JIM DIXON                                                                                             One Northlake Road
MANUFACTURING & SUPPLY CHAIN EXECUTIVE                                                                Columbia, SC 29223
Delivering best-in-class performance in key supply chain imperatives                                   803-381-1572
                                                                                                       Jim@DixonMcRae.com
  EXECUTIVE PROFILE

                                Dynamic and inspirational executive with more than 20 years of diverse experience in
 Areas of                       complex highly regulated industries, a “Big Pharma” and Energy background, and a
 Expertise                      strong “hybrid” skill-set encompassing leadership in large and mid-size companies of fiscal,
                                general, supply chain, and operations. Highly regarded by business partners, clients, and
                                executive teams as a high integrity, energetic leader known for ability to envision and create
 Executive Leadership,          successful outcomes.
 Coaching and Mentoring
                                Successful leadership of strategic growth and supply chain transformation.
 Vision, Strategy               Consistent success maximizing performance, driving growth, improving profits and
 and Execution                  supporting customers in more than 140 global markets. Provided key leadership through
                                three corporate mergers delivering significant cost savings, productivity and performance
 Cost Reductions with Quality   improvements. Developed supply chain vision and growth strategy targeting $27 billion
 Improvement                    revenue increase within ten years. Identified global supply chain synergies across three
                                business units delivering $1.1 billion savings through procurement and logistics initiatives.
 Merger Consolidations and
 Integrations
                                Effective and wholly accountable in high-profile executive roles.
                                Delivering inspirational leadership and strategy development to drive change management
 Business and Strategic         and improvements in communications, strategic execution, leadership development,
 Planning and Execution         corporate governance, risk management, and procedural compliance. Specializing in Supply
                                Chain management.
 Crisis and Turnaround
 Management
                                Visionary thinker with global perspective and entrepreneurial drive.
 Knowledge Management           Key contributor to enterprise level planning and decision-making. Delivered $350 million
                                savings through a logistics strategy rollout associated with order consolidation, distribution
 Best-in-Class Benchmarking     center rationalization, freight consolidation, outsourcing, tax savings, process and efficiency
                                improvements.
 Operational and Financial
 Risk Management                Strong supply chain and operations orientations in complex regulated markets.
                                Participate in high-level and complex operational initiatives improving product
 Reengineering                  development and quality, manufacturing design, customer-supplier collaboration, regulatory
 and Transformation             and compliance audits, infrastructure design and business unit reorganization. Mitigated
                                supply chain risk through risk management, business continuity planning and global trade
                                compliance.
 Continuous Improvement
                                Success streamlining operations, maximizing productivity and delivering value.
 Capitalization Strategy        Rationalized logistics networks during merger and reengineered people, process and system
                                enablement resulting in a 50% reduction in operating budget. Spearheaded distribution
 Staff Development and
 Turnover Reduction             rationalization strategy resulting in reduction of eight-distribution center network to two.
                                Increased customer on time delivery from 95 to 99% utilizing vendor managed inventory
 Enterprise Systems             strategies and improved inventory accuracy to 99.998% by deploying a warehouse
 Implementation                 management system and incorporating RFID and bar coding into the product line.

                                Experience leading and implementing advanced technology initiatives.
                                Identified, designed and led technology implementations improving process capability and
                                efficiency. Successfully implemented technologies and systems including SAP, I2
                                production planning, Manugistics CPFR, DRP planning, sales and operations planning,
                                warehouse management and shop floor execution systems.

                                Track record for building and transforming high-performance teams.
                                Attract, motivate and retain key talent. Transformed a tactically driven, underachieving
                                group into a highly motivated global team exceeding organizational objectives.
CHRONOLOGY

Oliver Wight America’s, Inc.
Principal Management Consultant                      Columbia, SC                               May 2011 to Present

    •   Consultant, educator and business coach providing companies with guidance in the development of global Sales and
        Operations Planning / Integrated Business Planning processes.

