A P Pharma Consultants
“Focused Pharma Engineering and GMP solutions”
Contact Details:
Pravin Goyal
SCO 333, Chamber No 2, IInd
Floor,
Sector 9,
Panchkula (Near Chandigarh), Haryana
Mobile: 9805066066
Email: info@appharmaconsultants.com, pravin.goyal27@gmail.com
APPC
APPC
Vision
“To be the most preferred consultant
providing end to end Engineering,
GMP & operational Excellence Solutions”
Mission
“To provide innovative and
cost effective solutions in creating versatile
Pharmaceutical and FMCG facility
complying with latest international
regulatory Standards”
About Us
 APPC – a consultancy firm registered in Panchkula (near Chandigarh), founded
by a team of professionals having more than 2 decades of industrial work
experience in handling Projects, Engineering, Operations, Quality and
Regulatory affairs.
 Dedicated team of subject matter experts to guide on latest technological
alternatives available and suggest optimum solutions.
 Dynamic and innovative consultancy firm providing “concept to
commissioning” consultancy solutions to clients in -
 Pharmaceutical & Healthcare
 Bulk drug & API
 Personal care
 FMCG
 Foods and Beverages
 Expertise lays in Creating, Communicating and Delivering value added
solutions to support clients in putting up state of the art facilities, optimizing
resources and getting a competitive edge in their industry maximizing customer
satisfaction.
APPC
FOUNDER’S PROFILE
Qualifications
 B.E. (Mechanical)
Positions held
 Head – Projects (India, China, Indonesia)
 GM – Operations
 DGM – Engineering and Projects
 Project Manager
 Head Engineering
Founder’s Corporate Experience
23 years of rich corporate experience at –
 Reckitt Benckiser Healthcare India Ltd.
 Wockhardt Ltd.
 Ind-Swift Lab. Ltd.
 Torrent Pharma Ltd.
 Apollo International Ltd.
 IPCA Lab. Ltd.
 Jayant Vitamins Ltd.
APPC
Do you recognize any of these challenges?
 Implementing changes with minimal disruption of running production?
 Making robust investment decisions when production demands fluctuate?
 Ensuring well-integrated and balanced quality systems when targets move
constantly?
 Making the right technology choices for the new Pharma reality?
 Ensuring smooth project execution when the scope keeps changing?
 Meeting regulatory compliance as per international standards?
Why us?
 More than 2 decades of Industrial work experience
 Rich experience in international regulatory audits
 Commitment to Quality
 Customized need based solutions
 Energy Efficient and Economical Design
 Innovative and value added solutions
 Adhering to Time Schedule
APPC
If YES, then APPC provides customized solutions to each and
every of the above challenges.
APPC
Pharmaceutical
and healthcare
Bulk drug &
intermediates
FMCGFood and
beverages
Personnel
care
In the fields of -
Projects (Green field and Brown field)
Quality management services
Qualification and validations support and its documentations
GMP audits, gap analysis and compliance support, key risk and mitigation
Energy Audits and suggest latest energy conservation measures
Process improvements
Operational excellence
Clientele –
We offer end to end solutions to following industrial segments
APPC
Generating URS
Concept design
Master planning
Basic and detailed Engineering
Project management
Procurement assistance
Construction management
In the following disciplines –
 Architecture
 Civil
 Electrical and Instrumentations
 Mechanical
 HVAC
 Water generation
 Waste management
 Plant GMP design
Projects (Green field and Brown field) APPC
CAPEX and OPEX working
Strategic project planning
Project management office set-up and support
Project monitoring services
Cost management
Bid management
Contract management
Project supply chain management
Risk management
Project Management APPC
Qualifications & Validation Support
 Facility
 Equipment
 HVAC System
 Water generation and distribution System
 Compressed Air & Nitrogen System
 Heat Mapping Studies
Documentations support as per regulatory requirement
 SOP’s
 Equipment qualification URS, DQ,IQ,OQ, PQ
GMP trainings
GMP audits, gap analysis and compliance support, key risk and mitigation
APPCQuality Management Service –
Provide technical guidance to design, prepare & implement
Quality Management system for Drug Products (SVP, LVP, OSD
& Liquid Orals, Cream & Ointments), API’s, Food & Beverages,
Cosmetics & Ayurvedic facilities..
Plant capacity enhancement
Improvement in Plant operational efficiencies
Resource optimization
Energy audits and conservation measures
Yield improvement
End of line automation
Operational excellence APPC
APPC

Introduction_APPC

  • 1.
