Key Features of Inspiring Software


        Web based
        User friendly and intuitive interface
        Hardware independent
        Installed or hosted
        Multilingual
        Modular
        Scalable
        Training and knowledge transfer
        Highly sophisticated consultancy
        Can be integrated into virtually any system
        Very easy to implement


2
Inspiring Software: Methodology




3
Inspiring Software Technology Platform: Modules




4
Inspiring Software: Professional Services

     We aim to provide solutions, rather than products. That is why
     every customer interaction for us is a project which deserves
     the following services:



        Consultancy: grow and improve your business
        Advice: take the right decision
        Implementation: integrate our technology in your operations
        Training: expand your knowledge and expertise
        Support: never feel alone or helpless




5
Inspiring Software: Energy Management




6
Inspiring Software: Energy Management

         We work towards achieving comprehensive energy
                          management




7
Inspiring Software: Energy Management

     Do you want to know:

      HOW your facility consumes energy?
      WHY it consumes so much?
      WHERE to implement efficiency measures to reach the
       highest benefit?
      WHAT particular efficiency measures to implement?
      HOW to optimize the production of energy?
      WHAT are your energy costs?
      HOW to reduce your energy costs?

                ENERGY MODELS are the answer

8
Inspiring Software: Energy Management


     The Energy Model lets you:

      Take control of your energy consumption

      Manage and reduce your energy costs

      Check and monitor your facility’s real efficiency

      Optimize your business operations

      Make Energy Management part of your corporate
       responsibility
9
Inspiring Software: Clear Energy Analysis

      CUSUM chart




10
Inspiring Software: Consumption Monitoring




      Consumption charts: power consumption over time
11
Inspiring Software: Performance Monitoring




      Dashboard: real-time percentual values of Perfomance Ratio (PR)
      and plant productivity, produced energy and following day forecast.
12
Inspiring Software: A Case Study




13
The Facts:
      COOP is a system of Italian consumers’ cooperatives which
       operates the largest supermarket chain in Italy
      Our project was with COOP Adriatic District on 6 sites, all
       distribution centers
      200 million product loads turnover a year
      750 employees
      Energy consumption of 17,500,000 kWh a year
      Main energy users -> cooling facilities and machinery


               The Requirements:
                Find out the pattern of energy consumption
                Find out the causes for changes in consumption
                Evaluate the impact of energy on the business
                Train the company on the techniques for the assessment of
                 energy consumption
                Implement the foundations for long-term energy efficiency
                 policies and evaluate their effectiveness
14
ROI within 1 year!

     Inspiring Software’s Solution:
      Energy audit: identification & acquisition of consumption data
        from primary energy sources; get to know the business
      Construct a consumption model for each site and identify
        inefficiencies, energy drivers and cost-saving opportunities
      Consumption monitoring: analysis and control of energy
        consumption
      Energy costs: control budgets and implement operational
        improvements so as to reduce costs and waste


               The Results: The Client
                Has a practical tool for energy monitoring & analysis
                Has an effective energy management policy
                Can now forecast & control energy consumption
                Has reduced energy demand by 2%, maintenance costs by
                 20%, and waste by 10%
                Has reduced energy costs by €53,000
                Can monitor and control CO2 emissions
15
Inspiring Software: Maintenance Management




16
Inspiring Software: Maintenance Management

       We work towards achieving comprehensive optimization and
                     management of your facility
                               FACILITY




17
Inspiring Software: Maintenance Management

      Do you want to:

       Easily organize, visualize, and monitor your assets
       Have all types of valuable asset information at hand
       Optimize and manage your maintenance processes, and
        make them more lean
       Implement practices of predictive and planned maintenance
       Analyze your facility’s performance
       Know and control your costs
                                                    … and much more?

      Inspiring Software will help you do that.

18
Inspiring Software: CMMS/EAM




19
Inspiring Software: Control Over Your Operations




     Planned maintenance: Gantt and scheduling

20
Inspiring Software: KPIs




     Performance monitoring: technical and economical KPIs

21
Inspiring Software: Engineering




     FMECA/FMEA: criticality graphs

22
Inspiring Software: A Case Study




23
The Facts:
      Problem with a Scolari roaster
      Very often out of order due to the bow rejecting the coffee
       load
      Average downtime 1 working day
      High maintenance costs, > 50,000 euro
      Higher total production costs, > 100,000 euro




               The Requirements:
                Implement an ongoing maintenance plan and procedure in the
                 plant
                Web-based solution with high database capabilities which is
                 easy to use and has high analytical power
                Identify and resolve the machine problem
                Reduce costs
                Eliminate wastage and optimize production
24
Inspiring Software’s Solution:
      Equip the roaster with 24H predictive monitoring
      Perform FMECA 1 which includes making a functional
        dissection of the roaster in 4 macro areas deciding upon
        criticality parameters
      Perform FMECA 2 which includes obtaining a Global Critical
        Value for each component of the 4 areas
      Digitalize and display all necessary asset information
      Install a CMMS


               The Results:
                Increased reliability of roaster by 66%
                Increased reliability of entire plant by 50%
                Almost immediate positive return on investment
                Reduced costs 20%
                A leaner plant and maintenance program
                A more autonomous lower management

25
Inspiring Software Customers




26
Thank you for the attention!

            Interested? Get in touch with
                    us right away!