Dixon McRae, Inc.
Managing Director and President                      Columbia, SC                               May 2010 to Present

    •   Conducted assessment,gathered requirements and recommended solutions for U.S. Airforce supply chain task force
        on best in class performance metrics.
    •   Technical adviser to U.S.C for President Obama’s Council on global manufacturing competitiveness
    •   Technical adviser for U.S. Department of Commerce on Small Modular Nuclear Reactors

WESTINGHOUSE ELECTRIC COMPANY                           Columbia, SC                                               2006 -
2010

Vice-President, Global Supply Chain Management                                                      2008 to April 2010
Director, Global Supply and Demand Management                                                            2006 to 2008

Lead global supply chain organization of 40 professional and 200 indirect reports across global operations including Global
Sales and Operations Planning, Supply & Demand Planning, Strategic Sourcing & Procurement, Supplier Quality,
Warehousing and Logistics, Package Engineering and Development.

    •   Established global supply chain organization and infrastructure for the Nuclear Fuel Division in preparation of 10x
        volume growth driven by the nuclear renaissance.
    •   Developed an integrated supply chain strategy as part of nuclear value stream including customer, channel,
        manufacturing, sourcing, asset management, and transportation strategies to grow global markets.
    •   Jointly developed business and organization model to understand business drivers and align the organization from
        strategy development to execution and delivery of the business plan.
    •   Managed package development, regulatory and licensing activities across $150 million capital plan over 5 year plan.
    •   Co-developed transformation strategy to deliver $1 billion in savings through procurement and logistics synergies by
        merging 3 supply chain organizations into one. Led Asia Supply Chain integration activities with NFI acquisition.
    •   Established customer, financial, internal process, information technology, human capital roadmaps designed to build
        a robust infrastructure capable of delivering business plan goals. Implemented SAP in Europe & U.S. regions.
    •   Managed significant cultural and change management hurdles through quick wins and building credibility with key
        business partners. Improved business planning process to include make vs. buy and supply network optimization.
    •   Developed and managed global sales and operations planning process encompassing a 5 and 30 year planning
        horizon ensuring efficient management of sales, financials, inventory, capital and supply capability. Established
        global S&OP process, education, organization and implemented an Enterprise S&OP software tool within 60 days.
    •   Created five-year plan to deliver 30 percent inventory savings and 20 percent reduction in procurement spend. First
        2 years savings targets have been exceeded.

GLAXOSMITHKLINE PHARMACEUTICALS                               Research Triangle Park, NC                    2001 to 2006

Senior Director, Distribution and Import/Export Services

Senior supply chain position with responsibility for distribution, warehousing, transportation, trade compliance and
import/export functions supporting samples, promotional, clinical materials and trade product to the U.S. market with
revenues of $21 billion servicing over 10,000 sales representatives. Supported diverse customer base including wholesalers,
physicians, clinics and government agencies. Identified as a key talent performer for six consecutive years.

    •   Built support for a $90 million tax savings through a tax-free-zone distribution company design for end customers.
    •   Secured $13 million distribution savings by selling direct distribution strategy benefits to commercial management.
        Sell and distribute direct to hospital’s / HMO’s vaccine / cold chain line of products.
    •   Transformed a tactically driven and underachieving work group into a dynamic high performing team of which 80
percent have key talent designations.
    •      Designed a proprietary strategic planning process that launched an aggressive and comprehensive strategic analysis
           resulting in process re-engineering initiatives that significantly improved customer service, productivity, and quality
           scores as evidenced through customer surveys and more than 20 annual compliance audits.
    •      Spearheaded distribution rationalization strategy resulting in reduction of eight distribution center network to two.
           Increased customer on time delivery improvements from 95 to 99% utilizing vendor managed inventory strategies.
    •      Re-engineered logistics processes utilizing lean sigma tools that decreased order to cash cycle time by more than 100
           percent. Identified and implemented best practices in the commercial and global logistics organizations through
           benchmarking, knowledge management, and strategic planning.
    •      Led successful integration of GlaxoWellcome and SmithKlineBeecham U.S. distribution networks during merger,
           yielding a $350 million savings while achieving a 49 percent budget reduction.
    •      Convinced senior management to outsource transportation and warehouse operations to 3PL providers and
           implement a comprehensive logistics strategy resulting in 3x reduction in cost and service level improvement.
    •      Transformed warehouse management system for physical distribution department by becoming a state-of-the-art
           paperless system via radio frequency identification tags, barcoding, scanning with real time pick, pack and ship
           information. Initiative improved operational efficiencies by 50 percent and increased throughput by 80 percent.


