This document provides guidance on managing ICT risks for small to medium businesses. It discusses:
1) The importance of risk management and identifying risks before undertaking new business activities or decisions. 2) Common risk management methodologies like risk registers and risk matrices to document and evaluate risks. 3) Major types of ICT risks for businesses related to falling behind technology, poor purchasing decisions, lack of organizational commitment, and missed innovation opportunities. 4) Steps to identify and manage risks when assessing and procuring new ICT products and services.
8 steps to Successful Accounts System Selection - Xledger WhitepaperXledger UK
Looking at a new Finance or Accounts system?
Perhaps your current system is no longer supported or your business has simply outgrown it and needs something more suitable to support future growth.
What steps can you take to ensure your business makes the right choice and derives all the business benefits associated with a modern finance system?
With over 6,000 successful accounts system implementations behind us we outline our 8 Steps to Successful System Selection.
Understanding IT Governance and Risk Managementjiricejka
Describes IT Governance Holistic Framework for establishing transparent relation between Business and IT environment.
Describes Governance services and Risk Management Methods
Your Challenge
Risk is an unavoidable part of IT. And what you don't know, can hurt you. The question is, do you tackle risk head-on or leave it to chance?
Get a handle on risk management quickly using Info-Tech's methodology and reduce unfortunate IT surprises.
Our Advice
Critical Insight
1. IT risk is business risk.
Every IT risk has business implications. Create an IT risk management program that shares risk accountability with the business.
2. Risk is money.
It’s impossible to make intelligent decisions about risks without knowing what they’re worth.
3. You don’t know what you don’t know.
And what you don’t know can hurt you – so find out. To find hidden risks, you need a structured approach.
Impact and Result
Stop leaving IT risk to chance. Transform your ad hoc IT risk management processes into a formalized, ongoing program and increase risk management success by 53%.
Take a proactive stance against IT threats and vulnerabilities by identifying and assessing IT’s greatest risks before they happen.
Involve key stakeholders including the business senior management team to gain buy-in and to focus on IT risks that matter most to the organization.
Share accountability for IT risk with business stakeholders and have them weigh-in on prioritizing investments in risk response activities.
8 steps to Successful Accounts System Selection - Xledger WhitepaperXledger UK
Looking at a new Finance or Accounts system?
Perhaps your current system is no longer supported or your business has simply outgrown it and needs something more suitable to support future growth.
What steps can you take to ensure your business makes the right choice and derives all the business benefits associated with a modern finance system?
With over 6,000 successful accounts system implementations behind us we outline our 8 Steps to Successful System Selection.
Understanding IT Governance and Risk Managementjiricejka
Describes IT Governance Holistic Framework for establishing transparent relation between Business and IT environment.
Describes Governance services and Risk Management Methods
Your Challenge
Risk is an unavoidable part of IT. And what you don't know, can hurt you. The question is, do you tackle risk head-on or leave it to chance?
Get a handle on risk management quickly using Info-Tech's methodology and reduce unfortunate IT surprises.
Our Advice
Critical Insight
1. IT risk is business risk.
Every IT risk has business implications. Create an IT risk management program that shares risk accountability with the business.
2. Risk is money.
It’s impossible to make intelligent decisions about risks without knowing what they’re worth.
3. You don’t know what you don’t know.
And what you don’t know can hurt you – so find out. To find hidden risks, you need a structured approach.
Impact and Result
Stop leaving IT risk to chance. Transform your ad hoc IT risk management processes into a formalized, ongoing program and increase risk management success by 53%.
Take a proactive stance against IT threats and vulnerabilities by identifying and assessing IT’s greatest risks before they happen.
Involve key stakeholders including the business senior management team to gain buy-in and to focus on IT risks that matter most to the organization.
Share accountability for IT risk with business stakeholders and have them weigh-in on prioritizing investments in risk response activities.
Your Challenge
Infrastructure managers and change managers need to re-evaluate their change management process due to slow change turnaround time, too many unauthorized changes, too many incidents and outages because of poorly managed changes, or difficulty evaluating and prioritizing changes.
IT system owners often resist change management because they see it as slow and bureaucratic.
Infrastructure changes are often seen as “different” from application changes, and two (or more) processes may exist.
Our Advice
Critical Insight
ITIL provides a usable framework for change management, but full process rigor is not appropriate for every change request.
You need to design a process that is flexible enough to meet the demand for change, and strict enough to protect the live environment from change-related incidents.
A mature change management process will minimize review and approval activity. Counterintuitively, with experience in implementing changes, risk levels decline to a point where most changes are “preapproved.”
Impact and Result
Create a unified change management process that reduces risk and takes a balanced approach toward deploying changes, while also maintaining throughput of innovation and enhancements.
Categorize changes based on an industry-standard risk model with objective measures of impact and likelihood.
Establish and empower a change manager and change advisory board with the authority to manage, approve, and prioritize changes.
