Company Values Guide
JEC Thailand to Excellence
核心價值引領
泰國怡和機器獲取卓越成就
Wilson Kwong
鄺永銓
CEO's Message
行政總裁的話
P.02
Feature Story
特寫
P.04
Company Values Guide
JEC Thailand to Excellence
核心價值引領
泰國怡和機器獲取卓越成就
News
簡訊
P.09
JEC Participated in the Build4Asia 2016
Showcasing Sustainable Engineering
Solutions
怡和機器參與Build4Asia 2016展示可持續工
程解決方案
Launch of JEC's Vision Mission and Values
怡和機器啟動全新願景、使命和核心價值
JEC Strengthens Water Business with the
Award of Putatan Water Treatment Plant 2
Project
怡和機器獲得Putatan食水處理廠二期工程
合約  水務處理業務日益鞏固
JEC Provides Electrical and MVAC Systems
to Greenhill Villa in Shatin
怡和機器為沙田綠怡雅苑提供電氣與機械通
風及空調系統
JEC Awarded Significant Contracts from
The University of Hong Kong and MTR
Corporation
怡和機器獲香港大學及港鐵公司的重要合約
JEC Singapore's Technical Competent
Recognised in the Commercial and
Hospitality Sectors
新加坡怡和機器的專業技術獲商業及旅遊款
待業認可
Jardine Distribution, Inc. Acquires Exclusive
Rights to Provide Termite Treatment for
CitiHomes
JDI獨家代理CitiHomes滅白蟻服務
P.04
CEO'S
MESSAGE
行 政 總 裁 的 話
Our new Vision Mission and Values (VMV) initiative is designed to capture all that makes
JEC service delivery exceptional. This issue of JEC Magazine takes a close-up look at JEC
Thailand through the lens of our four T.E.A.M. values to better understand what we’re doing
right, and how to maintain excellence in engineering and customer service.
The last few months have seen a number of outstanding contract successes around the region.
In the Philippines, our growing strength in water and wastewater treatment has seen JEC
tasked with the complete design, construction, testing, and commissioning of a new facility that
will produce 100 million litres of potable water per day, as well as operation of the plant for at
least a year following, in western Metro Manila.
JEC Singapore is appointed to provide engineering and building services at Keppel Towers,
and will deliver addition and alteration works and install an MVAC system at the Grand Park
City Hall Hotel.
Meanwhile, JEC Hong Kong has secured contracts with the Hong Kong Housing Society to
provide Electrical and MVAC Systems to subsidised sale flats in Shatin, to upgrade the building
management system across the main campus of the University of Hong Kong, and MTR
Corporation, to replace chillers at Wanchai MTR station.
You can also learn about JEC’s participation in the biennial Build4Asia show, in Hong Kong,
where the distinctive JEC booth presented some of our leading engineering solutions.
Finally, I’d like to commend Tsang Tak Yin and Tsang Tak Keung, brothers in our Maintenance
and Renovation department, who have between them an amazing nine decades of service with
JEC, with both still proudly delivering unrivalled engineering solutions to our customers. Read
their story inside.
Have a wonderful summer.
我們啟動的全新願景、使命和核心價值,包含所有促使怡和機器服務別樹一幟的元素。今期內
容會從T.E.A.M.四大核心價值出發,細究泰國怡和機器的發展,讓讀者了解我們的成功之道,以
及如何在工程和客戶服務方面維持優秀表現。
近幾個月來,我們在區內獲得不少重大的合約。在菲律賓,怡和機器將負責設計、興建、測試
及調試一座新的食水處理設施。新設施位於馬尼拉西部,每日可生產1億公升食水,落成後會由
怡和機器負責營運最少一年。這個項目反映我們在當地有關水務處理的業務愈見優勢。
在新加坡,怡和機器獲指定為吉寶中心的機電工程及屋宇裝備工程服務供應商。另外亦會為君
樂皇府酒店進行加建及改建工程,並安裝機械通風及空調系統。
與此同時,怡和機器在香港也獲得數份重要合約,包括為香港房屋協會位於沙田的資助出售房
屋提供電氣和機械通風及空調系統;為香港大學本部校園的樓宇管理系統進行升級工程,以及
為港鐵公司更換灣仔站的制冷機組。
上個月怡和機器參與了兩年一度的Build4Asia展覽,展示了不少與時並進的工程方案。相關消息
亦載於本刊內。
最後,我想推介曾德賢與曾德強的故事。曾氏兄弟在怡和機器的保養及維修部合共服務了長達
九十年,現時仍致力為客戶提供優質的工程方案,實在令人敬佩。
願大家度過一個美好的夏天。
CONTENTS
JEC MAGAZINE ISSUE 35
目錄
E&MC Crowned DSD's Best Construction
Sites Housekeeping Award 2015
機電合約工程部獲渠務署頒發2015年「最佳
工地整潔獎」
JEC Participated in the 3rd Cross-Strait
Forum on Smart Rail Development
怡和機器參與第三屆「兩岸四地智能軌道交
通發展論壇」
JEC Spring Dinner 2016
2016年度怡和機器周年晚宴
Environmental, Health & Safety
環境、健康與安全
P.16
SMART Initiative for Workplace Safety
SMART計劃─提倡職業安全
Personality
人物故事
P.18
Nine Decades of Dedication in JEC
Brothers Tsang Tak Yin and Tsang Tak
Keung Exemplify 'Alliance'
共獻怡和機器九十年
曾氏兄弟  同心同德的寫照
Training & Development
培訓及發展
P.20
Cultivate the Next Generation, Engineer a
Better Asia
培育未來專才  建設美好亞洲
Community Care
關懷社區
P.22
JEC Caring Team Embarks on Sky-high
Journey with Children
怡和機器愛心大使與小朋友踏上天際之旅
JEC Participants Conquered "Walk Up
Jardine House 2016" to Raise Funds for
MINDSET
2016年度「齊步上怡廈」圓滿結束
成功為「思健」籌款
Product Solutions
產品方案
P.23
Bionomic Industries - Water Scrubber
System
水劑滌氣系統
Major Contracts Listing
工程合約
P.25
JEC Participated in the Build4Asia
2016 Showcasing Sustainable
Engineering Solutions
怡和機器參與Build4Asia 2016展示可
持續工程解決方案
P.09
SMART Initiative for Workplace
Safety
SMART計劃─提倡職業安全
P.16
Nine Decades of Dedication in
JEC
Brothers Tsang Tak Yin and Tsang
Tak Keung Exemplify 'Alliance'
共獻怡和機器九十年			
曾氏兄弟  同心同德的寫照
P.18
JEC Caring Team Embarks on
Sky-high Journey with Children
怡和機器愛心大使與小朋友踏上天際之旅
P.22
FEATURE STORY
JEC MAGAZINE ISSUE 35
特寫
J
EC Thailand has come a long way since the
1930s, when the Hong Kong–based Jardine
Matheson Group established an operation in
the kingdom – making it one of the most venerable
parts of the JEC family. As Thailand's economy and
built environment have grown and matured, especially
in Bangkok, one of Asia's five largest cities, JEC
operations in Thailand have also grown significantly to
meet local needs.
泰
國怡和機器於1930年代由總部設於
香港的怡和集團成立,自此成為怡
和機器的重要成員。隨着泰國,特
別是曼谷的經濟
及建築環境日趨
成熟,怡和機器
亦大力擴張泰國
的業務,以滿足
當地需求。
For more than 50 years, JEC Thailand and its forerunners have placed
a special focus on services and contracting solutions – installing and
maintaining the air-conditioning, security, communications and fire
systems of major projects, from shopping malls to airports.
JEC Thailand understands that success in this field requires more than
a high degree of technical competence. To secure fruitful and long-
lasting relationships with customers, it is necessary to win their trust and
confidence. Often this takes time, with smaller initial projects serving as
a testbed to demonstrate service levels, and for the parties to discover
one another. Always important in convincing prospects to consider JEC
is reputable professional certification, while a recommendation by a
customer's trusted partner or peer goes a long way too. Another valuable
過去50多年來,泰國怡和機器都以大型項目為服務重
點,為商場以至機場等不同項目安裝及保養空調、保
安、通訊及消防系統。
泰國怡和機器明白,要在上述領域取得成就,不能單靠
出色技術,要與客戶保持長遠互惠的關係,就必須贏得
他們的信任與信心。透過較小型的項目展示服務水準,
並了解對方的需要漸漸建立互信。昭著的信譽和專業保
證同樣重要,要獲得客戶信任的合作夥伴或同業推薦,
亦非一時三刻的事。另一個重要的方式是提供高質素的
項目評估和技術建議,這方面泰國怡和機器一直表現出
色。
Company Values Guide
JEC Thailand to Excellence
核心價值引領
泰國怡和機器獲取卓越成就
approach, at which JEC Thailand has long excelled, is the provision
of such a high quality of analysis of a project or situation, or technical
proposal, that JEC's capability simply shines through.
This effort is embodied in the set of values that everyone at JEC knows
as T.E.A.M. – Technical Proficiency (T), Empowered Workforce (E),
Alliance (A), Masterful Customer Service (M).
這些理念貫徹了怡和機器的核心價值T.E.A.M.:技
術精湛 (Technical Proficiency)、具備實力的員工
(Empowered Workforce)、同心同德 (Alliance) 及卓越
的客戶服務 (Masterful Customer Service)。

In the ME business that is the backbone of JEC Thailand's offering, it is
often the test and commission phase that most clearly distinguishes the
most technically able providers such as JEC in the industry.
This was seen in the acclaimed installation of the world's first and largest
radiant floor cooling system at Bangkok's Suvarnabhumi Airport, which
cleverly maintains comfortable levels of temperature, humidity and air
freshness in an air layer across 38 hectares of occupied floor area,
but only up to just above everyone's heads, minimising both costs and
environmental impact in these cavernous buildings. JEC Thailand is now
recognised as a leader in this field.
Among the hundreds of creative technical endeavours that JEC Thailand
has been involved with, a notable current project is the MRT Blue
Line Extension Project at two metro stations, Wat Mangkon and Wang
Burapha, in central Bangkok, for which, in 2014, JEC Thailand was
awarded the sub-contract to supply, install, test and commission the
environmental control systems.
JEC Thailand led the way in preparing
combined working drawings showing
detailed installation requirements
and accurate information to facilitate
cooperation among all involved
parties, and provided professional
project management such as
scheduling, procurement planning,
safety management, leveraging both
its technical excellence and good
relationships with main contractor
and project consultants.
機電工程業務是泰國怡和機器的重心;工程的測試和
調試階段最能分辨服務供應商的技術高低,像怡和機
器這樣的業內龍頭往往突圍而出。
例 如 , 泰 國 怡 和 機 器 為 曼 谷 蘇 凡 納 布 機 場
(Suvarnabhumi Airport) 安裝的全球首個並最大的地板
輻射供冷系統,能為機場內38公頃樓面維持舒適的溫
度、濕度及供應清新空氣,其效果更巧妙地止於頭頂
上方位置,既降低這些大型建築的營運開支,亦減少
其對環境的影響。現時這項技術以泰國怡和機器的最
為先進。
泰國怡和機器曾參與數百個創新工程項目,近年以曼
谷地鐵 (MRT) 藍線的延伸項目最值得關注。2014年,
泰國怡和機器贏得分判合約,為位處曼谷中部的龍蓮
寺 (Wat Mangkon) 站及翁布拉帕 (Wang Burapha) 站
供應、安裝、測試和調試環境控
制系統。
整合施工圖則也是泰國怡和機器
的領先範疇。清晰的安裝要求和
準確的資料,能方便各施工單位
合作,而專業的項目管理如編排
工序、採購策劃和安全管理,則
能在發揮技術優勢的同時,與總
承建商和工程顧問保持良好關
係。
Technical Proficiency
技術精湛
♦  Providing valuable technical advice to customers
♦  Driving towards excellence
♦ Resolving issues effectively and efficiently with latest
technologies / techniques
•  為客戶提供重要的技術建議
•  精益求精
• 以最新的科技 / 技術,有效並適時地解決問題
特寫
FEATURE STORY
0
JEC MAGAZINE ISSUE 35
特寫
FEATURE STORY
0
JEC MAGAZINE ISSUE 35
特寫
0
JEC MAGAZINE ISSUE 3
要維持泰國怡和機器的技術優勢,並以此取信於
客戶,就必須獲得廣被認受的專業認證。對一眾
高效能屋宇裝備供應商而言,美國國家環境平衡局
(NEBB) 是為行業樹立標準、程序及規格的重要認證
團體,負責評估供應商是否合資格為供暖、通風及
冷氣系統進行測試、調整及平衡工作。
自2014年起,泰國怡和機器取得NEBB認證,合符
資格承辦上述工作,以檢測屋宇裝備的運作效率,
從而為項目業主提供專屬的解決方案。泰國怡和機
器是泰國首間、東南亞第三間獲得NEBB認證的公
司。
泰國一些有遠見的客戶,會聘請獲NEBB認證的承建
商承接項目,特別是涉及測試和調試的項目,如外
國領事館、無塵室和醫院。
當今建築設計的一大趨勢是採用建築信息模擬 (BIM)
技術,以電腦模型展示建築設計,演示已相連接的
建築部件,並註明部件之間的關係及各自的特性。
為了在此創新範疇保持領先,泰國怡和機器在國內
設立首個BIM中心,以加強公司處理大型和複雜BIM
項目及為員工提供相關技術培訓的能力。
靈活而具規模的實習計劃,是泰國怡和機器另一致
勝關鍵。計劃的對象是泰國頂尖學府的文憑生及本
科生,為他們提供學習技能及了解大型工程公司的
機會。實習為期2至4個月,藉着擔任有薪職位和
接受富經驗的導師指導,學生得以從多方面認識行
業。這項計劃極具社會責任,不但可提升年輕人的
技能、展示怡和機器的技術,還可增加泰國的工程
專才,可謂滿足了學生、企業以至社會的需要。
2013年緬甸怡和機器的成立,是怡和機器在東南亞
發展的一大里程碑。泰國怡和機器亦立即傾力支援
這間新公司,安排工程師及管理人員定期造訪以分
享工程知識,特別是機電工程系統及工序的知識。
緬甸怡和機器亦會派員工到曼谷接受工程管理及成
本估算的訓練,同時認識日趨重要的工程管理和支
援技術。
FEATURE STORY
To maintain JEC Thailand's technical capabilities, and to convey this
differentiating advantage to clients, a key tool is the attainment of respected
industry certification. Among providers of high performance building systems,
the benchmark certification body for industry standards, procedures and
specification is the NEBB (National Environmental Balancing Bureau), which
assesses delivery of testing, adjusting and balancing (TAB) of systems such
as heating, ventilation and air-conditioning.
Since 2014, JEC Thailand has been certified by NEBB as able to undertake
TAB of heating, ventilation and air-conditioning systems and to investigate
and determine building systems' efficiency and provide customised solutions
for project owners, the first company in Thailand to secure this recognition,
and only the third in South East Asia.
Forward-thinking customers in Thailand, such as for a new foreign embassy
complex, or in cleanrooms and hospitals, require NEBB certification,
especially for projects that involve testing and commissioning.
An emerging trend in building design is the adoption of a building information
model (BIM) approach, in which designs are rendered as computer models
comprising interconnected geometrical objects tagged with relationships
and attributes. To secure a lead in this innovative domain, the company has
established the first BIM Centre in Thailand, to develop the capability to
handle larger and more complex BIM projects and provide staff with training
in this latest critical skill set.
Another winning source of empowerment at JEC Thailand is its dynamic and
growing apprenticeship programme, which offers diploma and degree students
from Thailand's strongest educational institutions the opportunity to develop
their personal skills and familiarity with a major engineering organisation, in
paid positions that expose them to multiple facets of the business, for periods
of two to four months, all under the guidance of an experienced mentor. This
responsible approach serves the needs of the students, the company, and
society at large, as it strengthens the pool of engineering talent in the country,
sharing JEC's capabilities and empowering young individuals.
The establishment of JEC Myanmar in 2013 was an exciting breakthrough
for the company in the SE Asia region. JEC Thailand immediately stepped
up to offer its full support, with engineers and managers making regular trips
to this new JEC operation to share engineering competencies, especially
in ME systems and processes. The traffic was two-way, as selected
JEC Myanmar staff came over to Bangkok to receive training in business
management and cost estimation, as well as a range of up-and-coming
technologies in business management and ever-important support functions.
Empowered Workforce
具備實力的員工
♦  Empowering individuals
♦  Sharing knowledge and skills
♦ Preparing for future needs
•  賦予員工能力以發揮所長
•  分享知識與技能
•  積極裝備,應付未來市場需要
Masterful Customer Service
卓越的客戶服務

怡和機器的一大使命,是為客戶提供綜合的解決方
案。公司上下同心協力為客戶提供全面的工程方案及
服務,滿足客戶現在及將來的需要,是怡和機器包括
泰國怡和機器的一大優勢 ─ 各部門及各支團隊高度
合作,經常交流及分享消息、構思及技術進展。
除了共同協作和相互支援外,不少怡和機器的資深員
工,亦會樂意向團隊中的年輕和新成員分享寶貴經
驗。
泰國怡和機器視資深員工的經驗為最寶貴資產,並為
此發展出一套嚴謹的知識傳承方法,把經年累積的經
驗、價值觀、安裝與保養技術以至管理技巧整合成為
公司的機電系統標準,以便傳達給所有團隊。
過去一年,泰國怡和機器為各級員工安排內部培訓課
程,提供相應的技術培訓,包括基礎機電系統、機電
工作流程概要、安裝流程、繪圖標準、屋宇自動化系
統及防火系統。資深員工還有機會獲邀擔任培訓員,
向公司的年輕員工傳授技術。
It is at the core of JEC's mission to offer integrated
solutions to customers. To make this a reality and
deliver the full spectrum of engineering solutions and
services to address customers' present and future needs as one team,
a great strength of the JEC model – and certainly at JEC Thailand –
has always been the high level of cooperation among departments and
teams, with constant interaction and sharing of news, ideas and technical
developments.
Not only is there a fluidity in collaboration and support across disciplines,
so too there is transfer between generations, as JEC's many long-serving
staff share their years of experience with younger and newer members of
the team.
JEC Thailand clearly recognises that this depth of experience of its senior
staff is its greatest asset, and has developed a rigorous knowledge
capture process in order to coordinate and regularise the experience,
engineering values, installation and maintenance techniques, and
management capability built up over the years, and bring it together
as the ME System Standards of JEC Thailand, which can then be
disseminated to all teams.
Throughout the year, the company arranges in-house courses to provide
relevant technical training for staff at all levels – including in basic ME
systems, ME overview workflow, installation process schedule, drawing
standards, building automation systems and fire protection systems.
Wherever possible, experienced staff are invited to be the facilitators,
allowing them an opportunity to share and teach the next generation of
JEC Thailand staff.
♦  Offering complete solutions to customers proactively
♦  Building strategic relationships
♦  Providing value and benefits to customers
•  主動為客戶提供全面的解決方案
•  建立策略性伙伴關係
•  為客戶創造價值及優勢
完善的服務比任何廣告都更有宣傳效果。在近期的一
項工程中,泰國怡和機器為位於曼谷的AIA Capital
Market Centre供應、安裝、測試和調試空調及其他系
統。由於泰國怡和機器在有關工程的表現理想,公司獲
AIA指定為AIA Sathorn的機電工程承建商,負責進行相
類似的工程。AIA Sathorn佔地70,000平方米、樓高27
The completeness of business's service delivery is a
better advert for the company than anything money
can buy. A recent contract to supply, install, test and
commission air-conditioning and other systems at
Bangkok's AIA Capital Market Centre so impressed AIA
that when the company implemented its second office
Alliance
同心同德 ♦  Working and leveraging as one team
♦  Helping other JEC members to succeed
•  同心協力,團結一致
•  協助團隊成員邁向成功
特寫
FEATURE STORY
0
JEC MAGAZINE ISSUE 35
特寫
FEATURE STORY
0
JEC MAGAZINE ISSUE 35
特寫
FEATURE STORY
0
JEC MAGAZINE ISSUE 3
building, AIA-Sathorn, it nominated JEC Thailand as the preferred ME
contractor to supply, install, test and commission a similar set of systems
over 70,000 square metres of this 27-storey office tower in the nation's
capital. Key contributors to the win were the excellent working relationship
between JEC and the first main contractor and the company's consistently
high standards of site and project management, leading to a smooth
implementation, plus of course the trust between customer and JEC.
Another customer whose close-up experience of JEC Thailand's project
handling built trust and led to a fruitful relationship was the long-established
Bhiraj Buri Group. Expertly executed ME work by the company on the air
conditioning, sanitary and fire systems for the shopping mall and 45-storey
office tower of the EmQuartier and Bhiraj Tower, greatly impressed our
client. The trust that established meant that when, in 2014, a timeline of
only sixteen months was available for a US$50-million ME project to
supply, install and test and commission HVAC, electrical, communications,
fire and other systems for the expansion of Bangkok International Trade
and Exhibition Centre to more than twice its original area, at 70,000 square
metres (BITEC II), JEC was awarded the contract, as the client recognised
the deep dependability that JEC Thailand could bring to the project.