GLAXOWELLCOME PHARMACEUTICALS Inc.                                          Research Triangle Park, NC                  1996 to
2001

Group Director, Demand Management and Import/Export Services North America                                       1999 to 2001
Director, Strategic Planning, Sourcing, and Business Reporting North America                                              1998
to 1999
Manager, Logistics                                                                                               1996 to 1998

Managed the supply chain for new and existing products in intensely competitive national and global markets for a multi-
billion dollar pharmaceutical enterprise. Hired, motivated and led professional teams in this key supply chain role which
utilized U.S. supply capabilities to plan, source, make and deliver products to key international markets.

   •      Directed start-up of a North American business unit responsible for supply chain functions supporting more than $10
          billion in sales in 140 international markets.
   •      Reduced finished goods inventory by $1.1b from 8 to 5 weeks of supply.
   •      Directed the introduction of 15 major products into 40 countries utilizing domestic and foreign supply sites.
   •      Spearheaded global team charged with developing and implementing supply chain performance metrics and a
          balanced scorecard management system benchmarking 55 sites against industry best practices.
   •      Managed the coordination of all outsourced manufacturing, to ensure seamless connectivity to core operations
          initiatives with both a service effectiveness and a profit efficient mindset.
   •      Created and implemented strategic master plan for U.S. distribution encompassing network rationalization, customer
          satisfaction, competitive benchmarking analysis and capital and resource planning delivering a $15 million savings.

BURROUGHS WELLCOME PHARMACEUTICALS                                        Greenville, NC                       1985 to 1995

Manager, Solid Dose Manufacturing Operations                                                                    1995 to 1996
Section Head, Production, Planning and Control                                                                   1990 to 1995
Operations Research Analyst                                                                                     1985 to 1988

   •      Managed production planning and control operations in solid dosage manufacturing and packaging department
          supporting 255 personnel, $182 million in assets, and annual sales of $1.2 billion.
   •      Managed operational functions including production, quality, training and safety.
   •      Achieved $1.8 million yield improvements, improved customer service levels from 96% to 99.1% and lowered
          production costs by 20 percent.
   •      Managed the supply of bulk chemicals into the solid dose manufacturing operation. The chemical division produced
          over 30 intermediates and final bulk chemicals through batch processing.
   •      Designed and implemented the industry’s first advanced planning and scheduling system reducing schedule time from
          three days to one minute while improving changeover time by 50 percent and throughput efficiencies by 30 percent.


EDUCATION
Bachelor of Science, Industrial Technology
1987
East Carolina University, Greenville, NC