Establish easy-to-follow intake, assessment, and approval processes, and ensure that there is visibility into changes across the organization.
Business Continuity Strategy Benchmarking April 8th, 2009Mauro Giorgi
The scope of the document is to provide our customer with some high level benchmarking information and leading practice about Business Continuity Management.
•The report provides a comparison about the Business Continuity Strategy Stage and it has the purpose to provide a brief overview on current practices, to leverage past experiences in future engagements
Analyzing Your Organization’s Risk...
In order to develop a Business Continuity Plan a thorough understanding of your organizational needs and critical
processes is required - This process is known as a Business Impact Analysis:
This involves:-
Knowing your critical activities, the effect of those activities being disrupted and the priority for recovery
of those activities; and
Knowing what events could disrupt your critical activities and lead to a failure of your organisation.
Your Challenge
As the market evolves, capabilities that were once cutting edge become default and new functionality becomes differentiating.
Vendors use a lot of marketing jargon, buzzwords, and statistics to sell their solutions, making objective evaluation rather difficult.
The endpoint protection (EPP) market is overcrowded and fragmented, resulting in information overload and consequently, a difficult vendor assessment.
Disparate product solutions are being bundled into one-off solutions or suites, often resulting in less efficient solutions than the more niche players.
Imminent obsolescence is an issue. Previous EPP solutions have not adapted with the rapidly evolving threat landscape and are no longer relevant, resulting in breaches or vulnerabilities.
Critical Insight
Don’t let vendors and market reports define your endpoint protection needs. Identify the use cases and corresponding feature sets that best align with your risk profile before evaluating the vendor marketspace.
Your security controls are diminishing in value (if they haven’t already). Develop a strategy that accounts for the rapid evolution and imminent obsolescence of your endpoint controls. Plan for future needs when making purchasing decisions today.
Endpoint protection is a matter of defense in depth and risk modelling, there is no silver bullet protection and mitigation solution. As end-client-technology providers release regular product/software updates, security tools will become outdated. Multiyear endpoint protection commitments will leave you playing a constant game of catch up.
Impact and Result
The solution is a holistic internal security assessment that not only identifies, but satisfies, your desired endpoint protection feature set with the corresponding endpoint protection suite and a comprehensive implementation strategy.
Use this blueprint to walk through the steps of selecting and implementing an endpoint protection solution that best aligns with your organizational needs.
Your Challenge
Companies understand the importance of business process improvement (BPI) and recognize the touted benefits: cost savings, waste elimination, and process efficiency.
With this said, 70% of companies that embark on process improvement initiatives fail.
The high probability of failure is attributed to a number of factors, including lack of continuous improvement and failing to define measurable outcomes.
Our Advice
Adopt a forward-facing outlook. Don’t focus solely on the current state, set improvement targets upfront to drive the initiative.
Break problems down into root-cause variables. Don’t look at the symptom, dive deeper and alleviate the root cause.
Empower business analysts. Create a practical process improvement methodology that your analysts can follow.
Impact and Result
Kick off process improvement by identifying the goals and defining the improvement targets.
Start by referring to the operating model and identifying level 1, 2, and 3 processes. Once the team understands the relationship between processes, they can begin to map a level 3 process using a standard mapping notation.
Use qualitative and quantitative techniques for analyzing the root cause rather than the symptoms.
Ensure the design is aligned with the initial improvement targets. Focus on value-added activities.
Consistently monitor the process and assess the root-cause variables to gauge the success of the process improvements.
Over the past five years, companies of all sizes have been under increased pressure to improve IT efficiency and effectiveness.
IDC customer-based studies show that each year, the average midsize company experiences 15–18 business hours of network, system, or application downtime. Causes of downtime vary, but aging systems can have components or software that fail, while network connections and power grids can fail at any time because of external causes (e.g., weather, construction work, or natural disaster). Outages occurring during business hours result in revenue loss, as orders are dropped, customers move on, and employees cannot access critical applications. IDC research found that revenue losses per hour averaged $75,000. However, the adoption of best practices has allowed midsize companies to reduce downtime significantly in recent years. Solutions that improve system management, protect data assets from loss and unauthorized access, strengthen network security, and ensure availability directly reduce these losses at customer sites.
When assessing the possibility to in- or outsource often matrixes are used. The two axes of a matrix are however hardly sufficient to capture the complexity of a sourcing decision. More effective are so called sourcing decision trees. This presentations outlines one of them.
Risk management is an integral part of business management. This set of principles was developed by the industry for the industry. They have been drafted to make them so practical that they will resonate with any financial organization.
Your Challenge
Internal stakeholders usually have different – and often conflicting – needs and expectations that require careful facilitation and management.
Vendors have well-honed negotiating strategies. Without understanding your own position and leverage points, it’s difficult to withstand their persuasive – and sometimes pushy – tactics.
