SlideShare a Scribd company logo
CUARTO DE
RESIDUOS
CUARTOS
ELECTROGENO
CUARTO DE
MAQUINAS
PSICOLOGIA
CONSULTORIO
MEDICINA GENERAL 1
VESTIDOR
CONSULTORIO
GINECO-OBSTETRICIA
TRIAJE
PEDIATRÍA CRED
BAÑO
VARONES
BAÑO
DAMAS
FARMACIA
HISTORIAS CLINICAS
ESPERA
ADMISION
CAJA
TOMA DE MUESTRA
ODONTOLOGÍA
BAÑO
DISCAPACITADOS
CADENA DE FRIO
ALMACEN
CUARTO
DE
LIMPIEZA
N.P.T +0.15
N.P.T +-0.00
N.P.T +0.15
RAMPA S= 8.33%
RAMPA
S=
11.19%
1.80
1.34
1.50
1.50
1.30
SEGURIDAD
TOPICO/EMERGENCIA
STD-14
T
T
T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T T T
T
T
T
T
T
T
T
T
T T
T T
T
T
T
TG
T
T
T
P.T
T
T
T
T
T
T
T
T
T
STD-1
STD-2 STD-3
STD-4
STD-6
STD-7
STD-8 STD-5
STD-9
STD-10
STD-11
STD-12
STD-13
STD-16
T
STD-17
TTA
STD-15
DIAGRAMA UNIFILAR TABLERO GENERAL (TG)
BORNERA DE TIERRA
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C-5
C-2
SUB TABLERO DE DISTRUBICON (TD-1)
C-1
3x25A
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
220V
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-3
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-4
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-6
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-7
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-10
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-8
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-9
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-11
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-12
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-13
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-14
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-15
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-16
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-17
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-18
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
C-19
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
SUB TABLERO DE DISTRUBICON (TD-2)
SUB TABLERO DE DISTRUBICON (TD-3)
SUB TABLERO DE DISTRUBICON (TD-4)
SUB TABLERO DE DISTRUBICON (TD-5)
SUB TABLERO DE DISTRUBICON (TD-6)
SUB TABLERO DE DISTRUBICON (TD-7)
SUB TABLERO DE DISTRUBICON (TD-8
SUB TABLERO DE DISTRUBICON (TD-9)
SUB TABLERO DE DISTRUBICON (TD-10)
SUB TABLERO DE DISTRUBICON (TD-11)
SUB TABLERO DE DISTRUBICON (TD-12)
SUB TABLERO DE DISTRUBICON (TD-13)
SUB TABLERO DE DISTRUBICON (TD-14)
SUB TABLERO DE DISTRUBICON (TD-15)
SUB TABLERO DE DISTRUBICON (TD-16)
SUB TABLERO DE DISTRUBICON (TD-17)
R E S E R V A
R E S E R V A
R E S E R V A
R E S E R V A
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x25A
3x250A
3x250A
VIENE DEL SUMINISTRO ELECTRICO
3-1x70.0mm2(N2XOH)+1x16.0mm2(T)
50 mm2 Ø PVC
3-1x70.0mm2(N2XOH)+1x16.0mm2(T)
50 mm2 Ø PVC
VIENE DEL GENERADOR ELECTRICO
220V
(TTA)
INTERRUPTOR DE CUCHILLA CON FUSIBLE DE PROTECCION
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE
SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE, DOBLE, TRIPLE
LEYENDA
TUB. EMPOTRADO POR PISO O PARED PARA EL SISTEMA DE INTERCOMUNICACION 20mmØPVC-P
INTERRUPTOR AUTOMATICO TERMOMAGNETICO NO FUSE BIPOLAR
INTERRUPTOR AUTOMATICO TERMOMAGNETICO NO FUSE TRIPOLAR
TUB. EMPOTRADA POR EL PISO
TUB. EMPOTRADA POR EL TECHO O PARED
SALIDA PARA POZO A TIERRA
T T T SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE
SALIDA PARA CALENTADOR ELECTRICO
CAJA DE PASE CUADRADA (DIMENSION INDICADA)
CON TOMA A TIERRA
CAJA DE PASE OCTOGONAL CON TAPA CIEGA