層,是AIA在曼谷的第二棟寫字樓。能夠獲得新合
約,關鍵在怡和機器於對上一次工程與總承建商建
立了良好的合作關係,加上一向出色的工地及項目
管理,促使工程順利完工,並獲得客戶的信賴。
歷史悠久的Bhiraj Buri集團,是另一個與泰國怡和
機器建立起互信和良好關係的客戶。位於曼谷市中
心的EmQuatier和Bhiraj Tower,分別為大型商場和
樓高45層的辦公大樓,這個項目的空調、衞生及消
防系統工程,便由泰國怡和機器負責,並獲得客戶
大加讚賞。因此於2014年,該集團把曼谷國際貿易
展覽中心 (BITEC) 的擴建工程合約,直接委託泰國
怡和機器負責,合約總值5,000萬美元。泰國怡和
機器須在短短16個月內將BITEC的面積擴大一倍至
70,000平方米,並為擴建部分 (BITEC II) 供應、安
裝、測試及調試暖通空調、電氣、通訊、消防及其
他系統。正是源於客戶對泰國怡和機器工程實力的
信賴,才令公司榮獲此項重要合約。
幾十年來的經驗和努力,塑造了怡和機器的核心價值,並一
直引領泰國怡和機器因應當地需求發展及擴充業務。如今,
為實現怡和機器「齊創新 促發展 攜手建亞洲」的願景,這些
核心價值被整合為T.E.A.M.,亦即上述的技術精湛 (Technical
Proficiency)、具備實力的員工 (Empowered Workforce)、
同心同德 (Alliance) 及卓越的客戶服務 (Masterful Customer
Service)。
泰國怡和機器董事總經理Narongchai Chavanussaporn對公司的
優勢和前景充滿信心。「我們把業務重心放在機電工程服務及
合約工程方案上,因此團隊的長遠成功取決於技術能力、待人
技巧和創造力。我們能為員工提供技術、資源、支援以及持續
培訓,他們正是與客戶溝通的橋樑,因此客戶關係管理是決定
業務成敗的關鍵。」他說。
T.E.A.M.核心價值是一個框架,引領團隊成員不負怡和機器所
託。Chavanussaporn指,「兼顧並結合各項優勢,並貫徹怡和
機器的核心價值,是怡和機器在泰國的經營方式。」
泰國怡和機器的經營之道,與母公司一脈相承。無論是個人抑
或團隊,只有明白客戶需要,在工作上展現核心價值,才能實
現攜手建亞洲的願景。
Over these many decades, the team at JEC Thailand have
grown and strengthened their business according to local
needs, guided by a set of values that they and the rest of
the JEC family have established through experience and
endeavour. Today, in pursuit of JEC's vision of 'Together we
engineer a better Asia', these values are codified and shared
as T.E.A.M. – Technical Proficiency, Empowered Workforce,
Alliance, Masterful Customer Service.
Mr. Narongchai Chavanussaporn, Managing Director of JEC
Thailand is no doubt where the company's strength and
prospects lie. Our key business focus is on ME services
and contracting solutions. So our continuing success depends
crucially on the technical ability, personal skills and creativity
of our teams. We can provide the technology, resources,
coordination and ongoing training, but it is our staff that the
customers interact with and their decisions and relationship
management are what determine whether we win or lose that
business, he says.
The T.E.A.M. values provide the framework that allows
team members to deliver for JEC Thailand, says Mr
Chavanussaporn. The balance and combination of strengths
in the team is then translated into successful projects through
the day-to-day implementation of these values, which
represent the JEC way of doing business in Thailand.
And what works in Thailand works throughout JEC. Technical
competence delivered by individuals and teams who
understand the needs of their customers, applying T.E.A.M.
values to help make that vision of a better Asia a reality.
Looking to the future  展望未來
怡
和機器於2016年5月4至6日參與了於香港會議展覽中心舉行,每兩年一度的Build4Asia。這是亞洲最大型的建築科技、電氣照
明及防火保安展覽會,今屆吸引了約9,500位來自本地、中國內地、韓國及其他東南亞國家的海內外買家到場參觀。
怡和機器的展位設計別出心裁,展示了多項可持續解決工程方案,包括能源效益、水務管理、照明、室內空氣質素、建築產品、創新
保安系統和方案以及消防產品。我們的同事與參觀買家互相交流行業資訊及推廣展品的技術和特點,對拓展公司業務起着重要的作
用。
I
n between 4th-6th May, 2016, JEC participated in the Asia's
leading biennial tradeshow, Build4Asia, which was held at
the Hong Kong Exhibition and Convention Centre. The event
was known as Asia's largest tradeshow for building, electrical
engineering and security services, with around 9,500 local and
overseas trade buyers coming from China, Taiwan, Korea and other
Southeast Asian countries.
The distinctive JEC Stand featured sustainable engineering
solutions in different aspects, including Energy Efficiency, Water
Management, Lightings, Green Building Technologies, Building
Products, Innovative Security Systems and Solutions, and Fire
Services Equipment. The visitors and our colleagues exchanged
useful market information and technical knowledge about the
exhibits. It was an eventful and meaningful occasion for networking
and business development.
JEC Participated in the Build4Asia 2016
Showcasing Sustainable Engineering Solutions
怡和機器參與Build4Asia 2016展示可持續工程解決方案
NEWS
JEC MAGAZINE ISSUE 35
簡訊
簡訊
NEWS
JEC MAGAZINE ISSUE 35
怡和機器啟動全新願景、使命和核心價值
Launch of JEC's Vision Mission and Values
W
e are proud to announce JEC's new set of Vision Mission and
Values (VMV) which aims to achieve our business growth strategy.
The new set of VMV was officially implemented on 1st April 2016
across the group. The Vision defines the future we want to create, the
Mission describes what we do to get us to our Vision, and the Values guide
us how we can effectively carry out the Mission.
為
了配合集團的業務發展策略,怡和機器啟
動了全新的願景、使命和核心價值,並於
2016年4月1日起在集團內全面推行。新的
願景為我們的未來確立了目標,使命闡述了我們為
達至願景而應採取的行動,而核心價值則提供了清
晰的指引,讓我們能夠有效地履行使命。
● Train and develop our employees for sustainable growth
  培育員工,持續增值
● Offer integrated solutions to customers
  為客戶提供綜合的解決方案
● Provide technical expertise and advice to customers
  為客戶提供專業的技術知識及建議
Mission 使命
Vision 願景
Together we engineer a better Asia
齊創新  促發展  攜手建亞洲
We also hope that the Values can be constantly reflected in our ongoing and future
collaborations with stakeholders across each business unit and regional office. Together, we
are engineering a better Asia!
我們期望於今後繼續與各業務單位的持份者合作,充分展現怡和機器的核心價值,讓我們攜手
建設更美好的亞洲!
vValues 核心價值
   lliance
同心同德
   mpowered Workforce
具備實力的員工
  echnical Proficiency
技術精湛
T
E
A
   asterful Customer Service
卓越的客戶服務
M
2
010年,由設計及興建污水處理廠和污水泵房
開始,怡和機器勇於開拓水務管理系統這一
個新的業務範疇。首份合約是在菲律賓興建
Taguig Baybreeze 污水處理廠,每日能處理4千萬公
升污水。成功完成項目後,公司再獲另一合約,興建
每日處理量達7.5千萬公升的Libingan ng mga Bayani
污水處理廠。
為擴充水務處理業務,怡和機器現時亦涉足食水處
理廠的設計及建造項目。公司最近更獲得菲律賓
Putatan食水處理廠二期項目的重要合約,反映新業
務的發展前景光明。
Putatan食水處理廠二期的合約總值高達1億美元,是
Maynilad Water Services的項目。該公司是菲律賓
政府「都市供水及污水處理系統」的特許經營商,為
馬尼拉西部提供食水、排污及污水處理服務。新的食
水處理廠可為超過六百萬名馬尼拉市民提供潔淨的食
水,每天總處理量由10萬立方米提升至15萬立方米。
怡和機器將負責設計、興建、測試及調試,以及在設
施落成後營運至少一年。項目將應用先進科技,包括
過濾技術及逆滲透技術,以保證食水水質安全可靠。
通力合作
今次怡和機器的合作夥伴為Acciona Agua Spain及
FreyFil Corporation;要執行這一項目需要熟練的項
目管理,從而把食水處理、機電工程及土木工程等不
同專業範疇的人員聯合起來,活用各方的技術、專業
資格和資源。為了在緊迫的時限內竣工,團隊的緊密
合作至關重要。
怡和機器致力於環境安全
怡和機器一直致力運用具能源效益和對環境負責的工
程技術並善用新科技,承辦高水平的環保基建項目,
Putatan食水處理廠二期項目正好體現了這一點。
I
n 2010, JEC boldly entered the new business area of water
management systems, initially focusing on the design and build of
wastewater treatment plants and wastewater pumping stations. Its
first contract success in The Philippines, for construction of the Taguig
Baybreeze Sewage Treatment Plant – able to process 40 million litres of
wastewater per day (MLD) – was soon followed by another win, to build
the 75 MLD Libingan ng mga Bayani (LNMB) STP.
To expand its business in the water sector, JEC has now ventured into the
design and build of potable water treatment plants. This looks a promising
move, with the recent award of the contract to develop the Putatan Water
Treatment Plant 2 in The Philippines.
Putatan 2 plant is a USD 100 Million design and build project which will
provide clean drinking water to almost 6 million people in the metropolitan
area of Manila with a capacity of 100,000 m3
per day, extendable to
150,000 m3
per day. The project is from Maynilad Water Services, a
concessionaire of Metropolitan Waterworks and Sewerage System, which
provides water, sewerage and sanitation services to western Metro Manila.
The scope includes the design, construction, testing, and commissioning
of the new plant, as well as the operation of the plant for at least a year
following completion of the commissioning. The project will apply advanced
technologies including ultra-filtration and reverse osmosis, which together
assure high and reliable water quality standards.
Implementation of the project will require deft project management,
bringing together the skills, credentials and resources of various internal
and external parties, under diverse disciplines including water treatment
processes, mechanical  electrical engineering, and civil engineering. It
will be vital to create and structure the right partnerships in order to deliver
the project within the stringent project timeline. To deliver this project JEC
has partnered with Acciona Agua Spain and FreyFil Corporation.
The Putatan Water Treatment Plant 2 is part of JEC’s ongoing commitment
to undertake quality environmental infrastructure projects that widen
and deepen the use of energy-efficient and environmentally responsible
engineering and the use of new technologies.
JEC Strengthens Water Business with the Award of
Putatan Water Treatment Plant 2 Project
怡和機器獲得Putatan食水處理廠二期工程合約
水務處理業務日益鞏固
JEC Provides Electrical and MVAC Systems
to Greenhill Villa in Shatin
怡和機器為沙田綠怡雅苑提供電氣與機械通風及空調系統
J
EC's Maintenance and Renovation team has been awarded a significant contract from
the Hong Kong Housing Society for the installation of Electrical, Extra Low Voltage (ELV)
and MVAC systems at Greenhill Villa, a subsidised sale flats project in Shatin.
The project covers three 35 to 38-storey towers providing over 1,000 small and medium-
sized flats as well as two levels of basement carpark and a clubhouse on G/F. JEC is
responsible for the supply and installation of various EM systems including power supply
and main switchboard, security system, CCTV system, VRV Unit and ventilation system.
The project is expected to be completed in the third quarter of 2018.
怡
和機器的保養及維修團隊獲得香港房屋協會的重要合約,為沙田區的資助出售房屋項目綠怡雅苑安裝電氣、特低電壓和
機械通風及空調系統。
綠怡雅苑有三座樓高35至38層的樓宇,共提供逾1,000個中小型住宅單位,並設有會所設施和兩層地下停車場。怡和機器將負責供應及
安裝各類機電系統,包括供電設備及總掣櫃、保安系統、閉路電視系統、可變冷劑流量系統 (VRV) 裝置及通風系統等。工程預期在2018
年第三季完成。
J
EC's Maintenance and Renovation team has been awarded a contract from The
University of Hong Kong (HKU) for AAI - Improvement of Building Management
System (BMS) in 19 buildings in Main Campus for integrated monitoring. The
scope covers integration of existing BMS in 19 buildings located in HKU and extension
of the BMS including some new building system provisions. The new BMS shall enhance
HKU's ability to remotely control and manage various building systems, hence adding
values to the existing operations with increased visibility on systems performance and
swift incident management. With integrated monitoring, it also facilitates potential energy
saving initiatives while users' comfort and needs are maintained.
For MTR Corporation, JEC's Maintenance and Renovation team has won a contract for chiller replacement at Wanchai MTR station
and while Electrical and Mechanical Contracting team has secured another significant contract to provide floodgate system for Shatin
to Central Link Phase 2. The floodgate provision will be complex, as there are two ventilation buildings with a total of 6 floodgates
installed and constructed to prevent influx of the sea water to the land section of the tunnel, in the event of heavy leakage of seawater
due to rupture of the immersed tube.
We are keen to provide engineering solutions to help customers in improving their facility management and system operating objectives
that suit their best interests.
怡
和機器保養及維修團隊獲得香港大學的改建、加建及改善工程的合約,為本部校園19座大樓的樓宇管理系統進行升級工程,以
便校方綜合監測校內設施。工程範圍包括整合上述19座大樓現有的樓宇管理系統,並加入新功能。新的系統能有助香港大學加
強遙距控制和管理各屋宇裝備系統的能力,讓他們更清晰地掌握系統表現及提升應變效率。系統的整合既促進節能,又能兼顧
使用者的舒適和需要。
港鐵工程方面,保養及維修團隊獲得為灣仔港鐵站更換制冷機組的合約;與此同時,機電合約工程團隊獲得另一重要合約,為沙中綫第二期
工程裝設防洪閘系統。此項目較為複雜,團隊需要在兩座通風大樓內安裝6道防洪閘,作用在於防止海水因隧道沉管破裂而大量湧入隧道。
我們致力設計工程方案,協助客戶提高設施管理水平及系統營運目標,滿足他們的最大需要。
JEC Awarded Significant Contracts from
The University of Hong Kong and MTR Corporation
怡和機器獲香港大學及港鐵的重要合約
簡訊
NEWS
JEC MAGAZINE ISSUE 35
J
EC Singapore has been awarded two significant contracts in the first quarter of 2016. The company was appointed as the facilities
manager of Keppel Towers and Keppel Towers 2, providing electrical and mechanical engineering works and building services at
these premises.
Furthermore, JECS (Thermal) has been working on a 20-months new contract with the Grand Park City Hall Hotel since April this year,
covering 10 storeys and two basements. The scope of the contract focuses on the addition and alteration (AA) works and MVAC
system installation, replacing chillers, cooling towers, building management system and electrical works.
The winning of the contracts validates the technical competent of JEC Singapore  JECS (Thermal) in providing dependable
facilities management, AA and MVAC services to its customers.
新
加坡怡和機器在今年首季獲得兩項重要的工程合約。首先公司獲指定為新加坡吉寶中心及中心
二期的設施管理服務供應商,負責物業的機電工程及屋宇裝備工程。
此外,JECS (Thermal) 於今年4月獲得新加坡君樂皇府酒店為期20個月的合約,為
酒店進行加建及改建工程,並安裝機械通風及空調系統,以及更換製冷機組、冷卻
塔、樓宇管理系統和電氣裝置。此項目涵蓋10個樓層及兩個地下室。
能夠獲得這些項目工程,再次證明新加坡怡和機器及JECS (Thermal) 的專業技
術能為客戶提供可靠的設施管理、加建與改建,以及機械通風及空調系統工程
和服務。
J
ardine Distribution, Inc. (JDI) acquires the exclusive rights to provide termite treatment for real
estate sites of CitiHomes Builders and Development, Inc. (CBDI), one of the leading property
developers in North Philippines which specialises in providing comfortable and affordable homes
for Filipino families.
JDI will provide soil treatment using Protek, the nation's leading soil termiticide, for all the on-going and
future developments of CitiHomes.
This is a strategic business development opportunity for JDI, as it not only re-affirms our reputation as
an effective home protection provider, but also gives us a chance to venture into the service application
of the products we sell. said Mr. Edwin Hernandez, President of JDI.
J
ardine Distribution, Inc. (JDI) 獲得CitiHomes Builders and Development, Inc. (CitiHomes) 的獨家代理權,
為該公司的住宅地盤提供滅白蟻服務。CitiHomes是菲律賓北部最大的房地產發展商之一,專為菲律賓家庭
供應舒適及價格相宜的住宅。
JDI將採用菲律賓國內常用的白蟻藥Protek為未來及現正進行工程的地盤杜蟻。
JDI總裁Edwin Hernandez說:「這對公司來說是拓展業務的策略性機遇,不但再次肯定JDI家居保護服務的信譽,
也給我們機會嘗試在服務中使用自家產品。」
JEC Singapore's Technical Competent Recognised
in the Commercial and Hospitality Sectors
新加坡怡和機器的專業技術獲商業及旅遊款待業認可
Jardine Distribution, Inc. Acquires Exclusive Rights to
Provide Termite Treatment for CitiHomes
JDI獨家代理CitiHomes滅白蟻服務
▲ Mr. C K Tam (2nd from left), Mr. Alex Law (3rd from right) and the
project team attended the Award Presentation Ceremony.
   譚俊傑先生(左二)、羅志偉先生(右三)及項目團隊成員出席了頒獎典禮。
簡訊
NEWS
JEC MAGAZINE ISSUE 35
E
MC was awarded the Best Construction Sites Housekeeping
Award (Electrical  Mechanical Projects Division) for Contract No.
DE/2013/05 – Provision of EM Facilities for Tin Liu Ha Sewage
Pumping Station and Tong Min Tsuen Sewage Pumping Station, which is
the first EM contract in Drainage services Department (DSD) adopting
Engineering and Construction Contract (ECC) Option C of New Engineering
Contract (NEC) form. A presentation ceremony was hosted by DSD on 19th
March 2016. Led by Mr. C K Tam, Managing Director – EM Contracting
and Mr. Alex Law, Assistant General Manager – EM Contracting, the
project team received the award from Mr. Edwin Tong Ka-hung, Director
of DSD, in recognition of their outstanding performance during the project
execution.
機
電合約工程部項目「為田寮下污水泵房和塘面村供應及安裝機電設
備」﹙合約編號DE/2013/05﹚獲渠務署頒發「最佳工地整潔獎」。
該合約是渠務署首宗採用「新工程合約」模式內的「工程建造合約C
選項」的機電工程合約。頒獎典禮於2016年3月19日舉行,項目團隊在機電
合約工程董事總經理譚俊傑先生以及機電合約工程助理總經理羅志偉先生帶
領下,從渠務署署長唐嘉鴻先生手上接過獎項,以表揚團隊在施工過程的傑
出表現。
T
he 3rd Cross-Strait Forum on Smart Rail Development – Present  Future was
successfully held on 9th-11th March 2016 at the Hong Kong Convention  Exhibition
Centre. The Forum was organised by the Hong Kong Institution of Engineers (HKIE),
and co-organised by China Communications and Transportation Association, Rail Engineering
Society of Taiwan and the Macau Institution of Engineers. Over 250 delegates coming from
Hong Kong, mainland China, Macau and Taiwan, attended the Forum.
In the Forum, an exhibition was held concurrently which provided an opportunity for the
industry to showcase innovative projects and new technologies to enhance their business
growth. JEC is delighted to participate in the event as an exhibitor, showcasing our projects
and engineering expertise in the railway sector across Asia. Our existing railway projects
focus on trackside maintenance works, security and safety segments. We will continue to
work with stakeholders to engineer a better railway sector in the region.
第
三屆「兩岸四地智能軌道交通發展論壇」於2016年3月9至11日假香港會議展貿中心
舉行。該論壇由香港工程師學會主辦,並獲中國交通運輸協會、台灣軌道工程學會及
澳門工程師學會協辦,超過250名香港、中國、澳門及台灣的業界代表出席。
論壇同場設有展覽,讓參展商有機會展示創新項目和新技術,促進其業務發展。怡和機器非常
榮幸能成為論壇的參展商,得以展示我們在亞洲的鐵路項目及相關工程技術。我們現行的鐵路
項目主要為軌道旁的維修工作和安全項目。我們會繼續與各個持份者合作,推動區內鐵路業的
發展。
EMC Crowned DSD's Best Construction Sites
Housekeeping Award 2015
機電合約工程部獲渠務署頒發2015年
「最佳工地整潔獎」
JEC Participated in the 3rd Cross-Strait Forum
on Smart Rail Development
怡和機器參與第三屆
「兩岸四地智能軌道交通發展論壇」
怡
和機器周年晚宴已於2016年3月4日假九龍
灣國際展貿中心「匯星」圓滿舉行。今年我
們以「怡和機器武林大會」為主題,管理層
紛紛化身成膾炙人口的經典武俠劇集及小說角色,矚
目的造型令人眼前一亮,他們在台上的精彩表演,成
為晚宴一大亮點。是次晚宴有逾1,200名同事與嘉賓
出席,場面熱鬧!
T
he annual staff event, JEC Spring Dinner, was held successfully
on 4th March 2016 at the Star Hall of the Kowloonbay International
Trade and Exhibition Centre. The theme of this year's annual dinner
was JEC Wulin Congress, one of the highlights were the performances
by Executive Committee Members and Directors on stage with eye-
catching costumes representing Chinese contemporary martial-arts
fictional characters. More than 1,200 colleagues and guests enjoyed the
eventful occasion.
2016年度怡和機器周年晚宴
JEC Spring Dinner 2016
ENVIRONMENTAL,
HEALTH  SAFETY
JEC MAGAZINE ISSUE 35
環境、健康與安全
D
uring the first three quarters of 2015, approximately 10 construction
workers suffered from fatal accidents in Hong Kong's construction
industry. The fatal accident rate has decreased from 16 cases
recorded in the same period in 2014, however, the overall industrial accident
rate has increased by about 7%. The industrial accident rate shall be kept
at minimum level, or even zero, for the benefit of the physical well-being of
workers as well as the industry. The number on record does not only reflect
the cases of workers' physical injuries, it also includes lost wages, functional
impairment or death of workers, which leads to medical treatment, physical
and vocational rehabilitation, dispute resolution, claims administration and
other systematic costs.
To achieve and sustain a high level of health and safety performance;
occupiers, employers, suppliers, manufacturers, designers and persons
at work that create risks would be held accountable for eliminating or
reducing those risks. For instance, employers have the responsibility to put
in place effective safety management systems; the management should
provide adequate resources, training and power for safety personnel to
carry out their duties effectively; architects and engineers are responsible
for designing structures and buildings in construction projects that can be
built in safe method and tools; manufacturers and suppliers are responsible
for ensuring that the machines they supply or maintain are safe when in
operations. Workers have the responsibility to adhere to safe work practices
and provide feedback upon receiving safety advice. Every person at work
has to accept responsibility for his own safety and care for the others who
are affected directly or indirectly by their work.