Software – and software licensing – is constantly changing, making it difficult to acquire and retain subject matter expertise.
Our Advice
Critical Insight
Conservatively, it’s possible to save 5% of the overall IT budget through comprehensive software contract review.
Focus on the terms and conditions, not just the price.
Learning to negotiate is crucial.
Impact and Result
Look at your contract holistically to find cost savings.
Guide communication between vendors and your organization for the duration of contract negotiations.
Redline the terms and conditions of your software contract.
Prioritize crucial terms and conditions to negotiate.
Your Challenge
Service desk managers with immature service desk processes struggle with:
Low business satisfaction.
High cost to resolve incidents and implement requests.
Confused and unhappy end users.
High ticket volumes and a lack of root-cause analysis to reduce recurring issues.
Wasted IT time and wages resolving the same issues time and again.
Ineffective demand planning.
Our Advice
Critical Insight
Don’t be fooled by a tool that’s new. A new service desk tool alone won’t solve the problem. Service desk maturity improvements depend on putting in place the right people and processes to support the technology.
Service desk improvement is an exercise in organizational change. Engage specialists across the IT organization in building the solution, and emphasize how everyone stands to benefit from the initiative.
Organizations are sometimes tempted to track their work under a single ticket type. Unfortunately, the practice obscures the fact that incidents, requests, and projects require radically different amounts of time and resources, and can create the impression that IT is underperforming. Distinguish between incidents, requests, and projects, and design specific processes to support and track the performance of each activity.
Remember, the value of any IT service management (ITSM) tool is a function of the processes it supports and the adoption of those processes. The ITSM tool with the best functionality is worth little if you do not build the right processes, configure the tool to support them, and work to improve tool adoption in your organization.
Impact and Result
Increase business satisfaction.
Reduce recurring issues and ticket volumes.
Reduce average incident resolution time and average request implementation time.
Increase efficiency and lower operating costs.
Enhance demand planning.
The Significance of IT Security Management & Risk AssessmentBradley Susser
The Significance of IT Security Management & Risk Assessment
An overview of IT Security Management, which is comprised of standards, policies, plans, and procedures as well as risk assessment and the various techniques and approaches to minimize an organization’s financial impact due to the exploitation of numerous organizational assets.
Enterprise Risk Management: Minimizing Exposure, Fostering Innovation and Acc...Cognizant
Formal policies and processes for enterprise risk management (ERM) are common among large corporations, such as those in finance and healthcare. However, most technology-focused companies consider ERM an obstacle to innovation. When properly implemented and maintained, an enterprise risk management program can lessen risk, accelerate strategic development, drive innovation and bolster bottom-line growth.
Your Challenge
Infrastructure managers and change managers need to re-evaluate their change management process due to slow change turnaround time, too many unauthorized changes, too many incidents and outages because of poorly managed changes, or difficulty evaluating and prioritizing changes.
IT system owners often resist change management because they see it as slow and bureaucratic.
Infrastructure changes are often seen as “different” from application changes, and two (or more) processes may exist.
Our Advice
Critical Insight
ITIL provides a usable framework for change management, but full process rigor is not appropriate for every change request.
You need to design a process that is flexible enough to meet the demand for change, and strict enough to protect the live environment from change-related incidents.
A mature change management process will minimize review and approval activity. Counterintuitively, with experience in implementing changes, risk levels decline to a point where most changes are “preapproved.”
Impact and Result
Create a unified change management process that reduces risk and takes a balanced approach toward deploying changes, while also maintaining throughput of innovation and enhancements.
Categorize changes based on an industry-standard risk model with objective measures of impact and likelihood.
Establish and empower a change manager and change advisory board with the authority to manage, approve, and prioritize changes.
Establish easy-to-follow intake, assessment, and approval processes, and ensure that there is visibility into changes across the organization.
Business Continuity Strategy Benchmarking April 8th, 2009Mauro Giorgi
The scope of the document is to provide our customer with some high level benchmarking information and leading practice about Business Continuity Management.
•The report provides a comparison about the Business Continuity Strategy Stage and it has the purpose to provide a brief overview on current practices, to leverage past experiences in future engagements
Analyzing Your Organization’s Risk...
In order to develop a Business Continuity Plan a thorough understanding of your organizational needs and critical
processes is required - This process is known as a Business Impact Analysis:
This involves:-
Knowing your critical activities, the effect of those activities being disrupted and the priority for recovery
of those activities; and
Knowing what events could disrupt your critical activities and lead to a failure of your organisation.
Your Challenge
As the market evolves, capabilities that were once cutting edge become default and new functionality becomes differentiating.
Vendors use a lot of marketing jargon, buzzwords, and statistics to sell their solutions, making objective evaluation rather difficult.
The endpoint protection (EPP) market is overcrowded and fragmented, resulting in information overload and consequently, a difficult vendor assessment.