SALIDA PARA INTERRUPTOR DE CONMUTACION
TABLERO DE DISTRIBUCION ELECTRICA ( TD )
CON TOMA A TIERRA Y A PRUEBA DE AGUA
MEDIDOR DE ENERGIA Kh.
SALIDA PARA CENTRO DE LUZ
T/Pa
SIMBOLO DESCRIPCION
TABLERO
TABLERO
SUELO
(m)
(mm)
RECT.
0.40
100x50
100x40
ESPECIAL
OCT.
RECT.
1.50
1.50
CUADRADA
100x40
OCT.
100x50x40 0.45/1.10/2.20
100x50x40
100x50x40
RECT.
RECT.
100x50x40
100x40
RECT.
OCT.
1.10
0.45
2.10
1.10
ESPECIAL
OCT.
ESPECIAL
ESPECIAL
100x40
0.70
TECHO
1.80 B.S
CAJA ALTURA
TUB. EMPOTRADA EN PISO O PARED PARA EL SISTEMA DE TELEVISION POR CABLE 20mmØPVC-P
2.10
SALIDA PARA ANTENA DE TV. y CABLE 100x50x40
RECT.
1.50
TV
F
SCN
N
TABLERO DE BOMBA DE AGUA ( TBA )
SALIDA PARA ARTEFACTO EMPOTRADO (SPOT-LYGHT)
N SALIDA EN PARED (BRAQUETE)
OCT.
100x40 TECHO
3SN
SN 2SN
100x50
CUADRADA
100x50
CUADRADA
0.40
0.40
CUADRADA
100x50
CUADRADA
ESPECIAL
100x50
CUADRADA
SALIDA PARA AMPLIFICADOR
APARATO INTERCOMUNICADOR
CHAPA ELECTRICA
SALIDA TELEFONO EXTERNO
100x50
CUADRADA
SALIDA INTERCOMUNICADOR
TUB. EMPOTRADO POR PISO O PARED PARA EL SISTEMA DE TELEFONO EXTERNO 20mmØPVC-P
N
SALIDA PARA TOMACORRIENTE TRIFASICA 100x50x40
RECT.
0.45
TBA
ESPECIAL 1.80 B.S
SUB TABLERO DE DISTRIBUCION ELECTRICA ( STD )
SALIDA DE FUERZA TRIFASICA
BORNERA PARA PUESTA A TIERRA
CONTACTOR
RELET
TV
TV
TV
TV
TV
TV
TV TV TV
TV
TV
TV
TV
TV
TV
TV
DE JOSFEL CON 2 LAMPARA FLUORESCENTES DE 36W.
ARTEFACTO FLUORESCENTE SIMILAR AL MODELO TPR 240 OCT.
100x40 TECHO
N
CAJA DE PASE PARA INTERCOMUNICADOR
CAJA DE PASE PARA TELEFONO EXTERNO
1.40
0.40
0.30
0.30
M
M
M
M
M
M
M
M
M
TAPA 1 GANG
CUADRADA
100x50
M
M
M M
M
M
M
TUBERIA PARA SISTEMA DE PARLANTES 20mmØPVC-P
CUADRADA
100x50
SALIDA PARA PARLANTE TECHO
TD-1
IC
TE
CONTROL DE VOLUMEN DE PARLANTES
100x50x40
RECT.
1.10
CV
M
M
SALIDA PARA ARTEFACTO EMPOTRADO DICROICO
D
CUADRO DE CARGAS-TOTAL
CARGA BASICA
D E S C R I P C I O N
FACTOR
DEMANDA
INSTALADA
CARGA MAXIMA
DEMANDA
550 x 30 W/m2 =2250
area: 550.00m2
(W) (%) (W)
1º PISO
CARGA TOMACORRIENTE
80
TOTAL 24 000.00
50 x 150 W/m2 = 2350
16 500.00
7 500.00
100
POTENCIA INSTALADA = 24 000 w
MAXIMA DEMANDA = 22 500 w
16 500.00
6 000.00
22 500.00
3x25A
SUB TABLEROS DE DISTRIBUCION DEL TD-1 AL TD-17
BORNERA DE TIERRA
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C-2
C-1
2x20A
3-1x4.0mm2(NH80)+1x4.0mm2(T)
20mm2 Ø PVC
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
2x20A
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
2-1x4.0mm (NH-80) - Ø10mm PVC
2-1x4.0mm (NH-80) +1x2.5mm²(T)- Ø10mm PVC
220 V.
S=30mA
2x25A
S=30mA
2x25A
ILUMINACION
TOMACORRIENTE
VIENEN DEL TG-1
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
R E S E R V A
C-3 R E S E R V A
EQUIPO DE ILUMINACIÓN
DE EMERGENCIA FIJADO EN
MURO
LÁMPARA DE 12 VOLTS
BASE DE AJUSTE DE LÁMPARA
TOMACORRIENTE ALTO
LUMINARIA DE EMERGENCIA
ESCALA : S/E
EMERGENCY LIGHTING
TABLERO GENERAL Y/O DISTRIBUCION :
- CAJA, PARA EMPOTRAR EN MURO, DEL TIPO GABINETE METALICO
A WESTINGHOUSE(USA), GENERAL (USA), ETC.
- INTERRUPTORES TIPO AUTOMATICO (THERMOMAGNETICO) IGUAL
- EL TABLERO GENERAL SERA DE PLANCHA DE ACERO DEL TIPO
PARA EMPOTRAR
ESCALA:
INDICADA
IE-101
ELECTRICAS-TOMACORRIENTE INSTALACIONES ELECTRICAS
JULIO 2022
“MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL CENTRO
POBLADO DE TAYAGASHA DEL DISTRITO DE PANAO - PROVINCIA
DE PACHITEA - DEPARTAMENTO DE HUÁNUCO”
Ubicacion :
Prov. : Pachitea
Dpto. : Huanuco
Loc. : Tayagasha
Dist. : Panao
CONSORCIO J&C

