose and make recommendations to eliminate production problems and to improve operating effectiveness through more efficient use and care of equipment  Managed department of 16 personnel, set goals, schedules, training, and performance reviews  Responsible for Overhead Crane, Construction, Electrical and General Contractors  Responsible for 3 separate facilities on 150 acres’ land  Developed several large pieces of equipment implementing complete safety and efficiency into design  Approved capital equipment purchases, oversee daily budget log, variances and completion schedules on numerous multi-project events Morrison Knudsen, Transit Rail Car Manufacturer, Oakland, CA Safety / Facilities / Project Manager, 08/1991 to 12/1994  Managed 15-70 union craftsmen to revamp 20 year vacated, 300,000 sq/ft facility  Managed $7 million project and all budgeted expenses executed in 9 months for the assembly of BART transit rail cars in San Francisco, California  Designed building, nozzle framework, pump and filtering system for water testing of rail cars  Developed Assembly Line Sequence and Work Center Procedures  Managed Maintenance and Safety Department personnel  Executed negotiations with CAL-OSHA and local authorities to secure all permits  Trained nearly 500 employees during start-up of plant  Customized Corporate Safety Manual and procedures for State of California operations EDUCATION State University of New York, Bachelor of Professional Studies Mohawk Valley Community College, Associate of Science in Mechanical / Electrical Technology MILITARY Marine Corps – Enlisted 3 years