Disparate product solutions are being bundled into one-off solutions or suites, often resulting in less efficient solutions than the more niche players.
Imminent obsolescence is an issue. Previous EPP solutions have not adapted with the rapidly evolving threat landscape and are no longer relevant, resulting in breaches or vulnerabilities.
Critical Insight
Don’t let vendors and market reports define your endpoint protection needs. Identify the use cases and corresponding feature sets that best align with your risk profile before evaluating the vendor marketspace.
Your security controls are diminishing in value (if they haven’t already). Develop a strategy that accounts for the rapid evolution and imminent obsolescence of your endpoint controls. Plan for future needs when making purchasing decisions today.
Endpoint protection is a matter of defense in depth and risk modelling, there is no silver bullet protection and mitigation solution. As end-client-technology providers release regular product/software updates, security tools will become outdated. Multiyear endpoint protection commitments will leave you playing a constant game of catch up.
Impact and Result
The solution is a holistic internal security assessment that not only identifies, but satisfies, your desired endpoint protection feature set with the corresponding endpoint protection suite and a comprehensive implementation strategy.
Use this blueprint to walk through the steps of selecting and implementing an endpoint protection solution that best aligns with your organizational needs.
Your Challenge
Companies understand the importance of business process improvement (BPI) and recognize the touted benefits: cost savings, waste elimination, and process efficiency.
With this said, 70% of companies that embark on process improvement initiatives fail.
The high probability of failure is attributed to a number of factors, including lack of continuous improvement and failing to define measurable outcomes.
Our Advice
Adopt a forward-facing outlook. Don’t focus solely on the current state, set improvement targets upfront to drive the initiative.
Break problems down into root-cause variables. Don’t look at the symptom, dive deeper and alleviate the root cause.
Empower business analysts. Create a practical process improvement methodology that your analysts can follow.
Impact and Result
Kick off process improvement by identifying the goals and defining the improvement targets.
Start by referring to the operating model and identifying level 1, 2, and 3 processes. Once the team understands the relationship between processes, they can begin to map a level 3 process using a standard mapping notation.
Use qualitative and quantitative techniques for analyzing the root cause rather than the symptoms.
Ensure the design is aligned with the initial improvement targets. Focus on value-added activities.
Consistently monitor the process and assess the root-cause variables to gauge the success of the process improvements.
Over the past five years, companies of all sizes have been under increased pressure to improve IT efficiency and effectiveness.
IDC customer-based studies show that each year, the average midsize company experiences 15–18 business hours of network, system, or application downtime. Causes of downtime vary, but aging systems can have components or software that fail, while network connections and power grids can fail at any time because of external causes (e.g., weather, construction work, or natural disaster). Outages occurring during business hours result in revenue loss, as orders are dropped, customers move on, and employees cannot access critical applications. IDC research found that revenue losses per hour averaged $75,000. However, the adoption of best practices has allowed midsize companies to reduce downtime significantly in recent years. Solutions that improve system management, protect data assets from loss and unauthorized access, strengthen network security, and ensure availability directly reduce these losses at customer sites.
When assessing the possibility to in- or outsource often matrixes are used. The two axes of a matrix are however hardly sufficient to capture the complexity of a sourcing decision. More effective are so called sourcing decision trees. This presentations outlines one of them.
Risk management is an integral part of business management. This set of principles was developed by the industry for the industry. They have been drafted to make them so practical that they will resonate with any financial organization.
Your Challenge
Internal stakeholders usually have different – and often conflicting – needs and expectations that require careful facilitation and management.
Vendors have well-honed negotiating strategies. Without understanding your own position and leverage points, it’s difficult to withstand their persuasive – and sometimes pushy – tactics.
Software – and software licensing – is constantly changing, making it difficult to acquire and retain subject matter expertise.
Our Advice
Critical Insight
Conservatively, it’s possible to save 5% of the overall IT budget through comprehensive software contract review.
Focus on the terms and conditions, not just the price.
Learning to negotiate is crucial.
Impact and Result
Look at your contract holistically to find cost savings.
Guide communication between vendors and your organization for the duration of contract negotiations.
Redline the terms and conditions of your software contract.
Prioritize crucial terms and conditions to negotiate.
Your Challenge
Service desk managers with immature service desk processes struggle with:
Low business satisfaction.
High cost to resolve incidents and implement requests.
Confused and unhappy end users.
High ticket volumes and a lack of root-cause analysis to reduce recurring issues.
Wasted IT time and wages resolving the same issues time and again.
Ineffective demand planning.
Our Advice
Critical Insight
Don’t be fooled by a tool that’s new. A new service desk tool alone won’t solve the problem. Service desk maturity improvements depend on putting in place the right people and processes to support the technology.
Service desk improvement is an exercise in organizational change. Engage specialists across the IT organization in building the solution, and emphasize how everyone stands to benefit from the initiative.