2
015年首3季,本港大約有10位工人在建造業
意外中喪生。雖然意外死亡率與去年同期的
16宗相比有所下降,但整體意外率仍有近7%
升幅。為了保障工人生命安全及行業發展,意外率
應保持在最低水平,甚至是零。這些記錄並非單純
的傷亡數字,它還反映了工人失去收入、技能甚至
性命的情況,並衍生醫療、身體復健和職業康復、
調解、索賠及其他有系統的成本。
為達致及保持高水平的職安健表現,工人、僱主、
供應商、製造商、設計人員及相關人士,都有責任
減低甚至消除因工作產生的風險。例如,僱主有責
任實施有效的安全管理制度;管理層應提供足夠的
資源、培訓及權力,讓安全人員能有效執行職務;
建築師及工程師為項目設計結構和建築物時,要確
保它們能以安全的方式和工具興建;製造商及供應
商則要確保其供應或保養的機器能在工地安全運
作。至於工人亦有責任遵守安全工作守則,並對安
全指示作出回應。每個人都要為個人安全負責,並
關心個人工作對他人的直接和間接影響。
SMART Initiative for Workplace Safety
SMART計劃─提倡職業安全
今年4月,怡和機器啟動了新的願景、使命及核心價值
(VMV),鼓勵員工在未來實現業務增長策略,公司的環
境、健康與安全部門更以SMART計劃作為提升安全及
預防意外的方法。要保持競爭力和生產力,就必須加
強內部協作,進一步改善現行營運,而保障員工的安
全與健康則是怡和機器最重要的經營目標之一。
In April, JEC's launch of the new set of Vision Mission and Values (VMV)
inspires the employees to achieve business growth strategies in coming
years. For EHS department in JEC, we also implement the SMART
initiative for safety and precautions. We need to stay competitive and
productive by further improving our existing activities through better
coordination and collaboration. Ensuring the safety and health of our
employees is one of JEC's most important business objectives.
怡和機器在職安健的長遠策略
17
打從開始了解這一點很重要:要達成SMART計劃的目
標,不能依靠現成工夫,只有公司上下都能投入和專
注,方能臻善。
員工在日常工作中貫徹SMART的原則,可以加強他們
的職安健意識,進而承擔改善工作環境的責任,最終
形成一種以安全和健康為先的公司文化,促成員工的
職安健實踐。清晰的政策、成熟的制度及管理層的承
諾,有助培育出正確的職安健態度,怡和機器對於保
持高水平的職安健表現並持續進步充滿信心。
SMART計劃的成功有賴公司內外不同的持份者,以及
業務夥伴的齊心協力,共同加強怡和機器安全工作的
文化。怡和機器相信,這個成就無法憑個人取得,只
有團隊努力配合強勢領導才能達致,而公司正堅定地
朝着正確的方向邁進。
It is important to acknowledge from the start that this will not be at
the expense of what has been accomplished, but the areas identified
in SMART will require all our collective effort and focus to achieve
the greatest improvement.
By implementing SMART in the employees' routine activities, the
perception of health and safety will be enhanced and all of us will
have the duty to improve the working environment. It will build a
company culture of enabling each employee to think about safety
and health first, and put them into practice on a daily basis. By
cultivating the correct attitude through implementing clear policy,
established system and management's commitment, JEC is
confident that we will be able to sustain our high level of health and
safety performance and continuously improve on it.
The success of the SMART initiative depends on internal and
external stakeholders and all partners to come together and
strengthen the culture of safety in JEC workplaces. This success
cannot be achieved by individuals alone, but only through our
collective effort and strong leadership, which we are confident that
we are committed and heading in the right direction.
5 key aspects of
the SMART Initiative
for Safety:
SMART計劃包含
5大安全範疇:
Site supervision
現場監督
S Managing the needs
of employees and
workers
處理僱員及
工人的要求
M
A
Alerting and
identifying
the risks
警惕及
識別風險
Reviewing and
establishing safe
working procedures
評估及
確立安全工作流程
R
Training to
ensure safety
at work
提供有關
工作安全
的培訓
T
PERSONALITY
JEC MAGAZINE ISSUE 35
人物故事
From a background that gave them no easy opportunities, brothers Tsang Tak
Yin ('Yin', the elder of the two) and Tsang Tak Keung ('Keung') joined JEC
in 1965 and 1974 respectively, to help provide for their family. Yin entered
JEC first, on the advice of a family member who worked in JEC's operations
department. Yin started as an apprentice in the maintenance and renovation
department, fixing window air-conditioning units in residential complexes. Keung
followed in the footsteps of his brother, working as an apprentice in JEC while
he completed his studies at Morrison Hill Technical Institute (currently IVE
(Morrison Hill)). He then joined the maintenance and renovation team, serving
commercial complexes.
Yin's early career saw him riding a motorbike all around the city, fixing air-
conditioning units for residential customers. Then in 1972, he was promoted to
be responsible for repairing window air-conditioning units at the Wong Chuk
Hang workshop.
An early highlight of Keung's JEC career, four years after joining JEC, was a
one-man mission in 1981 to the Mandarin Oriental in Bangkok, to repair the
chillers in the chiller plant room. He had to diagnose the problem, and then
direct a local machinery shop to manufacture parts he needed to undertake the
repair. The accomplishment was a memorable experience that demonstrated
his ability as an independent and high-calibre technician.
The recognition he receives from senior management for his technical expertise
and industry exposure motivates and empowers Yin. He also enjoys teaching
and passing on his technical knowledge, and introducing his customer networks
to younger staff, to ensure continuity of the trusting relationships he has built
between customers and the JEC team. The great regard in which he is held
by subordinates and customers are for Yin a reflection of the strong alliance
between his team, with him as a leader, and colleagues in JEC.
初出茅廬
成長在機會不多的年代,曾德賢和曾德強兩兄弟先
後在1965及1974年加入怡和機器,以期減輕家中經
濟負擔。在任職怡和機器營運部的家人建議下,曾德
賢先加入公司的維修部當學徒,主力修理住宅的冷氣
機。而弟弟曾德強於摩利臣山工業學院(IVE摩利臣
山分校前身)畢業後亦在怡和機器當學徒,後來與哥
哥同樣加入維修部工作,負責商廈維修。
起初曾德賢的工作是騎電單車,四出上門為顧客維
修冷氣機。1972年,他獲晉升並負責在黃竹坑工場
內維修冷氣機。
要說曾德強早年生涯的亮點,莫過於加入怡和機器4
年後,於1981年隻身到泰國曼谷的文華東方酒店維
修其冷氣機房。期間他要查找故障,並指示當地某
機械店製造維修所需零件。這次成績證明了他是個
能獨立工作並且手藝高超的技術員。
齊當團隊楷模
獲管理層視為技術專家和業內楷模,為曾德賢增添工
作的動力。他亦樂意向怡和機器的年青員工傳授維修
知識和轉介顧客,這確保他在公司與顧客之間建立的
信賴得以延續。曾德賢廣受同事和顧客尊敬,這顯示
他與團隊以至公司之間強而有力的關係。
曾德強同樣看重信賴,視之為與團隊成員相處的核
心,因此他致力保持積極態度和團隊精神。他的領
導風格是給予同事空間,讓他們自行解決問題,自
己則在必要時提供支援和指導。這種工作態度讓曾
德強獲得團隊以至公司的敬重。
▲
 Tsang's older (Tsang Tak Yin) and
younger (Tsang Tak Keung) brothers
  曾德賢(兄)及曾德強(弟)
Nine Decades of Dedication in JEC
Brothers Tsang Tak Yin and Tsang Tak Keung Exemplify 'Alliance'
共獻怡和機器九十年  曾氏兄弟  同心同德的寫照
▲  Tsang's brothers attended a dinner
with other JEC colleagues
  曾氏兄弟與怡和機器同事聚會
Keung likewise greatly values trust, placing it at the centre of his relationship
with his team, as he drives high levels of engagement and esprit de corps.
His management style makes space for staff to take responsibility for issues
they encounter. He provides back-up and guidance as needed, but recognises
the flexibility and effectiveness when team members can confidently and
independently tackle problems. The success of this 'alliance' has earned him
respect within the team and across the company.
Yin has established enduring relationships with the customers at the residential
units he is responsible for. One, a big household in Mid-Levels, has been
with him for more than 20 years, and he is sure to respond immediately upon
receiving their call, offering timely maintenance and repair services of the air-
conditioning units.
Meanwhile, for Keung, the day in 1999 that Typhoon York hit Hong Kong at
full T10 strength remains a memorable one. He received a call that the cooling
towers on the top floor of one of his commercial properties, in Central, had been
badly damaged. He immediately recognised that the situation had to be brought
under control without delay in order to restore an adequate air-conditioning
service after the typhoon moved past Hong Kong. So, he called his team to
gather at the job site, despite that the T10 signal was still hoisted, and set about
assessing the damage, collecting the scattered parts and sorting out which
cooling towers were still operable and which needed repair. The damage control
and assessment were swiftly managed while ensuring the safety of his staff.
Keung is justifiably proud of the dedication and professionalism of the team's
success in solving the customer's problem in highly challenging conditions.
Yin could have retired eight years ago, but has stayed on for the satisfaction he
gains from the job, the team, subordinates, his managers and customers. He
thoroughly enjoys his work conducting site visits to understand his customers'
concerns and completing each job to meet or exceed
their expectations. The pleasure he gets from
fulfilling this mission makes him more loyal to
the company every day, he says.
Keung has also continued at JEC past
retirement age because he values the
room that the company has given him
to grow over the years, promoting
him to higher levels of responsibility.
He appreciates that recognition
of his effort and contribution. The
profession is constantly evolving in
terms of technology, he notes, with
tightened regulations and certification,
and so he cheerfully recommends a
career with JEC in the maintenance and
renovation department.
卓越表現添誠信
曾德賢與他所服務的住宅區顧客建立起長期關係。
如他跟一位住在半山大宅的顧客相識逾廿年,每當
對方致電求助,他都會立即回應,及時提供冷氣機
維修服務。
1999年颱風約克吹襲香港,對曾德強來說印象深
刻。當時位於中環某座商廈頂層的冷卻塔因風暴嚴
重損毀,該處正是他的管轄範圍。接到商廈物業管
理人員的電話後,曾德強意識到必須立即評估損毀
情況並作相應處理,以便在風暴過後恢復商廈的冷
氣服務,因此他與團隊成員在10號風球下前赴該
處,即場評估損毀情況、清理碎片及找出需要維修
的部分。最終,損害的控制和評估工作迅速完成,
團隊成員安然無恙。這次團隊成功克服惡劣環境,
為客戶解決困難,展現出拼搏和專業,曾德強絕對
可以引以自豪。
一路信守
曾德賢早在8年前已屆退休之齡,之所以繼續留下,
只因他從工作、團隊、同事、管理層和顧客中間得
到滿足感。他尤其享受在實地巡查中了解顧客的需
要,並給出滿足甚至超過顧客期望的工作表現。曾
德賢指這種滿足感驅使他繼續為公司效力。
公司多年來的栽培、賞識、提拔和委以重任,亦是
讓曾德強願意在退休後,繼續信守怡和機器的原
因。他對公司充滿欣賞和感恩之情。曾德強又強調
科技進步、監管加強和資格收緊,使專業水平不斷
提升,故對維修部日後的工作前景充滿信心。
 Be courageous and ask questions when
in doubt; be proactive and engage with
colleagues to brainstorm any issue and how
to address it.
 Be meticulous when serving customers; put
yourself in their shoes to deeply understand
their needs, to create a win-win situation for
both JEC and the customer.
 Always persevere! Your willingness to work
hard and listen to your seniors' words of
encouragement will enable you to achieve
your career objectives.
Words of Encouragement
 遇到疑難要勇於發問,並主動參與
討論以找出問題及應對方法。
 一絲不苟地服務客戶,盡可能了解
他們的需要,為怡和機器和顧客創
造雙贏。
 要鍥而不捨!年輕一代要願意捱
苦,多聽前輩意見有助達成自己的
工作目標。
我們的寄語
TRAINING 
DEVELOPMENT
JEC MAGAZINE ISSUE 35
培訓及發展
A
World Bank paper published in 2015 showed that 83.5% of the
workforce in Thailand is unskilled. This puts Thailand's skilled
workforce at the lowest proportion among other ASEAN countries.
And there is a gap between education and equipping students with the
skills and knowledge they need to get good jobs, so competition for skilled
workforce is intense. JEC Thailand (JECT) needs skilful employees
with both knowledge and skills of installation, testing  commissioning,
maintenance as well as drawing for Mechanical  Electrical (ME) systems
to fill the positions of Foreman, Draftsman and Technician. Therefore JECT
has formulated a people development strategy to have more skilled workers
in the pipeline.
The strategy focuses on Diploma students who are the future pillars of the
industry, preparing more skilled workforce for a better Thailand.
There are two parts to the strategy: short term and long term.
JECT offers internship programmes to students from technical colleges with
mechanical  electrical majors. The programmes vary from 2 months to one
year, depending on their curriculum. During the programme, the students
will learn about equipment and tools used for maintenance, how to read
drawings and then perform installation and learn how to supervise the sub-
contractors. Moreover the students will learn about proper customer service
attitude.Since 2012 until now, JECT has joined up with seven technical
colleges, and provided internship experience to more than 100 students.
世
界銀行於2015年發表的報告顯示,泰國勞
動人口中83.5%為非技術工人,其熟練工
人佔勞動人口的比例為東盟國家中最低。
由於該國的教育未能為學生們提供適當的知識和技
能以應付工作的需要,導致市場上熟練工人十分短
缺。由於泰國怡和機器在安裝、測試和調試以及維
修機電系統以至繪製機電圖則,都需要熟練工人擔
任科文、繪圖員和技術員等職位;因此泰國怡和機
器設立了一套人才發展計劃以為未來培育更多熟練
工人。
這項計劃的對象乃為未來行業棟樑-文憑課程學生,
用意是培育更多熟練工人,建設更美好的泰國。
計劃分為短期和長期兩部分:
短期計劃
泰國怡和機器向主修機電工程的工業學院學生提供
各類實習項目,為期2個月至1年不等,因應學生
的課程而編排。學生於實習期間會學習使用維修設
備與工具、閱讀圖則及進行安裝,以及如何監督分
判商;此外學生亦會學習正確的客戶服務態度。自
2012年至今,泰國怡和機器已與7間工業學院合作,
為逾100位學生提供實習機會。
Cultivate the Next Generation, Engineer a Better Asia
培育未來專才  建設美好亞洲
Over the past 4 years, JECT has employed over 50 well-trained graduates from these technical colleges. After these
graduates started their employment with us, we will further enhance their professional knowledge by providing additional
training programmes including the following:
過去4年內,泰國怡和機器已從有合作關係的工業學院聘用了逾50位訓練有素的畢業生。公司會在他們入職後提供額外
培訓,進一步充實其專業知識,包括:
In 2013, JECT signed Memorandum of Understanding (MOU) with 2 very
outstanding technical colleges delivering superb quality technical training
to their students, and they are Ubon Ratchathani Technical College and
Khon Kaen Technical College. The main objectives of the MOU were to
enhance the quality of education, develop students' skills and knowledge
in the area of electrical and mechanical engineering, award scholarship to
distinguished students as well as build up the corporate branding.
Starting in 2016, apart from offering internship experience and scholarships
to students, JECT will also invite professors to work in the company for
two months during school vacations. During the period, the professors will
work and provide ME training including technical drawing skills and site
operation techniques to our colleagues. This programme not only benefitted
JECT employees but is also useful for the professors to bring up-to-date
work experience back to the college to share with the students. In addition,
five very experienced JECT employees will be sent to the technical college
to assist in the teaching. For a whole semester (about four months), the
JECT employees will teach about piping, sanitary and air-conditioning
systems. They will bring hands-on experience together with the real world
technical know-hows to the college students to get them ready to join the
workforce. It is anticipated that over 250 students will benefit from this
arrangement in 2016.
長期計劃
2013年,泰國怡和機器與Ubon Ratchathni和Khon
Kaen兩間知名的工業學院簽署諒解備忘錄,承諾向
兩校學生提供一流技術培訓,從而提升學院的教育
質素,增進學生的機電知識和技能,並以獎學金獎
勵優秀學生,連帶塑造公司的品牌形象。
除了向學生提供實習機會及獎學金,泰國怡和機器
今年起更會邀請兩間學院的教授於學校假期到公司
工作兩個月,藉此機會為公司員工進行機電工程培
訓,涵蓋專業繪圖技術和地盤作業技巧;這安排既
可使泰國怡和機器的員工受惠,亦好讓教授把最新
的工作經驗帶回校與學生分享。此外,公司亦會委
派5位資深員工到學院輔助教學;在為期約4個月的
學期內,這批資深員工將會於校內教授有關管道、
衞生及空調系統的知識,並以親身經驗和實際技
能,幫助學生做好投身職場的準備。上述安排料於
年內惠及逾250位學生。
憑藉這些計劃,泰國怡和機器得以培訓更多熟練工
人,既有助舒緩泰國勞動力短缺的問題,亦可藉聘
用這些訓練有素的員工支援公司的業務發展。怡
和機器一直致力為所服務的社區及地區帶來正面影
響,透過向泰國年輕人提供上述教育機會,泰國怡
和機器銳意建設更美好的亞洲。
With these strategies, JECT has been able to train up more skilled labour
to help with the country's labour shortage problem yet at the same time,
able to recruit well-trained employees to support the company's growth.
JEC always strive to make a positive impact in the communities and
territories where we operate, and by providing the above education
opportunities to the young people in Thailand, JECT actively seeks ways
to contribute towards engineering a better Asia.
機電項目流程概覽:概述機電業務的流程,從工程招
標開始到簽訂商業合約,以至系統的安裝、測試和調
試,幫助新員工充分理解工作內容。
機電系統-基礎課程:提供各類機電系統的基本資料
與技術知識,包括電氣及通訊、衞生、消防、空調及
通風系統。
泰國怡和機器繪圖標準課程:課程專為繪圖員而設,
協助員工在繪製各類機電系統圖則時應用不同的
AutoCAD標準。
環境健康與安全課程:這是所有員工的必修培訓,講
解在地盤工作以及工程設備的危險性。內容涵蓋安全
與健康政策以及安全條例,確保所有員工能以健康並
安全的方式工作。
ME Work Flow – Overview: this course outlines the ME
business processes starting from tendering, commercial contracting,
installation, to testing  commissioning, enabling the new employees
to understand more about their job.
ME System – Basic Course: this course provides the basic
information and technical knowledge of the various ME systems
including electrical  communication, sanitary, fire protection, air-
conditioning  ventilation systems.
JECT Drawing Standard Course: this course is for Draftsmen only. It
helps employees to apply the various AutoCAD drawing standards in
ME systems.
Environment Health and Safety Course: an essential training for all
employees about hazards of working in construction environment and
of engineering equipment. It covers safety and health policy, as well
as safety laws so that all our employees can perform their work in a
healthy and safe manner.
COMMUNITY CARE
JEC MAGAZINE ISSUE 35
關懷社區
O
n 17th April 2016, 6 colleagues from JEC participated in “Walk
Up Jardine House 2016“ and raised funds for MINDSET,
a registered charity raising awareness and understanding
of mental health issues, as well as providing direct assistance to
individuals, families and organizations in need of help.
As a major sponsor,
a r e l a y t e a m w a s
formed by 5 colleagues
across business units:
C a l v i n C h e n g a n d
Edmand Wong from
Chung Hing Engineers;
Anakin Liu from EM
Contracting; Tang Wai
Lun from Maintenance 
Renovation and Gary Lai, JEC's 2015 Management Trainee. The team
finished strong with a 4 minutes and 19 seconds record, for the course
running up 49 storeys. Other than team relay, Wong Hung Fai from
Commercial and Engineering Support also took part in the Barrow Cup
and achieved remarkably by running up 49 storeys in exactly 8 minutes.
2
016年4月17日,六位怡和機器的同事參加了一年
一度的「齊步上怡廈」活動,為註冊慈善機構「思
健」籌款。「思健」主要提倡精神健康,於社區作
推廣及教育工作,同
時為有需要的人士、
家 庭 及 機 構 提 供 支
援。
作 為 主 要 贊 助 商 之
一,怡和機器派出五
位來自不同部門的同
事參加了男子組接力
賽,分別是中興工程
的黃家輝和鄭凱文、
機電合約工程部的廖
卓懷、保養及維修部
的鄧偉倫以及2015年度管理培訓生黎明駿。五位同事都充
滿幹勁,以4分19秒的成績飛快地完成賽事。此外,商業
及工程支援部的王雄飛也參加了男子組單人賽,以8分鐘的
佳績跑畢49層樓梯!
JEC Participants Conquered Walk Up Jardine House 2016 to
Raise Funds for MINDSET
2016年度「齊步上怡廈」圓滿結束 成功為「思健」籌款
O
n 23rd April 2016, JEC Caring Team brought a group of 15
children from the Hong Kong Children and Youth Services to
visit the Sky100, the observation deck located on the 100th
floor of International Commerce Centre (ICC) and M+Rover Traveling
Creative Studio, a mobile truck with creative arts and installations.
The caring team activity served to encourage children to appreciate
and be familiar with art, as well as an opportunity to learn more about
signature architectures in
Hong Kong during the Sky100
Academy learning session.
The children were excited
and curious to look out of the
window from the observation
deck of Sky100, and had a lot
of fun during the day together
with JEC's caring team
members.
2
016年4月23日,怡和機器的愛心大使陪同15名來自
香港青少年服務處的小朋友到環球貿易廣場100樓
的天際100香港觀景台遊覽,另外又參觀載滿創意
藝術作品和裝置的特製拖車─「M+敢探號」流動創作
教室。
是次活動旨在鼓勵小朋友欣賞及認識藝術,同時藉參加天
際100學堂的教育活動認識香港的特色建築物。小朋友在
天際100觀景台望向窗外景物,既好奇又興奮,與怡和機
器愛心大使共度快樂的一天。
JEC Caring Team Embarks on Sky-high Journey with Children
怡和機器愛心大使與小朋友踏上天際之旅
▲ Mr. Wilson Kwong, Chief Executive (3rd
from right) supports the JEC Team.
