SlideShare a Scribd company logo
Resume of Joseph L. Howard
Houston, Texas
Email jlhinafghan@gmail.com
979-285-8580
OBJECTIVE
I would prefer to continue my career in a challenging Construction, Project or Quality management
position where my talents and experience will add value to any Organization. I thrive in adverse
conditions, remote locations and difficult situations and enjoy any and all challenges associated with
same.
SUMMARY
A diversified background describes my many attributes. This includes grass roots construction of
complete Infrastructures, Offices and Housing, Petro/Chemical, Bulk Material Handling, Tank Farms,
Refineries, LNG and Fuel Terminals, LOGCAP and Pharmaceutical Projects. I have always been the
“Site Go To” person while affiliated with EPCM Firms. Ninety five percent of the Construction
Projects I have managed or been associated with have been Lump Sum Turn Key Projects. I have over
twenty five years’ experience in construction along with operations and maintenance management. I
spent several years at the onset of my career in Quality Control which has given me an eye for detail
and the knowledge needed to recognize quality work in all disciplines. I have maintained an excellent
safety record for myself and my subordinates throughout my career. I have a current passport and I am
available for domestic or international travel. NCCER Certified Project Manager and Supervisor.
SKILLS
I Construction Manager
Managed and am currently managing all capital projects in three Lyondell/ Basell, Poly / Chemical
Plants to include all Mechanical, Civil and I&E projects. This includes preparation and evaluation of
estimates both external and internal, contract reviews, material procurement and receivables, all field
work, RFI resolution, and issuance of change orders. I am also responsible for all contractors’
adherence to site safety plan, schedules, adherence to QC procedures and adherence to all other
contract documents. We currently have over 125M in planned Capital Projects slated for 2016. Since
my arrival at Lyondell Basell we have refined the RFI system, scheduling and estimating procedures
and many other refinements to our construction processes and procedures. I have also managed testing,
commissioning and start-up on several projects, set up a Maintenance Contractor at Bigler L.P. and
have managed Capital and LSTK Projects with contract values up to 165M USD with peak manpower t
up to 1000.
II Superintendent / Site Manager
In 2014 with Cajun we completed a 25M Chemical Plant expansion in Texas City, Texas. I have
been responsible for the management of installation and testing of steel, equipment, AG and UG piping
systems which included tanks, rotating and static equipment associated with Boilers, Utilities, Fire
Protection, Ethylene, Pharmaceutical, Refinery, LNG, Nat Gas Turbines, and Polymer Projects.
Preparation of test and turnover packages, as – builts, weld maps and in charge of all Welders testing.
As General Superintendent I managed all Civil, Mechanical, Electrical and Capital and Maintenance
work associated with the construction and maintenance of an Airbase in Afghanistan which included
construction of roads, offices, living quarters, mess hall, utilities, ROPU unit and a prison. Project
contract amounts to 500M. Peak manpower at 240
III Project Manager
Completed my Contract with Contrack International in Jan. 2013 where I was serving as Project
Manager over O&M services at 130 Sites in Southern Afghanistan. We employed over 950 personnel
of which 95% were Local Nationals. I implemented a restricted overtime policy which saved Contrack
over 250 thousand USD the first month after implementation. I reorganized the method of operations
for the Afghan National Police bases where we were subcontracting and self performed the majority
thereafter which also saved the company 150 thousand dollars per month.
Served as Project Manager over all Capital Projects at Nalco Chemical Texas Operations this included
projects such as piping systems, rejuvenation of plant infrastructure to include under ground FW water
system, roads, and office renovations. Managed all construction activities associated with a Bulk Fuel
Distribution Project for Saudi Aramco in Medina Saudi Arabia. These activities included but were not
limited to all civil activities, tank erection, above and underground pipe installation, pipelines from
Bulk Storage to Distribution, all I&E installation, all pumps and truck loading stations and installation
of fire protection system, QC management and personnel management. Peak manpower at 1000.
IIII Quality Control
Served as QC Inspector for LOGCAP III Project at Camp Hammer in Iraq. Former Level II in RT,
MT, PT and UT. All hydro testing associated with several large piping projects.
Managed all QC at Pressure Vessel Manufacturing Facility and handled all QC functions at Sites as
Construction Manager for Belsco.
WORK HISTORY
2014 Construction Manager Lyondell Basell Three Plants in Bayport, Texas
2013-2014 Site Manager Cajun / IDC PVPP Expansion in Texas City, Texas
2011-2013 Project Manager Contrack International Kandahar, Afghanistan
2011-2011 Quality Control Inspector KBR Camp Victory Iraq
2009-2010 Project Manager Excel USA Freeport, Texas
2006 - 2008 Construction Manager Bigler L.P. Pasadena, Texas
2005 -2006 Construction Manager Englobal Construction Resources Houston, TX
2004 -2005 Project Manager Arabian Bemco Jeddah, Saudi Arabia
2003 -2004 General Superintendent Kellogg Brown and Root Kandahar, Afghanistan
1998 -2003 Construction Manager Belsco Services Inc. Houston, TX
1996-1998 Pipe Superintendent CCC Group Houston, TX
1991 - 1996 Maintenance Supervisor Brown and Root Industrial Svcs. Freeport, TX
1989 - 1991 Pipe Superintendent K.C.I. Freeport, TX
EDUCATION
NCCER certified Project Manager and Supervisor
Brazosport Junior College 1990-1992
Construction Management Courses, Pipe Drafting and Design, Engineering Graphics
Previously certified Level II in RT, MT, PT and UT.
COMPUTER SKILLS
Windows XP, Microsoft Word, Word Perfect, Excel and Project. Familiar with Primavera P 3 and P-6
PARTIAL PROJECT LIST
Ashland Chemical 25 M Expansion Texas City, Texas
Afghan Natl. Army O&M Services to 127 Sites Kandahar, Afghanistan
LOGCAP III Construction and QC Afghanistan and Iraq
Nalco Chemical All Capital Projects Freeport, Texas
Bigler LP Iso Butylene Refining/ Bulk Oil Dist. Pasadena, Texas
Hoffman La Roche Beta Carotene Manf. Facility Freeport, Texas
Saudi Aramco Bulk Fuel Distribution Plant Medina Saudi Arabia
U.S. Army Airbase Infrastructure Kandahar Afghanistan
TOSCO Dilute Phase Transfer/Plastics Project Freeport, Texas