Organizations are sometimes tempted to track their work under a single ticket type. Unfortunately, the practice obscures the fact that incidents, requests, and projects require radically different amounts of time and resources, and can create the impression that IT is underperforming. Distinguish between incidents, requests, and projects, and design specific processes to support and track the performance of each activity.
Remember, the value of any IT service management (ITSM) tool is a function of the processes it supports and the adoption of those processes. The ITSM tool with the best functionality is worth little if you do not build the right processes, configure the tool to support them, and work to improve tool adoption in your organization.
Impact and Result
Increase business satisfaction.
Reduce recurring issues and ticket volumes.
Reduce average incident resolution time and average request implementation time.
Increase efficiency and lower operating costs.
Enhance demand planning.
The Significance of IT Security Management & Risk AssessmentBradley Susser
The Significance of IT Security Management & Risk Assessment
An overview of IT Security Management, which is comprised of standards, policies, plans, and procedures as well as risk assessment and the various techniques and approaches to minimize an organization’s financial impact due to the exploitation of numerous organizational assets.
Enterprise Risk Management: Minimizing Exposure, Fostering Innovation and Acc...Cognizant
Formal policies and processes for enterprise risk management (ERM) are common among large corporations, such as those in finance and healthcare. However, most technology-focused companies consider ERM an obstacle to innovation. When properly implemented and maintained, an enterprise risk management program can lessen risk, accelerate strategic development, drive innovation and bolster bottom-line growth.
When implementing change, there are significant risks that can cost millions in potential disruption. Learn how to assess the three risk categories and develop strategies to mitigate risk by downloading our whitepaper: Integrated Risk Analysis.
5 Steps to Effectively Handle Digital Transformation and Business Disruption:...SVRTechnologies
Digital technology continues to change the business world dramatically. This article provides business and IT leaders’ helpful tools to drive and manage digital transformation effectively.
For Corporate Boards, a Cyber Security Top 10David X Martin
Corporate boards of directors have a fiduciary duty to understand and oversee cyber security. For most effective oversight, boards should approach cyber security from a good management-practices perspective rather than a technical perspective.
ER(Entity Relationship) Diagram for online shopping - TAEHimani415946
https://bit.ly/3KACoyV
The ER diagram for the project is the foundation for the building of the database of the project. The properties, datatypes, and attributes are defined by the ER diagram.
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesSanjeev Rampal
Talk presented at Kubernetes Community Day, New York, May 2024.
Technical summary of Multi-Cluster Kubernetes Networking architectures with focus on 4 key topics.
1) Key patterns for Multi-cluster architectures
2) Architectural comparison of several OSS/ CNCF projects to address these patterns
3) Evolution trends for the APIs of these projects
4) Some design recommendations & guidelines for adopting/ deploying these solutions.
This 7-second Brain Wave Ritual Attracts Money To You.!nirahealhty
Discover the power of a simple 7-second brain wave ritual that can attract wealth and abundance into your life. By tapping into specific brain frequencies, this technique helps you manifest financial success effortlessly. Ready to transform your financial future? Try this powerful ritual and start attracting money today!
1.Wireless Communication System_Wireless communication is a broad term that i...JeyaPerumal1
Wireless communication involves the transmission of information over a distance without the help of wires, cables or any other forms of electrical conductors.
Wireless communication is a broad term that incorporates all procedures and forms of connecting and communicating between two or more devices using a wireless signal through wireless communication technologies and devices.
Features of Wireless Communication
The evolution of wireless technology has brought many advancements with its effective features.
The transmitted distance can be anywhere between a few meters (for example, a television's remote control) and thousands of kilometers (for example, radio communication).
Wireless communication can be used for cellular telephony, wireless access to the internet, wireless home networking, and so on.
guildmasters guide to ravnica Dungeons & Dragons 5...
Innovation connections quick guide managing ict risk for business pdf
1. Quick Guide: Managing ICT Risk for
Business
This Quick Guide is one of a series of information products aimed at helping small to medium sized
enterprises identify and manage risks when assessing, buying and implementing new IT products.
The Discipline of Risk Management
Risk management is an increasingly important element of corporate governance and is closely
associated with the pursuit of improved business performance, innovation and productivity. The
identification, analysis, acceptance and mitigation of risk is essential to the process of buying and
implementing new IT products.
By identifying potential risks in advance of undertaking a business activity or business decision,
management can determine the likelihood and potential impact of the risks identified, as well as
strategies to avert or minimise the threats that each risk poses.
Many companies may already have a standing Risk Committee, comprising employees, managers
and/or board members, as appropriate. Typically such a committee would be chaired by the operations
manager, a senior executive or a board member, and would regularly meet to review and assess a
company’s risk exposures and risk treatment activities.
General Risk Management Methodologies
Two useful methodologies for managing risks are the ‘Risk Register’ and the ‘Risk Matrix’. The Risk
Register is a list of all risks that have been identified, their significance (i.e. whether the risk is likely and
how severe its impact will be if it occurs) and whether there is a way of mitigating (reducing) the impact.