  行政總裁鄺永銓先生(右三)專程到場為健兒
們打氣。
PRODUCT SOLUTIONS
JEC MAGAZINE ISSUE 35
產品方案
Bionomic Industries - Water Scrubber System
水劑滌氣系統
Vertical Quencher
Cooling liquid (normally water) is introduced at the top of the quencher
where the gas begins to cool towards saturation.
垂直冷卻器
冷卻液(一般都是清水)從裝置的頂部流入,氣體會在
該處冷卻至飽和狀態。
23
Incineration or major industrial combustion processes are likely to
generate toxic fumes and air pollutants. These toxic fumes and air
pollutants are directly released into the atmosphere, adversely affecting
the living environment if they are left untreated. In order to reduce air
pollution, a water scrubber can be utilized to clean air, fuel gas or other
gases of various pollutants and dust particles.
Bionomic water scrubber system is an air pollution control device that
uses liquid to remove particles or gases from exhaust streams. The
system consists of three main components:
焚化或大型工業的燃燒工序,有可能釋出有毒煙霧及空
氣污染物,若不加處理,直接把這些物質排放到大氣
中,會對生活環境構成負面影響。要減少空氣污染,可
選擇使用清水洗滌器以淨化空氣、燃氣或其他氣體中的
各類污染物及塵埃。
清水洗滌器是一種控制空氣污染的裝置,利用液體去除
廢氣的顆粒或氣體。系統由三個主要部件組成:
Venturi Scrubber
Through the venturi throat, the contaminated gas and liquid are
accelerated and mixed in a high energy, extremely turbulent
environment. The gas-liquid mixture exits from the quencher are sheared
into finer droplets, which are able to capture finer particulates.
文氏管洗滌器
在洗滌器的收窄通道內,要處理的氣體及液體會於一個
高能量及湍流急速的環境中混合。從冷卻器排出的氣液
混合物,分離成更微細的小滴,使系统有能力吸納微細
的顆粒。
Cyclonic Separator
The entrained liquid is removed by a combination of centrifugal and
gravitational forces. The fine particles are dropped into the bottom of
separator which contains certain amount of water.
旋風式分離器
隨着離心力和引力的作用下,微粒從液體中去除並跌落
在分離器底部。
Gas Flow: 35m3
/sec
Gas Temp: 378c◦
Moist: estimated 5%
氣體流量:35立方米/秒
氣體溫度:攝氏378度
濕度:估計5%
All size of particulate
entry the system
體積不一的顆粒進入系統
Water Scrubber System Process Flow Diagram  水劑滌氣系統運作示意圖
After cyclonic
Separator
經過旋風式分離器後
Remove = 4 micron
(achieve 95% efficiency)
Gas Flow: 16.9-21.3m3
/sec
Gas temp: 61-73c◦
Moist: 22-35%
去除4微米
(達致 95%效率)
氣體流量:16.9 - 21.3立方米/秒
氣體溫度:攝氏61至73度
濕度:22-35%
Gas Flow: 21.3m3
/sec
Gas temp: 76c◦
Moist: 37.8%
氣體流量:21.3立方米/秒
氣體溫度:攝氏76度
濕度:37.8%
After scrubber 
before cyclonic separator
經過洗滌器後,
進入旋風式分離器前
產品方案
PRODUCT SOLUTIONS
24
JEC MAGAZINE ISSUE 35
The water scrubber system features a designed throat and diverging
sections that provide high collection efficiencies at reduced pressure
drops. It is ideal for sticky or scaling dusts. Entrainment separator
vessels with secondary gas treatment and cooling options are available
for different type of scrubbers which are in a full range of sizes to handle
gas capacities from 0.236 to 217m3
/sec and remove down to 0.2 micron.
In the Fire and Ambulance Services Academy located at Tseung Kwan
O (Photo1), huge amount of smoke were released during fire simulator
training of the Academy. JEC supplied three sets of Bionomic water
scrubber system to the Architectural Services Department of HKSAR for
smoke treatment in order to minimize the impact of air pollutants on the
surrounding environment.
水劑滌氣系統備有特別設計的通道及分流部件,不但效
率高,也能減少壓降,適合處理黏性或大規模微粒。分
離器可配合冷卻功能,不同款式和體積的洗滌器,能對
氣體作二級處理,可處理的氣體每秒介乎0.236至217
立方米,去除顆粒小至0.2微米。
在將軍澳的消防及救護學院裏(圖一),消防員每天參
與模擬火災訓練時,大量濃煙會從訓練學院大樓排出室
外。怡和機器已向香港建築署供應了三組水劑滌氣系統
以處理煙霧,並減少空氣污染物對周邊環境的影響。
Smoke Extraction System Process Flow Diagram  排煙系統運作示意圖
Outdoor Compartment Fire
Behavior Training Hangar
室內火災訓練場
Demo  Attack Unit
示範及演練組件
Branch Distribution Unit
分流組件
Water Scrubber System
水劑滌氣系統
Smoke Extraction Fan
排煙風扇
Clear Air Discharge
排放已淨化空氣
Smoke and Odour Filtration
煙霧及氣味過濾
(Photo1)
MAJOR CONTRACTS
LISTING
JEC MAGAZINE ISSUE 35
工程合約
Hong Kong
14-39 King Wah Road, North Point Supply of Active Chilled Beam and induction VAV Simon Kwok
Alexandra House Supply and installation of LED light box Edmond Chau
American Club at Exchange Square 2 FS  MVAC system renovation Philip Tsang / Taylor Wong
Café de Coral Centre, Fo Tan Design and build for replacement of chiller plant Alice Wong
Central Police Station Supply of ironmongery Lawrence Wong
Central-Wanchai Bypass Tunnel Building Supply and installation of metal door and glass door Lawrence Wong
Centre of Excellence in Paediatrics
Supply and installation of diesel gensets Dick Lee
Supply and installation of ELV systems and fire services system
Design, supply and installation of building maintenance unit and pneumatic tube
Godfrey Lee / Eddy Tong / Roy Leung
China Mobile Data Centre Expansion Supply and installation of genset system Dick Lee
City Garden Supply and replacement of sea water cooled chiller Taylor Wong
City University of Hong Kong Supply and installation of diesel gensets Dick Lee
Cityplaza Three Fitting out offices with combined building service installation Taylor Wong
CLP Castle Peak Power Station Supply and replacement of chillers, AHUs and FCUs Alice Wong
Empire Centre, Tsim Sha Tsui Replacement of sea water pipe works and equipment for A/C system Alice Wong
Equinix Data Center HK2-III Supply and installation of diesel gensets Dick Lee
Equinix Data Centre HK2-IV Supply and installation of cooling tower Simon Kwok
Exchange Square
Electrical installation - power supply upgrade works Fred Chan
FSID work for Tower 1, 2  3 Philip Tsang
MVAC work for FSID Fred Chan
Supply of LED lightings Edmond Chau
Tower 1  2 lift lobbies renovation and FS renovation Philip Tsang
FEHD Environmental Hygiene Offices-cum-Vehicle
Depot
ASD Contract No. SS D505 - BMU for reprovisioning of FEHD Sai Yee Street
Environmental Hygiene Offices-cum-Vehicle Depot at Yen Ming Road
Roy Leung / Roy Cheng
Fire Services Training School, Tseung Kwan O Supply and installation of steel doors and supply of ironmongery Lawrence Wong
Goldin Financial Global Centre
Supply and installation of genset system, PV panel, cooling tower and supply of
pumps and valves
Dick Lee / Simon Kwok / John Ma / David
Kwong
Great Eagle Centre Supply and installation of LED emergency lighting Edmond Chau
Hactl
10-year FS maintenance contract on Dry Fire Philip Tsang
Replacement of LED exit sign plate Edmond Chau
Supply and installation of LED lighting in office area Edmond Chau
Hang Seng Bank, 113 Argyle Street Supply and installation of raised floor and supply of sanitaryware Lawrence Wong
Hang Seng Tower, Kowloon Bay Supply and installation of carpet tiles and supply of sanitaryware Lawrence Wong
HK-Zhuhai-Macao Bridge
Supply and installation of diesel gensets for HK Boundary Crossing Facilities
Vehicle Clearance Plazas and Ancillary Building  Facilities
Dick Lee
Supply and installation of lifting appliances at road section between Scenic Hill and
HK Boundary Crossing Facilities
Roy Leung / Roy Cheng
Supply and installation of smoke curtain Tommy Tam
Supply of ironmongery for PCB façade package Lawrence Wong
Hong Kong Exchanges and Clearing Limited Data
Centre, Tseung Kwan O
Modification of drainage pipework and provision of term workers Alice Wong
Hong Kong International Airport
Design, supply and installation of conveyors of the Baggage Handling System at T1
for Midfield Concourse development
Eric Ho / Paul Wong
Maintenance services for conveyor systems and automatic sortation systems of the
Baggage Handling System
Eric Ho / Paul Wong
Maintenance, improvement and refurbishment works for electrical and mechanical
systems at Midfield Concourse and North Satellite Concourse
Alice Wong
Refurbishment works for general mechanical installation at T1, T2, HKIAT, IAC,
NSC, CTC, AWTC and Skypier, HKIA
Alice Wong
Supply and installation of metal design ceiling at Midfield Lawrence Wong
HSBC Main Building, HMB Project Bridge II Supply and installation of fuel system Dick Lee
I Tech Data Centre Phase 2 Supply and installation of diesel gensets Dick Lee
Jardine House Supply and installation of LED highmast flood light Edmond Chau
Kai Tak District Cooling Project Phase 3  3B Supply of seawater pumps John Ma
Kai Tak Nullah Reconstruction  Upgrading Supply and installation of stoplogs Chris Ding
Kennedy Town Swimming Pool (Phase II) Supply and installation of swimming pool filtration system Jin Wong
Kowloon Hospital, KCC Supply and installation of 71 sets of patient hoists at Kowloon Hospital Roy Leung
Landmark, Central
FSID work Philip Tsang
MVAC  electrical work for toilet renovation Fred Chan
MVAC work for FSID Fred Chan
Langham Place, Mongkok Supply and installation of motion sensor LED batten Edmond Chau
Leighton Contractors (Asia) Ltd
BMU for Liantang / Heung Yuen Wai Boundary Control Point (BCP) - BCP Building
and Associated Facilities Project
Roy Leung / Roy Cheng
Luk Hop Industrial Building - Energy Saving Rental
Centre
Supply and installation of LED lightings Edmond Chau
Manhattan Place MVAC installation on 43/F Alice Wong
Maxim's Office Building Supply and installation of carpet tiles Lawrence Wong
Maxim's Various Branches at HK, Kowloon and NT Supply maintenance services for various branches (2016 - 2017) Alice Wong
工程合約
MAJOR CONTRACTS LISTING
JEC MAGAZINE ISSUE 35
MTR Corporation
Building Management System installation and modification for East Rail Line
Station Control Room in Tai Wo, Fanling  Sheung Shui Stations
Martin Cheung
Chiller plant replacement for Wanchai Station Taylor Wong
Design, supply and installation of electrical works, fire services, pumps and drains,
swimming pool filtration system and supply of ironmongery for the reprovision of
Harbour Road Sports Centre and Wan Chai Swimming Pool
Eric Ho / Lawrence Wong
Provision of mobile wheel lathe  mobile lifting jack at Tsuen Wan Depot Roy Leung
Relining of condensing mains at Tsim Sha Tsui and Yau Ma Tei Stations Alice Wong
Replacement of underfloor wheel lathe at Ho Tung Lau Roy Leung / Roy Cheng
Retrofit service wagon Roy Leung
SCL Contract 1191 - provides floodgate system for Shatin to Central Link Phase 2 Roy Leung / Eric Ho
Supply and installation of Access Cover for South Island Line (East) Lawrence Wong
Supply and installation of steel door and frames for Shatin to Central Link Lawrence Wong
Supply and installation of stoplogs at West Kowloon Terminal Chris Ding
Supply and replacement of AFA system at Hong Kong and Kowloon Stations Tommy Tam
Supply of fire pumps for Shatin to Central Link Tommy Tam
Supply of 'Flamebar' fire resistant ductwork at Whampoa and Ho Man Tin Stations Simon Kwok
Supply of 'Flamebar' fire resistant ductwork for Express Rail Link Simon Kwok
Supply of metal door and ironmongery at Tin Shui Wai Station Lawrence Wong
Mui Wo Sewage Treatment Works Supply and installation of the lifting appliances Roy Leung / Roy Cheng
Murray Building
Supply and installation of diesel gensets Dick Lee
Supply of pumps and fire rated coating Simon Kwok
New World Centre Supply of valves, fire pumps and fire resistant ductwork David Kwong / Tommy Tam / Simon Kwok
NTT Data Centre (FDC2-EXP-001) Supply and installation of genset system Dick Lee
Ocean Park Polar Building Supply and installation of filtration system for life support system Jin Wong
Organic Waste Treatment Facilities Phase 1 Supply of absorption chiller Kelvin Tang
Pacific Place Replacement of high tension chillers Fred Chan
Peninsula Centre - Energy Saving Rental Centre Supply and installation of LED lightings Edmond Chau
Primary Schools at Kai Tak Supply and installation of timber doors for 30 classrooms and raised floor system Lawrence Wong
Prince's Building  Alexandra House Electrical installation - power supply upgrade works Fred Chan
Public Library and Indoor Recreation Centre in Area 3,
Yuen Long
Supply and installation of steel doors and supply of ironmongery Lawrence Wong
Public Rental Housing Development at Tuen Mun Area
54 Site 2 Phase 12
MVAC installation Eddy Tong
Residential Development at D.D. 105, Ngau Tam Mei Supply and installation of swimming pool filtration system Jin Wong
Residential Development at Kai Tak Supply and installation of diesel gensets Dick Lee
Residential Development in Cheung Sha, Lantau Supply and installation of Modwood composite wood decking Lawrence Wong
Sewage Pumping Station for Tung Chung Housing Supply and installation of EM equipment for sewage pumping station Alex Law
Shangri-la Hotel, Hunghom Supply of pumps John Ma
Shek Wu Hui Sewage Treatment Works Further Expansion Phase 1A - Advance Works Kent Mak
Shing Hing Construction Co Ltd Theatre seating for Sai Wan Ho Civil Centre Phase 2 Roy Leung / Natalie Tsang
Sports Centre in Area 14B, Shatin Supply and installation of cooling tower Simon Kwok
Sports Centre, Community Hall and District Library in
Area 14B, Shatin
Supply of ironmongery Lawrence Wong
Stonecutters Island Main Pumping Station Supply and installation of the lifting appliances Roy Leung / Roy Cheng
Sun Yuen Long Centre
Design and build contract for the enhancement work of the existing air cooled
chiller system
Alice Wong
Suntech International Management Ltd Seating for Broadway Cinema at AMC Pacific Place Roy Leung / Natalie Tsang
Tai Lam Centre for Women Supply and installation of door and ironmongery Lawrence Wong
Tai Po Water Treatment Works Supply of granular activated carbon Hydro Ho
Tin Shui Wai Hospital
Design, supply and installation of pneumatic tube system, and supply of pumps, air
quality products and central battery system
Eric Ho / John Ma / Hydro Ho / Tommy
Tam
Tsuen Wan 5 Bayside Supply of valves David Kwong
Tuen Mun Western Trunk Sewerage Tunnel Supply and installation of stoplogs Chris Ding
Tung Chung Crescent Supply and installation of motion sensor tube with emergency battery Edmond Chau
Wan Chung Construction Co Ltd
Theatre seating for renovation and improvement works to Jockey Club Auditorium
for The Hong Kong Polytechnic University
Roy Leung / Natalie Tsang
Wellcome  Mannings Various Stores at HK, Kowloon
and NT
MVAC repair and maintenance services for various stores (2016 - 2018) Alice Wong
West Kowloon Government Office at Yau Ma Tei Supply and installation of diesel gensets Dick Lee
West Kowloon Law Court Supply and installation of carpet tiles Lawrence Wong
West Rail Nam Cheong Station Property Development Supply and installation of swimming pool filtration system Jin Wong
WF Joseph Lee Primary School Supply and installation of swimming pool filtration system Jin Wong
Wing On House Upgrading of sea water system Taylor Wong
Wonder 9 Data Centre Supply and installation of metal door and timber door Lawrence Wong
World-Wide House, Central Replacement of water-cooled chiller Taylor Wong
Yan Chai Hospital Supply and installation of IPC, timber door and ironmongery Lawrence Wong
Yau Mai Tei Specialist Clinic at Queen Elizabeth
Hospital
Supply and installation of IPC, wall protection system and timber doors Lawrence Wong
Macau
Galaxy Resort Supply and installation of Pergo laminated floor for Phase 1 Lawrence Wong
Junior Court of Law Supply of central battery system Tommy Tam
Louis XIII Hotel Supply and installation of genset systems and supply of valve Dick Lee / David Kwong
Macau Fisherman's Wharf
Design, supply, installation, testing and commissioning of Linen and Refuse Chute
System for Fisherman's Wharf in Macau Phase 1 Stage 2
Roy Leung / Roy Cheng
Macau Light Rail Transit Design and supply for painting booth Roy Leung
MGM Cotai
Supply of floor drains and bathtubs Lawrence Wong
Supply and installation of cooling tower, smoke guard and supply of pumps and
valves
Simon Kwok / Tommy Tam / John Ma /
David Kwong
MGM Grand Paradise Design, supply and installation of building maintenance unit and turntable Roy Leung / Roy Cheng
St. Regis, Venetian Macau, Parcel 5B Supply of ironmongery and sanitaryware Lawrence Wong
Venetian Cotai P3
Design, supply and installation of baggage handling system Roy Leung / Roy Cheng
Supply and installation of diesel gensets Dick Lee
Supply of ironmongery and sanitaryware Lawrence Wong
Supply of valves David Kwong
Thailand
BITEC 2  BHIRAJ TOWER at BITEC
Supply, installation, testing and commissioning of air-conditioning and ventilation
system, electrical and communication system, sanitary and fire protection system
Suradech Sintanakul
BMS AIA Sathorn Supply and installation of Building Automation System (BAS) Wuttichai Kaewpairoj
BMS Kaennakorn Building Supply and installation of Building Automation System (BAS) Wuttichai Kaewpairoj
CP Leadership Development Center Nakhon
Ratchasima
Supply and installation of air-conditioning and ventilation system, electrical and
communication system, sanitary and fire protection system
Terapong Rujitanakul
Emporium Suite Supply and installation of sanitary system Somwang Aksornnukul
FAS Services 2016-2017 (EGAT) Supply and installation of fire alarm system Wuttichai Kaewpairoj
Gaysorn Plaza Operation and maintenance Somwang Aksornnukul
King Power at Suvarnabhumi Airport Operation and maintenance Somwang Aksornnukul
Main Villa - Ban Rai Sang dao
Supply and installation of air-conditioning and ventilation system, electrical and
communication system, sanitary and fire protection system
Terapong Rujitanakul
MRT
Supply and installation of air-conditioning and ventilation system for Blue Line
Extension Project
Suradech Sintanakul
National Institute of Metrology (Thailand) Operation and maintenance Somwang Aksornnukul
Renaissance Pattaya Supply and installation of Building Automation System (BAS)  fire alarm system Wuttichai Kaewpairoj
Siriraj Hospital (Syamindra Building) Supply and installation of sanitary system Somwang Aksornnukul
SPCG
Supply, installation, testing and commissioning of air-conditioning and ventilation
system, electrical and communication system, sanitary and fire protection system
Somwang Aksornnukul
Yothinburana School
Supply and installation of air-conditioning and ventilation system, electrical and
communication system, sanitary and fire protection system
Somwang Aksornnukul
Singapore
7-11 Stores Maintenance of refrigerated cases Walter Tan
Asia Square Tower 1  2 Mechanical and Electrical operation services Subramanian Chandran Pillai
Capital Square AHU/FCU replacement job Ang Boon Hui
Grand Park City Hall ACMV  BMS replacement job Ang Boon Hui
Keppel Towers/Tower 2 Mechanical and Electrical facility management Ivan Ho
Marina Bay Business Financial Tower 23 Mechanical and Electrical facility management Jess Debulgado
Marina Bay Financial Centre and One Raffles Quay Mechanical and Electrical facility management Jess Debulgado
One Raffles Link Mechanical and Electrical facility management Mike Wong
Plaza Singapura AA to common area ACMV Ang Boon Hui
Resorts World Sentosa Maintenance of district cooling plant Tay Choon Beng
Suntec City Electrical system maintenance services Mike Wong
Philippines
Doehle Haws Building Maintenance of VRF air-conditioning system and relocation works of Fan Coil Units Jess Bustamante
HVAC system of Plant A-C Admin Building (Tiwi, Albay) Preventive maintenance Enardo Flores
Integrated Facilities Management for JLL - IBM and JLL
- Schneider Electric
Property and asset management Jennie Elloso
Marikina North Sewer Network and Pump Station Design, build, testing and commissioning of sewage pumping station Lai Parcon
Mondelez Operation and maintenance Evelyn Leviste
Property and Asset Management for various facilities
managed by Jones Lang LaSalle
Operation and maintenance of facilities equipment Jennie Elloso
Property Management for Ayala Properties Management
Corporation
Operation and maintenance Evelyn Leviste
Putatan Water Treatment Plant 2 Design and construction of water treatment plant Lai Parcon / Alex Law
Sewage Treatment Plant in Libingan ng mga Bayani Design and construction of sewage treatment plant facilities Lai Parcon
Shopwise - Makati Supply and installation of chilled water system Jess Bustamante
Sonion Manufacturing Plant Supply and installation of HVAC units and MEPF Enrico Poquita
Taguig North Sub-Catchment Sewerage Project -
Makati South Sewer Line and Pumping Station
Supply, build, testing and commissioning of sewage pumping station and lift
stations
Lai Parcon
United Laboratories Operation and maintenance Evelyn Leviste
Universal Robina Corporation Operation and maintenance Evelyn Leviste
CHINA
Central Asia-China Gas Pipeline CCS2, CCS4, CCS6 
CCS8, Kazakhstan
Supply of CCHP system Eddie Ho
Hetian River Gas Field, Xinjiang Supply of gas gensets and accessories Eddie Ho
Kazakhstan Southern Pipeline, Bozoy Compression
Station
Supply of diesel genset Eddie Ho
Qingdao Gardening Expo Supply of CCHP system Eddie Ho
Shanghai Hongqiao Commercial Area Supply and commissioning of CCHP system Eddie Ho
Shaoxing Yuandong Petro-chemical Factory Supply of biogas CHP system Eddie Ho
Sinopec Supply and commissioning of gas gensets Eddie Ho
Space Technology 5th Institute - Phase 2 Supply and commissioning of gas gensets Eddie Ho
JEC Magazine 2016 issue 35

JEC Magazine 2016 issue 35

  • 2.