More Related Content

What's hot

Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
Kenny Hagan
 
David R Gambrell Resume
David R Gambrell ResumeDavid R Gambrell Resume
David R Gambrell Resume
David Gambrell
 
Resume
ResumeResume
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
Harley San Felix
 
WILLIAM HILDING RESUME
WILLIAM HILDING RESUMEWILLIAM HILDING RESUME
WILLIAM HILDING RESUME
William Hilding
 
Champagne Jonathan final resume
Champagne Jonathan final resumeChampagne Jonathan final resume
Champagne Jonathan final resume
Jonathan Champagne
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
Gowrijayashankar S V
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
Randy Seperak
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
Mujahid Ali Akhtar
 
kshirleyresume1
kshirleyresume1kshirleyresume1
kshirleyresume1
Kris Shirley
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
Julio Manhate
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
Joey Stephenson
 
Sollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGEDSollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGED
Sollie Van Nieuwenhuizen
 
res 2
res 2res 2
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
Kevin Hill
 
Dougs resume
Dougs resumeDougs resume
Dougs resume
Douglas Mason
 
2016ResumeLC
2016ResumeLC2016ResumeLC
2016ResumeLC
Logan Cole
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
James Beam
 
The resume
The resumeThe resume
The resume
Chris Ortiz
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
saddam abas
 

What's hot (20)

Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
David R Gambrell Resume
David R Gambrell ResumeDavid R Gambrell Resume
David R Gambrell Resume
 
Resume
ResumeResume
Resume
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
WILLIAM HILDING RESUME
WILLIAM HILDING RESUMEWILLIAM HILDING RESUME
WILLIAM HILDING RESUME
 
Champagne Jonathan final resume
Champagne Jonathan final resumeChampagne Jonathan final resume
Champagne Jonathan final resume
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
kshirleyresume1
kshirleyresume1kshirleyresume1
kshirleyresume1
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Sollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGEDSollie CV 25 June 2015 (4)_CHANGED
Sollie CV 25 June 2015 (4)_CHANGED
 
res 2
res 2res 2
res 2
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
Dougs resume
Dougs resumeDougs resume
Dougs resume
 
2016ResumeLC
2016ResumeLC2016ResumeLC
2016ResumeLC
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
 
The resume
The resumeThe resume
The resume
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 

