The 2017 tree planting project by BV for CMD had several issues including: 1) BV did not hold pre-planting meetings or inspections as promised. 2) Many trees were planted in ways that did not meet ANSI A300 standards for rootball depth, mulching, stock quality, circling roots, and staking. Over 200 defects were found. 3) One tree was not planted at all, 6 trees were planted in the wrong locations, and one planting hole was left open, posing a safety risk.