    Company Values Guide JECThailand to Excellence 核心價值引領 泰國怡和機器獲取卓越成就 Wilson Kwong 鄺永銓 CEO's Message 行政總裁的話 P.02 Feature Story 特寫 P.04 Company Values Guide JEC Thailand to Excellence 核心價值引領 泰國怡和機器獲取卓越成就 News 簡訊 P.09 JEC Participated in the Build4Asia 2016 Showcasing Sustainable Engineering Solutions 怡和機器參與Build4Asia 2016展示可持續工 程解決方案 Launch of JEC's Vision Mission and Values 怡和機器啟動全新願景、使命和核心價值 JEC Strengthens Water Business with the Award of Putatan Water Treatment Plant 2 Project 怡和機器獲得Putatan食水處理廠二期工程 合約  水務處理業務日益鞏固 JEC Provides Electrical and MVAC Systems to Greenhill Villa in Shatin 怡和機器為沙田綠怡雅苑提供電氣與機械通 風及空調系統 JEC Awarded Significant Contracts from The University of Hong Kong and MTR Corporation 怡和機器獲香港大學及港鐵公司的重要合約 JEC Singapore's Technical Competent Recognised in the Commercial and Hospitality Sectors 新加坡怡和機器的專業技術獲商業及旅遊款 待業認可 Jardine Distribution, Inc. Acquires Exclusive Rights to Provide Termite Treatment for CitiHomes JDI獨家代理CitiHomes滅白蟻服務 P.04 CEO'S MESSAGE 行 政 總 裁 的 話 Our new Vision Mission and Values (VMV) initiative is designed to capture all that makes JEC service delivery exceptional. This issue of JEC Magazine takes a close-up look at JEC Thailand through the lens of our four T.E.A.M. values to better understand what we’re doing right, and how to maintain excellence in engineering and customer service. The last few months have seen a number of outstanding contract successes around the region. In the Philippines, our growing strength in water and wastewater treatment has seen JEC tasked with the complete design, construction, testing, and commissioning of a new facility that will produce 100 million litres of potable water per day, as well as operation of the plant for at least a year following, in western Metro Manila. JEC Singapore is appointed to provide engineering and building services at Keppel Towers, and will deliver addition and alteration works and install an MVAC system at the Grand Park City Hall Hotel. Meanwhile, JEC Hong Kong has secured contracts with the Hong Kong Housing Society to provide Electrical and MVAC Systems to subsidised sale flats in Shatin, to upgrade the building management system across the main campus of the University of Hong Kong, and MTR Corporation, to replace chillers at Wanchai MTR station. You can also learn about JEC’s participation in the biennial Build4Asia show, in Hong Kong, where the distinctive JEC booth presented some of our leading engineering solutions. Finally, I’d like to commend Tsang Tak Yin and Tsang Tak Keung, brothers in our Maintenance and Renovation department, who have between them an amazing nine decades of service with JEC, with both still proudly delivering unrivalled engineering solutions to our customers. Read their story inside. Have a wonderful summer. 我們啟動的全新願景、使命和核心價值,包含所有促使怡和機器服務別樹一幟的元素。今期內 容會從T.E.A.M.四大核心價值出發,細究泰國怡和機器的發展,讓讀者了解我們的成功之道,以 及如何在工程和客戶服務方面維持優秀表現。 近幾個月來,我們在區內獲得不少重大的合約。在菲律賓,怡和機器將負責設計、興建、測試 及調試一座新的食水處理設施。新設施位於馬尼拉西部,每日可生產1億公升食水,落成後會由 怡和機器負責營運最少一年。這個項目反映我們在當地有關水務處理的業務愈見優勢。 在新加坡,怡和機器獲指定為吉寶中心的機電工程及屋宇裝備工程服務供應商。另外亦會為君 樂皇府酒店進行加建及改建工程,並安裝機械通風及空調系統。 與此同時,怡和機器在香港也獲得數份重要合約,包括為香港房屋協會位於沙田的資助出售房 屋提供電氣和機械通風及空調系統;為香港大學本部校園的樓宇管理系統進行升級工程,以及 為港鐵公司更換灣仔站的制冷機組。 上個月怡和機器參與了兩年一度的Build4Asia展覽,展示了不少與時並進的工程方案。相關消息 亦載於本刊內。 最後,我想推介曾德賢與曾德強的故事。曾氏兄弟在怡和機器的保養及維修部合共服務了長達 九十年,現時仍致力為客戶提供優質的工程方案,實在令人敬佩。 願大家度過一個美好的夏天。 CONTENTS JEC MAGAZINE ISSUE 35 目錄
  • 3.
    E&MC Crowned DSD'sBest Construction Sites Housekeeping Award 2015 機電合約工程部獲渠務署頒發2015年「最佳 工地整潔獎」 JEC Participated in the 3rd Cross-Strait Forum on Smart Rail Development 怡和機器參與第三屆「兩岸四地智能軌道交 通發展論壇」 JEC Spring Dinner 2016 2016年度怡和機器周年晚宴 Environmental, Health & Safety 環境、健康與安全 P.16 SMART Initiative for Workplace Safety SMART計劃─提倡職業安全 Personality 人物故事 P.18 Nine Decades of Dedication in JEC Brothers Tsang Tak Yin and Tsang Tak Keung Exemplify 'Alliance' 共獻怡和機器九十年 曾氏兄弟  同心同德的寫照 Training & Development 培訓及發展 P.20 Cultivate the Next Generation, Engineer a Better Asia 培育未來專才  建設美好亞洲 Community Care 關懷社區 P.22 JEC Caring Team Embarks on Sky-high Journey with Children 怡和機器愛心大使與小朋友踏上天際之旅 JEC Participants Conquered "Walk Up Jardine House 2016" to Raise Funds for MINDSET 2016年度「齊步上怡廈」圓滿結束 成功為「思健」籌款 Product Solutions 產品方案 P.23 Bionomic Industries - Water Scrubber System 水劑滌氣系統 Major Contracts Listing 工程合約 P.25 JEC Participated in the Build4Asia 2016 Showcasing Sustainable Engineering Solutions 怡和機器參與Build4Asia 2016展示可 持續工程解決方案 P.09 SMART Initiative for Workplace Safety SMART計劃─提倡職業安全 P.16 Nine Decades of Dedication in JEC Brothers Tsang Tak Yin and Tsang Tak Keung Exemplify 'Alliance' 共獻怡和機器九十年 曾氏兄弟  同心同德的寫照 P.18 JEC Caring Team Embarks on Sky-high Journey with Children 怡和機器愛心大使與小朋友踏上天際之旅 P.22
  • 4.
    FEATURE STORY JEC MAGAZINEISSUE 35 特寫 J EC Thailand has come a long way since the 1930s, when the Hong Kong–based Jardine Matheson Group established an operation in the kingdom – making it one of the most venerable parts of the JEC family. As Thailand's economy and built environment have grown and matured, especially in Bangkok, one of Asia's five largest cities, JEC operations in Thailand have also grown significantly to meet local needs. 泰 國怡和機器於1930年代由總部設於 香港的怡和集團成立,自此成為怡 和機器的重要成員。隨着泰國,特 別是曼谷的經濟 及建築環境日趨 成熟,怡和機器 亦大力擴張泰國 的業務,以滿足 當地需求。 For more than 50 years, JEC Thailand and its forerunners have placed a special focus on services and contracting solutions – installing and maintaining the air-conditioning, security, communications and fire systems of major projects, from shopping malls to airports. JEC Thailand understands that success in this field requires more than a high degree of technical competence. To secure fruitful and long- lasting relationships with customers, it is necessary to win their trust and confidence. Often this takes time, with smaller initial projects serving as a testbed to demonstrate service levels, and for the parties to discover one another. Always important in convincing prospects to consider JEC is reputable professional certification, while a recommendation by a customer's trusted partner or peer goes a long way too. Another valuable 過去50多年來,泰國怡和機器都以大型項目為服務重 點,為商場以至機場等不同項目安裝及保養空調、保 安、通訊及消防系統。 泰國怡和機器明白,要在上述領域取得成就,不能單靠 出色技術,要與客戶保持長遠互惠的關係,就必須贏得 他們的信任與信心。透過較小型的項目展示服務水準, 並了解對方的需要漸漸建立互信。昭著的信譽和專業保 證同樣重要,要獲得客戶信任的合作夥伴或同業推薦, 亦非一時三刻的事。另一個重要的方式是提供高質素的 項目評估和技術建議,這方面泰國怡和機器一直表現出 色。 Company Values Guide JEC Thailand to Excellence 核心價值引領 泰國怡和機器獲取卓越成就
  • 5.
    approach, at whichJEC Thailand has long excelled, is the provision of such a high quality of analysis of a project or situation, or technical proposal, that JEC's capability simply shines through. This effort is embodied in the set of values that everyone at JEC knows as T.E.A.M. – Technical Proficiency (T), Empowered Workforce (E), Alliance (A), Masterful Customer Service (M). 這些理念貫徹了怡和機器的核心價值T.E.A.M.:技 術精湛 (Technical Proficiency)、具備實力的員工 (Empowered Workforce)、同心同德 (Alliance) 及卓越 的客戶服務 (Masterful Customer Service)。 In the ME business that is the backbone of JEC Thailand's offering, it is often the test and commission phase that most clearly distinguishes the most technically able providers such as JEC in the industry. This was seen in the acclaimed installation of the world's first and largest radiant floor cooling system at Bangkok's Suvarnabhumi Airport, which cleverly maintains comfortable levels of temperature, humidity and air freshness in an air layer across 38 hectares of occupied floor area, but only up to just above everyone's heads, minimising both costs and environmental impact in these cavernous buildings. JEC Thailand is now recognised as a leader in this field. Among the hundreds of creative technical endeavours that JEC Thailand has been involved with, a notable current project is the MRT Blue Line Extension Project at two metro stations, Wat Mangkon and Wang Burapha, in central Bangkok, for which, in 2014, JEC Thailand was awarded the sub-contract to supply, install, test and commission the environmental control systems. JEC Thailand led the way in preparing combined working drawings showing detailed installation requirements and accurate information to facilitate cooperation among all involved parties, and provided professional project management such as scheduling, procurement planning, safety management, leveraging both its technical excellence and good relationships with main contractor and project consultants. 機電工程業務是泰國怡和機器的重心;工程的測試和 調試階段最能分辨服務供應商的技術高低,像怡和機 器這樣的業內龍頭往往突圍而出。 例 如 , 泰 國 怡 和 機 器 為 曼 谷 蘇 凡 納 布 機 場 (Suvarnabhumi Airport) 安裝的全球首個並最大的地板 輻射供冷系統,能為機場內38公頃樓面維持舒適的溫 度、濕度及供應清新空氣,其效果更巧妙地止於頭頂 上方位置,既降低這些大型建築的營運開支,亦減少 其對環境的影響。現時這項技術以泰國怡和機器的最 為先進。 泰國怡和機器曾參與數百個創新工程項目,近年以曼 谷地鐵 (MRT) 藍線的延伸項目最值得關注。2014年, 泰國怡和機器贏得分判合約,為位處曼谷中部的龍蓮 寺 (Wat Mangkon) 站及翁布拉帕 (Wang Burapha) 站 供應、安裝、測試和調試環境控 制系統。 整合施工圖則也是泰國怡和機器 的領先範疇。清晰的安裝要求和 準確的資料,能方便各施工單位 合作,而專業的項目管理如編排 工序、採購策劃和安全管理,則 能在發揮技術優勢的同時,與總 承建商和工程顧問保持良好關 係。 Technical Proficiency 技術精湛 ♦  Providing valuable technical advice to customers ♦  Driving towards excellence ♦ Resolving issues effectively and efficiently with latest technologies / techniques •  為客戶提供重要的技術建議 •  精益求精 • 以最新的科技 / 技術,有效並適時地解決問題
  • 6.
    特寫 FEATURE STORY 0 JEC MAGAZINEISSUE 35 特寫 FEATURE STORY 0 JEC MAGAZINE ISSUE 35 特寫 0 JEC MAGAZINE ISSUE 3 要維持泰國怡和機器的技術優勢,並以此取信於 客戶,就必須獲得廣被認受的專業認證。對一眾 高效能屋宇裝備供應商而言,美國國家環境平衡局 (NEBB) 是為行業樹立標準、程序及規格的重要認證 團體,負責評估供應商是否合資格為供暖、通風及 冷氣系統進行測試、調整及平衡工作。 自2014年起,泰國怡和機器取得NEBB認證,合符 資格承辦上述工作,以檢測屋宇裝備的運作效率, 從而為項目業主提供專屬的解決方案。泰國怡和機 器是泰國首間、東南亞第三間獲得NEBB認證的公 司。 泰國一些有遠見的客戶,會聘請獲NEBB認證的承建 商承接項目,特別是涉及測試和調試的項目,如外 國領事館、無塵室和醫院。 當今建築設計的一大趨勢是採用建築信息模擬 (BIM) 技術,以電腦模型展示建築設計,演示已相連接的 建築部件,並註明部件之間的關係及各自的特性。 為了在此創新範疇保持領先,泰國怡和機器在國內 設立首個BIM中心,以加強公司處理大型和複雜BIM 項目及為員工提供相關技術培訓的能力。 靈活而具規模的實習計劃,是泰國怡和機器另一致 勝關鍵。計劃的對象是泰國頂尖學府的文憑生及本 科生,為他們提供學習技能及了解大型工程公司的 機會。實習為期2至4個月,藉着擔任有薪職位和 接受富經驗的導師指導,學生得以從多方面認識行 業。這項計劃極具社會責任,不但可提升年輕人的 技能、展示怡和機器的技術,還可增加泰國的工程 專才,可謂滿足了學生、企業以至社會的需要。 2013年緬甸怡和機器的成立,是怡和機器在東南亞 發展的一大里程碑。泰國怡和機器亦立即傾力支援 這間新公司,安排工程師及管理人員定期造訪以分 享工程知識,特別是機電工程系統及工序的知識。 緬甸怡和機器亦會派員工到曼谷接受工程管理及成 本估算的訓練,同時認識日趨重要的工程管理和支 援技術。 FEATURE STORY To maintain JEC Thailand's technical capabilities, and to convey this differentiating advantage to clients, a key tool is the attainment of respected industry certification. Among providers of high performance building systems, the benchmark certification body for industry standards, procedures and specification is the NEBB (National Environmental Balancing Bureau), which assesses delivery of testing, adjusting and balancing (TAB) of systems such as heating, ventilation and air-conditioning. Since 2014, JEC Thailand has been certified by NEBB as able to undertake TAB of heating, ventilation and air-conditioning systems and to investigate and determine building systems' efficiency and provide customised solutions for project owners, the first company in Thailand to secure this recognition, and only the third in South East Asia. Forward-thinking customers in Thailand, such as for a new foreign embassy complex, or in cleanrooms and hospitals, require NEBB certification, especially for projects that involve testing and commissioning. An emerging trend in building design is the adoption of a building information model (BIM) approach, in which designs are rendered as computer models comprising interconnected geometrical objects tagged with relationships and attributes. To secure a lead in this innovative domain, the company has established the first BIM Centre in Thailand, to develop the capability to handle larger and more complex BIM projects and provide staff with training in this latest critical skill set. Another winning source of empowerment at JEC Thailand is its dynamic and growing apprenticeship programme, which offers diploma and degree students from Thailand's strongest educational institutions the opportunity to develop their personal skills and familiarity with a major engineering organisation, in paid positions that expose them to multiple facets of the business, for periods of two to four months, all under the guidance of an experienced mentor. This responsible approach serves the needs of the students, the company, and society at large, as it strengthens the pool of engineering talent in the country, sharing JEC's capabilities and empowering young individuals. The establishment of JEC Myanmar in 2013 was an exciting breakthrough for the company in the SE Asia region. JEC Thailand immediately stepped up to offer its full support, with engineers and managers making regular trips to this new JEC operation to share engineering competencies, especially in ME systems and processes. The traffic was two-way, as selected JEC Myanmar staff came over to Bangkok to receive training in business management and cost estimation, as well as a range of up-and-coming technologies in business management and ever-important support functions. Empowered Workforce 具備實力的員工 ♦  Empowering individuals ♦  Sharing knowledge and skills ♦ Preparing for future needs •  賦予員工能力以發揮所長 •  分享知識與技能 •  積極裝備,應付未來市場需要
  • 7.
    Masterful Customer Service 卓越的客戶服務 怡和機器的一大使命,是為客戶提供綜合的解決方 案。公司上下同心協力為客戶提供全面的工程方案及 服務,滿足客戶現在及將來的需要,是怡和機器包括 泰國怡和機器的一大優勢─ 各部門及各支團隊高度 合作,經常交流及分享消息、構思及技術進展。 除了共同協作和相互支援外,不少怡和機器的資深員 工,亦會樂意向團隊中的年輕和新成員分享寶貴經 驗。 泰國怡和機器視資深員工的經驗為最寶貴資產,並為 此發展出一套嚴謹的知識傳承方法,把經年累積的經 驗、價值觀、安裝與保養技術以至管理技巧整合成為 公司的機電系統標準,以便傳達給所有團隊。 過去一年,泰國怡和機器為各級員工安排內部培訓課 程,提供相應的技術培訓,包括基礎機電系統、機電 工作流程概要、安裝流程、繪圖標準、屋宇自動化系 統及防火系統。資深員工還有機會獲邀擔任培訓員, 向公司的年輕員工傳授技術。 It is at the core of JEC's mission to offer integrated solutions to customers. To make this a reality and deliver the full spectrum of engineering solutions and services to address customers' present and future needs as one team, a great strength of the JEC model – and certainly at JEC Thailand – has always been the high level of cooperation among departments and teams, with constant interaction and sharing of news, ideas and technical developments. Not only is there a fluidity in collaboration and support across disciplines, so too there is transfer between generations, as JEC's many long-serving staff share their years of experience with younger and newer members of the team. JEC Thailand clearly recognises that this depth of experience of its senior staff is its greatest asset, and has developed a rigorous knowledge capture process in order to coordinate and regularise the experience, engineering values, installation and maintenance techniques, and management capability built up over the years, and bring it together as the ME System Standards of JEC Thailand, which can then be disseminated to all teams. Throughout the year, the company arranges in-house courses to provide relevant technical training for staff at all levels – including in basic ME systems, ME overview workflow, installation process schedule, drawing standards, building automation systems and fire protection systems. Wherever possible, experienced staff are invited to be the facilitators, allowing them an opportunity to share and teach the next generation of JEC Thailand staff. ♦  Offering complete solutions to customers proactively ♦  Building strategic relationships ♦  Providing value and benefits to customers •  主動為客戶提供全面的解決方案 •  建立策略性伙伴關係 •  為客戶創造價值及優勢 完善的服務比任何廣告都更有宣傳效果。在近期的一 項工程中,泰國怡和機器為位於曼谷的AIA Capital Market Centre供應、安裝、測試和調試空調及其他系 統。由於泰國怡和機器在有關工程的表現理想,公司獲 AIA指定為AIA Sathorn的機電工程承建商,負責進行相 類似的工程。AIA Sathorn佔地70,000平方米、樓高27 The completeness of business's service delivery is a better advert for the company than anything money can buy. A recent contract to supply, install, test and commission air-conditioning and other systems at Bangkok's AIA Capital Market Centre so impressed AIA that when the company implemented its second office Alliance 同心同德 ♦  Working and leveraging as one team ♦  Helping other JEC members to succeed •  同心協力,團結一致 •  協助團隊成員邁向成功
  • 8.