Similar to Joe Howard CV

Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015
Mike Berry
 
E profile
E profileE profile
E profile
James Martin
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
Marcel Boutin
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
Bruce Kain
 
Resume - Stephen G. Hardin 4 [14405]
Resume - Stephen G. Hardin 4 [14405]Resume - Stephen G. Hardin 4 [14405]
Resume - Stephen G. Hardin 4 [14405]
Stephen Hardin
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
Philip Kwiatkowski
 
Bruce Kain Professional CV
Bruce Kain Professional CVBruce Kain Professional CV
Bruce Kain Professional CV
Bruce Kain
 
Justin Smith resume
Justin Smith resumeJustin Smith resume
Justin Smith resume
Justin Smith
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
Jack Dickerson
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
Jason Davenport
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
Bobby Horan, CHST
 
hudgensresume2015
hudgensresume2015hudgensresume2015
hudgensresume2015
Rick Hudgens
 
Alex Salinas Updated Resume
Alex Salinas Updated ResumeAlex Salinas Updated Resume
Alex Salinas Updated Resume
alex salinas
 
Update CV
Update CVUpdate CV
Update CV
Muhammad Waseem
 
Robert W Bezner resume 1.1
Robert W Bezner resume 1.1Robert W Bezner resume 1.1
Robert W Bezner resume 1.1
Robert Bezner
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
WIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipelineWIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipeline
Mike Nave
 

Similar to Joe Howard CV (20)

Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015
 
E profile
E profileE profile
E profile
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
 
Resume - Stephen G. Hardin 4 [14405]
Resume - Stephen G. Hardin 4 [14405]Resume - Stephen G. Hardin 4 [14405]
Resume - Stephen G. Hardin 4 [14405]
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Bruce Kain Professional CV
Bruce Kain Professional CVBruce Kain Professional CV
Bruce Kain Professional CV
 
Justin Smith resume
Justin Smith resumeJustin Smith resume
Justin Smith resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
hudgensresume2015
hudgensresume2015hudgensresume2015
hudgensresume2015
 
Alex Salinas Updated Resume
Alex Salinas Updated ResumeAlex Salinas Updated Resume
Alex Salinas Updated Resume
 
Update CV
Update CVUpdate CV
Update CV
 
Robert W Bezner resume 1.1
Robert W Bezner resume 1.1Robert W Bezner resume 1.1
Robert W Bezner resume 1.1
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
WIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipelineWIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipeline
 