More Related Content

More from SMOLLV SMOLLV

INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docxINF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
SMOLLV SMOLLV
 
1 FORMATO (1).pdf
1 FORMATO (1).pdf1 FORMATO (1).pdf
1 FORMATO (1).pdf
SMOLLV SMOLLV
 
3 FORMATO (3).pdf
3 FORMATO (3).pdf3 FORMATO (3).pdf
3 FORMATO (3).pdf
SMOLLV SMOLLV
 
8 FORMATO (8).pdf
8  FORMATO (8).pdf8  FORMATO (8).pdf
8 FORMATO (8).pdf
SMOLLV SMOLLV
 
10 FORMATO (10).pdf
10 FORMATO (10).pdf10 FORMATO (10).pdf
10 FORMATO (10).pdf
SMOLLV SMOLLV
 
6 FORMATO (6).pdf
6 FORMATO (6).pdf6 FORMATO (6).pdf
6 FORMATO (6).pdf
SMOLLV SMOLLV
 
7 FORMATO (7).pdf
7 FORMATO (7).pdf7 FORMATO (7).pdf
7 FORMATO (7).pdf
SMOLLV SMOLLV
 
5 FORMATO (5).pdf
5 FORMATO (5).pdf5 FORMATO (5).pdf
5 FORMATO (5).pdf
SMOLLV SMOLLV
 
377909072-CARTA-N-01-Partidas-Pendientes.pdf
377909072-CARTA-N-01-Partidas-Pendientes.pdf377909072-CARTA-N-01-Partidas-Pendientes.pdf
377909072-CARTA-N-01-Partidas-Pendientes.pdf
SMOLLV SMOLLV
 
14 FORMATO (14).pdf
14 FORMATO (14).pdf14 FORMATO (14).pdf
14 FORMATO (14).pdf
SMOLLV SMOLLV
 
SUNAT novak (1).pdf
SUNAT  novak (1).pdfSUNAT  novak (1).pdf
SUNAT novak (1).pdf
SMOLLV SMOLLV
 
12 FORMATO (12).pdf
12 FORMATO (12).pdf12 FORMATO (12).pdf
12 FORMATO (12).pdf
SMOLLV SMOLLV
 
2 FORMATO (2).pdf
2 FORMATO (2).pdf2 FORMATO (2).pdf
2 FORMATO (2).pdf
SMOLLV SMOLLV
 
DATOS.pdf
DATOS.pdfDATOS.pdf
DATOS.pdf
SMOLLV SMOLLV
 
tomo 2.pdf
tomo 2.pdftomo 2.pdf
tomo 2.pdf
SMOLLV SMOLLV
 
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
SMOLLV SMOLLV
 
014. 06. COTIZACION AGREGADO FINAL.pdf
014. 06. COTIZACION AGREGADO FINAL.pdf014. 06. COTIZACION AGREGADO FINAL.pdf
014. 06. COTIZACION AGREGADO FINAL.pdf
SMOLLV SMOLLV
 