    特寫 FEATURE STORY 0 JEC MAGAZINEISSUE 35 特寫 FEATURE STORY 0 JEC MAGAZINE ISSUE 35 特寫 FEATURE STORY 0 JEC MAGAZINE ISSUE 3 building, AIA-Sathorn, it nominated JEC Thailand as the preferred ME contractor to supply, install, test and commission a similar set of systems over 70,000 square metres of this 27-storey office tower in the nation's capital. Key contributors to the win were the excellent working relationship between JEC and the first main contractor and the company's consistently high standards of site and project management, leading to a smooth implementation, plus of course the trust between customer and JEC. Another customer whose close-up experience of JEC Thailand's project handling built trust and led to a fruitful relationship was the long-established Bhiraj Buri Group. Expertly executed ME work by the company on the air conditioning, sanitary and fire systems for the shopping mall and 45-storey office tower of the EmQuartier and Bhiraj Tower, greatly impressed our client. The trust that established meant that when, in 2014, a timeline of only sixteen months was available for a US$50-million ME project to supply, install and test and commission HVAC, electrical, communications, fire and other systems for the expansion of Bangkok International Trade and Exhibition Centre to more than twice its original area, at 70,000 square metres (BITEC II), JEC was awarded the contract, as the client recognised the deep dependability that JEC Thailand could bring to the project. 層,是AIA在曼谷的第二棟寫字樓。能夠獲得新合 約,關鍵在怡和機器於對上一次工程與總承建商建 立了良好的合作關係,加上一向出色的工地及項目 管理,促使工程順利完工,並獲得客戶的信賴。 歷史悠久的Bhiraj Buri集團,是另一個與泰國怡和 機器建立起互信和良好關係的客戶。位於曼谷市中 心的EmQuatier和Bhiraj Tower,分別為大型商場和 樓高45層的辦公大樓,這個項目的空調、衞生及消 防系統工程,便由泰國怡和機器負責,並獲得客戶 大加讚賞。因此於2014年,該集團把曼谷國際貿易 展覽中心 (BITEC) 的擴建工程合約,直接委託泰國 怡和機器負責,合約總值5,000萬美元。泰國怡和 機器須在短短16個月內將BITEC的面積擴大一倍至 70,000平方米,並為擴建部分 (BITEC II) 供應、安 裝、測試及調試暖通空調、電氣、通訊、消防及其 他系統。正是源於客戶對泰國怡和機器工程實力的 信賴,才令公司榮獲此項重要合約。 幾十年來的經驗和努力,塑造了怡和機器的核心價值,並一 直引領泰國怡和機器因應當地需求發展及擴充業務。如今, 為實現怡和機器「齊創新 促發展 攜手建亞洲」的願景,這些 核心價值被整合為T.E.A.M.,亦即上述的技術精湛 (Technical Proficiency)、具備實力的員工 (Empowered Workforce)、 同心同德 (Alliance) 及卓越的客戶服務 (Masterful Customer Service)。 泰國怡和機器董事總經理Narongchai Chavanussaporn對公司的 優勢和前景充滿信心。「我們把業務重心放在機電工程服務及 合約工程方案上,因此團隊的長遠成功取決於技術能力、待人 技巧和創造力。我們能為員工提供技術、資源、支援以及持續 培訓,他們正是與客戶溝通的橋樑,因此客戶關係管理是決定 業務成敗的關鍵。」他說。 T.E.A.M.核心價值是一個框架,引領團隊成員不負怡和機器所 託。Chavanussaporn指,「兼顧並結合各項優勢,並貫徹怡和 機器的核心價值,是怡和機器在泰國的經營方式。」 泰國怡和機器的經營之道,與母公司一脈相承。無論是個人抑 或團隊,只有明白客戶需要,在工作上展現核心價值,才能實 現攜手建亞洲的願景。 Over these many decades, the team at JEC Thailand have grown and strengthened their business according to local needs, guided by a set of values that they and the rest of the JEC family have established through experience and endeavour. Today, in pursuit of JEC's vision of 'Together we engineer a better Asia', these values are codified and shared as T.E.A.M. – Technical Proficiency, Empowered Workforce, Alliance, Masterful Customer Service. Mr. Narongchai Chavanussaporn, Managing Director of JEC Thailand is no doubt where the company's strength and prospects lie. Our key business focus is on ME services and contracting solutions. So our continuing success depends crucially on the technical ability, personal skills and creativity of our teams. We can provide the technology, resources, coordination and ongoing training, but it is our staff that the customers interact with and their decisions and relationship management are what determine whether we win or lose that business, he says. The T.E.A.M. values provide the framework that allows team members to deliver for JEC Thailand, says Mr Chavanussaporn. The balance and combination of strengths in the team is then translated into successful projects through the day-to-day implementation of these values, which represent the JEC way of doing business in Thailand. And what works in Thailand works throughout JEC. Technical competence delivered by individuals and teams who understand the needs of their customers, applying T.E.A.M. values to help make that vision of a better Asia a reality. Looking to the future  展望未來
  • 9.
    怡 和機器於2016年5月4至6日參與了於香港會議展覽中心舉行,每兩年一度的Build4Asia。這是亞洲最大型的建築科技、電氣照 明及防火保安展覽會,今屆吸引了約9,500位來自本地、中國內地、韓國及其他東南亞國家的海內外買家到場參觀。 怡和機器的展位設計別出心裁,展示了多項可持續解決工程方案,包括能源效益、水務管理、照明、室內空氣質素、建築產品、創新 保安系統和方案以及消防產品。我們的同事與參觀買家互相交流行業資訊及推廣展品的技術和特點,對拓展公司業務起着重要的作 用。 I n between 4th-6thMay, 2016, JEC participated in the Asia's leading biennial tradeshow, Build4Asia, which was held at the Hong Kong Exhibition and Convention Centre. The event was known as Asia's largest tradeshow for building, electrical engineering and security services, with around 9,500 local and overseas trade buyers coming from China, Taiwan, Korea and other Southeast Asian countries. The distinctive JEC Stand featured sustainable engineering solutions in different aspects, including Energy Efficiency, Water Management, Lightings, Green Building Technologies, Building Products, Innovative Security Systems and Solutions, and Fire Services Equipment. The visitors and our colleagues exchanged useful market information and technical knowledge about the exhibits. It was an eventful and meaningful occasion for networking and business development. JEC Participated in the Build4Asia 2016 Showcasing Sustainable Engineering Solutions 怡和機器參與Build4Asia 2016展示可持續工程解決方案 NEWS JEC MAGAZINE ISSUE 35 簡訊
  • 10.
    簡訊 NEWS JEC MAGAZINE ISSUE35 怡和機器啟動全新願景、使命和核心價值 Launch of JEC's Vision Mission and Values W e are proud to announce JEC's new set of Vision Mission and Values (VMV) which aims to achieve our business growth strategy. The new set of VMV was officially implemented on 1st April 2016 across the group. The Vision defines the future we want to create, the Mission describes what we do to get us to our Vision, and the Values guide us how we can effectively carry out the Mission. 為 了配合集團的業務發展策略,怡和機器啟 動了全新的願景、使命和核心價值,並於 2016年4月1日起在集團內全面推行。新的 願景為我們的未來確立了目標,使命闡述了我們為 達至願景而應採取的行動,而核心價值則提供了清 晰的指引,讓我們能夠有效地履行使命。 ● Train and develop our employees for sustainable growth   培育員工,持續增值 ● Offer integrated solutions to customers   為客戶提供綜合的解決方案 ● Provide technical expertise and advice to customers   為客戶提供專業的技術知識及建議 Mission 使命 Vision 願景 Together we engineer a better Asia 齊創新  促發展  攜手建亞洲 We also hope that the Values can be constantly reflected in our ongoing and future collaborations with stakeholders across each business unit and regional office. Together, we are engineering a better Asia! 我們期望於今後繼續與各業務單位的持份者合作,充分展現怡和機器的核心價值,讓我們攜手 建設更美好的亞洲! vValues 核心價值    lliance 同心同德    mpowered Workforce 具備實力的員工   echnical Proficiency 技術精湛 T E A    asterful Customer Service 卓越的客戶服務 M
  • 11.
    2 010年,由設計及興建污水處理廠和污水泵房 開始,怡和機器勇於開拓水務管理系統這一 個新的業務範疇。首份合約是在菲律賓興建 Taguig Baybreeze 污水處理廠,每日能處理4千萬公 升污水。成功完成項目後,公司再獲另一合約,興建 每日處理量達7.5千萬公升的Libinganng mga Bayani 污水處理廠。 為擴充水務處理業務,怡和機器現時亦涉足食水處 理廠的設計及建造項目。公司最近更獲得菲律賓 Putatan食水處理廠二期項目的重要合約,反映新業 務的發展前景光明。 Putatan食水處理廠二期的合約總值高達1億美元,是 Maynilad Water Services的項目。該公司是菲律賓 政府「都市供水及污水處理系統」的特許經營商,為 馬尼拉西部提供食水、排污及污水處理服務。新的食 水處理廠可為超過六百萬名馬尼拉市民提供潔淨的食 水,每天總處理量由10萬立方米提升至15萬立方米。 怡和機器將負責設計、興建、測試及調試,以及在設 施落成後營運至少一年。項目將應用先進科技,包括 過濾技術及逆滲透技術,以保證食水水質安全可靠。 通力合作 今次怡和機器的合作夥伴為Acciona Agua Spain及 FreyFil Corporation;要執行這一項目需要熟練的項 目管理,從而把食水處理、機電工程及土木工程等不 同專業範疇的人員聯合起來,活用各方的技術、專業 資格和資源。為了在緊迫的時限內竣工,團隊的緊密 合作至關重要。 怡和機器致力於環境安全 怡和機器一直致力運用具能源效益和對環境負責的工 程技術並善用新科技,承辦高水平的環保基建項目, Putatan食水處理廠二期項目正好體現了這一點。 I n 2010, JEC boldly entered the new business area of water management systems, initially focusing on the design and build of wastewater treatment plants and wastewater pumping stations. Its first contract success in The Philippines, for construction of the Taguig Baybreeze Sewage Treatment Plant – able to process 40 million litres of wastewater per day (MLD) – was soon followed by another win, to build the 75 MLD Libingan ng mga Bayani (LNMB) STP. To expand its business in the water sector, JEC has now ventured into the design and build of potable water treatment plants. This looks a promising move, with the recent award of the contract to develop the Putatan Water Treatment Plant 2 in The Philippines. Putatan 2 plant is a USD 100 Million design and build project which will provide clean drinking water to almost 6 million people in the metropolitan area of Manila with a capacity of 100,000 m3 per day, extendable to 150,000 m3 per day. The project is from Maynilad Water Services, a concessionaire of Metropolitan Waterworks and Sewerage System, which provides water, sewerage and sanitation services to western Metro Manila. The scope includes the design, construction, testing, and commissioning of the new plant, as well as the operation of the plant for at least a year following completion of the commissioning. The project will apply advanced technologies including ultra-filtration and reverse osmosis, which together assure high and reliable water quality standards. Implementation of the project will require deft project management, bringing together the skills, credentials and resources of various internal and external parties, under diverse disciplines including water treatment processes, mechanical electrical engineering, and civil engineering. It will be vital to create and structure the right partnerships in order to deliver the project within the stringent project timeline. To deliver this project JEC has partnered with Acciona Agua Spain and FreyFil Corporation. The Putatan Water Treatment Plant 2 is part of JEC’s ongoing commitment to undertake quality environmental infrastructure projects that widen and deepen the use of energy-efficient and environmentally responsible engineering and the use of new technologies. JEC Strengthens Water Business with the Award of Putatan Water Treatment Plant 2 Project 怡和機器獲得Putatan食水處理廠二期工程合約 水務處理業務日益鞏固
  • 12.
    JEC Provides Electricaland MVAC Systems to Greenhill Villa in Shatin 怡和機器為沙田綠怡雅苑提供電氣與機械通風及空調系統 J EC's Maintenance and Renovation team has been awarded a significant contract from the Hong Kong Housing Society for the installation of Electrical, Extra Low Voltage (ELV) and MVAC systems at Greenhill Villa, a subsidised sale flats project in Shatin. The project covers three 35 to 38-storey towers providing over 1,000 small and medium- sized flats as well as two levels of basement carpark and a clubhouse on G/F. JEC is responsible for the supply and installation of various EM systems including power supply and main switchboard, security system, CCTV system, VRV Unit and ventilation system. The project is expected to be completed in the third quarter of 2018. 怡 和機器的保養及維修團隊獲得香港房屋協會的重要合約,為沙田區的資助出售房屋項目綠怡雅苑安裝電氣、特低電壓和 機械通風及空調系統。 綠怡雅苑有三座樓高35至38層的樓宇,共提供逾1,000個中小型住宅單位,並設有會所設施和兩層地下停車場。怡和機器將負責供應及 安裝各類機電系統,包括供電設備及總掣櫃、保安系統、閉路電視系統、可變冷劑流量系統 (VRV) 裝置及通風系統等。工程預期在2018 年第三季完成。 J EC's Maintenance and Renovation team has been awarded a contract from The University of Hong Kong (HKU) for AAI - Improvement of Building Management System (BMS) in 19 buildings in Main Campus for integrated monitoring. The scope covers integration of existing BMS in 19 buildings located in HKU and extension of the BMS including some new building system provisions. The new BMS shall enhance HKU's ability to remotely control and manage various building systems, hence adding values to the existing operations with increased visibility on systems performance and swift incident management. With integrated monitoring, it also facilitates potential energy saving initiatives while users' comfort and needs are maintained. For MTR Corporation, JEC's Maintenance and Renovation team has won a contract for chiller replacement at Wanchai MTR station and while Electrical and Mechanical Contracting team has secured another significant contract to provide floodgate system for Shatin to Central Link Phase 2. The floodgate provision will be complex, as there are two ventilation buildings with a total of 6 floodgates installed and constructed to prevent influx of the sea water to the land section of the tunnel, in the event of heavy leakage of seawater due to rupture of the immersed tube. We are keen to provide engineering solutions to help customers in improving their facility management and system operating objectives that suit their best interests. 怡 和機器保養及維修團隊獲得香港大學的改建、加建及改善工程的合約,為本部校園19座大樓的樓宇管理系統進行升級工程,以 便校方綜合監測校內設施。工程範圍包括整合上述19座大樓現有的樓宇管理系統,並加入新功能。新的系統能有助香港大學加 強遙距控制和管理各屋宇裝備系統的能力,讓他們更清晰地掌握系統表現及提升應變效率。系統的整合既促進節能,又能兼顧 使用者的舒適和需要。 港鐵工程方面,保養及維修團隊獲得為灣仔港鐵站更換制冷機組的合約;與此同時,機電合約工程團隊獲得另一重要合約,為沙中綫第二期 工程裝設防洪閘系統。此項目較為複雜,團隊需要在兩座通風大樓內安裝6道防洪閘,作用在於防止海水因隧道沉管破裂而大量湧入隧道。 我們致力設計工程方案,協助客戶提高設施管理水平及系統營運目標,滿足他們的最大需要。 JEC Awarded Significant Contracts from The University of Hong Kong and MTR Corporation 怡和機器獲香港大學及港鐵的重要合約 簡訊 NEWS JEC MAGAZINE ISSUE 35
  • 13.
    J EC Singapore hasbeen awarded two significant contracts in the first quarter of 2016. The company was appointed as the facilities manager of Keppel Towers and Keppel Towers 2, providing electrical and mechanical engineering works and building services at these premises. Furthermore, JECS (Thermal) has been working on a 20-months new contract with the Grand Park City Hall Hotel since April this year, covering 10 storeys and two basements. The scope of the contract focuses on the addition and alteration (AA) works and MVAC system installation, replacing chillers, cooling towers, building management system and electrical works. The winning of the contracts validates the technical competent of JEC Singapore JECS (Thermal) in providing dependable facilities management, AA and MVAC services to its customers. 新 加坡怡和機器在今年首季獲得兩項重要的工程合約。首先公司獲指定為新加坡吉寶中心及中心 二期的設施管理服務供應商,負責物業的機電工程及屋宇裝備工程。 此外,JECS (Thermal) 於今年4月獲得新加坡君樂皇府酒店為期20個月的合約,為 酒店進行加建及改建工程,並安裝機械通風及空調系統,以及更換製冷機組、冷卻 塔、樓宇管理系統和電氣裝置。此項目涵蓋10個樓層及兩個地下室。 能夠獲得這些項目工程,再次證明新加坡怡和機器及JECS (Thermal) 的專業技 術能為客戶提供可靠的設施管理、加建與改建,以及機械通風及空調系統工程 和服務。 J ardine Distribution, Inc. (JDI) acquires the exclusive rights to provide termite treatment for real estate sites of CitiHomes Builders and Development, Inc. (CBDI), one of the leading property developers in North Philippines which specialises in providing comfortable and affordable homes for Filipino families. JDI will provide soil treatment using Protek, the nation's leading soil termiticide, for all the on-going and future developments of CitiHomes. This is a strategic business development opportunity for JDI, as it not only re-affirms our reputation as an effective home protection provider, but also gives us a chance to venture into the service application of the products we sell. said Mr. Edwin Hernandez, President of JDI. J ardine Distribution, Inc. (JDI) 獲得CitiHomes Builders and Development, Inc. (CitiHomes) 的獨家代理權, 為該公司的住宅地盤提供滅白蟻服務。CitiHomes是菲律賓北部最大的房地產發展商之一,專為菲律賓家庭 供應舒適及價格相宜的住宅。 JDI將採用菲律賓國內常用的白蟻藥Protek為未來及現正進行工程的地盤杜蟻。 JDI總裁Edwin Hernandez說:「這對公司來說是拓展業務的策略性機遇,不但再次肯定JDI家居保護服務的信譽, 也給我們機會嘗試在服務中使用自家產品。」 JEC Singapore's Technical Competent Recognised in the Commercial and Hospitality Sectors 新加坡怡和機器的專業技術獲商業及旅遊款待業認可 Jardine Distribution, Inc. Acquires Exclusive Rights to Provide Termite Treatment for CitiHomes JDI獨家代理CitiHomes滅白蟻服務
  • 14.
    ▲ Mr. C KTam (2nd from left), Mr. Alex Law (3rd from right) and the project team attended the Award Presentation Ceremony.    譚俊傑先生(左二)、羅志偉先生(右三)及項目團隊成員出席了頒獎典禮。 簡訊 NEWS JEC MAGAZINE ISSUE 35 E MC was awarded the Best Construction Sites Housekeeping Award (Electrical Mechanical Projects Division) for Contract No. DE/2013/05 – Provision of EM Facilities for Tin Liu Ha Sewage Pumping Station and Tong Min Tsuen Sewage Pumping Station, which is the first EM contract in Drainage services Department (DSD) adopting Engineering and Construction Contract (ECC) Option C of New Engineering Contract (NEC) form. A presentation ceremony was hosted by DSD on 19th March 2016. Led by Mr. C K Tam, Managing Director – EM Contracting and Mr. Alex Law, Assistant General Manager – EM Contracting, the project team received the award from Mr. Edwin Tong Ka-hung, Director of DSD, in recognition of their outstanding performance during the project execution. 機 電合約工程部項目「為田寮下污水泵房和塘面村供應及安裝機電設 備」﹙合約編號DE/2013/05﹚獲渠務署頒發「最佳工地整潔獎」。 該合約是渠務署首宗採用「新工程合約」模式內的「工程建造合約C 選項」的機電工程合約。頒獎典禮於2016年3月19日舉行,項目團隊在機電 合約工程董事總經理譚俊傑先生以及機電合約工程助理總經理羅志偉先生帶 領下,從渠務署署長唐嘉鴻先生手上接過獎項,以表揚團隊在施工過程的傑 出表現。 T he 3rd Cross-Strait Forum on Smart Rail Development – Present Future was successfully held on 9th-11th March 2016 at the Hong Kong Convention Exhibition Centre. The Forum was organised by the Hong Kong Institution of Engineers (HKIE), and co-organised by China Communications and Transportation Association, Rail Engineering Society of Taiwan and the Macau Institution of Engineers. Over 250 delegates coming from Hong Kong, mainland China, Macau and Taiwan, attended the Forum. In the Forum, an exhibition was held concurrently which provided an opportunity for the industry to showcase innovative projects and new technologies to enhance their business growth. JEC is delighted to participate in the event as an exhibitor, showcasing our projects and engineering expertise in the railway sector across Asia. Our existing railway projects focus on trackside maintenance works, security and safety segments. We will continue to work with stakeholders to engineer a better railway sector in the region. 第 三屆「兩岸四地智能軌道交通發展論壇」於2016年3月9至11日假香港會議展貿中心 舉行。該論壇由香港工程師學會主辦,並獲中國交通運輸協會、台灣軌道工程學會及 澳門工程師學會協辦,超過250名香港、中國、澳門及台灣的業界代表出席。 論壇同場設有展覽,讓參展商有機會展示創新項目和新技術,促進其業務發展。怡和機器非常 榮幸能成為論壇的參展商,得以展示我們在亞洲的鐵路項目及相關工程技術。我們現行的鐵路 項目主要為軌道旁的維修工作和安全項目。我們會繼續與各個持份者合作,推動區內鐵路業的 發展。 EMC Crowned DSD's Best Construction Sites Housekeeping Award 2015 機電合約工程部獲渠務署頒發2015年 「最佳工地整潔獎」 JEC Participated in the 3rd Cross-Strait Forum on Smart Rail Development 怡和機器參與第三屆 「兩岸四地智能軌道交通發展論壇」
  • 15.
    怡 和機器周年晚宴已於2016年3月4日假九龍 灣國際展貿中心「匯星」圓滿舉行。今年我 們以「怡和機器武林大會」為主題,管理層 紛紛化身成膾炙人口的經典武俠劇集及小說角色,矚 目的造型令人眼前一亮,他們在台上的精彩表演,成 為晚宴一大亮點。是次晚宴有逾1,200名同事與嘉賓 出席,場面熱鬧! T he annual staffevent, JEC Spring Dinner, was held successfully on 4th March 2016 at the Star Hall of the Kowloonbay International Trade and Exhibition Centre. The theme of this year's annual dinner was JEC Wulin Congress, one of the highlights were the performances by Executive Committee Members and Directors on stage with eye- catching costumes representing Chinese contemporary martial-arts fictional characters. More than 1,200 colleagues and guests enjoyed the eventful occasion. 2016年度怡和機器周年晚宴 JEC Spring Dinner 2016
  • 16.