    A P PharmaConsultants “Focused Pharma Engineering and GMP solutions” Contact Details: Pravin Goyal SCO 333, Chamber No 2, IInd Floor, Sector 9, Panchkula (Near Chandigarh), Haryana Mobile: 9805066066 Email: info@appharmaconsultants.com, pravin.goyal27@gmail.com APPC
  • 2.
    APPC Vision “To be themost preferred consultant providing end to end Engineering, GMP & operational Excellence Solutions” Mission “To provide innovative and cost effective solutions in creating versatile Pharmaceutical and FMCG facility complying with latest international regulatory Standards”
  • 3.
    About Us  APPC– a consultancy firm registered in Panchkula (near Chandigarh), founded by a team of professionals having more than 2 decades of industrial work experience in handling Projects, Engineering, Operations, Quality and Regulatory affairs.  Dedicated team of subject matter experts to guide on latest technological alternatives available and suggest optimum solutions.  Dynamic and innovative consultancy firm providing “concept to commissioning” consultancy solutions to clients in -  Pharmaceutical & Healthcare  Bulk drug & API  Personal care  FMCG  Foods and Beverages  Expertise lays in Creating, Communicating and Delivering value added solutions to support clients in putting up state of the art facilities, optimizing resources and getting a competitive edge in their industry maximizing customer satisfaction. APPC
  • 4.
    FOUNDER’S PROFILE Qualifications  B.E.(Mechanical) Positions held  Head – Projects (India, China, Indonesia)  GM – Operations  DGM – Engineering and Projects  Project Manager  Head Engineering Founder’s Corporate Experience 23 years of rich corporate experience at –  Reckitt Benckiser Healthcare India Ltd.  Wockhardt Ltd.  Ind-Swift Lab. Ltd.  Torrent Pharma Ltd.  Apollo International Ltd.  IPCA Lab. Ltd.  Jayant Vitamins Ltd. APPC
  • 5.
    Do you recognizeany of these challenges?  Implementing changes with minimal disruption of running production?  Making robust investment decisions when production demands fluctuate?  Ensuring well-integrated and balanced quality systems when targets move constantly?  Making the right technology choices for the new Pharma reality?  Ensuring smooth project execution when the scope keeps changing?  Meeting regulatory compliance as per international standards? Why us?  More than 2 decades of Industrial work experience  Rich experience in international regulatory audits  Commitment to Quality  Customized need based solutions  Energy Efficient and Economical Design  Innovative and value added solutions  Adhering to Time Schedule APPC If YES, then APPC provides customized solutions to each and every of the above challenges.
  • 6.
    APPC Pharmaceutical and healthcare Bulk drug& intermediates FMCGFood and beverages Personnel care In the fields of - Projects (Green field and Brown field) Quality management services Qualification and validations support and its documentations GMP audits, gap analysis and compliance support, key risk and mitigation Energy Audits and suggest latest energy conservation measures Process improvements Operational excellence Clientele – We offer end to end solutions to following industrial segments APPC
  • 7.
    Generating URS Concept design Masterplanning Basic and detailed Engineering Project management Procurement assistance Construction management In the following disciplines –  Architecture  Civil  Electrical and Instrumentations  Mechanical  HVAC  Water generation  Waste management  Plant GMP design Projects (Green field and Brown field) APPC
  • 8.
    CAPEX and OPEXworking Strategic project planning Project management office set-up and support Project monitoring services Cost management Bid management Contract management Project supply chain management Risk management Project Management APPC
  • 9.
    Qualifications & ValidationSupport  Facility  Equipment  HVAC System  Water generation and distribution System  Compressed Air & Nitrogen System  Heat Mapping Studies Documentations support as per regulatory requirement  SOP’s  Equipment qualification URS, DQ,IQ,OQ, PQ GMP trainings GMP audits, gap analysis and compliance support, key risk and mitigation APPCQuality Management Service – Provide technical guidance to design, prepare & implement Quality Management system for Drug Products (SVP, LVP, OSD & Liquid Orals, Cream & Ointments), API’s, Food & Beverages, Cosmetics & Ayurvedic facilities..
  • 10.
    Plant capacity enhancement Improvementin Plant operational efficiencies Resource optimization Energy audits and conservation measures Yield improvement End of line automation Operational excellence APPC
  • 11.