10477431297-R01-E001-3.pdf
10477431297-R01-E001-3.pdf10477431297-R01-E001-3.pdf
10477431297-R01-E001-3.pdf
SMOLLV SMOLLV
 
tomo l.pdf
tomo l.pdftomo l.pdf
tomo l.pdf
SMOLLV SMOLLV
 
019. COTIZACION SCTR MUNC PACHITEA..pdf
019. COTIZACION SCTR MUNC PACHITEA..pdf019. COTIZACION SCTR MUNC PACHITEA..pdf
019. COTIZACION SCTR MUNC PACHITEA..pdf
SMOLLV SMOLLV
 

More from SMOLLV SMOLLV (20)

INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docxINF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
INF.-002-2023_APOYO A LA IE 034 PANAO NUEVO (1).docx
 
1 FORMATO (1).pdf
1 FORMATO (1).pdf1 FORMATO (1).pdf
1 FORMATO (1).pdf
 
3 FORMATO (3).pdf
3 FORMATO (3).pdf3 FORMATO (3).pdf
3 FORMATO (3).pdf
 
8 FORMATO (8).pdf
8  FORMATO (8).pdf8  FORMATO (8).pdf
8 FORMATO (8).pdf
 
10 FORMATO (10).pdf
10 FORMATO (10).pdf10 FORMATO (10).pdf
10 FORMATO (10).pdf
 
6 FORMATO (6).pdf
6 FORMATO (6).pdf6 FORMATO (6).pdf
6 FORMATO (6).pdf
 
7 FORMATO (7).pdf
7 FORMATO (7).pdf7 FORMATO (7).pdf
7 FORMATO (7).pdf
 
5 FORMATO (5).pdf
5 FORMATO (5).pdf5 FORMATO (5).pdf
5 FORMATO (5).pdf
 
377909072-CARTA-N-01-Partidas-Pendientes.pdf
377909072-CARTA-N-01-Partidas-Pendientes.pdf377909072-CARTA-N-01-Partidas-Pendientes.pdf
377909072-CARTA-N-01-Partidas-Pendientes.pdf
 
14 FORMATO (14).pdf
14 FORMATO (14).pdf14 FORMATO (14).pdf
14 FORMATO (14).pdf
 
SUNAT novak (1).pdf
SUNAT  novak (1).pdfSUNAT  novak (1).pdf
SUNAT novak (1).pdf
 
12 FORMATO (12).pdf
12 FORMATO (12).pdf12 FORMATO (12).pdf
12 FORMATO (12).pdf
 
2 FORMATO (2).pdf
2 FORMATO (2).pdf2 FORMATO (2).pdf
2 FORMATO (2).pdf
 
DATOS.pdf
DATOS.pdfDATOS.pdf
DATOS.pdf
 
tomo 2.pdf
tomo 2.pdftomo 2.pdf
tomo 2.pdf
 
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
015. CREDENCIAL JNE Y DNI ALCALDE FINAL.pdf
 
014. 06. COTIZACION AGREGADO FINAL.pdf
014. 06. COTIZACION AGREGADO FINAL.pdf014. 06. COTIZACION AGREGADO FINAL.pdf
014. 06. COTIZACION AGREGADO FINAL.pdf
 
10477431297-R01-E001-3.pdf
10477431297-R01-E001-3.pdf10477431297-R01-E001-3.pdf
10477431297-R01-E001-3.pdf
 
tomo l.pdf
tomo l.pdftomo l.pdf
tomo l.pdf
 
019. COTIZACION SCTR MUNC PACHITEA..pdf
019. COTIZACION SCTR MUNC PACHITEA..pdf019. COTIZACION SCTR MUNC PACHITEA..pdf
019. COTIZACION SCTR MUNC PACHITEA..pdf
 

Recently uploaded

AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
cannyengineerings
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
abdatawakjira
 

Recently uploaded (20)

AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
 

INSTALACIONES ELECTRICAS-TOMACORRIENTE.pdf

  • 1. CUARTO DE RESIDUOS CUARTOS ELECTROGENO CUARTO DE MAQUINAS PSICOLOGIA CONSULTORIO MEDICINA GENERAL 1 VESTIDOR CONSULTORIO GINECO-OBSTETRICIA TRIAJE PEDIATRÍA CRED BAÑO VARONES BAÑO DAMAS FARMACIA HISTORIAS CLINICAS ESPERA ADMISION CAJA TOMA DE MUESTRA ODONTOLOGÍA BAÑO DISCAPACITADOS CADENA DE FRIO ALMACEN CUARTO DE LIMPIEZA N.P.T +0.15 N.P.T +-0.00 N.P.T +0.15 RAMPA S= 8.33% RAMPA S= 11.19% 1.80 1.34 1.50 1.50 1.30 SEGURIDAD TOPICO/EMERGENCIA STD-14 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TG T T T P.T T T T T T T T T T STD-1 STD-2 STD-3 STD-4 STD-6 STD-7 STD-8 STD-5 STD-9 STD-10 STD-11 STD-12 STD-13 STD-16 T STD-17 TTA STD-15 DIAGRAMA UNIFILAR TABLERO GENERAL (TG) BORNERA DE TIERRA T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-5 C-2 SUB TABLERO DE DISTRUBICON (TD-1) C-1 3x25A T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T 220V 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-3 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-4 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-6 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-7 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-10 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-8 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-9 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-11 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-12 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-13 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-14 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-15 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-16 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-17 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-18 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-19 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T SUB TABLERO DE DISTRUBICON (TD-2) SUB TABLERO DE DISTRUBICON (TD-3) SUB TABLERO DE DISTRUBICON (TD-4) SUB TABLERO DE DISTRUBICON (TD-5) SUB TABLERO DE DISTRUBICON (TD-6) SUB TABLERO DE DISTRUBICON (TD-7) SUB TABLERO DE DISTRUBICON (TD-8 SUB TABLERO DE DISTRUBICON (TD-9) SUB TABLERO DE DISTRUBICON (TD-10) SUB TABLERO DE DISTRUBICON (TD-11) SUB TABLERO DE DISTRUBICON (TD-12) SUB TABLERO DE DISTRUBICON (TD-13) SUB TABLERO DE DISTRUBICON (TD-14) SUB TABLERO DE DISTRUBICON (TD-15) SUB TABLERO DE DISTRUBICON (TD-16) SUB TABLERO DE DISTRUBICON (TD-17) R E S E R V A R E S E R V A R E S E R V A R E S E R V A 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3-1x4.mm²NH-80+1x4.0mm²(T)- Ø10mm PVC 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x25A 3x250A 3x250A VIENE DEL SUMINISTRO ELECTRICO 3-1x70.0mm2(N2XOH)+1x16.0mm2(T) 50 mm2 Ø PVC 3-1x70.0mm2(N2XOH)+1x16.0mm2(T) 50 mm2 Ø PVC VIENE DEL GENERADOR ELECTRICO 220V (TTA) INTERRUPTOR DE CUCHILLA CON FUSIBLE DE PROTECCION SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE, DOBLE, TRIPLE LEYENDA TUB. EMPOTRADO POR PISO O PARED PARA EL SISTEMA DE INTERCOMUNICACION 20mmØPVC-P INTERRUPTOR AUTOMATICO TERMOMAGNETICO NO FUSE BIPOLAR INTERRUPTOR AUTOMATICO TERMOMAGNETICO NO FUSE TRIPOLAR TUB. EMPOTRADA POR EL PISO TUB. EMPOTRADA POR EL TECHO O PARED SALIDA PARA POZO A TIERRA T T T SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE SALIDA PARA CALENTADOR ELECTRICO CAJA DE PASE CUADRADA (DIMENSION INDICADA) CON TOMA A TIERRA CAJA DE