The headings in a typical Risk Register look something like this:
Risk
Number
Risk
Description
Likelihood
of
Occurring
(Lo/Med/Hi)
Impact if it
Occurs
(Lo/Med/Hi)
Agreed Risk
Mitigation
Treatment
Residual Risk
Rating
(Lo/Med/Hi)
Risk Owner
e.g. R01 Corruption of
customer
data
Med Hi Full back up of
customer
records,
always
reconcile
before new
system go-
live.
Lo Sales
Manager to
sign off
before going
live.
Often a company will maintain a general risk register for all of its activities and periodically report to senior
managers and board members on the status of these risks. If a company is undertaking a new initiative or
project, it will typically create a risk register specifically focused on this new initiative.
The important discipline with the risk register is that there is a designated person who is responsible for
maintaining it and that there is a regular risk review process during which all active risks are reviewed, to
ensure that all risks are being monitored and treated.
2. The Risk Matrix is a visual tool that is very useful for highlighting the key risks confronting any project
or business. There are a variety of sophisticated visual presentations, but all employ the same basic
concepts. For a small and medium business, the following type of presentation will often be sufficient:
Risk Matrix – Residual Risks Following Risk Treatment
High R06 * R12
Business
Impact if
Risk Occurs
Medium R02, R09 R10, R11
Low
R01, R04, R13,
R14, R15, R16,
R17, R18, R19,
R120, R21, R22,
R23
R03, R05, R07 R08
Low Medium High
Likelihood of Risk Occurring
Legend:
Low Risk
Medium Risk
High Risk
* The codes R01, R02 etc. above refer to risk numbers in the relevant Risk Register
When using risk management methodologies as illustrated above, it is important to ensure the status of
risks is regularly monitored by management and that all risks in the Medium to High (orange to red
coloured) categories are managed intensively to minimise the business risk they pose if risk mitigation
action is not taken.
For a more in depth explanation of the broader discipline of risk management, refer to the Australian
Standard AS/NZS ISO 31000:2009 Risk Management – Principles and Guidelines.
ICT Risks
ICT risks are an increasingly important part of corporate risk management, because they include such
threats as business interruption, disaster recovery, business and information security, data back-up and
protection, software licence compliance, ICT outsourcing and cloud services, and employee and
contractor internet and social media use. However, one of the most important and far-reaching areas
of ICT risk relates to how new or improved IT products are evaluated, purchased and implemented
within a business. This is because new or changed IT systems can have game-changing impacts on a
business, potentially affecting many areas.
If well thought through, these changes can be extremely positive, creating major business
improvements. But careful planning and project management are required, otherwise a new IT system
can have major, negative impacts; extending well beyond employees, to customers and suppliers and,
ultimately, the viability of the business itself.
3. The Major Types of IT Risk for Business
In recent years, a variety of industry surveys of IT risk for business have been conducted across
many firms in many industries in a large number of countries. From these types of survey, it is
possible to identify four Common themes of IT risks for businesses:
1. Risks caused by falling behind
Firms failing to leverage readily available technology to improve business performance, access to
markets and competitive position, with the result that they lose ground against competitors and new
market entrants.
2. Risks caused by buying without sufficient care:
Firms making IT choices that do not fit with their other IT systems (or those of key customers or
suppliers), that do not produce the benefits expected and take much longer to implement, or which
create unexpected new costs.
3. Risks caused by failing to establish and maintain organisational commitment:
Firms failing to ensure adequate preparatory training and buy-in by staff, not ensuring strong project
alignment and commitment from senior management, and failing to ensure project timelines and new
system cut-overs occur as planned. All of which can lead to projects failing to realise anticipated
benefits and where legacy systems often continue to run in parallel.
4. Risks caused by missing the opportunity to innovate:
Firms not being sufficiently strategic in their IT choices. This is perhaps the greatest risk and can be a
consequence of any of the three foregoing risks. Because the opportunity costs of failing to maximise
the potential transformative effects of new IT products and solutions can stifle innovation and best-in-
class performance.
All businesses need to be constantly alert to the potential transformative effects of IT and to adopt
systematic processes for evaluating, selecting, buying and implementing IT in just the same way that
they would approach any other major, long-term business decision.
Identifying and Managing Risks during the IT
Product/Service Assessment Stage
You should start by asking the following four questions:
1. Do we have a clear idea of our requirements?
2. How have others solved this requirement and what problems have they encountered?
3. Has our initial market research identified solutions with the potential to meet our requirements?
4. Do we have enough information to compare the costs and benefits of potential solutions?
One of the best start-points in establishing a sound risk management approach towards IT projects is to
review the problem that you are trying to solve or the requirements that you have identified.
Often you will need to visit trade shows, conduct internet searches of available solutions and make
enquiries of vendors and other businesses with which you interact or of industry associations of which
you are a member.