Jimmy Dixon Sept2011

  • 1.
    JIM DIXON One Northlake Road MANUFACTURING & SUPPLY CHAIN EXECUTIVE Columbia, SC 29223 Delivering best-in-class performance in key supply chain imperatives 803-381-1572 Jim@DixonMcRae.com EXECUTIVE PROFILE Dynamic and inspirational executive with more than 20 years of diverse experience in Areas of complex highly regulated industries, a “Big Pharma” and Energy background, and a Expertise strong “hybrid” skill-set encompassing leadership in large and mid-size companies of fiscal, general, supply chain, and operations. Highly regarded by business partners, clients, and executive teams as a high integrity, energetic leader known for ability to envision and create Executive Leadership, successful outcomes. Coaching and Mentoring Successful leadership of strategic growth and supply chain transformation. Vision, Strategy Consistent success maximizing performance, driving growth, improving profits and and Execution supporting customers in more than 140 global markets. Provided key leadership through three corporate mergers delivering significant cost savings, productivity and performance Cost Reductions with Quality improvements. Developed supply chain vision and growth strategy targeting $27 billion Improvement revenue increase within ten years. Identified global supply chain synergies across three business units delivering $1.1 billion savings through procurement and logistics initiatives. Merger Consolidations and Integrations Effective and wholly accountable in high-profile executive roles. Delivering inspirational leadership and strategy development to drive change management Business and Strategic and improvements in communications, strategic execution, leadership development, Planning and Execution corporate governance, risk management, and procedural compliance. Specializing in Supply Chain management. Crisis and Turnaround Management Visionary thinker with global perspective and entrepreneurial drive. Knowledge Management Key contributor to enterprise level planning and decision-making. Delivered $350 million savings through a logistics strategy rollout associated with order consolidation, distribution Best-in-Class Benchmarking center rationalization, freight consolidation, outsourcing, tax savings, process and efficiency improvements. Operational and Financial Risk Management Strong supply chain and operations orientations in complex regulated markets. Participate in high-level and complex operational initiatives improving product Reengineering development and quality, manufacturing design, customer-supplier collaboration, regulatory and Transformation and compliance audits, infrastructure design and business unit reorganization. Mitigated supply chain risk through risk management, business continuity planning and global trade compliance. Continuous Improvement Success streamlining operations, maximizing productivity and delivering value. Capitalization Strategy Rationalized logistics networks during merger and reengineered people, process and system enablement resulting in a 50% reduction in operating budget. Spearheaded distribution Staff Development and Turnover Reduction rationalization strategy resulting in reduction of eight-distribution center network to two. Increased customer on time delivery from 95 to 99% utilizing vendor managed inventory Enterprise Systems strategies and improved inventory accuracy to 99.998% by deploying a warehouse Implementation management system and incorporating RFID and bar coding into the product line. Experience leading and implementing advanced technology initiatives. Identified, designed and led technology implementations improving process capability and efficiency. Successfully implemented technologies and systems including SAP, I2 production planning, Manugistics CPFR, DRP planning, sales and operations planning, warehouse management and shop floor execution systems. Track record for building and transforming high-performance teams. Attract, motivate and retain key talent. Transformed a tactically driven, underachieving group into a highly motivated global team exceeding organizational objectives.
  • 2.
    CHRONOLOGY Oliver Wight America’s,Inc. Principal Management Consultant Columbia, SC May 2011 to Present • Consultant, educator and business coach providing companies with guidance in the development of global Sales and Operations Planning / Integrated Business Planning processes. Dixon McRae, Inc. Managing Director and President Columbia, SC May 2010 to Present • Conducted assessment,gathered requirements and recommended solutions for U.S. Airforce supply chain task force on best in class performance metrics. • Technical adviser to U.S.C for President Obama’s Council on global manufacturing competitiveness • Technical adviser for U.S. Department of Commerce on Small Modular Nuclear Reactors WESTINGHOUSE ELECTRIC COMPANY Columbia, SC 2006 - 2010 Vice-President, Global Supply Chain Management 2008 to April 2010 Director, Global Supply and Demand Management 2006 to 2008 Lead global supply chain organization of 40 professional and 200 indirect reports across global operations including Global Sales and Operations Planning, Supply & Demand Planning, Strategic Sourcing & Procurement, Supplier Quality, Warehousing and Logistics, Package Engineering and Development. • Established global supply chain organization and infrastructure for the Nuclear Fuel Division in preparation of 10x volume growth driven by the nuclear renaissance. • Developed an integrated supply chain strategy as part of nuclear value stream including customer, channel, manufacturing, sourcing, asset management, and transportation strategies to grow global markets. • Jointly developed business and organization model to understand business drivers and align the organization from strategy development to execution and delivery of the business plan. • Managed package development, regulatory and licensing activities across $150 million capital plan over 5 year plan. • Co-developed transformation strategy to deliver $1 billion in savings through procurement and logistics synergies by merging 3 supply chain organizations into one. Led Asia Supply Chain integration activities with NFI acquisition. • Established customer, financial, internal process, information