    ENVIRONMENTAL, HEALTH SAFETY JECMAGAZINE ISSUE 35 環境、健康與安全 D uring the first three quarters of 2015, approximately 10 construction workers suffered from fatal accidents in Hong Kong's construction industry. The fatal accident rate has decreased from 16 cases recorded in the same period in 2014, however, the overall industrial accident rate has increased by about 7%. The industrial accident rate shall be kept at minimum level, or even zero, for the benefit of the physical well-being of workers as well as the industry. The number on record does not only reflect the cases of workers' physical injuries, it also includes lost wages, functional impairment or death of workers, which leads to medical treatment, physical and vocational rehabilitation, dispute resolution, claims administration and other systematic costs. To achieve and sustain a high level of health and safety performance; occupiers, employers, suppliers, manufacturers, designers and persons at work that create risks would be held accountable for eliminating or reducing those risks. For instance, employers have the responsibility to put in place effective safety management systems; the management should provide adequate resources, training and power for safety personnel to carry out their duties effectively; architects and engineers are responsible for designing structures and buildings in construction projects that can be built in safe method and tools; manufacturers and suppliers are responsible for ensuring that the machines they supply or maintain are safe when in operations. Workers have the responsibility to adhere to safe work practices and provide feedback upon receiving safety advice. Every person at work has to accept responsibility for his own safety and care for the others who are affected directly or indirectly by their work. 2 015年首3季,本港大約有10位工人在建造業 意外中喪生。雖然意外死亡率與去年同期的 16宗相比有所下降,但整體意外率仍有近7% 升幅。為了保障工人生命安全及行業發展,意外率 應保持在最低水平,甚至是零。這些記錄並非單純 的傷亡數字,它還反映了工人失去收入、技能甚至 性命的情況,並衍生醫療、身體復健和職業康復、 調解、索賠及其他有系統的成本。 為達致及保持高水平的職安健表現,工人、僱主、 供應商、製造商、設計人員及相關人士,都有責任 減低甚至消除因工作產生的風險。例如,僱主有責 任實施有效的安全管理制度;管理層應提供足夠的 資源、培訓及權力,讓安全人員能有效執行職務; 建築師及工程師為項目設計結構和建築物時,要確 保它們能以安全的方式和工具興建;製造商及供應 商則要確保其供應或保養的機器能在工地安全運 作。至於工人亦有責任遵守安全工作守則,並對安 全指示作出回應。每個人都要為個人安全負責,並 關心個人工作對他人的直接和間接影響。 SMART Initiative for Workplace Safety SMART計劃─提倡職業安全
  • 17.
    今年4月,怡和機器啟動了新的願景、使命及核心價值 (VMV),鼓勵員工在未來實現業務增長策略,公司的環 境、健康與安全部門更以SMART計劃作為提升安全及 預防意外的方法。要保持競爭力和生產力,就必須加 強內部協作,進一步改善現行營運,而保障員工的安 全與健康則是怡和機器最重要的經營目標之一。 In April, JEC'slaunch of the new set of Vision Mission and Values (VMV) inspires the employees to achieve business growth strategies in coming years. For EHS department in JEC, we also implement the SMART initiative for safety and precautions. We need to stay competitive and productive by further improving our existing activities through better coordination and collaboration. Ensuring the safety and health of our employees is one of JEC's most important business objectives. 怡和機器在職安健的長遠策略 17 打從開始了解這一點很重要:要達成SMART計劃的目 標,不能依靠現成工夫,只有公司上下都能投入和專 注,方能臻善。 員工在日常工作中貫徹SMART的原則,可以加強他們 的職安健意識,進而承擔改善工作環境的責任,最終 形成一種以安全和健康為先的公司文化,促成員工的 職安健實踐。清晰的政策、成熟的制度及管理層的承 諾,有助培育出正確的職安健態度,怡和機器對於保 持高水平的職安健表現並持續進步充滿信心。 SMART計劃的成功有賴公司內外不同的持份者,以及 業務夥伴的齊心協力,共同加強怡和機器安全工作的 文化。怡和機器相信,這個成就無法憑個人取得,只 有團隊努力配合強勢領導才能達致,而公司正堅定地 朝着正確的方向邁進。 It is important to acknowledge from the start that this will not be at the expense of what has been accomplished, but the areas identified in SMART will require all our collective effort and focus to achieve the greatest improvement. By implementing SMART in the employees' routine activities, the perception of health and safety will be enhanced and all of us will have the duty to improve the working environment. It will build a company culture of enabling each employee to think about safety and health first, and put them into practice on a daily basis. By cultivating the correct attitude through implementing clear policy, established system and management's commitment, JEC is confident that we will be able to sustain our high level of health and safety performance and continuously improve on it. The success of the SMART initiative depends on internal and external stakeholders and all partners to come together and strengthen the culture of safety in JEC workplaces. This success cannot be achieved by individuals alone, but only through our collective effort and strong leadership, which we are confident that we are committed and heading in the right direction. 5 key aspects of the SMART Initiative for Safety: SMART計劃包含 5大安全範疇: Site supervision 現場監督 S Managing the needs of employees and workers 處理僱員及 工人的要求 M A Alerting and identifying the risks 警惕及 識別風險 Reviewing and establishing safe working procedures 評估及 確立安全工作流程 R Training to ensure safety at work 提供有關 工作安全 的培訓 T
  • 18.
    PERSONALITY JEC MAGAZINE ISSUE35 人物故事 From a background that gave them no easy opportunities, brothers Tsang Tak Yin ('Yin', the elder of the two) and Tsang Tak Keung ('Keung') joined JEC in 1965 and 1974 respectively, to help provide for their family. Yin entered JEC first, on the advice of a family member who worked in JEC's operations department. Yin started as an apprentice in the maintenance and renovation department, fixing window air-conditioning units in residential complexes. Keung followed in the footsteps of his brother, working as an apprentice in JEC while he completed his studies at Morrison Hill Technical Institute (currently IVE (Morrison Hill)). He then joined the maintenance and renovation team, serving commercial complexes. Yin's early career saw him riding a motorbike all around the city, fixing air- conditioning units for residential customers. Then in 1972, he was promoted to be responsible for repairing window air-conditioning units at the Wong Chuk Hang workshop. An early highlight of Keung's JEC career, four years after joining JEC, was a one-man mission in 1981 to the Mandarin Oriental in Bangkok, to repair the chillers in the chiller plant room. He had to diagnose the problem, and then direct a local machinery shop to manufacture parts he needed to undertake the repair. The accomplishment was a memorable experience that demonstrated his ability as an independent and high-calibre technician. The recognition he receives from senior management for his technical expertise and industry exposure motivates and empowers Yin. He also enjoys teaching and passing on his technical knowledge, and introducing his customer networks to younger staff, to ensure continuity of the trusting relationships he has built between customers and the JEC team. The great regard in which he is held by subordinates and customers are for Yin a reflection of the strong alliance between his team, with him as a leader, and colleagues in JEC. 初出茅廬 成長在機會不多的年代,曾德賢和曾德強兩兄弟先 後在1965及1974年加入怡和機器,以期減輕家中經 濟負擔。在任職怡和機器營運部的家人建議下,曾德 賢先加入公司的維修部當學徒,主力修理住宅的冷氣 機。而弟弟曾德強於摩利臣山工業學院(IVE摩利臣 山分校前身)畢業後亦在怡和機器當學徒,後來與哥 哥同樣加入維修部工作,負責商廈維修。 起初曾德賢的工作是騎電單車,四出上門為顧客維 修冷氣機。1972年,他獲晉升並負責在黃竹坑工場 內維修冷氣機。 要說曾德強早年生涯的亮點,莫過於加入怡和機器4 年後,於1981年隻身到泰國曼谷的文華東方酒店維 修其冷氣機房。期間他要查找故障,並指示當地某 機械店製造維修所需零件。這次成績證明了他是個 能獨立工作並且手藝高超的技術員。 齊當團隊楷模 獲管理層視為技術專家和業內楷模,為曾德賢增添工 作的動力。他亦樂意向怡和機器的年青員工傳授維修 知識和轉介顧客,這確保他在公司與顧客之間建立的 信賴得以延續。曾德賢廣受同事和顧客尊敬,這顯示 他與團隊以至公司之間強而有力的關係。 曾德強同樣看重信賴,視之為與團隊成員相處的核 心,因此他致力保持積極態度和團隊精神。他的領 導風格是給予同事空間,讓他們自行解決問題,自 己則在必要時提供支援和指導。這種工作態度讓曾 德強獲得團隊以至公司的敬重。 ▲  Tsang's older (Tsang Tak Yin) and younger (Tsang Tak Keung) brothers   曾德賢(兄)及曾德強(弟) Nine Decades of Dedication in JEC Brothers Tsang Tak Yin and Tsang Tak Keung Exemplify 'Alliance' 共獻怡和機器九十年  曾氏兄弟  同心同德的寫照 ▲  Tsang's brothers attended a dinner with other JEC colleagues   曾氏兄弟與怡和機器同事聚會
  • 19.
    Keung likewise greatlyvalues trust, placing it at the centre of his relationship with his team, as he drives high levels of engagement and esprit de corps. His management style makes space for staff to take responsibility for issues they encounter. He provides back-up and guidance as needed, but recognises the flexibility and effectiveness when team members can confidently and independently tackle problems. The success of this 'alliance' has earned him respect within the team and across the company. Yin has established enduring relationships with the customers at the residential units he is responsible for. One, a big household in Mid-Levels, has been with him for more than 20 years, and he is sure to respond immediately upon receiving their call, offering timely maintenance and repair services of the air- conditioning units. Meanwhile, for Keung, the day in 1999 that Typhoon York hit Hong Kong at full T10 strength remains a memorable one. He received a call that the cooling towers on the top floor of one of his commercial properties, in Central, had been badly damaged. He immediately recognised that the situation had to be brought under control without delay in order to restore an adequate air-conditioning service after the typhoon moved past Hong Kong. So, he called his team to gather at the job site, despite that the T10 signal was still hoisted, and set about assessing the damage, collecting the scattered parts and sorting out which cooling towers were still operable and which needed repair. The damage control and assessment were swiftly managed while ensuring the safety of his staff. Keung is justifiably proud of the dedication and professionalism of the team's success in solving the customer's problem in highly challenging conditions. Yin could have retired eight years ago, but has stayed on for the satisfaction he gains from the job, the team, subordinates, his managers and customers. He thoroughly enjoys his work conducting site visits to understand his customers' concerns and completing each job to meet or exceed their expectations. The pleasure he gets from fulfilling this mission makes him more loyal to the company every day, he says. Keung has also continued at JEC past retirement age because he values the room that the company has given him to grow over the years, promoting him to higher levels of responsibility. He appreciates that recognition of his effort and contribution. The profession is constantly evolving in terms of technology, he notes, with tightened regulations and certification, and so he cheerfully recommends a career with JEC in the maintenance and renovation department. 卓越表現添誠信 曾德賢與他所服務的住宅區顧客建立起長期關係。 如他跟一位住在半山大宅的顧客相識逾廿年,每當 對方致電求助,他都會立即回應,及時提供冷氣機 維修服務。 1999年颱風約克吹襲香港,對曾德強來說印象深 刻。當時位於中環某座商廈頂層的冷卻塔因風暴嚴 重損毀,該處正是他的管轄範圍。接到商廈物業管 理人員的電話後,曾德強意識到必須立即評估損毀 情況並作相應處理,以便在風暴過後恢復商廈的冷 氣服務,因此他與團隊成員在10號風球下前赴該 處,即場評估損毀情況、清理碎片及找出需要維修 的部分。最終,損害的控制和評估工作迅速完成, 團隊成員安然無恙。這次團隊成功克服惡劣環境, 為客戶解決困難,展現出拼搏和專業,曾德強絕對 可以引以自豪。 一路信守 曾德賢早在8年前已屆退休之齡,之所以繼續留下, 只因他從工作、團隊、同事、管理層和顧客中間得 到滿足感。他尤其享受在實地巡查中了解顧客的需 要,並給出滿足甚至超過顧客期望的工作表現。曾 德賢指這種滿足感驅使他繼續為公司效力。 公司多年來的栽培、賞識、提拔和委以重任,亦是 讓曾德強願意在退休後,繼續信守怡和機器的原 因。他對公司充滿欣賞和感恩之情。曾德強又強調 科技進步、監管加強和資格收緊,使專業水平不斷 提升,故對維修部日後的工作前景充滿信心。  Be courageous and ask questions when in doubt; be proactive and engage with colleagues to brainstorm any issue and how to address it.  Be meticulous when serving customers; put yourself in their shoes to deeply understand their needs, to create a win-win situation for both JEC and the customer.  Always persevere! Your willingness to work hard and listen to your seniors' words of encouragement will enable you to achieve your career objectives. Words of Encouragement  遇到疑難要勇於發問,並主動參與 討論以找出問題及應對方法。  一絲不苟地服務客戶,盡可能了解 他們的需要,為怡和機器和顧客創 造雙贏。  要鍥而不捨!年輕一代要願意捱 苦,多聽前輩意見有助達成自己的 工作目標。 我們的寄語
  • 20.
    TRAINING DEVELOPMENT JEC MAGAZINEISSUE 35 培訓及發展 A World Bank paper published in 2015 showed that 83.5% of the workforce in Thailand is unskilled. This puts Thailand's skilled workforce at the lowest proportion among other ASEAN countries. And there is a gap between education and equipping students with the skills and knowledge they need to get good jobs, so competition for skilled workforce is intense. JEC Thailand (JECT) needs skilful employees with both knowledge and skills of installation, testing commissioning, maintenance as well as drawing for Mechanical Electrical (ME) systems to fill the positions of Foreman, Draftsman and Technician. Therefore JECT has formulated a people development strategy to have more skilled workers in the pipeline. The strategy focuses on Diploma students who are the future pillars of the industry, preparing more skilled workforce for a better Thailand. There are two parts to the strategy: short term and long term. JECT offers internship programmes to students from technical colleges with mechanical electrical majors. The programmes vary from 2 months to one year, depending on their curriculum. During the programme, the students will learn about equipment and tools used for maintenance, how to read drawings and then perform installation and learn how to supervise the sub- contractors. Moreover the students will learn about proper customer service attitude.Since 2012 until now, JECT has joined up with seven technical colleges, and provided internship experience to more than 100 students. 世 界銀行於2015年發表的報告顯示,泰國勞 動人口中83.5%為非技術工人,其熟練工 人佔勞動人口的比例為東盟國家中最低。 由於該國的教育未能為學生們提供適當的知識和技 能以應付工作的需要,導致市場上熟練工人十分短 缺。由於泰國怡和機器在安裝、測試和調試以及維 修機電系統以至繪製機電圖則,都需要熟練工人擔 任科文、繪圖員和技術員等職位;因此泰國怡和機 器設立了一套人才發展計劃以為未來培育更多熟練 工人。 這項計劃的對象乃為未來行業棟樑-文憑課程學生, 用意是培育更多熟練工人,建設更美好的泰國。 計劃分為短期和長期兩部分: 短期計劃 泰國怡和機器向主修機電工程的工業學院學生提供 各類實習項目,為期2個月至1年不等,因應學生 的課程而編排。學生於實習期間會學習使用維修設 備與工具、閱讀圖則及進行安裝,以及如何監督分 判商;此外學生亦會學習正確的客戶服務態度。自 2012年至今,泰國怡和機器已與7間工業學院合作, 為逾100位學生提供實習機會。 Cultivate the Next Generation, Engineer a Better Asia 培育未來專才  建設美好亞洲
  • 21.
    Over the past4 years, JECT has employed over 50 well-trained graduates from these technical colleges. After these graduates started their employment with us, we will further enhance their professional knowledge by providing additional training programmes including the following: 過去4年內,泰國怡和機器已從有合作關係的工業學院聘用了逾50位訓練有素的畢業生。公司會在他們入職後提供額外 培訓,進一步充實其專業知識,包括: In 2013, JECT signed Memorandum of Understanding (MOU) with 2 very outstanding technical colleges delivering superb quality technical training to their students, and they are Ubon Ratchathani Technical College and Khon Kaen Technical College. The main objectives of the MOU were to enhance the quality of education, develop students' skills and knowledge in the area of electrical and mechanical engineering, award scholarship to distinguished students as well as build up the corporate branding. Starting in 2016, apart from offering internship experience and scholarships to students, JECT will also invite professors to work in the company for two months during school vacations. During the period, the professors will work and provide ME training including technical drawing skills and site operation techniques to our colleagues. This programme not only benefitted JECT employees but is also useful for the professors to bring up-to-date work experience back to the college to share with the students. In addition, five very experienced JECT employees will be sent to the technical college to assist in the teaching. For a whole semester (about four months), the JECT employees will teach about piping, sanitary and air-conditioning systems. They will bring hands-on experience together with the real world technical know-hows to the college students to get them ready to join the workforce. It is anticipated that over 250 students will benefit from this arrangement in 2016. 長期計劃 2013年,泰國怡和機器與Ubon Ratchathni和Khon Kaen兩間知名的工業學院簽署諒解備忘錄,承諾向 兩校學生提供一流技術培訓,從而提升學院的教育 質素,增進學生的機電知識和技能,並以獎學金獎 勵優秀學生,連帶塑造公司的品牌形象。 除了向學生提供實習機會及獎學金,泰國怡和機器 今年起更會邀請兩間學院的教授於學校假期到公司 工作兩個月,藉此機會為公司員工進行機電工程培 訓,涵蓋專業繪圖技術和地盤作業技巧;這安排既 可使泰國怡和機器的員工受惠,亦好讓教授把最新 的工作經驗帶回校與學生分享。此外,公司亦會委 派5位資深員工到學院輔助教學;在為期約4個月的 學期內,這批資深員工將會於校內教授有關管道、 衞生及空調系統的知識,並以親身經驗和實際技 能,幫助學生做好投身職場的準備。上述安排料於 年內惠及逾250位學生。 憑藉這些計劃,泰國怡和機器得以培訓更多熟練工 人,既有助舒緩泰國勞動力短缺的問題,亦可藉聘 用這些訓練有素的員工支援公司的業務發展。怡 和機器一直致力為所服務的社區及地區帶來正面影 響,透過向泰國年輕人提供上述教育機會,泰國怡 和機器銳意建設更美好的亞洲。 With these strategies, JECT has been able to train up more skilled labour to help with the country's labour shortage problem yet at the same time, able to recruit well-trained employees to support the company's growth. JEC always strive to make a positive impact in the communities and territories where we operate, and by providing the above education opportunities to the young people in Thailand, JECT actively seeks ways to contribute towards engineering a better Asia. 機電項目流程概覽:概述機電業務的流程,從工程招 標開始到簽訂商業合約,以至系統的安裝、測試和調 試,幫助新員工充分理解工作內容。 機電系統-基礎課程:提供各類機電系統的基本資料 與技術知識,包括電氣及通訊、衞生、消防、空調及 通風系統。 泰國怡和機器繪圖標準課程:課程專為繪圖員而設, 協助員工在繪製各類機電系統圖則時應用不同的 AutoCAD標準。 環境健康與安全課程:這是所有員工的必修培訓,講 解在地盤工作以及工程設備的危險性。內容涵蓋安全 與健康政策以及安全條例,確保所有員工能以健康並 安全的方式工作。 ME Work Flow – Overview: this course outlines the ME business processes starting from tendering, commercial contracting, installation, to testing commissioning, enabling the new employees to understand more about their job. ME System – Basic Course: this course provides the basic information and technical knowledge of the various ME systems including electrical communication, sanitary, fire protection, air- conditioning ventilation systems. JECT Drawing Standard Course: this course is for Draftsmen only. It helps employees to apply the various AutoCAD drawing standards in ME systems. Environment Health and Safety Course: an essential training for all employees about hazards of working in construction environment and of engineering equipment. It covers safety and health policy, as well as safety laws so that all our employees can perform their work in a healthy and safe manner.
  • 22.
    COMMUNITY CARE JEC MAGAZINEISSUE 35 關懷社區 O n 17th April 2016, 6 colleagues from JEC participated in “Walk Up Jardine House 2016“ and raised funds for MINDSET, a registered charity raising awareness and understanding of mental health issues, as well as providing direct assistance to individuals, families and organizations in need of help. As a major sponsor, a r e l a y t e a m w a s formed by 5 colleagues across business units: C a l v i n C h e n g a n d Edmand Wong from Chung Hing Engineers; Anakin Liu from EM Contracting; Tang Wai Lun from Maintenance Renovation and Gary Lai, JEC's 2015 Management Trainee. The team finished strong with a 4 minutes and 19 seconds record, for the course running up 49 storeys. Other than team relay, Wong Hung Fai from Commercial and Engineering Support also took part in the Barrow Cup and achieved remarkably by running up 49 storeys in exactly 8 minutes. 2 016年4月17日,六位怡和機器的同事參加了一年 一度的「齊步上怡廈」活動,為註冊慈善機構「思 健」籌款。「思健」主要提倡精神健康,於社區作 推廣及教育工作,同 時為有需要的人士、 家 庭 及 機 構 提 供 支 援。 作 為 主 要 贊 助 商 之 一,怡和機器派出五 位來自不同部門的同 事參加了男子組接力 賽,分別是中興工程 的黃家輝和鄭凱文、 機電合約工程部的廖 卓懷、保養及維修部 的鄧偉倫以及2015年度管理培訓生黎明駿。五位同事都充 滿幹勁,以4分19秒的成績飛快地完成賽事。此外,商業 及工程支援部的王雄飛也參加了男子組單人賽,以8分鐘的 佳績跑畢49層樓梯! JEC Participants Conquered Walk Up Jardine House 2016 to Raise Funds for MINDSET 2016年度「齊步上怡廈」圓滿結束 成功為「思健」籌款 O n 23rd April 2016, JEC Caring Team brought a group of 15 children from the Hong Kong Children and Youth Services to visit the Sky100, the observation deck located on the 100th floor of International Commerce Centre (ICC) and M+Rover Traveling Creative Studio, a mobile truck with creative arts and installations. The caring team activity served to encourage children to appreciate and be familiar with art, as well as an opportunity to learn more about signature architectures in Hong Kong during the Sky100 Academy learning session. The children were excited and curious to look out of the window from the observation deck of Sky100, and had a lot of fun during the day together with JEC's caring team members. 2 016年4月23日,怡和機器的愛心大使陪同15名來自 香港青少年服務處的小朋友到環球貿易廣場100樓 的天際100香港觀景台遊覽,另外又參觀載滿創意 藝術作品和裝置的特製拖車─「M+敢探號」流動創作 教室。 是次活動旨在鼓勵小朋友欣賞及認識藝術,同時藉參加天 際100學堂的教育活動認識香港的特色建築物。小朋友在 天際100觀景台望向窗外景物,既好奇又興奮,與怡和機 器愛心大使共度快樂的一天。 JEC Caring Team Embarks on Sky-high Journey with Children 怡和機器愛心大使與小朋友踏上天際之旅 ▲ Mr. Wilson Kwong, Chief Executive (3rd from right) supports the JEC Team.   行政總裁鄺永銓先生(右三)專程到場為健兒 們打氣。
  • 23.