4. The objective is to gain as much understanding of what is available in the market- place and how closely
these offerings match your particular requirements.
For some businesses, these initial enquiries may be undertaken by one of the owners themselves, in the
first instance, or this may be a project that can be allocated to a suitable member of the management
team.
Either way, it is important, that this early process also involves consultation within the business –
especially those whose work area will potentially be affected. Obtaining input to requirements and
ensuring the regular review of preliminary findings is a key element in ensuring alignment and buy-in, as
well as ensuring that important considerations are not overlooked.
Depending on the size of the business and the extent of the ICT solution under evaluation, a project
team may need to be constituted and specialised external expertise may need to be bought in to
augment the process.
Once this early ‘scoping’ phase of your potential IT purchase is complete it is important, as part of the
process of establishing the ‘business case’, to analyse the findings and the risks that have been
identified.
Tips:
Try listing out potential risks under the following headings:
Requirement Risks: e.g. are the requirements documented and agreed by internal stakeholders?
Technology Risks: e.g. have the options available and relevant IT trends been adequately
researched/validated?
Project Management Risks: e.g. is there sufficient capacity to finance and manage the kind of changes
envisaged?
Project Scheduling Risks: e.g. are there any internal or external factors that impact on when the IT
solution can be implemented, and will the changes need to occur in stages?
Project Governance Risks: e.g. Are there clear arrangements in place governing accountability for
consultation, sign offs and decision-making?
Identifying and Managing Risks during the
Procurement Phase
Once a business has taken a decision to proceed beyond evaluating possible solutions, the serious
commitments (and potential risks) commence. It is therefore important to have a clear idea about how
ICT procurement works and how to minimise the commercial and business risks involved.
ICT procurement typically involves four components:
Hardware (such as a computer server or other equipment);
Software (such as a new customer relationship management system or accounting system);
Implementation services (such as the setting to work of the new hardware, the setting up of the new
software, migration of existing data to the new system and staff training); and
Ongoing support.
5. Some ICT procurements will involve only one of these categories, but for most ICT procurements all
four elements need to be considered collectively. A common procurement risk occurs when a business
attempts to purchase these components separately and inadvertently become responsible for
system integration.
Larger businesses will have one or more existing ICT personnel, who can advise on some aspects
of procurement, but they will also be busy managing existing IT activities and may not have the time
or expertise to manage a significant ICT procurement process.
An important first step is therefore determining whether a business has the in-house capacity to
manage ICT procurement, or whether specialist assistance will be required. If specialist assistance is
required, the business should consult with their other advisors (such as their accountants and/or
lawyers) as well as their industry association, before making a decision on who to engage.
If using an external advisor, ask for references from other clients who had similar needs and make
sure you check with those clients about their experience, before making an appointment. In terms of the
risks and risk mitigation strategies that a business should consider when commencing the procurement
phase, the following issues are very common potential problems that can be averted if care is taken at
the outset.
It is important to avoid committing to a single vendor until all of these questions can be answered:
General Procurement Risks
E.g. how will you decide on a vendor – will you seek quotations? Will you provide vendors with a briefing
and an information package? Do you have a draft contract? Have you considered how you will
structure payments to ensure that you have control over the vendor’s performance? Will you use
your legal or accounting firm to assist with managing elements of the procurement process? What
process will you follow to determine a preferred vendor?
Vendor-related Risks
E.g. Before selecting a preferred vendor, have you checked whether the short-listed vendors have a
reputation for successfully meeting requirements similar to yours? Have you spoken with (and even
visited) some of the short-listed vendors’ reference sites? Do the vendors have the capacity to be on
site and/or respond to calls for assistance when you need them at your location(s)?
Are you sure that you understand the structure of each short-listed vendor’s pricing and ongoing
support terms. (For example, some vendors will require you to pay an annual software licence fee and if
you fail to do so, the software will be deactivated and some cloud service providers may not allow you
to transfer your data if you change vendors.)
Do each of the short-listed vendors have a detailed implementation schedule and have you walked
through it with them to make sure that you agree with their approach and that you can meet any
obligations that you have to provide resources, etc.?
Have you ensured that the key internal stakeholders have had an opportunity to understand and
agree to the preferred vendor’s proposal and to meet the vendor and visit or speak to reference
sites, if appropriate?
Have you conducted a web search on the short-listed vendors to determine if there are any customer
complaints posted on discussion boards and so forth?
6. System Compatibility Risks
This is a potentially major risk that often only emerges after the procurement decision has been taken.
A very good way to avoid this is to have the preferred vendor conduct a small on-site trial to
demonstrate how the new system will interface with other business systems.
E.g. will the new system interface neatly with all your existing business systems or will there be a need
to upgrade or modify those systems so that they can ‘talk’ to the new system.