27
Inspiring Software srl
CONTACTS    Via Milano, 15/i
            I-20060 Bussero MI

            Aleksandra Peneva
            International Sales Director
             +44 207 193 3054
             +39 334 737 0072
             a.peneva@inspiringsoftware.com



FOLLOW US




      WWW.INSPIRINGSOFTWARE.COM

Inspiring Software Presentation

  • 1.
    INSPIRING SOFTWARE Be incontrol of your business Aleksandra Peneva, International Sales Director January 2013
  • 2.
    Key Features ofInspiring Software  Web based  User friendly and intuitive interface  Hardware independent  Installed or hosted  Multilingual  Modular  Scalable  Training and knowledge transfer  Highly sophisticated consultancy  Can be integrated into virtually any system  Very easy to implement 2
  • 3.
  • 4.
    Inspiring Software TechnologyPlatform: Modules 4
  • 5.
    Inspiring Software: ProfessionalServices We aim to provide solutions, rather than products. That is why every customer interaction for us is a project which deserves the following services:  Consultancy: grow and improve your business  Advice: take the right decision  Implementation: integrate our technology in your operations  Training: expand your knowledge and expertise  Support: never feel alone or helpless 5
  • 6.
  • 7.
    Inspiring Software: EnergyManagement We work towards achieving comprehensive energy management 7
  • 8.
    Inspiring Software: EnergyManagement Do you want to know:  HOW your facility consumes energy?  WHY it consumes so much?  WHERE to implement efficiency measures to reach the highest benefit?  WHAT particular efficiency measures to implement?  HOW to optimize the production of energy?  WHAT are your energy costs?  HOW to reduce your energy costs? ENERGY MODELS are the answer 8
  • 9.
    Inspiring Software: EnergyManagement The Energy Model lets you:  Take control of your energy consumption  Manage and reduce your energy costs  Check and monitor your facility’s real efficiency  Optimize your business operations  Make Energy Management part of your corporate responsibility 9
  • 10.
    Inspiring Software: ClearEnergy Analysis CUSUM chart 10
  • 11.
    Inspiring Software: ConsumptionMonitoring Consumption charts: power consumption over time 11
  • 12.
    Inspiring Software: PerformanceMonitoring Dashboard: real-time percentual values of Perfomance Ratio (PR) and plant productivity, produced energy and following day forecast. 12
  • 13.
    Inspiring Software: ACase Study 13
  • 14.
    The Facts:  COOP is a system of Italian consumers’ cooperatives which operates the largest supermarket chain in Italy  Our project was with COOP Adriatic District on 6 sites, all distribution centers  200 million product loads turnover a year  750 employees  Energy consumption of 17,500,000 kWh a year  Main energy users -> cooling facilities and machinery The Requirements:  Find out the pattern of energy consumption  Find out the causes for changes in consumption  Evaluate the impact of energy on the business  Train the company on the techniques for the assessment of energy consumption  Implement the foundations for long-term energy efficiency policies and evaluate their effectiveness 14
  • 15.
    ROI within 1year! Inspiring Software’s Solution:  Energy audit: identification & acquisition of consumption data from primary energy sources; get to know the business  Construct a consumption model for each site and identify inefficiencies, energy drivers and cost-saving opportunities  Consumption monitoring: analysis and control of energy consumption  Energy costs: control budgets and implement operational improvements so as to reduce costs and waste The Results: The Client  Has a practical tool for energy monitoring & analysis  Has an effective energy management policy  Can now forecast & control energy consumption  Has reduced energy demand by 2%, maintenance costs by 20%, and waste by 10%  Has reduced energy costs by €53,000  Can monitor and control CO2 emissions 15
  • 16.
  • 17.
    Inspiring Software: MaintenanceManagement We work towards achieving comprehensive optimization and management of your facility FACILITY 17
  • 18.
    Inspiring Software: MaintenanceManagement Do you want to:  Easily organize, visualize, and monitor your assets  Have all types of valuable asset information at hand  Optimize and manage your maintenance processes, and make them more lean  Implement practices of predictive and planned maintenance  Analyze your facility’s performance  Know and control your costs … and much more? Inspiring Software will help you do that. 18
  • 19.
  • 20.
    Inspiring Software: ControlOver Your Operations Planned maintenance: Gantt and scheduling 20
  • 21.
    Inspiring Software: KPIs Performance monitoring: technical and economical KPIs 21
  • 22.
    Inspiring Software: Engineering FMECA/FMEA: criticality graphs 22
  • 23.
    Inspiring Software: ACase Study 23
  • 24.
    The Facts:  Problem with a Scolari roaster  Very often out of order due to the bow rejecting the coffee load  Average downtime 1 working day  High maintenance costs, > 50,000 euro  Higher total production costs, > 100,000 euro The Requirements:  Implement an ongoing maintenance plan and procedure in the plant  Web-based solution with high database capabilities which is easy to use and has high analytical power  Identify and resolve the machine problem  Reduce costs  Eliminate wastage and optimize production 24
  • 25.
    Inspiring Software’s Solution:  Equip the roaster with 24H predictive monitoring  Perform FMECA 1 which includes making a functional dissection of the roaster in 4 macro areas deciding upon criticality parameters  Perform FMECA 2 which includes obtaining a Global Critical Value for each component of the 4 areas  Digitalize and display all necessary asset information  Install a CMMS The Results:  Increased reliability of roaster by 66%  Increased reliability of entire plant by 50%  Almost immediate positive return on investment  Reduced costs 20%  A leaner plant and maintenance program  A more autonomous lower management 25
  • 26.
  • 27.
    Thank you forthe attention! Interested? Get in touch with us right away! 27
  • 28.
    Inspiring Software srl CONTACTS Via Milano, 15/i I-20060 Bussero MI Aleksandra Peneva International Sales Director  +44 207 193 3054  +39 334 737 0072  a.peneva@inspiringsoftware.com FOLLOW US WWW.INSPIRINGSOFTWARE.COM