    PRODUCT SOLUTIONS JEC MAGAZINEISSUE 35 產品方案 Bionomic Industries - Water Scrubber System 水劑滌氣系統 Vertical Quencher Cooling liquid (normally water) is introduced at the top of the quencher where the gas begins to cool towards saturation. 垂直冷卻器 冷卻液(一般都是清水)從裝置的頂部流入,氣體會在 該處冷卻至飽和狀態。 23 Incineration or major industrial combustion processes are likely to generate toxic fumes and air pollutants. These toxic fumes and air pollutants are directly released into the atmosphere, adversely affecting the living environment if they are left untreated. In order to reduce air pollution, a water scrubber can be utilized to clean air, fuel gas or other gases of various pollutants and dust particles. Bionomic water scrubber system is an air pollution control device that uses liquid to remove particles or gases from exhaust streams. The system consists of three main components: 焚化或大型工業的燃燒工序,有可能釋出有毒煙霧及空 氣污染物,若不加處理,直接把這些物質排放到大氣 中,會對生活環境構成負面影響。要減少空氣污染,可 選擇使用清水洗滌器以淨化空氣、燃氣或其他氣體中的 各類污染物及塵埃。 清水洗滌器是一種控制空氣污染的裝置,利用液體去除 廢氣的顆粒或氣體。系統由三個主要部件組成: Venturi Scrubber Through the venturi throat, the contaminated gas and liquid are accelerated and mixed in a high energy, extremely turbulent environment. The gas-liquid mixture exits from the quencher are sheared into finer droplets, which are able to capture finer particulates. 文氏管洗滌器 在洗滌器的收窄通道內,要處理的氣體及液體會於一個 高能量及湍流急速的環境中混合。從冷卻器排出的氣液 混合物,分離成更微細的小滴,使系统有能力吸納微細 的顆粒。 Cyclonic Separator The entrained liquid is removed by a combination of centrifugal and gravitational forces. The fine particles are dropped into the bottom of separator which contains certain amount of water. 旋風式分離器 隨着離心力和引力的作用下,微粒從液體中去除並跌落 在分離器底部。 Gas Flow: 35m3 /sec Gas Temp: 378c◦ Moist: estimated 5% 氣體流量:35立方米/秒 氣體溫度:攝氏378度 濕度:估計5% All size of particulate entry the system 體積不一的顆粒進入系統 Water Scrubber System Process Flow Diagram  水劑滌氣系統運作示意圖 After cyclonic Separator 經過旋風式分離器後 Remove = 4 micron (achieve 95% efficiency) Gas Flow: 16.9-21.3m3 /sec Gas temp: 61-73c◦ Moist: 22-35% 去除4微米 (達致 95%效率) 氣體流量:16.9 - 21.3立方米/秒 氣體溫度:攝氏61至73度 濕度:22-35% Gas Flow: 21.3m3 /sec Gas temp: 76c◦ Moist: 37.8% 氣體流量:21.3立方米/秒 氣體溫度:攝氏76度 濕度:37.8% After scrubber before cyclonic separator 經過洗滌器後, 進入旋風式分離器前
  • 24.
    產品方案 PRODUCT SOLUTIONS 24 JEC MAGAZINEISSUE 35 The water scrubber system features a designed throat and diverging sections that provide high collection efficiencies at reduced pressure drops. It is ideal for sticky or scaling dusts. Entrainment separator vessels with secondary gas treatment and cooling options are available for different type of scrubbers which are in a full range of sizes to handle gas capacities from 0.236 to 217m3 /sec and remove down to 0.2 micron. In the Fire and Ambulance Services Academy located at Tseung Kwan O (Photo1), huge amount of smoke were released during fire simulator training of the Academy. JEC supplied three sets of Bionomic water scrubber system to the Architectural Services Department of HKSAR for smoke treatment in order to minimize the impact of air pollutants on the surrounding environment. 水劑滌氣系統備有特別設計的通道及分流部件,不但效 率高,也能減少壓降,適合處理黏性或大規模微粒。分 離器可配合冷卻功能,不同款式和體積的洗滌器,能對 氣體作二級處理,可處理的氣體每秒介乎0.236至217 立方米,去除顆粒小至0.2微米。 在將軍澳的消防及救護學院裏(圖一),消防員每天參 與模擬火災訓練時,大量濃煙會從訓練學院大樓排出室 外。怡和機器已向香港建築署供應了三組水劑滌氣系統 以處理煙霧,並減少空氣污染物對周邊環境的影響。 Smoke Extraction System Process Flow Diagram  排煙系統運作示意圖 Outdoor Compartment Fire Behavior Training Hangar 室內火災訓練場 Demo Attack Unit 示範及演練組件 Branch Distribution Unit 分流組件 Water Scrubber System 水劑滌氣系統 Smoke Extraction Fan 排煙風扇 Clear Air Discharge 排放已淨化空氣 Smoke and Odour Filtration 煙霧及氣味過濾 (Photo1)
  • 25.
    MAJOR CONTRACTS LISTING JEC MAGAZINEISSUE 35 工程合約 Hong Kong 14-39 King Wah Road, North Point Supply of Active Chilled Beam and induction VAV Simon Kwok Alexandra House Supply and installation of LED light box Edmond Chau American Club at Exchange Square 2 FS MVAC system renovation Philip Tsang / Taylor Wong Café de Coral Centre, Fo Tan Design and build for replacement of chiller plant Alice Wong Central Police Station Supply of ironmongery Lawrence Wong Central-Wanchai Bypass Tunnel Building Supply and installation of metal door and glass door Lawrence Wong Centre of Excellence in Paediatrics Supply and installation of diesel gensets Dick Lee Supply and installation of ELV systems and fire services system Design, supply and installation of building maintenance unit and pneumatic tube Godfrey Lee / Eddy Tong / Roy Leung China Mobile Data Centre Expansion Supply and installation of genset system Dick Lee City Garden Supply and replacement of sea water cooled chiller Taylor Wong City University of Hong Kong Supply and installation of diesel gensets Dick Lee Cityplaza Three Fitting out offices with combined building service installation Taylor Wong CLP Castle Peak Power Station Supply and replacement of chillers, AHUs and FCUs Alice Wong Empire Centre, Tsim Sha Tsui Replacement of sea water pipe works and equipment for A/C system Alice Wong Equinix Data Center HK2-III Supply and installation of diesel gensets Dick Lee Equinix Data Centre HK2-IV Supply and installation of cooling tower Simon Kwok Exchange Square Electrical installation - power supply upgrade works Fred Chan FSID work for Tower 1, 2 3 Philip Tsang MVAC work for FSID Fred Chan Supply of LED lightings Edmond Chau Tower 1 2 lift lobbies renovation and FS renovation Philip Tsang FEHD Environmental Hygiene Offices-cum-Vehicle Depot ASD Contract No. SS D505 - BMU for reprovisioning of FEHD Sai Yee Street Environmental Hygiene Offices-cum-Vehicle Depot at Yen Ming Road Roy Leung / Roy Cheng Fire Services Training School, Tseung Kwan O Supply and installation of steel doors and supply of ironmongery Lawrence Wong Goldin Financial Global Centre Supply and installation of genset system, PV panel, cooling tower and supply of pumps and valves Dick Lee / Simon Kwok / John Ma / David Kwong Great Eagle Centre Supply and installation of LED emergency lighting Edmond Chau Hactl 10-year FS maintenance contract on Dry Fire Philip Tsang Replacement of LED exit sign plate Edmond Chau Supply and installation of LED lighting in office area Edmond Chau Hang Seng Bank, 113 Argyle Street Supply and installation of raised floor and supply of sanitaryware Lawrence Wong Hang Seng Tower, Kowloon Bay Supply and installation of carpet tiles and supply of sanitaryware Lawrence Wong HK-Zhuhai-Macao Bridge Supply and installation of diesel gensets for HK Boundary Crossing Facilities Vehicle Clearance Plazas and Ancillary Building Facilities Dick Lee Supply and installation of lifting appliances at road section between Scenic Hill and HK Boundary Crossing Facilities Roy Leung / Roy Cheng Supply and installation of smoke curtain Tommy Tam Supply of ironmongery for PCB façade package Lawrence Wong Hong Kong Exchanges and Clearing Limited Data Centre, Tseung Kwan O Modification of drainage pipework and provision of term workers Alice Wong Hong Kong International Airport Design, supply and installation of conveyors of the Baggage Handling System at T1 for Midfield Concourse development Eric Ho / Paul Wong Maintenance services for conveyor systems and automatic sortation systems of the Baggage Handling System Eric Ho / Paul Wong Maintenance, improvement and refurbishment works for electrical and mechanical systems at Midfield Concourse and North Satellite Concourse Alice Wong Refurbishment works for general mechanical installation at T1, T2, HKIAT, IAC, NSC, CTC, AWTC and Skypier, HKIA Alice Wong Supply and installation of metal design ceiling at Midfield Lawrence Wong HSBC Main Building, HMB Project Bridge II Supply and installation of fuel system Dick Lee I Tech Data Centre Phase 2 Supply and installation of diesel gensets Dick Lee Jardine House Supply and installation of LED highmast flood light Edmond Chau Kai Tak District Cooling Project Phase 3 3B Supply of seawater pumps John Ma Kai Tak Nullah Reconstruction Upgrading Supply and installation of stoplogs Chris Ding Kennedy Town Swimming Pool (Phase II) Supply and installation of swimming pool filtration system Jin Wong Kowloon Hospital, KCC Supply and installation of 71 sets of patient hoists at Kowloon Hospital Roy Leung Landmark, Central FSID work Philip Tsang MVAC electrical work for toilet renovation Fred Chan MVAC work for FSID Fred Chan Langham Place, Mongkok Supply and installation of motion sensor LED batten Edmond Chau Leighton Contractors (Asia) Ltd BMU for Liantang / Heung Yuen Wai Boundary Control Point (BCP) - BCP Building and Associated Facilities Project Roy Leung / Roy Cheng Luk Hop Industrial Building - Energy Saving Rental Centre Supply and installation of LED lightings Edmond Chau Manhattan Place MVAC installation on 43/F Alice Wong Maxim's Office Building Supply and installation of carpet tiles Lawrence Wong Maxim's Various Branches at HK, Kowloon and NT Supply maintenance services for various branches (2016 - 2017) Alice Wong
  • 26.
    工程合約 MAJOR CONTRACTS LISTING JECMAGAZINE ISSUE 35 MTR Corporation Building Management System installation and modification for East Rail Line Station Control Room in Tai Wo, Fanling Sheung Shui Stations Martin Cheung Chiller plant replacement for Wanchai Station Taylor Wong Design, supply and installation of electrical works, fire services, pumps and drains, swimming pool filtration system and supply of ironmongery for the reprovision of Harbour Road Sports Centre and Wan Chai Swimming Pool Eric Ho / Lawrence Wong Provision of mobile wheel lathe mobile lifting jack at Tsuen Wan Depot Roy Leung Relining of condensing mains at Tsim Sha Tsui and Yau Ma Tei Stations Alice Wong Replacement of underfloor wheel lathe at Ho Tung Lau Roy Leung / Roy Cheng Retrofit service wagon Roy Leung SCL Contract 1191 - provides floodgate system for Shatin to Central Link Phase 2 Roy Leung / Eric Ho Supply and installation of Access Cover for South Island Line (East) Lawrence Wong Supply and installation of steel door and frames for Shatin to Central Link Lawrence Wong Supply and installation of stoplogs at West Kowloon Terminal Chris Ding Supply and replacement of AFA system at Hong Kong and Kowloon Stations Tommy Tam Supply of fire pumps for Shatin to Central Link Tommy Tam Supply of 'Flamebar' fire resistant ductwork at Whampoa and Ho Man Tin Stations Simon Kwok Supply of 'Flamebar' fire resistant ductwork for Express Rail Link Simon Kwok Supply of metal door and ironmongery at Tin Shui Wai Station Lawrence Wong Mui Wo Sewage Treatment Works Supply and installation of the lifting appliances Roy Leung / Roy Cheng Murray Building Supply and installation of diesel gensets Dick Lee Supply of pumps and fire rated coating Simon Kwok New World Centre Supply of valves, fire pumps and fire resistant ductwork David Kwong / Tommy Tam / Simon Kwok NTT Data Centre (FDC2-EXP-001) Supply and installation of genset system Dick Lee Ocean Park Polar Building Supply and installation of filtration system for life support system Jin Wong Organic Waste Treatment Facilities Phase 1 Supply of absorption chiller Kelvin Tang Pacific Place Replacement of high tension chillers Fred Chan Peninsula Centre - Energy Saving Rental Centre Supply and installation of LED lightings Edmond Chau Primary Schools at Kai Tak Supply and installation of timber doors for 30 classrooms and raised floor system Lawrence Wong Prince's Building Alexandra House Electrical installation - power supply upgrade works Fred Chan Public Library and Indoor Recreation Centre in Area 3, Yuen Long Supply and installation of steel doors and supply of ironmongery Lawrence Wong Public Rental Housing Development at Tuen Mun Area 54 Site 2 Phase 12 MVAC installation Eddy Tong Residential Development at D.D. 105, Ngau Tam Mei Supply and installation of swimming pool filtration system Jin Wong Residential Development at Kai Tak Supply and installation of diesel gensets Dick Lee Residential Development in Cheung Sha, Lantau Supply and installation of Modwood composite wood decking Lawrence Wong Sewage Pumping Station for Tung Chung Housing Supply and installation of EM equipment for sewage pumping station Alex Law Shangri-la Hotel, Hunghom Supply of pumps John Ma Shek Wu Hui Sewage Treatment Works Further Expansion Phase 1A - Advance Works Kent Mak Shing Hing Construction Co Ltd Theatre seating for Sai Wan Ho Civil Centre Phase 2 Roy Leung / Natalie Tsang Sports Centre in Area 14B, Shatin Supply and installation of cooling tower Simon Kwok Sports Centre, Community Hall and District Library in Area 14B, Shatin Supply of ironmongery Lawrence Wong Stonecutters Island Main Pumping Station Supply and installation of the lifting appliances Roy Leung / Roy Cheng Sun Yuen Long Centre Design and build contract for the enhancement work of the existing air cooled chiller system Alice Wong Suntech International Management Ltd Seating for Broadway Cinema at AMC Pacific Place Roy Leung / Natalie Tsang Tai Lam Centre for Women Supply and installation of door and ironmongery Lawrence Wong Tai Po Water Treatment Works Supply of granular activated carbon Hydro Ho Tin Shui Wai Hospital Design, supply and installation of pneumatic tube system, and supply of pumps, air quality products and central battery system Eric Ho / John Ma / Hydro Ho / Tommy Tam Tsuen Wan 5 Bayside Supply of valves David Kwong Tuen Mun Western Trunk Sewerage Tunnel Supply and installation of stoplogs Chris Ding Tung Chung Crescent Supply and installation of motion sensor tube with emergency battery Edmond Chau Wan Chung Construction Co Ltd Theatre seating for renovation and improvement works to Jockey Club Auditorium for The Hong Kong Polytechnic University Roy Leung / Natalie Tsang Wellcome Mannings Various Stores at HK, Kowloon and NT MVAC repair and maintenance services for various stores (2016 - 2018) Alice Wong West Kowloon Government Office at Yau Ma Tei Supply and installation of diesel gensets Dick Lee West Kowloon Law Court Supply and installation of carpet tiles Lawrence Wong West Rail Nam Cheong Station Property Development Supply and installation of swimming pool filtration system Jin Wong WF Joseph Lee Primary School Supply and installation of swimming pool filtration system Jin Wong Wing On House Upgrading of sea water system Taylor Wong Wonder 9 Data Centre Supply and installation of metal door and timber door Lawrence Wong World-Wide House, Central Replacement of water-cooled chiller Taylor Wong Yan Chai Hospital Supply and installation of IPC, timber door and ironmongery Lawrence Wong Yau Mai Tei Specialist Clinic at Queen Elizabeth Hospital Supply and installation of IPC, wall protection system and timber doors Lawrence Wong
  • 27.
    Macau Galaxy Resort Supplyand installation of Pergo laminated floor for Phase 1 Lawrence Wong Junior Court of Law Supply of central battery system Tommy Tam Louis XIII Hotel Supply and installation of genset systems and supply of valve Dick Lee / David Kwong Macau Fisherman's Wharf Design, supply, installation, testing and commissioning of Linen and Refuse Chute System for Fisherman's Wharf in Macau Phase 1 Stage 2 Roy Leung / Roy Cheng Macau Light Rail Transit Design and supply for painting booth Roy Leung MGM Cotai Supply of floor drains and bathtubs Lawrence Wong Supply and installation of cooling tower, smoke guard and supply of pumps and valves Simon Kwok / Tommy Tam / John Ma / David Kwong MGM Grand Paradise Design, supply and installation of building maintenance unit and turntable Roy Leung / Roy Cheng St. Regis, Venetian Macau, Parcel 5B Supply of ironmongery and sanitaryware Lawrence Wong Venetian Cotai P3 Design, supply and installation of baggage handling system Roy Leung / Roy Cheng Supply and installation of diesel gensets Dick Lee Supply of ironmongery and sanitaryware Lawrence Wong Supply of valves David Kwong Thailand BITEC 2 BHIRAJ TOWER at BITEC Supply, installation, testing and commissioning of air-conditioning and ventilation system, electrical and communication system, sanitary and fire protection system Suradech Sintanakul BMS AIA Sathorn Supply and installation of Building Automation System (BAS) Wuttichai Kaewpairoj BMS Kaennakorn Building Supply and installation of Building Automation System (BAS) Wuttichai Kaewpairoj CP Leadership Development Center Nakhon Ratchasima Supply and installation of air-conditioning and ventilation system, electrical and communication system, sanitary and fire protection system Terapong Rujitanakul Emporium Suite Supply and installation of sanitary system Somwang Aksornnukul FAS Services 2016-2017 (EGAT) Supply and installation of fire alarm system Wuttichai Kaewpairoj Gaysorn Plaza Operation and maintenance Somwang Aksornnukul King Power at Suvarnabhumi Airport Operation and maintenance Somwang Aksornnukul Main Villa - Ban Rai Sang dao Supply and installation of air-conditioning and ventilation system, electrical and communication system, sanitary and fire protection system Terapong Rujitanakul MRT Supply and installation of air-conditioning and ventilation system for Blue Line Extension Project Suradech Sintanakul National Institute of Metrology (Thailand) Operation and maintenance Somwang Aksornnukul Renaissance Pattaya Supply and installation of Building Automation System (BAS) fire alarm system Wuttichai Kaewpairoj Siriraj Hospital (Syamindra Building) Supply and installation of sanitary system Somwang Aksornnukul SPCG Supply, installation, testing and commissioning of air-conditioning and ventilation system, electrical and communication system, sanitary and fire protection system Somwang Aksornnukul Yothinburana School Supply and installation of air-conditioning and ventilation system, electrical and communication system, sanitary and fire protection system Somwang Aksornnukul Singapore 7-11 Stores Maintenance of refrigerated cases Walter Tan Asia Square Tower 1 2 Mechanical and Electrical operation services Subramanian Chandran Pillai Capital Square AHU/FCU replacement job Ang Boon Hui Grand Park City Hall ACMV BMS replacement job Ang Boon Hui Keppel Towers/Tower 2 Mechanical and Electrical facility management Ivan Ho Marina Bay Business Financial Tower 23 Mechanical and Electrical facility management Jess Debulgado Marina Bay Financial Centre and One Raffles Quay Mechanical and Electrical facility management Jess Debulgado One Raffles Link Mechanical and Electrical facility management Mike Wong Plaza Singapura AA to common area ACMV Ang Boon Hui Resorts World Sentosa Maintenance of district cooling plant Tay Choon Beng Suntec City Electrical system maintenance services Mike Wong Philippines Doehle Haws Building Maintenance of VRF air-conditioning system and relocation works of Fan Coil Units Jess Bustamante HVAC system of Plant A-C Admin Building (Tiwi, Albay) Preventive maintenance Enardo Flores Integrated Facilities Management for JLL - IBM and JLL - Schneider Electric Property and asset management Jennie Elloso Marikina North Sewer Network and Pump Station Design, build, testing and commissioning of sewage pumping station Lai Parcon Mondelez Operation and maintenance Evelyn Leviste Property and Asset Management for various facilities managed by Jones Lang LaSalle Operation and maintenance of facilities equipment Jennie Elloso Property Management for Ayala Properties Management Corporation Operation and maintenance Evelyn Leviste Putatan Water Treatment Plant 2 Design and construction of water treatment plant Lai Parcon / Alex Law Sewage Treatment Plant in Libingan ng mga Bayani Design and construction of sewage treatment plant facilities Lai Parcon Shopwise - Makati Supply and installation of chilled water system Jess Bustamante Sonion Manufacturing Plant Supply and installation of HVAC units and MEPF Enrico Poquita Taguig North Sub-Catchment Sewerage Project - Makati South Sewer Line and Pumping Station Supply, build, testing and commissioning of sewage pumping station and lift stations Lai Parcon United Laboratories Operation and maintenance Evelyn Leviste Universal Robina Corporation Operation and maintenance Evelyn Leviste CHINA Central Asia-China Gas Pipeline CCS2, CCS4, CCS6 CCS8, Kazakhstan Supply of CCHP system Eddie Ho Hetian River Gas Field, Xinjiang Supply of gas gensets and accessories Eddie Ho Kazakhstan Southern Pipeline, Bozoy Compression Station Supply of diesel genset Eddie Ho Qingdao Gardening Expo Supply of CCHP system Eddie Ho Shanghai Hongqiao Commercial Area Supply and commissioning of CCHP system Eddie Ho Shaoxing Yuandong Petro-chemical Factory Supply of biogas CHP system Eddie Ho Sinopec Supply and commissioning of gas gensets Eddie Ho Space Technology 5th Institute - Phase 2 Supply and commissioning of gas gensets Eddie Ho