ABSTRACT


       This thesis is a study of the interaction between built and natural systems. These

interactions are becoming more important as the world population grows and continues

to concentrate further within cities that typically supplant rather than develop within

ecosystems. Through immersion in a series of typological environments and ecologies a

more thorough understanding of the systems and components of these typologies can be

gained by the occupant. The St Johns River system and Jacksonville, FL are the natural

and built bases for the various interactive typologies. These typologies are expressed in

the development of a mixed-use urban development anchored by an ecological center

exhibiting and researching the St Johns River basin. The typologies create a varied

level of enclosure or immersion from fully closed research biomes to completely open

natural areas. The immersion of the occupant into the St Johns River and its ecologies

is intended to trace the path of the river system. By following the river from its fresh

headwaters to the brackish mouth and into the ocean beyond the hydrological and

ecological connections that span hundreds or even thousands of miles can be condensed

and experienced.
Project Site   Alternative Sites   Alternative Sites   Alternative Sites
Proposed Naval Museum         Jacksonville Maritime Museum   Friendship Park    Museum of Science & History


Jacksonville History Center   Public Riverwalk               River Taxi Stops   Project Site
Proposed
                                                              Ecological Center



1320’ Radius from Transit Station




                Comfortable Walking Distance   5’ Topo Line               Site Access
St. Johns River
    3

2                                       4. occulina reef
        4
                5. tropical reef                                     3. bivalve




                                             ecology


        1


                        1. fresh water                 2. brackish




                          outreach
                         cafe, store,                  tropical reef
                           exhibit,                     aquarium
                         auditorium                    occulina reef
                                                        aquarium
                                                         bivalve
                                                        aquarium
                              circulation paths

                                                       fresh water
                                                          biome

                            support, ticketing,
                            mechanical systems,         brackish
            5               storage, restrooms           biome
outreach
                    cafe, store,                 tropical reef
                                      offices     aquarium
                      exhibit,
                    auditorium                   occulina reef
        5                                         aquarium
                                                   bivalve
                                                  aquarium
                         circulation paths
                4
                                                 fresh water
                                                    biome

                      support, ticketing,
                      mechanical systems,         brackish
                      storage, restrooms           biome
            3
1




    2




        5


                4




1           3




                             1     fresh water biome
                             2     brackish biome
                             3     bivalve aquarium
    2                        4     occulina reef aquarium
                             5     tropical reef aquarium
Sensory Enviornment
      Natural Path
    Non Critical Path
    All Senses Active
Sensory Enviornment
       Covered Path
        Critical Path
 Senses Limited by Distance
Vision
                   Position allows
                  greater access to
                       foliage




                      Smell
                  Natural aroma’s
                 of flora prevelant




                     Touch
                   Most flora and
                    fauna out of
                       reach




Sensory Enviornment
   Partially Enclosed Paths
  Critical & Non Critical Paths
Senses Inhibited by Structure &
             distance
Vision
                   Position allows
                  greater access to
                       foliage




                      Smell
                   Natural aroma’s
                  of flora prevelant




                      Touch
                   Most flora and
                    fauna out of
                       reach




Sensory Enviornment
         Biome Tunnel
 Critical & Non-Critical Paths
      Restricted to Vision
Interactive Typologies
Interactive Typologies

Interactive Typologies

  • 2.
    ABSTRACT This thesis is a study of the interaction between built and natural systems. These interactions are becoming more important as the world population grows and continues to concentrate further within cities that typically supplant rather than develop within ecosystems. Through immersion in a series of typological environments and ecologies a more thorough understanding of the systems and components of these typologies can be gained by the occupant. The St Johns River system and Jacksonville, FL are the natural and built bases for the various interactive typologies. These typologies are expressed in the development of a mixed-use urban development anchored by an ecological center exhibiting and researching the St Johns River basin. The typologies create a varied level of enclosure or immersion from fully closed research biomes to completely open natural areas. The immersion of the occupant into the St Johns River and its ecologies is intended to trace the path of the river system. By following the river from its fresh headwaters to the brackish mouth and into the ocean beyond the hydrological and ecological connections that span hundreds or even thousands of miles can be condensed and experienced.
  • 3.
    Project Site Alternative Sites Alternative Sites Alternative Sites
  • 4.
    Proposed Naval Museum Jacksonville Maritime Museum Friendship Park Museum of Science & History Jacksonville History Center Public Riverwalk River Taxi Stops Project Site
  • 5.
    Proposed Ecological Center 1320’ Radius from Transit Station Comfortable Walking Distance 5’ Topo Line Site Access
  • 7.
    St. Johns River 3 2 4. occulina reef 4 5. tropical reef 3. bivalve ecology 1 1. fresh water 2. brackish outreach cafe, store, tropical reef exhibit, aquarium auditorium occulina reef aquarium bivalve aquarium circulation paths fresh water biome support, ticketing, mechanical systems, brackish 5 storage, restrooms biome
  • 9.
    outreach cafe, store, tropical reef offices aquarium exhibit, auditorium occulina reef 5 aquarium bivalve aquarium circulation paths 4 fresh water biome support, ticketing, mechanical systems, brackish storage, restrooms biome 3 1 2 5 4 1 3 1 fresh water biome 2 brackish biome 3 bivalve aquarium 2 4 occulina reef aquarium 5 tropical reef aquarium
  • 23.
    Sensory Enviornment Natural Path Non Critical Path All Senses Active
  • 24.
    Sensory Enviornment Covered Path Critical Path Senses Limited by Distance
  • 25.
    Vision Position allows greater access to foliage Smell Natural aroma’s of flora prevelant Touch Most flora and fauna out of reach Sensory Enviornment Partially Enclosed Paths Critical & Non Critical Paths Senses Inhibited by Structure & distance
  • 26.
    Vision Position allows greater access to foliage Smell Natural aroma’s of flora prevelant Touch Most flora and fauna out of reach Sensory Enviornment Biome Tunnel Critical & Non-Critical Paths Restricted to Vision