Use this process to identify whether any changes need to be made to network configuration (such as to
support more users or to handle multi-site connections), or to adjust on or off-site data storage, back-up
or disaster recovery arrangements.
Also use this opportunity to assess the adequacy of business change management plans, such as
training needed for users of the new system, opportunities to streamline business processes and retire
legacy systems.
This is also a good way to ensure that the vendor fully understands the requirements of the project. It is
important that such a trial is undertaken before any final purchase commitment is given. This will
generally ensure that the vendor undertakes the pilot at no charge or for a nominal fee and it provides
the business with a valuable opportunity for a pre-purchase reality check.
During the past two or three years an increasing range of so-called cloud services has become
available. These services are particularly suited to many businesses needs since they essentially
outsource many of the traditional hardware and software procurement and maintenance activities to
a specialist vendor. For example, many businesses no longer have in-house accounting systems,
customer management systems, email systems, switchboards, call centres, secretarial services, and
so forth. In the age of the internet, these are all services that can be purchased on a subscription basis
and accessed from any location.
In considering IT procurement options, it is becoming increasingly important to also consider whether
a cloud service offers a viable alternative to an outright purchase.
Identifying and Managing Risks during the
Implementation Phase
If a business conducts its evaluation and procurement phases well, the system implementation phase
will be relatively straight-forward. Conversely, deficiencies in evaluation and procurement will surface
during implementation and when this does occur, the results can be very painful for all involved.
A successful implementation is based on thorough planning, so it is important to ensure that the staff
and the vendor have a well-prepared plan at the commencement of the implementation phase.
This ‘Implementation Plan’ is often one of the first deliverables for a vendor and can be used as a
trigger for their first milestone payment. Important implementation challenges that should be
addressed in the implementation plan include:
Determining the system testing and acceptance regime -
E.g. how will the vendor demonstrate that the system is correctly performing to requirements, before it
goes live?
7. Depending on the scale of the ICT project, this may entail the initial establishment of a test bed or
test environment (on site or at the vendor’s premises), so that the new system can be configured
and tested without disruption to business as usual activities.
Determining how much configuration of the new system should be undertaken -
E.g. If an business is upgrading its accounting system, will it bring across its existing chart of accounts,
or adopt a new account structure that is designed to make better use of the new system’s in-built
reporting functionality?
Planning how (and when) data from existing systems will be migrated to the new system -
E.g. Will all of a firm’s customer and vendor data be transferred into the new system, or only customers
and vendors from, say, the past two years? If only some data is to be transferred, how will the other data
be accessed if required?
Tips:
An ICT system Implementation Plan should determine:
The system testing and acceptance regime
How much configuration of the new system should be undertaken
Planning how and when data from existing systems will be migrated to the new system
System security requirements
Training requirements for affected staff
Board and senior management issues
Go-live and Cut-over arrangements
Transitioning to ‘Business as Usual’ and Benefits Realisation
System Security requirements -
E.g. Ensuring that any new hardware required is installed (either on site or in a hosted environment)
and that associated network and data security operates as required.
Training for Affected Personnel -
E.g. How much training is required, can it be accommodated ‘on the job’ or will staff need to be released
for training sessions? How will business disruption be minimised? Are staff prepared to undertake
additional hours of work/training to minimise disruption?
Board and Senior Management Issues -
E.g. Are the board and senior management involved in monitoring the project and committed to its
implementation? Will there be any impact on the reporting and control processes that they are used to,
are they aware of these changes?
Go-live and Cut-over Arrangements -
E.g. Determining how the business will cut-over to the new system – will it be over a weekend (with
sufficient time to roll-back to the old system if there is a problem)? Will there be a staged go-live
process, possibly starting at only one site initially and then expanding once the system is known to be
8. working? Will certain key customers or vendors be advised in advance so that any important
processing can be completed before the cut-over commences. Will vendor personnel be required on-
site during cut-over to help with any trouble-shooting?
Transitioning to ‘Business as Usual’ and Benefits Realisation -
E.g. what is the warranty period for rectification of bugs and deficiencies? How much of the contract
value is held back pending final acceptance? Has all training and documentation been delivered? What
on-going support arrangements are in place?
Often a major ICT investment is partly based on the realisation of savings, such as reduced running
costs of legacy systems, productivity improvements or reduced inventories. It is important to press for
the realisation of these benefits and to measure the relevant aspects of business performance before
and after.
Risk Management is designed to enable Businesses to
Grow, Innovate and Pursue Opportunities
ICT is now one of the major drivers of global productivity and innovation.
Businesses need to invest in IT and leverage its game-changing potential. This is particularly the
case for small and medium sized businesses, which make up well over 90% of all Australian
businesses.
Successful businesses have systems and management approaches that are designed to do a better job
of managing risk than their competitors. The purpose of this guide to managing risks when buying or
implementing new IT systems is to help businesses better understand IT risks, so that they can better
manage them.