Joe Howard CV

  • 1. Resume of Joseph L. Howard Houston, Texas Email jlhinafghan@gmail.com 979-285-8580 OBJECTIVE I would prefer to continue my career in a challenging Construction, Project or Quality management position where my talents and experience will add value to any Organization. I thrive in adverse conditions, remote locations and difficult situations and enjoy any and all challenges associated with same. SUMMARY A diversified background describes my many attributes. This includes grass roots construction of complete Infrastructures, Offices and Housing, Petro/Chemical, Bulk Material Handling, Tank Farms, Refineries, LNG and Fuel Terminals, LOGCAP and Pharmaceutical Projects. I have always been the “Site Go To” person while affiliated with EPCM Firms. Ninety five percent of the Construction Projects I have managed or been associated with have been Lump Sum Turn Key Projects. I have over twenty five years’ experience in construction along with operations and maintenance management. I spent several years at the onset of my career in Quality Control which has given me an eye for detail and the knowledge needed to recognize quality work in all disciplines. I have maintained an excellent safety record for myself and my subordinates throughout my career. I have a current passport and I am available for domestic or international travel. NCCER Certified Project Manager and Supervisor. SKILLS I Construction Manager Managed and am currently managing all capital projects in three Lyondell/ Basell, Poly / Chemical Plants to include all Mechanical, Civil and I&E projects. This includes preparation and evaluation of estimates both external and internal, contract reviews, material procurement and receivables, all field work, RFI resolution, and issuance of change orders. I am also responsible for all contractors’ adherence to site safety plan, schedules, adherence to QC procedures and adherence to all other contract documents. We currently have over 125M in planned Capital Projects slated for 2016. Since my arrival at Lyondell Basell we have refined the RFI system, scheduling and estimating procedures and many other refinements to our construction processes and procedures. I have also managed testing, commissioning and start-up on several projects, set up a Maintenance Contractor at Bigler L.P. and have managed Capital and LSTK Projects with contract values up to 165M USD with peak manpower t up to 1000. II Superintendent / Site Manager In 2014 with Cajun we completed a 25M Chemical Plant expansion in Texas City, Texas. I have been responsible for the management of installation and testing of steel, equipment, AG and UG piping systems which included tanks, rotating and static equipment associated with Boilers, Utilities, Fire Protection, Ethylene, Pharmaceutical, Refinery, LNG, Nat Gas Turbines, and Polymer Projects. Preparation of test and turnover packages, as – builts, weld maps and in charge of all Welders testing. As General Superintendent I managed all Civil, Mechanical, Electrical and Capital and Maintenance work associated with the construction and maintenance of an Airbase in Afghanistan which included construction of roads, offices, living quarters, mess hall, utilities, ROPU unit and a prison. Project contract amounts to 500M. Peak manpower at 240 III Project Manager Completed my Contract with Contrack International in Jan. 2013 where I was serving as Project Manager over O&M services at 130 Sites in Southern Afghanistan. We employed over 950 personnel of which 95% were Local Nationals. I implemented a restricted overtime policy which saved Contrack over 250 thousand USD the first month after implementation. I reorganized the method of operations for the Afghan National Police bases where we were subcontracting and self performed the majority
  • 2. thereafter which also saved the company 150 thousand dollars per month. Served as Project Manager over all Capital Projects at Nalco Chemical Texas Operations this included projects such as piping systems, rejuvenation of plant infrastructure to include under ground FW water system, roads, and office renovations. Managed all construction activities associated with a Bulk Fuel Distribution Project for Saudi Aramco in Medina Saudi Arabia. These activities included but were not limited to all civil activities, tank erection, above and underground pipe installation, pipelines from Bulk Storage to Distribution, all I&E installation, all pumps and truck loading stations and installation of fire protection system, QC management and personnel management. Peak manpower at 1000. IIII Quality Control Served as QC Inspector for LOGCAP III Project at Camp Hammer in Iraq. Former Level II in RT, MT, PT and UT. All hydro testing associated with several large piping projects. Managed all QC at Pressure Vessel Manufacturing Facility and handled all QC functions at Sites as Construction Manager for Belsco. WORK HISTORY 2014 Construction Manager Lyondell Basell Three Plants in Bayport, Texas 2013-2014 Site Manager Cajun / IDC PVPP Expansion in Texas City, Texas 2011-2013 Project Manager Contrack International Kandahar, Afghanistan 2011-2011 Quality Control Inspector KBR Camp Victory Iraq 2009-2010 Project Manager Excel USA Freeport, Texas 2006 - 2008 Construction Manager Bigler L.P. Pasadena, Texas 2005 -2006 Construction Manager Englobal Construction Resources Houston, TX 2004 -2005 Project Manager Arabian Bemco Jeddah, Saudi Arabia 2003 -2004 General Superintendent Kellogg Brown and Root Kandahar, Afghanistan 1998 -2003 Construction Manager Belsco Services Inc. Houston, TX 1996-1998 Pipe Superintendent CCC Group Houston, TX 1991 - 1996 Maintenance Supervisor Brown and Root Industrial Svcs. Freeport, TX 1989 - 1991 Pipe Superintendent K.C.I. Freeport, TX EDUCATION NCCER certified Project Manager and Supervisor Brazosport Junior College 1990-1992 Construction Management Courses, Pipe Drafting and Design, Engineering Graphics Previously certified Level II in RT, MT, PT and UT. COMPUTER SKILLS Windows XP, Microsoft Word, Word Perfect, Excel and Project. Familiar with Primavera P 3 and P-6 PARTIAL PROJECT LIST Ashland Chemical 25 M Expansion Texas City, Texas Afghan Natl. Army O&M Services to 127 Sites Kandahar, Afghanistan LOGCAP III Construction and QC Afghanistan and Iraq Nalco Chemical All Capital Projects Freeport, Texas Bigler LP Iso Butylene Refining/ Bulk Oil Dist. Pasadena, Texas Hoffman La Roche Beta Carotene Manf. Facility Freeport, Texas Saudi Aramco Bulk Fuel Distribution Plant Medina Saudi Arabia U.S. Army Airbase Infrastructure Kandahar Afghanistan TOSCO Dilute Phase Transfer/Plastics Project Freeport, Texas