technology, human capital roadmaps designed to build a robust infrastructure capable of delivering business plan goals. Implemented SAP in Europe & U.S. regions. • Managed significant cultural and change management hurdles through quick wins and building credibility with key business partners. Improved business planning process to include make vs. buy and supply network optimization. • Developed and managed global sales and operations planning process encompassing a 5 and 30 year planning horizon ensuring efficient management of sales, financials, inventory, capital and supply capability. Established global S&OP process, education, organization and implemented an Enterprise S&OP software tool within 60 days. • Created five-year plan to deliver 30 percent inventory savings and 20 percent reduction in procurement spend. First 2 years savings targets have been exceeded. GLAXOSMITHKLINE PHARMACEUTICALS Research Triangle Park, NC 2001 to 2006 Senior Director, Distribution and Import/Export Services Senior supply chain position with responsibility for distribution, warehousing, transportation, trade compliance and import/export functions supporting samples, promotional, clinical materials and trade product to the U.S. market with revenues of $21 billion servicing over 10,000 sales representatives. Supported diverse customer base including wholesalers, physicians, clinics and government agencies. Identified as a key talent performer for six consecutive years. • Built support for a $90 million tax savings through a tax-free-zone distribution company design for end customers. • Secured $13 million distribution savings by selling direct distribution strategy benefits to commercial management. Sell and distribute direct to hospital’s / HMO’s vaccine / cold chain line of products. • Transformed a tactically driven and underachieving work group into a dynamic high performing team of which 80
  • 3.
    percent have keytalent designations. • Designed a proprietary strategic planning process that launched an aggressive and comprehensive strategic analysis resulting in process re-engineering initiatives that significantly improved customer service, productivity, and quality scores as evidenced through customer surveys and more than 20 annual compliance audits. • Spearheaded distribution rationalization strategy resulting in reduction of eight distribution center network to two. Increased customer on time delivery improvements from 95 to 99% utilizing vendor managed inventory strategies. • Re-engineered logistics processes utilizing lean sigma tools that decreased order to cash cycle time by more than 100 percent. Identified and implemented best practices in the commercial and global logistics organizations through benchmarking, knowledge management, and strategic planning. • Led successful integration of GlaxoWellcome and SmithKlineBeecham U.S. distribution networks during merger, yielding a $350 million savings while achieving a 49 percent budget reduction. • Convinced senior management to outsource transportation and warehouse operations to 3PL providers and implement a comprehensive logistics strategy resulting in 3x reduction in cost and service level improvement. • Transformed warehouse management system for physical distribution department by becoming a state-of-the-art paperless system via radio frequency identification tags, barcoding, scanning with real time pick, pack and ship information. Initiative improved operational efficiencies by 50 percent and increased throughput by 80 percent. GLAXOWELLCOME PHARMACEUTICALS Inc. Research Triangle Park, NC 1996 to 2001 Group Director, Demand Management and Import/Export Services North America 1999 to 2001 Director, Strategic Planning, Sourcing, and Business Reporting North America 1998 to 1999 Manager, Logistics 1996 to 1998 Managed the supply chain for new and existing products in intensely competitive national and global markets for a multi- billion dollar pharmaceutical enterprise. Hired, motivated and led professional teams in this key supply chain role which utilized U.S. supply capabilities to plan, source, make and deliver products to key international markets. • Directed start-up of a North American business unit responsible for supply chain functions supporting more than $10 billion in sales in 140 international markets. • Reduced finished goods inventory by $1.1b from 8 to 5 weeks of supply. • Directed the introduction of 15 major products into 40 countries utilizing domestic and foreign supply sites. • Spearheaded global team charged with developing and implementing supply chain performance metrics and a balanced scorecard management system benchmarking 55 sites against industry best practices. • Managed the coordination of all outsourced manufacturing, to ensure seamless connectivity to core operations initiatives with both a service effectiveness and a profit efficient mindset. • Created and implemented strategic master plan for U.S. distribution encompassing network rationalization, customer satisfaction, competitive benchmarking analysis and capital and resource planning delivering a $15 million savings. BURROUGHS WELLCOME PHARMACEUTICALS Greenville, NC 1985 to 1995 Manager, Solid Dose Manufacturing Operations 1995 to 1996 Section Head, Production, Planning and Control 1990 to 1995 Operations Research Analyst 1985 to 1988 • Managed production planning and control operations in solid dosage manufacturing and packaging department supporting 255 personnel, $182 million in assets, and annual sales of $1.2 billion. • Managed operational functions including production, quality, training and safety. • Achieved $1.8 million yield improvements, improved customer service levels from 96% to 99.1% and lowered production costs by 20 percent. • Managed the supply of bulk chemicals into the solid dose manufacturing operation. The chemical division produced over 30 intermediates and final bulk chemicals through batch processing. • Designed and implemented the industry’s first advanced planning and scheduling system reducing schedule time from three days to one minute while improving changeover time by 50 percent and throughput efficiencies by 30 percent. EDUCATION
  • 4.
    Bachelor of Science,Industrial Technology 1987 East Carolina University, Greenville, NC