PASE OCTOGONAL CON TAPA CIEGA SALIDA PARA INTERRUPTOR DE CONMUTACION TABLERO DE DISTRIBUCION ELECTRICA ( TD ) CON TOMA A TIERRA Y A PRUEBA DE AGUA MEDIDOR DE ENERGIA Kh. SALIDA PARA CENTRO DE LUZ T/Pa SIMBOLO DESCRIPCION TABLERO TABLERO SUELO (m) (mm) RECT. 0.40 100x50 100x40 ESPECIAL OCT. RECT. 1.50 1.50 CUADRADA 100x40 OCT. 100x50x40 0.45/1.10/2.20 100x50x40 100x50x40 RECT. RECT. 100x50x40 100x40 RECT. OCT. 1.10 0.45 2.10 1.10 ESPECIAL OCT. ESPECIAL ESPECIAL 100x40 0.70 TECHO 1.80 B.S CAJA ALTURA TUB. EMPOTRADA EN PISO O PARED PARA EL SISTEMA DE TELEVISION POR CABLE 20mmØPVC-P 2.10 SALIDA PARA ANTENA DE TV. y CABLE 100x50x40 RECT. 1.50 TV F SCN N TABLERO DE BOMBA DE AGUA ( TBA ) SALIDA PARA ARTEFACTO EMPOTRADO (SPOT-LYGHT) N SALIDA EN PARED (BRAQUETE) OCT. 100x40 TECHO 3SN SN 2SN 100x50 CUADRADA 100x50 CUADRADA 0.40 0.40 CUADRADA 100x50 CUADRADA ESPECIAL 100x50 CUADRADA SALIDA PARA AMPLIFICADOR APARATO INTERCOMUNICADOR CHAPA ELECTRICA SALIDA TELEFONO EXTERNO 100x50 CUADRADA SALIDA INTERCOMUNICADOR TUB. EMPOTRADO POR PISO O PARED PARA EL SISTEMA DE TELEFONO EXTERNO 20mmØPVC-P N SALIDA PARA TOMACORRIENTE TRIFASICA 100x50x40 RECT. 0.45 TBA ESPECIAL 1.80 B.S SUB TABLERO DE DISTRIBUCION ELECTRICA ( STD ) SALIDA DE FUERZA TRIFASICA BORNERA PARA PUESTA A TIERRA CONTACTOR RELET TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV DE JOSFEL CON 2 LAMPARA FLUORESCENTES DE 36W. ARTEFACTO FLUORESCENTE SIMILAR AL MODELO TPR 240 OCT. 100x40 TECHO N CAJA DE PASE PARA INTERCOMUNICADOR CAJA DE PASE PARA TELEFONO EXTERNO 1.40 0.40 0.30 0.30 M M M M M M M M M TAPA 1 GANG CUADRADA 100x50 M M M M M M M TUBERIA PARA SISTEMA DE PARLANTES 20mmØPVC-P CUADRADA 100x50 SALIDA PARA PARLANTE TECHO TD-1 IC TE CONTROL DE VOLUMEN DE PARLANTES 100x50x40 RECT. 1.10 CV M M SALIDA PARA ARTEFACTO EMPOTRADO DICROICO D CUADRO DE CARGAS-TOTAL CARGA BASICA D E S C R I P C I O N FACTOR DEMANDA INSTALADA CARGA MAXIMA DEMANDA 550 x 30 W/m2 =2250 area: 550.00m2 (W) (%) (W) 1º PISO CARGA TOMACORRIENTE 80 TOTAL 24 000.00 50 x 150 W/m2 = 2350 16 500.00 7 500.00 100 POTENCIA INSTALADA = 24 000 w MAXIMA DEMANDA = 22 500 w 16 500.00 6 000.00 22 500.00 3x25A SUB TABLEROS DE DISTRIBUCION DEL TD-1 AL TD-17 BORNERA DE TIERRA T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T C-2 C-1 2x20A 3-1x4.0mm2(NH80)+1x4.0mm2(T) 20mm2 Ø PVC T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T 2x20A T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T 2-1x4.0mm (NH-80) - Ø10mm PVC 2-1x4.0mm (NH-80) +1x2.5mm²(T)- Ø10mm PVC 220 V. S=30mA 2x25A S=30mA 2x25A ILUMINACION TOMACORRIENTE VIENEN DEL TG-1 T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T R E S E R V A C-3 R E S E R V A EQUIPO DE ILUMINACIÓN DE EMERGENCIA FIJADO EN MURO LÁMPARA DE 12 VOLTS BASE DE AJUSTE DE LÁMPARA TOMACORRIENTE ALTO LUMINARIA DE EMERGENCIA ESCALA : S/E EMERGENCY LIGHTING TABLERO GENERAL Y/O DISTRIBUCION : - CAJA, PARA EMPOTRAR EN MURO, DEL TIPO GABINETE METALICO A WESTINGHOUSE(USA), GENERAL (USA), ETC. - INTERRUPTORES TIPO AUTOMATICO (THERMOMAGNETICO) IGUAL - EL TABLERO GENERAL SERA DE PLANCHA DE ACERO DEL TIPO PARA EMPOTRAR ESCALA: INDICADA IE-101 ELECTRICAS-TOMACORRIENTE INSTALACIONES ELECTRICAS JULIO 2022 “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL CENTRO POBLADO DE TAYAGASHA DEL DISTRITO DE PANAO - PROVINCIA DE PACHITEA - DEPARTAMENTO DE HUÁNUCO” Ubicacion : Prov. : Pachitea Dpto. : Huanuco Loc. : Tayagasha Dist. : Panao CONSORCIO J&C